KR100802164B1 - Structure for reinforcing steel pile head of footing foundation structure - Google Patents

Structure for reinforcing steel pile head of footing foundation structure Download PDF

Info

Publication number
KR100802164B1
KR100802164B1 KR1020070048884A KR20070048884A KR100802164B1 KR 100802164 B1 KR100802164 B1 KR 100802164B1 KR 1020070048884 A KR1020070048884 A KR 1020070048884A KR 20070048884 A KR20070048884 A KR 20070048884A KR 100802164 B1 KR100802164 B1 KR 100802164B1
Authority
KR
South Korea
Prior art keywords
steel pipe
pipe pile
reinforcing bar
reinforcing
fixing member
Prior art date
Application number
KR1020070048884A
Other languages
Korean (ko)
Inventor
박종복
Original Assignee
주식회사 다우컨설턴트
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 다우컨설턴트 filed Critical 주식회사 다우컨설턴트
Priority to KR1020070048884A priority Critical patent/KR100802164B1/en
Application granted granted Critical
Publication of KR100802164B1 publication Critical patent/KR100802164B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • E02D5/285Prefabricated piles made of steel or other metals tubular, e.g. prefabricated from sheet pile elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/226Protecting piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Foundations (AREA)

Abstract

A structure for reinforcing a head of a steel pipe pile for a spread foundation structure is provided to prevent the separation of a reinforcing bar fixing member and to reinforce a head of a steel pipe pile strongly by installing a reinforcing bar fixing member easily and increasing the binding strength of filling materials and a reinforcing bar fixing member. A structure for reinforcing a head of a steel pipe pile for a spread foundation structure comprises a reinforcing bar(100) installed to many steel pipe piles(10) installed under the ground by driving to make the upper part exposed above the ground and connecting main reinforcing bars(20) for the bottom of a spread foundation, and a reinforcing bar fixing member fixing the reinforcing bar to the steel pipe piles strongly. The reinforcing bar comprises ring-shaped hoop reinforcements and vertical reinforcements(120) coupled along the circumferential direction of the hoop reinforcements at regular intervals, and the reinforcing bar fixing member comprises a lower backing plate(210) setting the placing depth of filling materials(A), many support bars fixing the lower backing plate to the steel pipe pile, a reinforcing bar backing strap(230) coupled to the middle of the support bar installed at the appointed height from the lower backing plate to support the reinforcing bar, and a two-stage non-slip strap coupled to the support bars and fixed to the steel pipe pile.

Description

확대기초구조물의 강관 말뚝 두부 보강 구조{STRUCTURE FOR REINFORCING STEEL PILE HEAD OF FOOTING FOUNDATION STRUCTURE}Steel pipe pile head reinforcement structure of expanded foundation structure {STRUCTURE FOR REINFORCING STEEL PILE HEAD OF FOOTING FOUNDATION STRUCTURE}

도 1은 종래 기술에 의한 확대기초구조물의 강관 말뚝 두부 보강 구조를 보인 시공 상태 단면도.1 is a cross-sectional view showing the construction state showing the steel pipe pile head reinforcement structure of the expanded base structure according to the prior art.

도 2는 본 발명에 의한 확대기초구조물의 강관 말뚝 두부 보강 구조를 보인 단면도.Figure 2 is a cross-sectional view showing a steel pipe pile head reinforcement structure of the expanded base structure according to the present invention.

도 3은 본 발명에 의한 확대기초구조물의 강관 말뚝 두부 보강 구조의 사시도.Figure 3 is a perspective view of the steel pipe pile head reinforcement structure of the expanded base structure according to the present invention.

도 4는 본 발명에 의한 확대기초구조물의 강관 말뚝 두부 보강 구조의 분해 사시도.Figure 4 is an exploded perspective view of the steel pipe pile head reinforcement structure of the expanded base structure according to the present invention.

< 도면의 주요 부분에 대한 부호 설명><Description of Signs for Main Parts of Drawings>

100 : 보강 철근, 200 : 철근 고정부재100: reinforcing bar, 200: rebar fixing member

210 : 하부 받침판, 220 : 지지바210: lower support plate, 220: support bar

230 : 철근 받침띠, 240 : 미끄럼방지띠230: reinforcing bar, 240: slip ring

본 발명은 확대기초구조물의 기초를 위한 말뚝의 두부 보강 구조에 관한 것으로, 더욱 상세하게는 철근 고정부재의 설치 작업이 용이하고, 속채움재와 철근 고정부재간의 결속력이 증대됨에 따라 철근 고정부재의 이탈을 막을 수 있도록 한 확대기초구조물의 기초를 위한 말뚝의 두부 보강 구조에 관한 것이다.The present invention relates to the head reinforcement structure of the pile for the foundation of the expanded foundation structure, more specifically, the installation work of the rebar fixing member is easy, the separation of the rebar fixing member as the binding force between the filling material and the rebar fixing member is increased It relates to the head reinforcement structure of the pile for the foundation of the enlarged foundation structure to prevent it.

토목공사는 일반국도와 고속도로 건설을 위한 도로건설, 각종 교량의 건설과 철도와 항만건설공사, 비행장건설과 해안선 보호를 위한 건설 30층 이상의 대형 고층 건축물등 다양한 종류의 공사가 있다.Civil engineering includes various types of construction including road construction for general national highways and highways, construction of various bridges, railway and port construction, and construction for airfield construction and coastline protection.

이러한 공사를 시행하기 위해서는 구축물과 건출물이 놓여질 기초공사를 하여야 하는데 지반이 암석으로 되어 있을 경우에는 별도의 보강공사없이 바로 기초공사를 시행하면 된다.In order to implement such a construction, it is necessary to perform the basic construction on which the construction and the building are to be placed. If the ground is made of rock, the basic construction should be performed without additional reinforcing work.

그러나, 지반이 토사층이나 자갈, 사암과 같이 연약한 암반층일 경우에는 지반을 보강하기 위한 보강공사를 선행한 후 기초공사를 하게 된다.However, when the ground is a soft rock layer such as soil layer, gravel, and sandstone, the foundation work is performed after the reinforcement work for reinforcing the ground.

상기와 같이 지반보강을 위한 공사는 강한 암반층이 나올때 까지 지반을 파들어간 후 기초 콘크리트를 타설하거나, 콘크리트 말뚝을 강한 암반층까지 박은 후 콘크리트를 타설하는 방법과, 강관을 강한 암반층까지 박은 후 강관의 속을 채움하여 콘크리트를 타설하는 방법이 있다.As mentioned above, the construction for reinforcing the ground is to dig the ground until a strong rock layer comes out, and then install the foundation concrete, or to put concrete piles to the strong rock layer, and then to put the concrete, and to put the steel pipe to the strong rock layer, There is a way to pour concrete by filling it.

본 발명은 강관 말뚝에 관한 것이므로 이하에서는 강관 말뚝에 대해서만 설명한다.Since the present invention relates to steel pipe piles, only the steel pipe piles will be described below.

일반적으로 연약지반에 강관말뚝을 설치하여 구조물을 시공하는 경우, 항타기로 강관말뚝을 항타하여 강관말뚝의 선단을 견고한 지반에 정착시킨 후, 그 강관 말뚝 위로 구조물의 하부구조인 기초콘크리트를 강관말뚝의 두부와 일체화시키는 구조로 이루어져 구조물의 하중을 정착된 강관말뚝을 통하여 견고한 지반 상에서 지지하는 구조로 구축되어진다. 그런데, 구조물의 하부구조인 기초콘크리트를 강관말뚝과 일체화시키기 위해서는 중공으로 이루어진 강관말뚝의 두부 내에 속채움 콘크리트를 타설함에 있어, 강관말뚝의 두부내 삽입되는 보강철근 조립체를 지지하고, 추후 타설되는 콘크리트가 강관말뚝의 하측으로 흘러내리지 않도록 바닥거푸집의 역할을 하는 받침판을 지지하도록 강관말뚝의 두부에 지지 구조부를 설치하게 된다. 즉, 강관말뚝의 두부 내에 수직·수평의 보강철근조립체를 설치하고, 수직의 보강철근들을 강관말뚝의 두부 상부로 노출시켜 기초콘크리트의 철근조립체에 일체로 연결하여 조립하게 된다. In general, when constructing a structure by installing a steel pipe pile on a soft ground, the steel pipe pile is driven by a driving machine to fix the tip of the steel pipe pile on a solid ground, and then the foundation concrete, which is a substructure of the structure, is placed on the steel pipe pile. It consists of a structure that integrates with the head and is constructed with a structure that supports the load of the structure on a solid ground through a fixed steel pipe pile. However, in order to integrate the foundation concrete, which is a substructure of the structure, with the steel pipe pile, in filling the concrete into the head of the hollow steel pipe pile, the reinforcing steel reinforcement assembly inserted into the head of the steel pipe pile is supported, and the concrete that is poured later The supporting structure is installed on the head of the steel pipe pile so as to support the supporting plate serving as the floor formwork so that the steel pipe pile does not flow down to the lower side of the steel pipe pile. That is, vertical and horizontal rebar assemblies are installed in the head of the steel pipe pile, and vertical reinforcing bars are exposed to the upper part of the head of the steel pipe pile to be integrally connected to the reinforcing steel assembly of the foundation concrete.

이후, 기초콘크리트의 철근조립체와 강관말뚝의 두부내 삽입된 철근조립체가 일체로 조립연결된 상태에서 콘크리트를 타설함으로써, 철근조립체를 피복시키면서강관말뚝의 내측상단과 구조물의 하부구조인 기초콘크리트를 일체화시키는 구조로 구축되어지는 것이다.Subsequently, by pouring concrete while the reinforcing bar assembly of the foundation concrete and the reinforcing bar assembly inserted into the head of the steel pipe pile are integrally connected to each other, the inner concrete upper part of the steel pipe pile and the lower part of the structure are integrated while covering the reinforcing bar assembly. It is structured.

따라서, 기초콘크리트와 견고한 지반속에 정착된 강관말뚝의 상단이 일체화된 구조로 형성됨으로써, 기초콘크리트의 상부구조로부터 작용하는 적재하중이 기초콘크리트의 바닥면으로 분산되어 작용될 뿐만 아니라, 기초콘크리트의 구조와 일체로 결합되어진 강관말뚝을 통하여 견고한 지반으로 전달되기 때문에 구조물의 안 정성을 도모할 수 있게 된다.Therefore, by forming the foundation concrete and the upper end of the steel pipe pile fixed in the solid ground, the loading load acting from the upper structure of the foundation concrete is distributed to the bottom surface of the foundation concrete, as well as the structure of the foundation concrete Since it is transmitted to the solid ground through the steel pipe pile that is integrally combined with, it is possible to promote the stability of the structure.

