JPH02282511A - Construction of sol pile column crest stop wall - Google Patents

Construction of sol pile column crest stop wall

Info

Publication number
JPH02282511A
JPH02282511A JP10355289A JP10355289A JPH02282511A JP H02282511 A JPH02282511 A JP H02282511A JP 10355289 A JP10355289 A JP 10355289A JP 10355289 A JP10355289 A JP 10355289A JP H02282511 A JPH02282511 A JP H02282511A
Authority
JP
Japan
Prior art keywords
sol
pile
reinforcing material
length
short
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP10355289A
Other languages
Japanese (ja)
Other versions
JPH0833005B2 (en
Inventor
Osami Nakano
中野 修己
Hideo Inagaki
稲垣 秀雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toda Corp
Original Assignee
Toda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toda Corp filed Critical Toda Corp
Priority to JP10355289A priority Critical patent/JPH0833005B2/en
Publication of JPH02282511A publication Critical patent/JPH02282511A/en
Publication of JPH0833005B2 publication Critical patent/JPH0833005B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

PURPOSE:To use resources effectively and to reduce the cost by employing a long reinforcement and a short reinforcement preferentially in each soil pile of a soil pile column, or by extending the short reinforcement with a size correction device on top of it, and by burying it. CONSTITUTION:Continuous drilling is performed by a multiple spindle special drilling machine, a soil and a cement mill being mixed together and stirred, so as to construct a column of a soil pile 2, and a long reinforcement 3 which is of the same length as that of the pile 2, and which is made of H-steel, is suspended in every several line among them, and is buried. Or a short reinforcement 4 which is shorter than the long reinforcement 3 is suspended and buried with a size correction device 5 put on the upper edge of it. When the lower edge of the short reinforcement 4 reaches the bottom of the soil pile 2, the size correction device 5 is extracted and is lifted, so as to construct a soil pile column crest stop wall 1. Accuracy in positioning can be the same as the case with the long reinforcement 3, and the short reinforcement material 4 can thus be used again.

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は、ゾールパイル列山留壁の構築工法に関するも
のである。
DETAILED DESCRIPTION OF THE INVENTION (Industrial Field of Application) The present invention relates to a method for constructing a sol pile retaining wall.

(従来の技術) 地下構造物を構築する場合、ゾールパイル列で山留壁を
構築することがある。ゾールパイル列山留壁は、多軸削
孔専用機にて連続削孔し、蒸上とセメントミルクを混合
攪拌してゾールパイルを形成した後、細幅H鋼等の補強
材を吊り下して沈埋することにより構成している。この
補強材は、地下躯体外面と接しており、高い位置決め精
度が要求されるため、上部をガイド定規に固定する必要
があり、地盤面と上端を揃えた補強材が使用されてきた
(Prior Art) When constructing an underground structure, a retaining wall is sometimes constructed using rows of sol piles. The sol pile retaining wall is made by continuously drilling holes using a multi-axis drilling machine, mixing and stirring steamed and cement milk to form a sol pile, and then suspending reinforcing material such as narrow H steel and submerging it. It is composed of: This reinforcing material is in contact with the outer surface of the underground structure and requires high positioning accuracy, so it is necessary to fix the upper part to a guide ruler, so reinforcing material whose upper end is aligned with the ground surface has been used.

このようなゾールパイル列山留壁1に作用する側圧は第
5図に示すように上部に行くに従って小さくなり、また
曲げモーメントも第6図に示すように上部に行くに従っ
て小さくなっている。
The lateral pressure acting on the sol pile retaining wall 1 decreases as it goes upwards, as shown in FIG. 5, and the bending moment also decreases as it goes upwards, as shown in FIG.

(発明が解決しようとする課題) 上記のようにゾールパイル列山留壁1は、上部の方では
受ける側圧や曲げモーメントが小さいにも拘らず、位置
決め精度向上等の関係で、同じ強度をもつように構築せ
ざるを得なかったので、コスト高になる問題点があった
(Problems to be Solved by the Invention) As mentioned above, although the lateral pressure and bending moment received at the upper part of the sol pile retaining wall 1 are small, in order to improve positioning accuracy, etc., the sol pile retaining wall 1 is designed to have the same strength. Since it had no choice but to be built in

本発明の目的は、経済的にゾールパイル列山留壁を構築
できるゾールパイル列山留壁の構築工法を提供すること
にある。
An object of the present invention is to provide a method for constructing a sol pile retaining wall that can be constructed economically.

(課題を解決するための手段) 上記の目的を達成するための本発明の詳細な説明すると
、本発明はゾールパイル列の各ゾールパイルの中に補強
材をそれぞれ沈埋してゾールパイル列山留壁を構築する
ゾールパイル列山留壁の構築工法において、前記各ゾー
ルパイルの中には何本かおきに該ゾールパイルの長さに
相当する長さをもつ長尺補強材 吊り下して沈埋し、該
長尺補強材を沈埋してなる前記ゾールパイルの中には前
記長尺補強材より長さの短い短尺補強材をその上端に長
さ補正具を継ぎ足して該長さ補正具側で吊って下すこと
により沈埋し、前記短尺補強材の下端が所定深さの箇所
に到達した段階で前記長さ補正具を前記短尺補強材から
外して引き上げることを特徴とする。
(Means for Solving the Problems) To explain in detail the present invention for achieving the above object, the present invention constructs a sol pile retaining wall by embedding reinforcing materials in each sol pile of the sol pile row. In the construction method of a sol pile retaining wall, a long reinforcing material having a length corresponding to the length of the sol pile is suspended and buried in every few sol piles, and the long reinforcing material is suspended and buried. In the sol pile formed by immersing the material, a short reinforcing material having a length shorter than the long reinforcing material is added to the upper end of the sol pile, and a length correcting tool is added to the upper end of the reinforcing material, and the material is suspended from the side of the length correcting tool. , the length corrector is removed from the short reinforcing material and pulled up when the lower end of the short reinforcing material reaches a predetermined depth.

(作用) このようにゾールパイル列中の各ゾールパイルの中に長
尺補強材又は短尺補強材を選択的に沈埋すると、全てに
長尺補強材を沈埋する場合に比べてコストを低減できる
。また、短尺補強材はその上に長さ補正具を継ぎ足して
沈埋を行うので、位置決め精度も長尺補強材と同程度に
することができる。長さ補正具は、短尺補強材の沈埋後
に、該短尺補強材から外して引き上げるので、何度でも
再使用できる。
(Function) By selectively burying the long reinforcing material or the short reinforcing material in each sol pile in the sol pile row in this way, the cost can be reduced compared to the case where the long reinforcing material is buried in all of the sol piles. Furthermore, since the short reinforcing material is immersed with a length corrector added thereon, the positioning accuracy can be made comparable to that of the long reinforcing material. Since the length corrector is removed from the short reinforcing material and pulled up after the short reinforcing material is buried, it can be reused any number of times.

(実施例〉 以下、本発明の実施例を第1図(A>(B)乃至第4図
(A)〜(D)を参照して詳細に説明する。
(Example) Hereinafter, an example of the present invention will be described in detail with reference to FIG. 1 (A>(B) to FIG. 4 (A) to (D)).

本実施例では、多軸削孔専用機にて連続削孔し、蒸上と
セメントミルクを混合攪拌して第1図(A)(B)に示
すようなゾールパイル2の列を構築する。これらゾール
パイル2の中には何本がおきに該ゾールパイル2の長さ
に相当する長さをもつH鋼等よりなる長尺補強材3を吊
り下して沈埋する。該長尺補強材3を沈埋してないゾー
ルパイル2には、該長尺補強材3より長さの短い短尺補
強材4をその上端に後述する長さ補正具を継ぎ足して該
長さ補正具側で吊って下すことにより第1図(A)に示
すように沈埋する。短尺補強材4の下端がゾールパイル
2の底部に着底した段階で長さ補正具を短尺補強材4か
ら外して引き上げ、第1図(A)(B)に示すようなゾ
ールパイル列山留壁1を得る。
In this embodiment, continuous drilling is performed using a multi-axis drilling machine, and the steaming and cement milk are mixed and stirred to construct rows of sol piles 2 as shown in FIGS. 1(A) and 1(B). Inside these sol piles 2, long reinforcing members 3 made of H steel or the like having a length corresponding to the length of the sol piles 2 are suspended and buried. For the sol pile 2 in which the long reinforcing material 3 is not buried, a short reinforcing material 4 having a shorter length than the long reinforcing material 3 is added to the upper end of the sol pile 2, and a length correcting tool to be described later is added to the length correcting tool side. By suspending it from the ground, it is buried as shown in Figure 1 (A). When the lower end of the short reinforcing material 4 reaches the bottom of the sol pile 2, the length corrector is removed from the short reinforcing material 4 and pulled up to form the sol pile row retaining wall 1 as shown in FIGS. 1(A) and 1(B). get.

第2図及び第3図は、長さ補正具5の例を示したもので
ある。該長さ補正具5は、不足分の長さをもつH鋼6を
主体とし、該H鋼6の両ウェブ面にずれ止めプレート7
がその基部を溶接固定しその先端を下方に突出させてそ
れぞれ設けられ、且つH鋼6の両フランジ面には仮止め
用長尺ボルト8が軸受9で回転及び下向自在に支持され
、H鋼6の上端には吊り孔10が設けられた構造になっ
ている。これに伴い、H鋼よりなる短尺補強材4は、長
尺ボルト8に対応してフランジ面の上部にナツト11が
固定されている。
2 and 3 show examples of the length corrector 5. FIG. The length corrector 5 is mainly composed of an H steel 6 having a short length, and has anti-slip plates 7 on both web surfaces of the H steel 6.
are provided with their bases fixed by welding and their tips protruding downward, and long bolts 8 for temporary fixing are supported on both flange surfaces of the H steel 6 by bearings 9 so as to be freely rotatable and downward. The structure is such that a hanging hole 10 is provided at the upper end of the steel 6. Accordingly, nuts 11 are fixed to the upper part of the flange surface of the short reinforcing material 4 made of H steel in correspondence with the long bolts 8.

このため第2図に示すように、HfI4よりなる短尺補
強材4の上端に長さ補正具5の8m6を重ね、該H鋼6
の下端の両ウェブ面に設けられているずれ止めプレート
7で短尺補強材4の両ウェブ面を挟んで位置決め整列さ
せた状態で、長尺ボルト8を回すと該長尺ボルト8の先
端が短尺補強材4のナツト11に螺合されて、短尺補強
材4に対して長さ補正具5を連結することができる。
For this reason, as shown in FIG.
When the long bolt 8 is turned while the short reinforcing material 4 is positioned and aligned by sandwiching both web surfaces of the short reinforcing material 4 with the anti-slip plates 7 provided on both web surfaces at the lower end, the tip of the long bolt 8 becomes short. The length corrector 5 can be connected to the short reinforcing member 4 by being screwed into the nut 11 of the reinforcing member 4 .

次に、第4図(A)〜(D)を参照して、上記の如き長
さ補正具5を用いた短尺補強材4の沈埋の仕方について
説明する。
Next, with reference to FIGS. 4(A) to 4(D), a method of immersing the short reinforcing material 4 using the length correcting tool 5 as described above will be explained.

まず、第2図に示すように、上部にナツト11を設けた
短尺補強材4を、第4図(A)に示すようにゾールパイ
ル2の中に吊り下して、該ゾールパイル2の上部のガイ
ド定規12に支持ビン13で仮固定する。
First, as shown in FIG. 2, a short reinforcing member 4 with a nut 11 provided on the upper part is suspended in the sol pile 2 as shown in FIG. It is temporarily fixed to the ruler 12 with a support pin 13.

この状態で、第4図(B)に示すように、該短尺補強材
4の上部に長さ補正具5をワイヤー14で吊り下して第
2図に示すように重ね、且つ両ずれ止めプレート7で短
尺補強材4の両ウェブ面を挟み、該長さ補正具5の長尺
ボルト8を回して該長尺ボルト8を短尺補強材4に連結
する。
In this state, as shown in FIG. 4(B), the length corrector 5 is suspended from the top of the short reinforcing material 4 with a wire 14, and the length corrector 5 is stacked as shown in FIG. 7 sandwich both web surfaces of the short reinforcing material 4, and turn the long bolt 8 of the length corrector 5 to connect the long bolt 8 to the short reinforcing material 4.

しかる後、支持ビン13を抜き、短尺補強材4とこれに
連結された長さ補正具5とを第4図(D)に示すように
クレーンで吊り下すことによりゾールパイル2中に沈埋
する。このとき、短尺補強材4と長さ補正具5とは、ガ
イド定規12でガイドされつつ沈埋されるので、高い精
度で沈埋を行うことができる。
Thereafter, the support bin 13 is removed, and the short reinforcing material 4 and the length corrector 5 connected thereto are suspended by a crane and buried in the sol pile 2, as shown in FIG. 4(D). At this time, the short reinforcing material 4 and the length corrector 5 are buried while being guided by the guide ruler 12, so that the burial can be performed with high accuracy.

短尺補強材4の下端が第4図(C)に示すように所定深
さのゾールパイル2の形成孔における底部に着底した段
階で、長さ補正具5の長尺ボルト8を逆回しして、該長
尺ボルト8を短尺補強材4のナツト11から外し、短尺
補強材4に対する長さ補正具5の連結を解除し、第4図
(D)に示すように該長さ補正具5をワイヤー14で吊
り上げてゾールパイル2から抜き取る。かくして、短尺
補強材4の沈埋作業が終わる。
When the lower end of the short reinforcing material 4 reaches the bottom of the formation hole of the sol pile 2 of a predetermined depth as shown in FIG. 4(C), the long bolt 8 of the length corrector 5 is turned in the opposite direction. , remove the long bolt 8 from the nut 11 of the short reinforcing material 4, release the connection of the length correcting tool 5 to the short reinforcing material 4, and remove the length correcting tool 5 as shown in FIG. 4(D). It is lifted up with the wire 14 and removed from the sol pile 2. In this way, the work of burying the short reinforcing material 4 is completed.

上記のような短尺補強材4は、ゾールパイル2の長さが
10m以上の場合には、その長さを10〜30%減少さ
せることができる。
When the length of the sol pile 2 is 10 m or more, the short reinforcing material 4 as described above can reduce the length by 10 to 30%.

上記実施例では、長さ補正具5としてHl6を用いた例
について説明したが、該長さ補正具5として鉄筋を使用
し、該鉄筋を短尺補強材4に仮付けし、該鉄筋を短尺補
強材4と共に沈埋してそのまま残してしまうこともでき
る。
In the above embodiment, an example was explained in which Hl6 was used as the length corrector 5, but reinforcing bars were used as the length correcting tool 5, the reinforcing bars were temporarily attached to the short reinforcing material 4, and the reinforcing bars were short reinforced. It is also possible to bury it together with the material 4 and leave it as is.

短尺補強材4に対する長さ補正具5の連結は、フック等
を用いて行うこともできる。
The length corrector 5 can also be connected to the short reinforcing member 4 using a hook or the like.

(発明の効果) 以上説明したように本発明では、ゾールパイル列中の各
ゾールパイルの中に長尺補強材又は短尺補強材を選択的
に沈埋するので、全てに長尺補強材を沈埋する場合に6
比べて、省資源化が図れ、コストダウンを図ることがで
きる。また、短尺補強材は、その上部に長さ補正具を継
ぎ足して沈埋を行うので、位置決め精度も長尺補強材と
同程度にすることができる。
(Effects of the Invention) As explained above, in the present invention, long reinforcing materials or short reinforcing materials are selectively buried in each sol pile in the sol pile row. 6
In comparison, it is possible to save resources and reduce costs. Further, since the short reinforcing material is immersed with a length corrector added to the top thereof, the positioning accuracy can be made comparable to that of the long reinforcing material.

【図面の簡単な説明】[Brief explanation of drawings]

第1図(A)(B)は本発明の方法で構築されたゾール
パイル列山留壁の一例を示す縦断面図及び平面図、第2
図は本実施例で用いる短尺補強材と長さ補正具との連結
部の一例を示す斜視図、第3図は本実施例で用いている
長さ補正具の一例を示す正面図、第4図(A)〜(D)
は本実施例における長さ補正具を用いた短尺補強材の法
理工程を示す工程図、第5図はゾールパイル列山留壁に
対する側圧の分布図、第6図はゾールパイル列山留壁に
対する曲げモーメントの分布図である。 1・・・ゾールパイル列山留壁、2・・・ゾールパイル
、3・・・長尺補強材、4・・・短尺補強材、5・・・
長さ補正具、6・・・Hl、7・・・ずれ止めプレート
、8・・・仮止め用長尺ボルト、9・・・軸受、1o・
・・吊り孔、11・・・ナツト、12・・・ガイド定規
、13・・・支持ビン、14・・・ワイヤー 図面の浄書 第4図 (A) (B) (C) (D) 手 続 補 正 書(方式) %式% 事件の表示 平成1年特許願第103552号 発明の名称 ンイルパイル列山留壁の横築工法 補正をする者 事件との関係 名     称
1(A) and 1(B) are a vertical cross-sectional view and a plan view showing an example of a sol pile retaining wall constructed by the method of the present invention, and FIG.
The figure is a perspective view showing an example of the connecting part between the short reinforcing material and the length corrector used in this example, FIG. 3 is a front view showing an example of the length corrector used in this example, and FIG. Figures (A) to (D)
is a process diagram showing the legal process of short reinforcing material using the length corrector in this example, Fig. 5 is a distribution diagram of lateral pressure against the sol pile row retaining wall, and Fig. 6 is a bending moment against the sol pile row retaining wall. FIG. DESCRIPTION OF SYMBOLS 1... Sol pile row retaining wall, 2... Sol pile, 3... Long reinforcing material, 4... Short reinforcing material, 5...
Length corrector, 6... Hl, 7... Anti-slip plate, 8... Long bolt for temporary fixing, 9... Bearing, 1o.
...Hanging hole, 11...Nut, 12...Guide ruler, 13...Support bin, 14...Engraving of wire drawing Figure 4 (A) (B) (C) (D) Procedure amendment Type (Method) % Formula % Display of the case 1999 Patent Application No. 103552 Name of the invention Person who amends the horizontal construction method of Nile Pile Mountain Retaining Walls Name related to the case

Claims (1)

【特許請求の範囲】[Claims] ゾールパイル列の各ゾールパイルの中に補強材をそれぞ
れ沈埋してゾールパイル列山留壁を構築するゾールパイ
ル列山留壁の構築工法において、前記各ゾールパイルの
中には何本かおきに該ゾールパイルの長さに相当する長
さをもつ長尺補強材を吊り下して沈埋し、該長尺補強材
を沈埋してなる前記ゾールパイルの中には前記長尺補強
材より長さの短い短尺補強材をその上端に長さ補正具を
継ぎ足して該長さ補正具側で吊って下すことにより沈埋
し、前記短尺補強材の下端が所定深さの箇所に到達した
段階で前記長さ補正具を前記短尺補強材から外して引き
上げることを特徴とするゾールパイル列山留壁の構築工
法。
In a construction method for a sol pile retaining wall in which a reinforcing material is buried in each sol pile of the sol pile row to construct a sol pile retaining wall, the length of each sol pile is set at every few sol piles. A long reinforcing material having a length corresponding to the length of A length corrector is added to the upper end and suspended from the side of the length corrector to submerge it, and when the lower end of the short reinforcing member reaches a predetermined depth, the length corrector is added to the short reinforcing member. A construction method for sol pile retaining walls that is characterized by removing them from the timber and pulling them up.
JP10355289A 1989-04-25 1989-04-25 Construction method of soil pile row mountain retaining wall Expired - Fee Related JPH0833005B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10355289A JPH0833005B2 (en) 1989-04-25 1989-04-25 Construction method of soil pile row mountain retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10355289A JPH0833005B2 (en) 1989-04-25 1989-04-25 Construction method of soil pile row mountain retaining wall

Publications (2)

Publication Number Publication Date
JPH02282511A true JPH02282511A (en) 1990-11-20
JPH0833005B2 JPH0833005B2 (en) 1996-03-29

Family

ID=14356988

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10355289A Expired - Fee Related JPH0833005B2 (en) 1989-04-25 1989-04-25 Construction method of soil pile row mountain retaining wall

Country Status (1)

Country Link
JP (1) JPH0833005B2 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11350469A (en) * 1998-06-03 1999-12-21 Nishimatsu Constr Co Ltd Inserting method and inserting device for water stop sheet
JP2002138465A (en) * 2000-11-01 2002-05-14 Seiko Kogyo Kk Steel pipe column earth retaining wall construction method
JP2003184075A (en) * 2001-12-18 2003-07-03 Tokyu Constr Co Ltd Soil cement column strip earth retaining wall and its construction method
JP2005133310A (en) * 2003-10-28 2005-05-26 Marutoku Kigyo:Kk Core material erecting method in diaphragm wall construction method
JP2008255688A (en) * 2007-04-06 2008-10-23 Tobishima Corp Shaft construction method
JP2008280768A (en) * 2007-05-11 2008-11-20 Tobishima Corp Method for constructing vertical shaft temporary wall
JP2009138505A (en) * 2007-12-11 2009-06-25 Asanuma Corp Labor saving method for core material in soil cement column row wall
JP2015124475A (en) * 2013-12-25 2015-07-06 株式会社竹中工務店 Earth retaining wall and construction method of earth retaining wall
JP2018168664A (en) * 2017-03-30 2018-11-01 株式会社熊谷組 Method for positioning core material

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11350469A (en) * 1998-06-03 1999-12-21 Nishimatsu Constr Co Ltd Inserting method and inserting device for water stop sheet
JP2002138465A (en) * 2000-11-01 2002-05-14 Seiko Kogyo Kk Steel pipe column earth retaining wall construction method
JP2003184075A (en) * 2001-12-18 2003-07-03 Tokyu Constr Co Ltd Soil cement column strip earth retaining wall and its construction method
JP2005133310A (en) * 2003-10-28 2005-05-26 Marutoku Kigyo:Kk Core material erecting method in diaphragm wall construction method
JP2008255688A (en) * 2007-04-06 2008-10-23 Tobishima Corp Shaft construction method
JP2008280768A (en) * 2007-05-11 2008-11-20 Tobishima Corp Method for constructing vertical shaft temporary wall
JP2009138505A (en) * 2007-12-11 2009-06-25 Asanuma Corp Labor saving method for core material in soil cement column row wall
JP2015124475A (en) * 2013-12-25 2015-07-06 株式会社竹中工務店 Earth retaining wall and construction method of earth retaining wall
JP2018168664A (en) * 2017-03-30 2018-11-01 株式会社熊谷組 Method for positioning core material

Also Published As

Publication number Publication date
JPH0833005B2 (en) 1996-03-29

Similar Documents

Publication Publication Date Title
KR101863526B1 (en) Drawing apparatus for H beam
JPH02282511A (en) Construction of sol pile column crest stop wall
JP2016084690A (en) Base type foundation unit
KR20210033815A (en) Method for strengthening the foundation of a structure with improved construction precision and reinforced structural strength
JPS6315449Y2 (en)
JPH0721196B2 (en) Reverse construction method of underground structure
JPH06341154A (en) Construction of underground building frame
CN217458592U (en) Simple electric hoist hanger
JPS631408B2 (en)
JP2637680B2 (en) Underground beam foundation construction method for house building
JPH062437A (en) Device for building steel structure cage
JP2532575Y2 (en) Construction jig for stress material
JPH0632989Y2 (en) Work table of pile press-in / pull-out machine
CN212129947U (en) Tower-type material distributor steel platform base
JPH0530930B2 (en)
JPH0362846B2 (en)
CN217054226U (en) Manual hole digging pile operating platform
JPH0673727A (en) Method of constructing soil pile column row earth retaining wall and special h-shaped steel bar
JP3975401B2 (en) Steel tower raising method
JP3022082U (en) Concrete pile pile head cement removal device
JP3158055B2 (en) Septic tank equipment laying method
JPH0643362Y2 (en) Steel frame pillar hanging jig
JPS597403Y2 (en) Shoring frame
JPH048148Y2 (en)
JPH047415A (en) Structure of anchor plate and method for constructing anchor supporting beam

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees