JPH073780A - Method for treating head of cast-in-place concrete pile - Google Patents

Method for treating head of cast-in-place concrete pile

Info

Publication number
JPH073780A
JPH073780A JP14723693A JP14723693A JPH073780A JP H073780 A JPH073780 A JP H073780A JP 14723693 A JP14723693 A JP 14723693A JP 14723693 A JP14723693 A JP 14723693A JP H073780 A JPH073780 A JP H073780A
Authority
JP
Japan
Prior art keywords
pipe
pile
concrete
double
pipes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP14723693A
Other languages
Japanese (ja)
Inventor
Kouki Maeda
耕喜 前田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP14723693A priority Critical patent/JPH073780A/en
Publication of JPH073780A publication Critical patent/JPH073780A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE:To facilitate a pile-head treatment by which an extra-banking portion is separated from a pile main body by installing a plurality of double pipes on the same horizontal plane at a predetermined depth when inserting reinforcing bars into a drilled pile hole. CONSTITUTION:Double pipes 1 comprise an outer pipe 1A, an inner pipe 1B and an inner-pipe extrusion device 1C, and the device 1C is secured to the outer pipe 1A and the two parallel pipes 1 are connected together by means of a joint pipe 2 via a branch pipe 13, and all of the pipes 1 are so formed to be coplanar. With the pipe 1B enclosed in the pipe 1A, reinforcing bars 3 are bound by a binding wire 11 and the pipes 1 are inserted into a pile hole. A rotor 19 is rotated by turning a handle 14 above the ground to push the pipe 1B outside, and the piles 1 are installed with their end faces pressed against the wall 7 of the hole, and underwater concrete is placed by way of a tremie e pipe to construct a pile main body 6. Then earth around the head of the pile is removed, the pipe 1B is extracted, and a jack for a rock crusher is inserted to exert pressure to crack the concrete vertically so as to remove an extra-banking portion 5.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、場所打ちコンクリート
杭の余盛り部を杭本体から切り離す杭頭処理方法に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pile head treating method for separating an extra portion of a cast-in-place concrete pile from a pile body.

【0002】[0002]

【従来の技術】場所打ちコンクリート杭を構築する際の
杭体のコンクリートはトレミー管により水中打設するの
が一般的である。従って、初期に打設されて長時間泥水
の影響を受けている杭頭部のコンクリートは品質的に脆
弱と見做され、余盛り部として取り扱われている。余盛
り部は杭体本体からはつり取られる。このはつり作業は
ブレーカーなどを使用して行われるので、騒音や粉塵が
発生し、振動が作業者に肉体的苦痛を与え、極めて悪い
環境下での作業である。さらに、はつりにより杭体本体
にまでひび割れを起こすこともある。
2. Description of the Related Art In general, when constructing a cast-in-place concrete pile, the concrete of the pile body is generally placed underwater by a tremie pipe. Therefore, the concrete on the pile head, which was placed in the initial stage and has been affected by muddy water for a long time, is considered to be qualitatively weak and is treated as an extra portion. The extra portion is taken off from the pile body. Since this chipping work is performed using a breaker or the like, noise and dust are generated, and the vibration causes physical pain to the worker, and the work is performed in an extremely bad environment. Furthermore, chipping may cause cracks in the pile body.

【0003】[0003]

【発明が解決しようとする課題】本発明は、かかる悪い
環境下でのはつり作業を行うことなく、良い環境下での
作業で、脆弱と見做されている余盛り部を本体から取り
除くものである。
DISCLOSURE OF THE INVENTION The present invention is intended to remove an extra portion, which is considered to be fragile, from a main body in a work in a good environment without performing a chipping work in such a bad environment. is there.

【0004】[0004]

