Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP33878794A
Other languages
Japanese (ja)
Other versions
JP3151116B2 (en
Inventor
Tokuo Takahashi
徳夫 高橋
Tsutomu Igarashi
勉 五十嵐
Yasutoshi Hagiwara
靖俊 萩原
Eikichi Kikyo
栄吉 桔梗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Okumura Corp
Original Assignee
Okumura Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Okumura Corp filed Critical Okumura Corp
Priority to JP33878794A priority Critical patent/JP3151116B2/en
Publication of JPH08184287A publication Critical patent/JPH08184287A/en
Application granted granted Critical
Publication of JP3151116B2 publication Critical patent/JP3151116B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Earth Drilling (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

PURPOSE: To reduce the, construction period, by parallelly and efficiently carrying out a lining work of an excavated wall face and the excavation work of the tunnel with a certain length by use of a blasting work against the ground of working faces of the upper and lower benches, in a tunnel construction work by means a two-stage bench cut method. CONSTITUTION: Working machines like a drilling machine 4 for blasting holes, a work cage 5 for erection of supports, a concrete sprayer 6, etc., are arranged so as to freely travel, on a long gantry body 1 in the longitudinal direction of a tunnel, in which the front studs are installed on the upper bench A in a two-stage bench and the rear studs 12a, 12b are installed on the tunnel bottom face of the rear side of the lower bench so as to freely travel respectively. The tunnel excavation of the working face ground in the upper bench A and the lining work thereof are carried out by these working machines. Working machines like a crawler mounted drilling machine D with a working cage or a concrete sprayer are made transferable through the lower space of the gantry body 1, for the lower bench B. The tunnel excavation for the working face ground of the lower bench B and the lining work thereof are carried out in parallel with various works for the upper bench, by these working machines.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明はトンネル切羽部を上段ベ
ンチと下段ベンチとに区分して夫々のベンチの切羽地盤
を掘削するトンネル工事において、上下段ベンチに対す
る発破作業からコンクリート吹付作業までの作業工程を
並行して行うトンネルの掘削方法とその方法の実施に使
用するガントリに関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention is a tunnel construction in which a tunnel face portion is divided into an upper bench and a lower bench to excavate the face ground of each bench, from the blasting work to the upper bench to the concrete spraying work. The present invention relates to a tunnel excavation method in which steps are performed in parallel and a gantry used for implementing the method.

【0002】[0002]

【従来の技術】従来から、トンネルを発破工法によって
掘削する場合、小断面のトンネルにおいては発破孔の穿
孔機や作業ケージ等の作業機械を備えたガントリを使用
して切羽全面に対する発破孔の穿設作業と、発破後にお
ける支保工の組立作業、コンクリートの吹付作業を行う
ことが可能であるが、トンネル断面を上半側のベンチと
下半側のベンチとに区分して夫々のベンチを発破工法に
よって掘削していく大断面のトンネルの場合には、上下
段ベンチの切羽地盤に対する発破作業後、発破により掘
削された上下段ベンチの掘削ずりを排除したのち、両ベ
ンチの掘削壁面に対して支保工の組立、金網の張設、コ
ンクリートの吹付作業を順次施工しなければならない。
2. Description of the Related Art Conventionally, when a tunnel is excavated by a blasting method, a gantry equipped with a blasting hole punching machine or a working machine such as a working cage is used in a tunnel having a small cross section to pierce the cutting face with a blasting hole. It is possible to perform installation work, support work assembly work after blasting, and concrete spraying work, but blast each bench by dividing the tunnel section into a bench on the upper half side and a bench on the lower half side. In the case of a tunnel with a large cross-section that is excavated by the construction method, after excavating the upper and lower benches against the face of the face, after removing the excavation shear of the upper and lower benches excavated by the blasting, Assembling support work, wire netting, and concrete spraying work must be carried out in sequence.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、上記の
ような各種の作業は切羽地盤に集中して行われるため、
上下段ベンチに対する1つの作業が終了するまで他の作
業機械をトンネル後方に待機させておき、その作業の終
了後、次の作業機械を切羽まで移動させることになり、
狭いトンネル内に作業機械や掘削ずり運搬車等が輻輳し
て危険であると共に作業性が悪くて長期間の工期を必要
とし、特に、上段ベンチに対する作業機械の搬出入が困
難で下段ベンチと並行して各種作業を行うことができな
くなり、工期が一層長期に亘るという問題点があった。
However, since the various operations described above are concentrated on the face of the face,
Until one work on the upper and lower benches is completed, the other work machine is made to stand by behind the tunnel, and after the work is completed, the next work machine is moved to the face.
Congestion of work machines and excavated shear trucks in a narrow tunnel is dangerous and poor workability requires a long construction period. In particular, it is difficult to carry work machines in and out of the upper bench in parallel with the lower bench. As a result, various works cannot be performed and the construction period is extended.

【0004】本発明はこのような問題点に鑑みてなされ
たもので、その目的とするところは上段ベンチ側に対す
る各種作業用機械をトンネル内下段ベンチ側に走行可能
に配設したガントリに搭載し、下段ベンチ側の各種作業
用機械と輻輳させることなく下段ベンチ側に対する作業
と並行して上段ベンチ側に対する作業を実施可能にした
トンネルの掘削方法とその方法の実施に使用するガント
リを提供するにある。
The present invention has been made in view of the above problems, and an object of the present invention is to mount various working machines for the upper bench side on a gantry arranged so as to be able to travel on the lower bench side in a tunnel. To provide a tunnel excavation method that enables work on the upper bench side in parallel with work on the lower bench side without congestion with various work machines on the lower bench side, and a gantry used for performing the method. is there.

【0005】[0005]

【課題を解決するための手段】上記目的を達成するため
に、本発明のトンネル掘削方法は、トンネル切羽部を上
段ベンチと下段ベンチとに区分して両ベンチの切羽地盤
を掘削することによりトンネルを掘進する方法であっ
て、穿孔機や作業ケージ、コンクリート吹付装置等の各
種作業機械を前後移動自在に搭載しているガントリをト
ンネル内下段ベンチ側に走行自在に配設し、上記上段ベ
ンチに対してはこのガントリを前進させて穿孔機による
発破孔の穿孔作業と発破後における作業ケージを用いて
の支保工組立作業並びにコンクリート吹付け作業を行う
と共に、下段ベンチに対してはガントリによる上段ベン
チに対する上記各作業と並行して発破孔の穿孔作業と発
破後における支保工組立作業並びにコンクリート吹付作
業を行い、上下段ベンチの発破作業時にはガントリ及び
下段ベンチ側の穿孔機等をトンネル後方に退避させるこ
とを特徴とするものである。
In order to achieve the above object, a tunnel excavation method of the present invention is a tunnel excavation method in which a tunnel face is divided into an upper bench and a lower bench to excavate the face ground of both benches. A gantry equipped with various working machines such as a punching machine, a working cage, and a concrete spraying device so as to be movable back and forth is movably arranged on the lower bench side in the tunnel, and is mounted on the upper bench. On the other hand, the gantry is moved forward to perform the piercing work of the blast hole by the piercing machine, the supporting and assembling work using the work cage after blasting, and the concrete spraying work, and the lower bench is the upper bench of the gantry. In parallel with each of the above work for blasting, perform piercing work of blasting holes, supporting and assembling work after blasting, and concrete spraying work. During Chi blasting work is characterized in that retracting the gantry and the lower bench side drilling machine or the like to the tunnel behind.

【0006】又、上記方法の実施に使用するガントリ
は、請求項2に記載しているように、ガントリ本体はト
ンネルの長さ方向に長い枠台に前後脚柱を設けてなる正
面門形形状に形成されており、その後部脚柱を介してト
ンネル内下段ベンチ側に走行自在に支持されていると共
に前端側脚柱を後部脚柱よりも短尺に形成してトンネル
切羽部の上下段ベンチにおける上段ベンチ上に走行自在
に接地させるように構成すると共にその枠台の下方空間
部を下段ベンチに対する穿孔機やコンクリート吹付機等
の作業機械が通過可能な大きさに形成してあり、さら
に、ガントリ本体の枠台上に上段ベンチに対する穿孔機
や作業ケージ、コンリート吹付装置等の作業機械を前後
移動自在に搭載してなる構造としている。
Further, the gantry used for carrying out the above method is, as described in claim 2, a gantry main body having a front gate shape in which front and rear pedestals are provided on a frame base long in the length direction of the tunnel. In the upper and lower benches of the tunnel face, the front end side pedestal is formed to be shorter than the rear pedestal while being supported movably on the lower bench side in the tunnel via the rear pedestal. It is constructed so that it can be freely grounded on the upper bench, and the lower space of the frame is formed so that a working machine such as a punching machine or a concrete spraying machine for the lower bench can pass through it. It has a structure in which a work machine such as a punching machine for the upper bench, a work cage, and a blast spray device is mounted on the frame of the main body so as to be movable back and forth.

【0007】[0007]

【作用】切羽地盤に対する発破孔穿設時には、ガントリ
を前進させてその前端側脚柱を上段ベンチ上に接地さ
せ、該脚柱とトンネル底面に、即ち、下段ベンチ側に走
行自在に設置した後部脚柱とによってガントリ本体の枠
台を支持させる。この状態で枠台上に搭載している穿孔
機を前進させ、上段ベンチの切羽地盤に発破孔を穿設す
る。一方、下段ベンチにおいてはガントリ本体の下方空
間部を通過可能な適宜な穿孔機によってその切羽地盤に
発破孔を穿設する。
[Operation] When a blast hole is drilled in the face of the face, the gantry is moved forward so that the front-end pedestal is grounded on the upper bench, and the pedestal and the tunnel bottom surface, that is, the rear portion movably installed on the lower bench side. The gantry body frame is supported by the pillars. In this state, the punching machine mounted on the frame base is moved forward to form a blast hole in the face ground of the upper bench. On the other hand, in the lower stage bench, a blast hole is bored in the face ground by an appropriate punching machine capable of passing through the space below the gantry body.

【0008】上下段ベンチの切羽地盤に対する発破孔の
穿設後、発破孔に爆薬を装填して爆破させる前に、ガン
トリと下段ベンチ側の穿孔機をトンネル後方側の適所ま
で後退させる。この際、ガントリの前端脚柱が上段ベン
チから離れてガントリ本体を支持できなくなるので、搭
載している全ての作業機械をガントリ本体の後端にまで
移動させて重心を後側脚柱上に変位させることによりガ
ントリ本体を後側脚柱によって後退可能にする。この場
合、後部脚柱の後方部に重錘を設けておけばガントリ本
体の重心を安定させることができる。
After forming the blasting holes in the face of the upper and lower benches and before loading the blasting holes with explosives, the gantry and the punching machine on the lower bench side are retracted to the proper positions on the rear side of the tunnel. At this time, the front pedestal of the gantry moves away from the upper bench and can no longer support the gantry body, so move all the installed work machines to the rear end of the gantry body and displace the center of gravity to the rear pedestal. By doing so, the gantry body can be retracted by the rear pedestal. In this case, if a weight is provided in the rear part of the rear pillar, the center of gravity of the gantry body can be stabilized.

【0009】次いで、発破孔に装填した爆薬を爆破させ
て上下ベンチの切羽地盤をトンネル長さ方向に所定長、
掘削する。そして、上段ベンチ側の掘削ずりを下段ベン
チ側に掻き落とし、土砂運搬車等によってトンネル後方
に搬出したのち、ガントリを前進させてその前端側脚柱
を上段ベンチ上に接地させ、該脚柱と後部脚柱とによっ
てガントリ本体を支持した状態にしてガントリ本体上に
搭載している作業ケージを前進させ、上段ベンチの掘削
壁面に対する支保工の建込作業を行ったのち、コンリー
ト吹付装置によってコンクリート覆工を施す。この際、
下段ベンチ側においても、その掘削壁面に対して穿孔機
に備えている作業ケージを利用して支保工の建込作業を
行ったのち、コンクリート吹付作業を上記上側ベンチに
対する作業と並行して行う。しかるのち、上下段ベンチ
の切羽地盤に対して再び発破孔の穿孔作業を行う。な
お、ガントリ本体にトロリーを走行自在に配設しておく
ことにより、上記支保工等の部材をガントリ後方側から
所定の建込位置まで自動的に能率よく運搬することがで
きる。
Next, the explosive loaded in the blast hole is blown up so that the ground face of the upper and lower benches has a predetermined length in the tunnel length direction,
Excavate. Then, scrape the excavation slide on the upper bench side to the lower bench side, and carry it out to the rear of the tunnel with a sand carrier, etc., and then move the gantry forward to ground the front end side pedestal on the upper bench, After the gantry body is supported by the rear pedestal and the work cage mounted on the gantry body is moved forward, the construction work for supporting the excavation wall of the upper stage bench is carried out, and then the concrete covering is performed by the conrete spraying device. Apply work. On this occasion,
On the lower bench side as well, after the support work is installed on the excavated wall surface using the work cage provided in the drilling machine, concrete spraying work is performed in parallel with the work on the upper bench. After that, blast holes are drilled again on the face of the upper and lower benches. By disposing the trolley on the gantry body so that the trolley is freely movable, the members such as the supporting members can be automatically and efficiently transported from the rear side of the gantry to a predetermined built-in position.

【0010】[0010]

【実施例】本発明の実施例を図面について説明すると、
図1〜図3において、1はトンネルTの長さ方向に長い
水平枠台よりなるガントリ本体で、トンネルTの切羽部
はその上半を上段ベンチAに、下半を下段ベンチBに夫
々区分してあり、このガントリ本体1は上段ベンチAか
ら後方側と既に掘削の完了したトンネル底面Cの上方間
に達する長さを有すると共に、その前端両側に同一長さ
の脚柱11、11を垂下状態に一体的に固着していると共に
後部両側に該前側脚柱11、11よりも長い脚柱12a 、12b
を一体的に固着して正面門形状に形成してなるものであ
る。
Embodiments of the present invention will now be described with reference to the drawings.
1 to 3, reference numeral 1 denotes a gantry body composed of a horizontal frame stand that is long in the length direction of the tunnel T. The face part of the tunnel T is divided into an upper bench A in the upper half and a lower bench B in the lower half. The gantry body 1 has a length reaching from the upper bench A to the rear side and above the bottom surface C of the tunnel which has already been excavated, and the stanchions 11, 11 of the same length are hung on both sides of the front end thereof. The pedestals 12a and 12b that are integrally fixed to the state and are longer than the front pedestals 11 and 11 on both sides of the rear part.
Are integrally fixed to each other to form a front gate shape.

【0011】このガントリ本体1を構成する上記水平枠
台は、トンネルTの上方両側部に水平に配設された上下
一対の水平桁材13、14間を長さ方向に適宜間隔毎に縦桁
15によって一体に連結すると共に上側の桁材13、13間を
横桁16によって一体に連結してなり、その下方の空間部
は下段ベンチBの切羽地盤に穿孔するクローラ式穿孔機
Dや下段ベンチBの掘削壁面に対するコンクリート吹付
装置、ポンプ車、生コン車(いずれも図示せず)、及び
図5に示すようにずり運搬車E、掘削ずりを掻き寄せて
運搬車Eに搭載するバックホーF等が自由に通過できる
大きさに形成している。また、クローラ式穿孔機Dには
作業ケージGが昇降並びに旋回自在に付設されている。
The horizontal frame base constituting the gantry main body 1 is a vertical girder at a proper interval in the longitudinal direction between a pair of upper and lower horizontal girder members 13 and 14 horizontally arranged on both upper sides of the tunnel T.
The upper girders 13, 13 are integrally connected with each other by the horizontal girders 16, and the space below the upper girders 13, 13 is crawler-type perforator D for perforating the face ground of the lower bench B and the lower bench. The concrete spraying device for the excavated wall surface of B, the pump car, the ready-mixed car (all not shown), the shear carrier E as shown in FIG. 5, the backhoe F that scrapes the excavated shear and mounts it on the carrier E, and the like. It has a size that allows it to pass freely. Further, a work cage G is attached to the crawler type punching machine D so as to be vertically movable and rotatable.

【0012】ガントリ本体1の前端部を支持する前端側
の上記短い脚柱11は、図2に示すように、最前端の横桁
16の両側端から垂下状態に固着されてあり、これらの両
側脚柱11、11の下端に上段ベンチAの水平な底面上を走
行する無限履帯(キャタピラ)17を装着している。この
無限履帯17はモータ17a によって駆動されると共に脚柱
11、11の下端に昇降ジャッキ18を介して装着されてあ
り、この昇降ジャッキ18を伸縮させることによって脚柱
11、11を上下方向に移動させ、ガントリ本体1の前端側
の高さを後端側の高さに合わせるように構成している。
なお、走行自在な無限履帯17でなくても、上段ベンチA
上を摺動可能なプレートであってもよい。
As shown in FIG. 2, the short pedestal 11 on the front end side that supports the front end portion of the gantry body 1 is, as shown in FIG.
The endless tracks (caterpillars) 17 running on the horizontal bottom surface of the upper bench A are attached to the lower ends of the pedestals 11 and 11 on both sides. This endless track 17 is driven by a motor 17a
It is attached to the lower ends of 11 and 11 via an elevating jack 18, and by extending and contracting the elevating jack 18, the pedestal
11 and 11 are moved in the vertical direction so that the height of the front end side of the gantry body 1 is adjusted to the height of the rear end side.
In addition, even if it is not an infinite track 17 that can run freely, upper bench A
It may be a plate slidable on the top.

【0013】一方、ガントリ本体1の後部側を支持する
上記後側脚柱12は、図1及び図3に示すように、ガント
リ本体1のうしろ寄りの位置における横桁16の両側端に
上端を固着してなる脚柱12a と、ガントリ本体1の後部
の横桁16の両側端に上端を固着してなる脚柱12b とから
なり、これら四本の脚柱12a 、12b の下端には、既に掘
削が完了したトンネル底面C上に敷設されているレール
2上を走行する車輪19が回転自在に軸支されている。な
お、この車輪19はガントリ本体1の適所に設置した駆動
モータ20によって積極的に回転駆動させられるように構
成している。また、レール2はトンネルの掘進に従って
継ぎ足しながらトンネル長さ方向に敷設される。なお、
レール2は下段ベンチBの掘削に引続き、インバートの
掘削およびインバートコンクリートが打設される場合
は、そのコンリクート上に敷設される。即ち、図1にお
いて、クローラ式穿孔機Dと脚柱12a との間でインバー
ト部分を掘削すると共にコンクリートを打設することが
できる。
On the other hand, the rear pedestal 12 which supports the rear side of the gantry body 1 is, as shown in FIGS. 1 and 3, an upper end on both side ends of the cross beam 16 at a position near the gantry body 1. A pedestal 12a, and a pedestal 12b having upper ends fixed to both side ends of the transverse girder 16 at the rear of the gantry main body 1. The lower ends of these four pedestals 12a, 12b are Wheels 19 running on rails 2 laid on the bottom surface C of the tunnel that has already been excavated are rotatably supported. The wheels 19 are configured to be positively rotated by a drive motor 20 installed at a proper position on the gantry body 1. Further, the rail 2 is laid in the tunnel length direction while being added as the tunnel excavates. In addition,
Following the excavation of the lower bench B, the rail 2 is laid on the concret when excavating the invert and placing the invert concrete. That is, in FIG. 1, it is possible to excavate the invert portion between the crawler type drilling machine D and the pedestal 12a and to pour concrete.

【0014】ガントリ本体1の枠台上には複々線状に4
組のレール3a、3b、3c、3dが略全長に亘って敷設され、
両側のレール3a、3d上には発破孔の穿孔機4、4を、他
のレール3b、3dには作業ケージ5とコンクリート吹付機
6が夫々適宜な駆動機構を介して走行自在に配設してい
る。さらに、ガントリ本体1の枠台の横桁16の中央部両
側下面に、ガントリ本体1の略全長に亘ってトロリー吊
支用レール3e、3eを固着してあり、このレール3e、3eに
トロリー7、7を適宜な駆動機構(図示せず)によって
該レール5に沿って前後方向に走行させるように吊支
し、これらのトロリー7、7によってガントリ本体1の
後方から前方側に支保工や金網等を搬送させるように構
成している。また、搭載している全ての作業機械をガン
トリー本体1の後端まで移動させて重心を後側脚柱12a
と12b との間に位置させることによって、ガントリ本体
1を後側脚柱12a 、12b のみで支持しながら後退できる
ようにしている。
On the frame base of the gantry body 1, there are 4
A pair of rails 3a, 3b, 3c, 3d are laid over substantially the entire length,
Blast hole punching machines 4 and 4 are installed on the rails 3a and 3d on both sides, and a work cage 5 and a concrete spraying machine 6 are installed on the other rails 3b and 3d so that they can travel freely through appropriate drive mechanisms. ing. Further, rails 3e, 3e for suspending trolleys are fixed to the lower surfaces on both sides of the central portion of the horizontal beam 16 of the frame base of the gantry main body 1 over substantially the entire length of the gantry main body 1, and the trolley 7 is attached to these rails 3e, 3e. , 7 are hung and supported by an appropriate drive mechanism (not shown) so as to run in the front-rear direction along the rails 5, and the trolleys 7, 7 support the gantry body 1 from the rear side to the front side and wire mesh. Etc. are configured to be transported. In addition, all the working machines installed are moved to the rear end of the gantry body 1 to adjust the center of gravity to the rear pedestal 12a.
By locating the gantry body 1 between the rear stanchions 12a and 12b, the gantry body 1 can be moved backward while being supported between the rear stanchions 12a and 12b.

【0015】このように構成したガントリを使用してト
ンネルTを掘削する方法について述べる。トンネルTの
切羽部はその上半を上段ベンチAに、下半を下段ベンチ
Bに夫々区分され、これらの上下段ベンチA、Bの切羽
地盤に発破孔を穿設したのち装薬して爆破させる発破工
法によってトンネルTの掘進方向に一定長、掘削したの
ち、その掘削ずりの排除を行い、ずりの排除後、上下段
ベンチA、Bの掘削壁面に支保工の建込みからコンクリ
ートの吹付けまでの一次覆工Hを並行して行う一方、下
段ベンチBの後方側におけるトンネル底面においてはイ
ンバートの掘削からコンクリートCの打設作業を上記掘
削ずりの排除から一次覆工Hの施工作業に並行して行
う。そして、上記穿孔作業から一次覆工作業を繰り返し
行ってトンネルを掘削していくものである。
A method of excavating the tunnel T using the gantry thus constructed will be described. The upper half of the face of the tunnel T is divided into the upper bench A and the lower half is divided into the lower bench B, and after blasting holes are formed in the face of the upper and lower benches A and B, the blasting is carried out. After excavating a certain length in the direction of excavation of the tunnel T by the blasting method, the excavation shear is removed, and after the shear is removed, concrete is sprayed from the construction of the support work on the excavated wall surfaces of the upper and lower benches A and B. While the primary lining H up to the above is performed in parallel, at the bottom of the tunnel on the rear side of the lower bench B, the work of placing the concrete C from excavation of the invert is performed in parallel with the work of the primary lining H from the removal of the excavation slide. Then do. Then, the tunnel digging is performed by repeatedly performing the primary lining work from the drilling work.

【0016】このトンネル掘削の作業順序を上段ベンチ
A側に対する作業と、下段ベンチB側に対する作業、及
び両ベンチに対する共通作業とに区分して図示した図6
に基づいて説明する。まず、ガントリ本体1やクローラ
式穿孔機D等をトンネル後方に待機させた状態で図4に
示すように上下段ベンチA、Bの切羽地盤の発破作業を
行い、切羽側を換気する。この換気下で図5に示すよう
に、バックホーFを下段ベンチBの近傍部まで前進さ
せ、該バックホーF等によって上段ベンチA側の掘削ず
りを下段ベンチB側に掻き落とすと共に該掘削ずりをダ
ンプトラック等の運搬車Eに搭載し、トンネル後方に搬
出させる。
The work sequence of this tunnel excavation is divided into the work for the upper bench A side, the work for the lower bench B side, and the common work for both benches.
It will be described based on. First, with the gantry body 1 and the crawler-type punching machine D standing by at the rear of the tunnel, as shown in FIG. 4, blasting work is performed on the face of the upper and lower benches A and B to ventilate the face of the face. Under this ventilation, as shown in FIG. 5, the backhoe F is advanced to the vicinity of the lower bench B, and the backhoe F and the like scrape off the excavation shear on the upper bench A side to the lower bench B side and dump the excavated shear. It is mounted on a carrier E such as a truck and carried out behind the tunnel.

【0017】発破によって掘削されたずりが全て搬出さ
れると、ガントリ本体1をトンネル後方の待機位置から
レール2上を前進させてその短い前端側脚柱11の下端無
限履帯17を上段ベンチA上に接地させ、該脚柱11と後部
脚柱12a 、12b とによってガントリ本体1の枠台を上段
ベンチAと掘削が完了したトンネル底面C上間に架設状
態に配置させる。この状態にしてガントリ本体1の枠台
上で後端側に待機させていた作業ケージ5を前進させて
ガントリ本体1の前端から掘削壁面に臨ませる。一方、
下段ベンチB側においては、後方に待機させていたクロ
ーラ式穿孔機Dを該下段ベンチBの掘削壁面に対する作
業位置まで前進させる。
When all the excavated shears have been carried out by blasting, the gantry body 1 is moved forward from the standby position behind the tunnel on the rail 2 and the short endless track 17 of the short front end pedestal 11 is placed on the upper bench A. The pedestal 11 and the rear pedestals 12a and 12b are used to arrange the frame of the gantry body 1 between the upper bench A and the tunnel bottom C where the excavation is completed. In this state, the work cage 5, which has been waiting on the rear end side on the frame base of the gantry main body 1, is advanced to face the excavation wall surface from the front end of the gantry main body 1. on the other hand,
On the side of the lower bench B, the crawler-type punching machine D, which has been waiting backward, is advanced to the work position for the excavation wall surface of the lower bench B.

【0018】さらに、ガントリ本体1の枠台下のレール
3e、3eに吊支したトロリー7、7によって一次覆工のた
めの分割された支保工や金網を上下段ベンチA、B側に
搬送し、上段ベンチA側においてはガントリ本体1側の
作業ケージ5上で、下段ベンチB側においてはクローラ
式穿孔機Dに付設している作業ケージG上で夫々作業員
が掘削壁面に対する支保工の建込みと必要に応じて支保
工頂面部に対する既設支保工との間に金網張設作業を行
う。しかるのち、ガントリ本体1上の作業ケージ5及び
クローラ式穿孔機Dをトンネル後方に後退させる一方、
上段ベンチA側ではガントリ本体1の枠台上のコンクリ
ート吹付機6を前進させ、下段ベンチB側では同じくコ
ンクリート吹付装置(図示せず)を支保工建込部まで前
進させて支保工の厚みまでコンクリートの吹付けを行う
ことにより一次覆工作業を完了する。
Further, a rail under the frame base of the gantry body 1
3e, the trolleys 7 suspended from 3e, convey the divided support for the primary lining and the wire mesh to the upper and lower benches A and B, and the work cage on the gantry body 1 side on the upper bench A side. On the lower bench B side, on the work cage G attached to the crawler type drilling machine D on the lower bench B side, the workers respectively construct the support for the excavation wall surface and, if necessary, the existing support for the support work top surface. Wire mesh installation work will be performed between and. After that, the work cage 5 on the gantry body 1 and the crawler type punching machine D are retracted to the rear of the tunnel,
On the upper bench A side, the concrete spraying machine 6 on the frame of the gantry body 1 is advanced, and on the lower bench B side, a concrete spraying device (not shown) is also advanced to the support construction part to the thickness of the support work. The primary lining work is completed by spraying concrete.

【0019】次いで、これらのコンクリート吹付装置を
後退させ、上段ベンチA側においてはガントリ本体1の
枠台上で穿孔機4、4を前端まで前進させて新たな切羽
地盤に次のトンネル掘削のための発破孔8aの穿設作業と
その周壁地盤に対するロックボルト孔の穿設作業を行う
一方、下段ベンチB側においてはガントリ本体1の下方
空間部を通じてクローラ式穿孔機Dを再び下段ベンチB
の切羽地盤近傍部まで前進させ、上段ベンチA側と並行
して該切羽地盤に次のトンネル掘削のための発破孔8bの
穿設作業とその周壁地盤に対するロックボルト孔の穿設
作業を行う。
Next, these concrete spraying devices are retracted, and on the side of the upper bench A, the perforators 4, 4 are advanced to the front end on the frame base of the gantry body 1 for excavating a new tunnel face for the next tunnel excavation. The blasting hole 8a is drilled and the rock bolt hole is drilled in the surrounding wall ground. On the lower bench B side, the crawler-type drilling machine D is again passed through the lower space of the gantry body 1 to the lower bench B.
Then, the blast hole 8b for the next tunnel excavation work and the work of the rock bolt hole for the peripheral wall ground are drilled in the face ground in parallel with the upper bench A side.

【0020】これらの穿孔作業が完了すると、上段ベン
チA側においては再び作業ケージ5をガントリ本体1の
前端まで前進させ、この作業ケージ5とクローラ式穿孔
機Dの作業ケージGを利用してロックボルト孔に対する
ロックボルト9の打込みを行うと共に上下段ベンチA、
Bの発破孔8a、8b内に対する爆薬の装填作業を行う。こ
の装薬後、ガントリ本体1上の穿孔機4、4や作業ケー
ジ5等の全ての作業機械をガントリ本体1の枠台後端部
上にまで後退させた状態にしてガントリ全体の重心を後
側脚柱12上に変位させ、ガントリ本体1の前側脚柱11の
支持がなくても該後側脚柱12でガントリ本体1の枠台を
支持させて走行可能な状態とする。
When these punching operations are completed, the work cage 5 on the upper bench A side is again advanced to the front end of the gantry body 1, and the work cage 5 and the work cage G of the crawler punch D are locked. The lock bolt 9 is driven into the bolt hole, and the upper and lower benches A,
Loading work of explosive into the blast holes 8a and 8b of B is performed. After this charging, all the working machines such as the punching machines 4 and 4 on the gantry body 1 and the work cage 5 are retracted to the rear end of the frame base of the gantry body 1, and the center of gravity of the entire gantry is rearmed. The gantry body 1 is displaced onto the side pedestal 12 so that the rear pedestal 12 can support the frame of the gantry body 1 without the support of the front pedestal 11 of the gantry body 1 so that the gantry body 1 can travel.

【0021】しかるのち、ガントリ本体1及びクローラ
式穿孔機Dを発破の影響を受けないトンネル後方にまで
後退させ、上下段ベンチA、Bの切羽地盤側において上
記発破孔8a、8bを爆破させることにより一定長のトンネ
ル掘削を行うものである。そして、この爆破により生じ
た掘削ずりを上記同様にして搬出したのち、一次覆工作
業を行い、以下、上記作業工程を繰り返し行ってトンネ
ルを掘進していくものである。
After that, the gantry body 1 and the crawler type punching machine D are retracted to the rear of the tunnel which is not affected by the blasting, and the blasting holes 8a and 8b are blown up on the face of the upper and lower benches A and B on the face ground side. Will excavate a tunnel for a certain length. Then, after excavating the excavation caused by this blast in the same manner as above, the primary lining work is performed, and thereafter, the above-mentioned work steps are repeated to advance the tunnel.

【0022】なお、以上の実施例においてはガントリ本
体1の架台上の作業機械を後端側にまで移動させること
によりガントリ全体を後側の重心を後側の前後脚柱12a
、12b によって走行可能に支持させているが、これと
共に該前後脚柱12a 、12b の下端部間を連結している水
平枠材21の後端部上に重錘22を装着しておき、ガントリ
本体1の後部側に常に重心を位置させておくことが望ま
しい。また、爆破により生じた掘削ずりの搬出はガント
リ本体1の下方空間部を通過して下段ベンチBの近傍部
にまでダンプトラック等の運搬車Eを走行させている
が、ガントリ本体1の枠台の下面にベルトコンベア等の
運搬装置を前後移動自在に吊支しておき、この運搬装置
によって上下段ベンチA、Bの掘削ずりをガントリ本体
1の後端まで搬送して、該後端側に待機しているダンプ
トラック等の運搬車Eに搭載するように構成しておいて
もよい。このようにすると、ベルトコンベアの下方でイ
ンバートの掘削およびコンクリートを打設することがで
きる。
In the above embodiment, the working machine on the mount of the gantry body 1 is moved to the rear end side so that the center of gravity of the rear side of the entire gantry is the front and rear pedestals 12a.
, 12b are movably supported, and together with this, a weight 22 is mounted on the rear end of the horizontal frame member 21 connecting the lower ends of the front and rear pedestals 12a, 12b. It is desirable that the center of gravity is always located on the rear side of the main body 1. Further, the excavation excavation carried out by the blast passes through the space below the gantry body 1 and runs the transport vehicle E such as a dump truck to the vicinity of the lower bench B. A carrying device such as a belt conveyor is hung on the lower surface of the carriage so as to be movable back and forth, and by this carrying device, the excavation slides of the upper and lower benches A and B are carried to the rear end of the gantry body 1 and the rear end side thereof is It may be configured to be mounted on a transportation vehicle E such as a dump truck that is on standby. In this way, invert excavation and concrete can be placed below the belt conveyor.

【0023】この場合、下段ベンチBの底面に連続する
後方のトンネル底面には上記上下段ベンチA、Bの切羽
地盤の掘削から一次覆工までの1サイクル分の作業に並
行してインバートの掘削と、該インバートに対するコン
クリートCの打設作業とがガントリ本体1の下方空間部
を利用して行うことができ、この作業に必要なコンクリ
ート打設用型枠等は上記トロリー7によってインバート
の上方まで搬送したのち、降下させて設置することがで
きる。
In this case, the invert excavation is carried out on the bottom of the tunnel which is continuous to the bottom of the lower bench B, in parallel with one cycle work from the excavation of the face ground of the upper and lower benches A and B to the primary lining. And the work of placing concrete C on the invert can be performed using the lower space portion of the gantry body 1. The concrete placing formwork and the like required for this work can be provided above the invert by the trolley 7. After transportation, it can be lowered and installed.

【0024】[0024]

【発明の効果】以上のように本発明のトンネル掘削方法
によれば、トンネル切羽部を上段ベンチと下段ベンチと
に区分して両ベンチの切羽地盤を掘削することによりト
ンネルを掘進する方法であって、穿孔機や作業ケージ、
コンクリート吹付装置等の各種作業機械を前後移動自在
に搭載しているガントリをトンネル内下段ベンチ側に走
行自在に配設し、上記上段ベンチに対してはこのガント
リを前進させて穿孔機による発破孔の穿孔作業と発破後
における作業ケージを用いての支保工建込作業並びにコ
ンクリート吹付け作業を行うと共に、下段ベンチに対し
てはガントリによる上段ベンチに対する上記各作業と並
行して発破孔の穿孔作業と発破後における支保工組立作
業並びにコンクリート吹付作業を行い、上下段ベンチの
発破作業時にはガントリ及び下段ベンチ側の穿孔機等を
トンネル後方に退避させるものであるから、上段ベンチ
側においては、その切羽地盤に対する発破孔穿設作業か
ら発破工法による一定長のトンネル部の掘削作業、掘削
壁面に対する支保組立及びコンクリート吹付までの一連
作業を、穿孔機や作業ケージ、コンクリート吹付装置等
の各種作業機械を搭載しているガントリガントリを使用
して下段ベンチ側の作業に影響されたり、影響を及ぼし
たりすることなく下段ベンチ側の作業と互いに並行して
行うことができ、トンネルの掘削作業が能率よく行えて
工期を著しく短縮し得るものである。
As described above, according to the tunnel excavation method of the present invention, the tunnel face is divided into the upper bench and the lower bench to excavate the face ground of both benches to advance the tunnel. A punch, a work cage,
A gantry on which various work machines such as concrete spraying equipment are mounted so as to be movable back and forth is movably arranged on the lower bench side in the tunnel, and the gantry is advanced to the upper bench to blast holes by a punching machine. Drilling work and post-blasting work using support cage construction work and concrete spraying work, as well as drilling blast holes in parallel with the above work on the upper bench by the gantry for the lower bench. When the blasting work of the upper and lower benches is performed, the gantry and the punching machine on the lower bench side are retracted to the rear of the tunnel. Excavation work of a certain length of tunnel part by blasting method from blast hole drilling work to the ground, support to excavation wall surface Performing a series of work from standing up and concrete spraying to a work on the lower bench side using a gantry gantry equipped with various working machines such as punching machines, work cages, concrete spraying equipment, etc. The work can be performed in parallel with the work on the lower bench side without doing so, and the tunnel excavation work can be performed efficiently, which can significantly shorten the construction period.

【0025】また、ガントリの本体はトンネルの長さ方
向に長い枠台に前後脚柱を設けてなる正面門形形状に形
成されており、その後部脚柱を介してトンネル内に走行
自在に支持されていると共に前端側脚柱を後部脚柱より
も短尺に形成してトンネル切羽部の上下段ベンチにおけ
る上段ベンチ上に走行自在に接地させるように構成して
いるので、上段ベンチ上と下段ベンチ後方のトンネル底
面上との間に架設状態にして安定した姿勢でもって前後
移動可能に配設し得ると共に、その枠台の下方空間部を
下段ベンチに対する穿孔機やコンクリート吹付機等の作
業機械が通過可能な大きさに形成しているので、下段ベ
ンチ側に対する発破孔穿設作業から爆破後における掘削
壁面のコンクリート覆工作業を円滑に行うことができ、
その上、ガントリ本体の枠台上には上段ベンチに対する
穿孔機や作業ケージ、コンリート吹付装置等の作業機械
を前後移動自在に搭載しているので、下段ベンチ側に対
する各種作業機械とはこれらの機械とは全く輻輳するこ
とはなく、それぞれの作業機械を互いに邪魔することも
なく単独的に自由に走行させることができて、所定の作
業を効率よく実施することができるものである。また、
ガントリ本体の重心を後側脚柱上にすることによって、
ガントリ本体を後方に走行可能にできる。さらにガント
リ本体上の作業機械を後退させてガントリ本体の重心を
後側脚柱上に位置させることもできる。
Further, the main body of the gantry is formed in a front gate shape in which a front and rear pedestal is provided on a frame base long in the length direction of the tunnel, and is supported movably in the tunnel via the rear pedestal. In addition, the front end pedestal is formed shorter than the rear pedestal so that it can be freely grounded on the upper bench of the upper and lower benches of the tunnel face, so the upper and lower benches It can be installed between the bottom of the tunnel and the bottom of the tunnel so that it can be moved back and forth with a stable posture, and the lower space of the frame can be used for work machines such as punches and concrete sprayers for the lower bench. Since it is formed with a size that allows passage, it is possible to smoothly perform concrete lining work on the excavated wall surface after blasting from blast hole drilling work on the lower bench side,
In addition, since a work machine such as a punching machine for the upper bench, a working cage, and a spray spray device is mounted on the frame base of the gantry body so that it can be moved back and forth, the various working machines for the lower bench side are these machines. Does not cause any congestion, and the respective working machines can be independently and freely traveled without disturbing each other, and the predetermined work can be efficiently performed. Also,
By placing the center of gravity of the gantry body on the rear pedestal,
The gantry body can be made to run backwards. Further, the work machine on the gantry body can be retracted so that the center of gravity of the gantry body is located on the rear pedestal.

【0026】また、ガントリ本体に支保工等の運搬用ト
ロリーを走行自在に配設しておくことによって、トンネ
ル後方側から該ガントリ本体を通じて上記上下段ベンチ
側に覆工に必要な支保工等の各種部材を容易に且つ迅速
に搬送することができ、トンネルの築造作業を一層能率
よく行なえるものである。
Further, by disposing a transportation trolley for supporting such as support on the gantry body, the supporting trolley required for lining from the rear side of the tunnel to the upper and lower bench side through the gantry body. Various members can be easily and quickly transported, and the tunnel construction work can be performed more efficiently.

【図面の簡単な説明】[Brief description of drawings]

【図1】トンネル掘削に使用しているガントリの簡略側
面図、
FIG. 1 is a simplified side view of a gantry used for tunnel excavation,

【図2】その前端側の拡大縦断正面図、FIG. 2 is an enlarged vertical front view of the front end side thereof,

【図3】その中間部分の拡大縦断背面図、FIG. 3 is an enlarged vertical rear view of the middle portion thereof,

【図4】上下段ベンチの切羽地盤を発破させた状態の簡
略縦断側面図、
FIG. 4 is a simplified vertical cross-sectional side view of the upper and lower bench with the blasting face ground blasted,

【図5】掘削ずりを搬出している状態の簡略縦断側面
図、
FIG. 5 is a simplified vertical sectional side view showing a state where the excavation slide is being carried out;

【図6】トンネル掘削の作業工程を示すブロック図。FIG. 6 is a block diagram showing a work process of tunnel excavation.

【符号の説明】[Explanation of symbols]

T トンネル A 上段ベンチ B 下段ベンチ D クローラ式穿孔機 1 ガントリ本体 2 レール 4 穿孔機 5 作業ケージ 6 コンクリート吹付機 7 トロリー 11 前側脚柱 12a 、12b 側脚柱 T tunnel A upper bench B lower bench D crawler type puncher 1 gantry body 2 rail 4 puncher 5 working cage 6 concrete sprayer 7 trolley 11 front pedestal 12a, 12b side pedestal

───────────────────────────────────────────────────── フロントページの続き (72)発明者 萩原 靖俊 大阪市阿倍野区松崎町2丁目2番2号 株 式会社奥村組内 (72)発明者 桔梗 栄吉 大阪市阿倍野区松崎町2丁目2番2号 株 式会社奥村組内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Yasutoshi Hagiwara 2-2-2 Matsuzaki-cho, Abeno-ku, Osaka City Okumura-gumi Co., Ltd. Stock company Okumura Gumi

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 トンネル切羽部を上段ベンチと下段ベン
チとに区分して両ベンチの切羽地盤を掘削することによ
りトンネルを掘進する方法であって、穿孔機や作業ケー
ジ、コンクリート吹付装置等の各種作業機械を前後移動
自在に搭載しているガントリをトンネル内下段ベンチ側
に走行自在に配設し、上記上段ベンチに対してはこのガ
ントリを前進させて穿孔機による発破孔の穿孔作業と発
破後における作業ケージを用いての支保工組立作業並び
にコンクリート吹付け作業を行うと共に、下段ベンチに
対してはガントリによる上段ベンチに対する上記各作業
と並行して発破孔の穿孔作業と発破後における支保工組
立作業並びにコンクリート吹付作業を行い、上下段ベン
チの発破作業時にはガントリ及び下段ベンチ側の穿孔機
等をトンネル後方に退避させることを特徴とするトンネ
ル掘削方法。
1. A method of excavating a tunnel by dividing a tunnel face into an upper bench and a lower bench and excavating the face ground of both benches, and various methods such as a punching machine, a working cage, and a concrete spraying device. A gantry equipped with a work machine that can be moved back and forth is arranged so that it can run freely on the lower bench side in the tunnel. In addition to performing support assembly work and concrete spraying work using the work cage in the above, in parallel with the above work on the upper bench by the gantry for the lower bench, drilling of blast holes and support assembly after blasting. Performing work and concrete spraying work, and when blasting the upper and lower benches, place the gantry and the punch on the lower bench side behind the tunnel. A tunnel excavation method characterized by evacuating.
【請求項2】 ガントリ本体はトンネルの長さ方向に長
い枠台に前後脚柱を設けてなる正面門形形状に形成され
ており、その後部脚柱を介してトンネル内に走行自在に
支持されていると共に前端側脚柱を後部脚柱よりも短尺
に形成してトンネル切羽部の上下段ベンチにおける上段
ベンチ上に走行自在に接地させるように構成すると共に
その枠台の下方空間部を下段ベンチに対する穿孔機やコ
ンクリート吹付機等の作業機械が通過可能な大きさに形
成してあり、さらに、ガントリ本体の枠台上に上段ベン
チに対する穿孔機や作業ケージ、コンリート吹付装置等
の作業機械を前後移動自在に搭載してなることを特徴と
するトンネル掘削方法に使用するガントリ。
2. The gantry body is formed in a front gate shape in which a front and rear pedestal is provided on a frame base that is long in the length direction of the tunnel, and is supported movably in the tunnel through the rear pedestal. In addition, the front end pedestal is formed shorter than the rear pedestal so that it can be freely grounded on the upper bench in the upper and lower benches of the tunnel face and the lower space of the frame is lower bench. The work machine such as a punching machine and a concrete spraying machine is formed to pass through. A gantry used in tunnel excavation methods, which is characterized by being mounted so that it can move freely.
【請求項3】 ガントリ本体に支保工等の運搬用トロリ
ーを長さ方向に走行自在に配設していることを特徴とす
る請求項2記載のトンネル掘削方法に使用するガント
リ。
3. A gantry for use in a tunnel excavation method according to claim 2, wherein a trolley for transportation such as support work is arranged on the gantry body so as to be movable in the longitudinal direction.
【請求項4】 ガントリ本体の重心が後部脚柱上にある
ことを特徴とする請求項2記載のトンネル掘削方法に使
用するガントリ。
4. The gantry used in the tunnel excavating method according to claim 2, wherein the center of gravity of the gantry body is on the rear pedestal.
【請求項5】 ガントリ本体上の作業機械を後部脚柱上
に後退させたときにガントリ本体の重心が該後部脚柱上
にあることを特徴とする請求項2記載のトンネル掘削方
法に使用するガントリ。
5. The tunnel excavation method according to claim 2, wherein the center of gravity of the gantry body is on the rear pedestal when the work machine on the gantry body is retracted onto the rear pedestal. Gantry.
JP33878794A 1994-12-27 1994-12-27 Tunnel excavation method and gantry used for this method Expired - Lifetime JP3151116B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP33878794A JP3151116B2 (en) 1994-12-27 1994-12-27 Tunnel excavation method and gantry used for this method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP33878794A JP3151116B2 (en) 1994-12-27 1994-12-27 Tunnel excavation method and gantry used for this method

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2000272463A Division JP3357654B2 (en) 2000-09-08 2000-09-08 Gantry used for tunnel excavation method

Publications (2)

Publication Number Publication Date
JPH08184287A true JPH08184287A (en) 1996-07-16
JP3151116B2 JP3151116B2 (en) 2001-04-03

Family

ID=18321472

Family Applications (1)

Application Number Title Priority Date Filing Date
JP33878794A Expired - Lifetime JP3151116B2 (en) 1994-12-27 1994-12-27 Tunnel excavation method and gantry used for this method

Country Status (1)

Country Link
JP (1) JP3151116B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020024912A (en) * 2000-09-27 2002-04-03 고순방 Method of construct a tunnel
KR100347912B1 (en) * 1998-04-09 2002-08-09 다이세이 겐세쓰 가부시키가이샤 Tunneling Plant
CN107060775A (en) * 2017-05-11 2017-08-18 中国电建集团华东勘测设计研究院有限公司 A kind of bilayer is while the deep-lying tunnel rock burst relief structure excavated in the same direction and its application
CN110500113A (en) * 2019-09-20 2019-11-26 中铁二局第二工程有限公司 A kind of micro- bench excavation combination rack in tunnel and the micro- bench excavation method in tunnel

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100347912B1 (en) * 1998-04-09 2002-08-09 다이세이 겐세쓰 가부시키가이샤 Tunneling Plant
KR20020024912A (en) * 2000-09-27 2002-04-03 고순방 Method of construct a tunnel
CN107060775A (en) * 2017-05-11 2017-08-18 中国电建集团华东勘测设计研究院有限公司 A kind of bilayer is while the deep-lying tunnel rock burst relief structure excavated in the same direction and its application
CN107060775B (en) * 2017-05-11 2023-09-12 中国电建集团华东勘测设计研究院有限公司 Double-layer simultaneous and homodromous excavation deep-buried tunnel rock burst releasing structure and application thereof
CN110500113A (en) * 2019-09-20 2019-11-26 中铁二局第二工程有限公司 A kind of micro- bench excavation combination rack in tunnel and the micro- bench excavation method in tunnel

Also Published As

Publication number Publication date
JP3151116B2 (en) 2001-04-03

Similar Documents

Publication Publication Date Title
JP3103284B2 (en) Tunnel excavation shearing gantry
JP2017031687A (en) Carry-out method of shear at tunnel excavation work and moving stage using in the same
JP3322716B2 (en) Tunnel construction method
JPH08184287A (en) Excavation method for tunnel and gantry used for the method
JP2820854B2 (en) Pier for tunnel construction, invert construction method and tunnel construction method
JP2018178638A (en) Export arrangement of sediment crushed stone generated in tunnel construction
DE19522228C2 (en) Jacking and loading machine
JP3103285B2 (en) Tunnel excavation method
JP2003269074A (en) Extension method of existing tunnel
JP3357654B2 (en) Gantry used for tunnel excavation method
JP3831900B2 (en) Tunnel construction method
JP2898818B2 (en) Tunnel construction method
JP2618798B2 (en) Multi-function excavator
JP3441016B2 (en) Tunnel construction equipment
JP2767231B2 (en) Tunnel excavation method
US2164753A (en) Apparatus for tunneling in consolidated material
JPH07113393A (en) Gantry backhoe of concrete form loaded type
JP3438208B2 (en) Tunnel construction equipment
JP4034442B2 (en) Electa interlocking segment assembly scaffold
JP2791261B2 (en) Multi-function excavator
RU22186U1 (en) MINING INSTALLATION
JP2898551B2 (en) Working equipment for tunnel construction
JP2022085413A (en) Method for constructing slope structure
JP4172330B2 (en) Widening equipment and widening method for existing tunnels
JP2709876B2 (en) Tunnel wall construction equipment

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130119

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130119

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150119

Year of fee payment: 14

EXPY Cancellation because of completion of term