JPH0833005B2 - Construction method of soil pile row mountain retaining wall - Google Patents

Construction method of soil pile row mountain retaining wall

Info

Publication number
JPH0833005B2
JPH0833005B2 JP10355289A JP10355289A JPH0833005B2 JP H0833005 B2 JPH0833005 B2 JP H0833005B2 JP 10355289 A JP10355289 A JP 10355289A JP 10355289 A JP10355289 A JP 10355289A JP H0833005 B2 JPH0833005 B2 JP H0833005B2
Authority
JP
Japan
Prior art keywords
pile
length
reinforcing material
retaining wall
short
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP10355289A
Other languages
Japanese (ja)
Other versions
JPH02282511A (en
Inventor
修己 中野
秀雄 稲垣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toda Corp
Original Assignee
Toda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toda Corp filed Critical Toda Corp
Priority to JP10355289A priority Critical patent/JPH0833005B2/en
Publication of JPH02282511A publication Critical patent/JPH02282511A/en
Publication of JPH0833005B2 publication Critical patent/JPH0833005B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は、ソイルパイル列山留壁の構築工法に関する
ものである。
TECHNICAL FIELD The present invention relates to a method for constructing a pile pile mountain retaining wall.

(従来の技術) 地下構造物を構築する場合、ソイルパイル列で山留壁
を構築することがある。ソイルパイル列山留壁は、多軸
削孔専用機にて連続削孔し、原土とセメントミルクを混
合撹拌してソイルパイルを形成した後、細幅H鋼等の補
強材を吊り下して沈埋することにより構成している。こ
の補強材は、地下躯体外面と接しており、高い位置決め
精度が要求されるため、上部をガイド定規に固定する必
要があり、地盤面と上端を揃えた補強材が使用されてき
た。
(Prior art) When constructing an underground structure, a mountain retaining wall may be constructed with a pile pile row. The pile pile row mountain retaining wall is continuously drilled by a dedicated multi-axis drilling machine, and after mixing and stirring the original soil and cement milk to form a soil pile, a reinforcement material such as narrow width H steel is hung to be buried. It is configured by doing. Since this reinforcing material is in contact with the outer surface of the underground structure and requires high positioning accuracy, it is necessary to fix the upper part to the guide ruler, and a reinforcing material in which the ground surface and the upper end are aligned has been used.

このようなソイルパイル列山留壁1に作用する側圧は
第5図に示すように上部に行くに従って小さくなり、ま
た曲げモーメントも第6図に示すように上部に行くに従
って小さくなっている。
The lateral pressure acting on the pile pile mountain retaining wall 1 becomes smaller as it goes to the upper part as shown in FIG. 5, and the bending moment becomes smaller as it goes to the upper part as shown in FIG.

(発明が解決しようとする課題) 上記のようにソイルパイル列山留壁1は、上部の方で
は受ける側圧や曲げモーメントが小さいにも拘らず、位
置決め精度向上等の関係で、同じ強度をもつように構築
せざるを得なかったので、コスト高になる問題点があっ
た。
(Problems to be Solved by the Invention) As described above, the soil pile row mountain retaining wall 1 has the same strength due to the improvement of the positioning accuracy and the like, although the lateral pressure and bending moment received in the upper portion are small. Since there was no choice but to build it, there was a problem that the cost increased.

本発明の目的は、経済的にソイルパイル列山留壁を構
築できるソイルパイル列山留壁の構築工法を提供するこ
とにある。
An object of the present invention is to provide a method for constructing a pile pile mountain retaining wall that can economically construct a soil pile mountain retaining wall.

(課題を解決するための手段) 上記の目的を達成するための本発明の手段を説明する
と、本発明はソイルパイル列の各ソイルパイルの中に補
強材をそれぞれ沈埋してソイルパイル列山留壁を構築す
るソイルパイル列山留壁の構築工法において、前記各ソ
イルパイルの中には何本かおきに該ソイルパイルの長さ
に相当する長さをもつ長尺補強材吊り下して沈埋し、該
長尺補強材を沈埋してなる前記ソイルパイルの中には前
記長尺補強材より長さの短り短尺補強材をその上端に長
さ補正具を継ぎ足して該長さ補正具側で吊って下すこと
により沈埋し、前記短尺補強材の下端が所定深さの箇所
に到達した段階で前記長さ補正具を前記短尺補強材から
外して引き上げることを特徴とする。
(Means for Solving the Problems) To explain the means of the present invention for achieving the above object, the present invention constructs a pile pile row mountain retaining wall by burying a reinforcing material in each of the soil piles of the pile pile row. In the method for constructing a pile pile mountain retaining wall, a long reinforcing material having a length corresponding to the length of the soil pile is suspended in each of the pile piles and buried in the soil pile. In the soil pile formed by burying the material, the length is shorter than that of the long reinforcing material, and the short reinforcing material is added to the upper end of the soil reinforcing material and the length compensating material is hung to hang it down. Then, when the lower end of the short reinforcing material reaches a portion having a predetermined depth, the length correction tool is removed from the short reinforcing material and pulled up.

