Publication number
JPH0362846B2
JPH0362846B2 JP14217386A JP14217386A JPH0362846B2 JP H0362846 B2 JPH0362846 B2 JP H0362846B2 JP 14217386 A JP14217386 A JP 14217386A JP 14217386 A JP14217386 A JP 14217386A JP H0362846 B2 JPH0362846 B2 JP H0362846B2
Authority
JP
Japan
Prior art keywords
ruler
shaped steel
hole
steel material
casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP14217386A
Other languages
Japanese (ja)
Other versions
JPS63521A (en
Inventor
Nagatomo Ochi
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokki Industries Co Ltd
Original Assignee
Tokki Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokki Industries Co Ltd filed Critical Tokki Industries Co Ltd
Priority to JP14217386A priority Critical patent/JPS63521A/en
Publication of JPS63521A publication Critical patent/JPS63521A/en
Publication of JPH0362846B2 publication Critical patent/JPH0362846B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は山止及び止水用として地中に造成さ
れるソイルモルタル柱列杭用の長尺の鋼材を、モ
ルタルを注入した掘削孔に垂直に挿入する方法に
関するものである。
[Detailed Description of the Invention] [Industrial Application Field] This invention applies long steel materials for soil mortar column piles, which are constructed underground for mountain and water stop purposes, to an excavated hole into which mortar has been injected. It concerns a method of vertical insertion.

〔従来の技術〕[Conventional technology]

通常モルタルを注入した掘削孔へのI型鋼材の
挿入は、掘削孔の中央にI型鋼材を吊り下して行
つている。また一部では挿入位置の精度を出すた
めに、掘削孔の上に枠組によりI型鋼材の挿入穴
を形成した定規を設置して行つている。
Usually, the I-type steel is inserted into a drilled hole into which mortar has been injected by suspending the I-shaped steel at the center of the hole. In some cases, in order to ensure accuracy in the insertion position, a ruler with a frame for forming an insertion hole for the I-shaped steel is installed above the excavation hole.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

通常I型鋼材は運搬時の積卸しに際して自重に
よる反りが生じ易い。このためI型鋼材の下端を
掘削孔の開口部に垂直位置させて挿入しても、反
りによりて途中でI型鋼材のフランジ先端が孔壁
に接し、I型鋼材の挿入を困難となすばかりか、
孔壁が崩れるなどの問題があつた。
Normally, I-shaped steel materials tend to warp due to their own weight during loading and unloading during transportation. For this reason, even if the lower end of the I-shaped steel is inserted vertically into the opening of the borehole, the flange tip of the I-shaped steel will come into contact with the hole wall halfway due to warping, making it difficult to insert the I-shaped steel. mosquito,
There were problems such as the hole wall collapsing.

この発明は上記従来の問題点を解決するために
考えられたものであつて、その目的は長尺になる
ほど挿入作業が困難となるI型鋼材を手際よくモ
ルタルを注入した掘削孔に挿入することができる
新たな工法を提供することにある。
This invention was devised to solve the above-mentioned conventional problems, and its purpose is to skillfully insert I-type steel, which becomes difficult to insert as the length becomes longer, into an excavated hole into which mortar has been injected. The goal is to provide a new construction method that allows for

〔問題点を解決するための手段〕[Means for solving problems]

上記目的によるこの発明は、長尺のI型鋼材の
下端に先端部材を取付けて、フランジ下端を傾斜
面に形成し、そのI型鋼材を地中に垂直に設けた
ケーシング内の所要数のローラの間に吊り入れ
て、鋼材に生じたそりを直すぐに修正する一方、
モルタルを注入した地中の柱列杭用の掘削孔に、
平面が長方形で四隅にI型鋼材の案内を有する所
要長さの定規を垂直に挿入し、その定規を作業台
により保持したのち、上記I型鋼材をケーシング
から抜き出し、上記定規を通して上記掘削孔に吊
り持ちながら垂直に挿入することを要旨とするも
のである。
This invention for the above-mentioned purpose has a tip member attached to the lower end of a long I-shaped steel material, the lower end of the flange is formed into an inclined surface, and the I-shaped steel material is installed vertically in the ground, and a required number of rollers are installed in a casing. It is suspended between the steel parts to immediately correct warpage that occurs in the steel,
Drilling holes for column piles in the ground injected with mortar.
After vertically inserting a ruler of the required length with a rectangular plane and guides for the I-shaped steel material at the four corners and holding the ruler on a workbench, pull out the I-shaped steel material from the casing and insert it into the excavation hole through the ruler. The gist of this is that it is inserted vertically while being held suspended.

