JPH0813405A - Widening construction of road - Google Patents

Widening construction of road

Info

Publication number
JPH0813405A
JPH0813405A JP6147791A JP14779194A JPH0813405A JP H0813405 A JPH0813405 A JP H0813405A JP 6147791 A JP6147791 A JP 6147791A JP 14779194 A JP14779194 A JP 14779194A JP H0813405 A JPH0813405 A JP H0813405A
Authority
JP
Japan
Prior art keywords
road
ground
wall
pile
wall body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP6147791A
Other languages
Japanese (ja)
Other versions
JP3120103B2 (en
Inventor
Yoji Kikuchi
洋司 菊地
Mitsutoshi Ogata
光俊 尾形
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nittoc Constructions Co Ltd
Original Assignee
Nittoc Constructions Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nittoc Constructions Co Ltd filed Critical Nittoc Constructions Co Ltd
Priority to JP06147791A priority Critical patent/JP3120103B2/en
Publication of JPH0813405A publication Critical patent/JPH0813405A/en
Application granted granted Critical
Publication of JP3120103B2 publication Critical patent/JP3120103B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Abstract

PURPOSE:To make it possible to drive a pile near to the face of slope to the utmost before the execution, shorten the length of the pile and to enable the reduction of an amount of banking by forming the upper end of a wall in the shape of a haunch projected to the outside, and bearing the side end of a newly constructed road on the diameter enlarged part in the case the ground surface of the existing road is widened to construct the new road thereon. CONSTITUTION:In the case block bodies 3a are combined, and a narrow 6 is formed in a notch section 14 of the joint end face. Piles 9 are erected on the foundation ground 1 at proper intervals. The block bodies 3 are piled up on the ground 1 so that the piles 9 of steel materials are inserted in holes 2 of the block bodies 3a, and the holes are filled with gap filling concrete mortar 18 to fix. The block bodies 3 are piled up to form the wall, and baking 4 is applied to the inside thereof. The enlarged end 17 of a ground anchor 16 is inserted in the narrow 6 from an upward opening, the ground anchor 16 is led to the outside through a slit 15 linked outward from the narrow 6, and it is lowered to provide it in the banking 4. The block body 3a of the upper end of the wall is formed in the shape of a haunch projected to the outside. A new road 13 is constructed on the ground surface widened is a such way.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、急勾配の斜面に築造さ
れた道路を拡幅する道路の拡幅構造に関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a road widening structure for widening a road built on a steep slope.

【0002】[0002]

【従来の技術】特公平4-2733号公報に記載があるが、図
3、図4に示すように急勾配の斜面において既設道路12
がある場合に、これを拡幅して新設道路13とするには、
まず、基礎地盤1を掘孔し、根入してH鋼による杭9を
適宜間隔で立する。
2. Description of the Related Art As described in Japanese Examined Patent Publication No. 4-2733, there is an existing road 12 on a steep slope as shown in FIGS.
If there is, to widen it and make it a new road 13,
First, the foundation ground 1 is dug, the root is inserted, and the piles 9 made of H steel are erected at appropriate intervals.

【0003】そしてコンクリートパネル等のブロック体
3aは両端に係合溝10を形成してあり、これをH鋼によ
る杭9の前側フランジに係合させて、杭9間に該ブロッ
ク体3aを嵌込み、かつ上下に積み上げることで壁体3
を形成する。
The block body 3a such as a concrete panel is formed with engaging grooves 10 at both ends, and the block body 3a is fitted between the piles 9 by engaging with the front flange of the pile 9 made of H steel. Wall body 3 by including and stacking vertically
To form.

【0004】また、壁体3の裏側に盛土4を施すのに該
盛土4内に盛土内補強材5を配設して造成地盤を形成
し、その造成地盤の地盤面に新設道路13を施工するよう
にしている。αは既道路幅員、βは新道路幅員である。
図中7は施工前ののり面、8は表層土である。
In addition, in order to apply the embankment 4 to the back side of the wall body 3, the embankment reinforcement material 5 is arranged in the embankment 4 to form a ground, and a new road 13 is constructed on the ground surface of the ground. I am trying to do it. α is the width of the existing road and β is the width of the new road.
In the figure, 7 is the slope before construction and 8 is the surface soil.

【0005】この特公平4-2733号公報の補強土用壁面構
造によれば、壁体3は杭9による支持が得られるので、
盛土内補強材5の長さも短くでき、また、コンクリート
パネルである壁体3も連続性のあるものとなって倒れや
はらみ出しの発生が防止でき、垂直性も確保できる。
According to the wall structure for reinforced soil of Japanese Patent Publication No. 4-2733, since the wall body 3 can be supported by the pile 9,
The length of the reinforcing material 5 in the embankment can be shortened, and the wall body 3 which is a concrete panel can be made continuous so that it can be prevented from falling or protruding, and verticality can be secured.

【0006】[0006]

【発明が解決しようとする課題】しかし、杭9は施工前
ののり面7からかなり離れた個所に設置することにな
り、杭9や壁体3はある程度の高さが必要とされ、盛土
4の量も増大するとともに、杭9や壁体3にかかる土圧
荷重も大きいので、杭9や壁体3や盛土内補強材5にそ
れなりの強度を有するものが要求される。
However, the pile 9 is to be installed at a position far away from the slope 7 before construction, and the pile 9 and the wall 3 need to have a certain height, and the embankment 4 As the amount of soil is increased and the earth pressure load applied to the pile 9 and the wall 3 is large, it is required that the pile 9, the wall 3 and the embankment reinforcement 5 have a certain level of strength.

【0007】本発明は前記従来例の不都合を解消し、地
盤上にブロック体を積み重ねてなる壁体を所定間隔で立
設した杭で固定し、また、この壁体の裏側に盛土を施し
て従来の道路の施工個所である地盤面を拡幅し、この拡
幅された地盤面上に道路を施工する道路の拡幅構造にお
いて、杭を極力施工前ののり面に近づけて設置でき、そ
の結果、杭長を短く、また、盛土量を少なくできるの
で、工費、工期の節減等施工の合理化を図ることができ
る道路の拡幅構造を提供することにある。
The present invention eliminates the disadvantages of the above-mentioned conventional example, in which the wall body formed by stacking the block bodies on the ground is fixed by the piles standing upright at predetermined intervals, and the back side of the wall body is filled with earth. In the road widening structure in which the ground surface that is the conventional road construction site is widened and the road is constructed on this widened ground surface, the pile can be installed as close as possible to the slope before the construction, and as a result, the pile can be installed. The purpose of the present invention is to provide a road widening structure that can shorten the length of the road and reduce the amount of embankment so that the construction cost can be reduced and the construction period can be rationalized.

【0008】[0008]

【課題を解決するための手段】本発明は前記目的を達成
するため、第1に、壁体上方端は外側に張り出すハンチ
形状とし、この拡径された部分で前記道路側端部を支承
すること、第2に、壁体を構成するブロック体には杭を
挿通する孔を形成して杭は壁体を挿通してからこの孔内
に間詰めモルタルを充填して固定すること、第3に、盛
土内に配設する地盤アンカーはその膨大端部を壁体構成
のブロック体の左右接続端面に形成した切欠部を組合わ
せて得られる狭間内に差し入れ、該狭間内に間詰めモル
タルを充填して固定することを要旨とするものである。
In order to achieve the above-mentioned object, the present invention firstly requires that the upper end of the wall body is in the form of a haunch that projects outward, and the road side end is supported by this enlarged diameter portion. Secondly, a hole for inserting the pile is formed in the block body constituting the wall body, and the pile is inserted through the wall body, and then the hole is filled with the filling mortar and fixed. In Fig. 3, the ground anchor to be placed in the embankment is inserted into a narrow space obtained by combining notched portions formed on the left and right connecting end surfaces of the block body having the wall-structured block end, and the narrow space mortar is packed in the narrow space. The gist is to fill and fix.

【0009】[0009]

【作用】請求項1記載の本発明によれば、壁体上方端は
外側に張り出すハンチ形状としてこれを盛土地盤の延長
部としてこの部分で道路側端部を支承することができる
ので、従来の壁体と比べて外側に張り出す分だけ杭およ
び壁体を施工前ののり面に近づけて設置できる。その結
果、杭は短く、壁体も低いものですみ、また、盛土量も
少なくてすむ。
According to the present invention as set forth in claim 1, since the upper end of the wall body is formed into a haunch shape protruding outward, the end of the road side can be supported by this portion as an extension of the embankment. The piles and walls can be installed closer to the pre-construction slope compared to the walls of the above, as much as they project outward. As a result, the piles are short, the walls are low, and the amount of embankment is small.

【0010】請求項2記載の本発明によれば、前記作用
に加えて、杭と壁体は間詰めモルタルを介して一体化し
ており、土圧等を有効に杭や盛土内補強材に伝達するこ
とができるとともに、倒れや局部変形がしにくく、垂直
度が管理しやすい。さらに、杭に鋼材を使用してもこれ
が間詰めモルタル内に埋設されるので錆等の発生はな
い。
According to the second aspect of the present invention, in addition to the above-mentioned action, the pile and the wall body are integrated with each other through the filling mortar, and the earth pressure and the like are effectively transmitted to the pile and the reinforcement material in the embankment. In addition, the verticality is easy to manage because it is difficult to fall down or locally deform. Further, even if a steel material is used for the pile, it is buried in the filling mortar so that rust does not occur.

【0011】請求項3記載の本発明によれば、地盤アン
カーは狭間である孔内を間詰めモルタルを充填してその
膨大端部を固定することができる。
According to the third aspect of the present invention, the ground anchor can fix the bulged end by filling the space between the holes, which is narrow, with mortar.

【0012】[0012]

【実施例】以下、図面について本発明の実施例を詳細に
説明する。図1は本発明の道路の拡幅構造の1実施例を
示す縦断側面図、図2は図1のA−A線断面図であり、
前記従来例を示す図3、図4と同一構成要素には同一参
照符号を付したものである。
Embodiments of the present invention will now be described in detail with reference to the drawings. 1 is a vertical sectional side view showing an embodiment of a road widening structure of the present invention, and FIG. 2 is a sectional view taken along the line AA of FIG.
The same components as those in FIGS. 3 and 4 showing the conventional example are designated by the same reference numerals.

【0013】本発明においても、急勾配の斜面において
既設道路12がある場合に、これを拡幅して新設道路13と
する場合であり、基礎地盤1を掘孔し、根入してH鋼に
よる杭9を適宜間隔で立設し、コンクリートパネル等の
ブロック体3aを積み重ねて壁体3を形成し、この壁体
3を杭9で支持させるとともにその裏側に盛土4を施
す。
Also in the present invention, when there is an existing road 12 on a steep slope, the existing road 12 is widened to form a new road 13. The foundation ground 1 is dug into the ground, and the H is made of H steel. Piles 9 are erected at appropriate intervals, block bodies 3a such as concrete panels are stacked to form a wall body 3, and the wall bodies 3 are supported by the piles 9 and an embankment 4 is applied to the back side thereof.

【0014】そして、該盛土4内に盛土内補強材5を配
設して造成地盤を形成し、その造成地盤の地盤面に新設
道路13を施工するようにする点は前記従来例と同一であ
る。
As in the above-mentioned conventional example, the embankment reinforcing material 5 is arranged in the embankment 4 to form a ground and the new road 13 is constructed on the ground surface of the ground. is there.

【0015】本発明は、ブロック体3aは中央部に上下
方向にH鋼等の鋼材による杭9が挿通する孔2を形成
し、また、接続端面にこれらブロック体3a相互が組み
合わさった時に狭間6をなす切欠部14を形成した。
According to the present invention, the block body 3a has a hole 2 formed in the central portion in the vertical direction through which a pile 9 made of a steel material such as H steel is inserted, and when the block body 3a is interlocked with each other when the block bodies 3a are combined with each other. The notch 14 forming 6 was formed.

【0016】前記杭9は基礎地盤1を掘孔し、根入して
適宜間隔で立設する。そして、前記ブロック体3aをそ
の孔2にこの杭9を挿通するように地盤1上にから積み
重ねる。その際、該杭9は孔2の中心に位置するように
調整し、孔2内に間詰めコンクリートモルタル18を充填
して固定する。
The piles 9 are formed by making a hole in the foundation ground 1 and by embedding the foundation ground at appropriate intervals. Then, the block bodies 3a are stacked on the ground 1 so that the piles 9 are inserted into the holes 2 of the block bodies 3a. At this time, the pile 9 is adjusted so as to be located at the center of the hole 2, and the hole 2 is filled with the filling concrete mortar 18 and fixed.

【0017】このようにして1段もしくは所定段ブロッ
ク体3aを積み重ねて壁体3を順次構成したなら、壁体
3の内側に盛土4を施し、また、ブロック体3aの接続
端面に形成されている切欠部14同士で狭間6が形成さ
れ、さらに、ブロック体3aの接続端同士でこの狭間6
から外方へ連通するスリット15が形成されるので、この
狭間6内にその上方開口から地盤アンカー16の膨大端部
17を差し入れ、スリット15を介してこの地盤アンカー16
を外側に導き、そのまま下降させて盛土4中に配設す
る。
In this way, if the block bodies 3a of one stage or a predetermined stage are stacked to form the wall body 3 in sequence, the embankment 4 is applied to the inside of the wall body 3 and is formed on the connection end face of the block body 3a. A gap 6 is formed between the notches 14 and the gap 6 is formed between the connecting ends of the block body 3a.
Since the slit 15 communicating from the outside to the outside is formed, the enlarged end portion of the ground anchor 16 is formed in the narrow space 6 from its upper opening.
Insert the 17 and insert this ground anchor 16 through the slit 15.
To the outside and lower it as it is to place it in the embankment 4.

【0018】また、壁体3の上方端に位置するブロック
体3aはこの壁体3が外側に張り出すハンチ形状となる
ようにしたものである。
Further, the block body 3a located at the upper end of the wall body 3 has a haunch shape in which the wall body 3 projects outward.

【0019】前記杭9にはH鋼の他に鋼管や鉄筋カゴの
利用も考えられ、また、地盤アンカー16の膨大端部17は
湾曲板などによる定着板体を取り付けてなり、狭間6に
も間詰めコンクリートモルタル18を充填して固定する。
In addition to H steel, steel pipes and reinforced steel baskets may be used for the piles 9, and the enlarging end 17 of the ground anchor 16 is provided with a fixing plate member such as a curved plate, which is used in the space 6 as well. Fill the space with concrete mortar 18 and fix.

【0020】このようにして壁体3の裏側に盛土4を施
して既設道路12の施工個所である地盤面を拡幅し、この
拡幅された地盤面上に拡幅した新設道路13を施工する。
In this way, the embankment 4 is applied to the back side of the wall body 3 to widen the ground surface which is the construction site of the existing road 12, and the widened new road 13 is constructed on the widened ground surface.

【0021】前記のごとく壁体3の上方端は外側に張り
出すハンチ形状としてこれが盛土地盤の延長部となるの
で、道路側端部を支承することができ、従来の壁体γと
比べて外側に張り出す分だけ杭9および壁体3を施工前
ののり面7に近づけて設置できる。
As described above, the upper end of the wall 3 is formed into a haunch shape that extends outward, and this serves as an extension of the embankment, so that the end on the road side can be supported. The pile 9 and the wall 3 can be installed close to the pre-constructed slope 7 by the amount of overhang.

【0022】[0022]

【発明の効果】以上述べたように本発明の道路の拡幅構
造は、地盤上にブロック体を積み重ねてなる壁体を所定
間隔で立設した杭で固定し、また、この壁体の裏側に盛
土を施して従来の道路の施工個所である地盤面を拡幅
し、この拡幅された地盤面上に道路を施工する道路の拡
幅構造において、杭を極力施工前ののり面に近づけて設
置できる。
As described above, according to the road widening structure of the present invention, the wall bodies formed by stacking the block bodies on the ground are fixed by the piles which are erected at predetermined intervals, and the back side of the wall bodies is fixed. In the road widening structure in which the ground surface, which is a conventional road construction site, is widened by applying embankment and the road is constructed on the widened ground surface, the pile can be installed as close as possible to the slope before the construction.

【0023】その結果、杭長を短く、また、壁体の高さ
も低いものですみ、盛土量も少なくできるので、工費、
工期の節減等施工の合理化を図ることができるものであ
る。
As a result, the pile length is short, the height of the wall is low, and the amount of embankment can be reduced.
It is possible to reduce the construction period and rationalize construction.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の道路の拡幅構造の1実施例を示す縦断
側面図である。
FIG. 1 is a vertical sectional side view showing an embodiment of a road widening structure of the present invention.

【図2】図1のA−A線断面図である。FIG. 2 is a sectional view taken along the line AA of FIG.

【図3】従来例を示す縦断側面図である。FIG. 3 is a vertical sectional side view showing a conventional example.

【図4】従来例を示す横断平面図である。FIG. 4 is a cross-sectional plan view showing a conventional example.

【符号の説明】[Explanation of symbols]

1…基礎地盤 2…孔 3…壁体 3a…ブロック体 4…盛土 5…盛土内補強材 6…狭間 7…施工前ののり面 8…表層土 9…杭 10…係合溝 11…係合杆 12…既設道路 13…新設道路 14…切欠部 15…スリット 16…地盤アンカー 17…膨大端部 18…間詰めコンクリー
トモルタル
1 ... Foundation ground 2 ... Hole 3 ... Wall body 3a ... Block body 4 ... Embankment 5 ... Embankment reinforcement material 6 ... Narrow space 7 ... Pre-construction slope 8 ... Surface soil 9 ... Pile 10 ... Engagement groove 11 ... Engagement Rods 12… Existing roads 13… New roads 14… Notches 15… Slits 16… Ground anchors 17… Large ends 18… Stuffed concrete mortar

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 地盤上にブロック体を積み重ねてなる壁
体を所定間隔で立設した杭で固定し、また、この壁体の
裏側に盛土を施して従来の道路の施工個所である地盤面
を拡幅し、この拡幅された地盤面上に道路を施工する道
路の拡幅構造において、壁体上方端は外側に張り出すハ
ンチ形状とし、この拡径された部分で前記道路側端部を
支承することを特徴とした道路の拡幅構造。
1. A ground surface, which is a construction site of a conventional road, in which a wall body formed by stacking block bodies on the ground is fixed by stakes which are erected at predetermined intervals, and a backside of the wall body is filled with embankment. In the road widening structure in which the road is widened and the road is constructed on the widened ground surface, the upper end of the wall has a haunch shape protruding outward, and the road side end is supported by the widened portion. Widening structure of the road characterized by that.
【請求項2】 壁体を構成するブロック体には杭を挿通
する孔を形成して杭は壁体を挿通してからこの孔内に間
詰めモルタルを充填して固定する請求項1記載の道路の
拡幅構造。
2. The block body constituting the wall body is formed with a hole through which the pile is inserted, and the pile is inserted through the wall body, and then the mortar is filled into the hole and fixed. Road widening structure.
【請求項3】 盛土内に配設する地盤アンカーはその膨
大端部を壁体構成のブロック体の左右接続端面に形成し
た切欠部を組合わせて得られる狭間内に差し入れ、該狭
間内に間詰めモルタルを充填して固定する請求項1また
は請求項2記載の道路の拡幅構造。
3. A ground anchor to be arranged in the embankment is inserted into a narrow space obtained by combining notched portions formed on the left and right connecting end faces of a block body having a wall body with its enlarged end portion, and the ground anchor is inserted into the narrow space. The road widening structure according to claim 1 or 2, wherein the filling mortar is filled and fixed.
JP06147791A 1994-06-29 1994-06-29 Road widening structure Expired - Fee Related JP3120103B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP06147791A JP3120103B2 (en) 1994-06-29 1994-06-29 Road widening structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP06147791A JP3120103B2 (en) 1994-06-29 1994-06-29 Road widening structure

Publications (2)

Publication Number Publication Date
JPH0813405A true JPH0813405A (en) 1996-01-16
JP3120103B2 JP3120103B2 (en) 2000-12-25

Family

ID=15438294

Family Applications (1)

Application Number Title Priority Date Filing Date
JP06147791A Expired - Fee Related JP3120103B2 (en) 1994-06-29 1994-06-29 Road widening structure

Country Status (1)

Country Link
JP (1) JP3120103B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100975673B1 (en) * 2010-02-03 2010-08-17 콘비젼스 주식회사 Expanded bicycle road built around road and construction method thereof
JP2011236722A (en) * 2010-05-12 2011-11-24 Iritech Co Ltd Double retaining wall and construction method of the same
JP2011236721A (en) * 2010-05-12 2011-11-24 Iritech Co Ltd Retaining wall panel for creating slope for road or building land and method for constructing the same
KR101118611B1 (en) * 2009-09-29 2012-02-27 동아에스텍 주식회사 Road for bicycle and walker constructing on the slope of road

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101118611B1 (en) * 2009-09-29 2012-02-27 동아에스텍 주식회사 Road for bicycle and walker constructing on the slope of road
KR100975673B1 (en) * 2010-02-03 2010-08-17 콘비젼스 주식회사 Expanded bicycle road built around road and construction method thereof
JP2011236722A (en) * 2010-05-12 2011-11-24 Iritech Co Ltd Double retaining wall and construction method of the same
JP2011236721A (en) * 2010-05-12 2011-11-24 Iritech Co Ltd Retaining wall panel for creating slope for road or building land and method for constructing the same

Also Published As

Publication number Publication date
JP3120103B2 (en) 2000-12-25

Similar Documents

Publication Publication Date Title
JP3828153B2 (en) Underground structure for constructing tunnels, underground passages, underground parking lots, etc., construction method thereof, and prefabricated member for the structure
US4369004A (en) Earth retaining method and structure
JP2016515173A (en) Precast concrete retaining wall
KR102018567B1 (en) Self-supporting retaining wall structure and its construction method
US4561804A (en) Earth retaining method
JP2000265484A (en) CONSTRUCTION METHOD FOR UNDERGROUND STRUCTURE BY PCa PILE UNDERGROUND WALL
JPH0813405A (en) Widening construction of road
JP3829319B2 (en) Construction method of underground hollow structure and its underground hollow structure
JPS58120924A (en) Block for assembling retaining wall
IE902098A1 (en) Formwork for forming structural beams
KR102482690B1 (en) Bridge foundation construction method using formwork integrated PC panels
JPH0892981A (en) Earth retaining wall
JP6860895B2 (en) Retaining wall and its construction method
KR102252011B1 (en) Composite Pile Using Angled Channel With Different Strength Steels
JP2787806B2 (en) Earth retaining wall
KR101920228B1 (en) Precast vertical retaining wall and construction method therefor
JP2928903B2 (en) Embankment retaining wall
JP2750364B2 (en) Steep embankment
KR20040050137A (en) Panel Assembly A Breast Wall to increase supporting power
JP3234820B2 (en) Retaining wall construction method and construction of retaining wall for building residential land
JP2880909B2 (en) Reinforced soil structure
JPH07268867A (en) Cast-in-place concrete pile and method for fabricating the same
JP2629142B2 (en) Retaining wall construction method
JPH08199565A (en) Pile head joint construction of cast-in-place concrete pile
JPS6043495B2 (en) How to build a retaining wall

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees