JPH0739916Y2 - Ventilator for dam waiter for high rise building - Google Patents

Ventilator for dam waiter for high rise building

Info

Publication number
JPH0739916Y2
JPH0739916Y2 JP5068390U JP5068390U JPH0739916Y2 JP H0739916 Y2 JPH0739916 Y2 JP H0739916Y2 JP 5068390 U JP5068390 U JP 5068390U JP 5068390 U JP5068390 U JP 5068390U JP H0739916 Y2 JPH0739916 Y2 JP H0739916Y2
Authority
JP
Japan
Prior art keywords
garbage
cage
hoistway
waste
intake pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP5068390U
Other languages
Japanese (ja)
Other versions
JPH049872U (en
Inventor
晃 川瀬
Original Assignee
石川島播磨重工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 石川島播磨重工業株式会社 filed Critical 石川島播磨重工業株式会社
Priority to JP5068390U priority Critical patent/JPH0739916Y2/en
Publication of JPH049872U publication Critical patent/JPH049872U/ja
Application granted granted Critical
Publication of JPH0739916Y2 publication Critical patent/JPH0739916Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Refuse Collection And Transfer (AREA)
  • Types And Forms Of Lifts (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Description

【考案の詳細な説明】 「産業上の利用分野」 本考案は、高層建物用ダムウエイターの換気装置に関す
るものである。
[Detailed Description of the Invention] [Industrial Application Field] The present invention relates to a ventilation device for a dam weighter for a high-rise building.

「従来の技術」 従来、高層建物におけるごみ処理施設の例として、ダス
トシュートや、特開昭59-149201号公報に記載されるよ
うなダムウエイターが考えられている。
"Prior Art" Conventionally, a dust chute and a dam weighter as described in JP-A-59-149201 have been considered as an example of a waste treatment facility in a high-rise building.

ダムウエイターによるごみ処理施設の例を説明すると、
ビル(高層建物)の各階を上下に貫く昇降路の中に、巻
き上げ装置のワイヤによって吊持されるごみケージが昇
降可能に設けられ、昇降路の各階の壁部にごみ投入口が
設けられ、さらに、昇降路の下部にごみケージの中のご
みを一時的に貯留するごみ貯留装置が設けられる構造と
されている。
Explaining an example of a waste treatment facility by a dam waiter,
In the hoistway that penetrates each floor of the building (high-rise building) up and down, a garbage cage suspended by the wire of the hoisting device is provided so that it can be raised and lowered, and a garbage entrance is provided on the wall of each floor of the hoistway. Furthermore, a structure is provided in the lower part of the hoistway to provide a waste storage device that temporarily stores the waste in the waste cage.

そして、ごみを投入する場合には、ごみケージをごみ投
棄者のいる階に呼び出し、ごみケージの到着後に、ごみ
をごみ投入口からごみケージの中に投入することによ
り、ごみ投棄が可能となるものである。なお、ごみケー
ジは、呼び出しに応じて各階の間を移動し、内部のごみ
が満杯状態となった場合に、昇降路を下降してごみ貯留
装置に内部のごみを排出するようになっている。
Then, when throwing in the garbage, call the garbage cage to the floor where the garbage dumper is located, and after the garbage cage arrives, throw the garbage into the garbage cage through the garbage loading port, so that the garbage can be dumped. It is a thing. In addition, the garbage cage moves between floors in response to a call, and when the inside garbage becomes full, it descends the hoistway and discharges the inside garbage to the waste storage device. .

「考案が解決しようとする課題」 しかし、上述したダムウエイター式のごみ処理施設であ
ると、ごみケージの上下移動にともなって、その移動前
方の空気が圧縮されることにより、昇降路内の臭気を有
する空気が、ごみ投入口等の隙間から居住区である各階
に漏出して、悪臭を拡散させる恐れが残されている。
"Problems to be solved by the device" However, in the above-mentioned dam waiter-type waste treatment facility, the air in front of the waste cage is compressed as the waste cage moves up and down, which causes odors in the hoistway. There is a risk that air containing air will leak to the floors, which are living quarters, from the gaps such as the dust entrance, and spread the bad odor.

本考案は、上記事情に鑑みてなされたもので、ダムウエ
イター式ごみ処理施設の停止時及び運転時の悪臭拡散を
防止するとともに、悪臭拡散防止のための施設の作動を
最小限に止どめて省エネルギー化を図ることを目的とす
るものである。
The present invention has been made in view of the above circumstances, and prevents the malodor from spreading when the dam waiter type waste treatment facility is stopped or operating, and also minimizes the operation of the facility to prevent the malodor from spreading. The purpose is to save energy.

「課題を解決するための手段」 本考案は、これらの課題を解決するための手段を提案し
ており、ビルの各階を上下に貫く昇降路の中に、巻き上
げ装置のワイヤによって吊持されるごみケージが昇降可
能に設けられてなる高層建物用ダムウエイターに設置さ
れるものであり、前記昇降路の上部位置及び下部位置に
連通状態に配設される上部吸気管及び下部吸気管と、該
両吸気管に接続状態に設けられ昇降路の空気を吸引排出
する排気手段と、前記巻き上げ装置の昇降作動信号に同
期して排気手段を選択作動させる制御手段とを具備する
構成の高層建物用ダムウエイターの換気装置としてい
る。
"Means for Solving Problems" The present invention proposes means for solving these problems, and is suspended by a wire of a hoisting device in a hoistway that vertically penetrates each floor of a building. A dust cage is installed in a high-rise building dam weighter that can be raised and lowered, and an upper intake pipe and a lower intake pipe are provided in communication with the upper position and the lower position of the hoistway, and Dam for a high-rise building, which is connected to both intake pipes and has exhaust means for sucking and discharging air in the hoistway and control means for selectively operating the exhaust means in synchronization with the hoisting operation signal of the hoisting device. It is used as a waiter ventilation system.

「作用」 ダムウエイターが非動作状態となっている場合は、昇降
路の内部の煙突効果による弱い空気上昇流が生じて、ビ
ル外へ空気を排出することにより、居住区への悪臭拡散
が行なわれない。
[Action] When the dam waiter is inactive, a weak air upward flow occurs due to the chimney effect inside the hoistway, and the air is discharged to the outside of the building to spread the foul odor to the living area. I can't.

一方、ダムウエイターが作動状態となると、その昇降作
動信号によって排気手段が選択作動させられ、ごみケー
ジの移動前方に位置している吸気管によって、昇降路内
部の空気を吸引しかつ外部に排出する。このため、ごみ
ケージの上下移動にともなって、その移動前方の空気が
圧縮されて圧力が高くなることが妨げられ、昇降路内部
の圧力が居住区より低く維持されるものとなり、居住区
への悪臭拡散が行なわれない。
On the other hand, when the dam waiter is activated, the evacuation operation signal selectively activates the exhaust means, and the intake pipe located in front of the movement of the dust cage sucks air in the hoistway and discharges it outside. . For this reason, as the garbage cage moves up and down, the air in front of the movement is prevented from being compressed and the pressure is prevented from increasing, and the pressure inside the hoistway is kept lower than in the living area. No foul odor spread.

なお、ごみケージの移動方向の背部に位置する昇降路に
おいては、ごみケージの移動によって減圧雰囲気とな
り、居住区に悪影響を及ぼすことがなく、ごみケージが
停止すると、当初の状態に戻ることになる。
In the hoistway located at the back of the moving direction of the garbage cage, moving the garbage cage creates a decompressed atmosphere and does not adversely affect the living area.When the garbage cage stops, it will return to the initial state. .

「実施例」 以下、本考案に係る高層建物用ダムウエイターの換気装
置の一実施例を第1図に基づいて説明する。
[Embodiment] An embodiment of the ventilation device for a dam weighter for a high-rise building according to the present invention will be described below with reference to FIG.

各図において、符号1はビル(高層建物)、2は昇降
路、3はダムウエイター、4は巻き上げ装置、5はワイ
ヤ、6はごみケージ、7は換気装置、8は上部吸気管、
9は下部吸気管、10は排気手段、11は制御手段、12はご
み収納用コンテナ、13はコンテナ出入り口、14は開閉扉
(防火扉)、15はごみ投入部、16はごみ移載装置、17は
コンテナ反転装置、18は貯留排出設備、19はごみ収集
車、20はコンベア部である。
In each drawing, reference numeral 1 is a building (high-rise building), 2 is a hoistway, 3 is a dam weighter, 4 is a hoisting device, 5 is a wire, 6 is a garbage cage, 7 is a ventilation device, 8 is an upper intake pipe,
9 is a lower intake pipe, 10 is an exhaust means, 11 is a control means, 12 is a container for storing dust, 13 is a container entrance / exit, 14 is an opening / closing door (fire door), 15 is a dust input part, 16 is a dust transfer device, 17 is a container reversing device, 18 is a storage and discharge facility, 19 is a garbage truck, and 20 is a conveyor section.

前記昇降路2は、その横断面積が例えば2.5m2程度の大
きさを有するものとされ、ごみケージ6は、昇降路2の
内部と間隔を空けて自由に昇降し得る程度の大きさとさ
れ、巻き上げ装置4に対して吊持状態に取り付けられ
る。
The hoistway 2 has a cross-sectional area of, for example, about 2.5 m 2 , and the garbage cage 6 has a size such that it can be freely hoisted at a distance from the inside of the hoistway 2. It is attached to the hoisting device 4 in a suspended state.

前記換気装置7の詳細について説明すると、上部吸気管
8及び下部吸気管9は、前記昇降路2の上部位置及び下
部位置に対して連通状態に配設されるとともに、その途
中に切り換え弁A・B・C・Dが介在させられ、上部吸
気管8及び下部吸気管9と排気手段10との間には、活性
炭吸着機能等を有する脱臭装置21が挿入されている。
Explaining the details of the ventilation device 7, the upper intake pipe 8 and the lower intake pipe 9 are arranged in communication with the upper position and the lower position of the hoistway 2, and the switching valve A A deodorizing device 21 having an activated carbon adsorption function or the like is inserted between the upper intake pipe 8 and the lower intake pipe 9 and the exhaust means 10 with B, C and D interposed.

前記排気手段10は、上部吸気管8及び下部吸気管9に対
して接続状態に設けられ、その吸気排気量は、ごみケー
ジ6の移動時の単位時間当たりの空気移動量よりも大き
な排気量を具備する例えばブロアであり、ごみケージ6
が毎分60mの速度で移動しかつ昇降路2の横断面積が2.5
m2である場合を例にとると、毎分150m3の程度の吸引排
気量を有するものが適用される。
The exhaust means 10 is provided in a connected state with respect to the upper intake pipe 8 and the lower intake pipe 9, and its intake exhaust amount is larger than the air transfer amount per unit time when the dust cage 6 is moved. It is equipped with, for example, a blower, and a garbage cage 6
Is moving at a speed of 60 m / min and the cross-sectional area of hoistway 2 is 2.5
Taking the case of m 2 as an example, a device having an intake / exhaust volume of about 150 m 3 per minute is applied.

前記制御手段11は、ごみケージ6の呼び出し指令に基づ
いて巻き上げ装置4の昇降作動を行なうとともに、この
昇降作動信号に同期する信号を信号ケーブル22によって
排気手段10に伝達し、ごみケージ6が上方に移動する場
合には、移動前方位置となる上部吸気管8に接続された
方の排気手段10を作動させ、ごみケージ6が下方に移動
する場合には、下部吸気管9に接続された方の排気手段
10を作動させるものとしている。なお、第1図にあっ
て、下方の排気手段10の信号ケーブル22の記載は、省略
されている。
The control means 11 raises and lowers the hoisting device 4 on the basis of an instruction to call the dust cage 6, and transmits a signal synchronized with this raising and lowering operation signal to the exhaust means 10 by the signal cable 22 so that the dust cage 6 moves upward. When the waste cage 6 moves to the front, the exhaust means 10 connected to the upper intake pipe 8 at the forward position is operated, and when the waste cage 6 moves downward, the one connected to the lower intake pipe 9. Exhaust means
It is supposed to activate 10. Incidentally, in FIG. 1, the signal cable 22 of the lower exhaust means 10 is not shown.

そして、第1図の下部に示す排気手段10にあっては、コ
ンテナ反転装置17の近傍と、貯留排出設備18からごみ収
集車19へごみを移載するための搭載コンベア23の近傍と
に、下部吸気管9と接続状態の吸気フード24がそれぞれ
配設される。
In the exhaust means 10 shown in the lower part of FIG. 1, in the vicinity of the container reversing device 17 and in the vicinity of the loading conveyor 23 for transferring the waste from the storage and discharge facility 18 to the waste collection vehicle 19, An intake hood 24 connected to the lower intake pipe 9 is provided.

以下、ダムウエイター3を使用したごみの収集及び換気
装置8による換気について説明する。
Hereinafter, collection of dust using the dam weighter 3 and ventilation by the ventilation device 8 will be described.

ダムウエイター3が非作動状態となっている場合は、昇
降路2の内部と大気との温度差に基づいて、煙突効果に
よる弱い空気上昇流が生じて、昇降路2の上部に適宜に
設けられる図示を略した小さな換気口等を経由して、昇
降路2の空気がビル1の外に排出されるために、各階の
居住区への悪臭拡散が行なわれることなく、居住環境が
維持される。
When the dam waiter 3 is in a non-operating state, a weak air upflow due to the chimney effect is generated based on the temperature difference between the inside of the hoistway 2 and the atmosphere, and is appropriately provided above the hoistway 2. Since the air in the hoistway 2 is discharged to the outside of the building 1 via a small ventilation port (not shown), the living environment is maintained without the malodorous spread to the living areas on each floor. .

一般的なごみの投棄は、各階に設置されたごみ投入部15
から、ダムウエイター3の位置とは無関係に、ごみ収納
用コンテナ12の中にごみを投入することによって行なわ
れる。
General waste dumping is done by the waste dumper 15 installed on each floor.
Therefore, regardless of the position of the dam waiter 3, the waste is put in the waste container 12 to carry out the waste.

そして、ごみ収納用コンテナ12が満杯状態となった場合
等において、ごみ回収を必要とする階にごみケージ6が
呼び出されると、ダムウエイター3が作動状態となるこ
とによって、ごみケージ6の昇降作動信号に同期して排
気手段10が選択作動させられる。例えばごみケージ6が
上方に移動させられる場合であると、切り換え弁Dが開
放状態とされ、第1図の上方の換気装置7の排気手段10
が作動状態となって、上部吸気管8により昇降路2の内
部上方の空気が吸引され、脱臭装置21により悪臭を除去
した状態で大気中に排出される。
Then, when the garbage storage container 12 is full, when the garbage cage 6 is called up on a floor requiring garbage collection, the dam waiter 3 is activated, and the garbage cage 6 is moved up and down. The exhaust means 10 is selectively operated in synchronization with the signal. For example, when the dust cage 6 is moved upward, the switching valve D is opened and the exhaust means 10 of the upper ventilation device 7 in FIG. 1 is opened.
Is in an operating state, the air above the inside of the hoistway 2 is sucked by the upper intake pipe 8, and is discharged into the atmosphere in a state where the deodorizing device 21 removes a bad odor.

このため、ごみケージ6の上方への移動にともなって、
ごみケージ6よりも上方に位置する昇降路2の内部空気
が圧縮されるが、換気装置7による排気量がごみケージ
6による空気圧縮量を上回る条件が満たされていると、
昇降路2の内部圧力が居住区より低く維持されるものと
なり、居住区への悪臭拡散が行なわれない。
Therefore, with the upward movement of the garbage cage 6,
Although the internal air of the hoistway 2 located above the garbage cage 6 is compressed, if the condition that the exhaust amount by the ventilation device 7 exceeds the compressed air amount by the garbage cage 6 is satisfied,
The internal pressure of the hoistway 2 is kept lower than that of the living area, and the malodor is not diffused into the living area.

なお、換気装置7の排気手段10の能力(吸気排気量)
は、ごみケージ6が移動する場合のその回りの空気の逆
流等を考慮した圧縮空気量より大きくなるように設定す
ればよい。
The capacity of the exhaust means 10 of the ventilation device 7 (intake and exhaust volume)
Should be set to be larger than the compressed air amount in consideration of the backflow of air around the dust cage 6 when it moves.

一方、ごみケージ6の移動時において、移動方向の背部
に位置する昇降路2の内部は減圧雰囲気となるが、コン
テナ出入り口13等から居住区の空気を取り入れるものと
なるために、居住区に臭気を放出する等の悪影響を及ぼ
すことがなく、ごみケージ6が停止状態となると、排気
手段10が停止させられるために、自然に当初の状態に戻
ることになる。
On the other hand, when the garbage cage 6 is moved, the inside of the hoistway 2 located on the back side in the moving direction is in a decompressed atmosphere, but since the air in the living area is taken in from the container entrance 13 etc. When the dust cage 6 is brought into a stopped state without adversely affecting it, the exhaust means 10 is stopped, so that the original state is naturally restored.

そして、ごみケージ6が、呼び出し階のコンテナ出入り
口13に位置合わせされた状態で停止すると、開閉扉14が
引き上げられてコンテナ出入り口13が開放され、その
後、ごみ移載装置16の作動によって、第1図の鎖線で示
すように、ごみ収納用コンテナ12がごみケージ6の中に
収容された状態となり、コンテナ出入り口13が開閉扉14
によって閉塞される。
Then, when the garbage cage 6 is stopped in a state of being aligned with the container entrance / exit 13 of the calling floor, the opening / closing door 14 is pulled up to open the container entrance / exit 13, and thereafter, by the operation of the garbage transfer device 16, the first As shown by the chain line in the figure, the waste container 12 is stored in the waste cage 6, and the container entrance / exit 13 is opened / closed by a door 14.
Is blocked by.

次いで、ダムウエイター3の作動により、ごみ収納用コ
ンテナ12を収容したごみケージ6を、昇降路2の下部ま
で下降させる。この場合においては、第1図の下方の換
気装置7の排気手段10が作動状態となって、前述の切り
換え弁Dが閉塞状態、切り換え弁Aが開放状態とされ、
下部吸気管9によって昇降路2の内部下部の空気が吸引
されて、脱臭装置21により悪臭を除去した状態で大気中
に排出される。
Next, by operating the dam waiter 3, the dust cage 6 containing the dust container 12 is lowered to the lower part of the hoistway 2. In this case, the exhaust means 10 of the lower ventilation device 7 in FIG. 1 is in the operating state, the switching valve D is in the closed state, and the switching valve A is in the open state,
The air in the lower part of the inside of the hoistway 2 is sucked by the lower intake pipe 9, and is discharged into the atmosphere with the odor removed by the deodorizing device 21.

昇降路2の最下位までごみケージ6を降ろした状態にお
いては、切り換え弁Aが閉塞状態に戻されるとともに、
ごみ収納用コンテナ12がコンベア部20の上に引き出され
て、ごみ収納用コンテナ12の中のごみのみが、コンテナ
反転装置17を介して貯留排出設備18に移載され、ごみの
移載によって[空]となった状態のごみ収納用コンテナ
12は、再び、ごみケージ6に戻されて収容される。この
場合にあっては、ごみケージ6の昇降作動が停止してい
る場合においても、切り換え弁Bが開放状態とされ、吸
気フード24によってコンテナ反転装置17の近傍の空気が
吸引されて悪臭の拡散防止がなされる。
In the state where the garbage cage 6 is lowered to the lowest position of the hoistway 2, the switching valve A is returned to the closed state, and
The waste container 12 is pulled out onto the conveyor section 20, and only the waste in the waste container 12 is transferred to the storage and discharge facility 18 via the container reversing device 17, and by the transfer of the waste [ Empty container for garbage storage
12 is returned to the waste cage 6 again and is stored therein. In this case, even when the raising / lowering operation of the dust cage 6 is stopped, the switching valve B is opened, and the air in the vicinity of the container reversing device 17 is sucked by the intake hood 24 to diffuse the malodor. Prevention is made.

また、貯留排出設備18からごみ収集車19へ搭載コンベア
23を経由してごみを移載する場合においては、切り換え
弁Cが開放状態とされ、吸気フード24によって移載位置
近傍の空気が吸引されて悪臭の拡散防止がなされる。
In addition, a conveyor that is installed from the storage and discharge facility 18 to the garbage truck 19
When the dust is transferred via 23, the switching valve C is opened and the intake hood 24 sucks the air in the vicinity of the transfer position to prevent the malodor from spreading.

そして、[空]のごみ収納用コンテナ12を収容したごみ
ケージ6は、ダムウエイター3を作動させることによ
り、任意の階まで戻される。この場合は、ごみケージ6
を上昇させることによって行なわれ、第1図の上部の換
気装置7が前述に準じて作動させられ、第1図の下部の
換気装置7と並行運転が可能である。
Then, the garbage cage 6 accommodating the [empty] garbage container 12 is returned to an arbitrary floor by operating the dam waiter 3. In this case, the garbage cage 6
, The upper ventilator 7 in FIG. 1 is operated in the same manner as described above, and parallel operation with the lower ventilator 7 in FIG. 1 is possible.

なお、ごみケージ6の下方への移動と、コンテナ反転装
置17、貯留排出設備18及びごみ収集車19の作動が重複す
る場合には、切り換え弁Aの開放による吸気の方を優先
させるものとする。
When the downward movement of the waste cage 6 and the operation of the container reversing device 17, the storage and discharge facility 18, and the waste collection vehicle 19 overlap, the intake by opening the switching valve A is prioritized. .

一方、火災発生に基づいて、火災警報が発せられた場合
においては、切り換え弁A・Dを閉塞状態として、昇降
路2を遮蔽することにより対応がなされる。
On the other hand, when a fire alarm is issued based on the occurrence of a fire, the switching valves A and D are closed and the hoistway 2 is shielded.

「考案の効果」 以上説明したように、本考案に係る高層建物用ダムウエ
イターの換気装置によると、以下のような優れた効果を
奏する。
[Advantages of Device] As described above, the ventilation device for a dam weighter for a high-rise building according to the present invention has the following excellent effects.

(1) 昇降路に上部吸気管及び下部吸気管が接続さ
れ、巻き上げ装置の昇降作動に同期して排気手段を選択
作動させるものとしているから、ごみケージの上下移動
にともなう圧縮空気の発生を抑制して、昇降路内の臭気
を有する空気が、ごみ投入口等の隙間から居住区である
各階に漏出することによる悪臭の拡散を防止して、居住
環境を乱すことがない。
(1) Since the upper intake pipe and the lower intake pipe are connected to the hoistway and the exhaust means is selectively operated in synchronization with the lifting operation of the hoisting device, the generation of compressed air accompanying the vertical movement of the dust cage is suppressed. Then, the odorous air in the hoistway is prevented from diffusing a bad odor due to leaking from the gap such as the dust entrance to each floor which is a living area, and does not disturb the living environment.

(2) ごみケージの昇降と換気装置の作動とが連動す
るために、必要な時間だけ悪臭拡散防止のための設備を
作動させ、省エネルギー化及び長寿命化を図ることがで
きる。
(2) Since the raising and lowering of the garbage cage and the operation of the ventilation device are interlocked with each other, it is possible to operate the equipment for preventing the malodorous diffusion for a required time to save energy and prolong the service life.

【図面の簡単な説明】[Brief description of drawings]

第1図は本考案に係る高層建物用ダムウエイターの換気
装置の一実施例を示す正断面図である。 1……ビル(高層建物)、2……昇降路、3……ダムウ
エイター、4……巻き上げ装置、5……ワイヤ、6……
ごみケージ、7……換気装置、8……上部吸気管、9…
…下部吸気管、10……排気手段、11……制御手段、12…
…ごみ収納用コンテナ、13……コンテナ出入り口、14…
…開閉扉(防火扉)、15……ごみ投入部、16……ごみ移
載装置、17……コンテナ反転装置、18……貯留排出設
備、19……ごみ収集車、20……コンベア部、21……脱臭
装置、22……信号ケーブル、23……搭載コンベア、24…
…吸気フード、A・B・C・D……切り換え弁。
FIG. 1 is a front sectional view showing an embodiment of a ventilation system for a dam weighter for a high-rise building according to the present invention. 1 ... Building (high-rise building), 2 ... Hoistway, 3 ... Damweight, 4 ... Winding device, 5 ... Wire, 6 ...
Garbage cage, 7 ... Ventilator, 8 ... Upper intake pipe, 9 ...
… Lower intake pipe, 10 …… Exhaust means, 11 …… Control means, 12…
… Garbage storage container, 13… Container entrance, 14…
… Opening / closing door (fire door), 15 …… Gas input part, 16 …… Gas transfer device, 17 …… Container reversing device, 18 …… Storage and discharge equipment, 19 …… Garbage collection vehicle, 20 …… Conveyor part, 21 ... Deodorizing device, 22 ... Signal cable, 23 ... Equipped conveyor, 24 ...
… Intake hood, A ・ B ・ C ・ D …… Switching valve.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】ビルの各階を上下に貫く昇降路の中に、巻
き上げ装置のワイヤによって吊持されるごみケージが昇
降可能に設けられてなる高層建物用ダムウエイターであ
って、前記昇降路の上部位置及び下部位置に連通状態に
配設される上部吸気管及び下部吸気管と、該両吸気管に
接続状態に設けられ昇降路の空気を吸引排出する排気手
段と、前記巻き上げ装置の昇降作動信号に同期して排気
手段を選択作動させる制御手段とを具備することを特徴
とする高層建物用ダムウエイターの換気装置。
1. A dam weighter for a high-rise building, comprising a hoisting device provided with a garbage cage suspended by wires of a hoisting device in a hoistway vertically extending through each floor of a building. An upper intake pipe and a lower intake pipe, which are arranged in communication with each other at an upper position and a lower position, an exhaust means connected to the both intake pipes for sucking and discharging air in a hoistway, and a hoisting operation of the hoisting device. And a control means for selectively operating the exhaust means in synchronism with a signal.
JP5068390U 1990-05-15 1990-05-15 Ventilator for dam waiter for high rise building Expired - Lifetime JPH0739916Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5068390U JPH0739916Y2 (en) 1990-05-15 1990-05-15 Ventilator for dam waiter for high rise building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5068390U JPH0739916Y2 (en) 1990-05-15 1990-05-15 Ventilator for dam waiter for high rise building

Publications (2)

Publication Number Publication Date
JPH049872U JPH049872U (en) 1992-01-28
JPH0739916Y2 true JPH0739916Y2 (en) 1995-09-13

Family

ID=31569444

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5068390U Expired - Lifetime JPH0739916Y2 (en) 1990-05-15 1990-05-15 Ventilator for dam waiter for high rise building

Country Status (1)

Country Link
JP (1) JPH0739916Y2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101654506B1 (en) * 2016-03-23 2016-09-05 서순교 Waste discharge apparatus and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101654506B1 (en) * 2016-03-23 2016-09-05 서순교 Waste discharge apparatus and method

Also Published As

Publication number Publication date
JPH049872U (en) 1992-01-28

Similar Documents

Publication Publication Date Title
JPH0739916Y2 (en) Ventilator for dam waiter for high rise building
KR20170004355A (en) Elevator system for collectiing waste and method for collecting waste using the same
CN104843401A (en) Rubbish compression transport system and rubbish compression transport method
JPH0339921B2 (en)
JP3084509B2 (en) Garbage collection system
JPH08244906A (en) Refuse storage device
JP2923531B2 (en) Transfer equipment for dam waiters for high-rise buildings
CN100469676C (en) Elevator apparatus
JP2009155093A (en) Elevator for multiple dwelling houses
CN213293532U (en) Garbage classification collection and treatment system
JPH07116824B2 (en) Dust chute
JP2882036B2 (en) Building Waste Disposal Method
JP2020041324A (en) Mechanical parking device and fire extinguish method thereof
JPH0489788A (en) Method for removing odor of hydraulic oil of hydraulic elevator
JP2018083716A (en) Waste storage tank and waste receiving supply apparatus
JPH01271307A (en) Waste container opening device for waste carrying system
JPH01303206A (en) Bucket supply device in bucket carrying system
FI77628B (en) SOPBEHAOLLARE ANORDNAD FOER TOEMNING MED HJAELP AV VAKUUM.
JPH085925Y2 (en) Garbage input equipment
JP2557218Y2 (en) Excessive negative pressure prevention device for garbage pit
JPH02276701A (en) Waste discharging equipment in multistoried building
JPH089046Y2 (en) lift device
JPH028102A (en) Bucket conveyor system and dust collecting method therewith
JPH0747362Y2 (en) Building waste treatment equipment
JPH085932Y2 (en) Garbage carrier

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term