〔実施例〕〔Example〕

第1図に示すように、まず長尺(10m以上)の
I型鋼材1の下端に、フランジ1aの下端を内方
へ傾斜形成する傾斜板2aを両側に有する先端部
材2aを取付けて置く。
As shown in FIG. 1, first, a tip member 2a having inclined plates 2a on both sides of which the lower end of the flange 1a is inclined inward is attached to the lower end of a long (10 m or more) I-shaped steel member 1.

このI型鋼材1を、後記するソイルモルタル柱
列杭用の掘削孔とほぼ深さを同じくする掘削孔内
に予め設けたケーシング3内のローラ4の間に吊
り下す。
This I-shaped steel material 1 is suspended between rollers 4 in a casing 3 previously provided in an excavated hole having approximately the same depth as an excavated hole for soil mortar column piles to be described later.

上記ローラ4は第2図及び第3図に示すよう
に、ケーシング3内に設けたフレーム3aに、一
対ごと所要間隔を空けて多段に設けられ、そのロ
ーラ4の間をI型鋼材1はケーシング底部にまで
吊り下されて、積卸しの際に生じた反りが真すぐ
に修正される。
As shown in FIGS. 2 and 3, the rollers 4 are provided in pairs on a frame 3a provided in the casing 3 in multiple stages at required intervals. It is suspended all the way to the bottom, and any warping that occurs during loading and unloading can be straightened out.

また既に掘削されていて、モルタル(図面では
省略)を注入したソイルモルタル柱列杭用の掘削
孔5には、第4図に示すように、所要長さの定規
6を垂直に挿入する。
Further, as shown in FIG. 4, a ruler 6 of a required length is vertically inserted into the excavated hole 5 for the soil mortar column pile, which has already been excavated and injected with mortar (not shown in the drawing).

この定規6は第8図に示すように、四隅に山型
鋼材6aによる案内を有する平面形状が長方形の
もので、各山型鋼材6aは一定間隔ごとに鋼板6
bにより囲繞されて一体に連結されている。
As shown in FIG. 8, this ruler 6 has a rectangular planar shape with guides by angle-shaped steel members 6a at the four corners, and each angle-shaped steel member 6a is connected to a steel plate at regular intervals.
b and are connected together.

この定規6は上記に掘削孔5に垂直に挿入され
たのち、地上に設置した作業台7の垂直部材7a
にて保持し、挿入作業時に位置がずれないように
してある。
After this ruler 6 is inserted vertically into the excavation hole 5, the vertical member 7a of the work platform 7 installed on the ground
It is held in place to prevent it from shifting during the insertion process.

また作業台7には上記垂直部材7aと直交した
水平部材7bにジヤツキ8が設けられ、これによ
り作業台7は地面に対して水平に設置されてい
る。
Further, the workbench 7 is provided with a jack 8 on a horizontal member 7b perpendicular to the vertical member 7a, so that the workbench 7 is installed horizontally with respect to the ground.

上記定規6の挿入と垂直保持作業が完了したな
らば、上記ケーシング2内のI型鋼材1を地上に
吊り上げそのまま掘削孔5の所まで移送する。
When the insertion of the ruler 6 and the vertical holding work are completed, the I-shaped steel member 1 in the casing 2 is lifted above the ground and transported to the excavation hole 5 as it is.

そして第5図に示すように、先端部材2を有す
る下端を定規6に挿入し、その定規6を通してI
型鋼材1を掘削孔5に挿入する。
Then, as shown in FIG. 5, the lower end with the tip member 2 is inserted into the ruler 6, and the
The shaped steel material 1 is inserted into the excavated hole 5.

I型鋼材1の挿入が終つたならば、定規6を作
業台7の垂直部材7aから外し、第6図に示すよ
うに、上方へと吊り上げて掘削孔5から抜き出
す。その後、作業台7をも吊り上げて定規6と共
に次のI型鋼材の挿入位置に移動する。
When the insertion of the I-shaped steel material 1 is completed, the ruler 6 is removed from the vertical member 7a of the workbench 7, and as shown in FIG. 6, it is lifted upward and extracted from the excavation hole 5. Thereafter, the workbench 7 is also lifted and moved together with the ruler 6 to the insertion position for the next I-shaped steel material.

以上のようにケーシング2内のローラ4により
積卸時などに生じた反りを無くし、予め掘削孔5
に挿入した定規6を通して掘削孔5に挿入された
I型鋼材1は、それが著しく長尺のものであつて
も、フランジ下端によつて孔壁を損傷することな
く、第7図に示すように、掘削孔5に中央に設置
される。
As described above, the roller 4 in the casing 2 eliminates the warping that occurs during loading and unloading, and
Even if the I-shaped steel material 1 is inserted into the borehole 5 through the ruler 6 inserted into the hole, the lower end of the flange does not damage the hole wall, as shown in FIG. 7, even if it is extremely long. It is installed centrally in the borehole 5.

〔発明の効果〕〔Effect of the invention〕

この発明は上述のように、長尺のI型鋼材の下
端に、フランジ下端を傾斜面となす傾斜板を有す
る先端部材を取付けたので、この先端部材により
定規への挿入が容易となるばかりか、フランジ下
端によつて、孔壁が損傷を受けるようなこともな
い。
As described above, in this invention, a tip member having an inclined plate with the lower end of the flange as an inclined surface is attached to the lower end of the long I-shaped steel material, so this tip member not only facilitates insertion into a ruler. , the hole wall will not be damaged by the lower end of the flange.

また掘削孔への挿入前に、I型鋼材の反りを真
すぐに修正したことから、反りによる挿入困難は
なく、モルタルが固化するまでの間に挿入作業を
手際よく実施することができるなどの特長を有す
る。
In addition, since the warpage of the I-beam steel was straightened before insertion into the excavation hole, there was no difficulty in inserting it due to warpage, and the insertion work could be carried out quickly before the mortar solidified. It has characteristics.

【図面の簡単な説明】[Brief explanation of drawings]

図面はこの発明に係る方法を示すもので、第1
図はI型鋼材の下端部の斜視図、第2図はケーシ
ングの平面図、第3図は同じく断面図、第4図か
ら第7図は掘削孔への挿入工程を順に示す断面
図、第8図は定規の平面図である。 1……I型鋼材、1a……フランジ、2……先
端部材、2a……傾斜板、3……ケーシング、4
……ローラ、5……掘削孔、6……定規、7……
作業台、7a……垂直部材。
The drawings show the method according to the present invention.
The figure is a perspective view of the lower end of the I-type steel material, FIG. 2 is a plan view of the casing, FIG. 3 is a sectional view, and FIGS. Figure 8 is a plan view of the ruler. 1...I type steel material, 1a...flange, 2...tip member, 2a...inclined plate, 3...casing, 4
...Roller, 5...Drilling hole, 6...Ruler, 7...
Workbench, 7a... Vertical member.

Claims (1)

【特許請求の範囲】[Claims] 1 長尺のI型鋼材の下端に先端部材を取付けて
フランジ下端を傾斜面に形成し、そのI型鋼材を
地中に垂直に設けたケーシング内の所要数のロー
ラの間に吊り入れて、鋼材に生じたそりを直すぐ
に修正する一方、モルタルを注入した地中の柱列
杭用の掘削孔に、平面が長方形で四隅にI型鋼材
の案内を有する所要長さの定規を垂直に挿入し、
その定規を作業台により保持したのち、上記I型
鋼材をケーシングから抜き出し、上記定規を通し
て上記掘削孔に吊り持ちながら垂直に挿入するこ
とを特長とするソイルモルタル柱列杭の鋼材挿入
工法。
1 Attach a tip member to the lower end of a long I-shaped steel member to form the lower end of the flange into an inclined surface, suspend the I-shaped steel member between the required number of rollers in a casing installed vertically in the ground, While immediately correcting warpage that has occurred in the steel, a ruler of the required length with a rectangular plane and guides for the I-beam steel at the four corners is vertically inserted into the mortar-injected underground column pile drilling hole. insert,
A steel material insertion method for soil mortar column piles, characterized in that after holding the ruler on a workbench, the I-shaped steel material is extracted from the casing, and vertically inserted into the excavation hole through the ruler while being suspended.
JP14217386A 1986-06-18 1986-06-18 Insertion work of steel material of soil-mortar column-line pile Granted JPS63521A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14217386A JPS63521A (en) 1986-06-18 1986-06-18 Insertion work of steel material of soil-mortar column-line pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14217386A JPS63521A (en) 1986-06-18 1986-06-18 Insertion work of steel material of soil-mortar column-line pile

Publications (2)

Publication Number Publication Date
JPS63521A JPS63521A (en) 1988-01-05
JPH0362846B2 true JPH0362846B2 (en) 1991-09-27

Family

ID=15309055

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14217386A Granted JPS63521A (en) 1986-06-18 1986-06-18 Insertion work of steel material of soil-mortar column-line pile

Country Status (1)

Country Link
JP (1) JPS63521A (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5281213B1 (en) * 2013-03-15 2013-09-04 鹿島建設株式会社 Core material and soil cement continuous wall method using the same
CN104746510B (en) * 2015-03-24 2016-08-24 浙江省长城建设集团有限公司 A kind of shaped steel inserts positioner and construction method thereof
JP7240274B2 (en) * 2019-07-04 2023-03-15 鹿島建設株式会社 Core material for earth retaining wall and installation method thereof

Also Published As

Publication number Publication date
JPS63521A (en) 1988-01-05

Similar Documents

Publication Publication Date Title
JPH0362846B2 (en)
JPH0768705B2 (en) Soil retaining method and its retaining pile
US3407609A (en) Tunnelling method and apparatus
JPH02282511A (en) Construction of sol pile column crest stop wall
US1895985A (en) Construction of retaining walls
KR100567853B1 (en) Structure for retaining wall
GB1481186A (en) Concrete casting
CN216108444U (en) Guide frame for steel sheet pile
JPH0593423A (en) Guide wall constructing pc slab and construction method of guide wall
CN109469073B (en) Chute equipment and construction method thereof, and construction method of backfilling engineering
US2987890A (en) Method and apparatus for constructing and setting trench cribbing
CN211421151U (en) Double-walled steel cofferdam based on picture peg
JP2622597B2 (en) Rail connection method for elevators in pits
JPS5833146Y2 (en) The bottom part of the pile for erecting an excavated hole
CN211285657U (en) Double-walled steel cofferdam picture peg underwater anchoring structure based on finish rolling deformed steel bar
JPH0673727A (en) Method of constructing soil pile column row earth retaining wall and special h-shaped steel bar
JP2017197951A (en) Countermeasure wall against drawn-in subsidence and construction method thereof
JPS6310249B2 (en)
JPH0641993A (en) Learned retaining wall
CN116856447A (en) Foundation pit template construction method
JP3183992B2 (en) Jig for loading riser unit
JPS594723A (en) Sheathing and timbering work for excavated trench
JPH0730748Y2 (en) Earth retaining frame
JPS6310250B2 (en)
KR870000824Y1 (en) Frame for proventing earth-breaking level