상기와 같이, 강관말뚝의 두부내 속채움콘크리트 타설을 위한 지지구조와 관련된 종래의 기술로서는, 도 1에 도시된 바와 같이, 그 지지구조부가 용접형태로 강관말뚝에 결합되어 적용된 기술로서, 견고한 지반에 정착된 강관말뚝(10)의 두부를 연약지반의 바닥면으로부터 20㎝ 정도만 노출되게 절단하고, 두부 상단에서 1m 아래부분의 내주면에 지지편(11)을 용접한 후, 그 지지편(11)의 상부에 원통관(12)을 거치시켜 강관말뚝의 내주면에 용접시킨 후, 원통관(12)의 상부에 다시 속채움 콘크리트(A)의 타설시 지지되는 받침판(13)을 거치시킨다. 상기와 같이 받침판(13)을 지지시킨 후에 연약지반의 바닥면과 강관말뚝(10)의 두부내 받침판 상에 일정두께의 버림 콘크리트(B)를 타설하고, 강관말뚝(10)의 두부 내로 수직·수평의 보강 철근조립체를 삽입하고, 이 철근조립체의 수직철근(14)들이 강관말뚝(10)의 두부 상부로 노출되어서 기초콘크리트에 배근되는 수직·수평의 철근들에 조립 연결되면서 기초콘크리트의 철근조립체와 강관말뚝(10)의 두부내로 삽입된 보강 철근조립체를 일체로 조립 연결한다. 이후, 강관말뚝(10)의 내부에 삽입된 철근조립체의 강관말뚝(10)내로 속채움 콘크리트(A)를 타설한 후, 이어서 강관말뚝(10) 외부의 기초콘크리트의 철근조립체가 매설되도록 기초구조부에도 기초콘크리트(C)를 타설함으로써 강관말뚝(10)의 두부와 구조물의 하부구조인 기초콘크리트를 일체의 구조로 성형시키게 된다.As described above, as a related art related to the support structure for filling concrete in the head of the steel pipe pile, as shown in FIG. 1, the support structure is applied to the steel pipe pile in a welded form, and is a solid foundation. After cutting the head of the steel pipe pile (10) fixed in the exposed portion about 20cm from the bottom surface of the soft ground, and welded the support piece 11 to the inner peripheral surface of 1m below the head of the head, the support piece 11 After the cylindrical tube 12 is mounted on the upper portion of the steel pipe pile to be welded to the inner circumferential surface of the cylindrical tube 12, the base plate 13 supported during the pouring of the filling concrete (A) is mounted. After supporting the support plate 13 as described above, cast concrete (B) having a predetermined thickness on the bottom surface of the soft ground and the head support plate of the steel pipe pile 10, and vertically into the head of the steel pipe pile 10. Insert the horizontal reinforcing reinforcing bar assembly, and the vertical reinforcing bars 14 of the reinforcing bar assembly are exposed to the upper part of the head of the steel pipe pile 10 and assembled to the vertical and horizontal reinforcing bars which are placed on the foundation concrete. And connect the reinforcing reinforcing bar assembly inserted into the head of the steel pipe pile (10) integrally. Subsequently, after pouring the filling concrete (A) into the steel pipe pile (10) of the reinforced steel assembly inserted into the steel pipe pile (10), and then the foundation structure so that the reinforced steel assembly of the foundation concrete outside the steel pipe pile (10) Edo foundation concrete (C) by pouring the head of the steel pipe pile 10 and the foundation concrete of the lower structure of the structure is molded into an integral structure.

그러나, 상기와 같은 종래의 기술은 강관말뚝의 두부하단 1m부분 내주면에 지지편(11)과 원통관(12)을 용접하여 지지구조부를 형성함에 있어, 현실적으로 강 관말뚝(10)의 관경이 작아 용접작업을 위한 작업자의 진입이 곤란하고, 안전하게 진입한다 하더라도 용접작업의 위험성이 상존할 뿐만 아니라, 용접작업이 현장에서 이루어지는 관계로 일정품질을 확보할 수 없는 등 시공작업이 비효율적이고, 용접에 따른 지지구조부를 형성함에 있어 작업기간이 더 소요되는 문제점을 갖고 있다.However, in the conventional technique as described above, in forming the support structure by welding the support piece 11 and the cylindrical tube 12 to the inner circumferential surface of the head of the lower end of the steel pipe pile 1m, the diameter of the steel pipe pile 10 is practically small. It is difficult for the worker to enter the welding work, and the risk of welding work still exists even if it enters safely.In addition, the construction work is inefficient because the welding work is carried out in the field and the quality cannot be secured. In forming the support structure, there is a problem that the working period is longer.

한편, 다른 종래의 기술로서, 도면에 도시하지는 않았지만, 강관말뚝내 속채움 콘크리트 타설시 그 지지구조부가 볼트결합형태로 강관말뚝에 결합되어 적용된 기술로서, 이는 우선 강관말뚝의 두부 측면부분에 타공위치를 표시한 후, 표시된 타공위치에 유압 타공기를 이용하여 볼트삽입구멍들을 형성한다. 이후 단부 소정위치에 암나사홈들이 구비된 십자형 연결구를 일체로 형성한 공장제품을 상기 강관말뚝의 두부 내측에 삽입하여 상기 십자형 연결구의 단부에 형성된 암나사홈에 상기 강관말뚝에 형성된 볼트삽입구멍들을 일치시켜 상기 강관말뚝의 외측에서 볼트로 체결한 후, 십자형 연결구의 상단 테두리부에 금속제의 덮개판을 얹어 십자형 연결구의 상단 테두리와 덮개판을 용접하여 일체화시킨다. 이후, 상기 덮개판의 상면에 철근조립체를 고정시키고, 연약지반의 바닥면에 일정두게로 포설된 버림콘크리트 상에 배근되는 기초콘크리트의 철근조립체에 상기 덮개판의 상면에 고정되는 철근조립체를 일체로 조립 연결시킨 후, 콘크리트를 타설함으로써, 강관말뚝의 두부와 기초콘크리트를 일체로 하는 구조를 구축하게 된다.On the other hand, as another conventional technology, although not shown in the drawings, when the filling concrete in the steel pipe piles, the support structure is applied to the steel pipe piles in the form of bolted coupling, which is applied to the head side of the steel pipe pile first After the mark, form the bolt insertion holes using the hydraulic perforation machine at the marked perforation position. After inserting a factory product integrally formed with a cross-shaped connector with female thread grooves at a predetermined end portion inside the head of the steel pipe pile to match the bolt insertion holes formed in the steel pipe pile to the female screw groove formed at the end of the cross-shaped connector After fastening with bolts on the outside of the steel pipe pile, the metal cover plate is placed on the upper edge of the cross-shaped connector to weld the top frame and the cover plate of the cross-shaped connector to integrate. Thereafter, the reinforcing bar assembly is fixed to the upper surface of the cover plate, and the reinforcing bar assembly fixed to the upper surface of the cover plate is integrally with the reinforcing bar assembly of the foundation concrete which is placed on the discarded concrete with a certain thickness on the bottom surface of the soft ground. After assembling and connecting concrete, the concrete is constructed by integrating the head of the steel pipe pile and the foundation concrete.

