JPH0828072A - Construction of middle-and-high-storied multiple dwelling - Google Patents

Construction of middle-and-high-storied multiple dwelling

Info

Publication number
JPH0828072A
JPH0828072A JP16376994A JP16376994A JPH0828072A JP H0828072 A JPH0828072 A JP H0828072A JP 16376994 A JP16376994 A JP 16376994A JP 16376994 A JP16376994 A JP 16376994A JP H0828072 A JPH0828072 A JP H0828072A
Authority
JP
Japan
Prior art keywords
floor
unit
residential
work
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP16376994A
Other languages
Japanese (ja)
Inventor
Goro Yamanaka
五郎 山中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Motor Corp
Original Assignee
Toyota Motor Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyota Motor Corp filed Critical Toyota Motor Corp
Priority to JP16376994A priority Critical patent/JPH0828072A/en
Publication of JPH0828072A publication Critical patent/JPH0828072A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To facilitate works for carrying-in and installation. CONSTITUTION:An open ceiling 46, extending from the ground floor to the uppermost floor in the direction of the height of a building frame, is formed on the building frame 12 of a middle-and-high-storied multiple dwelling 10. Second floor-slabs 20B and dwelling units 34 are hung down for installation with a tower crane 52 through an opening 56 of the open ceiling 46. Thereby, dwelling units 34 can be carried in without interfering with columns 16, girders 18, beams 22 and first floor-slabs 20B.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、中高層集合住宅の構築
方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a middle and high-rise housing complex.

【0002】[0002]

【従来の技術】人工の都市集中化に伴って、所謂中高層
集合住宅に対するニーズが高まっている。このような中
高層集合住宅を構築する場合、現状では、まずRC造又
はS造等による躯体を構築し、次いで各階の所定位置に
必要資材(パネル材等)を搬入し、その後各分野ごとの
専門の職工が手作業で仕上げていくという構築手順を踏
むことが多い。
2. Description of the Related Art With the centralization of artificial cities, there is an increasing need for so-called middle and high-rise apartments. When constructing such middle- and high-rise apartments, at present, first construct the frame by RC construction or S construction, then bring in the necessary materials (panel materials, etc.) to the prescribed position on each floor, and then specialize in each field. Often, the craftsmen take the construction procedure of finishing by hand.

【0003】ところが、近年の労働者不足や品質向上の
要請等を背景として、最近では工業化工法と呼ばれる工
法が検討され採用されつつある。この工業化工法は工場
生産で賄う割合を増やし施工現場での作業を極力減らす
ことにより、労務量の低減、品質の向上、工期の短縮等
を図るものであり、大別すると躯体に関するものと内装
や設備等に関するものとがある。しかし、生産性を重視
して各部の共通化を図り過ぎると、空間の画一化を招
き、住空間の多様化、個性化への対応が困難になるきら
いがある。
However, due to the shortage of workers and demands for quality improvement in recent years, a method called an industrialized method has been studied and adopted recently. This industrialized construction method aims to reduce the amount of labor, improve quality, shorten the construction period, etc. by increasing the proportion covered by factory production and reducing the work at the construction site as much as possible. There are some related to facilities. However, if productivity is emphasized and the parts are shared too much, the space will be standardized, and it will be difficult to deal with the diversification and individualization of the living space.

【0004】そこで、工業化を進めつつ個別対応度をも
考慮した工法が、既に特公平4−78784号公報に開
示されている。以下、この公報に開示された工法につい
て簡単に説明する。
[0004] Therefore, a method of construction in which the degree of individual correspondence is taken into consideration while industrialization is advanced has already been disclosed in Japanese Patent Publication No. 4-78784. The construction method disclosed in this publication will be briefly described below.

【0005】図10には中高層集合住宅150の所定階
の間取り図が示されており、この図に示される如く柱1
52、梁、床版154等より成る躯体156の各階に
は、住宅購入者の希望プランに合わせた多種類(ここで
はAタイプ〜Cタイプ)の居住部158が設置されてい
る。各居住部158は、玄関160A、160B(図1
1(A)参照)、洗面・浴室等の設備コア162A、1
62B(図11(B)参照)、キッチン164A、16
4B(図11(C)参照)、ダイニングリビング166
A、166B、166C(図11(D)参照)、洋室1
68A、168B、168C(図11(E)参照)、和
室170A、170B、170C、170D(図11
(F)参照)といった細分化された居住部構成要素を任
意に組み合わせることにより構成されている。なお、こ
れらの居住部構成要素は、予め工場生産されたものであ
る。この工法によれば、工場生産で対応する部分が従来
よりも増える点で工業化を促進することができ、又個別
対応度もある程度向上させることができる。
FIG. 10 shows a floor plan of a predetermined floor of a middle and high-rise apartment house 150. As shown in this figure, the pillar 1
On each floor of a frame 156 composed of 52, beams, floor slabs 154, etc., various types (here, A type to C type) of living parts 158 are installed according to the plan desired by the home buyer. Each living part 158 has entrances 160A and 160B (see FIG. 1).
1 (A)), facility cores 162A for bathrooms, bathrooms, etc., 1
62B (see FIG. 11B), kitchens 164A, 16
4B (see FIG. 11C), dining living room 166.
A, 166B, 166C (see FIG. 11D), Western-style room 1
68A, 168B, 168C (see FIG. 11E), Japanese-style rooms 170A, 170B, 170C, 170D (FIG. 11)
It is configured by arbitrarily combining the subdivided living part constituent elements such as (F). It should be noted that these components of the living part are manufactured in advance in a factory. According to this construction method, industrialization can be promoted in that the number of corresponding parts in factory production is larger than in the past, and the individual adaptability can be improved to some extent.

【0006】[0006]

【発明が解決しようとする課題】しかしながら、上記公
報に開示された工法による場合、躯体156の構築後に
居住部構成要素を所定位置に搬入して設置する必要があ
るが、現実にこの搬入及び設置作業を行おうとすると以
下の不具合が生じる。すなわち、この場合、各階外壁面
に搬入ステージを設けて、この搬入ステージから転子等
によって居住部構成要素を取り込むことになるが、この
際に居住部構成要素が柱152や梁或いは床版154等
に干渉するおそれが多分にある。このため、作業が困難
なものとなり、搬入設置作業に支障を来す。
However, in the case of the construction method disclosed in the above publication, it is necessary to carry in and install the housing component at a predetermined position after the building body 156 is constructed. When you try to work, the following problems occur. That is, in this case, a carrying-in stage is provided on the outer wall surface of each floor, and the housing part constituent elements are taken in from the carrying-in stage by a trochanter or the like. At this time, the housing part constituent elements are columns 152, beams, or floor 154. There is a possibility of interfering with the like. For this reason, the work becomes difficult and the carrying-in and setting work is hindered.

【0007】本発明は上記事実を考慮し、搬入設置作業
の容易化を図ることができる中高層集合住宅の構築方法
を得ることが目的である。
In view of the above facts, an object of the present invention is to obtain a method for constructing a middle-high rise apartment house which can facilitate the carrying-in and installing work.

【0008】[0008]

【課題を解決するための手段】本発明に係る中高層集合
住宅の構築方法は、下方基準階所定部位から上方基準階
所定部位に亘って高さ方向に貫通する吹抜け部を有する
躯体を構築し、吹抜け部の上方基準階側の開口部から床
版及び居住用等のユニットを交互に搬入及び設置する、
ことを特徴としている。
A method for constructing a middle-high-rise apartment house according to the present invention is to construct a skeleton having a void portion penetrating in a height direction from a lower reference floor predetermined portion to an upper reference floor predetermined portion, From the opening on the upper standard floor side of the stairwell, alternately load and install units such as floor slabs and residential units,
It is characterized by:

【0009】[0009]

【作用】上記構成によれば、以下の手順によって中高層
集合住宅が構築される。なお、説明に際し、一例として
下方基準階を一階とし上方基準階を屋上階とする。
According to the above construction, the middle-high rise apartment house is constructed by the following procedure. In the description, the lower reference floor is the first floor and the upper reference floor is the rooftop floor as an example.

【0010】まず、一階から屋上階に亘って高さ方向に
貫通する吹抜け部を有する躯体が構築される。次いで、
この吹抜け部の屋上階側の開口部から床版が搬入されて
一階に設置される。次いで、同じ開口部から居住用等の
ユニットが搬入されて既に設置された一階の床版の上に
設置される。その後は、床版の搬入及び設置作業と居住
用等のユニットの搬入及び設置作業とが、最上階(屋上
階の直下)に到るまで交互に繰り返される。これによ
り、中高層集合住宅が構築される。
First, a frame having a blow-through portion that penetrates in the height direction from the first floor to the rooftop floor is constructed. Then
The floor slab is carried in from the opening on the rooftop floor side of this blow-through section and installed on the first floor. Then, a residential unit is loaded from the same opening and installed on the floor slab on the first floor that has already been installed. After that, the work of loading and installing the floor slab and the work of loading and installing the unit for residential use are alternately repeated until reaching the top floor (immediately below the roof floor). As a result, a high-rise apartment building is constructed.

【0011】上記構築方法によれば、躯体に吹抜け部を
設け、この吹抜け部を利用して居住用等のユニットを搬
入して設置するので、搬入しようとするユニットと柱や
梁、床版等との干渉の問題が解消される。
According to the above construction method, since the blow-through portion is provided in the skeleton and the unit for residential use is carried in and installed by using this blow-through portion, the unit to be carried in and the pillar, beam, floor slab, etc. The problem of interference with is solved.

【0012】[0012]

【実施例】以下、図1及び図2を用いて、本発明の一実
施例を説明する。 〔全体構成〕最初に、図1及び図2を用いて、本実施例
に係る中高層集合住宅10の全体構成について説明す
る。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to FIGS. [Overall Configuration] First, the overall configuration of the middle-high rise apartment house 10 according to the present embodiment will be described with reference to FIGS. 1 and 2.

【0013】図1には、中高層集合住宅10の建築途中
の状態が側面視で示されている。この図に示されるよう
に、中高層集合住宅10の躯体12は、基礎14に支持
された柱16、各階ごとに設けられ大梁18等によって
支承された床版20によって構成されている。
FIG. 1 is a side view showing a state in which a middle-high-rise apartment 10 is being built. As shown in this figure, the skeleton 12 of the middle- and high-rise apartment house 10 is composed of a pillar 16 supported by a foundation 14 and a floor slab 20 supported on each floor by a girder 18 and the like.

【0014】一方、図2には、完成後の中高層集合住宅
10の各階概略構成が示されている。この図に示される
ように、左右の大梁18の中間位置には、小梁22が設
けられている。この内、図上左側の大梁18の上端部と
小梁22の上端部とには、第1の床版20Aが支持され
ている。また、図上右側の大梁18の下端部と小梁22
の下端部とには、第2の床版20Bが支持されている。
なお、第2の床版20Bの端部は、図上右側の大梁18
と小梁22とにファスナ24によって強固に連結されて
いる。また、第2の床版20Bが設置された状態では、
第2の床版20Bは第1の床版20に対して段差を介し
て平行に配置されている。
On the other hand, FIG. 2 shows a schematic structure of each floor of the middle-high-rise apartment house 10 after completion. As shown in this figure, a small beam 22 is provided at an intermediate position between the left and right large beams 18. Of these, the first floor slab 20A is supported by the upper ends of the large beams 18 and the small beams 22 on the left side of the drawing. In addition, the lower end of the girder 18 and the girder 22 on the right side of the drawing
The second floor slab 20B is supported on the lower end of the second floor slab 20B.
In addition, the end portion of the second floor slab 20B is a large beam 18 on the right side of the drawing.
And the beam 22 are firmly connected by a fastener 24. Also, in the state where the second floor slab 20B is installed,
The second floor slab 20B is arranged parallel to the first floor slab 20 with a step.

【0015】上述した第1の床版20A上には間仕切り
パネル、天井パネル等の種々のパネルが建て込まれ、こ
れにより天井高さHの南側居室が構成されている。な
お、天井パネルの上方には上階側の第1の床版20Aと
の間に天井裏チャンバ26が形成されており、この天井
裏チャンバ26を利用して図示しない配管ユニット、配
線ユニット等が配設されるようになっている。
Various panels such as a partition panel and a ceiling panel are built on the first floor slab 20A described above, whereby a south-side room having a ceiling height H is constructed. An overhead space chamber 26 is formed between the ceiling panel and the first floor slab 20A on the upper floor side. Using the overhead space chamber 26, a piping unit, a wiring unit, and the like (not shown) are installed. It is arranged.

【0016】また、第2の床版20B上には、図上右側
の大梁18に隣接する位置にアルコーブ28が配設され
ている。なお、アルコーブ28の上部空間は玄関として
利用すべく、玄関ドア30が設置されている。さらに、
第2の床版20B上には、小梁22とアルコーブ28と
の間に一対のユニット支持梁32が配設されている。こ
れらのユニット支持梁32上には、居住用ユニット34
が設置されている。これにより、北側居室が構成されて
いる。
Further, an alcove 28 is provided on the second floor slab 20B at a position adjacent to the girder 18 on the right side of the drawing. An entrance door 30 is installed so that the upper space of the alcove 28 can be used as an entrance. further,
On the second floor slab 20B, a pair of unit support beams 32 are arranged between the beam 22 and the alcove 28. On these unit support beams 32, residential units 34
Is installed. As a result, the north room is constructed.

【0017】居住用ユニット34が設置された状態で
は、その下方に床下チャンバ36が形成されており、こ
の床下チャンバ36を利用して配管ユニット38、床下
収納部40、半埋込みバス42等が設置される。なお、
この床下チャンバ36と同階の天井裏チャンバ26を適
宜箇所にて連通し、図示していないが床下チャンバ36
又は天井裏チャンバ26と接している大梁18に設けら
れた建物外部との通排気孔と連通することにより、吸排
気チャンバとして活用することもできる。
When the residential unit 34 is installed, an underfloor chamber 36 is formed below it, and a piping unit 38, an underfloor storage section 40, a semi-embedded bath 42, etc. are installed using the underfloor chamber 36. To be done. In addition,
The underfloor chamber 36 and the above-ceiling chamber 26 on the same floor are communicated with each other at an appropriate location.
Alternatively, it can be utilized as an intake / exhaust chamber by communicating with an exhaust hole provided on the girder 18 which is in contact with the above-ceiling chamber 26 and communicates with the outside of the building.

【0018】以上までの構成を総括すると、床版20が
第1の床版20Aと第2の床版20Bとに分割されてお
り、この内、第1の床版20Aの上部空間がパネル工法
によるパネル工法エリアとされ、第2の床版20Bの上
部空間がユニット工法によるユニット工法エリアとされ
ている。なお、図上左側の大梁18から張り出した部分
にはアウトドアコンポーネントユニット44が設置さ
れ、サンルーム等として利用される。また、図上右側の
大梁18から張り出した部分は、廊下として利用され
る。
Summarizing the above constructions, the floor slab 20 is divided into a first floor slab 20A and a second floor slab 20B, of which the upper space of the first floor slab 20A is the panel construction method. Is a panel construction method area, and the upper space of the second floor slab 20B is a unit construction method area. An outdoor component unit 44 is installed in a portion projecting from the girder 18 on the left side of the drawing, and is used as a sunroom or the like. Further, the portion protruding from the large beam 18 on the right side of the drawing is used as a corridor.

【0019】さて、上述した居住用ユニット34の設置
を可能にすべく、本実施例では図1に示される如く、躯
体12に吹抜け部46を設けている。より具体的には、
躯体12におけるユニット工法エリアに相当する部分に
は、一階から屋上階に亘って躯体高さ方向に貫通する吹
抜け部46が形成されている。なお、パネル工法エリア
に相当する部分には、第1の床版20Aが設置されてい
るので吹抜けにはなっていない。
In order to allow the above-mentioned residential unit 34 to be installed, in this embodiment, as shown in FIG. 1, the body 12 is provided with a blow-through portion 46. More specifically,
In a portion of the skeleton 12 corresponding to the unit construction method area, a blow-through portion 46 that penetrates in the skeleton height direction is formed from the first floor to the roof floor. In addition, since the first floor slab 20A is installed in a portion corresponding to the panel construction method area, there is no blow through.

【0020】以下に、中高層集合住宅10の構築手順の
説明を通して、本実施例の作用を説明する。
The operation of the present embodiment will be described below through the description of the procedure for constructing the middle-high-rise apartment house 10.

【0021】まず、躯体工事が行われ、中高層集合住宅
10の躯体12が構築される。このとき、第1の床版2
0Aは各階ごとに設けていくが、第2の床版20Bにつ
いては設置しないでおく。これにより、躯体12が構築
された状態では、ユニット工法エリアに相当する部分に
一階から屋上階に亘って躯体高さ方向に貫通する吹抜け
部46が形成される。
First, the skeleton work is performed to construct the skeleton 12 of the middle and high-rise housing complex 10. At this time, the first floor slab 2
0A is provided for each floor, but the second floor slab 20B is not installed. As a result, in the state where the skeleton 12 is constructed, the blow-through portion 46 that penetrates in the skeleton height direction from the first floor to the rooftop floor is formed in the portion corresponding to the unit construction method area.

【0022】次に、各階のパネル工法エリアに種々のパ
ネル等の建築資材48(図1参照)を搬入する作業及び
ユニット工法エリアに居住用ユニット34を搬入、設置
する作業等が行われる。なお、この作業は、躯体12の
大梁18に控え金物50を介して支持されたタワークレ
ーン52を操作することにより行われる。具体的には、
以下の要領で行われる。
Next, the work of loading the building materials 48 (see FIG. 1) such as various panels into the panel construction area of each floor and the work of loading and installing the residential unit 34 in the unit construction area are performed. This work is performed by operating the tower crane 52 supported by the girder 18 of the skeleton 12 via the metal fixture 50. In particular,
The procedure is as follows.

【0023】まず、第2の床版20Bをタワークレーン
52のワイヤ54に係止させて吊り上げ、吹抜け部46
の屋上階の開口部56から一階のユニット工法エリアま
で降ろしていく。ユニット工法エリアに到達したら、図
2に図示される如く大梁18の下端部及び小梁22の下
端部に載置させ、ファスナ24によって固定する。これ
により、一階のユニット工法エリアに第2の床版20B
が設置され、第1の床版20Aと共に床版20が構成さ
れる。
First, the second floor slab 20B is suspended by the wire 54 of the tower crane 52 and lifted up, and the blow-through portion 46
From the rooftop floor opening 56 to the unit construction area on the first floor. When the unit construction method area is reached, it is placed on the lower end of the girder 18 and the lower end of the girder 22 as shown in FIG. As a result, the second floor slab 20B is installed in the unit construction area on the first floor.
Is installed, and the floor slab 20 is configured together with the first floor slab 20A.

【0024】次に、タワークレーン52を同様に操作し
て、吹抜け部46の屋上階の開口部56から種々のパネ
ル等の建築資材48がまとめて吊り込まれて既に設置さ
れた第2の床版20B上に載置される。載置後、一階の
パネル工法エリアに建築資材48が移される。この際、
第2の床版20Bが足場的な役割を果たす。なお、この
作業の後、各パネルの建込み作業等が行われ、北側居室
が構成される。また、並行して第2の床版20B上に配
管ユニット38や床下収納部40、半埋込みバス42等
の設置作業が行われる。
Next, by operating the tower crane 52 in the same manner, the building materials 48 such as various panels are collectively suspended from the opening 56 on the roof floor of the blow-through section 46, and the second floor is already installed. It is placed on the plate 20B. After the placement, the building material 48 is transferred to the panel construction area on the first floor. On this occasion,
The second floor slab 20B plays a scaffolding role. After this work, the building work for each panel will be performed, and the north side room will be constructed. Further, in parallel, the installation work of the piping unit 38, the underfloor storage section 40, the semi-embedded bus 42, etc. is performed on the second floor slab 20B.

【0025】その後、同じくタワークレーン52を同様
に操作して、吹抜け部46の屋上階の開口部56から居
住用ユニット34が吊り込まれ、一対のユニット支持梁
32上に載置させながら図示しないアンカボルト等を用
いて固定する。これにより、北側居室が構成される。な
お、例えば地階等の適宜階においては、居住用ユニット
34の代わりに設備専用のユニット等が設置される。
Thereafter, the tower crane 52 is also operated in the same manner to suspend the residential unit 34 from the opening 56 on the roof floor of the blow-through section 46 and place it on the pair of unit support beams 32 (not shown). Secure with anchor bolts. This constitutes the north side room. In addition, for example, on an appropriate floor such as a basement, a unit dedicated to equipment is installed in place of the residential unit 34.

【0026】上記一連の作業が行われることにより、一
階部分における建築資材48の搬入作業並びに居住用ユ
ニット34等の搬入及び設置作業が終了する。そして、
この一連の作業が、二階以降最上階に到るまで繰り返さ
れる。なお、すべての作業が終了した後、躯体12の吹
抜け部46の屋上階の開口部56を閉塞すべく、例えば
山型、ドーム型等の意匠的効果も備えた蓋58(図1参
照)が設置される。
By carrying out the above-described series of operations, the work of loading the building material 48 on the first floor and the work of loading and installing the residential unit 34 and the like are completed. And
This series of work is repeated from the second floor to the top floor. After all the work is completed, a lid 58 (see FIG. 1) having a design effect such as a mountain shape or a dome shape is provided to close the opening 56 on the rooftop floor of the blow-through portion 46 of the skeleton 12. Is installed.

【0027】このように本実施例では、躯体12のユニ
ット工法エリアに相当する部分に一階から屋上階に亘っ
て躯体高さ方向に貫通する吹抜け部46を設け、この吹
抜け部46の開口部56から第2の床版20B及び居住
用ユニット34を交互に搬入して設置する構築方法を案
出したので、柱16や大梁18、小梁22、第1の床版
20等に搬入しようとする居住用ユニット34を干渉さ
せることなく、円滑かつ安全に搬入及び設置作業を行う
ことができる。
As described above, in this embodiment, the blow-out portion 46 penetrating in the height direction of the body is provided in the portion corresponding to the unit construction area of the body 12 from the first floor to the rooftop floor, and the opening of the blow-out portion 46 is provided. Since a method of construction in which the second floor slab 20B and the residential unit 34 are alternately loaded and installed from 56 is devised, an attempt is made to carry them into the pillar 16, the girder 18, the beam 22, the first floor slab 20, etc. It is possible to smoothly and safely carry in and install the living unit 34 without interfering with it.

【0028】しかも、本実施例によれば居住用ユニット
34が工場生産されるため、品質を向上させることがで
きる点、内装作業等の諸作業を工場で行うことによる現
場作業の大幅な削減が可能になる点、これに伴い工期を
短縮することができる点等のユニット工法のメリットを
十分に生かすことができる。従って、より一層工業化率
を高めることができ、労務量の削減、品質向上、コスト
削減等の要請にも十分に応えることができる。なお、従
来構造においても工場生産された居住部構成要素を用い
ている点である程度工業化率を向上させることが可能で
あるが、この構造では住宅居住部を細分化することを基
本としていることから、本実施例の方が工業化率を高め
ることができる。
Moreover, according to the present embodiment, since the residential unit 34 is manufactured at the factory, the quality can be improved, and the field work can be greatly reduced by performing various works such as interior work at the factory. It is possible to make full use of the merits of the unit construction method, such as the possibility of shortening the construction period. Therefore, it is possible to further increase the industrialization rate, and it is possible to sufficiently meet requests for reduction of labor amount, quality improvement, cost reduction, and the like. It should be noted that even in the conventional structure, it is possible to improve the industrialization rate to some extent in that it uses the factory-produced living part constituent elements, but since this structure is based on subdividing the residential part In this example, the industrialization rate can be increased.

【0029】さらに、ユニット工法エリアの他にパネル
工法エリアを設けているので、南側居室のレイアウトの
自由度も高く維持することができ、住宅購入者の個別対
応度も高めることができる。
Furthermore, since the panel construction method area is provided in addition to the unit construction method area, it is possible to maintain a high degree of freedom in the layout of the south-side living room, and it is possible to increase the degree of individual correspondence of the home buyer.

【0030】また、本実施例によれば、居住用ユニット
34が設置された状態では、居住用ユニット34とその
下部の第2の床版20Bとの間に床下チャンバ36が形
成されるので、配管ユニット38、床下収納部40、半
埋込みバス42等の設置スペースとして、或いは吸排気
チャンバとして利用することができる。従って、空間の
有効利用を図ることができる。 〔各部詳細〕以上が本実施例の基本的な構成であるが、
以下に各部の詳細についても触れておく。ユニットのクローズドシステム 図3(A)には居住用ユニット34の平面配置図が示さ
れており、本実施例では居住用ユニット34の割付が部
屋単位で行われている。なお、図2では図3(A)の平
面配置図と異なり居住用ユニット34を一つのみ図示し
がたが、これは居住用ユニットを概念的に代表して示し
たからである。
Further, according to the present embodiment, since the underfloor chamber 36 is formed between the residential unit 34 and the second floor slab 20B below the residential unit 34 when the residential unit 34 is installed, It can be used as an installation space for the piping unit 38, the underfloor storage 40, the semi-embedded bath 42, or the like, or as an intake / exhaust chamber. Therefore, it is possible to effectively use the space. [Details of Each Part] The above is the basic configuration of the present embodiment.
The details of each part are also mentioned below. Unit Closed System FIG. 3A shows a plan layout of the residential units 34. In this embodiment, the residential units 34 are allocated in units of rooms. Note that, in FIG. 2, only one living unit 34 is shown, unlike the plan layout view of FIG. 3A, because this is a conceptual representation of the living unit.

【0031】さらに、居住用ユニット34同士は、居住
用ユニット34が備える扉60や襖等の開口部62廻り
でのみ接合されている。別言すれば、扉60等の建具を
設けるための開口部62に、居住用ユニット34の接合
部(ドッキング部)を設定している。この際、図3
(B)に拡大して示されるように、隣接する居住用ユニ
ット34の組付位置に僅かなずれが生じた場合には、開
口部62廻りで調整するようになっている。具体的に
は、調整材64の厚さを変えることで組付位置のずれを
吸収している。なお、図3(B)において示される逃げ
調整代66は、居住用ユニット34の据付け時に組付位
置調整用に用いられる隙間である。
Further, the residential units 34 are joined to each other only around the doors 60 of the residential units 34 and the openings 62 such as the sliding doors. In other words, the joint portion (docking portion) of the residential unit 34 is set in the opening portion 62 for providing the fitting such as the door 60. At this time, FIG.
As shown in an enlarged view in (B), when a slight deviation occurs in the assembly position of the adjacent residential units 34, the adjustment is performed around the opening 62. Specifically, by changing the thickness of the adjusting material 64, the deviation of the assembling position is absorbed. The clearance adjustment allowance 66 shown in FIG. 3B is a gap used for adjusting the assembly position when the living unit 34 is installed.

【0032】上記構成によれば、以下の効果が得られ
る。従来では居住用ユニットのフレーム寸法を重視した
関係で、部屋の途中に居住用ユニット同士の接合部が現
れることが多く、このため床、壁、天井等の駄目工事が
現場作業として残り、ひいては不陸発生の原因になって
いた。しかしながら、上記構成によれば、居住用ユニッ
ト34の割付が部屋単位で完結されるため、開口部62
を除いて居住用ユニット34を閉6面体で構成すること
ができる。このため、前記駄目工事が現場作業として残
ることはなく、双方の接合を開口部62廻りでのみ行う
ことにより施工現場では開口部62廻りの調整作業のみ
を行えばよくなる。従って、熟練度を要する現場作業を
削減することができ、又不陸も発生しない。さらに、現
場作業が減り工場作業が主となることから、施工現場へ
の部品発送種類及び量も減るので、施工現場での誤欠品
の問題を解消することができると共に搬送コストを削減
することができる。間仕切り設置用スライドガイドシステム 図4にはパネル工法エリアである南側居室が示されてお
り、更にその5−5線及び6−6線に沿った断面構造が
図5及び図6に示されている。図5に示されるように、
上階側の第1の床版20Aの裏面(即ち天井)にはチャ
ンネル状の天井側ランナー68が螺子70で固定されて
いる。これに対応して下階側の第1の床版20Aの表面
には、幅木も兼ねて断面L字形に組まれた床側ランナー
72が配設されている。この内、床側ランナー72の底
部中央には半円形の溝74が形成されており、更に溝7
4内には円形断面の実76が嵌合されている。そして、
これらの天井側ランナー68と床側ランナー72とに、
間仕切りパネル78がスライド可能に装着されている。
なお、間仕切りパネル78の下端部には、実76と噛み
合う溝80が形成されている。一方、図6に示されるよ
うに、間仕切りパネル78の幅方向端部にも、実76が
嵌合される溝80が形成されている。
According to the above structure, the following effects can be obtained. Conventionally, due to the emphasis on the frame size of the residential units, joints between the residential units often appear in the middle of the room, so that the construction work such as floors, walls, and ceilings remains as on-site work, and eventually It was the cause of land outbreak. However, according to the above configuration, since the allocation of the residential units 34 is completed for each room, the opening 62
The housing unit 34 can be configured as a closed hexahedron except for. For this reason, the useless construction does not remain as a site work, and only the adjustment work around the opening 62 need be performed at the construction site by joining the two only around the opening 62. Therefore, it is possible to reduce the on-site work that requires a degree of skill, and the trouble does not occur. Furthermore, since the site work is reduced and the factory work is mainly performed, the type and quantity of parts to be sent to the construction site are also reduced, so that the problem of erroneous items at the construction site can be solved and the transportation cost can be reduced. You can Slide guide system for partition installation Fig. 4 shows the south side room, which is the panel construction area, and the sectional structure along line 5-5 and line 6-6 is shown in Figs. 5 and 6. . As shown in FIG.
A channel-shaped ceiling-side runner 68 is fixed by screws 70 to the back surface (that is, the ceiling) of the first floor slab 20A on the upper floor side. Corresponding to this, on the surface of the first floor slab 20 </ b> A on the lower floor side, a floor-side runner 72, which also serves as a skirting board and is assembled into an L-shaped cross section, is arranged. Among these, a semicircular groove 74 is formed at the center of the bottom of the floor-side runner 72.
A fruit 76 having a circular cross section is fitted in the inside of the container 4. And
In these ceiling side runner 68 and floor side runner 72,
A partition panel 78 is slidably mounted.
It should be noted that a groove 80 that meshes with the fruit 76 is formed at the lower end of the partition panel 78. On the other hand, as shown in FIG. 6, a groove 80 into which the fruit 76 is fitted is also formed at the widthwise end of the partition panel 78.

【0033】上記構成によれば、図4に番号を付した順
で、間仕切りパネル78が天井側ランナー68及び床側
ランナー72に沿ってスライドされて装着される。但
し、4番目に装着される間仕切りパネル78について
は、天井側ランナー68のみが使用される。なお、間仕
切りパネル78をスライドさせる際、間仕切りパネル7
8の幅方向端部の端面に接着剤が塗布される。上記の如
くして、間仕切りパネル78が装着された後、図4に図
示する「▼」記号の部位にて楔締めされる。これによ
り、間仕切りパネル78の溝80同士が実76に緊密に
嵌合される。従って、間仕切りパネル78の建込み作業
が容易になるだけでなく、間仕切りパネル78に不陸が
発生するのを防止することができる。また、これによ
り、間仕切り用クロス材82を張る作業も不陸がない分
容易になる。壁・天井クロス張りの工場クロス張り化 図7には、居住用ユニット34の壁84の一部を拡大し
た断面が示されている。この図に示されるように、壁8
4を構成する一対のプラスターボード86間には、不陸
発生を防止する枠材88及び実90が設けられている。
なお、枠材88は手違い平鎹92によって木煉瓦94に
固定されている。また、プラスターボード86間には、
その平面性を確保(曲げ変形防止)するためのランバー
コア等によるリブ下地96が所定の間隔で必要な部位に
不連続で接着配設されている。そして、平面性が確保さ
れたプラスターボード86の室内側の表面をそのまま生
かして、壁クロス材98が工場作業によって直に貼着さ
れている。なおこの際、壁クロス材98の端末は、枠材
88側へ巻き込ませておく。
According to the above construction, the partition panel 78 is slid along the ceiling runner 68 and the floor runner 72 in the order numbered in FIG. However, for the partition panel 78 that is mounted fourth, only the ceiling-side runner 68 is used. When sliding the partition panel 78, the partition panel 7
An adhesive is applied to the end surface of the width direction end portion of 8. After the partition panel 78 is mounted as described above, the partition panel 78 is wedge-fastened at the portion indicated by the symbol "▼" shown in FIG. As a result, the grooves 80 of the partition panel 78 are tightly fitted to the actual 76. Therefore, not only the work of constructing the partition panel 78 can be facilitated, but also it is possible to prevent the partition panel 78 from becoming uneven. Further, as a result, the work of stretching the partition cloth material 82 is easy because there is no inconvenience. Wall / ceiling cloth tensioned factory cloth tensioned FIG. 7 shows an enlarged cross-section of a part of the wall 84 of the residential unit 34. As shown in this figure, the wall 8
Between the pair of plaster boards 86 forming part 4, the frame material 88 and the actual material 90 for preventing the occurrence of non-landing are provided.
The frame material 88 is fixed to the wooden bricks 94 by a misplaced flat hull 92. Also, between the plaster boards 86,
A rib base 96 made of a lumber core or the like for ensuring its flatness (preventing bending deformation) is discontinuously bonded and arranged at a predetermined interval at a required portion. Then, the wall cloth material 98 is directly attached by the factory work while making the most of the indoor surface of the plaster board 86 whose flatness is ensured. At this time, the end of the wall cloth material 98 is wound around the frame material 88 side.

【0034】上記構成によれば、壁クロス材98の貼着
作業をも工場作業で処理することができるので、施工現
場での壁クロス材98の貼着作業をなくすことができ
る。また、従来必要であった壁クロス材98の下地面の
パテ処理が不要になる。さらに、壁クロス材98の端末
が巻き込まれていることから輸送中の振動による壁面の
一時的な変形に対する追従性が良く、壁クロス材98に
皺が発生する等の不具合が生じるのを防止することがで
きる。
According to the above construction, since the work of sticking the wall cloth material 98 can be processed by the factory work, the work of sticking the wall cloth material 98 at the construction site can be eliminated. Further, the putty treatment of the lower ground of the wall cloth material 98, which is conventionally required, becomes unnecessary. Further, since the end of the wall cloth material 98 is caught, the wall cloth material 98 has a good followability to the temporary deformation of the wall surface due to the vibration during the transportation, and prevents the wall cloth material 98 from being wrinkled. be able to.

【0035】なお、以上の構成は、壁クロス材98のみ
ならず、天井クロス材についても同様に行われる。後付内装諸部材の接着時における保持構造 図8(A)には、居住用ユニット34の柱100付近の
拡大図が示されている。この図に示されるように、柱1
00の周囲には柱カバー102が配設されている。柱カ
バー102は、接着剤によって居住用ユニット34の壁
84に後付けされるようになっている。
The above structure is applied not only to the wall cloth material 98 but also to the ceiling cloth material. Holding Structure at the Time of Adhesion of Various Rear Interior Parts FIG. 8A is an enlarged view of the vicinity of the pillar 100 of the living unit 34. As shown in this figure, the pillar 1
A column cover 102 is arranged around 00. The post cover 102 is adapted to be retrofitted to the wall 84 of the residential unit 34 with an adhesive.

【0036】ここで、接着剤を用いると接着剤が乾くま
で取付状態を保持しておく必要があり、この点従来では
柱カバー102を釘等で仕上げ面に固定する方法等を採
っていた。このため、作業が煩雑になる等の不具合が生
じていた。この点を考慮し、本構成では、図8(B)に
示されるように柱カバー102の裏面の枠材104にス
プリングファスナ106を適宜間隔で設けると共に、壁
84には各スプリングファスナ106に対応して留め金
具108を設けている。なお、図8(B)において二点
鎖線で示されるのは、スプリングファスナ106を枠材
104に固定する際に用いられる楔状の治具(打ちつけ
台)である。
Here, when an adhesive is used, it is necessary to hold the attached state until the adhesive dries. In this respect, conventionally, a method of fixing the column cover 102 to the finished surface with a nail or the like has been adopted. For this reason, there have been problems such as complicated work. In consideration of this point, in this configuration, as shown in FIG. 8B, the spring fasteners 106 are provided at appropriate intervals on the frame member 104 on the back surface of the column cover 102, and the wall 84 corresponds to each spring fastener 106. The fastener 108 is provided. In addition, what is indicated by a chain double-dashed line in FIG. 8B is a wedge-shaped jig (a mounting base) used when fixing the spring fastener 106 to the frame member 104.

【0037】上記構成によれば、柱カバー102を取り
付けるには、接着剤を塗布した後、スプリングファスナ
106が壁84の留め金具108に係止されるように柱
カバー102を落とし込めばよい。これにより、スプリ
ングファスナ106の付勢力によって柱カバー102は
壁84側に引き付けられて密着状態で保持される。そし
て、この状態が維持されている間に接着剤が完全に乾
く。従って、ワンタッチで柱カバー102を取り付ける
ことができる。
According to the above construction, in order to attach the pillar cover 102, after applying the adhesive, the pillar cover 102 may be dropped so that the spring fastener 106 is locked to the fastener 108 of the wall 84. As a result, the pillar cover 102 is attracted to the wall 84 side by the biasing force of the spring fastener 106 and is held in a close contact state. Then, the adhesive is completely dried while this state is maintained. Therefore, the pillar cover 102 can be attached with one touch.

【0038】なお、以上の構成は、柱カバー102に限
らず、後付内装諸部材に適用可能である。ユニット内構成室の拡充システム 図9には、居住用ユニット34の平面配置図が示されて
いる。この居住用ユニット34は、ユニット内構成室が
拡充可能に設けられている。すなわち、居住用ユニット
34の4つの壁84の内の一つ(以下、「壁84A」と
する)が、工場生産時に仮ボルト等による仮固定状態と
されている。また、この居住用ユニット34内には、拡
充用の床、天井、壁のための図示しないエキステンショ
ン下地が内蔵されている。
The above structure is applicable not only to the column cover 102 but also to various rear interior members. Expansion System of Unit Internal Chamber FIG. 9 shows a plan layout of the residential unit 34. The residential unit 34 is provided so that the internal chambers of the unit can be expanded. That is, one of the four walls 84 of the residential unit 34 (hereinafter referred to as "wall 84A") is in a temporarily fixed state with a temporary bolt or the like at the time of factory production. In addition, in the residential unit 34, extension bases (not shown) for expansion floors, ceilings, and walls are built in.

【0039】上記構成によれば、工場から施工現場へ居
住用ユニット34を搬送する場合には、積載制限等を考
慮して居住用ユニット34を拡充していない状態にして
搬送する。このとき、壁84Aは仮固定状態とされてい
る。これにより、搬送時には居住用ユニット34を閉6
面体で保持しておくことができるので、居住用ユニット
34の剛性を確保することができる。従って、居住用ユ
ニット34が搬送時に変形するのを防止することができ
る。
According to the above configuration, when the residential unit 34 is transported from the factory to the construction site, the residential unit 34 is transported in an unexpanded state in consideration of stacking restrictions and the like. At this time, the wall 84A is in a temporarily fixed state. As a result, the residential unit 34 is closed during transportation.
Since it can be held by a face piece, the rigidity of the residential unit 34 can be ensured. Therefore, it is possible to prevent the residential unit 34 from being deformed during transportation.

【0040】一方、居住用ユニット34が施工現場に搬
入され、更にこれを前述したタワークレーン52を用い
て躯体14の所定位置に据え付けた後、仮ボルト等が外
されて壁84Aが拡充予定位置までスライドされる。次
いで、居住用ユニット34内に内蔵されていたエキステ
ンション下地を、スライドされた壁84A側へスライド
させる。その後、壁パネル110、床パネル112、天
井パネルが建込まれる。これにより、居住用ユニット3
4が比較的容易な作業で拡充される。また、エキステン
ション下地を内蔵しておくことにより、拡充後の不陸が
発生するのを防止することができ、品質向上に資するこ
とができる。
On the other hand, after the residential unit 34 is carried into the construction site and further installed at a predetermined position of the skeleton 14 by using the above-mentioned tower crane 52, the temporary bolts and the like are removed and the wall 84A is planned to be expanded. Is slid up to. Next, the extension base built in the residential unit 34 is slid to the slidable wall 84A side. Then, the wall panel 110, the floor panel 112, and the ceiling panel are built. As a result, the residential unit 3
4 is expanded by relatively easy work. Further, by incorporating the extension base, it is possible to prevent the occurrence of unevenness after the expansion, which contributes to the quality improvement.

【0041】なお、本実施例では、吹抜け部46を躯体
12の一階から屋上階に亘って通しで設けているが(こ
の場合、「一階」が請求項1記載の「下方基準階」に相
当し、又「屋上階」が「上方基準階」に相当する)、こ
れに限らず、例えば高層集合住宅を建築する場合に躯体
を例えば10階分等の所定階単位で区分してブロック化
し、最初は一階或いは地階から10階までについて吹抜
け部を有する躯体を構築して前述した作業を行い、次に
11階から20階までについて吹抜け部を有する躯体を
構築して同様の作業を行うようにしてもよい(この場
合、「一階或いは地階」及び「11階」が前記「下方基
準階」に相当し、又「10階」及び「屋上階」が前記
「上方基準階」に相当する)。
In this embodiment, the blow-through part 46 is provided through from the first floor of the frame 12 to the roof floor (in this case, "first floor" is the "lower reference floor" in claim 1). And the "roof floor" corresponds to the "upper standard floor"), but not limited to this, for example, when building a high-rise apartment building, the skeleton is divided into predetermined floor units such as 10 floors First, construct a structure with a stairwell on the first floor or the basement to the 10th floor and perform the above-mentioned work, then build a structure with a stairwell on the 11th floor to the 20th floor and perform the same work. It may be carried out (in this case, "first floor or basement" and "11th floor" correspond to the "lower reference floor", and "10th floor" and "roof floor" to the "upper reference floor". Equivalent to).

【0042】また、本実施例では、パネル工法エリアと
ユニット工法エリアとにエリアを分割してユニット工法
エリアについてのみ居住用ユニット34を設置すべくこ
のエリアに吹抜け部46を設けたが、これに限らず、パ
ネル工法エリアをもユニット工法エリアとして複数の吹
抜け部46を躯体12に設ける構成にしてもよい。な
お、この場合、間取り自由度が高い居住用ユニット34
を用いる等すれば、住宅購入者に対する個別対応度を損
なうこともない。
Further, in the present embodiment, the area is divided into the panel construction method area and the unit construction method area, and the blow-through portion 46 is provided in this area in order to install the residential unit 34 only in the unit construction method area. Not limited to this, the panel construction method area may be a unit construction method area, and a plurality of blow-through portions 46 may be provided in the skeleton 12. In this case, the residential unit 34 having a high degree of layout freedom
By using, for example, there is no loss of individual support for home buyers.

【0043】また、請求項1記載の本発明をより具体的
にすると、例えば以下の如くとなる。 「下方基準階所定部位から上方基準階所定部位に亘って
高さ方向に貫通する吹抜け部を有する躯体を構築し、吹
抜け部の上方基準階側の開口部から床版及び居住用等の
ユニットを交互にかつ両者の間に所定の空間が開けられ
るように搬入及び設置する、ことを特徴とする中高層集
合住宅の構築方法。」 上記の如くとした場合には、床版(第2の床版20B)
と居住用等のユニット(居住用ユニット34)との間に
チャンバ(床下チャンバ36)が形成されるので、配管
ユニット等の設置スペースとして或いは吸排気チャンバ
としての利用価値を見出すことができ、空間の有効利用
を図ることができる。
Further, when the present invention according to claim 1 is more concretely described, for example, it is as follows. `` Construct a skeleton that has a stairwell that penetrates in the height direction from a predetermined part on the lower reference floor to a predetermined part on the upper reference floor, and install units such as floor slabs and residential units from the opening on the upper reference floor side of the stairwell. A method of constructing a middle-high-rise apartment house, characterized by carrying in and installing so that a predetermined space can be opened alternately between the two. "In the case of the above, the floor slab (second floor slab 20B)
Since a chamber (underfloor chamber 36) is formed between a unit for living and the like (unit 34 for living), it is possible to find utility value as an installation space for a piping unit or an intake / exhaust chamber. Can be effectively used.

【0044】また、以下の如く、請求項1記載の本発明
を具体化することもできる。 「平面計画段階でユニット工法採用エリアとユニット工
法非採用エリアとに分割し、ユニット工法採用エリアに
おける下方基準階所定部位から上方基準階所定部位に高
さ方向に貫通する吹抜け部を有する躯体を構築し、吹抜
け部の上方基準階側の開口部から床版を搬入及び設置
後、当該開口部からユニット工法非採用エリアで使用す
る建築資材を搬入し、続いて当該開口部から居住用等の
ユニットを搬入及び設置する一連の作業を各階ごとに繰
り返す、ことを特徴とする中高層集合住宅の構築方
法。」 上記の如くとした場合には、住宅購入者の個別対応度を
高めつつ、工業化率の向上を図ることができる。なお、
前述した実施例におけるパネル工法エリアが上記例にお
ける「ユニット工法非採用エリア」に相当する。
Further, the present invention according to claim 1 can be embodied as follows. "At the time of the floor plan, it is divided into a unit construction method adoption area and a unit construction method non-adoption area, and a frame with a blow-through part that penetrates in the height direction from the lower reference floor predetermined area to the upper reference floor predetermined area in the unit construction method area is constructed. After loading and installing the floor slab from the opening on the upper reference floor side of the stairwell, carry in the building materials used in the area where the unit construction method is not adopted from the opening, and then the unit for residential use etc. from the opening. A method of constructing a middle- and high-rise apartment house characterized by repeating a series of operations for loading and installing each floor. ”In the case of the above, while increasing the individual support level of the home buyer, the industrialization rate It is possible to improve. In addition,
The panel construction method area in the above-described embodiment corresponds to the "unit construction method non-adoption area" in the above example.

【0045】[0045]

【発明の効果】以上説明したように本発明に係る中高層
集合住宅の構築方法は、下方基準階所定部位から上方基
準階所定部位に亘って高さ方向に貫通する吹抜け部を有
する躯体を構築し、吹抜け部の上方基準階側の開口部か
ら床版及び居住用等のユニットを交互に搬入及び設置す
ることを構成とする構築方法であるので、搬入設置作業
の容易化を図ることができるという優れた効果を有す
る。
As described above, the method of constructing a middle-high rise apartment house according to the present invention constructs a frame having a blow-through portion which penetrates in a height direction from a predetermined portion on the lower reference floor to a predetermined portion on the upper reference floor. Since the construction method is configured to alternately carry in and install units such as floor slabs and residential units from the opening on the upper reference floor side of the blow-through section, it can be said that the carry-in installation work can be facilitated. Has excellent effect.

【0046】また、本発明に係る中高層集合住宅の構築
方法によれば、ユニット工法のメリットを十分に生かす
ことができるので、より一層工業化率を高めることがで
きるという優れた効果をも得ることができる。
Further, according to the method for constructing a middle-high-rise apartment house according to the present invention, the merit of the unit construction method can be fully utilized, so that an excellent effect that the industrialization rate can be further enhanced can be obtained. it can.

【図面の簡単な説明】[Brief description of drawings]

【図1】本実施例に係る中高層集合住宅の建築途中の状
態を示す側面図である。
FIG. 1 is a side view showing a state in which a middle-high-rise apartment building according to this embodiment is in the process of being constructed.

【図2】完成後の中高層集合住宅の各階概略構成を示す
構成図である。
FIG. 2 is a configuration diagram showing a schematic configuration of each floor of the middle-high-rise housing complex after completion.

【図3】ユニットのクローズドシステムを説明するため
の説明図に係り、(A)は居住用ユニットの平面配置
図、(B)はA線矢視拡大図である。
FIG. 3 relates to an explanatory view for explaining a closed system of a unit, (A) is a plan layout view of a residential unit, and (B) is an enlarged view taken along the line A.

【図4】間仕切り設置用スライドガイドシステムを説明
するための説明図に係り、間仕切りパネルの配置図であ
る。
FIG. 4 is a layout diagram of a partition panel according to an explanatory view for explaining a slide guide system for installing a partition.

【図5】図4の5−5線断面図である。FIG. 5 is a sectional view taken along line 5-5 in FIG. 4;

【図6】図4の6−6線断面図である。6 is a sectional view taken along line 6-6 of FIG.

【図7】壁・天井クロス張りの工場クロス張り化を説明
するための断面図である。
FIG. 7 is a cross-sectional view for explaining how to apply a wall / ceiling cloth to a factory cloth.

【図8】後付内装諸部材の接着時における保持構造を説
明するための説明図に係り、(A)は居住用ユニットの
柱カバーを示す平面図、(B)は保持構造の要部を示す
斜視図である。
FIG. 8 relates to an explanatory view for explaining a holding structure at the time of adhering various rear interior members, (A) is a plan view showing a pillar cover of a residential unit, and (B) is a main part of the holding structure. It is a perspective view shown.

【図9】ユニット内構成室の拡充システムを説明するた
めの説明図である。
FIG. 9 is an explanatory diagram for explaining an expansion system of a unit internal chamber.

【図10】従来構造に係る中高層集合住宅の間取り図で
ある。
FIG. 10 is a floor plan of a medium- and high-rise apartment building having a conventional structure.

【図11】図10の間取り構成のために使用されるユニ
ット構成単位の例である。
11 is an example of a unit structural unit used for the floor plan configuration of FIG.

【符号の説明】[Explanation of symbols]

10 中高層集合住宅 12 躯体 20B 第2の床版 34 居住用ユニット(居住用等のユニット) 46 吹抜け部 56 開口部 10 Mid-High-Rise Apartment House 12 Body 20B Second Floor Slab 34 Residential Unit (Residential Unit) 46 Venthole 56 Opening

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 下方基準階所定部位から上方基準階所定
部位に亘って高さ方向に貫通する吹抜け部を有する躯体
を構築し、 吹抜け部の上方基準階側の開口部から床版及び居住用等
のユニットを交互に搬入及び設置する、 ことを特徴とする中高層集合住宅の構築方法。
1. A building body having a blow-through portion penetrating in a height direction from a predetermined portion of a lower reference floor to a predetermined portion of an upper reference floor is constructed, and a floor slab and a residence are opened from an opening portion on the upper reference floor side of the blow-through portion. A method of constructing a middle- and high-rise apartment building, characterized in that units such as the above are alternately loaded and installed.
JP16376994A 1994-07-15 1994-07-15 Construction of middle-and-high-storied multiple dwelling Pending JPH0828072A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16376994A JPH0828072A (en) 1994-07-15 1994-07-15 Construction of middle-and-high-storied multiple dwelling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16376994A JPH0828072A (en) 1994-07-15 1994-07-15 Construction of middle-and-high-storied multiple dwelling

Publications (1)

Publication Number Publication Date
JPH0828072A true JPH0828072A (en) 1996-01-30

Family

ID=15780371

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16376994A Pending JPH0828072A (en) 1994-07-15 1994-07-15 Construction of middle-and-high-storied multiple dwelling

Country Status (1)

Country Link
JP (1) JPH0828072A (en)

Similar Documents

Publication Publication Date Title
US6951079B2 (en) System and method of panelized construction
US6651393B2 (en) Construction system for manufactured housing units
US9115504B2 (en) System for modular building construction
US20160160515A1 (en) System for modular building construction
US20070294954A1 (en) Prefabricated bathroom assembly and methods of its manufacture and installation
US7421828B2 (en) Integral forming technology, a method of constructing steel reinforced concrete structures
EA000200B1 (en) Prefabricated construction panels and modules for multistory buildings and methods for their use
EP3889374B1 (en) Method for constructing buildings
JPH04231551A (en) Interior finishing method for building
JPH0828072A (en) Construction of middle-and-high-storied multiple dwelling
JP6770829B2 (en) Joining structure and joining method of building units and wall panels
JPH03132536A (en) Construction of unit housing
US11629491B1 (en) Interchangable modular construction method
JPH0765357B2 (en) New medium space partition wall and its assembly method
JP2018017088A (en) Building unit and manufacturing method of building unit
WO2002072963A1 (en) Building using pier posts and foundation blocks
JP6817601B2 (en) Building unit construction method and hanging members
JP2004270361A (en) Structure of outdoor floor slab
JPS60105737A (en) Anchoring of unit building
JPH05331955A (en) Ceiling frame and ceiling panel
JP2018017090A (en) Building unit
JPH06294175A (en) Attic space separation wall construction
JP2018017092A (en) Building unit and manufacturing method of building unit
JPH09100627A (en) Construction method of building
ITUB201545499U1 (en) PREFABRICATED MODULAR BUILDING SYSTEM FOR BUILDING.