JPH08209632A - Building method for steel girder - Google Patents

Building method for steel girder

Info

Publication number
JPH08209632A
JPH08209632A JP3911895A JP3911895A JPH08209632A JP H08209632 A JPH08209632 A JP H08209632A JP 3911895 A JP3911895 A JP 3911895A JP 3911895 A JP3911895 A JP 3911895A JP H08209632 A JPH08209632 A JP H08209632A
Authority
JP
Japan
Prior art keywords
side block
fixed
block
blocks
steel girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP3911895A
Other languages
Japanese (ja)
Other versions
JP3263722B2 (en
Inventor
Mineo Kobayashi
峯男 小林
Souji Kanai
壮次 金井
Nobuyuki Koyoshi
信幸 子吉
Toshio Otomo
利夫 大伴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Kawada Industries Inc
Original Assignee
Taisei Corp
Kawada Industries Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp, Kawada Industries Inc filed Critical Taisei Corp
Priority to JP3911895A priority Critical patent/JP3263722B2/en
Publication of JPH08209632A publication Critical patent/JPH08209632A/en
Application granted granted Critical
Publication of JP3263722B2 publication Critical patent/JP3263722B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PURPOSE: To connect together joint parts quickly and esasily by assembling a bridge dividing into two blocks, by hoisting them with cranes and positioning on the abutments on both banks and over a river, and sending out the adjusting side block by means of a sending facility. CONSTITUTION: Abutments 1a, 1b are built on both banks of a river, and a sending facility 2 is provided on the abutment 1b. A bridge is assembled dividing into the fixed side block 3a and the adjusting side block 3b at the middle part, and they are temporarily placed on both banks in parallel with the river by cranes 4. At first the fixed side block 3a is hoisted and turned by the crane 4 through a lifting beam 41, loaded on the abutment 1a after positioning, and the extreme end side is fixed with traverse wire. Next, the adjusting side block 3b is similarly hoisted, sent by a sending facility 2 after positioning so as to keep a prescribed space against the fixed side block 3a, and hence the joint parts of both blocks 3a, 3b are connected together. After completing connection, both blocks are hoisted, the sending facility 2 is removed, and both blocks 3a, 3b are brought down on the abutments 1a, 1b and installed.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、橋梁等の鋼桁の架設方
法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a steel girder such as a bridge.

【0002】[0002]

【従来の技術】近年、鉄道、道路、河川等の既存施設の
上空の有効利用の必要性がさけばれ、これらの制約を受
ける空間への構造物構築の省力化、急速施工法の開発が
急務となっている。
2. Description of the Related Art In recent years, the necessity for effective use of the sky above existing facilities such as railways, roads, and rivers has been avoided, and labor saving in constructing structures in spaces subject to these restrictions and development of rapid construction methods are urgently needed. Has become.

【0003】[0003]

【発明が解決しようとする課題】従来の鋼桁の架設方法
は、二分割した鋼桁を河川等の両側に沿って平行に仮置
きしておき、それらを吊り上げて河川等を横断させて所
定位置まで旋回させ、それらの先端の仕口部同士をジャ
ッキにより引き寄せて連結を行っていた。従って、両桁
を吊った状態で連結が行われるため、振れが生じて連結
作業が困難であった。
In the conventional method of constructing steel girders, the steel girders divided in two are temporarily placed in parallel along both sides of a river or the like, and they are hoisted to cross the river or the like. It was rotated to the position, and the joints at the ends were pulled together by a jack to connect them. Therefore, since the connection is performed in a state in which both the girders are suspended, a shake occurs and the connection work is difficult.

【0004】[0004]

【本発明の目的】本発明は、上記のような問題点を解決
するためになされたもので、二分割した鋼桁の連結作業
を迅速かつ容易に行うことができる鋼桁の架設方法を提
供することを目的とする。
SUMMARY OF THE INVENTION The present invention has been made in order to solve the above problems, and provides a method for erection of steel girders that can perform a work of connecting two divided steel girders quickly and easily. The purpose is to do.

【0005】[0005]

【課題を解決するための手段】即ち、本発明は、分割さ
れた二つの鋼桁ブロックの一方を、その基端側を架台上
に支持した状態で吊り上げ、他方の鋼桁ブロックもその
基端側を架台上に支持した状態で吊り上げ、両鋼桁ブロ
ックの先端同士を連結して行う、鋼桁の架設方法であ
る。また、鋼桁を固定側ブロックと調整側ブロックとに
二分割し、前記固定側ブロックをその基端側を架台上に
支持した状態で吊り上げて固定し、前記調整側ブロック
をその基端側を架台上に支持した状態で吊り上げ、その
先端側方向に移動させて前記固定側ブロックと先端同士
を連結して行う、鋼桁の架設方法である。さらに、鋼桁
を固定側ブロックと調整側ブロックとに二分割し、前記
固定側ブロックをその基端側を架台上に支持した状態で
吊り上げて固定し、前記調整側ブロックをその基端側を
架台上に支持した状態で吊り上げ、その基端側に設置し
た送出し設備により先端側方向に送り出し、両ブロック
の先端に設けた引込み設備により前記調整側ブロックを
固定側ブロック側に引き込んで両ブロックの先端同士を
連結して行う、鋼桁の架設方法である。
That is, according to the present invention, one of two divided steel girder blocks is lifted while its base end side is supported on a frame, and the other steel girder block also has its base end. It is a method of erection of steel girders, in which the sides are lifted while being supported on a pedestal and the ends of both steel girder blocks are connected. Further, the steel girder is divided into a fixed side block and an adjustment side block, and the fixed side block is lifted and fixed while the base end side thereof is supported on a frame, and the adjustment side block is fixed at the base end side. It is a method of erection of a steel girder, which is carried out by lifting it while being supported on a gantry, and moving it in the direction of the tip side to connect the fixed side block and the tips to each other. Further, the steel girder is divided into a fixed side block and an adjustment side block, and the fixed side block is lifted and fixed while the base end side is supported on a pedestal, and the adjustment side block is fixed at the base end side. It is lifted while being supported on a pedestal, and it is sent out toward the tip side by the sending equipment installed at the base end side, and the adjusting side block is drawn into the fixed side block side by the drawing equipment installed at the tip of both blocks It is a method of erection of steel girders by connecting the tips of the.

【0006】[0006]

【実施例】以下、図面を参照しながら、本発明の一実施
例について説明する。なお、本実施例は橋梁の架設につ
いて説明するが、本発明はこれに限定されるものではな
い。<イ>送出し設備の組立て 図1に示すように、橋梁の架設に当たって、河川の両岸
に構築された既設の橋台1a、1bを利用する。橋台の
一方、本実施例では図の右側の橋台1bの上部に、送出
し設備2をクレ−ン等で組立てる。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings. It should be noted that although the present embodiment describes the construction of a bridge, the present invention is not limited to this. <A> Assembling of sending equipment As shown in FIG. 1, when constructing a bridge, existing abutments 1a and 1b constructed on both sides of the river are used. On one side of the abutment, in the present embodiment, on the upper side of the abutment 1b on the right side of the drawing, the delivery facility 2 is assembled by a crane or the like.

【0007】送出し設備2としては、図9、10に示す
ような2タイプが考えられる。図9の送出し設備2a
は、橋台1bの上部にH鋼などで基台21を設け、その
上部にテフロン板などで構成した滑り支承22を設けた
構造である。
As the sending equipment 2, two types as shown in FIGS. 9 and 10 can be considered. Delivery facility 2a of FIG.
Is a structure in which a base 21 made of H steel or the like is provided above the abutment 1b, and a slide bearing 22 made of a Teflon plate or the like is provided above the base 21.

【0008】図10に示す送出し設備2bは、橋台1b
上にレ−ル23とその端部にストッパ−24を設け、レ
−ル23上に旋回台車25を走行可能に設置した構造で
ある。
The sending equipment 2b shown in FIG. 10 is the abutment 1b.
This is a structure in which a rail 23 and a stopper 24 are provided on an end portion of the rail 23, and a turning carriage 25 is installed on the rail 23 so that it can travel.

【0009】<ロ>架設ブロックの仮置き 図2に示すように、橋梁は中間部より二分割された固定
側ブロック3aと調整側ブロック3bとよりなる。これ
らのブロック3a、3bは、トレ−ラ−により架設場所
に搬入されるか、現地で組み立てられた後に、クレ−ン
4によって河川と平行に仮置きされる。
<B> Temporary placement of the erection block As shown in FIG. 2, the bridge is composed of a fixed side block 3a and an adjustment side block 3b which are divided into two parts from the middle part. These blocks 3a and 3b are carried in to a construction site by a trailer or assembled on site and then temporarily placed in parallel with a river by a crane 4.

【0010】架設準備として、添接足場の組立て、引込
み設備の組立て、ジャッキシステム、計測システムの設
置を行う。このうち、計測システムの設置は、図2に示
すように、河川両岸の架設場所の近傍にト−タルステ−
ション5等を設ける。
As a preparation for installation, assembling scaffolding scaffolding, assembling retraction equipment, and installing a jack system and a measuring system are performed. Of these, as shown in Fig. 2, the measurement system is installed in the total station near the construction site on both banks of the river.
Set up Option 5, etc.

【0011】また、引込み設備としては、図11に示す
ような設備を両ブロック3a、3bの先端の仕口部に装
備する。この引込み設備6は、調整側ブロック3b側に
固定したジャッキ設置部治具61に、クレビスジャッキ
等の複数の引込みジャッキ62の一端を軸支し、その他
端側を固定側ブロック3aに固定したジャッキ支圧部治
具63にU字座金64を介して装着したものである。
As the drawing-in equipment, the equipment as shown in FIG. 11 is equipped at the joints at the tips of both blocks 3a, 3b. In this retracting equipment 6, one end of a plurality of retracting jacks 62 such as clevis jacks are pivotally supported on a jack installation jig 61 fixed on the adjustment side block 3b side, and the other end side is fixed to the fixed side block 3a. It is mounted on the pressure bearing jig 63 via a U-shaped washer 64.

【0012】さらに、引込みジャッキ62の途上は調整
側ブロック3b側に固定したジャッキ受金具65で支持
し、引込みジャッキ62の先端はリミットスイッチ66
と接続する構造とする。
Further, the middle of the retracting jack 62 is supported by a jack receiving metal fitting 65 fixed to the adjustment side block 3b side, and the tip of the retracting jack 62 is provided with a limit switch 66.
The structure to connect with.

【0013】そして、固定側ブロック3aと調整側ブロ
ック3bとの仕口部にエレクションピ−ス67と連結治
具68を設け、引込みジャッキ62を収縮させることに
よって、調整側ブロック3bを固定側ブロック3a側に
引込んで、両ブロック3a、3bの仕口部同士を連結さ
せることができる。このような引込み設備6を採用する
ことによって、動揺する桁の無人化連結、死荷重に対す
る強度保有、任意の時期に添接作業を行えるなどの効果
が期待できる。
Then, an erection piece 67 and a connecting jig 68 are provided at the joint between the fixed block 3a and the adjusting block 3b, and the retracting jack 62 is contracted to move the adjusting block 3b to the fixed block. The joint portions of both the blocks 3a and 3b can be connected to each other by pulling in the 3a side. By adopting such a retracting equipment 6, effects such as unmanned connection of swaying girders, retention of strength against dead load, and splicing work at any time can be expected.

【0014】<ハ>固定側ブロックの旋回、固定 図3に示すように、固定側ブロック3aを吊天秤41を
介してクレ−ン4で吊り上げ、河川を横断させて所定の
位置まで旋回させる。そして、位置計測及び調整を行
い、固定側ブロック3aの位置決めを行った後、その基
端側を橋台1a上に搭載し、先端側をトラワイヤ−にて
固定する。これによって、固定側ブロック3aは先端部
と基端部の両端を支持されて安定した状態を維持でき
る。
<C> Turning and fixing the fixed block As shown in FIG. 3, the fixed block 3a is lifted by the crane 4 via the hanging balance 41 and is swung to a predetermined position across the river. Then, after the position measurement and adjustment are performed and the fixed block 3a is positioned, the base end side thereof is mounted on the abutment 1a, and the tip end side thereof is fixed with a trough wire. As a result, the fixed block 3a can maintain a stable state by supporting both ends of the front end and the base end.

【0015】なお、位置決めにおける計測は、固定側ブ
ロック3aの傾き、こがえり、通り(ト−タルステ−シ
ョン5による)を計測し、計測に基ずく調整は傾き、こ
がえりを電動チェ−ンブロックにより行い、通りはトラ
ワイヤ−により行う。
In the positioning, the fixed side block 3a is measured for inclination, deflection and passage (by total station 5), and adjustment based on the measurement is performed for inclination and deflection. Block and the trawler.

【0016】<ニ>調整側ブロックの旋回、位置決め 図4に示すように、調整側ブロック3bも同様に旋回し
て位置決めを行う。但し、調整側ブロック3bは、両ブ
ロック3a、3bの先端間に所定の間隔を確保して位置
決めを行う。
<D> Turning and Positioning of Adjustment-side Block As shown in FIG. 4, the adjustment-side block 3b is also turned and positioned similarly. However, the adjustment-side block 3b performs positioning while ensuring a predetermined space between the tips of the blocks 3a and 3b.

【0017】また図9、10に示すように、調整側ブロ
ック3bの基端側には、予め反力受け26と送出しジャ
ッキ27が装着された状態で、送出し設備2上に据え付
けられる。
Further, as shown in FIGS. 9 and 10, a reaction force receiver 26 and a delivery jack 27 are attached to the base end side of the adjustment side block 3b in advance, and the adjustment side block 3b is installed on the delivery facility 2.

【0018】<ホ>調整側ブロックの送出し 図5に示すように、送出し設備2によって両ブロック3
a、3bの先端部同士が近接するまで送り出す。この際
にも上記と同様に位置計測及び調整を行い、かつ仕口部
の状況確認をCCDカメラにより観察する。
<E> Sending out of the adjustment side block As shown in FIG.
It is sent out until the tips of a and 3b come close to each other. At this time as well, position measurement and adjustment are performed in the same manner as described above, and the status of the joint portion is confirmed by a CCD camera.

【0019】<ヘ>調整側ブロックの引込み 両ブロック3a、3bの近接後、図6に示すように、引
込み設備6の引込みジャッキ62を収縮させて、調整側
ブロック3bを固定側ブロック3a側に引込む。架設形
状をト−タルステ−ション5により計測した後、両ブロ
ック3a、3bの仕口部の添接作業(エレクションピ−
ス)を行い連結する。
<F> Retraction of adjustment side block After the two blocks 3a and 3b are brought close to each other, the retraction jack 62 of the retraction equipment 6 is contracted to move the adjustment side block 3b to the fixed side block 3a side as shown in FIG. Pull in. After measuring the installation shape by the total station 5, the splicing work of the joints of both blocks 3a, 3b (erection piece)
And connect them.

【0020】<ト>橋梁の据付け 両ブロック3a、3bの連結完了後、引込み設備6を撤
去し、また橋梁3を橋台1a、1bより吊り上げて、送
出し設備2を撤去する。そして、再び橋梁3を橋台1
a、1b上に降下させ、据付け作業を行う。以上で架設
作業を終了する。
<G> Installation of Bridge After the connection of both blocks 3a and 3b is completed, the retracting equipment 6 is removed, and the bridge 3 is lifted from the abutments 1a and 1b and the delivery equipment 2 is removed. And again, bridge 3 and abutment 1
a and 1b, and then install. This completes the erection work.

【0021】[0021]

【本発明の効果】本発明は以上説明したようになるた
め、次のような効果を得ることができる。即ち、鋼桁ブ
ロックの基端側は架台に、先端側は吊り部材に、鋼桁ブ
ロックの両端を支持した状態で連結作業を行うことがで
きる。従って、連結時の鋼桁ブロックの振れが半減し、
連結作業を迅速かつ容易に行える。
Since the present invention has been described above, the following effects can be obtained. That is, the base end side of the steel girder block can be connected to the pedestal, and the tip end side of the steel girder block can be connected to the suspending member, and both ends of the steel girder block can be supported for connection work. Therefore, the runout of the steel girder block when connected is halved,
Connection work can be done quickly and easily.

【図面の簡単な説明】[Brief description of drawings]

【図1】 送出し設備の組立て工程の説明図FIG. 1 is an explanatory diagram of an assembling process of a delivery facility.

【図2】 鋼桁ブロックの仮置き工程の説明図FIG. 2 is an explanatory diagram of a temporary placing process of a steel girder block.

【図3】 固定側ブロックの旋回、固定工程の説明図FIG. 3 is an explanatory diagram of a process of turning and fixing a fixed block.

【図4】 調整側ブロックの旋回工程の説明図FIG. 4 is an explanatory view of a turning process of the adjustment side block.

【図5】 調整側ブロックの送出し工程の説明図FIG. 5 is an explanatory diagram of a sending process of the adjustment side block.

【図6】 調整側ブロックの引込み工程の説明図FIG. 6 is an explanatory diagram of a retracting process of the adjusting block.

【図7】 送出し設備の撤去工程の説明図[Fig. 7] Explanatory drawing of the removal process of the delivery facility

【図8】 架設完了状態の説明図FIG. 8 is an explanatory diagram of a completed installation state

【図9】 送出し設備の説明図FIG. 9 is an explanatory diagram of the sending equipment.

【図10】 送出し設備の説明図FIG. 10 is an explanatory diagram of a sending facility.

【図11】 引込み設備の説明図FIG. 11 is an explanatory diagram of the drawing equipment

───────────────────────────────────────────────────── フロントページの続き (72)発明者 子吉 信幸 東京都北区滝野川1丁目3番11号 川田工 業株式会社内 (72)発明者 大伴 利夫 東京都北区滝野川1丁目3番11号 川田工 業株式会社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Nobuyuki Koyoshi 1-3-11 Takinokawa, Kita-ku, Tokyo Within Kawada Industry Co., Ltd. (72) Toshio Otomo 1-13-1 Takinogawa, Kita-ku, Tokyo Kawada Industry Co., Ltd.

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 分割された二つの鋼桁ブロックの一方
を、その基端側を架台上に支持した状態で吊り上げ、 他方の鋼桁ブロックもその基端側を架台上に支持した状
態で吊り上げ、 両鋼桁ブロックの先端同士を連結して行う、 鋼桁の架設方法。
1. One of the two divided steel girder blocks is lifted with its base end side supported on a gantry, and the other steel girder block is also lifted with its base end side supported on a gantry. A method of constructing steel girders by connecting the ends of both steel girder blocks.
【請求項2】 鋼桁を固定側ブロックと調整側ブロック
とに二分割し、 前記固定側ブロックをその基端側を架台上に支持した状
態で吊り上げて固定し、 前記調整側ブロックをその基
端側を架台上に支持した状態で吊り上げ、その先端側方
向に移動させて前記固定側ブロックと先端同士を連結し
て行う、 鋼桁の架設方法。
2. A steel girder is divided into a fixed side block and an adjustment side block, and the fixed side block is lifted and fixed while the base end side thereof is supported on a frame, and the adjustment side block is fixed to the base side. A method for erection of a steel girder in which the end side is lifted while being supported on a gantry, and the end side is moved toward the tip side to connect the fixed side block and the tips to each other.
【請求項3】 鋼桁を固定側ブロックと調整側ブロック
とに二分割し、 前記固定側ブロックをその基端側を架台上に支持した状
態で吊り上げて固定し、 前記調整側ブロックをその基
端側を架台上に支持した状態で吊り上げ、その基端側に
設置した送出し設備により先端側方向に送り出し、 両ブロックの先端に設けた引込み設備により前記調整側
ブロックを固定側ブロック側に引き込んで両ブロックの
先端同士を連結して行う、 鋼桁の架設方法。
3. A steel girder is divided into a fixed side block and an adjustment side block, and the fixed side block is lifted and fixed with its base end side being supported on a gantry, and the adjustment side block is Suspend while supporting the end side on the pedestal, send out toward the tip side by the delivery equipment installed at the base end side, and pull in the adjustment side block to the fixed side block side by the retraction equipment provided at the tips of both blocks A steel girder installation method in which the ends of both blocks are connected with each other.
JP3911895A 1995-02-03 1995-02-03 Steel girder erection method Expired - Fee Related JP3263722B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3911895A JP3263722B2 (en) 1995-02-03 1995-02-03 Steel girder erection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3911895A JP3263722B2 (en) 1995-02-03 1995-02-03 Steel girder erection method

Publications (2)

Publication Number Publication Date
JPH08209632A true JPH08209632A (en) 1996-08-13
JP3263722B2 JP3263722B2 (en) 2002-03-11

Family

ID=12544179

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3911895A Expired - Fee Related JP3263722B2 (en) 1995-02-03 1995-02-03 Steel girder erection method

Country Status (1)

Country Link
JP (1) JP3263722B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007205014A (en) * 2006-02-01 2007-08-16 Yokogawa Bridge Corp Bridge construction method and apparatus
CN113026528A (en) * 2021-03-10 2021-06-25 浙江中天恒筑钢构有限公司 Method for mounting mountain forest space curve steel structure plank road
CN113322830A (en) * 2021-06-30 2021-08-31 嘉兴力达建设有限公司 Construction method of inclined lifting beam
CN114790697A (en) * 2022-04-27 2022-07-26 中铁高新工业股份有限公司 Method for installing and positioning large-tonnage special-shaped casting hinge structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007205014A (en) * 2006-02-01 2007-08-16 Yokogawa Bridge Corp Bridge construction method and apparatus
CN113026528A (en) * 2021-03-10 2021-06-25 浙江中天恒筑钢构有限公司 Method for mounting mountain forest space curve steel structure plank road
CN113322830A (en) * 2021-06-30 2021-08-31 嘉兴力达建设有限公司 Construction method of inclined lifting beam
CN114790697A (en) * 2022-04-27 2022-07-26 中铁高新工业股份有限公司 Method for installing and positioning large-tonnage special-shaped casting hinge structure

Also Published As

Publication number Publication date
JP3263722B2 (en) 2002-03-11

Similar Documents

Publication Publication Date Title
CN110259145A (en) A kind of arch tubular truss rapid constructing method
CN111042539B (en) Single-point support installation construction method for large-span steel structure truss
CN106193618B (en) A kind of aerial steel structure truss construction of Long span
US6260311B1 (en) Concrete form suspension system and method
JP2001226913A (en) Device and method for erecting bridge
JP3455660B2 (en) Lifting device for bridge girder erection
US6021910A (en) Construction crane base
CN109235903A (en) Steel structure modularization construction method
JP3440422B2 (en) Bridge construction method and bridge construction device
JP2768283B2 (en) Bridge construction method
CN112942661B (en) Construction method of stay cable with flexible cable net boundary
JPH08209632A (en) Building method for steel girder
JP2001049622A (en) Bridge erecting apparatus and bridge erecting method
CN111119493A (en) Construction method for integrally and synchronously lifting light steel keel
JP3038154B2 (en) Overhang work equipment
JPH08134845A (en) Erection method of bridge
CN110040632A (en) A kind of segmental hoisting construction method of large span section steel beam
JPH10195826A (en) Bridge construction method and device thereof
KR20060002650A (en) Upper bridge structure construcion method with precast segment deck or box using a lifting traveller
JPH11269825A (en) Installation method of bridge girder and lifting equipment
CN111005302B (en) Steel anchor beam mounting method
CN220638385U (en) Movable tensioning device suitable for precast T beam edge and midspan hogging moment
CN218027188U (en) Movable formwork for concrete construction of overhanging wing plate of steel-concrete composite beam
CN117513172A (en) Clampable extension embedded butt pin hole device and construction method thereof
CN217810578U (en) Overhauling device for hanger rod of railway arch bridge

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081228

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081228

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 8

Free format text: PAYMENT UNTIL: 20091228

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 8

Free format text: PAYMENT UNTIL: 20091228

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 9

Free format text: PAYMENT UNTIL: 20101228

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 10

Free format text: PAYMENT UNTIL: 20111228

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111228

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121228

Year of fee payment: 11

LAPS Cancellation because of no payment of annual fees