그러나, 상기와 같은 종래의 기술도 강관말뚝 두부상단을 유압 타공기로 정확한 위치에 다수의 구멍들을 천공하는 작업과, 이 구멍들과 상기 원통형의 연결구를 지지하는 십자형의 보강부재의 단부측에 형성된 암나사부의 구멍을 일치시켜 볼 트로 고정결합시키는 작업, 금속제의 덮개판 상부에 철근조립체를 고정시키는 작업등 번거로운 작업으로 인하여 시공이 비효율적일 뿐만 아니라, 현장에서 강관말뚝의 주면상 소정의 위치에 정확하게 타공을 하여야 하는 고도의 정밀시공이 요구됨으로써, 공사기간이 더 소요될 뿐만 아니라, 장치 및 부수자재 등을 사용함에 따른 공사비용이 증가되는 비경제적인 문제점이 있다.However, the prior art as described above is also formed in the end of the reinforcing member of the cross-shaped reinforcing member for drilling a plurality of holes in the correct position with a hydraulic perforator at the top of the steel pipe pile head The construction is not only inefficient due to the cumbersome work such as matching the hole of the female thread part with the bolt and fixing the reinforcing bar assembly on the upper part of the metal cover plate, and drilling the hole at the predetermined position on the main surface of the steel pipe pile in the field. As a high precision construction is required to be required, not only the construction period is longer, but also the cost of construction is increased due to the use of equipment and auxiliary materials.

그리고, 보강 철근이 강관 말뚝에 삽입된 상태를 유지하여야 하지만, 보강 철근과 강관 말뚝의 연결 구조상 보강 철근이 미끄러져 빠지거나 흔들리는 문제점도 있을 수 있다.In addition, although the reinforcing bars should be kept inserted into the steel pipe pile, there may be a problem in that the reinforcing steel slides out or shakes due to the connection structure between the reinforcing steel bars and the steel pipe piles.

또한, 종래에는 전체적인 두부 보강 구조상 일반 철근을 사용할 경우 두부의 구조가 취약하고 미끄러짐이 발생하는 등의 문제점이 발생되며, 이러한 이유 등에 의해 보강 철근을 일반 철근으로 하지 못하여 공장에서 별도로 제작되어 사용되고 있다.In addition, conventionally, when using general reinforcing head reinforcement structure, there is a problem that the structure of the head is vulnerable and slippage occurs. For this reason, the reinforcing bar is not manufactured as a general reinforcing bar and used separately in a factory.

본 발명은 상기한 종래 문제점을 해결하기 위한 것으로, 강관 말뚝과 주철근을 결속하는 보강 철근을 강관 말뚝에 고정하는 고정수단의 강도를 유지하여 보강 철근의 결속력을 증대하며 공구를 사용하지 않고 고정이 가능하도록 한 확대기초구조물의 강관 말뚝 두부 보강 구조를 제공하려는데 그 목적이 있다.The present invention is to solve the above-mentioned conventional problems, to maintain the strength of the fixing means for fixing the reinforcing bars for binding the steel pipe pile and the main reinforcement to the steel pipe pile to increase the binding force of the reinforcing bars and can be fixed without using a tool The purpose is to provide a steel pipe pile head reinforcement structure of the expanded foundation structure.

그리고, 본 발명의 다른 목적은 보강 철근이 강관 말뚝에 삽입된 상태를 유지하여 이탈되지 않도록 하려는데 있다.In addition, another object of the present invention is to prevent the reinforcing bar from being separated by maintaining the state inserted into the steel pipe pile.

상기 목적을 달성하기 위한 본 발명에 따른 확대기초구조물의 강관 말뚝 두부 보강 구조는, 다수의 강관 말뚝, 상기 강관 말뚝에 삽입되는 보강 철근, 상기 보강 철근을 상기 강관 말뚝에 고정하는 철근 고정부재를 포함하며, 상기 철근 고정부재는 속채움재의 채움을 유도하는 하부 받침판, 상기 강관 말뚝에 걸려 고정되며 상기 하부 받침판을 상기 강관 말뚝에 설치하는 지지바, 상기 하부 받침판의 상부에 결합되며 상기 보강 철근이 고정되는 철근 받침띠, 상기 철근 받침띠의 상부에 다단으로 형성되는 미끄럼방지띠를 포함하여 구성된 것을 특징으로 한다.Steel pipe pile head reinforcement structure of the expanded base structure according to the present invention for achieving the above object, a plurality of steel pipe piles, reinforcing steel reinforcement is inserted into the steel pipe pile, the reinforcing bars fixed to the steel pipe pile And, the reinforcing bar fixing member is fixed to the lower support plate to guide the filling of the filling material, the steel pipe piles and the support bar for installing the lower support plate on the steel pipe piles, coupled to the upper portion of the lower support plate and the reinforcing steel is fixed Reinforcing bar support, characterized in that it comprises a non-slip belt formed in multiple stages on the upper portion of the reinforcing bar.

본 발명의 특징 및 이점들은 첨부도면에 의거한 다음의 상세한 설명으로 더욱 명백해질 것이다. 이에 앞서, 본 명세서 및 청구범위에 사용된 용어나 단어는 발명자가 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.The features and advantages of the present invention will become more apparent from the following detailed description based on the accompanying drawings. Prior to this, the terms or words used in the present specification and claims are defined in the technical spirit of the present invention on the basis of the principle that the inventor can appropriately define the concept of the term in order to explain his invention in the best way. It must be interpreted to mean meanings and concepts.

도 2에서 보이는 것처럼, 본 발명에 의한 확대기초구조물의 강관 말뚝 두부 보강 구조는, 상부가 지상으로 돌출되도록 지중에 항타 등으로 설치되는 다수의 강관 말뚝(10)에 설치되며 최종으로 확대 기초 하면 주철근(20)을 연결하는 보강 철근(100) 및 보강 철근(100)을 강관 말뚝(10)에 견고하게 고정하는 철근 고정부재(200)로 이루어져, 강관 말뚝(10)의 두부를 보강한다.As shown in Figure 2, the steel pipe pile head reinforcement structure of the expanded base structure according to the present invention is installed on a plurality of steel pipe piles 10 installed in the ground so that the upper portion protrudes to the ground and finally the base reinforcement Consists of the reinforcing bar 100 to connect the 20 and the reinforcing bar 100 to the steel pipe pile 10 to firmly fix the steel pipe pile 10, to reinforce the head of the steel pipe pile (10).

보강 철근(100)은 환형의 띠 철근(110), 띠 철근(110)에 원주방향을 따라 일 정 간격을 두고 결합되는 다수의 수직 철근(120)으로 이루어진다. 띠 철근(110)과 수직 철근(120)은 용접, 결속선 등을 통해 서로 결합되며, 이러한 구조의 보강 철근(100)은 강관 말뚝(10)의 두부 보강을 위하여 강관 말뚝(10)과 확대 기초 하면 주철근(20)을 결속하는 기능을 수행하는 것으로 일부분이 강관 말뚝(10)의 외부로 돌출되도록 강관 말뚝(10)의 내부에 삽입 고정되어 최종으로 확대 기초 하면 주철근(20)과 결속선 등으로 연결된다. 강관 말뚝(10)과의 연결은 후술하는 철근 고정부재(200)의 설명시 구체적으로 설명한다. 보강 철근(100)을 구성하는 띠 철근(110)과 수직 철근(120)은 통상적으로 사용되는 일반 철근이 사용된다.Reinforcing bar 100 is composed of a plurality of vertical reinforcing bars 120 are coupled at a predetermined interval along the circumferential direction to the annular strip reinforcement 110, the strip reinforcement 110. The strip reinforcing bar 110 and the vertical reinforcing bar 120 are connected to each other through welding, a binding line, and the like, and the reinforcing bar 100 of this structure is a steel pipe pile 10 and an enlarged foundation for reinforcing the head of the steel pipe pile 10. If it is to perform the function of binding the main reinforcing bar 20 is inserted into the inside of the steel pipe pile 10 so that a portion protrudes to the outside of the steel pipe pile 10 and finally enlarged based on the main reinforcing bar 20 and the binding line Connected. Connection with the steel pipe pile 10 will be described in detail in the description of the rebar fixing member 200 to be described later. As for the band reinforcing bars 110 and the vertical reinforcing bars 120 constituting the reinforcing bar 100, general reinforcing bars are used.

철근 고정부재(200)는 속채움재(A)의 타설 깊이를 설정하는 하부 받침판(210), 하부 받침판(210)을 강관 말뚝(10)에 고정하는 다수의 지지바(220), 하부 받침판(210)으로부터 일정 높이 이격된 지지바(220)의 도중에 결합되며 보강 철근(100)을 받쳐되는 철근 받침띠(230), 지지바(220)들에 결합되며 강관 말뚝(10)에 고정되는 2단의 미끄럼 방지띠(240)로 구성되며, 각 구성요소를 구체적으로 설명하면 다음과 같다.The rebar fixing member 200 includes a plurality of support bars 220 and a lower support plate 210 for fixing the lower support plate 210 and the lower support plate 210 to the steel pipe pile 10 to set the placing depth of the filling material A. Coupled in the middle of the support bar 220 spaced apart from a certain height) and is supported by the reinforcing steel reinforcing bar 100, two bars are coupled to the support bars 220 and fixed to the steel pipe pile (10) Consisting of the anti-skid strap 240, and will be described in detail for each component.

하부 받침판(210)은 강관 말뚝(10)의 내부와 동일 형상인 원형 판재이면서 강관 말뚝(10) 내부에 원활하게 삽입되도록 직경이 강관 말뚝(10)의 내경보다 작게 예를 들어 4㎜ 작게 형성된다.The lower support plate 210 is a circular plate having the same shape as the inside of the steel pipe pile 10 and is smaller than the inner diameter of the steel pipe pile 10 so as to be smoothly inserted into the steel pipe pile 10, for example, 4 mm smaller. .

지지바(220)는 하부 받침판(210)의 둘레부에 원주방향을 따라 일정 간격을 두고 배열되어 하단부가 하부 받침판(210)에 용접 결합되며 상단부에는 강관 말뚝(10)에 걸려 고정되는 행거부(221)가 형성된다. 즉, 지지바(220)는 강관 말 뚝(10)에 볼트로 고정되지 않고 행거부(221)를 매개로 하여 매달리기식으로 고정됨에 따라 설치 작업이 용이하다. 행거부(221)는 예컨대 도중 양측에 노치부(222)가 각각 형성되어 이 노치부(222)를 중심으로 하여 하측으로 절곡되어 성형 또는 절단될 수 있다.The support bar 220 is arranged at a circumferential direction along the circumferential portion of the lower support plate 210 so that the lower end is welded to the lower support plate 210 and the hanger part is fixed to the steel pipe pile 10 at the upper end ( 221 is formed. That is, the support bar 220 is not fixed to the steel pipe pile (10) by bolts and is fixed by the hanging method via the hanger 221 as an installation work is easy. The hanger 221 may be formed or cut by, for example, notches 222 formed on both sides of the hanger 221 and bent downward based on the notches 222.

