JPH08232284A - Method for restoring unevenly settled building and lift member for use in restoration - Google Patents

Method for restoring unevenly settled building and lift member for use in restoration

Info

Publication number
JPH08232284A
JPH08232284A JP4013895A JP4013895A JPH08232284A JP H08232284 A JPH08232284 A JP H08232284A JP 4013895 A JP4013895 A JP 4013895A JP 4013895 A JP4013895 A JP 4013895A JP H08232284 A JPH08232284 A JP H08232284A
Authority
JP
Japan
Prior art keywords
lifting
foundation
building
base
repairing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP4013895A
Other languages
Japanese (ja)
Inventor
Keisuke Seko
計助 世古
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEKO KOMUTEN KK
Original Assignee
SEKO KOMUTEN KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEKO KOMUTEN KK filed Critical SEKO KOMUTEN KK
Priority to JP4013895A priority Critical patent/JPH08232284A/en
Publication of JPH08232284A publication Critical patent/JPH08232284A/en
Pending legal-status Critical Current

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

PURPOSE: To provide a restoration method by which a building tilted due to the settlement of the foundation is easily restored in a small space without using large machines such as a crane and to provide a lift member for use in restoration. CONSTITUTION: A building 1 comprises a foundation 2 and a building main body 4 provided on the foundation 2, and a lift member 7 on which a lift means 6 for lifting the foundation 2 works is passed through a plurality of through holes 5 provided in the foundation 2. The lift member 7 is lifted by the lift means 6, the foundation 2 is thereby lifted by the lift member 7, and a self- hardening grout 13 is cast into a space formed thereby below the foundation 2.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、地震等により基礎部か
ら傾いた建物を修復する不等沈下建物の修復方法及び修
復に用いる持上部材に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for repairing an unequal subsidence building for repairing a building tilted from a foundation due to an earthquake or the like, and a lifting member used for the repair.

【0002】[0002]

【従来の技術】従来、地震等により基礎部から傾いた建
物を修復するには、建物の基礎部又は基礎部上に備えた
建物本体をクレーン等の作業機により持ち上げて修復す
る方法があった。
2. Description of the Related Art Conventionally, in order to restore a building tilted from a foundation due to an earthquake or the like, there has been a method of lifting the foundation of a building or a building body provided on the foundation by a working machine such as a crane to restore the building. .

【0003】[0003]

【発明が解決しようとする課題】しかし、上述の方法で
は、クレーンを備えた車両が侵入し、作業をするスペー
スが必要であり、特に住宅等の建物の密集地において
は、このような作業スペースを確保するのが困難であ
り、またクレーン等の大型機械を使用するため、作業が
大掛かりなものとなっていたっていた。
However, the above-mentioned method requires a space for the vehicle equipped with a crane to invade and work, especially in a dense area of a building such as a house. Was difficult to secure, and large-scale machines such as cranes were used, resulting in large-scale work.

【0004】そこで、本発明は、クレーンのような大型
機械を使用することなく狭いスペースで容易に作業を行
うことができる不等沈下建物の修復方法及び修復に用い
る持上部材を提供することを目的とする。
Therefore, the present invention provides a method of repairing an unequal subsidence building and a lifting member used for the repair, which can easily work in a narrow space without using a large machine such as a crane. To aim.

【0005】[0005]

【課題を解決するための手段】本発明は、基礎部2と、
該基礎部2上に備えた建物本体4とからなる建物1の基
礎部2の沈下による傾きを修復する不等沈下建物の修復
方法において、上述の目的を達成するために以下の技術
的手段を講じている。すなわち、前記基礎部2に建物1
の屋内外を連通する挿通孔5を複数設け、それぞれの前
記挿通孔5に挿通し、前記基礎部2を持ち上げるための
持上手段6が作用する持上部材7を備え、前記持上手段
6によって前記持上部材7を持ち上げることにより、該
持上部材7を介して前記挿通孔5位置で前記基礎部2を
持ち上げ、該基礎部2を持ち上げることにより生じた基
礎部2下方の隙間に時硬性のグラウト材13を流入する
ことを特徴としている。
The present invention comprises a base portion 2 and
In a method for repairing an unequal subsidence building for repairing an inclination due to subsidence of a foundation part 2 of a building 1 comprising a building main body 4 provided on the foundation part 2, the following technical means are provided in order to achieve the above object. I am taking it. That is, the building 1 is attached to the foundation 2.
There are provided a plurality of insertion holes 5 for communicating indoors and outdoors, and each of the insertion holes 5 is provided with a lifting member 7 on which lifting means 6 for lifting the base portion 2 act. By lifting the lifting member 7 by means of the lifting member 7, the foundation part 2 is lifted at the position of the insertion hole 5 through the lifting member 7, and when the foundation part 2 is lifted, a gap is formed below the foundation part 2. It is characterized by inflowing a hard grout material 13.

【0006】また、前記挿通孔5を、前記基礎部2の地
面Gと近い位置に設けていることを特徴としている。そ
して、前記持上部材7は、前記挿通孔5に挿通する下側
部材8と、該下側部材8の上方に配置し、前記持上手段
6が作用する上側部材9と、前記下側部材8の端部と前
記上側部材9の端部とを連結する連結部材10とからな
ることを特徴としている。
Further, the insertion hole 5 is provided at a position close to the ground G of the base portion 2. The lifting member 7 is inserted into the insertion hole 5, a lower member 8 is disposed above the lower member 8, and an upper member 9 on which the lifting means 6 acts, and the lower member It is characterized in that it comprises a connecting member 10 for connecting the end of 8 and the end of the upper member 9.