【課題を解決するための手段】本発明の第1発明は、
(A)掘削された杭孔内に補強筋を挿入設置する際に、
所定の深さの同一水平面に複数の二重管を設置し、内管
を押し出し内管端面を杭孔壁に圧接させた後、杭孔内に
トレミー管によりコンクリートを打設して場所打ちコン
クリート杭を構築する工程、(B)構築したコンクリー
ト杭の杭頭周囲の土を除去して、二重管の内管を引き抜
き、その跡に割岩機用ジャッキを挿入しジャッキに圧力
を付与して二重管の外管およびコンクリート杭を上下に
割る工程、とからなる場所打ちコンクリート杭の杭頭処
理方法であり、第2発明は、(A)掘削された杭孔内に
補強筋を挿入設置する際に、所定の深さの同一水平面に
複数の二重管を設置するとともに、二重管の設置水平面
上方の杭頭部に鉛直方向に複数の管または仕切り板を設
置しておき、該二重管の内管を押し出して内管端面を杭
孔壁に圧接させた後、杭孔内にトレミー管によりコンク
リートを打設して場所打ちコンクリート杭を構築する工
程、(B)構築したコンクリート杭の杭頭周囲の土を除
去して、二重管の内管を引き抜き、その跡に割岩機用ジ
ャッキを挿入しジャッキに圧力を付与して二重管の外管
およびコンクリート杭を上下に割る工程、(C)杭頭部
に鉛直方向に埋設された管または仕切り板を利用して、
杭頭部コンクリートを鉛直方向に分割する工程、とから
なる場所打ちコンクリート杭の杭頭処理方法である。
The first invention of the present invention comprises:
(A) When inserting and installing the reinforcing bar in the excavated pile hole,
After installing multiple double pipes on the same horizontal surface at a specified depth, pushing out the inner pipe and pressing the inner pipe end face against the wall of the pile hole, concrete is placed in the pile hole with a tremie pipe and cast in place. Step of constructing the pile, (B) Remove the soil around the pile head of the constructed concrete pile, pull out the inner pipe of the double pipe, insert the jack for the split rock machine into the mark and apply pressure to the jack. A step of splitting an outer pipe of a double pipe and a concrete pile up and down, and a pile head treatment method for a cast-in-place concrete pile, wherein the second invention is (A) inserting and installing a reinforcing bar in an excavated pile hole. In this case, a plurality of double pipes are installed on the same horizontal surface of a predetermined depth, and a plurality of pipes or partition plates are installed vertically in the pile head above the installation horizontal surface of the double pipe, The inner pipe of the double pipe was pushed out and the end face of the inner pipe was pressed against the pile hole wall. , A process of placing concrete with a tremie pipe in the pile hole to construct a cast-in-place concrete pile, (B) removing soil around the pile head of the constructed concrete pile, and pulling out the inner pipe of the double pipe, Inserting a jack for a rock breaking machine into the trace and applying pressure to the jack to split the outer pipe of the double pipe and the concrete pile up and down, (C) Pipe or partition plate vertically embedded in the pile head Use
A pile head treatment method for cast-in-place concrete piles, which comprises a step of vertically dividing pile head concrete.

【0005】本発明の第1発明の要点は、余盛り部下部
の同一水平面に複数の孔を設けて置き、その孔に割岩機
用ジャッキを挿入しジャッキに圧力を付与することによ
って、孔が設けられてられている水平面を境にして余盛
り部を杭体から切り離す点である。従って、上記(A)
の工程は余盛り部下部の同一水平面に複数の孔を設ける
ための準備工程であるということができる。
The first aspect of the present invention is that a plurality of holes are provided on the same horizontal surface below the extra heap portion, and a jack for a rock breaking machine is inserted into the holes and pressure is applied to the jacks to form the holes. This is the point where the extra heap is separated from the pile body at the horizontal plane provided. Therefore, (A) above
It can be said that this step is a preparatory step for forming a plurality of holes on the same horizontal surface below the extra embankment.

【0006】本発明の第2発明の要点は、第1発明によ
り杭体から切り離された余盛り部を、さらに小さく鉛直
方向に分割する点である。鉛直方向に分割することを可
能にするため、上記(A)の工程で余盛り部にコンクリ
ートに複数の管または仕切り板を予め埋設しておくもの
である。
An important point of the second invention of the present invention is that the extra portion separated from the pile body according to the first invention is further divided in the vertical direction. In order to be able to divide in the vertical direction, a plurality of pipes or partition plates are previously embedded in concrete in the extra part in the step (A) described above.

【0007】[0007]

【実施例】以下図面を参照しながら本発明を説明する。DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below with reference to the drawings.

【0008】図1〜図4は第1発明を説明するもので、
図5、図6は第2発明を説明するものである。
1 to 4 illustrate the first invention,
5 and 6 illustrate the second invention.

【0009】図1は第1発明の(A)の工程で構築した
小径の場所打ちコンクリート杭の杭頭部に示すもので
(a)は水平断面図であり、(b)は鉛直断面図であ
る。
FIG. 1 shows a pile head of a small diameter cast-in-place concrete pile constructed in the step (A) of the first invention, in which (a) is a horizontal sectional view and (b) is a vertical sectional view. is there.

【0010】図2は同様に第1発明の(A)の工程で構
築した大径の場所打ちコンクリート杭の杭頭部に示すも
ので(a)は水平断面図であり、(b)は鉛直断面図で
ある。 大径のものと小径のものとは、同一水平面に設
置する二重管の数が異なるのみであるので、以下図1を
中心にして説明する。
FIG. 2 also shows a pile head of a large diameter cast-in-place concrete pile constructed in the step (A) of the first invention, in which (a) is a horizontal sectional view and (b) is vertical. FIG. The large-diameter pipe and the small-diameter pipe are different from each other only in the number of double pipes installed on the same horizontal plane.

【0011】この例では、4個の二重管1が使用されて
いるが、内管1B2本について1本の外管1Aを共用し
ている。二重管1は外管1A、内管1B、内管押し出し
装置1Cから構成され、内管押し出し装置1Cは外管1
Aに止着され、内管押し出し装置1Cの上部の外管1A
にはハンドル挿入孔12が穿孔されている。平行する2
本の二重管1は分岐管13を介してつなぎ管2によって
連結され、全ての二重管1が同一平面に存在するように
形成されている(図4(a)参照)。全ての二重管1は
内管1Bを外管1A内に収納された状態で水平面を保持
するように補強筋3に結束線11によって結束されて杭
孔内に挿入される。この際、内管押し出し装置1C内の
回転体9はその突起部でハンドル14と嵌合されてい
る。(図4(b)および図3(a)参照)。全ての二重
管1を所定の位置に水平に設置したのち、地上でハンド
ル14を回すと回転体9が回転して内管1Bは外側に押
し出され、その端面は孔壁7に圧着される(図3(b)
および図4(c)参照)。このように二重管1を設置し
たのちハンドル14を取り外すか取り外さずに、水中コ
ンクリートをトレミー管により打設する。コンクリート
硬化後、図1、図2に示す場所打ちコンクリート杭が構
築される。
In this example, four double tubes 1 are used, but one outer tube 1A is shared with two inner tubes 1B. The double pipe 1 is composed of an outer pipe 1A, an inner pipe 1B and an inner pipe pushing device 1C, and the inner pipe pushing device 1C is the outer pipe 1
The outer pipe 1A which is fixed to A and is located above the inner pipe pushing device 1C
A handle insertion hole 12 is bored in this. Two parallel
The double pipes 1 of the book are connected by a connecting pipe 2 via a branch pipe 13, and all the double pipes 1 are formed so as to exist in the same plane (see FIG. 4A). All of the double pipes 1 are bound by the reinforcing wires 3 by the binding wires 11 and inserted into the pile holes so that the inner pipe 1B is accommodated in the outer pipe 1A so as to maintain a horizontal plane. At this time, the rotating body 9 in the inner pipe pushing device 1C is fitted to the handle 14 by its protrusion. (See FIG. 4 (b) and FIG. 3 (a)). After horizontally installing all the double pipes 1 at predetermined positions, when the handle 14 is rotated on the ground, the rotating body 9 rotates and the inner pipe 1B is pushed out to the outside, and its end face is crimped to the hole wall 7. (Fig. 3 (b)
And FIG. 4 (c)). After installing the double pipe 1 in this way, the underwater concrete is poured by the tremie pipe without removing or removing the handle 14. After the concrete hardens, the cast-in-place concrete piles shown in FIGS. 1 and 2 are constructed.

【0012】構築したコンクリート杭の杭頭周囲の土を
除去すると、内管1Bの端面が杭表面に露出するので、
内管1Bを引き抜き、その跡に割岩機用ジャッキ(図1
の場合は4台、図2の場合は8台)を挿入する。全部の
ジャッキに同時に圧力を掛けると外管1Aおよびコンク
リート杭のコンクリートは上下に割れるので、上のコン
クリートを撤去して作業は終了する。
When the soil around the pile head of the constructed concrete pile is removed, the end face of the inner pipe 1B is exposed on the pile surface.
Pull out the inner pipe 1B, and at the trace of it, jack for a rock breaking machine (Fig. 1
4 units in the case of, and 8 units in the case of FIG. 2). When the pressure is applied to all the jacks at the same time, the concrete of the outer pipe 1A and the concrete of the concrete pile is cracked up and down, so the work is completed by removing the concrete above.

【0013】本発明で使用する外管1Aはジャッキの圧
力で割裂する必要があるが一方杭頭部に打設されるコン
クリートの重力に抵抗する必要があるので、比較的割れ
易いプラスチック製のものが使用される。また、余盛り
部5のコンクリートは、何れ撤去される部分であり、補
強筋3と付着していない方が本発明でのジャッキ圧力に
よる割裂が起こり易いので、余盛り部5の補強筋3には
スリーブ4を被せて、コンクリートと補強筋3との縁を
切っておくのが好ましい。このスリーブ4は必要な範囲
で補強筋3に被せ、その端を接着テープなどで補強筋3
に止着しておけばよい。
The outer pipe 1A used in the present invention needs to be split by the pressure of the jack, but on the other hand, it needs to resist the gravity of the concrete placed on the head of the pile, so it is made of a relatively fragile plastic. Is used. Further, the concrete of the extra reinforcement portion 5 is a portion to be removed eventually, and it is easier to split the concrete due to the jack pressure in the present invention if it is not attached to the reinforcement reinforcement 3, so It is preferable to cover the concrete 4 and the reinforcing bar 3 by covering them with a sleeve 4. This sleeve 4 covers the reinforcing bar 3 within a necessary range, and the end thereof is bonded with an adhesive tape or the like.
You just have to fasten it.

【0014】内管押し出し装置1Cとしては、上記の回
転体によるもののほか、図3(c)、(d)に示すよう
に、バネを利用して、縮めた状態でバネを結束線で結束
しておき、その結束線に1部を地上まで延長しておき、
地上で結束線を切断する方法や縮めた状態でバネを水溶
性繊維性の結束線で結束しておき、結束線が泥水のため
切れてバネが延びるという機構などを採用することがで
きる。
As the inner pipe pushing device 1C, in addition to the above-mentioned rotating body, as shown in FIGS. 3 (c) and 3 (d), a spring is used to bind the spring with a binding wire in a contracted state. Keep a part of the tie line to the ground,
It is possible to employ a method of cutting the binding wire on the ground, a mechanism in which the spring is bound with a water-soluble fibrous binding wire in a contracted state, and the binding wire is broken due to muddy water and the spring extends.

【0015】図5は第2発明の(A)の工程で構築した
小径の場所打ちコンクリート杭の杭頭部を示すもので
(a)は水平断面図であり、(b)は鉛直断面図であ
る。この例では、4個の鉛直管15が分岐管13の分岐
を1つ増加した分岐管を介して二重管1の外管1Aに鉛
直方向に接続され、上端は蓋16で覆われている。大径
の場所打ちコンクリート杭の場合については図示しない
が、8個程度の鉛直管が分岐管や接続金物で二重管1の
外管1Aに鉛直方向に接続されている。割岩機用ジャッ
キを外管1Aに挿入し圧力を掛けて上下に割ったのち、
鉛直管15に割岩機用ジャッキを挿入し圧力を掛けると
余盛り部5のコンクリートは鉛直方向に分割され、小塊
となる。
FIG. 5 shows a pile head of a small diameter cast-in-place concrete pile constructed in the step (A) of the second invention, (a) is a horizontal sectional view, and (b) is a vertical sectional view. is there. In this example, four vertical pipes 15 are vertically connected to the outer pipe 1A of the double pipe 1 via a branch pipe in which the number of branches of the branch pipe 13 is increased by 1, and an upper end is covered with a lid 16. . Although not shown in the case of a large-diameter cast-in-place concrete pile, about eight vertical pipes are vertically connected to the outer pipe 1A of the double pipe 1 by branch pipes or connecting hardware. After inserting the jack for a rock breaking machine into the outer tube 1A, applying pressure and breaking it up and down,
When a jack for a rock breaking machine is inserted into the vertical pipe 15 and pressure is applied, the concrete in the extra embankment 5 is divided in the vertical direction and becomes a small block.

【0016】図6は第2発明の(A)の工程で構築した
小径の場所打ちコンクリート杭の杭頭部の別の例を示す
もので(a)は水平断面図であり、(b)は鉛直断面図
である。この例では、多数の仕切り板17が二重管1の
外管1Aおよびつなぎ管2の上方に通常の接続金物で鉛
直方向に接続されている。仕切り板17を間隔を保って
多数設けるのはコンクリート打設の際のコンクリートの
流れを阻害しないためであるので、コンクリートの流れ
を阻害しない程度であれば、間隔は狭い方が好ましい。
余盛り部5のコンクリートは多数の仕切り板17によっ
て区切られているので、割岩機用ジャッキを外管1Aに
挿入し圧力を掛けて上下に割ったのち、余盛り部5のコ
ンクリートに衝撃を与えると、コンクリートは仕切り板
17の部位で容易に分割され、小塊となる。仕切り板1
7は余盛り部5のコンクリートは多数の部分に区切るた
めのものであるので、コンクリートとの付着の弱いプラ
スチック板が好ましく、時には付着防止加工を施してお
くことが好ましい。
FIG. 6 shows another example of a pile head of a small diameter cast-in-place concrete pile constructed in the step (A) of the second invention. (A) is a horizontal sectional view and (b) is It is a vertical cross-sectional view. In this example, a large number of partition plates 17 are vertically connected to the upper portion of the outer pipe 1A of the double pipe 1 and the connecting pipe 2 with a normal connecting metal piece. The reason why a large number of partition plates 17 are provided at intervals is to prevent the flow of concrete during concrete pouring from being obstructed. Therefore, it is preferable that the intervals be narrow as long as the flow of concrete is not obstructed.
Since the concrete in the extra portion 5 is divided by a large number of partition plates 17, after inserting the jack for a rock breaking machine into the outer pipe 1A and applying pressure to divide it vertically, the concrete in the extra portion 5 is impacted. Then, the concrete is easily divided at the part of the partition plate 17 and becomes a small block. Partition board 1
Since the concrete of the extra portion 5 is for dividing the concrete into a large number of portions, a plastic plate having a weak adhesion to the concrete is preferable, and it is sometimes preferable to perform an adhesion preventing process.

【0017】[0017]

【発明の効果】はつり作業に代えて、ジャッキ力による
割裂により余盛り部を杭本体から切り離すことができ、
さらに余盛り部を小塊に分割できるので、悪い環境下で
のはつり作業から解放される。また、杭体本体にひび割
れを起こすことはない。
The surplus portion can be separated from the pile main body by splitting by jacking force instead of the hanging work.
Furthermore, since the extra portion can be divided into small pieces, it is free from the hanging work in a bad environment. In addition, the pile body does not crack.

【図面の簡単な説明】[Brief description of drawings]

【図1】第1発明の(A)の工程で構築した小径の場所
打ちコンクリート杭の杭頭部を示すもので(a)は水平
断面図であり、(b)は鉛直断面図である。
FIG. 1 shows a pile head of a small diameter cast-in-place concrete pile constructed in the step (A) of the first invention, in which (a) is a horizontal sectional view and (b) is a vertical sectional view.

【図2】第1発明の(A)の工程で構築した大径の場所
打ちコンクリート杭の杭頭部を示すもので(a)は水平
断面図であり、(b)は鉛直断面図である。
FIG. 2 shows a pile head of a large-diameter cast-in-place concrete pile constructed in the step (A) of the first invention, (a) is a horizontal sectional view, and (b) is a vertical sectional view. .

【図3】内管の押し出し機構を示す水平断面図であり、
(a)、(b)は回転体を使用したもので、(a)は回
転前を(b)は回転後を示す。(c)、(d)はバネを
使用したもので、(c)は縮んだ状態を(d)は伸びた
状態を示す。
FIG. 3 is a horizontal cross-sectional view showing an inner pipe pushing mechanism,
(A) and (b) use a rotating body, (a) shows before rotation, and (b) shows after rotation. (C) and (d) use a spring, (c) shows a contracted state, and (d) shows an extended state.

【図4】二重管とつなぎ管との接続を示し、(a)は水
平断面図であり、(b)、(c)は(a)のA−A矢視
図であり、(b)は回転体の回転前を(c)は回転体の
回転後を示す。
FIG. 4 shows a connection between a double pipe and a connecting pipe, (a) is a horizontal sectional view, (b) and (c) are A-A arrow views of (a), and (b). Shows before the rotation of the rotating body, and (c) shows after the rotation of the rotating body.

【図5】第2発明の(A)の工程で構築した小径の場所
打ちコンクリート杭の杭頭部を示すもので(a)は水平
断面図であり、(b)は鉛直断面図である。
FIG. 5 shows a pile head of a small diameter cast-in-place concrete pile constructed in the step (A) of the second invention, in which (a) is a horizontal sectional view and (b) is a vertical sectional view.

【図6】第2発明の(A)の工程で構築した小径の場所
打ちコンクリート杭の杭頭部の別の例を示すもので
(a)は水平断面図であり、(b)は鉛直断面図であ
る。
FIG. 6 shows another example of a pile head of a small diameter cast-in-place concrete pile constructed in the step (A) of the second invention, (a) is a horizontal sectional view, and (b) is a vertical sectional view. It is a figure.

【符号の説明】 1・・二重管、1A・・外管、1B・・内管、1C・・
内管押し出し装置、2・・つなぎ管、3・・補強筋、4
・・スリーブ、5・・余盛り部、6・・杭本体、7・・
杭孔壁、8・・内管の蓋、9・・回転体、10・・バ
ネ、11・・結束線、12・・ハンドル挿入孔、13・
・分岐管、14・・ハンドル、15・・鉛直管、16・
・鉛直管の蓋、17・・仕切り板
[Explanation of symbols] 1 ... Double pipe, 1A ... Outer pipe, 1B ... Inner pipe, 1C ...
Inner pipe pushing device, 2 ... Connection pipe, 3 ... Reinforcing bar, 4
..Sleeve, 5 ... Excessive portion, 6 ... Pile body, 7 ...
Pile hole wall, 8 ... Inner tube lid, 9 ... Rotating body, 10 ... Spring, 11 ... Bundling wire, 12 ... Handle insertion hole, 13 ...
・ Branch pipe, 14 ・ ・ Handle, 15 ・ ・ Vertical pipe, 16 ・
.Vertical pipe lids, 17..partition plates

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 (A)掘削された杭孔内に補強筋を挿入
設置する際に、所定の深さの同一水平面に複数の二重管
を設置し、内管を押し出し内管端面を杭孔壁に圧接させ
た後、杭孔内にトレミー管によりコンクリートを打設し
て場所打ちコンクリート杭を構築する工程、(B)構築
したコンクリート杭の杭頭周囲の土を除去して、二重管
の内管を引き抜き、その跡に割岩機用ジャッキを挿入し
ジャッキに圧力を付与して二重管の外管およびコンクリ
ート杭を上下に割る工程、とからなる場所打ちコンクリ
ート杭の杭頭処理方法
1. (A) When inserting and installing a reinforcing bar into an excavated pile hole, a plurality of double pipes are installed on the same horizontal plane of a predetermined depth, and the inner pipe is extruded and the end face of the inner pipe is piled. After press contacting the hole wall, the step of placing concrete with a tremie pipe in the pile hole to construct a cast-in-place concrete pile, (B) Removing the soil around the pile head of the constructed concrete pile, Pile head treatment for cast-in-place concrete piles, which consists of pulling out the inner pipe of the pipe, inserting a jack for a rock breaking machine into the mark and applying pressure to the jack to split the outer pipe of the double pipe and the concrete pile up and down Method
【請求項2】 (A)掘削された杭孔内に補強筋を挿入
設置する際に、所定の深さの同一水平面に複数の二重管
を設置するとともに、二重管の設置水平面上方の杭頭部
に鉛直方向に複数の管または仕切り板を設置しておき、
該二重管の内管を押し出して内管端面を杭孔壁に圧接さ
せた後、杭孔内にトレミー管によりコンクリートを打設
して場所打ちコンクリート杭を構築する工程、(B)構
築したコンクリート杭の杭頭周囲の土を除去して、二重
管の内管を引き抜き、その跡に割岩機用ジャッキを挿入
しジャッキに圧力を付与して二重管の外管およびコンク
リート杭を上下に割る工程、(C)杭頭部に鉛直方向に
埋設された管または仕切り板を利用して、杭頭部コンク
リートを鉛直方向に分割する工程、とからなる場所打ち
コンクリート杭の杭頭処理方法
2. (A) When inserting and installing reinforcing bars in an excavated pile hole, a plurality of double pipes are installed on the same horizontal plane of a predetermined depth, and the double pipes are installed above the horizontal plane. Install multiple pipes or partition plates in the vertical direction on the pile head,
A step of constructing a cast-in-place concrete pile by pushing out the inner pipe of the double pipe to press the end face of the inner pipe against the wall of the pile hole, and then placing concrete by a tremie pipe in the pile hole, (B) Remove the soil around the pile head of the concrete pile, pull out the inner pipe of the double pipe, insert a jack for a split rock machine at the mark and apply pressure to the jack to move the outer pipe of the double pipe and the concrete pile up and down. Pile head treatment method for cast-in-place concrete piles, which comprises a step of dividing the pile head concrete vertically using a pipe or partition plate vertically embedded in the pile head (C)
JP14723693A 1993-06-18 1993-06-18 Method for treating head of cast-in-place concrete pile Pending JPH073780A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14723693A JPH073780A (en) 1993-06-18 1993-06-18 Method for treating head of cast-in-place concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14723693A JPH073780A (en) 1993-06-18 1993-06-18 Method for treating head of cast-in-place concrete pile

Publications (1)

Publication Number Publication Date
JPH073780A true JPH073780A (en) 1995-01-06

Family

ID=15425657

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14723693A Pending JPH073780A (en) 1993-06-18 1993-06-18 Method for treating head of cast-in-place concrete pile

Country Status (1)

Country Link
JP (1) JPH073780A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5238095B1 (en) * 2012-12-07 2013-07-17 池田 岳雷 Pile head processing method
CN108104116A (en) * 2018-01-19 2018-06-01 中建筑港集团有限公司 A kind of filling pile head processing method and Quick Release pile crown bored concrete pile

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03286019A (en) * 1990-04-02 1991-12-17 Taisei Corp Pile head processing method for cast-in-place concrete pile
JPH0559721A (en) * 1991-08-30 1993-03-09 Shigeru Iwakiri Head end treating method for cast-in-place pile

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03286019A (en) * 1990-04-02 1991-12-17 Taisei Corp Pile head processing method for cast-in-place concrete pile
JPH0559721A (en) * 1991-08-30 1993-03-09 Shigeru Iwakiri Head end treating method for cast-in-place pile

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5238095B1 (en) * 2012-12-07 2013-07-17 池田 岳雷 Pile head processing method
CN108104116A (en) * 2018-01-19 2018-06-01 中建筑港集团有限公司 A kind of filling pile head processing method and Quick Release pile crown bored concrete pile

Similar Documents

Publication Publication Date Title
EP1738031B1 (en) Hydraulic pile cap removal
JPH0372110A (en) Method and apparatus for peeling header of wall portion driven underground from concrete to which said header is adhered
JPH073780A (en) Method for treating head of cast-in-place concrete pile
JPH09111758A (en) Cast-in-place concrete pile and construction method thereof
JPS6354093B2 (en)
JP2726241B2 (en) Pile head treatment method of cast-in-place foundation pile and tool for performing this treatment
JP2564465B2 (en) Ready-made pile burying method
JP2650539B2 (en) Construction method of underground diaphragm wall
JPS63308113A (en) Chipping method of pile head of sheet pile in cast-in-place concrete pile
JP4213705B2 (en) Open shield method
JP4197383B2 (en) Underground continuous wall
KR200400210Y1 (en) A apparatus for installation of Vertical drain(Beaudrain-S)
JPS6229597B2 (en)
JP2812366B2 (en) Destruction and removal of walls of concrete structures
JPH05179804A (en) Concrete placing joint method in reverse depositing
JPH09111756A (en) Construction method of caste-in-place concrete pile
JPH04203037A (en) Prestress introduction method for box segment
KR20200101637A (en) An auxiliary rack device for continuous construction of a pile
JP2001003666A (en) Method for drilling concrete
JPH07301005A (en) Demolition method of foundation
KR20060129796A (en) A system and method for installation of vertical drain
JPH0860683A (en) Construction method of underground buried part of concrete structure and form thereof
JP2003105756A (en) Pile head treating tool and pile head treating method
JPS61151318A (en) Method of elimianting negative friction force of cast-in-place pile
JP2006228165A (en) Method for installing vending machine or the like on asphalt surface using anchor bolt and anchor bolt for use therein

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 19970415