(作用) このようにソイルパイル列中の各ソイルパイルの中に
長尺補強材又は短尺補強材を選択的に沈埋すると、全て
に長尺補強材を沈埋する場合に比べてコストを低減でき
る。また、短尺補強材はその上に長さ補正具を継ぎ足し
て沈埋を行うので、位置決め精度も長尺補強材と同程度
にすることができる。長さ補正具は、短尺補強材の沈埋
後に、該短尺補強材から外して引き上げるので、何度で
も再使用できる。
(Operation) By selectively burying the long reinforcing material or the short reinforcing material in each soil pile in the soil pile row in this manner, the cost can be reduced as compared with the case where the long reinforcing material is buried in all the pile piles. Further, since the short length reinforcing material is additionally buried with the length correction tool on the short length reinforcing material, the positioning accuracy can be made approximately the same as that of the long length reinforcing material. Since the length correction tool is removed from the short reinforcing material and pulled up after the short reinforcing material is buried, it can be reused any number of times.

(実施例) 以下、本発明の実施例を第1図(A)(B)乃至第4
図(A)〜(D)を参照して詳細に説明する。
(Example) Hereinafter, an example of the present invention will be described with reference to FIGS.
This will be described in detail with reference to FIGS.

本実施例では、多軸削孔専用機にて連続削孔し、原土
とセメントミルクを混合撹拌して第1図(A)(B)に
示すようなソイルパイル2の列を構築する。これらソイ
ルパイル2の中には何本かおきに該ソイルパイル2の長
さに相当する長さをもつH鋼等よりなる長尺補強材3を
吊り下して沈埋する。該長尺補強材3を沈埋してないソ
イルパイル2には、該長尺補強材3より長さの短い短尺
補強材4をその上端に後述する長さ補正具を継ぎ足して
該長さ補正具側で吊って下すことにより第1図(A)に
示すように沈埋する。短尺補強材4の下端がソイルパイ
ル2の底部に着底した段階で長さ補正具を短尺補強材4
から外して引き上げ、第1図(A)(B)に示すような
ソイルパイル列山留壁1を得る。
In this embodiment, continuous drilling is carried out by a dedicated machine for multi-axis drilling, and raw soil and cement milk are mixed and stirred to construct a row of soil piles 2 as shown in FIGS. 1 (A) and (B). In each of these soil piles 2, a long reinforcing material 3 made of H steel or the like having a length corresponding to the length of the soil pile 2 is suspended and buried. In the soil pile 2 in which the long reinforcing material 3 is not buried, a short reinforcing material 4 having a shorter length than the long reinforcing material 3 is added to the upper end of a length correcting tool which will be described later, and the length correcting tool side It is suspended as shown in FIG. When the lower end of the short reinforcing member 4 has bottomed on the bottom of the soil pile 2, the length correction tool is attached to the short reinforcing member 4.
Then, the pile pile row pile retaining wall 1 as shown in FIGS. 1 (A) and (B) is obtained.

第2図及び第3図は、長さ補正具5の例を示したもの
である。該長さ補正具5は、不足分の長さをもつH鋼6
を主体とし、該H鋼6の両ウエブ面にずれ止めプレート
7がその基部を溶接固定しその先端を下方に突出させて
それぞれ設けられ、且つH鋼6の両フランジ面には仮止
め用長尺ボルト8が軸受9で回転及び下向自在に支持さ
れ、H鋼6の上端には吊り孔10が設けられた構造になっ
ている。これに伴い、H鋼よりなる短尺補強材4は、長
尺ボルト8に対応してフランジ面の上部にナット11が固
定されている。
2 and 3 show an example of the length correction tool 5. The length correction tool 5 is made of H steel 6 having a short length.
Of the H steel 6 are provided with slip prevention plates 7 by welding and fixing their bases and projecting their tips downward. The scale bolt 8 is rotatably and downwardly supported by a bearing 9, and a suspension hole 10 is provided at the upper end of the H steel 6. Along with this, in the short reinforcing member 4 made of H steel, the nut 11 is fixed to the upper portion of the flange surface corresponding to the long bolt 8.