철근 받침띠(230)은 보강 철근(100)의 하단부가 지지된 상태로 고정되는 부분으로, 속채움재(A)의 타설을 간섭하지 않도록 환형으로 이루어진다. 한편 철근 받침띠(230)은 하부 받침판(210)과의 높이차가 있기 때문에 그 하부에서부터 속채움재(A)가 채워지기 때문에 속채움재(A)에 의해 변형이 일어나지 않으면서 속채움재(A)와의 결속이 증대되도록 다수의 채움공(231)이 구비된다. 즉, 보강 철근(100)의 수직 철근(120)은 그 하단부가 채움공(231)에 삽입되지 않고 철근 받침띠(230)의 표면에 맞닿아 높이는 것이다.The reinforcing bar 230 is a portion fixed to the lower end of the reinforcing bar 100 is supported, is made of an annular so as not to interfere with the placing of the filling material (A). Meanwhile, since the reinforcing bar 230 has a height difference from the lower support plate 210, the filling material A is filled from the lower part thereof, so that the deformation of the reinforcing bar 230 is not caused by the filling material A, and thus the binding member 230 is bound with the filling material A. A plurality of filling holes 231 are provided to increase this. That is, the vertical reinforcing bar 120 of the reinforcing bar 100 is to be raised in contact with the surface of the reinforcing bar (230) without the lower end is inserted into the filling hole 231.

미끄럼방지띠(240)는 지지바(220)들에 외접(또는 내접)되도록 결합되며 강관 말뚝(10) 내부에 삽입할 때 강관 말뚝(10)의 내경과의 차이가 있더라도 삽입이 가능하도록 도중에 절개부(241)가 형성된다. 미끄럼방지띠(240)는 강관 말뚝(10) 내주면에 필렛용접으로 결합될 수 있다.The non-slip belt 240 is coupled to the support bars 220 so as to be externally (or inscribed), and when inserted into the steel pipe pile 10, it is cut in the middle so that insertion is possible even if there is a difference between the inner diameter of the steel pipe pile 10. The part 241 is formed. Non-slip belt 240 may be coupled to the fillet welding on the inner peripheral surface of the steel pipe pile (10).

이와 같이 구성된 본 발명에 의한 확대기초구조물의 강관 말뚝 두부 보강 구조에 따르면, 지중에 다수의 강관 말뚝(10)을 매설한 후, 하부 받침판(210)을 강관 말뚝(10) 내부에 삽입한다. 하부 받침판(210)의 삽입시 미끄럼방지띠(240)의 직경이 강관 말뚝(10)의 내경보다 크더라도 미끄럼방지띠(240)는 절개부(241)의 안내를 받아 탄성 변형되어 강관 말뚝(10) 내주면에 밀착된다. 지지바(220)의 행거부(221) 가 강관 말뚝(10)의 상단에 걸릴 때까지 하부 받침판(210)을 삽입하며, 그 삽입이 완료되면 미끄럼방지띠(240)와 강관 말뚝(10)의 사이를 필렛용접한다.According to the steel pipe pile head reinforcement structure of the expanded foundation structure according to the present invention configured as described above, after embedding a plurality of steel pipe piles 10 in the ground, the lower support plate 210 is inserted into the steel pipe pile (10). When the lower support plate 210 is inserted, even if the diameter of the non-slip belt 240 is larger than the inner diameter of the steel pipe pile 10, the anti-skid belt 240 is elastically deformed under the guidance of the incision 241, the steel pipe pile (10) ) It adheres to the inner circumferential surface. Insert the lower support plate 210 until the hanger 221 of the support bar 220 is caught on the upper end of the steel pipe pile 10, and when the insertion is completed, the anti-skid belt 240 and the steel pipe pile 10 Fillet weld between them.

보강 철근(100)의 수직 철근(120)을 강관 말뚝(10) 내부에 삽입하여 그 하단부가 철근 받침판(230) 상면에 닿도록 한 상태에서 스페이서(232) 등으로 간격을 유지한다.The vertical reinforcing bar 120 of the reinforcing bar 100 is inserted into the steel pipe pile 10 to maintain a gap with the spacer 232 in a state in which the lower end thereof contacts the upper surface of the reinforcing bar 230.

이어서 속채움재(A)를 강관 말뚝(10) 내부에 채우게 되면, 철근 받침띠(230)의 내부 및 채움공(231)를 통해 하부 받침판(210) 위쪽에 채워지게 된다. 구체적으로 설명하면, 먼저 속채움재(A)는 하부 받침판(210)과 철근 받침띠(230)의 사이에 채워져 상부를 향해 올라오게 되며, 일부 속채움재(A)가 채움공(231)을 통과하기 때문에 속채움재(A)의 타설 압력에 의한 철근 받침띠(230)의 휨 변형이 발생되지 않고, 속채움재(A)가 채움공(231)에 채워져 속채움재(A)와 철근 고정부재(200)가 결속된다.Subsequently, when the filling material A is filled in the steel pipe pile 10, the inside of the reinforcing bar 230 and the filling hole 231 is filled above the lower support plate 210. Specifically, first, the filling material (A) is filled between the lower support plate 210 and the reinforcing bar (230) is raised toward the top, some filling material (A) to pass through the filling hole (231) Therefore, the bending deformation of the reinforcing bar support 230 due to the placing pressure of the filling material (A) does not occur, and the filling material (A) is filled in the filling hole (231) to fill the filling material (A) and the rebar fixing member (200). Is bound.

이후에 보강 철근(100)과 확대 기초 하면 주철근(20)을 연결하고 콘크리트 타설하는 것은 종래와 동일하며, 이처럼 시공이 완료되면 미끄럼방지띠(240)가 강관 말뚝(10)보다 돌출되어 미끄럼방지띠(240)의 상하부에 속채움재(A)가 채워짐에 따라 속채움재(A)와 철근 고정부재(200)가 결속됨에 따라 철근 고정부재(200)가 강관 말뚝(10) 및 속채움재(A)로부터 이탈되지 않게 된다.After the reinforcement reinforcement (100) and the expansion base to connect the main reinforcement (20) and concrete pouring is the same as the conventional, so when the construction is completed, the non-slip belt 240 protrudes than the steel pipe pile (10) As the filling material (A) is filled in the upper and lower portions of the 240, as the filling material (A) and the reinforcing bar fixing member 200 is bound, the reinforcing steel fixing member 200 from the steel pipe pile 10 and the filling material (A) It will not break away.

이상에서 설명한 바와 같이, 본 발명에 따른 확대기초구조물의 강관 말뚝 두 부 보강 구조에 의하면, 지지바의 행거부를 강관 말뚝에 매달아 고정함으로써 철근 고정부재의 설치가 가능하므로 강관 말뚝에 볼트공을 천공하지 않고 공구를 사용하지 않으므로 설치작업이 용이하다.As described above, according to the steel pipe pile head reinforcement structure of the enlarged base structure according to the present invention, it is possible to install the reinforcing bar fixing member by hanging the hanger portion of the support bar to the steel pipe pile, so that the bolt hole is not drilled in the steel pipe pile. It is easy to install because no tools are used.

그리고, 속채움재가 채움공에 채워짐과 아울러 미끄럼방지띠에 의해 속채움재와 철근 고정부재간의 결속력이 증대됨에 따라 철근 고정부재의 이탈을 막을 수 있고 결과적으로 강관 말뚝의 두부를 견실하게 보강할 수 있다.In addition, as the filling material is filled in the filling hole and the binding force between the filling material and the reinforcing bar fixing member is increased by the anti-slip band, the separation of the reinforcing bar fixing member can be prevented, and as a result, the head of the steel pipe pile can be firmly reinforced.

또한, 보강 철근이 일반 철근으로 이루어지더라도 강관 말뚝 두부의 구조가 안정적이기 때문에 자재활용도를 높일 수 있고 원가를 절감할 수 있다.In addition, even if the reinforcing bars are made of ordinary reinforcing bars, since the structure of the steel pipe pile head is stable, the material utilization can be increased and the cost can be reduced.

아울러, 미끄럼방지띠를 적용하여 도로교 설계 기준을 충실히 이행함에 따라 제품화가 활발히 이루어질 수도 있다.In addition, by applying the non-slip belt to faithfully implement the road bridge design standards, it may be actively commercialized.

이상, 본 발명을 본 발명의 원리를 예시하기 위한 바람직한 실시예와 관련하여 설명하고 도시하였지만, 본 발명은 그와 같이 도시되고 설명된 그대로의 구성 및 작용으로 한정되는 것이 아니다. 오히려, 첨부된 청구범위의 사상 및 범주를 일탈함이 없이 본 발명에 대한 다수의 변경 및 수정이 가능함을 당업자들은 잘 이해할 수 있을 것이다. 따라서, 그러한 모든 적절한 변경 및 수정과 균등물들도 본 발명의 범위에 속하는 것으로 간주되어야 할 것이다.While the invention has been described and illustrated in connection with a preferred embodiment for illustrating the principles of the invention, the invention is not limited to the configuration and operation as such is shown and described. Rather, it will be apparent to those skilled in the art that many changes and modifications to the present invention are possible without departing from the spirit and scope of the appended claims. Accordingly, all such suitable changes and modifications and equivalents should be considered to be within the scope of the present invention.

Claims (2)

삭제delete 지상으로부터 일정 높이 돌출되도록 지중에 박히는 다수의 강관 말뚝, Multiple steel pipe piles embedded in the ground to protrude from the ground to a certain height, 환형의 띠 철근, 상기 띠 철근에 원주방향을 따라 일정 간격을 두고 결합되는 수직 철근으로 이루어져 상기 강관 말뚝의 내부에 삽입 고정되며 상기 강관 말뚝 상부에 배근되는 주철근과 연결되는 보강 철근, Ring-shaped reinforcing bars, the reinforcing bars are made of vertical reinforcing bars coupled to the band reinforcement at regular intervals along the circumferential direction and inserted into and fixed to the inside of the steel pipe piles, and are connected to the main steel bars that are reinforced on the steel pipe piles. 상기 보강 철근을 상기 강관 말뚝에 고정하는 철근 고정부재를 포함하며, Reinforcing bar fixing member for fixing the reinforcement to the steel pipe pile, 상기 철근 고정부재는 상기 강관 말뚝 내부에 상측 개구부로부터 아래측으로 이격된 곳에 삽입되어 상기 강관 말뚝 내부에 속채움재가 채워지도록 유도하는 하부 받침판, The reinforcing bar fixing member is inserted into the spaced apart from the upper opening in the inner side of the steel pipe pile to the lower support plate to guide the filling material inside the steel pipe pile, 상기 하부 받침판의 둘레부에 원주방향을 따라 일정 간격을 두고 이격되어 하단부가 고정되며 상단부가 상기 강관 말뚝에 고정되는 다수의 지지바,A plurality of support bars are fixed to the lower end is spaced apart at regular intervals along the circumferential portion of the lower support plate and the upper end is fixed to the steel pipe pile, 상기 하부 받침판으로부터 상측으로 일정 높이 이격되며 상기 지지바에 고정되고 속채움재가 통과하는 다수의 채움공이 구비되며 상기 보강 철근의 수직 철근이 결합되는 철근 받침띠를 포함하는 확대기초구조물의 강관 말뚝 두부 보강 구조에 있어서,Steel pipe pile head reinforcement structure of the expanded base structure including a reinforcing bar which is spaced apart from the lower support plate by a predetermined height and fixed to the support bar and provided with a plurality of filling holes through which the filling material passes, and the vertical reinforcing bars of the reinforcing bars are coupled. To 상기 지지바는 상단부에 노치부에 의해 상기 강관 말뚝을 감싸도록 접히는 행거부가 구비되어 상기 강관 말뚝에 매달려 고정되고,The support bar is provided with a hanger that is folded to surround the steel pipe pile by the notch portion at the upper end is fixed to the steel pipe pile, 일부분에 절개부가 형성되어 탄성 변형되는 띠 형태이며 상기 다수의 지지바들에 2단으로 결합되면서 상기 강관 말뚝에 상기 강관 말뚝의 내주면보다 돌출되도록 용접 결합되어 상하부에 속채움재가 채워지도록 하는 미끄럼 방지띠를 포함하여 구성된 것을 특징으로 하는 확대기초구조물의 강관 말뚝 두부 보강 구조.A non-slip band is formed in a cut portion formed in a portion to be elastically deformed, and is coupled to the plurality of support bars in two stages so that the steel pipe pile is welded to protrude from the inner circumferential surface of the steel pipe pile so that the filling material is filled in the upper and lower portions. Steel pipe pile head reinforcement structure of the expanded foundation structure comprising a.
KR1020070048884A 2007-05-18 2007-05-18 Structure for reinforcing steel pile head of footing foundation structure KR100802164B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070048884A KR100802164B1 (en) 2007-05-18 2007-05-18 Structure for reinforcing steel pile head of footing foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070048884A KR100802164B1 (en) 2007-05-18 2007-05-18 Structure for reinforcing steel pile head of footing foundation structure

