JPH08284315A - Method and device for assembling wall reinforcement unit - Google Patents

Method and device for assembling wall reinforcement unit

Info

Publication number
JPH08284315A
JPH08284315A JP8727095A JP8727095A JPH08284315A JP H08284315 A JPH08284315 A JP H08284315A JP 8727095 A JP8727095 A JP 8727095A JP 8727095 A JP8727095 A JP 8727095A JP H08284315 A JPH08284315 A JP H08284315A
Authority
JP
Japan
Prior art keywords
muscles
shear
net
reinforcement
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP8727095A
Other languages
Japanese (ja)
Other versions
JP3281974B2 (en
Inventor
Masashi Adachi
昌史 安達
Katsuo Maruyama
克夫 丸山
Shinzaburo Mori
真三郎 森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP08727095A priority Critical patent/JP3281974B2/en
Publication of JPH08284315A publication Critical patent/JPH08284315A/en
Application granted granted Critical
Publication of JP3281974B2 publication Critical patent/JP3281974B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

PURPOSE: To facilitate assembly of a wall unit by a method wherein each of paired netted reinforcements is formed separately while hooking parts are formed at both ends of each of shear reinforcing bars, and the hooking parts are hung on and fixed to both of the netted reinforcements. CONSTITUTION: An inner netted reinforcement 2 and an outer netted reinforcement 3 are separately formed in latticework on bar arrangement beds 21 and 22, and hooking parts 4a are formed beforehand at both ends of each of shear reinforcing bars. With the outer netted reinforcement 3 kept in placement on the bar arrangement bed 22, the inner netted reinforcement 2 is hoisted, being hung down from a hanger beam 40, with a crane from the bar arrangement bed 21 and moved to a position above the outer netted reinforcement 3. The hanger beam 40 is suspended with jacks 32, and the shear reinforcing bars 4 are inserted through the inner netted reinforcement 2 and the outer netted reinforcement 3 with the distance between both of the netted reinforcements 2 and 3 slightly narrowed, and a unit 1 is formed with the hooking parts 4a hung on and fixed to the netted reinforcements. Therefore, a large-sized wall reinforcement unit can be assembled efficiently and precisely.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、鉄筋コンクリート造の
壁体を形成する際に用いる壁鉄筋ユニットの組立方法な
らびにその組立装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and apparatus for assembling a wall reinforcing bar unit used when forming a wall body made of reinforced concrete.

【0002】[0002]

【従来の技術】近年、建築・土木構造物の施工の合理化
を図るべく種々の工法が提案され、実用化されている
が、鉄筋コンクリート造の壁体、特に大規模構造物にお
ける壁厚の大きい壁体を施工する際の壁鉄筋の配筋作業
については充分な合理化が実現されておらず、未だ手作
業に頼らざるを得ないことが現状である。
2. Description of the Related Art In recent years, various construction methods have been proposed and put to practical use in order to rationalize the construction of construction and civil engineering structures. However, reinforced concrete wall bodies, especially walls with large wall thickness in large-scale structures. The rationalization of the wall reinforcement work when constructing the body has not been sufficiently rationalized, and it is the current situation that it is still necessary to rely on manual work.

【0003】図18は壁厚の大きい鉄筋コンクリート壁
の配筋例を示すものである。これは例えば大きな土圧を
受ける大規模な地中構造物の側壁を構成するものであっ
て、呼び径が例えば38mmあるいは41mmというよ
うな太径の鉄筋からなる縦筋aおよび横筋bからなる網
筋c,dを二重に配置し、それら網筋c,dどうしを剪
断筋eにより互いに連結する形態としたものである。そ
して、このような壁体を施工する際の配筋作業は、予め
格子状に形成した内外の網筋c,dを用意しておき、ま
ず外側の網筋cを建て込んでからその内側に適正な間隔
を確保して内側の網筋dを建て込み、次いで、双方の網
筋c,dに対して剪断筋e,eの先端部に形成されてい
るフックf,fをそれぞれ係止させた後、それら剪断筋
e,eの基端部どうしを機械継手gあるいは重ね継手h
により互いに接続する、という手順が一般に採用されて
いる。
FIG. 18 shows an example of reinforcement of a reinforced concrete wall having a large wall thickness. This constitutes a side wall of a large-scale underground structure which receives a large earth pressure, for example, and is a net consisting of a vertical bar a and a horizontal bar b made of rebar having a large nominal diameter of 38 mm or 41 mm. The muscles c and d are doubly arranged, and the net muscles c and d are connected to each other by the shear muscle e. Then, for the reinforcement work when constructing such a wall body, the inner and outer net reinforcements c and d formed in a grid shape are prepared in advance, and the outer net reinforcement c is first built and then the inner reinforcement The inner net streak d is built with a proper space secured, and then the hooks f and f formed at the tips of the shear streaks e and e are locked to the two net streaks c and d, respectively. After that, the base end portions of the shear muscles e, e are mechanically joined to each other or to the lap joint h.
The procedure of connecting to each other is generally adopted.

【0004】[0004]

【発明が解決しようとする課題】しかしながら上記のよ
うな従来の配筋作業は、外側の網筋cの建て込み、内側
の網筋dの建て込み、各剪断筋e,eの配筋とそれらの
接続、という作業の繰り返しとなるので、非常に手間が
かかる非効率的なものであった。また、剪断筋e,eど
うしを機械継手gにより接続する場合は機械継手gのコ
ストがかさみ、また、重ね継手hとする場合には重ね代
分だけ鉄筋量が増大するので、いずれにしてもコスト削
減を図る上での障害となっている。
However, in the conventional rebar work as described above, the outer rebar c is built in, the inner rebar d is built in, the shear rebars e, e are arranged and It was very time-consuming and inefficient because it was necessary to repeat the process of connecting. Further, when the shear joints e, e are connected to each other by the mechanical joint g, the cost of the mechanical joint g is high, and in the case of the lap joint h, the amount of the reinforcing bar is increased by the overlap margin. It is an obstacle to cost reduction.

【0005】このため、上記のような問題を解決するべ
く、壁鉄筋を予めユニット化しておくことで現場での作
業を削減することが検討され、また、機械継手gや重ね
継手hを用いることなく剪断筋eの配筋を行うことも検
討されている。しかし、そのようなことを実現させるた
めには壁鉄筋ユニットを効率的に組み立てるための手法
の開発が不可欠であり、そのような手法の開発が急務と
されていた。
Therefore, in order to solve the above-mentioned problems, it has been considered to reduce the work on site by unitizing the wall reinforcing bars in advance, and to use the mechanical joint g and the lap joint h. It is also considered to arrange the shear muscles e without using them. However, in order to realize such a thing, it is indispensable to develop a method for efficiently assembling the wall reinforcing bar unit, and there has been an urgent need to develop such a method.

【0006】[0006]

【課題を解決するための手段】上記事情に鑑み、請求項
1記載の発明は壁鉄筋ユニットを組み立てるための有効
な方法を提供することを目的とするものであって、縦筋
と横筋とが格子状に組まれてなる一対の網筋が間隔をお
いて対向して剪断筋により互いに連結されてなる壁鉄筋
ユニットを組み立てるに際し、前記一対の網筋の双方を
それぞれ個別に形成するとともに、前記剪断筋の両端部
に各網筋に係止し得るフック部を予め形成しておき、一
方の網筋を略水平な状態に定置するとともに他方の網筋
をその上方に吊り支持することにより、それら双方の網
筋の相互間隔を前記剪断筋の長さよりやや小さくした状
態に保持し、その状態で前記剪断筋を双方の網筋に跨が
るようにその両端部をそれぞれ双方の網筋に対して挿通
させた後、前記他方の網筋を上方に持ち上げることによ
り剪断筋の両端のフック部をそれぞれ双方の網筋に対し
て係止させ、次いで、剪断筋の両端部を各網筋に対して
溶接あるいは締結して固定するようにしたものである。
In view of the above circumstances, the invention as set forth in claim 1 is intended to provide an effective method for assembling a wall reinforcing bar unit, in which vertical and horizontal bars are provided. When assembling a wall reinforcing bar unit in which a pair of reticulate bars assembled in a lattice form are opposed to each other with a gap and are connected to each other by a shear bar, both of the pair of reticulated bars are individually formed, and By previously forming a hook portion that can be locked to each reticulum at both ends of the shear muscle, by placing one reticulum in a substantially horizontal state and suspending and supporting the other reticulum above it, Retaining the mutual spacing of both reticulums in a state of being slightly smaller than the length of the shear muscle, in that state so that the both ends of the reticulum to both reticulums so that the shear muscle straddles both reticulums. After inserting it in the opposite direction, other than the above The hooks at both ends of the shear muscle are locked to both net muscles by lifting the net muscle of the above, and then both ends of the shear muscle are welded or fastened to each net muscle to be fixed. It was done like this.

【0007】また、請求項2記載の発明は上記方法を実
施する際に用いて好適な壁鉄筋ユニットの組立装置であ
って、前記双方の網筋をそれぞれ略水平な状態として形
成するための2台の配筋ベッドと、一方の配筋ベッド上
で形成された一方の網筋の上方に、他方の配筋ベッド上
で形成された他方の網筋を移送してきて吊り支持する吊
りビームと、前記一方の配筋ベッドの周囲に配置され、
前記吊りビームを下方から支持するとともに同期して作
動して該吊りビームを昇降させることにより双方の網筋
の相互間隔を調節する複数台のジャッキとを具備したも
のである。
The invention according to claim 2 is a wall rebar unit assembling apparatus suitable for use in carrying out the above method, wherein both of the net bars are formed in a substantially horizontal state. Reinforcement bed of the table, and a suspension beam that transfers and suspends and supports the other reticulate muscle formed on the other rebar bed above one reticulate muscle formed on one rebar bed, It is placed around the one reinforcement bar,
A plurality of jacks are provided for supporting the suspension beam from below and operating in synchronization with each other to elevate and lower the suspension beam to adjust the mutual distance between the two mesh bars.

【0008】さらに、請求項3記載の発明は、組み立て
た壁鉄筋ユニットを起立させるための建て起こし機を上
記の組立装置に付設したものであり、その建て起こし機
は、ほぼ水平な状態からほぼ垂直な状態に起立する起立
ベッドを有し、該起立ベッド上に組み立てた壁鉄筋ユニ
ットをほぼ水平な状態に保持して該起立ベッドを起立さ
せることで壁鉄筋ユニットをほぼ垂直な状態に起立させ
るようにしたものである。
Further, the invention according to claim 3 is such that a raising machine for raising the assembled wall reinforcing bar unit is attached to the above-mentioned assembling apparatus, and the raising machine is almost in a horizontal state. Having a standing bed which stands upright, the wall reinforcing bar unit assembled on the standing bed is held in a substantially horizontal state, and the standing bed is raised so that the wall reinforcing bar unit stands up in a substantially vertical state. It was done like this.

【0009】[0009]

【作用】本発明の方法では1本の剪断筋の両端に予めフ
ック部を形成しておくとともに、予め個別に形成した双
方の網筋を接近させた状態で対向させておき、それら網
筋の双方に対して剪断筋を挿通させてから網筋の間隔を
適正な間隔にまで拡げることにより、剪断筋の両端のフ
ック部を双方の網筋に対して係止する。したがって従来
のように2本の剪断筋を用いてそれらを機械継手や重ね
継手により接続する必要がない。
According to the method of the present invention, the hook portions are formed in advance on both ends of one shear muscle, and both of the separately formed net muscles are opposed to each other in a state of being close to each other. By inserting the shear muscles into both of them and then expanding the distance between the net muscles to an appropriate distance, the hook portions at both ends of the shear muscle are locked to both net muscles. Therefore, it is not necessary to use two shear muscles and connect them by a mechanical joint or a lap joint as in the prior art.

【0010】また、本発明の装置では、配筋ベッド上に
おいて水平な状態で形成した一方の網筋の上方に、他方
の配筋ベッドで形成した他方の網筋を吊りビームにより
移送してきて、その吊りビームをジャッキにより支持す
ることで双方の網筋どうしを接近させた状態に対向させ
る。そして、予め両端部にフック部を形成した剪断筋を
双方の網筋に挿通させてから、吊りビームをジャッキア
ップして網筋の間隔を拡げることにより、剪断筋の両フ
ック部を双方の網筋に対して係止させ、その状態で剪断
筋を双方の網筋に対して固定する。
Further, in the apparatus of the present invention, the one net bar formed in the other bar is transferred above the one net bar formed in the horizontal state on the bar by the hanging beam, By supporting the suspension beam with a jack, both net reeds are made to face each other in a close state. Then, after inserting the shear muscles having hook portions formed at both ends into both of the net muscles, the hanging beam is jacked up to widen the distance between the net muscles, so that the hook portions of the shear muscles are connected to each other. It is locked to the muscle, and in that state, the shear muscle is fixed to both reticulate muscles.

【0011】[0011]

【実施例】以下、本発明の一実施例を図面を参照して説
明する。図1〜図5は本実施例において用いる壁鉄筋ユ
ニット1(以下では単にユニット1と略す)を示す。こ
のユニット1は、大規模な地下構造物の側壁に適用され
るもので、その側壁の形状に対応して湾曲している一対
の内側網筋2と外側網筋3、それら網筋2,3どうしを
連結する剪断筋4(図4、図5参照)、および補強フレ
ーム5とにより構成されるものである。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings. 1 to 5 show a wall reinforcing bar unit 1 (hereinafter simply referred to as unit 1) used in this embodiment. This unit 1 is applied to the side wall of a large-scale underground structure, and has a pair of inner reticulum 2 and outer reticulum 3, which are curved corresponding to the shape of the side wall, and those reticulum 2, 3 It is composed of a shear muscle 4 (see FIG. 4 and FIG. 5) for connecting together and a reinforcing frame 5.

【0012】網筋2,3はいずれも多数の縦筋6と横筋
7とが格子状に組まれたものであり、剪断筋4はその両
端に形成されているフック部4aが双方の網筋2,3に
係止された状態で番線等により締結されて固定されてい
る。補強フレーム5は図3に示すようにアングル材8お
よびブレース材9により構成され、Uボルト10により
網筋2,3に対して締結されて双方の網筋2,3の間に
取り付けられている。なお、本実施例のユニット1にお
いては、補強フレーム5は図1に示すように水平に4段
にわたって取り付けられており、最上段の補強フレーム
5にはこのユニット1を吊り上げる際に用いる吊具11
が取り付けられている。
Each of the reticular muscles 2 and 3 is composed of a large number of longitudinal muscles 6 and transverse muscles 7 assembled in a lattice, and the shear muscles 4 have hook portions 4a formed at both ends thereof. It is fastened and fixed by a numbered wire or the like while being locked to the second and third parts. As shown in FIG. 3, the reinforcing frame 5 is composed of an angle member 8 and a brace member 9, and is fastened to the net rebars 2 and 3 by a U-bolt 10 and attached between the net rebars 2 and 3. . In addition, in the unit 1 of the present embodiment, the reinforcing frame 5 is horizontally attached in four steps as shown in FIG. 1, and the suspending tool 11 used when hoisting the unit 1 is attached to the uppermost reinforcing frame 5.
Is attached.

【0013】そして、上記のユニット1は、図4,図5
に示すように、互いに隣接するものどうしが一部をラッ
プさせた状態で左右方向および上下方向に連続するよう
に順次建て込まれ、全体としてその側壁の配筋を構成す
るものである。
The unit 1 described above is shown in FIGS.
As shown in FIG. 5, the adjacent ones are sequentially built up in a state of being partially overlapped so as to be continuous in the left-right direction and the up-down direction, and the reinforcement of the side wall is configured as a whole.

【0014】上記ユニット1の組立手順を組立装置の構
成とともに説明する。まず、図6(a)に示すように、
内側網筋2および外側網筋3をそれぞれ配筋ベッド2
1,22上においてそれぞれ所定の寸法、形状の格子状
に個別に形成する。内側網筋2を形成するための配筋ベ
ッド21は、図7〜図9に示すように、ベースフレーム
23上に縦横に組まれた支持フレーム24が支柱25に
より支持されたものである。支持フレーム24は形成す
るべき内側網筋2の曲率に対応して湾曲しており、この
支持フレーム24上において縦筋6および横筋7をそれ
ぞれ格子状に並べて組み立てるようになっている。な
お、横筋7は支持フレーム24上に配置されるのみで自
ずと支持フレーム24に沿って所望の曲率に湾曲し、し
たがって予め曲げ加工を施しておく必要はない。図9に
おける符号26は各横筋7の位置決めのための切欠溝2
6aが形成された定規板、27は各縦筋6の一端を揃え
てその位置決めを行うための定規板である。
The procedure for assembling the unit 1 will be described together with the configuration of the assembling apparatus. First, as shown in FIG.
The inner reticulum 2 and the outer reticulum 3 are arranged in the rebar bed 2
They are individually formed on the electrodes 1 and 22 in a lattice shape having a predetermined size and shape. As shown in FIG. 7 to FIG. 9, the reinforcing bar bed 21 for forming the inner side net reinforcement 2 has a support frame 24 vertically and horizontally assembled on a base frame 23 and supported by columns 25. The support frame 24 is curved in accordance with the curvature of the inner net muscle 2 to be formed, and the vertical stripes 6 and the horizontal stripes 7 are arranged on the support frame 24 in a grid pattern and assembled. Note that the horizontal streaks 7 are only arranged on the support frame 24, and naturally bend along the support frame 24 to have a desired curvature, and therefore, it is not necessary to perform bending in advance. Reference numeral 26 in FIG. 9 is a notch groove 2 for positioning each lateral bar 7.
A ruler plate 6a is formed, and 27 is a ruler plate for aligning one end of each vertical stripe 6 to perform its positioning.

【0015】一方、外側網筋3を形成するための配筋ベ
ッド22も上記配筋ベッド21と同様のものであって、
図10〜図12に示すようにベースフレーム28、外側
網筋3の曲率に対応して湾曲している支持フレーム2
9、支柱30、定規板31から構成されているが、さら
に、この配筋ベッド22の周囲にはジャッキ32を支持
するためのポスト33が複数台(図示例のものは8台)
設置されているとともに、それらジャッキ32に接続さ
れる油圧供給源装置34が付設されている。油圧供給源
装置34は、図11に示すように、油圧ポンプ35、供
給側および返送側の主管路36a,36b、供給側およ
び返送側のマニホールド37a,37b、供給側および
返送側の分岐管路38a,38bにより構成され、各ジ
ャッキ32を同期させて一斉に作動させるものとされて
いる。
On the other hand, the reinforcing bar bed 22 for forming the outer reticulum 3 is also the same as the reinforcing bar bed 21.
As shown in FIGS. 10 to 12, the support frame 2 which is curved corresponding to the curvatures of the base frame 28 and the outer net reinforcement 3.
Although it is composed of 9, a column 30, and a ruler plate 31, a plurality of posts 33 for supporting the jack 32 are further provided around the bar arrangement bed 22 (eight in the illustrated example).
In addition to being installed, a hydraulic pressure supply device 34 connected to the jacks 32 is additionally provided. As shown in FIG. 11, the hydraulic pressure supply device 34 includes a hydraulic pump 35, main pipelines 36a and 36b on the supply side and return side, manifolds 37a and 37b on the supply side and return side, and branch pipelines on the supply side and return side. The jacks 32 are composed of 38a and 38b and are operated simultaneously in synchronization with each other.

【0016】上記のようにして各配筋ベッド21,22
上において内側網筋2および外側網筋3をそれぞれ個別
に形成したら、それらの網筋2,3どうしを剪断筋4お
よび補強フレーム5により一体に組み立てるのである
が、その手順を以下に説明する。なお、剪断筋4は予め
その両端部にそれぞれフック部4a,4aを形成してお
く。また、補強フレーム5の各アングル材8やブレース
材9等も、予め所望の形状、寸法に加工しておくと良
い。
As described above, the respective bar arrangement beds 21 and 22 are arranged.
When the inner reticulum 2 and the outer reticulum 3 are individually formed in the above, the reticulums 2 and 3 are assembled together by the shear 4 and the reinforcing frame 5. The procedure will be described below. The shear muscle 4 has hook portions 4a, 4a formed at both ends thereof in advance. Also, each angle member 8 and the brace member 9 of the reinforcing frame 5 may be processed in advance into desired shapes and dimensions.

【0017】図6(b)に示すように外側網筋3はその
まま配筋ベッド22上に配置しておき、内側網筋2をク
レーンにより駆動される吊りビーム40により配筋ベッ
ド21から吊り上げて外側網筋3の上方まで移送する。
吊りビーム40は図13,図14に示すように、湾曲し
ている主フレーム41とその上部の補強フレーム42か
らなり、主フレーム41の下部に内側網筋2を吊り支持
するための吊り具43が取り付けられているとともに、
主フレーム41の両端部下面側には上記ポスト33上に
設置されているジャッキ32の先端に嵌合し得るジャッ
キ連結部材44が取り付けられているものである。
As shown in FIG. 6 (b), the outer net reinforcement 3 is arranged on the reinforcement bed 22 as it is, and the inner reinforcement 2 is lifted from the reinforcement bed 21 by a suspension beam 40 driven by a crane. Transfer to above the outer reticulum 3.
As shown in FIGS. 13 and 14, the suspension beam 40 is composed of a curved main frame 41 and a reinforcing frame 42 above the curved main frame 41, and a suspender 43 for suspending and supporting the inner net reinforcement 2 under the main frame 41. Is attached,
On the lower surface sides of both ends of the main frame 41, jack connecting members 44 that can be fitted to the tips of the jacks 32 installed on the posts 33 are attached.

【0018】内側網筋2を移送してきた吊りビーム40
を図6(c)に示すように各ジャッキ32により支持さ
せるとともに、各ジャッキ23を降下させた状態として
おくことにより、配筋ベッド22上の外側網筋3と吊り
ビーム40から吊り支持されている内側網筋2との間隔
を、最終的に設定するべき適正な間隔より若干狭くして
おく。そして、その状態で、予めフック部4aが形成さ
れている剪断筋4を双方の網筋2,3に挿通させてその
フック部4aを適宜網筋2,3に引っ掻ける。
The suspension beam 40 that has transferred the inner net line 2
Is supported by the jacks 32 as shown in FIG. 6 (c), and the jacks 23 are kept in a lowered state, so that the jacks are suspended and supported from the outer net reinforcement 3 and the suspension beam 40 on the reinforcement bar 22. The space between the inner reticulum 2 is slightly narrower than the proper space to be finally set. Then, in this state, the shear muscle 4 in which the hook portion 4a is formed in advance is inserted into both the net muscles 2 and 3, and the hook portion 4a is appropriately scratched by the net muscles 2 and 3.

【0019】次いで、各ジャッキ32を同期させて一斉
に作動させることにより吊りビーム40および内側網筋
2を若干持ち上げ、これにより双方の網筋2,3の相互
間隔を最終的に設定するべき適正な間隔にまで拡げる。
これにより、図6(d)に示すように剪断筋4の両フッ
ク部4a,4aは自ずと双方の網筋2,3に対して係止
されることになる。そこで、剪断筋4を番線により網筋
2,3に対して締結するとともに、双方の網筋2,3の
間に補強フレーム5を所定位置に取り付け、さらに、必
要に応じて例えば型枠や足場に関する各種の仮設材を適
宜取り付ければ、ユニット1が完成する。完成品は図6
(e)に示すように吊りビーム40により吊り上げて仮
置きヤードへ移送し、建て込みを行うまでストックして
おく。
Then, the suspension beams 40 and the inner net reeds 2 are slightly lifted by operating the jacks 32 in synchronism with each other at the same time, so that the mutual distance between the two nets 2 and 3 should be finally set. Expand to even intervals.
As a result, as shown in FIG. 6 (d), the hook portions 4a, 4a of the shear muscle 4 are naturally locked to both the net muscles 2, 3. Therefore, the shear muscles 4 are fastened to the braids 2 and 3 by the numbered wire, and the reinforcing frame 5 is attached between the braided ribs 2 and 3 at a predetermined position. The unit 1 is completed by properly attaching various temporary materials related to. Figure 6 shows the finished product
As shown in (e), it is hoisted by the hoisting beam 40, transferred to a temporary storage yard, and stocked until it is built.

【0020】以上で説明した組立装置を用いて以上の手
順によりユニット1を組み立てることにより、太径の縦
筋6や横筋7を用いた大規模なユニット1を効率良くし
かも充分な管理の下で精度良く組み立てることが可能で
あり、したがってこれを一括して建て込むことで現場で
の配筋作業が大幅に軽減され、省力化、工費削減に充分
に寄与できる。
By assembling the unit 1 according to the above procedure using the assembling apparatus described above, a large-scale unit 1 using the large-diameter vertical bar 6 and the horizontal bar 7 can be efficiently and sufficiently managed. It is possible to assemble with high accuracy, and therefore, by arranging them all at once, the work of bar arrangement on site can be greatly reduced, which can contribute to labor saving and construction cost reduction.

【0021】また、双方の網筋2,3を接近させた状態
としておいて剪断筋4を挿通させた後、内側網筋2をジ
ャッキアップすることで剪断筋4の両端のフック部4
a,4aを双方の網筋2,3に係止させるようにしたこ
とから、1本ものの剪断筋4の採用が可能となったので
あり、したがって図18に示した従来一般の場合のよう
に2本の剪断筋e,eを機械継手gや重ね継手hにより
接続する必要がなくなるから、この点においても省力化
と工費削減を図ることができる。なお、剪断筋4を足場
として利用することがあるが、その場合も強度が充分に
確保される。
Further, after the shear muscles 4 are inserted while keeping the both net muscles 2 and 3 close to each other, the inner net muscles 2 are jacked up so that the hook portions 4 at both ends of the shear muscles 4 are inserted.
Since the a and 4a are locked to both the net muscles 2 and 3, it is possible to employ only one shear muscle 4, and therefore, as in the conventional general case shown in FIG. Since it is not necessary to connect the two shear lines e, e by the mechanical joint g or the lap joint h, labor saving and construction cost reduction can be achieved also in this respect. The shear muscle 4 may be used as a scaffold, but in that case, sufficient strength is secured.

【0022】ところで、仮置きヤードに仮置きしておい
た完成品のユニット1を建て込む際には、水平な状態か
ら鉛直な状態に起立させた状態で吊り上げる必要があ
る。この際、ユニット1自体が建て起こしに耐え得る充
分な剛性を有する場合はユニット1を単にクレーンによ
り吊り上げて建て起こせば良いが、ユニット1の剛性が
不十分であって建て起こしに耐えられないような場合、
つまり、吊り上げ時に自重がかかることでユニット1自
身が曲げ変形を生じる懸念があるような場合には、図1
5〜図17に示すような建て起こし機50を付設してお
き、それを用いてユニット1を建て起こせば良い。
By the way, when the unit 1 of the finished product temporarily placed in the temporary placing yard is to be built, it is necessary to lift the unit 1 from the horizontal state to the vertical state. At this time, if the unit 1 itself has sufficient rigidity to withstand the erecting, the unit 1 may be simply lifted by a crane to erect, but the rigidity of the unit 1 is insufficient so that the unit 1 cannot withstand the erecting. If
In other words, if there is a concern that the unit 1 itself may be bent and deformed due to its own weight during lifting,
It is sufficient to attach a erection machine 50 as shown in FIGS. 5 to 17 and use it to erection the unit 1.

【0023】本実施例における建て起こし機50は、ベ
ースフレーム51と、そのベースフレーム51に対して
基部側が軸体52により軸支されて上下方向に起立可能
に連結された起立ベッド53により構成され、起立ベッ
ド53上にユニット1を保持してその上部側をクレーン
により持ち上げて起立させることにより、ユニット1を
何等荷重を加えることなく起立させるようにしたもので
ある。
The erection machine 50 in this embodiment is composed of a base frame 51 and a standing bed 53 connected to the base frame 51 at the base side by a shaft 52 so as to be vertically erected. The unit 1 is held on the standing bed 53, and the upper side of the unit 1 is lifted by a crane to stand up, so that the unit 1 can stand up without applying any load.

【0024】そのような建て起こし機50を用いれば、
剛性が不十分でそれ自体では建て起こしに耐えられない
ユニット1であっても支障なく建て起こすことができ
る。換言すれば、このような建て起こし機50を用いる
ことを前提とすれば、ユニット1の剛性は低いもので良
いことになり、したがって補強フレーム5を不要あるい
は設ける場合も必要最小限度で良い。その結果、補強フ
レーム5に要するコスト削減を図ることができるととも
に、ユニット1の自重軽減を図ることができる。
If such a raising machine 50 is used,
Even a unit 1 which has insufficient rigidity and cannot stand up by itself can be built without any trouble. In other words, assuming that such a erection machine 50 is used, the unit 1 may have a low rigidity, and therefore, even when the reinforcing frame 5 is unnecessary or provided, the minimum necessary amount is sufficient. As a result, the cost required for the reinforcing frame 5 can be reduced, and the weight of the unit 1 can be reduced.

【0025】なお、上記のような建て起こし機50を用
いることなくユニット1自体で建て起こすことを想定
し、建て起こしの際の剛性確保を目的として補強フレー
ム5を設ける場合には、補強フレーム5を水平方向では
なく鉛直方向に設けることが当然に有効であるが、その
ように補強フレーム5を鉛直方向に設けた場合はコンク
リート打設の際にその補強フレーム5によってコンクリ
ートが水平方向に展開することが阻害されてしまい、そ
の結果、コンクリートの充填性が損われることが懸念さ
れる。これに対し、上記のような建て起こし機50を用
いることを前提とした場合は、補強フレーム5を設ける
としてもそれを鉛直方向に設ける必要は全くなく、例え
ば上記実施例のように水平方向に設けることで充分であ
るから、打設されたコンクリートが水平方向に展開する
ことが妨げられることはなく、充填性が損われる懸念も
ない。
In the case where the reinforcing frame 5 is provided for the purpose of ensuring rigidity when the unit 1 itself is built up without using the above-mentioned building machine 50, when the reinforcing frame 5 is provided. It is naturally effective to provide the vertical direction instead of the horizontal direction. However, when the reinforcing frame 5 is provided in the vertical direction in this way, the concrete is expanded horizontally by the reinforcing frame 5 when placing concrete. This is impeded, and as a result, the filling property of concrete is impaired. On the other hand, if it is premised that the erecting machine 50 as described above is used, even if the reinforcing frame 5 is provided, it need not be provided in the vertical direction at all, and, for example, in the horizontal direction as in the above embodiment. Since it is sufficient to provide it, there is no hindrance to the horizontal spreading of the cast concrete, and there is no fear of impairing the filling property.

【0026】以上で本発明の一実施例を説明したが、本
発明は上記実施例に限定されるものでは勿論なく、ユニ
ット1の形態や寸法、組立装置の細部の構成等は種々の
設計的な変更を任意に行い得るものである。たとえば、
上記実施例におけるユニット1は湾曲した壁体に適用さ
れるものであるので双方の網筋2,3を湾曲させたもの
としたが、平面状の壁体に適用する場合には湾曲させる
ことなく平面的なユニット1とすれば良いことは勿論で
あり、その場合は配筋ベッド21,22における支持フ
レーム24,29や建て起こし機50における起立ベッ
ド53も単なる平面的なものとすれば良い。
Although one embodiment of the present invention has been described above, the present invention is not limited to the above embodiment, and the form and size of the unit 1 and the detailed structure of the assembling apparatus are variously designed. It can be arbitrarily changed. For example,
Since the unit 1 in the above-described embodiment is applied to a curved wall body, both of the mesh lines 2 and 3 are curved. However, when the unit 1 is applied to a planar wall body, it is not curved. Of course, the flat unit 1 may be used, and in that case, the support frames 24 and 29 of the arranging beds 21 and 22 and the standing bed 53 of the erecting machine 50 may be simply flat.

【0027】また、上記実施例の組立装置には完成品の
ユニット1を建て起こすための建て起こし機50を付設
したが、その建て起こし機50は必ずしも必須ではな
く、ユニット1自体が充分な剛性を有する場合等におい
ては建て起こし機50を省略して良い。あるいは、外側
網筋3を形成するための配筋ベッド22における支持フ
レーム29を上記の起立ベッド53のように起立可能と
することで、その配筋ベッド22を建て起こし機として
兼用することも可能である。さらに、上記実施例の建て
起こし機50は起立ベッド53をクレーンにより持ち上
げて起立させるようにしたが、起立ベッド53を起立、
転倒させるための油圧ジャッキ等の駆動源を建て起こし
機50に搭載しておくことも考えられる。
Further, the assembling apparatus of the above-mentioned embodiment is provided with a erection machine 50 for erection of the finished unit 1, but the erection machine 50 is not always necessary, and the unit 1 itself has sufficient rigidity. In the case of having the above, the erecting machine 50 may be omitted. Alternatively, by making the support frame 29 in the reinforcing bar 22 for forming the outer side net bars 3 upright like the standing bed 53, the reinforcing bar 22 can also be used as a erection machine. Is. Further, the erection machine 50 of the above-described embodiment is configured such that the standing bed 53 is lifted by the crane so as to stand up.
It is conceivable to mount a drive source such as a hydraulic jack for overturning on the raising machine 50.

【0028】[0028]

【発明の効果】以上で説明したように、本発明の組立方
法は、一対の網筋を接近させた状態で対向させてそれら
に剪断筋を挿通させた後、それらの相互間隔を拡げて剪
断筋のフック部を双方の網筋に係止させ、その後、剪断
筋と網筋と固定するようにしたので、大規模な壁鉄筋ユ
ニットを効率良くしかも充分な管理の下で精度良く組み
立てることが可能となることはもとより、特に1本もの
の剪断筋の採用が可能となったことにより、2本の剪断
筋を機械継手や重ね継手により接続していた従来の場合
に比して大幅な省力化と工費削減を図ることができる。
As described above, according to the assembling method of the present invention, a pair of net muscles are opposed to each other in a state where they are close to each other, and a shear muscle is inserted through them, and then the mutual spacing between them is expanded and sheared. Since the hooks of the muscles are locked to both reticulums, and then the shears and braids are fixed, it is possible to assemble a large-scale wall rebar unit efficiently and accurately with sufficient control. Not only is it possible, but it is also possible to use one single shear muscle, resulting in a significant labor saving compared to the conventional case where two shear muscles were connected by a mechanical joint or a lap joint. And the construction cost can be reduced.

【0029】また、本発明の組立装置は、双方の網筋を
形成するための配筋ベッドと、一方の網筋の上方に他方
の網筋を移送して重ねるための吊りビームと、吊りビー
ムをジャッキアップして網筋の相互間隔を調節するジャ
ッキを備えているので、上記方法を容易にかつ確実に実
施でき、上記方法を実施する際に採用して好適なもので
ある。さらに、完成した壁鉄筋ユニットを建て起こすた
めの建て起こし機を付設しておけば、壁鉄筋ユニットの
建て起こし時の剛性は低くて良く、したがって補強フレ
ームを不要あるいは必要最小限とできる。
Further, the assembling apparatus of the present invention includes a rebar bed for forming both reticles, a suspension beam for transferring the other reticulation above one reticulation and stacking it, and a suspension beam. Since it is provided with a jack for adjusting the mutual spacing of the net streaks by jacking up, the above method can be easily and surely carried out, and is suitable for use when carrying out the above method. Furthermore, if an erecting machine for erecting the completed wall reinforcing bar unit is additionally provided, the rigidity of the wall reinforcing bar unit at the time of erecting can be low, and therefore the reinforcing frame can be unnecessary or can be minimized.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明方法により組み立てる壁鉄筋ユニットの
一例を示す正面図である。
FIG. 1 is a front view showing an example of a wall reinforcing bar unit assembled by the method of the present invention.

【図2】同ユニットの平面図である。FIG. 2 is a plan view of the unit.

【図3】同ユニットの部分拡大平面図である。FIG. 3 is a partially enlarged plan view of the unit.

【図4】同ユニットを建て込んだ状態を示す平面図であ
る。
FIG. 4 is a plan view showing a state in which the unit is installed.

【図5】同ユニットを建て込んだ状態を示す立断面図で
ある。
FIG. 5 is a vertical cross-sectional view showing a state in which the unit is installed.

【図6】本発明の一実施例である組立方法における作業
手順を示すフロー図である。
FIG. 6 is a flowchart showing a work procedure in an assembly method which is an embodiment of the present invention.

【図7】本発明の一実施例である組立装置における内側
網筋形成用の配筋ベッドを示す正面図である。
FIG. 7 is a front view showing a bar arrangement bed for forming internal meshes in the assembling apparatus which is an embodiment of the present invention.

【図8】同、平面図である。FIG. 8 is a plan view of the same.

【図9】同、要部拡大図である。FIG. 9 is an enlarged view of a main part of the same.

【図10】本発明の一実施例である組立装置における外
側網筋形成用の配筋ベッドを示す正面図である。
FIG. 10 is a front view showing a bar arrangement bed for forming outer meshes in the assembling apparatus which is an embodiment of the present invention.

【図11】同、平面図である。FIG. 11 is a plan view of the same.

【図12】同、要部拡大図である。FIG. 12 is an enlarged view of a main part of the same.

【図13】本発明の一実施例である組立装置における吊
りビームを示す正面図である。
FIG. 13 is a front view showing a suspension beam in the assembling apparatus that is an embodiment of the present invention.

【図14】同、平面図である。FIG. 14 is a plan view of the same.

【図15】本発明の一実施例である組立装置における建
て起こし機を示す側面図である。
FIG. 15 is a side view showing the erection machine in the assembling apparatus that is an embodiment of the present invention.

【図16】同、平面図である。FIG. 16 is a plan view of the same.

【図17】同、正面図である。FIG. 17 is a front view of the same.

【図18】コンクリート壁体における配筋例を示す図で
ある。
FIG. 18 is a diagram showing an example of bar arrangement in a concrete wall body.

【符号の説明】[Explanation of symbols]

1 壁鉄筋ユニット 2 内側網筋 3 外側網筋 4 剪断筋 4a フック部 5 補強フレーム 6 縦筋 7 横筋 21,22 配筋ベッド 32 ジャッキ 40 吊りビーム 50 建て起こし機 53 起立ベッド。 1 Wall Reinforcing Bar Unit 2 Inner Net Reinforcing Bar 3 Outer Net Reinforcing Bar 4 Shear Reinforcing Bar 4a Hook Part 5 Reinforcing Frame 6 Vertical Bar 7 Horizontal Bar 21,22 Reinforcing Bed 32 Jack 40 Hanging Beam 50 Erecting Machine 53 Standing Bed.

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 縦筋と横筋とが格子状に組まれてなる一
対の網筋が間隔をおいて対向して剪断筋により互いに連
結されてなる壁鉄筋ユニットを組み立てるに際し、 前記一対の網筋の双方をそれぞれ個別に形成するととも
に、前記剪断筋の両端部に各網筋に係止し得るフック部
を予め形成しておき、 一方の網筋を略水平な状態に定置するとともに他方の網
筋をその上方に吊り支持することにより、それら双方の
網筋の相互間隔を前記剪断筋の長さよりやや小さくした
状態に保持し、 その状態で前記剪断筋を双方の網筋に跨がるようにその
両端部をそれぞれ双方の網筋に対して挿通させた後、 前記他方の網筋を上方に持ち上げることにより剪断筋の
両端のフック部をそれぞれ双方の網筋に対して係止さ
せ、 次いで、剪断筋の両端部を各網筋に対して溶接あるいは
締結して固定することを特徴とする壁鉄筋ユニットの組
立方法。
1. When assembling a wall reinforcing bar unit in which a pair of net reinforcing bars, which are composed of vertical bars and horizontal bars, are opposed to each other with a gap and are connected to each other by a shear bar, the pair of net bars is provided. Both of them are individually formed, and hook portions capable of engaging with the reticulated muscles are formed in advance at both ends of the shear muscle, and one of the reticulated muscles is placed in a substantially horizontal state and the other mesh is By suspending and supporting the muscles above them, the mutual distance between the two reticulums is kept slightly smaller than the length of the shear muscles, and in that condition the shear muscles straddle both reticulum muscles. After inserting both end portions of the reticulum to both reticulums, the hook portions at both ends of the shear muscle are locked to both reticulums by lifting the other reticulum, , Pair both ends of the shear muscle with each Method of assembling the wall rebar unit, characterized in that the welded or fastened and fixed Te.
【請求項2】 請求項1記載の組立方法を実施する際に
用いる壁鉄筋ユニットの組立装置であって、 前記双方の網筋をそれぞれ略水平な状態として形成する
ための2台の配筋ベッドと、 一方の配筋ベッド上で形成された一方の網筋の上方に、
他方の配筋ベッド上で形成された他方の網筋を移送して
きて吊り支持する吊りビームと、 前記一方の配筋ベッドの周囲に配置され、前記吊りビー
ムを下方から支持するとともに同期して作動して該吊り
ビームを昇降させることにより双方の網筋の相互間隔を
調節する複数台のジャッキとを具備してなることを特徴
とする壁鉄筋ユニットの組立装置。
2. An apparatus for assembling a wall reinforcing bar unit used when carrying out the assembling method according to claim 1, wherein two rebar beds are provided for forming both of the net bars in a substantially horizontal state. And above one reticulum formed on one rebar bed,
A suspension beam that transfers and suspends the other net reinforcement formed on the other reinforcement bed, and a suspension beam that is arranged around the one reinforcement bed and supports the suspension beam from below and operates in synchronization. And a plurality of jacks for adjusting the mutual spacing between the net bars by raising and lowering the suspension beam.
【請求項3】 請求項2記載の壁鉄筋ユニットの組立装
置であって、 ほぼ水平な状態からほぼ垂直な状態に起立する起立ベッ
ドを有し、該起立ベッド上に壁鉄筋ユニットをほぼ水平
な状態に保持して該起立ベッドを起立させることで壁鉄
筋ユニットをほぼ垂直な状態に起立させる建て起こし機
が付設されてなることを特徴とする壁鉄筋ユニットの組
立装置。
3. The apparatus for assembling a wall reinforcing bar unit according to claim 2, further comprising a standing bed that stands up from a substantially horizontal state to a substantially vertical state, and the wall reinforcing bar unit is substantially horizontal on the standing bed. An apparatus for assembling a wall reinforcing bar unit, further comprising a erection / raising machine for standing up the wall reinforcing bar unit in a substantially vertical state by holding the standing bed upright.
JP08727095A 1995-04-12 1995-04-12 Method and apparatus for assembling wall rebar unit Expired - Fee Related JP3281974B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP08727095A JP3281974B2 (en) 1995-04-12 1995-04-12 Method and apparatus for assembling wall rebar unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP08727095A JP3281974B2 (en) 1995-04-12 1995-04-12 Method and apparatus for assembling wall rebar unit

Publications (2)

Publication Number Publication Date
JPH08284315A true JPH08284315A (en) 1996-10-29
JP3281974B2 JP3281974B2 (en) 2002-05-13

Family

ID=13910081

Family Applications (1)

Application Number Title Priority Date Filing Date
JP08727095A Expired - Fee Related JP3281974B2 (en) 1995-04-12 1995-04-12 Method and apparatus for assembling wall rebar unit

Country Status (1)

Country Link
JP (1) JP3281974B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020051234A (en) * 2018-09-28 2020-04-02 鹿島建設株式会社 Method for constructing reinforced concrete structure and reinforcing bar supporting device
JP2020131644A (en) * 2019-02-25 2020-08-31 株式会社Ihiインフラ建設 Reinforcement assembling frame
JP2022054519A (en) * 2020-09-28 2022-04-07 東急建設株式会社 Reinforcing bar unit and reinforcing bar assembly method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020051234A (en) * 2018-09-28 2020-04-02 鹿島建設株式会社 Method for constructing reinforced concrete structure and reinforcing bar supporting device
JP2020131644A (en) * 2019-02-25 2020-08-31 株式会社Ihiインフラ建設 Reinforcement assembling frame
JP2022054519A (en) * 2020-09-28 2022-04-07 東急建設株式会社 Reinforcing bar unit and reinforcing bar assembly method

Also Published As

Publication number Publication date
JP3281974B2 (en) 2002-05-13

Similar Documents

Publication Publication Date Title
JP6200550B1 (en) Temporary deadline method, temporary deadline structure
JP4150981B1 (en) Reinforcing bar construction method by transfer of temporary assembly rebar unit
KR100969992B1 (en) Concrete Sheeting System for A Bridge Pier
JP2017210865A (en) Temporary cut-off method, temporary cut-off structure, supporting, supporting unit
JP4385236B1 (en) Reinforcement construction method for deep pile and its reinforcing bar unit
CN109469083B (en) Foundation beam reinforcement cage assembling system and construction method thereof
JP3281974B2 (en) Method and apparatus for assembling wall rebar unit
CA2568953C (en) Lifting anchor support
JP2006063718A (en) Method of constructing overhung bridge using corrugated steel plate web
JP3752934B2 (en) Method for constructing annular concrete frame using slip form device
JP5453172B2 (en) Floor reinforcement arrangement method
JP4070748B2 (en) Bridge erection device and bridge erection method
JP4027170B2 (en) External scaffold device and construction method of external scaffold device
JP3981469B2 (en) Construction method of concrete structure
JPH10216878A (en) Build up method, build up device and build up jig for reinforcing cage
CN216196958U (en) Cooling tower with double-cross inclined strut structure
JP5597952B2 (en) How to build the connection between the column and foundation, and how to place the ring reinforcement
JP2002038475A (en) Construction method of caisson type pile
JP3125205B2 (en) Construction method of temporary side wall
JP3803018B2 (en) Formwork and manufacturing method thereof, underground beam construction method and column and beam construction method
JP2003013493A (en) Beam-column connection joint and beam-column connection method
JPH0340983Y2 (en)
JP3364185B2 (en) Temporary scaffold for assembling wooden ramen and method of assembling wooden ramen using the temporary scaffold
JPH0711771A (en) Reinforced crate assembly and built-up device
CN110541365A (en) Construction method for multi-layer steel truss building

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20020108

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080301

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090301

Year of fee payment: 7

LAPS Cancellation because of no payment of annual fees