このため第2図に示すように、H鋼よりなる短尺補強
材4の上端に長さ補正具5のH鋼6を重ね、該H鋼6の
下端の両ウエブ面に設けられているずれ止めプレート7
で短R補強材4の両ウエブ面を挟んで位置決め整列させ
た状態で、長尺ボルト8を回すと該長尺ボルト8の先端
が短尺補強材4のナット11に螺合されて、短尺補強材4
に対して長さ補正具5を連結することができる。
Therefore, as shown in FIG. 2, the H steel 6 of the length correction tool 5 is overlapped on the upper end of the short reinforcing member 4 made of H steel, and the shift stoppers provided on both web surfaces at the lower end of the H steel 6 are prevented. Plate 7
When the long bolt 8 is turned in a state where it is positioned and aligned by sandwiching both web surfaces of the short R reinforcement 4, the tip of the long bolt 8 is screwed into the nut 11 of the short reinforcement 4, and the short reinforcement is performed. Material 4
The length corrector 5 can be connected to the.

次に、第4図(A)〜(D)を参照して、上記の如き
長さ補正具5を用いた短尺補強材4の沈埋の仕方につい
て説明する。
Next, with reference to FIGS. 4A to 4D, a method of burying the short reinforcing member 4 using the length correcting tool 5 as described above will be described.

まず、第2図に示すように、上部にナット11を設けた
短尺補強材4を、第4図(A)に示すようにソイルパイ
ル2の中に吊り下して、該ソイルパイル2の上部のガイ
ド定規12に支持ピン13で仮固定する。
First, as shown in FIG. 2, a short reinforcing member 4 provided with a nut 11 on the upper portion is suspended in the soil pile 2 as shown in FIG. 4 (A), and a guide on the upper portion of the soil pile 2 is suspended. Temporarily fix it to the ruler 12 with the support pin 13.

この状態で、第4図(B)に示すように、該短尺補強
材4の上部に長さ補正具5をワイヤー14で吊り下して第
2図に示すように重ね、且つ両ずれ止めプレート7で短
尺補強材4の両ウエブ面を挟み、該長さ補正具5の長尺
ボルト8を回して該長尺ボルト8を短尺補強材4に連結
する。
In this state, as shown in FIG. 4 (B), the length correction tool 5 is hung on the upper portion of the short length reinforcing member 4 with the wire 14 and is overlapped as shown in FIG. Both web surfaces of the short reinforcing member 4 are sandwiched with 7, and the long bolt 8 of the length correcting tool 5 is turned to connect the long bolt 8 to the short reinforcing member 4.

しかる後、支持ピン13を抜き、短尺補強材4とこれに
連結された長さ補正具5とを第4図(D)に示すように
クレーンで吊り下すことによりソイルパイル2中に沈埋
する。このとき、短尺補強材4と長さ補正具5とは、ガ
イド定規12でガイドされつつ沈埋されるので、高い精度
で沈埋を行うことができる。
After that, the support pin 13 is removed, and the short reinforcing material 4 and the length correction tool 5 connected to the short reinforcing material 4 are suspended by a crane as shown in FIG. 4 (D) to be buried in the soil pile 2. At this time, since the short reinforcing member 4 and the length correction tool 5 are buried while being guided by the guide ruler 12, it is possible to carry out the burial with high accuracy.

短尺補強材4の下端が第4図(C)に示すように所定
深さのソイルパイル2の形成孔における底部に着底した
段階で、長さ補正具5の長尺ボルト8を逆回しして、該
長尺ボルト8を短尺補強材4のナット11から外し、短尺
補強材4に対する長さ補正具5の連結を解除し、第4図
(D)に示すように該長さ補正具5をワイヤー14で吊り
上げてソイルパイル2から抜き取る。かくして、短尺補
強材4の沈埋作業が終わる。
At the stage where the lower end of the short length reinforcing material 4 reaches the bottom of the formation hole of the soil pile 2 having a predetermined depth as shown in FIG. 4 (C), the long length bolt 8 of the length corrector 5 is turned backward. , The long bolt 8 is removed from the nut 11 of the short reinforcing material 4, the length correcting tool 5 is disconnected from the short reinforcing material 4, and the length correcting tool 5 is removed as shown in FIG. 4 (D). Lift the wire 14 and pull it out of the soil pile 2. Thus, the work of burying the short reinforcing member 4 is completed.

上記のような短尺補強材4は、ソイルパイル2の長さ
が10m以上の場合には、その長さを10〜30%減少させる
ことができる。
The short reinforcing material 4 as described above can reduce the length of the soil pile 2 by 10 to 30% when the length of the soil pile 2 is 10 m or more.

上記実施例では、長さ補正具5としてH鋼6を用いた
例について説明したが、該長さ補正具5として鉄筋を使
用し、該鉄筋を短尺補強材4に仮付けし、該鉄筋を短尺
補強材4と共に沈埋してそのまま残してしまうこともで
きる。
In the above-described embodiment, the example in which the H steel 6 is used as the length correction tool 5 has been described, but a reinforcing bar is used as the length correction tool 5, and the reinforcing bar is temporarily attached to the short length reinforcing member 4, and the reinforcing bar is It is also possible to bury it together with the short reinforcing material 4 and leave it as it is.

短尺補強材4に対する長さ補正具5の連結は、フック
等を用いて行うこともできる。
The length correction tool 5 can be connected to the short reinforcing member 4 by using a hook or the like.

(発明の効果) 以上説明したように本発明では、ソイルパイル列中の
各ソイルパイルの中に長尺補強材又は短尺補強材を選択
的に沈埋するので、全てに長尺補強材を沈埋する場合に
比べて、省資源化が図れ、コストダウンを図ることがで
きる。また、短尺補強材は、その上部に長さ補正具を継
ぎ足して沈埋を行うので、位置決め精度も長尺補強材と
同程度にすることができる。
(Effect of the invention) As described above, in the present invention, the long reinforcing material or the short reinforcing material is selectively embedded in each soil pile in the soil pile row. In comparison, resource saving and cost reduction can be achieved. Moreover, since the short length reinforcing member is additionally buried with the length correction tool on the upper portion, the positioning accuracy can be made approximately the same as that of the long length reinforcing member.

【図面の簡単な説明】[Brief description of drawings]

第1図(A)(B)は本発明の方法で構築されたソイル
パイル列山留壁の一例を示す縦断面図及び平面図、第2
図は本実施例で用いる短尺補強材と長さ補正具との連結
部の一例を示す斜視図、第3図は本実施例で用いている
長さ補正具の一例を示す正面図、第4図(A)〜(D)
は本実施例における長さ補正具を用いた短尺補強材の沈
埋工程を示す工程図、第5図はソイルパイル列山留壁に
対する側圧の分布図、第6図はソイルパイル列山留壁に
対する曲げモーメントの分布図である。 1……ソイルパイル列山留壁、2……ソイルパイル、3
……長尺補強材、4……短尺補強材、5……長さ補正
具、6……H鋼、7……ずれ止めプレート、8……仮止
め用長尺ボルト、9……軸受、10……吊り孔、11……ナ
ット、12……ガイド定規、13……支持ピン、14……ワイ
ヤー。
1 (A) and (B) are a longitudinal sectional view and a plan view showing an example of a pile pile mountain retaining wall constructed by the method of the present invention.
FIG. 3 is a perspective view showing an example of a connecting portion between the short reinforcing member and the length correction tool used in this embodiment, and FIG. 3 is a front view showing an example of the length correction tool used in this embodiment. Figures (A)-(D)
Is a process drawing showing the step of burying the short length reinforcing material using the length corrector in this embodiment, FIG. 5 is a lateral pressure distribution map for the soil pile mountain retaining wall, and FIG. 6 is a bending moment for the soil pile mountain retaining wall. FIG. 1 …… Soil pile row mountain retaining wall, 2 …… Soil pile, 3
…… Long reinforcing material, 4 …… Short reinforcing material, 5 …… Length compensator, 6 …… H steel, 7 …… Separation prevention plate, 8 …… Long bolt for temporary fixing, 9 …… Bearing, 10 …… hanging hole, 11 …… nut, 12 …… guide ruler, 13 …… support pin, 14 …… wire.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】ソイルパイル列の各ソイルパイルの中に補
強材をそれぞれ沈埋してソイルパイル列山留壁を構築す
るソイルパイル列山留壁の構築工法において、前記各ソ
イルパイルの中には何本かおきに該ソイルパイルの長さ
に相当する長さをもつ長尺補強材を吊り下して沈埋し、
該長尺補強材を沈埋してなる前記ソイルパイルの中には
前記長尺補強材より長さの短い短尺補強材をその上端に
長さ補正具を継ぎ足して該長さ補正具側で吊って下すこ
とにより沈埋し、前記短尺補強材の下端が所定深さの箇
所に到達した段階で前記長さ補正具を前記短尺補強材か
ら外して引き上げることを特徴とするソイルパイル列山
留壁の構築工法。
1. A method for constructing a pile pile mountain retaining wall by burying a reinforcing material in each soil pile of a pile pile row, wherein a pile pile mountain retaining wall construction method is used. A long reinforcing material having a length corresponding to the length of the soil pile is suspended and submerged,
In the soil pile formed by burying the long reinforcing material, a short reinforcing material having a shorter length than the long reinforcing material is added to the upper end of a length correcting tool and hung down on the length correcting tool side. The method for constructing a pile pile mountain retaining wall is characterized in that the length correcting tool is removed from the short reinforcing material and pulled up when the lower end of the short reinforcing material reaches a position of a predetermined depth.
JP10355289A 1989-04-25 1989-04-25 Construction method of soil pile row mountain retaining wall Expired - Fee Related JPH0833005B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10355289A JPH0833005B2 (en) 1989-04-25 1989-04-25 Construction method of soil pile row mountain retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10355289A JPH0833005B2 (en) 1989-04-25 1989-04-25 Construction method of soil pile row mountain retaining wall

Publications (2)

Publication Number Publication Date
JPH02282511A JPH02282511A (en) 1990-11-20
JPH0833005B2 true JPH0833005B2 (en) 1996-03-29

Family

ID=14356988

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10355289A Expired - Fee Related JPH0833005B2 (en) 1989-04-25 1989-04-25 Construction method of soil pile row mountain retaining wall

Country Status (1)

Country Link
JP (1) JPH0833005B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005133310A (en) * 2003-10-28 2005-05-26 Marutoku Kigyo:Kk Core material erecting method in diaphragm wall construction method

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11350469A (en) * 1998-06-03 1999-12-21 Nishimatsu Constr Co Ltd Inserting method and inserting device for water stop sheet
JP2002138465A (en) * 2000-11-01 2002-05-14 Seiko Kogyo Kk Steel pipe column earth retaining wall construction method
JP2003184075A (en) * 2001-12-18 2003-07-03 Tokyu Constr Co Ltd Soil cement column strip earth retaining wall and its construction method
JP4806370B2 (en) * 2007-04-06 2011-11-02 飛島建設株式会社 Vertical shaft construction method
JP4806375B2 (en) * 2007-05-11 2011-11-02 飛島建設株式会社 Vertical wall construction method
JP4833190B2 (en) * 2007-12-11 2011-12-07 株式会社淺沼組 Labor saving method of core material in soil cement column wall
JP6444595B2 (en) * 2013-12-25 2018-12-26 株式会社竹中工務店 Retaining wall and retaining wall construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005133310A (en) * 2003-10-28 2005-05-26 Marutoku Kigyo:Kk Core material erecting method in diaphragm wall construction method

Also Published As

Publication number Publication date
JPH02282511A (en) 1990-11-20

Similar Documents

Publication Publication Date Title
US4107889A (en) Foundation system
JPH0833005B2 (en) Construction method of soil pile row mountain retaining wall
KR20210033815A (en) Method for strengthening the foundation of a structure with improved construction precision and reinforced structural strength
KR20010007930A (en) The connectors for steel pile head embedded in concrete footing and thereof structure
US6641333B2 (en) Method of forming enlarged pile heads
JP4947459B2 (en) Pile core construction method
KR100802164B1 (en) Structure for reinforcing steel pile head of footing foundation structure
JPH0194109A (en) Wall pile and its setting work
JPH0721196B2 (en) Reverse construction method of underground structure
JP6715131B2 (en) Soil retaining work, supporting work removal method, and supporting work parts
KR20190142677A (en) Top down construction method using girdir support structure
JP3293796B2 (en) Pile driver
JPH0593423A (en) Guide wall constructing pc slab and construction method of guide wall
CN220505045U (en) Colliery well reinforcing apparatus
CN215165644U (en) Permanent supporting device for mud-sand separation system site
CN208346826U (en) A kind of asymmetric foundation pit supporting construction
JP3325550B2 (en) Pile construction equipment and pile construction method
JPH0530930B2 (en)
JP4637937B2 (en) Steel underground wall member, underground steel continuous wall construction method, and steel underground wall
JPH08177043A (en) Disposal structure of landslide protection wall core-material
KR200162948Y1 (en) Device for supporting wall forms
JP3622385B2 (en) Pile structure
JP2618796B2 (en) How to build a wall
CN115538594A (en) Beam column positioning structure of prefabricated concrete structure
JPH0410933B2 (en)

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250