JPH08218522A - Construction method for concrete exterior wall - Google Patents

Construction method for concrete exterior wall

Info

Publication number
JPH08218522A
JPH08218522A JP2560095A JP2560095A JPH08218522A JP H08218522 A JPH08218522 A JP H08218522A JP 2560095 A JP2560095 A JP 2560095A JP 2560095 A JP2560095 A JP 2560095A JP H08218522 A JPH08218522 A JP H08218522A
Authority
JP
Japan
Prior art keywords
deck plate
concrete
wall
fixed
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2560095A
Other languages
Japanese (ja)
Other versions
JP3087594B2 (en
Inventor
Yoshihiro Fujita
佳広 藤田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP07025600A priority Critical patent/JP3087594B2/en
Publication of JPH08218522A publication Critical patent/JPH08218522A/en
Application granted granted Critical
Publication of JP3087594B2 publication Critical patent/JP3087594B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

PURPOSE: To comply with various requirements which may vary with construction sites variously and enhance the economical performance of a construction work of a concrete exterior wall and construction efficiency and well. CONSTITUTION: A plurality of reinforcing bars 14 are welded and fixed with the rear surface of a deck plate 11 across their uneven parts on a concrete-made exterior wall of a structure while a plurality of space holding members 12, which are being held with the reinforcing bars 14, are projectingly installed to the front surface of the deck plate 11. Then, a welded metal net 17 is fixed with the front surface of the deck plate 11 with the space holding members 12 and laid out where an exterior form 13 is installed with the space holding members 12, thereby forming a form unit 20. The deck plate 11 is fixed with the structure 1 at its outer peripheral position so that the form unit may be installed to a construction scheduled location of the concrete exterior wall. Concrete is placed inside the form unit 20. After the concrete is cured, the exterior form 13 is removed from the space holding members 12, thereby constituting the concrete exterior wall.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、構造物のコンクリー
ト外壁を構築する方法に関する。
FIELD OF THE INVENTION The present invention relates to a method for constructing a concrete outer wall of a structure.

【0002】[0002]

【従来の技術】従来、構造物のコンクリート外壁を構築
する場合には、プレキャストコンクリート部材を、外壁
の構築予定個所に建込むことにより行っていた。かかる
プレキャストコンクリート部材は、既設の工場或いは施
工現場近辺の仮設工場において、あらかじめ一律の規格
をもって、型枠にコンクリートを打込むことにより製作
され、施工現場まで搬送されるものである。
2. Description of the Related Art Conventionally, in the case of constructing a concrete outer wall of a structure, a precast concrete member has been built in a planned location of the outer wall. Such a precast concrete member is manufactured by driving concrete into a formwork in an existing factory or a temporary factory near the construction site according to a uniform standard, and then transported to the construction site.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、従来の
プレキャストコンクリート部材を建込む方法では、上述
したように、プレキャストコンクリート部材は一律の規
格で製作されるものであるため、汎用性に乏しいという
問題があった。すなわち、かかるプレキャストコンクリ
ート部材を用いた工法では、施工現場によって変化する
種々の条件に適合させるために、工場製作の段階で規格
を適宜変更する必要があった。従って、規格を変更する
のに一定の工期を要し、またそれに伴う設備費が嵩むこ
ととなり、経済性、施工能率が低下するという惧れがあ
った。
However, in the conventional method of constructing a precast concrete member, as described above, the precast concrete member is manufactured according to a uniform standard, so that there is a problem of poor versatility. there were. That is, in the construction method using such a precast concrete member, it is necessary to appropriately change the standard at the stage of factory production in order to adapt to various conditions that vary depending on the construction site. Therefore, it takes a certain period of time to change the standard, and the equipment cost associated therewith increases, which may reduce economic efficiency and construction efficiency.

【0004】そこで、この発明は、かかる問題を解決す
るためになされたもので、施工現場によって種々に変化
する諸条件に容易に適合させることができ、コンクリー
ト外壁の構築作業の経済性、施工能率の向上を図ること
のできるコンクリート外壁の構築方法を提供することを
目的とするものである。
Therefore, the present invention has been made to solve the above problems, and can be easily adapted to various conditions that vary depending on the construction site, which makes the construction work of the concrete outer wall economical and construction efficient. It is an object of the present invention to provide a method for constructing a concrete outer wall that can improve the property.