Publications (1)

Publication Number Publication Date
KR100802164B1 true KR100802164B1 (en) 2008-02-12

Family

ID=39342800

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070048884A KR100802164B1 (en) 2007-05-18 2007-05-18 Structure for reinforcing steel pile head of footing foundation structure

Country Status (1)

Country Link
KR (1) KR100802164B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100994398B1 (en) 2008-03-17 2010-11-16 에이원스틸(주) A process of steel pipe post and the head armature for a pondside strengthening
KR20240024602A (en) * 2022-08-17 2024-02-26 박봉근 Phc pile with shear key and head reinforcement structure of phc pile using the same

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020044618A (en) * 2000-12-06 2002-06-19 김성환 Head rein forced apparatus for steel pipe piles
KR200378210Y1 (en) 2004-12-09 2005-03-14 노춘복 A pile head reinforcement structure of precastconcrete pile

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020044618A (en) * 2000-12-06 2002-06-19 김성환 Head rein forced apparatus for steel pipe piles
KR200378210Y1 (en) 2004-12-09 2005-03-14 노춘복 A pile head reinforcement structure of precastconcrete pile

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100994398B1 (en) 2008-03-17 2010-11-16 에이원스틸(주) A process of steel pipe post and the head armature for a pondside strengthening
KR20240024602A (en) * 2022-08-17 2024-02-26 박봉근 Phc pile with shear key and head reinforcement structure of phc pile using the same
KR102650575B1 (en) * 2022-08-17 2024-03-21 박봉근 Phc pile with shear key and head reinforcement structure of phc pile using the same

Similar Documents

Publication Publication Date Title
KR101696916B1 (en) Construction method of permanent wall with retaining wall combined PHC pile and steel pipe
KR100401279B1 (en) Method of building underground structure
KR101973565B1 (en) Sheathing method for constructing both sheathing wall and cutoff collar by welding cutoff plate to phc pile with longitudinal plate
JP4013182B2 (en) Self-supporting mountain retaining wall method and self-supporting mountain retaining wall
JP2006104747A (en) Pier stud connection structure and pier stud connecting method
KR100802164B1 (en) Structure for reinforcing steel pile head of footing foundation structure
KR101493495B1 (en) reinforcement structure for PHC pile and constructing method of PHC pile using thereof
KR100714920B1 (en) Joint cap of concrete pile
KR20060117746A (en) A pc girder member for frame of underground layer and assembling structure of frame of underground by using of it and the method therof
JP6006004B2 (en) Pile head space formation auxiliary tool, hollow ready-made pile provided with the same, pile head processing method using the hollow ready-made pile, and pile head space forming method
GB2582167A (en) Apparatus and method for installation of vehicle restraint system
JP6656901B2 (en) Construction method of segments and submerged structures
KR100562686B1 (en) The underground structure and it&#39;s construction method is using sheet pile and cast in a place concrete
KR20180112453A (en) Soil Retaining Wall using PHC Pile and Construction Method
EP1767710B1 (en) Composite anchor bolt and construction method for the anchor bolt
KR102098141B1 (en) A method of constructing an underground wall structure using an earth retaining wall and an underground wall structure
JPS63280153A (en) Underground inverted lining method
JP4146250B2 (en) Open caisson bottom plate construction method
EP1405952B1 (en) Method of constructing a basement beneath an existing building
TWI790741B (en) Retaining wall and its construction method
KR20190109883A (en) Composite phc pile for soil retaining wall
JP3597824B2 (en) Construction method of overhang road
KR100420075B1 (en) Supporting Structure for Concreting in Head of a Steel-Pile
JPH10331569A (en) Steel segment piece with joint box opened to its outer surface and method for constructing sunk body using the same
CN216109626U (en) Connecting structure of assembled platform and tool post

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
A302 Request for accelerated examination
E902 Notification of reason for refusal
N231 Notification of change of applicant
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
G170 Publication of correction
FPAY Annual fee payment

Payment date: 20130129

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20140204

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20150202

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20170124

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20190130

Year of fee payment: 12