【0007】また、本発明は、基礎部2と、該基礎部2
上面に備えた土台15を有する建物本体4とからなる建
物1の基礎部2の沈下による傾きを修復する不等沈下建
物の修復方法において、前記土台15に建物1の屋内外
を連通する挿通孔5を複数設け、それぞれの前記挿通孔
5に挿通し、前記土台15を持ち上げるための持上手段
6が作用する持上部材7を備え、前記持上手段6によっ
て前記持上部材7を持ち上げることにより、該持上部材
7を介して前記挿通孔5位置で前記土台15を持ち上
げ、該土台15を持ち上げることにより生じた前記基礎
部2との隙間に時硬性のグラウト材13を流入すること
を特徴としている。
The present invention also provides a base portion 2 and the base portion 2
In a method of repairing an unequal subsidence building for repairing an inclination due to subsidence of a foundation portion 2 of a building 1 comprising a building body 4 having a base 15 provided on an upper surface thereof, an insertion hole communicating the inside and outside of the building 1 with the base 15. A plurality of 5 are provided, each of which is inserted into each of the insertion holes 5 and includes a lifting member 7 on which a lifting means 6 for lifting the base 15 acts, and the lifting means 6 lifts the lifting member 7. Thus, the base 15 is lifted at the position of the insertion hole 5 via the lifting member 7, and the hour-hardness grout material 13 is caused to flow into the gap between the base 2 and the base 15 generated by lifting the base 15. It has a feature.

【0008】また、基礎部2の上部に、該基礎部2の屋
内外方向の幅に亘って切欠凹部19を複数設け、前記切
欠凹部19と土台15下面に囲まれた空間に挿通し、前
記土台15を持ち上げるための持上手段6が作用する持
上部材7を備え、前記持上手段6によって前記持上部材
7を持ち上げることにより、該持上部材7を介して前記
切欠凹部19位置で前記土台15を持ち上げ、該土台1
5を持ち上げることにより生じた前記基礎部2との隙間
に時硬性のグラウト材13を流入することを特徴として
いる。
Further, a plurality of cutout recesses 19 are provided on the upper part of the base 2 over the width of the base 2 in the indoor and outdoor directions, and are inserted into the space surrounded by the cutout recesses 19 and the lower surface of the base 15, A lifting member 7 on which lifting means 6 for lifting the base 15 acts is provided, and by lifting the lifting member 7 by the lifting means 6, at the position of the cutout recess 19 via the lifting member 7. The base 15 is lifted, and the base 1
The time-hardening grout material 13 is caused to flow into a gap between the foundation portion 2 and the base portion 2, which is generated by lifting the lifting portion 5.

【0009】そして、本発明は、基礎部2と、該基礎部
2上に備えた建物本体4とからなる建物1の基礎部2の
沈下による傾きを修復する不等沈下建物の修復に用いる
持上部材において、建物1の屋内外を連通し、基礎部2
の地面と近い位置に設けた挿通孔5に挿通する下側部材
8と、該下側部材8の上方に配置し、前記基礎部2を持
ち上げるための持上手段6が作用する上側部材9と、前
記下側部材8の端部と前記上側部材9の端部とを連結す
る連結部材10とからなることを特徴としている。
[0009] The present invention is used for repairing an unequal-subsidence building for repairing the inclination of the foundation part 2 of a building 1 consisting of the foundation part 2 and the building body 4 provided on the foundation part 2 due to the subsidence. In the upper member, the inside and outside of the building 1 communicate with each other, and the foundation 2
A lower member 8 which is inserted into an insertion hole 5 provided at a position close to the ground surface, and an upper member 9 which is disposed above the lower member 8 and on which a lifting means 6 for lifting the foundation 2 acts. The connecting member 10 connects the end of the lower member 8 and the end of the upper member 9 to each other.

【0010】[0010]

【作用】基礎部2に挿通孔5を複数設け、この複数の挿
通孔5部分で荷重を分配して基礎部2を持ち上げるた
め、小型の持上手段6を用いることができる。また、挿
通孔5を地面Gと近い位置に設けているため、該挿通孔
5から基礎部2の上面までの距離を大きくし、この部分
が、基礎部を持ち上げる際の建物の荷重に十分に耐え得
るようにしている。
Since a plurality of insertion holes 5 are provided in the base portion 2 and the plurality of insertion holes 5 are used to distribute the load to lift the base portion 2, a small lifting means 6 can be used. Further, since the insertion hole 5 is provided at a position close to the ground G, the distance from the insertion hole 5 to the upper surface of the foundation portion 2 is increased, and this portion is sufficient for the load of the building when lifting the foundation portion. I try to endure it.

【0011】そして、持上部材7は、挿通孔5に挿通
し、基礎部2を持ち上げる際の作用部分となる下側部材
8よりも上方に、持上手段6の作用部分となる上側部材
9を配置しているので、挿通孔5を地面に近い位置に設
けた場合にも持上手段6を地面G上に設置するスペース
を確保することができる。そして、基礎部2上面に備え
た土台15に挿通孔5を複数設け、この複数の挿通孔5
部分で荷重を分配して土台を持ち上げるので、小型の持
上手段6を用いることができ、前記挿通孔5に持上手段
6が作用する持上部材7を挿通しているので、持上手段
6を地面上に設置するスペースを十分に確保することが
でき、また、土台15から基礎部2より上の建物本体4
を持ち上げるため、持ち上げる重量を小さくすることが
でき、持上手段6の数を減らすことができる。
The lifting member 7 is inserted into the insertion hole 5 and is located above the lower member 8 which serves as a working portion when the foundation 2 is lifted, and the upper member 9 which serves as a working portion of the lifting means 6. Therefore, even when the insertion hole 5 is provided at a position close to the ground, a space for installing the lifting means 6 on the ground G can be secured. Then, a plurality of insertion holes 5 are provided in the base 15 provided on the upper surface of the base portion 2, and the plurality of insertion holes 5 are provided.
Since the load is distributed by the portion to lift the base, a small lifting means 6 can be used, and the lifting member 7 on which the lifting means 6 acts is inserted into the insertion hole 5, so the lifting means is 6 can be sufficiently secured on the ground, and the building body 4 above the foundation 15 above the foundation 15 can be secured.
The lifting weight can be reduced and the number of lifting means 6 can be reduced.

【0012】そして、基礎部2上面に備えた土台に建物
の屋内外方向の幅に亘って切欠凹部を複数設け、該切欠
凹部19部分で荷重を分配して土台15を持ち上げるの
で、小型の持上手段6を用いることができ、基礎部2上
部の切欠凹部19と土台15の下面とに囲まれた空間に
持上手段6が作用する持上部材7を挿通しているので、
持上手段6を地面上に設置するスペースを十分に確保す
ることができ、基礎部2より上の土台15から建物本体
4を持ち上げるため、持ち上げる重量を小さくすること
ができ持上手段6の数量を減らすことができる。
A plurality of cutout recesses are provided on the base provided on the upper surface of the base portion 2 across the width of the building in the indoor / outdoor direction, and the load is distributed in the cutout recesses 19 to lift the base 15, so that a small size is maintained. Since the upper means 6 can be used and the lifting member 7 on which the lifting means 6 acts is inserted into the space surrounded by the cutout recess 19 in the upper part of the base 2 and the lower surface of the base 15,
A sufficient space for installing the lifting means 6 on the ground can be secured, and since the building body 4 is lifted from the base 15 above the foundation 2, the lifting weight can be reduced and the number of lifting means 6 can be increased. Can be reduced.

【0013】[0013]

【実施例】本発明の実施例を図を参照して説明する。図
1は、本発明の第1実施例を示しており、建物1は、地
面内部に一部埋め込まれた基礎部2と、該基礎部2の上
部に備えた建物本体4よりなり、前記基礎部2の下方に
は、割栗石等の基礎地盤3を形成している。
Embodiments of the present invention will be described with reference to the drawings. FIG. 1 shows a first embodiment of the present invention, in which a building 1 is composed of a foundation part 2 partially embedded in the ground and a building body 4 provided on the upper part of the foundation part 2. Below the part 2, a foundation ground 3 such as a split stone is formed.

【0014】地震等の発生による地盤の沈下や、埋め立
て地等の地盤沈下により、前記基礎地盤3とともに前記
基礎部2が沈下し、前記建物1が傾くことがあるが、こ
の際に前記建物1を修復するには、まず、前記基礎部2
に屋内外を連通する挿通孔5を設ける。この挿通孔5
は、コアドリル等を用いて基礎部2の比較的地面と近い
位置に間隔をおいて複数設けている。
Due to the subsidence of the ground due to the occurrence of an earthquake or the like or the subsidence of a landfill or the like, the foundation part 2 may be submerged together with the foundation ground 3 and the building 1 may be tilted. In order to restore the
An insertion hole 5 is provided to communicate indoors and outdoors. This insertion hole 5
Are provided at a position relatively close to the ground of the base portion 2 by using a core drill or the like at intervals.

【0015】そして、複数の前記挿通孔5のそれぞれに
持上部材7を挿通する。この持上部材7は、H形鋼、I
型鋼、溝型鋼、又は、山型鋼等の鋼材で形成しており、
前記挿通孔5に挿通する下側部材8と、該下側部材8の
両端より斜め上方に配置した上側部材9と、前記下側部
材8の端部と前記上側部材9の端部とを連結する連結部
材10よりなっている。そして、前記上側部材9の下面
に当接するように前記持上手段6を地面G上に設置して
いる。
Then, the lifting member 7 is inserted into each of the plurality of insertion holes 5. This lifting member 7 is an H-shaped steel, I
It is made of steel material such as type steel, groove type steel, or mountain type steel,
A lower member 8 that is inserted into the insertion hole 5, an upper member 9 that is disposed obliquely above both ends of the lower member 8, and an end portion of the lower member 8 and an end portion of the upper member 9 are connected to each other. It is composed of a connecting member 10. Further, the lifting means 6 is installed on the ground G so as to come into contact with the lower surface of the upper member 9.

【0016】前記持上手段6としては、ジャッキやウイ
ンチ等を用い、本実施例では、油圧ジャッキ、空圧ジャ
ッキ、又はネジ式ジャッキ等のジャッキを用いている。
また、前記持上手段6は、電動あるいは手動のものを用
いることができる。上述の構成により、持上手段6によ
って持上部材7を持ち上げ、挿通孔5部分で前記持上部
材7を介して基礎部2を持ち上げる。そして、基礎部2
の下方の基礎地盤3との間に生じた隙間に、あらかじめ
設けておいた流入路12より、コンクリート、モルタ
ル、又は樹脂等の時硬性のグラウト材13を流入する。
As the lifting means 6, a jack, a winch or the like is used. In this embodiment, a jack such as a hydraulic jack, a pneumatic jack or a screw type jack is used.
The lifting means 6 may be electric or manual. With the above-described configuration, the lifting means 6 lifts the lifting member 7, and the foundation 2 is lifted through the lifting member 7 at the insertion hole 5 portion. And foundation part 2
Into a gap formed between the ground foundation 3 and the ground foundation 3, a time-hardening grout material 13 such as concrete, mortar, or resin flows in from a previously provided inflow path 12.