【0005】[0005]

【課題を解決するための手段】この発明のコンクリート
外壁の構築方法は上記目的を達成するためになされたも
のであり、構造物のコンクリート外壁を構築する方法で
あって、縦方向に凹凸部を有するデッキプレートの裏面
に、該デッキプレートの凹凸部を横断して、鉄筋を複数
溶接固定するとともに、該鉄筋で保持しつつ、間隔保持
部材を該デッキプレートを貫通させて該デッキプレート
の表面側に複数突設する工程と、前記間隔保持部材に固
定して、該デッキプレートの表面側に、これに沿って溶
接金網を配設するとともに、上記間隔保持部材により外
型枠を配設して型枠ユニットを形成する工程と、前記デ
ッキプレートを構造物の外周位置に固定して、前記外型
枠が構造物の外周面に位置するように該型枠ユニットを
コンクリート外壁の構築予定箇所に設置する工程と、前
記型枠ユニット内にコンクリートを打設する工程と、コ
ンクリートが硬化した後に前記間隔保持部材より前記外
型枠を取り外す工程とからなるものである。
The method for constructing a concrete outer wall of the present invention is made in order to achieve the above object, and is a method for constructing a concrete outer wall for a structure, wherein an uneven portion is formed in the longitudinal direction. A plurality of reinforcing bars are welded and fixed to the back surface of the deck plate having the concave and convex portions of the deck plate, and while being held by the reinforcing bars, a spacing member is passed through the deck plate and the front surface side of the deck plate. A plurality of projections are provided on the deck plate and fixed to the spacing member, a welding wire mesh is arranged along the front side of the deck plate along with the outer frame by the spacing member. Forming a formwork unit, fixing the deck plate to the outer peripheral position of the structure, and placing the formwork unit on the outer peripheral surface of the structure so that the outer formwork is located on the concrete outer wall. A step of installing a building planned portion, a step of pouring the concrete into the formwork in the unit, in which concrete and a step of removing the outer frame from the spacing member after curing.

【0006】また、前記コンクリート外壁の構築方法で
は、前記型枠ユニットを前記構造物の外周位置に固定す
る際に、該構造物の外周位置に配設された鉄骨梁に取付
部材を取付けるとともに、前記デッキプレートの両端部
に補強鉄板を取付け、該補強鉄板を取付部材に固設する
ことが好ましい。
Further, in the method of constructing a concrete outer wall, when the formwork unit is fixed to the outer peripheral position of the structure, a mounting member is attached to the steel frame beam arranged at the outer peripheral position of the structure, It is preferable that reinforcing iron plates are attached to both ends of the deck plate, and the reinforcing iron plates are fixed to the attachment member.

【0007】[0007]

【作用】この発明のコンクリート外壁の構築方法によれ
ば、予めデッキプレートの表面に間隔保持部材を固設す
るとともに、この間隔保持部材を介してデッキプレート
に外型枠を配設して型枠ユニットを形成するため、デッ
キプレートの寸法、及び間隔保持部材の長さを適宜調節
することによって、構築される外壁の縦横の寸法、壁厚
等を変更することができ、施工現場によって変化する種
々の諸条件に容易且つ迅速に適合させることができる。
According to the method of constructing a concrete outer wall of the present invention, a space holding member is fixedly mounted on the surface of the deck plate in advance, and the outer frame is arranged on the deck plate via the space holding member. In order to form the unit, by adjusting the dimensions of the deck plate and the length of the spacing member as appropriate, the vertical and horizontal dimensions of the outer wall to be constructed, the wall thickness, etc. can be changed, and various types that vary depending on the construction site. The conditions can be easily and quickly adapted.

【0008】また、デッキプレートに間隔保持部材を固
設する際、デッキプレートの裏面に、溶接固定された鉄
筋で間隔保持部材を保持しつつ、デッキプレートに固設
するので、間隔保持部材をデッキプレートに容易に且つ
強固に固定することができる。
Further, when the spacing holding member is fixedly mounted on the deck plate, the spacing holding member is fixedly mounted on the deck plate while being held by the reinforcing bar welded and fixed to the back surface of the deck plate. It can be easily and firmly fixed to the plate.

