JPH08133635A - Temporary machine room for jump-up elevator - Google Patents

Temporary machine room for jump-up elevator

Info

Publication number
JPH08133635A
JPH08133635A JP26926094A JP26926094A JPH08133635A JP H08133635 A JPH08133635 A JP H08133635A JP 26926094 A JP26926094 A JP 26926094A JP 26926094 A JP26926094 A JP 26926094A JP H08133635 A JPH08133635 A JP H08133635A
Authority
JP
Japan
Prior art keywords
machine room
main rope
layer
reels
reel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP26926094A
Other languages
Japanese (ja)
Inventor
Osamu Kobayashi
修 小林
Shoji Hongo
昌治 本郷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Otis Elevator Co
Original Assignee
Otis Elevator Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Otis Elevator Co filed Critical Otis Elevator Co
Priority to JP26926094A priority Critical patent/JPH08133635A/en
Publication of JPH08133635A publication Critical patent/JPH08133635A/en
Withdrawn legal-status Critical Current

Links

Abstract

PURPOSE: To install large main rope reels and feeding cable reels by forming a temporary machine room with a first layer where a winding machine and a control panel are installed and a second layer where the main rope reels and the feeding cable reels are installed. CONSTITUTION: For construction work while jumping up a temporary machine room 2 on the way of an upper floor in the process of the construction of a high-rise building, the temporary machine room 2 is formed with a first layer 6 and a second layer 7 disposed thereon. The first layer 6 is formed into a box of shape steel, on the floor surface 6a of which a finger beam 29 is mounted in an accessible manner to be engaged with a steel frame 30. The floor surface 6a is provided with a winding machine 3 for elevating up and down a working box and a control panel 8. On the other hand, the second layer 7 includes a plurality of supporting shafts 13-15 laterally mounted on which a plurality of main rope reels 16, 19 and feeding cable reels are supported in a rotatable manner.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、建設躯体の建設進行状
況に応じて移動させるようにしたジャンプアップエレベ
ーターの仮設機械室に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a temporary machine room for a jump-up elevator, which is adapted to be moved according to the progress of construction of a construction frame.

【0002】[0002]

【従来の技術】従来、巻上機等の駆動装置や制御装置が
取付けられた台からなる移動式の仮設機械室が、建築工
事が進むにつれて階床から階床へ迅速に移動(ジャン
プ)するジャンプアップエレベーターが用いられてい
る。
2. Description of the Related Art Conventionally, a movable temporary machine room, which is composed of a table to which a drive device such as a hoisting machine and a control device are attached, quickly moves (jumps) from one floor to another as construction work progresses. A jump-up elevator is used.

【0003】すなわち、仮設品と本設機器の一部を組み
合わせた仮設機械室を本設エレベーターの昇降路内に仮
設し、建設躯体の建設進行状況に応じて低層の段階から
エレベーターの運転を行う。次に鉄骨の建て方の進行に
従って、仮設機械室を数階とびにクレーンによって吊り
上げて昇降路内に仮設し、再びエレベーターの運転を行
うようにしている。
That is, a temporary machine room, which is a combination of temporary parts and a part of the main equipment, is temporarily installed in the hoistway of the main elevator, and the elevator is operated from the lower level according to the progress of the construction of the construction frame. . Next, as the construction of the steel frame progresses, the temporary machine room is lifted by a crane every few floors and temporarily installed in the hoistway, and the elevator is operated again.

【0004】[0004]

【発明が解決しようとする課題】このような従来のジャ
ンプアップエレベーターにあっては、これを高層ビルに
設置しようとすると、かごを牽引するためのメインロー
プやかごに給電するための給電ケーブルは、高くなった
昇降路に応じて長くしなければならず、必然的にこれが
巻回されたメインロープ用リールや給電ケーブル用リー
ルも大型になってしまう。ここで、このメインロープ用
リールや給電ケーブル用リールは仮設機械室に設置して
いる。したがって、大型になったメインロープ用リール
や給電ケーブル用リールは仮設機械室にはスペースの点
から設置することができなくなるという問題点が生じ
た。
In such a conventional jump-up elevator, when it is installed in a high-rise building, the main rope for pulling the car and the power feeding cable for feeding the car , It has to be lengthened according to the height of the hoistway, and inevitably the reel for the main rope and the reel for the power supply cable around which it is wound become large. Here, the reel for the main rope and the reel for the power feeding cable are installed in the temporary machine room. Therefore, there is a problem that the large-sized main rope reel and the power supply cable reel cannot be installed in the temporary machine room due to space limitations.

【0005】本発明は、大型になったメインロープ用リ
ールや給電ケーブル用リールを設置することができるよ
うにしたジャンプアップエレベーターの仮設機械室を提
供することを目的とする。
An object of the present invention is to provide a temporary machine room for a jump-up elevator in which a large-sized main rope reel and a power supply cable reel can be installed.

【0006】[0006]

【課題を解決するための手段】このような目的を達成す
るために、本発明にあっては、かごを駆動するための巻
上機およびこの巻上機の駆動を制御するための制御盤が
設置された第1層部と、かごを牽引するためのメインロ
ープが巻回されたメインロープ用リールおよびかごに給
電するための給電ケーブルが巻回された給電ケーブル用
リールが設置された第2層部とを備えた構成としてい
る。
In order to achieve such an object, according to the present invention, a hoisting machine for driving a car and a control panel for controlling the driving of the hoisting machine are provided. The installed first layer part, the main rope reel around which the main rope for pulling the car is wound, and the power cable reel around which the power cable for supplying power to the car is wound around. And a layer portion.

【0007】[0007]

【作用】メインロープ用リールおよび給電ケーブル用リ
ールは、巻上機や制御盤が設けられた第1層部とは別の
第2層部に設けられているので、このメインロープ用リ
ールおよび給電ケーブル用リールは大型のものであって
も充分に第2層部に設けることができる。
Since the reel for the main rope and the reel for the power feeding cable are provided in the second layer portion different from the first layer portion provided with the hoisting machine and the control board, the reel for the main rope and the power feeding cable are provided. Even if the cable reel is large, it can be sufficiently provided in the second layer portion.

【0008】[0008]

【実施例】以下、本発明を図面に基づいて説明する。図
1ないし図7は本発明に係るジャンプアップエレベータ
ーの仮設機械室の一実施例を示す図である。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below with reference to the drawings. 1 to 7 are views showing an embodiment of a temporary machine room of a jump-up elevator according to the present invention.

【0009】図6において、符号1は建設中の高層ビル
(例えば、全高30階)において、途中階(例えば、1
0階)まで出来上っているときの昇降路である。この昇
降路1における最上階(前記10階)には仮設機械室2
が仮設され、この仮設機械室2に設けられた巻上機3に
よって工事用のかご4を上下移動させている。これによ
り、建築中のビルの作業員の縦の交通機関としての役割
を果すことになり、前記作業員はこの交通機関を利用し
て作業する。
In FIG. 6, reference numeral 1 is a high-rise building under construction (for example, the total height is 30 floors), and an intermediate floor (for example, 1 floor).
It is a hoistway when it is completed up to the 0th floor). The temporary machine room 2 is on the top floor (10th floor) of this hoistway 1.
Is temporarily installed, and the hoisting machine 3 provided in the temporary machine room 2 vertically moves the construction car 4. As a result, the worker of the building under construction plays a role of vertical transportation, and the worker uses this transportation to work.

【0010】次に、前記作業中に、建築中の高層ビルに
おいて、昇降路がさらに上方の途中階(例えば、20
階)まで出来上ったとすると、図7に示すように仮設機
械室2をクレーンによって吊り上げて前記上方の途中階
に仮設し、前記作業を再び行う。
Next, during the above-mentioned work, in a high-rise building under construction, the hoistway is on an intermediate floor (for example, 20
If it is completed up to the first floor, the temporary machine room 2 is lifted by a crane to temporarily install it on the intermediate floor above the floor as shown in FIG. 7, and the above work is performed again.

【0011】ここで、仮設機械室2は図1に示すよう
に、第1層部6とこの上に位置する第2層部7とからな
っている。第1層部6は形鋼によって箱型に構成されて
おり、図2にも示すように、第1層部6の床面6aには
出入自在のフィンガービーム29が取り付けられ、この
フィンガービーム29は鉄骨30上に係合している。ま
た、この床面6aには工事用のかご4を上下移動させる
ための巻上機3と、この巻上機3の駆動を制御するため
の制御盤8とが設けられている。巻上機3は駆動用シー
ブ9を有しており、この駆動用シーブ9には工事用のか
ご4を牽引するためのメインロープ10が掛けられてい
る。また、第1層部6内には形鋼11が横架されてお
り、この形鋼11にはクリッピングシーブ12が回転自
在に支持されている。
Here, as shown in FIG. 1, the temporary machine room 2 is composed of a first layer portion 6 and a second layer portion 7 located thereon. The first layer portion 6 is formed of a shaped steel into a box shape, and as shown in FIG. 2, a finger beam 29 that can be moved in and out is attached to the floor surface 6a of the first layer portion 6. Are engaged on the steel frame 30. Further, a hoisting machine 3 for vertically moving the construction car 4 and a control panel 8 for controlling the drive of the hoisting machine 3 are provided on the floor surface 6a. The hoisting machine 3 has a drive sheave 9, and a main rope 10 for pulling the construction car 4 is hung on the drive sheave 9. Further, a shaped steel 11 is laid horizontally in the first layer portion 6, and a clipping sheave 12 is rotatably supported on the shaped steel 11.

【0012】第2層部7も同様に形鋼によって箱型に構
成されている。図3および図4に示すように、第2層部
7内には複数の支軸13,14,15が横架されてお
り、この支軸13,14の方にはメインロープ用リール
16,17,18,19,20が回転自在に支持されて
いる。また、図5にも示すように支軸14の方には給電
ケーブル用リール21,22が回転自在に支持されてお
り、この給電ケーブル用リール21,22に巻回された
給電ケーブル23(図1に示す)は、工事用のかご4内
のかご操作盤等と接続されている。メインロープ用リー
ル16,17,18,19,20および給電ケーブル用
リール21,22は、巻上機3や制御盤8が設けられた
第1層部6とは別の第2層部7に設けられているので、
このメインロープ用リール16,17,18,19,2
0および給電ケーブル用リール21,22は大型のもの
であっても充分に第2層部7に設けることができる。
The second layer portion 7 is also made of shaped steel into a box shape. As shown in FIG. 3 and FIG. 4, a plurality of support shafts 13, 14, 15 are laterally installed in the second layer portion 7, and the support shafts 13, 14 are connected to the main rope reel 16, 17, 18, 19, and 20 are rotatably supported. Further, as shown in FIG. 5, the power feeding cable reels 21 and 22 are rotatably supported on the support shaft 14, and the power feeding cable 23 wound around the power feeding cable reels 21 and 22 (see FIG. 1) is connected to a car operation panel or the like in the car 4 for construction. The main rope reels 16, 17, 18, 19, 20 and the power supply cable reels 21, 22 are provided in a second layer portion 7 different from the first layer portion 6 provided with the hoisting machine 3 and the control panel 8. Because it is provided,
This main rope reel 16, 17, 18, 19, 2
0 and the feeding cable reels 21 and 22 can be sufficiently provided in the second layer portion 7 even if they are large in size.

【0013】ここで、リール16,17,18,19,
20から繰り出されたメインロープ10は、図6に示す
ようにグリッピングシーブ12に巻き付けられた後工事
用のかご4のシーブ24に掛けられ、さらに巻上機3の
駆動シーブ9に掛けられ、さらにカウンターウエイト2
5のシーブ26に掛けられている。このロープ10の一
端側はロープクランプ27に押え付けられて第1層部6
に固定され、他端は第1層部6の止着部28に止着され
ている。なお、工事用のかご4とカウンターウエイト2
5を上下移動させる巻上機3は、動滑車の原理により、
かごおよびカウンターウエイトにロープを直に取り付け
た場合に比べて動力が半分となる。
Here, the reels 16, 17, 18, 19,
As shown in FIG. 6, the main rope 10 fed out from 20 is hung on the sheave 24 of the car 4 for construction after being wrapped around the gripping sheave 12, and further hung on the drive sheave 9 of the hoisting machine 3. Counterweight 2
It is hung on the sheave 26 of 5. One end side of the rope 10 is pressed by the rope clamp 27 so that the first layer portion 6
, And the other end is fixed to the fixing portion 28 of the first layer portion 6. In addition, construction basket 4 and counterweight 2
The hoisting machine 3 that moves the 5 up and down, by the principle of the moving pulley,
The power is half compared to the case where the rope is directly attached to the car and the counterweight.

【0014】[0014]

【発明の効果】以上説明したように、本発明によれば、
メインロープ用リールおよび給電ケーブル用リールを第
2層部に設けるようにしたことにより、これらのリール
が大型化した高層ビル用のものであっても仮設機械室に
設けることができる。また、巻上機上部にリールを設置
することによりメインロープの繰り出しをしやすくする
ことができ、さらに巻上機の上部の保護にも役立ってい
る。
As described above, according to the present invention,
Since the reel for the main rope and the reel for the power feeding cable are provided in the second layer portion, even if these reels are for a high-rise building with a large size, they can be provided in the temporary machine room. Also, by installing a reel on the upper part of the hoisting machine, it is possible to easily feed the main rope, and it is also useful for protecting the upper part of the hoisting machine.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係るジャンプアップエレベーターの仮
設機械室の一実施例を示す正面図
FIG. 1 is a front view showing an embodiment of a temporary machine room of a jump-up elevator according to the present invention.

【図2】第1層部の平面図FIG. 2 is a plan view of a first layer portion.

【図3】図1中A−A線断面図FIG. 3 is a sectional view taken along line AA in FIG.

【図4】第2層部の平面図FIG. 4 is a plan view of a second layer portion.

【図5】図1中B−B線断面図5 is a sectional view taken along line BB in FIG.

【図6】このジャンプアップエレベーターの概略全体図[Fig. 6] Schematic overview of this jump-up elevator

【図7】このジャンプアップエレベーターの概略全体図[Figure 7] Schematic overview of this jump-up elevator

【符号の説明】[Explanation of symbols]

1…昇降路 2…仮設機械室 3…巻上機 8…制御盤 10…メインロープ 16,17,18,19,20…メインロープ用シーブ 21,22…給電ケーブル用リール 23…給電ケーブル 1 ... Hoistway 2 ... Temporary machine room 3 ... Hoisting machine 8 ... Control panel 10 ... Main rope 16, 17, 18, 19, 20 ... Main rope sheave 21, 22 ... Feed cable reel 23 ... Feed cable

───────────────────────────────────────────────────── フロントページの続き (72)発明者 本郷 昌治 神奈川県川崎市高津区坂戸3−2−1 日 本オーチス・エレベータ株式会社 オーチ ス技術研究所内 ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Shoji Hongo 3-2-1 Sakado, Takatsu-ku, Kawasaki-shi, Kanagawa Japan Otis Elevator Co., Ltd.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 かごを駆動するための巻上機およびこの
巻上機の駆動を制御するための制御盤が設置された第1
層部と、かごを牽引するためのメインロープが巻回され
たメインロープ用リールおよびかごに給電するための給
電ケーブルが巻回された給電ケーブル用リールが設置さ
れた第2層部とを備えたことを特徴とするジャンプアッ
プエレベーターの仮設機械室。
1. A first hoisting machine provided with a hoisting machine for driving a car and a control panel for controlling the driving of the hoisting machine.
And a second layer portion on which a reel for a main rope around which a main rope for pulling a car is wound and a reel for a power feeding cable around which a power feeding cable for feeding power to a car is wound are installed. The temporary machine room of the jump-up elevator, which is characterized by that.
JP26926094A 1994-11-02 1994-11-02 Temporary machine room for jump-up elevator Withdrawn JPH08133635A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP26926094A JPH08133635A (en) 1994-11-02 1994-11-02 Temporary machine room for jump-up elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP26926094A JPH08133635A (en) 1994-11-02 1994-11-02 Temporary machine room for jump-up elevator

Publications (1)

Publication Number Publication Date
JPH08133635A true JPH08133635A (en) 1996-05-28

Family

ID=17469879

Family Applications (1)

Application Number Title Priority Date Filing Date
JP26926094A Withdrawn JPH08133635A (en) 1994-11-02 1994-11-02 Temporary machine room for jump-up elevator

Country Status (1)

Country Link
JP (1) JPH08133635A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001287881A (en) * 2000-04-04 2001-10-16 Hitachi Building Systems Co Ltd Elevator for construction and its installation method
CN1305749C (en) * 2003-09-04 2007-03-21 三菱电机株式会社 Rope feeding device for construction elevator
CN101920891A (en) * 2010-08-23 2010-12-22 康力电梯股份有限公司 Carriage bracket for household lift
JP2013216483A (en) * 2012-04-12 2013-10-24 Toshiba Elevator Co Ltd Lifting height extending construction method for elevator for construction
JP2013220859A (en) * 2012-04-12 2013-10-28 Toshiba Elevator Co Ltd Head extension method for elevator for construction
CN111847202A (en) * 2019-04-25 2020-10-30 株式会社日立制作所 Elevator for construction

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001287881A (en) * 2000-04-04 2001-10-16 Hitachi Building Systems Co Ltd Elevator for construction and its installation method
CN1305749C (en) * 2003-09-04 2007-03-21 三菱电机株式会社 Rope feeding device for construction elevator
CN101920891A (en) * 2010-08-23 2010-12-22 康力电梯股份有限公司 Carriage bracket for household lift
JP2013216483A (en) * 2012-04-12 2013-10-24 Toshiba Elevator Co Ltd Lifting height extending construction method for elevator for construction
JP2013220859A (en) * 2012-04-12 2013-10-28 Toshiba Elevator Co Ltd Head extension method for elevator for construction
CN111847202A (en) * 2019-04-25 2020-10-30 株式会社日立制作所 Elevator for construction
CN111847202B (en) * 2019-04-25 2022-05-06 株式会社日立制作所 Elevator for construction

Similar Documents

Publication Publication Date Title
EP1154947B1 (en) Elevator system
US8602175B2 (en) Method and appliance for collecting rope
JP5951104B2 (en) Elevator repair method
JP6675225B2 (en) Hoisting device
JP2013220859A (en) Head extension method for elevator for construction
JPH03264482A (en) Method for installing elevator
JPH08133635A (en) Temporary machine room for jump-up elevator
WO2020044444A1 (en) Construction elevator with extendable hoisting height
WO2001064572A1 (en) Jump-lift and method for lifting a machine room
JPH08133636A (en) Temporary machine room for jump-up elevator
JPH08133637A (en) Rope gripper for temporary machine room for jump-up elevator
JP4108454B2 (en) Elevator equipment
JP2001114484A (en) Construction method for suspending elevator main rope
JPH08133634A (en) Jumping method for jump-up elevator
JPH09278325A (en) Construction work elevator lifting method and construction work elevator device
JP5538470B2 (en) Lift extension method for construction elevators
JP2011020805A (en) Rope hooking method of elevator and rope hooking tool used therefor
JP2005015071A (en) Main rope replacement device of elevator
WO2003104130A1 (en) Elevator
JPH08133638A (en) Temporary machine house for jump-up elevator
JPH05262475A (en) Installation method of elevator
JP5930842B2 (en) Elevator installation method and installation jig
JPH0923553A (en) Device and method for winding power cable elevator
JP6950458B2 (en) Elevator weight removal device and weight removal method
JPH10218528A (en) Hoisting device used in elevator shaft for elevator part

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20020115