【0017】上記第1実施例において、基礎部2に挿通
孔5を複数設け、この複数の挿通孔5部分で荷重を分配
して基礎部2を持ち上げるため、ジャッキやウインチ等
の比較的小型の持上手段6を用いることができ、クレー
ン等の大型機械を使用する必要がないので狭いスペース
で容易に作業をすることが可能である。また、この挿通
孔5を地面から近い位置に設けることにより、該挿通孔
5から基礎部2の上面まで距離を大きくして、この部分
が、基礎部2を持ち上げる際の荷重に十分に耐え得るよ
うにしている。
In the first embodiment described above, a plurality of insertion holes 5 are provided in the base portion 2, and the load is distributed by the plurality of insertion hole 5 portions to lift the base portion 2, so that a relatively small size such as a jack or winch is used. Since the lifting means 6 can be used and it is not necessary to use a large machine such as a crane, it is possible to easily work in a narrow space. Further, by providing the insertion hole 5 at a position close to the ground, the distance from the insertion hole 5 to the upper surface of the base portion 2 can be increased, and this portion can sufficiently bear the load when the base portion 2 is lifted. I am trying.

【0018】そして、持上部材7は、挿通孔5に挿通
し、基礎部2を持ち上げる際の作用部分となる下側部材
8よりも上方に、持上手段6の作用部分となる上側部材
9を配置しているので、地面と近い位置に挿通孔5を設
けた場合にも、ジャッキ等の持上手段6を地面上に設置
するスペースを確保することができ、地面を掘って持上
手段6を設置するスペースを作る作業等の必要がなく、
作業工程の低減を図っている。
The lifting member 7 is inserted into the insertion hole 5 and is located above the lower member 8 which serves as a working portion when the foundation 2 is lifted, and the upper member 9 which serves as a working portion of the lifting means 6. Since the above-mentioned arrangement is provided, it is possible to secure a space for installing the lifting means 6 such as a jack on the ground even when the insertion hole 5 is provided at a position close to the ground. There is no need to create a space to install 6,
The work process is being reduced.

【0019】図2は、本発明の第2実施例を示してお
り、第1実施例と異なるところは、持上部材7は、挿通
孔5に挿通する下側部材8と、該下側部材8の屋外側の
端部から斜め上方に配置した上側部材9と、前記下側部
材8の端部と前記上側部材9の端部とを連結する連結部
材10よりなり、該上側部材9は、持上手段6の作用点
から下側部材8の自由端までの長さと比べて持上手段6
の作用点から上側部材9の自由端までの長さが長くなる
ように形成していることろであり、上側部材9の自由端
の荷重が大きくなるように、例えばウエイト14等を自
由端に設けている。
FIG. 2 shows a second embodiment of the present invention. The difference from the first embodiment is that the lifting member 7 is a lower member 8 which is inserted into the insertion hole 5, and the lower member. The upper member 9 is disposed obliquely upward from the outdoor end of 8, and the connecting member 10 that connects the lower member 8 and the upper member 9 together. Compared with the length from the action point of the lifting means 6 to the free end of the lower member 8, the lifting means 6
Is formed so that the length from the point of action of the upper member 9 to the free end of the upper member 9 becomes long. It is provided.

【0020】本実施例においては、持上手段6を作動さ
せると、上側部材9の自由端はウエイト14等により荷
重を大きくし下方へと規制しているため、下側部材8を
上方へと持ち上げることとなり、よって基礎部2を持ち
上げることができるようにしている。第2実施例では、
持上手段6を建物1の屋外のみに設置するため、屋内に
持上手段6を設置するための作業、例えば、屋内の床板
を剥がす作業等を行う必要がなく、また、持上手段6の
数を減らすことができる。
In this embodiment, when the lifting means 6 is actuated, the weight of the free end of the upper member 9 is increased by the weight 14 or the like to regulate the load downward, so that the lower member 8 is moved upward. Therefore, the foundation 2 can be lifted. In the second embodiment,
Since the lifting means 6 is installed only outdoors of the building 1, there is no need to perform the work for installing the lifting means 6 indoors, for example, the work of peeling off the indoor floorboard. The number can be reduced.

【0021】なお、上記第1、第2実施例において、挿
通孔5の形状は、持上部材7の形状と対応させるように
するのが好ましい。例えば、持上部材7をH鋼でフラン
ジ部分を上下に配置して形成した場合には、応力集中を
避けるようにフランジ面が挿通孔5と面接触するように
該挿通孔5を形成する方がよい。逆に、挿通孔5と持上
部材7が面接触するように持上部材7を形成してもよ
い。
In the first and second embodiments, the shape of the insertion hole 5 is preferably made to correspond to the shape of the lifting member 7. For example, in the case where the lifting member 7 is formed of H steel with the flange portions arranged vertically, a method of forming the insertion hole 5 so that the flange surface is in surface contact with the insertion hole 5 so as to avoid stress concentration. Is good. On the contrary, the lifting member 7 may be formed so that the insertion hole 5 and the lifting member 7 are in surface contact with each other.

【0022】そして、挿通孔5の位置は、上記実施例で
述べたように地面と近い位置に設けるのが好ましいが、
基礎部2を持ち上げる際に挿通孔5から基礎部2上面ま
での部分が建物の荷重に耐えることができる範囲で変更
することができ、また、持上部材7としては、直線状に
形成した棒状の部材を用いることができる。また、挿通
孔5を地面Gと近い位置に設け、持上部材7として棒状
に形成したものを使用する場合に、地面Gと持上部材7
との間にジャッキが入らないときは、持上手段6として
ウインチを用い前記持上部材7を上方から引き上げるよ
うにすればよい。
The insertion hole 5 is preferably provided at a position close to the ground, as described in the above embodiment.
The part from the insertion hole 5 to the upper surface of the base part 2 can be changed within a range that can withstand the load of the building when the base part 2 is lifted, and the lifting member 7 has a linear rod shape. Can be used. In addition, when the insertion hole 5 is provided at a position close to the ground G and a rod-shaped member is used as the lifting member 7, the ground G and the lifting member 7 are used.
If the jack does not come in between, a winch may be used as the lifting means 6 and the lifting member 7 may be pulled up from above.

【0023】図3は、本発明の第3実施例を示してお
り、建物1は、基礎部2と、該基礎部2の上面に土台1
5を設け、該土台15の上面に柱16を立てて枠組みを
形成した建物本体4よりなり、主に、木造建築物に見ら
れる構造である。前記土台15は、木、又は溝型鋼等の
型鋼を用いて形成している。この建物1が基礎部2の沈
下により傾いた場合に、建物1を修復する際には、前記
土台15に、屋内外を連通する挿通孔5を間隔をおいて
複数設け、それぞれの挿通孔5に持上部材7を挿通し、
該持上部材7の屋内外両側の下面に当接するように地面
G上に持上手段6を設置する。
FIG. 3 shows a third embodiment of the present invention, in which a building 1 has a foundation 2 and a base 1 on the upper surface of the foundation 2.
5 is provided, and a pillar 16 is erected on the upper surface of the base 15 to form a framework, and the structure is mainly found in a wooden building. The base 15 is formed by using wood or shaped steel such as grooved steel. When the building 1 is inclined due to the subsidence of the foundation portion 2, when the building 1 is restored, a plurality of insertion holes 5 for communicating the inside and the outside of the building are provided on the base 15 at intervals, and the respective insertion holes 5 Insert the lifting member 7 into
The lifting means 6 is installed on the ground G so as to contact the lower surfaces of the lifting member 7 on both indoor and outdoor sides.

【0024】そして、持上手段6を作動することにより
土台15部分より建物本体4を持ち上げ、土台15と基
礎部2との間に生じた隙間にコンクリート、モルタル、
又は樹脂等の時硬性のグラウト材13を流入する。前記
挿通孔5は、水平方向に幅広のスリット状で、前記持上
部材7は、挿通孔5の形状に適合した平鋼を用いてい
る。
Then, by operating the lifting means 6, the building body 4 is lifted from the base 15 part, and concrete, mortar, and mortar are put in the gap formed between the base 15 and the base part 2.
Alternatively, the time-hard grout material 13 such as resin is flowed in. The insertion hole 5 is in the shape of a slit that is wide in the horizontal direction, and the lifting member 7 is made of flat steel that conforms to the shape of the insertion hole 5.

【0025】そして、前記持上部材7の曲げを防ぐため
に持上手段6を基礎部2に近づけて設置している。第3
実施例においては、基礎部2上の土台15に挿通孔5を
設け、この挿通孔5位置で土台15を持ち上げるように
しているため、持上手段6を設置するスペースを充分に
確保することができ、また、基礎部2より上の土台15
から建物本体4を持ち上げるため、持ち上げる重量を小
さくすることができ、持上手段6の数を減らすことがで
きる。
Then, in order to prevent the lifting member 7 from bending, the lifting means 6 is installed close to the base portion 2. Third
In the embodiment, the base 15 on the base 2 is provided with the insertion hole 5, and the base 15 is lifted at the position of the insertion hole 5, so that a sufficient space for installing the lifting means 6 can be secured. Yes, and the base 15 above the foundation 2
Since the building main body 4 is lifted from above, the weight to be lifted can be reduced and the number of lifting means 6 can be reduced.

【0026】図4は、本発明の第4実施例を示してお
り、建物1は、第3実施例と同様で基礎部2と、該基礎
部2の上面に土台15を設け、該土台15の上面に柱1
6を立てて枠組みを形成した建物本体4よりなり、建物
1の傾きを修複する際には、基礎部2の上部に、該基礎
部2の屋内外方向の幅に亘る複数の切欠凹部19を間隔
をおいて設け、該切欠凹部19と土台15の下面とに囲
まれた空間に持上部材7を挿通している。
FIG. 4 shows a fourth embodiment of the present invention. In the building 1, as in the third embodiment, a base 2 and a base 15 are provided on the upper surface of the base 2, and the base 15 is provided. Pillar 1 on top of
When the building main body 4 is formed by standing up 6 to form a framework and the inclination of the building 1 is to be repaired, a plurality of cutout recessed portions 19 extending over the width of the base portion 2 in the indoor / outdoor direction are provided on the upper portion of the base portion 2. The lifting member 7 is inserted into a space surrounded by the cutout recess 19 and the lower surface of the base 15 at intervals.

【0027】本実施例においては、第3実施例と同様
に、基礎部2上部に設けた切欠凹部19位置より土台1
5を持ち上げるようにしているため、持上手段6を設置
するスペースを充分に確保するとともに、基礎部2より
上の土台15から建物本体4を持ち上げるため、持ち上
げる重量を小さくすることができ持上手段6の数量を減
らすことができる。
In this embodiment, similarly to the third embodiment, the base 1 is formed from the position of the cutout recess 19 provided in the upper portion of the foundation 2.
Since 5 is lifted, a sufficient space for installing the lifting means 6 is secured, and since the building body 4 is lifted from the base 15 above the foundation 2, the lifting weight can be reduced. The quantity of means 6 can be reduced.

【0028】なお、上記第1〜4実施例において、基礎
部2又は土台15に設けた挿通孔5、及び、基礎部2上
面に設けた切欠凹部19は、建物の修復後にグラウト材
等により埋めて復元するが、基礎部2に設けた挿通孔5
については、埋めずに換気口としても利用することが可
能である。
In the first to fourth embodiments, the through hole 5 provided in the base 2 or the base 15 and the cutout recess 19 provided in the upper surface of the base 2 are filled with grout material or the like after the building is restored. To restore, but the insertion hole 5 provided in the base part 2
Can be used as a ventilation port without being filled.

【0029】[0029]

【発明の効果】本発明は、基礎部に挿通孔を複数設け、
この複数の挿通孔部分で荷重を分配して基礎部を持ち上
げるため、小型の持上手段を用いることができ、大型機
械を使用することなく狭いスペースで容易に作業を行う
ことができる。また、挿通孔を地面と近い位置に設けて
いるため、該挿通孔から基礎部の上面までの距離を大き
くし、この部分が、基礎部を持ち上げる際の建物の荷重
に十分に耐え得るようにして基礎部の破損を防いでい
る。
According to the present invention, a plurality of insertion holes are provided in the foundation,
Since the load is distributed by the plurality of insertion hole portions to lift the base portion, a small lifting means can be used, and the work can be easily performed in a narrow space without using a large machine. Also, since the insertion hole is provided at a position close to the ground, increase the distance from the insertion hole to the upper surface of the foundation part so that this part can sufficiently withstand the load of the building when lifting the foundation part. Prevents damage to the foundation.

【0030】そして、持上部材は、挿通孔に挿通し、基
礎部を持ち上げる際の作用部分となる下側部材よりも上
方に、持上手段の作用部分となる上側部材を配置してい
るので、挿通孔を地面に近い位置に設けた場合にも持上
手段を地面上に設置するスペースを確保することがで
き、地面を掘って持上手段を設置するスペースを作る作
業等の必要がなく、作業工程の低減を図っている。
Further, since the lifting member is inserted into the insertion hole and the upper member serving as the working portion of the lifting means is arranged above the lower member serving as the working portion when the base portion is lifted. Even when the insertion hole is provided at a position close to the ground, it is possible to secure a space for installing the lifting means on the ground, and there is no need to dig the ground to create a space for installing the lifting means. We are trying to reduce the work process.

【0031】そして、本発明は、基礎部上面に備えた土
台に挿通孔を複数設け、この複数の挿通孔部分で荷重を
分配して土台を持ち上げるので、小型の持上手段を用い
ることができ、前記挿通孔に持上手段が作用する持上部
材を挿通しているので、持上手段を地面上に設置するス
ペースを十分に確保することができ、また、基礎部より
上の土台から建物本体を持ち上げるため、持ち上げる重
量を小さくすることができ、持上手段の数を減らすこと
ができる。
According to the present invention, since a plurality of insertion holes are provided in the base provided on the upper surface of the foundation and the load is lifted by the plurality of insertion hole portions to lift the base, a small lifting means can be used. Since the lifting member, on which the lifting means acts, is inserted into the insertion hole, it is possible to secure a sufficient space for installing the lifting means on the ground, and from the base above the foundation to the building. Since the main body is lifted, the weight to be lifted can be reduced and the number of lifting means can be reduced.

【0032】そして、本発明は、基礎部上面に備えた土
台に建物の屋内外方向の幅に亘って切欠凹部を複数設
け、該切欠凹部部分で荷重を分配して土台を持ち上げる
ので、小型の持上手段を用いることができ、基礎部上部
の切欠凹部と土台の下面とに囲まれた空間に持上手段が
作用する持上部材を挿通しているので、持上手段を地面
上に設置するスペースを十分に確保することができ、基
礎部より上の土台から建物本体を持ち上げるため、持ち
上げる重量を小さくすることができ持上手段の数量を減
らすことができる。
Further, according to the present invention, a plurality of cutout recesses are provided on the base provided on the upper surface of the foundation over the width in the indoor and outdoor directions of the building, and the load is distributed in the cutout recesses to lift the base, so that the size is small. Since the lifting means can be used and the lifting member acting on the lifting means is inserted into the space surrounded by the notched concave portion at the upper part of the foundation and the lower surface of the base, the lifting means is installed on the ground. Since a sufficient space can be secured and the building body is lifted from the base above the foundation, the weight to be lifted can be reduced and the number of lifting means can be reduced.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の第1実施例を示し、(a)は断面図、
(b)は正面図である。
FIG. 1 shows a first embodiment of the present invention, (a) is a sectional view,
(B) is a front view.

【図2】本発明の第2実施例を示す断面図である。FIG. 2 is a sectional view showing a second embodiment of the present invention.

【図3】本発明の第3実施例を示し、(a)は断面図、
(b)は正面図である。
FIG. 3 shows a third embodiment of the present invention, (a) is a sectional view,
(B) is a front view.

【図4】本発明の第4実施例を示し、(a)は断面図、
(b)は正面図である。
FIG. 4 shows a fourth embodiment of the present invention, (a) is a sectional view,
(B) is a front view.

【符号の説明】[Explanation of symbols]

1 建物 2 基礎部 4 建物本体 5 挿通孔 6 持上手段 7 持上部材 8 下側部材 9 上側部材 10 連結部材 13 グラウト材 15 土台 19 切欠凹部 1 Building 2 Foundation Part 4 Building Main Body 5 Insertion Hole 6 Lifting Means 7 Lifting Member 8 Lower Member 9 Upper Member 10 Connecting Member 13 Grout Material 15 Base 19 Cutout Recess

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 基礎部(2)と、該基礎部(2)上に備
えた建物本体(4)とからなる建物(1)の基礎部
(2)の沈下による傾きを修復する不等沈下建物の修復
方法において、 前記基礎部(2)に建物(1)の屋内外を連通する挿通
孔(5)を複数設け、それぞれの前記挿通孔(5)に挿
通し、前記基礎部(2)を持ち上げるための持上手段
(6)が作用する持上部材(7)を備え、 前記持上手段(6)によって前記持上部材(7)を持ち
上げることにより、該持上部材(7)を介して前記挿通
孔(5)部分で前記基礎部(2)を持ち上げ、該基礎部
(2)を持ち上げることにより生じた基礎部(2)下方
の隙間に時硬性のグラウト材(13)を流入することを
特徴とする不等沈下建物の修復方法。
1. An unequal subsidence for repairing an inclination due to the subsidence of a foundation (2) of a building (1) comprising a foundation (2) and a building body (4) provided on the foundation (2). In the method for repairing a building, a plurality of insertion holes (5) communicating with the inside and outside of the building (1) are provided in the foundation part (2), and the insertion holes (5) are inserted into the insertion holes (5) to form the foundation part (2) A lifting member (7) on which lifting means (6) for lifting the lifting member acts. By lifting the lifting member (7) by the lifting means (6), the lifting member (7) is lifted. Through the insertion hole (5), the foundation portion (2) is lifted, and the hour-hardness grout material (13) is flown into the gap below the foundation portion (2) generated by lifting the foundation portion (2). A method of repairing an unequal subsidence building characterized by:
【請求項2】 前記挿通孔(5)を、前記基礎部(2)
の地面(G)と近い位置に設けていることを特徴とする
請求項1に記載の不等沈下建物の修復方法。
2. The through hole (5) is provided in the base portion (2).
The method for repairing an unequal subsidence building according to claim 1, wherein the method is provided at a position close to the ground (G).
【請求項3】 前記持上部材(7)は、前記挿通孔
(5)に挿通する下側部材(8)と、該下側部材(8)
の上方に配置し、前記持上手段(6)が作用する上側部
材(9)と、前記下側部材(8)の端部と前記上側部材
(9)の端部とを連結する連結部材(10)とからなる
ことを特徴とする請求項1又は2に記載の不等沈下建物
の修復方法。
3. The lifting member (7) includes a lower member (8) which is inserted into the insertion hole (5), and the lower member (8).
And an upper member (9) which is disposed above the upper member (6) and on which the lifting means (6) acts, and a connecting member (which connects the end of the lower member (8) and the end of the upper member (9) 10) The method for repairing an unequal subsidence building according to claim 1 or 2, comprising:
【請求項4】 基礎部(2)と、該基礎部(2)上面に
備えた土台(15)を有する建物本体(4)とからなる
建物(1)の基礎部(2)の沈下による傾きを修復する
不等沈下建物の修復方法において、 前記土台(15)に建物(1)の屋内外を連通する挿通
孔(5)を複数設け、それぞれの前記挿通孔(5)に挿
通し、前記土台(15)を持ち上げるための持上手段
(6)が作用する持上部材(7)を備え、 前記持上手段(6)によって前記持上部材(7)を持ち
上げることにより、該持上部材(7)を介して前記挿通
孔(5)位置で前記土台(15)を持ち上げ、該土台
(15)を持ち上げることにより生じた前記基礎部
(2)との隙間に時硬性のグラウト材(13)を流入す
ることを特徴とする不等沈下建物の修復方法。
4. An inclination due to the subsidence of a foundation (2) of a building (1) comprising a foundation (2) and a building body (4) having a base (15) provided on the upper surface of the foundation (2). In the method for repairing an unequal subsidence building, the base (15) is provided with a plurality of through holes (5) communicating with the inside and outside of the building (1), and the through holes (5) are inserted into the through holes (5), respectively. A lifting member (7) on which a lifting means (6) for lifting the base (15) acts, and the lifting member (7) is lifted by the lifting means (6) to lift the lifting member (7). The base (15) is lifted at the position of the insertion hole (5) via (7), and the time-hardening grout material (13) is provided in the gap between the base (2) generated by lifting the base (15). ) Is flowing in, the repair method of the unequal subsidence building characterized by the above.
【請求項5】 基礎部(2)と、該基礎部(2)上面に
備えた土台(15)を有する建物本体(4)とからなる
建物(1)の基礎部(2)の沈下による傾きを修復する
不等沈下建物の修復方法において、 基礎部(2)の上部に、該基礎部(2)の屋内外方向の
幅に亘って切欠凹部(19)を複数設け、前記切欠凹部
(19)と土台(15)下面に囲まれた空間に挿通し、
前記土台(15)を持ち上げるための持上手段(6)が
作用する持上部材(7)を備え、 前記持上手段(6)によって前記持上部材(7)を持ち
上げることにより、該持上部材(7)を介して前記切欠
凹部(19)位置で前記土台(15)を持ち上げ、該土
台(15)を持ち上げることにより生じた前記基礎部
(2)との隙間に時硬性のグラウト材(13)を流入す
ることを特徴とする不等沈下建物の修復方法。
5. Tilt due to subsidence of a foundation (2) of a building (1) comprising a foundation (2) and a building body (4) having a base (15) provided on the upper surface of the foundation (2). In the method of repairing an unequal subsidence building, a plurality of cutout recesses (19) are provided in an upper part of the base part (2) over the width of the base part (2) in the indoor / outdoor direction. ) And the bottom of the base (15),
A lifting member (7) on which lifting means (6) for lifting the base (15) acts, and the lifting member (7) is lifted to lift the lifting member (7). The base (15) is lifted at the position of the cutout recess (19) through the member (7), and the time-hardening grout material (in the gap between the base (2) generated by lifting the base (15). 13) A method for repairing an unequal subsidence building, characterized by inflowing.
【請求項6】 基礎部(2)と、該基礎部(2)上に備
えた建物本体(4)とからなる建物(1)の基礎部
(2)の沈下による傾きを修復する不等沈下建物の修復
に用いる持上部材において、 建物(1)の屋内外を連通し、基礎部(2)の地面と近
い位置に設けた挿通孔(5)に挿通する下側部材(8)
と、該下側部材(8)の上方に配置し、前記基礎部
(2)を持ち上げるための持上手段(6)が作用する上
側部材(9)と、前記下側部材(8)の端部と前記上側
部材(9)の端部とを連結する連結部材(10)とから
なることを特徴とする不等沈下建物の修復に用いる持上
部材。
6. An unequal subsidence for repairing an inclination due to the subsidence of a foundation (2) of a building (1) comprising a foundation (2) and a building body (4) provided on the foundation (2). In a lifting member used for repairing a building, a lower member (8) that communicates with the inside and outside of the building (1) and is inserted into an insertion hole (5) provided at a position close to the ground of the foundation (2).
An upper member (9) which is arranged above the lower member (8) and on which a lifting means (6) for lifting the foundation (2) acts, and an end of the lower member (8). And a connecting member (10) for connecting the end of the upper member (9) to a lifting member used for repairing an unequal subsidence building.
JP4013895A 1995-02-28 1995-02-28 Method for restoring unevenly settled building and lift member for use in restoration Pending JPH08232284A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4013895A JPH08232284A (en) 1995-02-28 1995-02-28 Method for restoring unevenly settled building and lift member for use in restoration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4013895A JPH08232284A (en) 1995-02-28 1995-02-28 Method for restoring unevenly settled building and lift member for use in restoration

Publications (1)

Publication Number Publication Date
JPH08232284A true JPH08232284A (en) 1996-09-10

Family

ID=12572432

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4013895A Pending JPH08232284A (en) 1995-02-28 1995-02-28 Method for restoring unevenly settled building and lift member for use in restoration

Country Status (1)

Country Link
JP (1) JPH08232284A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011144497A (en) * 2010-01-12 2011-07-28 Shikoku Res Inst Inc Lift device and method for restoring tilted object
JP2014040749A (en) * 2012-08-23 2014-03-06 Takenaka Komuten Co Ltd Method for raising building, and building structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011144497A (en) * 2010-01-12 2011-07-28 Shikoku Res Inst Inc Lift device and method for restoring tilted object
JP2014040749A (en) * 2012-08-23 2014-03-06 Takenaka Komuten Co Ltd Method for raising building, and building structure

Similar Documents

Publication Publication Date Title
JP4336682B2 (en) Construction method of elevator hoistway building
CN105863042A (en) All-steel structure building and construction method thereof
US20070151173A1 (en) Method of constructing structures with seismically-isolated base
JP2005090116A (en) Method for erecting steel frame column and positioning frame body used for it
JP2008150818A (en) Reinforcing method for existing foundation
JPH08232284A (en) Method for restoring unevenly settled building and lift member for use in restoration
CN111622347A (en) Cross-shaped node connecting structure of assembled frame structure and construction method thereof
JP2006144282A (en) Bridge removing method
CN105040991B (en) The supporting construction and method for supporting of large-span steel segmental hoisting
KR100444831B1 (en) Tower Crane Setup Method and Anchor used therein
JP3563128B2 (en) Precast concrete foundation structure, precast concrete foundation and foundation construction method
JPS6327628A (en) Correcting work for settlement of foundation slab
CN110344457A (en) A kind of shock resistance ancient architecture foundation ruggedized construction
KR100593203B1 (en) a deck supportframe and a construction methed
JP4420514B2 (en) Basement diving method
CN210946891U (en) Connecting structure of I-shaped steel and plate rib
JP2951330B1 (en) Woodwork sinking structure
JP2001193290A (en) Seismic isolation method for existing building
JPH0527744B2 (en)
JP2000017642A (en) Working method for pile head portion of diagonally assembled pile
JPH0210205Y2 (en)
CN115749354A (en) Construction method for additionally assembling modified indoor elevator shaft
CN111945711A (en) High-bearing large-diameter assembly type composite engineering pile and construction method thereof
JPS6013857Y2 (en) Simple earth retaining jig
KR20020009116A (en) Precast concrete segment for arch type culvert and construction method using this segment