【0009】併せて、型枠ユニットにコンクリートを打
設することによって、デッキプレートとコンクリート部
が一体となった外壁を容易に構築することができ、脱型
時は、デッキプレートは外壁部に残置させるものである
ため、コンクリート硬化後は間隔保持部材より外型枠の
みを取り外すだけでよく作業の省力化が図れる。
In addition, by placing concrete on the formwork unit, it is possible to easily construct an outer wall in which the deck plate and the concrete part are integrated, and when the mold is removed, the deck plate is left on the outer wall part. Therefore, after the concrete is hardened, it is sufficient to remove only the outer form from the spacing member, and the labor can be saved.

【0010】さらに、型枠ユニットを構造物の外周位置
に固定する際に、鉄骨梁に取付部材を取付け、補強鉄板
を取付部材に固設すれば、容易に型枠ユニットを構造物
に固設できる。
Further, when the formwork unit is fixed to the outer peripheral position of the structure, if the attaching member is attached to the steel beam and the reinforcing iron plate is fixedly attached to the attaching member, the formwork unit is easily attached to the structure. it can.

【0011】[0011]

【実施例】以下、この発明のコンクリート外壁の構築方
法の一実施例を添付図面を参照して詳細に説明する。図
1は、この実施例にかかるコンクリート外壁の構築方法
によって構造物1の外壁として構築されたコンクリート
外壁10を示すものである。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the method for constructing a concrete outer wall of the present invention will be described in detail below with reference to the accompanying drawings. FIG. 1 shows a concrete outer wall 10 constructed as an outer wall of a structure 1 by the method for constructing a concrete outer wall according to this embodiment.

【0012】構造物1は、例えば鉄骨造若しくは鉄筋コ
ンクリート造によるもので、その外周位置に鉄骨梁2,
3を有し、この鉄骨梁2,3上には床スラブ4が配設さ
れている。そして、この構造物1の外周面にはコンクリ
ート外壁10が構築されている。
The structure 1 is made of, for example, a steel frame structure or a reinforced concrete structure.
3, a floor slab 4 is arranged on the steel beams 2 and 3. A concrete outer wall 10 is constructed on the outer peripheral surface of the structure 1.

【0013】かかるコンクリート外壁10は、鉄骨梁
2,3に固定されるもので、縦方向(図1における高さ
方向)に波状の凹凸部11bが形成されたデッキプレー
ト11と、このデッキプレート11の外層部に配設さ
れ、その壁厚が120mm〜170mm程度のコンクリート
部21によって構成される合成壁である。なお、本実施
例では、このコンクリート外壁10の内側には内装材6
が配設されるとともに、コンクリート外壁10と内装材
6との間には断熱材5が配設されている。
The concrete outer wall 10 is fixed to the steel beams 2 and 3, and has a deck plate 11 in which a wavy uneven portion 11b is formed in the vertical direction (height direction in FIG. 1), and the deck plate 11 Is a composite wall which is arranged in the outer layer part and is constituted by the concrete part 21 having a wall thickness of about 120 mm to 170 mm. In the present embodiment, the interior material 6 is provided inside the concrete outer wall 10.
The heat insulating material 5 is arranged between the concrete outer wall 10 and the interior material 6.

【0014】そして、かかるコンクリート外壁10は以
下に示す作業手順により構築される。先ず、図2及び図
3に示すように、コンクリート外壁10の構築に先立っ
て、施工現場でのいわゆる地上組みによって型枠ユニッ
ト20を形成する。
The concrete outer wall 10 is constructed by the following work procedure. First, as shown in FIGS. 2 and 3, prior to the construction of the concrete outer wall 10, the formwork unit 20 is formed by so-called ground assembly at the construction site.

【0015】この型枠ユニット20は、デッキプレート
11の表面にセパレータ12を外方に向けて突出するよ
うに複数固設するとともに、このセパレータ12を利用
してデッキプレート11の表面にワイヤーメッシュ等の
溶接金網17(本実施例では、直径13mm程度)を配筋
し、さらに、デッキプレート11の表面に沿って外型枠
13をセパレータ12で固定してなるものである。
The formwork unit 20 has a plurality of separators 12 fixed to the surface of the deck plate 11 so as to project outward, and the separators 12 are used to wire mesh or the like on the surface of the deck plate 11. The welding wire net 17 (in this embodiment, a diameter of about 13 mm) is arranged, and the outer frame 13 is fixed by the separator 12 along the surface of the deck plate 11.

【0016】デッキプレート11は、図2(a)にも示
すように、通常床版等に用いられるものと同様の、強度
を保つために縦方向に波状の凹凸部11bが形成された
鉄製のものであり、所定幅(本実施例では600mm程
度)を有する複数の単位片を必要数(例えば4枚程度)
適宜接合し、所定寸法(例えば、幅2400mm、高さ3
000mm程度)のパネル状としたものである。そして、
このデッキプレート11の凹凸部11bの凸部側には、
デッキプレート11の全面に亘って縦横にセパレータ1
2を取付けるための取付孔11aが表裏を貫通して多数
穿設されている。
As shown in FIG. 2 (a), the deck plate 11 is made of iron and has a corrugated uneven portion 11b formed in the vertical direction in order to maintain strength, which is similar to that used for a normal floor slab. The required number of unit pieces having a predetermined width (about 600 mm in this embodiment) (for example, about 4 pieces).
Appropriately joined and set to a specified size (eg width 2400mm, height 3
It is a panel shape of about 000 mm). And
On the convex side of the uneven portion 11b of the deck plate 11,
Separator 1 vertically and horizontally across the entire surface of the deck plate 11.
A large number of mounting holes 11a for mounting 2 are formed penetrating the front and back.

【0017】また、デッキプレート11の裏面、すなわ
ちデッキプレート11が構造物1の外壁構築予定個所に
取付けられた際の構造物1側の側面には、鉄筋14(本
実施例では、直径6〜9mm程度)が溶接等によって接合
されている。この鉄筋14は、デッキプレート11の凹
凸部11bの凹部側を横断して、且つデッキプレート1
1に穿設された取付孔11aに対応した位置に複数本平
行に接合されている。なお、本実施例では、このデッキ
プレート11の両端部には後述するファスナー16を構
成する補強鉄板16bが取付けられている。
Further, on the back surface of the deck plate 11, that is, on the side surface on the structure 1 side when the deck plate 11 is attached to the outer wall of the structure 1 where the outer wall is to be constructed, a reinforcing bar 14 (diameter 6 to 6 in this embodiment is used). About 9 mm) is joined by welding or the like. This reinforcing bar 14 crosses the concave side of the concave and convex portion 11b of the deck plate 11 and the deck plate 1
A plurality of them are joined in parallel to each other at a position corresponding to the mounting hole 11a formed in the hole 1. In addition, in this embodiment, reinforcing iron plates 16b constituting a fastener 16 described later are attached to both ends of the deck plate 11.

【0018】前記セパレータ12は、図3(a)にも示
すように、デッキプレート11と外型枠13との間にコ
ンクリート打設空間15を形成すべく、デッキプレート
11と外型枠13との間隔を保持するもので、デッキプ
レート11の表面の凹凸部11bの凸部側に複数外方に
向けて突出するように配設される。このセパレータ12
は、図3(b)にセパレータ12のみを拡大して示すよ
うに、一方の端部に略L字形に屈曲した屈曲部12aを
有し、他方の端部にナット12bが螺合するネジ部12
cが刻設されたロッド状の金属製部材である。
As shown in FIG. 3A, the separator 12 includes a deck plate 11 and an outer mold 13 so that a concrete placing space 15 is formed between the deck plate 11 and the outer mold 13. Is maintained so that the plurality of protrusions are provided on the surface of the deck plate 11 so as to project outwardly on the convex side of the concave and convex portion 11b. This separator 12
As shown in FIG. 3B in which only the separator 12 is enlarged, has a bent portion 12a bent into a substantially L shape at one end and a threaded portion to which the nut 12b is screwed at the other end. 12
It is a rod-shaped metal member in which c is engraved.

【0019】そして、当該セパレータ12をデッキプレ
ート11に固設するには、まずセパレータ12の端部の
ネジ部12cをデッキプレート11の取付孔11aの凸
部側に、デッキプレート11の裏面側から挿通させる。
次いで、略L字形の屈曲部12aをデッキプレート11
の裏面に、凹凸部11bの凹部側を横断して接合された
鉄筋14に引掛けるとともに、これらを溶接等によって
相互に接合する。また、このセパレータ12の固設作業
終了後、図2(b)に示すように、このセパレータ12
に溶接網17をデッキプレート11に沿って溶接等によ
り配筋するとともに、デッキプレート11の両端部にお
いて、後述するファスナー16を構成する補強部材16
dに接合して保持させる。
In order to fix the separator 12 to the deck plate 11, first, the screw part 12c at the end of the separator 12 is placed on the convex side of the mounting hole 11a of the deck plate 11, and from the back side of the deck plate 11. Insert it.
Next, the L-shaped bent portion 12a is attached to the deck plate 11
The reinforcing bars 14 joined to the back surface of the concave portion 11b across the concave portion of the concave portion 11b are hooked, and these are joined to each other by welding or the like. Further, after the fixing work of the separator 12 is completed, as shown in FIG.
A welding net 17 is arranged along the deck plate 11 by welding or the like, and at both ends of the deck plate 11, a reinforcing member 16 constituting a fastener 16 described later is formed.
It is bonded to d and held.

【0020】一方、前記外型枠13は、図3(a)に示
すように、コンクリートを打設するために通常用いられ
る鉄製、木製の型枠を用いることができ、本実施例では
ベニヤ製のものを使用する。この外型枠13には前記セ
パレータ12が挿通される取付孔13aがセパレータ1
2の配設位置に対応した位置に穿設されている。
On the other hand, as shown in FIG. 3 (a), the outer form 13 can be made of iron or wood which is usually used for placing concrete. In this embodiment, it is made of veneer. Use one. The outer mold frame 13 has a mounting hole 13a through which the separator 12 is inserted.
The holes are provided at positions corresponding to the two positions.

【0021】そして、当該外型枠13をデッキプレート
11の表面に取付けるには、図2(c)に示すように、
デッキプレート11の表面に突設されたセパレータ12
のネジ部12cを外型枠13の取付孔13aに挿通する
とともに、挿通されて外型枠13の表面に突出したネジ
部12cに鋼端太等の支保部材18を取付けつつ、ナッ
ト12bを螺合させ固定する。
Then, in order to mount the outer mold 13 on the surface of the deck plate 11, as shown in FIG.
Separator 12 protruding from the surface of the deck plate 11
The screw portion 12c of the outer mold 13 is inserted into the mounting hole 13a of the outer mold 13, and the nut 12b is screwed while the support member 18 such as a steel edge is attached to the screw portion 12c which is inserted and protrudes from the surface of the outer mold 13. Combine and fix.

【0022】このようにして型枠ユニット20を形成す
る作業が終了したら、次いで当該型枠ユニット20をコ
ンクリート外壁10の構築予定箇所に設置する。かかる
設置は、型枠ユニット20を外型枠13が構造物1の外
周面に位置するように、ファスナー16を介して設置す
る。
When the work of forming the formwork unit 20 is completed in this way, then the formwork unit 20 is installed at the planned construction site of the concrete outer wall 10. In this installation, the mold unit 20 is installed via the fastener 16 so that the outer mold 13 is located on the outer peripheral surface of the structure 1.

【0023】このファスナー16は、図4に拡大して示
すように、鉄骨梁2,3のフランジ部に取付けられる断
面T字形の取付部材16aと、デッキプレート11の両
端部に取付けられ、取付部材16aにボルト・ナット等
の固定手段16cにより固設される補強鉄板16bと、
溶接金網17を固定するために、補強鉄板16bに取付
けられる補強部材16dとから構成される。
As shown in the enlarged view of FIG. 4, this fastener 16 is attached to both ends of the deck plate 11 and an attaching member 16a having a T-shaped cross section which is attached to the flanges of the steel beams 2 and 3, and is attached to the attaching member. A reinforcing iron plate 16b fixed to 16a by fixing means 16c such as bolts and nuts;
The reinforcing member 16d is attached to the reinforcing iron plate 16b to fix the welding wire net 17.

【0024】そして、このファスナー16を用いて型枠
ユニット20を設置するには、取付部材16aのウェブ
部を鉄骨梁2,3のフランジ部に溶接等によって固設す
るとともに、この取付部材16aにデッキプレート11
の両端部に取付けられた補強鉄板16bをボルト・ナッ
ト等の固定手段16cで取付ける。
To install the form unit 20 using the fastener 16, the web portion of the mounting member 16a is fixed to the flange portions of the steel beams 2 and 3 by welding or the like, and at the same time, the mounting member 16a is mounted. Deck plate 11
Reinforcing iron plates 16b attached to both ends of are attached by fixing means 16c such as bolts and nuts.

【0025】なお、当該型枠ユニット20の補強鉄板1
6bの取付け位置は、後に該型枠ユニット20の上方に
さらに配設される型枠ユニット(図4において、仮想線
で図示)との間に目地部19が形成される箇所とするこ
とが好ましい。
Incidentally, the reinforcing iron plate 1 of the mold unit 20.
It is preferable that the attachment position of 6b is a position where the joint portion 19 is formed between it and a form unit (illustrated by an imaginary line in FIG. 4) further arranged above the form unit 20 later. .

【0026】型枠ユニット20の設置作業が終了した
ら、次いでこの型枠ユニット20内のコンクリート打設
空間15にコンクリートを打設する。その後、コンクリ
ートが硬化しら、デッキプレート11を残置しつつ、セ
パレータ12から外型枠13を取り外してコンクリート
外壁10の構築作業を終了する。
When the installation work of the formwork unit 20 is completed, concrete is then placed in the concrete placement space 15 in the formwork unit 20. After that, when the concrete is hardened, the outer formwork 13 is removed from the separator 12 while leaving the deck plate 11 and the construction work of the concrete outer wall 10 is completed.

【0027】このような手順のコンクリート外壁10の
構築方法によれば、予めデッキプレート11の表面にセ
パレータ12を介して、外型枠13を配設して型枠ユニ
ット20を形成するため、デッキプレート11の寸法、
及びセパレータ12の長さを適宜調節することによっ
て、施工現場の諸条件に容易に適合させることができ
る。
According to the method of constructing the concrete outer wall 10 having such a procedure, since the outer formwork 13 is previously arranged on the surface of the deck plate 11 via the separator 12 to form the formwork unit 20, the deck is formed. Dimensions of plate 11,
By appropriately adjusting the length of the separator 12, it is possible to easily adapt to various conditions at the construction site.

【0028】また、デッキプレート11にセパレータ1
2を固設する際、デッキプレート11の裏面に鉄筋14
を複数溶接固定し、これによりセパレータ12を保持し
つつ固設するので、セパレータ12をデッキプレート1
1に容易に且つ強固に固定することができる。
Further, the separator 1 is attached to the deck plate 11.
When the 2 is fixed, the rebar 14 is attached to the back surface of the deck plate 11.
Since a plurality of welded parts are fixed together and the separator 12 is held and fixed thereby, the separator 12 is fixed to the deck plate 1
1 can be easily and firmly fixed.

【0029】一方、コンクリート外壁10の構築予定箇
所に設置した型枠ユニット20内にコンクリートを打設
するので、デッキプレート11とコンクリート部21が
一体となった外壁を構築することができる。さらには、
デッキプレート11は外壁部に残置させるものであるた
め、コンクリートが硬化した後にはセパレータ12より
外型枠13のみを取り外すだけでよく作業の省力化が図
れる。
On the other hand, since the concrete is placed in the form unit 20 installed at the location where the concrete outer wall 10 is to be constructed, the outer wall in which the deck plate 11 and the concrete portion 21 are integrated can be constructed. Furthermore,
Since the deck plate 11 is left on the outer wall portion, it is sufficient to remove only the outer formwork 13 from the separator 12 after the concrete is hardened, and labor can be saved.

【0030】さらに、本実施例では、デッキプレート1
1を構造物1の外周位置に固定する際に、鉄骨梁2,3
に取付部材16aを取付けこれに補強鉄板16bを固設
するので容易にデッキプレート11を構造物1に固設で
きる。
Further, in this embodiment, the deck plate 1
When fixing 1 to the outer peripheral position of the structure 1, steel beams 2, 3
Since the mounting member 16a is attached to and the reinforcing iron plate 16b is fixedly mounted thereto, the deck plate 11 can be easily fixed to the structure 1.

【0031】[0031]

【発明の効果】以上詳細に説明したように、この発明の
コンクリート外壁の構築方法によれば、予めデッキプレ
ートに間隔保持部材で外型枠を配設し、型枠ユニットを
形成するため、デッキプレートの寸法、及び間隔保持部
材の長さを適宜調節することによって、構築される外壁
の縦横の寸法、壁厚等を変更することができ、施工現場
によって変化する種々の諸条件に容易且つ迅速に適合さ
せることができる。
As described in detail above, according to the method of constructing a concrete outer wall of the present invention, the outer formwork is previously arranged on the deck plate by the spacing member to form the formwork unit. By appropriately adjusting the size of the plate and the length of the spacing member, it is possible to change the vertical and horizontal dimensions of the outer wall to be constructed, the wall thickness, etc., and to easily and quickly meet various conditions that change depending on the construction site. Can be adapted to.

【0032】また、デッキプレートに間隔保持部材を固
設する際、間隔保持部材を鉄筋で保持しつつデッキプレ
ートに固設するので、間隔保持部材をデッキプレートに
容易に且つ強固に固定することができる。
Further, when the spacing holding member is fixedly mounted on the deck plate, since the spacing holding member is fixedly mounted on the deck plate while being held by the reinforcing bar, the spacing holding member can be easily and firmly fixed to the deck plate. it can.

【0033】併せて、型枠ユニットにコンクリートを打
設することによって、デッキプレートとコンクリート部
が一体となった外壁を容易に構築することができ、脱型
時は、デッキプレートは外壁部に残置させるものである
ため、コンクリート硬化後は間隔保持部材より外型枠の
みを取り外すだけでよく作業の省力化が図れる。
In addition, by placing concrete on the formwork unit, an outer wall in which the deck plate and the concrete part are integrated can be easily constructed, and the deck plate is left on the outer wall part at the time of demolding. Therefore, after the concrete is hardened, it is sufficient to remove only the outer form from the spacing member, and the labor can be saved.

【0034】さらに、型枠ユニットを構造物の外周位置
に固定する際に、鉄骨梁に取付部材を取付け、補強鉄板
を取付部材に固設すれば、容易に型枠ユニットを構造物
に固設できる。
Further, when the formwork unit is fixed to the outer peripheral position of the structure, if the attaching member is attached to the steel beam and the reinforcing iron plate is fixed to the attaching member, the formwork unit can be easily attached to the structure. it can.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の一実施例にかかる、コンクリート外
壁を示す断面図である。
FIG. 1 is a cross-sectional view showing a concrete outer wall according to an embodiment of the present invention.

【図2】(a)ないし(c)は、この発明の一実施例に
かかる型枠ユニットの構築手順を示す、説明図である。
2 (a) to 2 (c) are explanatory views showing a procedure for constructing a mold unit according to an embodiment of the present invention.

【図3】この発明のコンクリート外壁の構築工法に用い
られる型枠ユニットを示すもので、(a)はその断面図
であり、(b)は間隔保持部材を示す側面図である。
3A and 3B show a form unit used in the method for constructing a concrete outer wall of the present invention, wherein FIG. 3A is a sectional view thereof, and FIG. 3B is a side view showing a spacing member.

【図4】この実施例にかかる型枠ユニットを固定するフ
ァスナーを拡大して示す断面図である。
FIG. 4 is an enlarged sectional view showing a fastener for fixing the form unit according to this embodiment.

【符号の説明】[Explanation of symbols]

10 コンクリート外壁 11 デッキプレート 12 セパレータ(間隔保持部材) 13 外型枠 14 鉄筋 16 ファスナー 16a 取付部材 16b 補強鉄板 16c 補強部材 17 溶接金網 20 型枠ユニット 10 Concrete outer wall 11 Deck plate 12 Separator (spacing member) 13 Outer formwork 14 Reinforcing bar 16 Fastener 16a Mounting member 16b Reinforcing iron plate 16c Reinforcing member 17 Welding wire mesh 20 Formwork unit

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】構造物のコンクリート外壁を構築する方法
であって、縦方向に凹凸部を有するデッキプレートの裏
面に、該デッキプレートの凹凸部を横断して、鉄筋を複
数溶接固定するとともに、該鉄筋で保持しつつ、間隔保
持部材を該デッキプレートを貫通させて該デッキプレー
トの表面側に複数突設する工程と、前記間隔保持部材に
固定して、該デッキプレートの表面側に、これに沿って
溶接金網を配設するとともに、上記間隔保持部材により
外型枠を配設して型枠ユニットを形成する工程と、前記
デッキプレートを構造物の外周位置に固定して、前記外
型枠が構造物の外周面に位置するように該型枠ユニット
をコンクリート外壁の構築予定箇所に設置する工程と、
前記型枠ユニット内にコンクリートを打設する工程と、
コンクリートが硬化した後に前記間隔保持部材より前記
外型枠を取り外す工程とからなることを特徴とするコン
クリート外壁の構築方法。
1. A method for constructing a concrete outer wall of a structure, wherein a plurality of reinforcing bars are welded and fixed to a back surface of a deck plate having an uneven portion in a longitudinal direction across the uneven portion of the deck plate, A step of penetrating the deck plate through the deck plate while being held by the reinforcing bars, and projecting a plurality of the space holding members on the front surface side of the deck plate; Along with the welding wire mesh and the step of forming the outer frame by the space holding member to form a frame unit, and fixing the deck plate to the outer peripheral position of the structure, A step of installing the formwork unit at a planned construction site of the concrete outer wall so that the frame is located on the outer peripheral surface of the structure;
A step of placing concrete in the formwork unit,
A method of constructing a concrete outer wall, comprising the step of removing the outer formwork from the spacing member after the concrete has hardened.
【請求項2】前記型枠ユニットを前記構造物の外周位置
に固定する際に、該構造物の外周位置に配設された鉄骨
梁に取付部材を取付けるとともに、前記デッキプレート
の両端部に補強鉄板を取付け、該補強鉄板を取付部材に
固設することを特徴とする請求項1に記載のコンクリー
ト外壁の構築方法。
2. When fixing the formwork unit to an outer peripheral position of the structure, a mounting member is attached to a steel frame beam arranged at the outer peripheral position of the structure, and both end portions of the deck plate are reinforced. The method for constructing a concrete outer wall according to claim 1, wherein an iron plate is attached and the reinforcing iron plate is fixedly attached to the attachment member.
JP07025600A 1995-02-14 1995-02-14 Construction method of concrete outer wall Expired - Fee Related JP3087594B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP07025600A JP3087594B2 (en) 1995-02-14 1995-02-14 Construction method of concrete outer wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP07025600A JP3087594B2 (en) 1995-02-14 1995-02-14 Construction method of concrete outer wall

Publications (2)

Publication Number Publication Date
JPH08218522A true JPH08218522A (en) 1996-08-27
JP3087594B2 JP3087594B2 (en) 2000-09-11

Family

ID=12170408

Family Applications (1)

Application Number Title Priority Date Filing Date
JP07025600A Expired - Fee Related JP3087594B2 (en) 1995-02-14 1995-02-14 Construction method of concrete outer wall

Country Status (1)

Country Link
JP (1) JP3087594B2 (en)

Also Published As

Publication number Publication date
JP3087594B2 (en) 2000-09-11

Similar Documents

Publication Publication Date Title
US8359797B2 (en) Structure constructed using precast members and method of constructing the same
GB2319274A (en) Framework for use in concrete walls for supporting wall shuttering
KR101237333B1 (en) Spacer for stripping deck
KR100412160B1 (en) Structure of steel aggregate for concrete building
KR20070036807A (en) A concrete-structure constructing system manufactured by pre-fabricating and the method thereof
KR102144476B1 (en) Modular steel plate form
JP3881135B2 (en) Connecting structure of floor slabs using concrete truss with concrete slab in bridge girder
JP3208530B2 (en) Precast concrete formwork and structure using the same
JP3429459B2 (en) Construction method of bridge deck haunch
JPH07317188A (en) Constructing method of reinforced concrete structure
JP3087594B2 (en) Construction method of concrete outer wall
KR20190001483A (en) Sandwich precast concrete wall and construction method using the same
JPH09195438A (en) Precast concrete plate and reinforcing structure of building
JPH09294318A (en) Installing method for cable rack
KR20220126001A (en) construction method and structure for TG beam form
KR101078292B1 (en) Concrete slab mold assembly and method for constructing slab
JP3142180B2 (en) Concrete construction method
KR20050112913A (en) A construction system of the wall/dome and the the method thereof it
JP3356853B2 (en) Formwork equipment
JP3009298B2 (en) Method of manufacturing PCa slab
JP4872301B2 (en) Construction method of RC structure
JP2651477B2 (en) Structure for mounting the outer frame of the building
JP2004218288A (en) Seismic-response controlled structure of structure, and mounting method for seismic-response controlled device
JP3191955B2 (en) Formwork of prefabricated steel frame formwork unit
JP2709155B2 (en) ALC floor panel mounting method

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees