JPH0559721A - Head end treating method for cast-in-place pile - Google Patents

Head end treating method for cast-in-place pile

Info

Publication number
JPH0559721A
JPH0559721A JP21963491A JP21963491A JPH0559721A JP H0559721 A JPH0559721 A JP H0559721A JP 21963491 A JP21963491 A JP 21963491A JP 21963491 A JP21963491 A JP 21963491A JP H0559721 A JPH0559721 A JP H0559721A
Authority
JP
Japan
Prior art keywords
concrete
cast
head end
vertical
place pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP21963491A
Other languages
Japanese (ja)
Inventor
Shigeru Iwakiri
尉 岩切
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP21963491A priority Critical patent/JPH0559721A/en
Publication of JPH0559721A publication Critical patent/JPH0559721A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE:To remove head end unnecessary-concrete smoothly in an ingot state, from a cast-in-place pile. CONSTITUTION:On the way of placing concrete for a cast-in-place pile 1, at a boundary between a head end left section and an unnecessary section, the filling injecting pipe 4 of crushing agent is set. Besides, the full lengths on the upper sides from the injecting pipe, of respective vertical reinforcements 3' are covered with cover members 6 for enabling the reinforcements to be drawn upward, and after that, the concrete is placed, and with the expansion of the crushing agent to be worked after the lapse of a set time, the injecting pipe is widened. The section of the injecting pipe to be set to be embedded in is cut off, and an upper side concrete ingot-shaped object on a cutting line is removed upward, and the vertical reinforcements are exposed.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、場所打ち杭の頭端不
要部分の処理方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for treating a portion of a cast-in-place pile that does not require a head end.

【0002】[0002]

【従来の技術】従来、場所打ちコンクリート杭の頭端に
例えば基礎フーチングを形成するため、上記頭端の不要
部分を除去する処理方法としては、コンクリートの打設
途中に杭の頭端側残置部分と不要部分と界に破砕剤の注
入管を配置し、打設コンクリート内に埋没する。
2. Description of the Related Art Conventionally, for example, a foundation footing is formed at the head end of a cast-in-place concrete pile. Therefore, a treatment method for removing unnecessary portions of the head end is to leave the remaining portion on the head end side of the pile during the concrete pouring. And the injection pipe of the crushing agent is arranged in the unnecessary part and the boundary, and it is buried in the pouring concrete.

【0003】上記埋没した注入管は、注入後設定時間が
経過すると膨脹する破砕剤により注入管を拡径(拡径し
やすくするため、注入管にはスリットが入れてある)さ
せて、場所打ち杭の頭端注入管の埋設部分を破砕する。
The buried injection pipe is expanded by a crushing agent that expands after a lapse of a set time after the injection (the slit is formed in the injection pipe to make it easy to expand the diameter), and then cast in place. Crush the buried part of the pile head injection pipe.

【0004】[0004]

【発明が解決しようとする課題】上記のような破砕方法
によると、破砕剤の膨脹にともなうコンクリートの破砕
力は、コンクリートと配筋された縦筋との結合によって
軸方向よりも周方向に大きく作用するので、場所打ち杭
の外周が溝状に崩壊し、杭頭端の不要コンクリートが縦
筋に結合して残る。このため、手数のかかる衝撃動工具
を用いたハツリ作業が必要になると共に、衝撃動工具の
使用により騒音問題が発生する。
According to the above-mentioned crushing method, the crushing force of concrete due to the expansion of the crushing agent is larger in the circumferential direction than in the axial direction due to the connection between the concrete and the longitudinal bars arranged. Since it works, the outer periphery of the cast-in-place pile collapses in the shape of a groove, and unnecessary concrete at the pile head end remains connected to the vertical streaks. For this reason, it is necessary to carry out chiseling work using a shocking impact tool, and noise problems occur due to the use of the impacting shock tool.

【0005】また、衝撃動工具により破壊したコンクリ
ート片の回収作業に手数がかかる問題があった。
Further, there is a problem in that it takes a lot of time to recover the concrete pieces destroyed by the impact tool.

【0006】さらに、ハツリ作業時に鉄筋に傷を付ける
ので、露出した鉄筋を基礎フーチングの配筋に用いる場
合、強度が低下するなどの問題もあった。
Further, since the reinforcing bar is damaged during the chipping work, there is a problem that the strength is lowered when the exposed reinforcing bar is used for the reinforcing bar of the basic footing.

【0007】そこで、この発明の課題は衝撃動工具を用
いないで場所打ち杭の頭端不要部分を容易に分離するこ
とができるようにした頭端処理方法を提供することであ
る。
SUMMARY OF THE INVENTION An object of the present invention is to provide a head end processing method capable of easily separating a head end unnecessary portion of a cast-in-place pile without using an impact tool.

【0008】[0008]

【課題を解決するための手段】上記の課題を解決するた
めに、この発明は場所打ち杭のコンクリート打設途中に
頭端残置部分と不要部分との界に硬化不要コンクリート
の押し上げ用破砕剤の注入管を縦筋に支持させて配置
し、また、上記それぞれの縦筋の上記注入管から上方の
全長を上方に引き抜き可能な被い部材により被い、然る
のちコンクリートを打設し、設定時間経過後作用する破
砕剤の膨張によりコンクリートの注入管を界とした部分
を切断し、切断線の上方コンクリート塊状物と共に被い
部材を上方に撤去して縦筋を露出させるようにした場所
打ち杭の頭端処理方法を採用したものである。
SUMMARY OF THE INVENTION In order to solve the above problems, the present invention provides a crushing agent for pushing up concrete that does not require hardening in the boundary between the remaining portion of the head end and the unnecessary portion during the concrete casting of a cast-in-place pile. The injection pipe is arranged to be supported by the vertical stirrup, and the entire length of each vertical streak above the injection pipe is covered by a cover member that can be pulled out upward, and then concrete is placed and set. After the passage of time, the crushing agent that acts after expansion cuts the part of the concrete that uses the injection pipe as a boundary, and the cover member is removed upward together with the concrete block above the cutting line to expose the longitudinal streaks. This is the method of treating the pile head end.

【0009】また、場所打ち杭のコンクリート打設途中
に頭端残置部分と不要部分との界に軸線を横切って杭の
外周に閉鎖端を位置させた中空管を縦筋に支持させ、ま
た、上記それぞれの縦筋の上記中空管から上方の全長を
上方に引き抜き可能な被い部材により被い、然るのちコ
ンクリートを打設し、次いで打設した硬化コンクリート
を上記中空管の部分に打撃を加えて軸線に対し直角に割
り、割った上方のコンクリート塊状物と共に被い部材を
上方に撤去して縦筋を露出させるようにした場所打ち杭
の頭端処理方法を採用したものである。
In addition, during the concrete casting of the cast-in-place pile, a hollow pipe having a closed end located on the outer periphery of the pile is supported by a vertical bar across the axis line in the boundary between the head end remaining portion and the unnecessary portion. , The vertical length of each of the vertical pipes is covered with a cover member capable of pulling out the entire length above the hollow pipe, and then concrete is poured, and then the hardened concrete is poured into the hollow pipe portion. It is a method of applying the head end treatment method of cast-in-place piles by striking and splitting it at right angles to the axis, removing the covering member together with the cracked concrete block above to expose the vertical streaks. is there.

【0010】[0010]

【作用】コンクリートの打設後に設定時間を経過する
と、埋没注入管内の充填破砕剤が膨脹して注入管を拡径
すると共に、破壊するので、破壊力が埋設注入管を界と
した上下方向に作用し、かつ縦筋と被い部材との不結合
によって上記埋設注入管から上方の硬化コンクリートを
押し上げる。このため、杭頭端の注入管の部分が軸線に
対し略直角に切断される。
[Operation] When the set time elapses after the concrete is poured, the filling and crushing agent in the buried injection pipe expands to expand the diameter of the injection pipe and destroys it. It acts and pushes up the hardened concrete above the buried pouring pipe due to the non-bonding of the longitudinal streaks and the covering member. For this reason, the portion of the injection pipe at the pile head end is cut at a substantially right angle to the axis.

【0011】上記切断されたコンクリート塊状物は、被
い部材と共に上方に撤去して縦筋を露出させる。
The cut concrete block is removed upward together with the covering member to expose the vertical streaks.

【0012】また、打設したコンクリートの硬化後、機
械や人力により場所打ちコンクリート杭の被い部材の下
端或いは下端より上方の部分を軸線に対し直角に割り、
そして割った上方のコンクリート塊状物を被い部材と共
に上方に撤去して縦筋を露出させる。
After the cast concrete is hardened, the lower end of the cover member of the cast-in-place concrete pile or the portion above the lower end is divided at right angles to the axis by machine or human power.
Then, the cracked upper concrete block is removed upward together with the covering member to expose the vertical streaks.

【0013】[0013]

【実施例】以下、この発明に係る実施例を添付図面に基
づいて説明する。
Embodiments of the present invention will be described below with reference to the accompanying drawings.

【0014】(第1実施例)図1に示す1は場所打ち杭
である。
(First Embodiment) 1 shown in FIG. 1 is a cast-in-place pile.

【0015】上記の場所打ち杭1は、既知の工法、例え
ば掘削機(アースオーガのみ或はケーシングと、アース
オーガとを組み合わせたもの)を用いて地面から地中の
所定深さ迄掘削すると共に、排土して設けた削孔2内に
鉄筋籠3を挿入し、然るのち、削孔2内にコンクリート
を打設する。
The cast-in-place pile 1 is excavated from the ground to a predetermined depth in the ground by a known method, for example, an excavator (only an earth auger or a combination of a casing and an earth auger) is used. Then, the rebar cage 3 is inserted into the drilled hole 2 that has been excavated, and then concrete is poured into the drilled hole 2.

【0016】上記場所打ち杭1を形成するコンクリート
打設途中に、図1に示すように頭端残置部分と頭端不要
部分との界に破砕剤Aの注入管4を配置すると共に、鉄
筋籠3の縦筋3’に針金5を介し上記注入管4を支持さ
せておく。
While pouring the concrete to form the cast-in-place pile 1, as shown in FIG. 1, an injection pipe 4 for the crushing agent A is arranged in the boundary between the head end remaining portion and the head end unnecessary portion, and a reinforcing bar basket is provided. The injection pipe 4 is supported via the wire 5 on the vertical line 3 ′ of 3.

【0017】また、それぞれの縦筋3’の注入管4から
上方の全長を上方に引き抜き可能な被い部材6により被
う。
Further, the entire upper length of each vertical streak 3'from the injection pipe 4 is covered by a covering member 6 which can be pulled out upward.

【0018】上記の被い部材6は、図3に示すように発
泡スチロール製筒状体を縦筋3’の数と同じ数に分割し
て形成し、被い部材6の一端から他端方向に縦筋3’を
突き刺し(被い部材6の一端面から他端部に前もって形
成してある挿入しやすい拡径スリット21付凹入孔7に
縦筋3’を挿入することもある)ながら、前記被い部材
6の対向縁を重ね合わせておく。
As shown in FIG. 3, the cover member 6 is formed by dividing a styrofoam cylindrical body into the same number as the number of vertical stripes 3 ', and extends from one end to the other end of the cover member 6. While piercing the vertical line 3 ′ (the vertical line 3 ′ may be inserted into the recessed hole 7 with the enlarged diameter slit 21 which is formed in advance from one end face to the other end of the covering member 6 and is easy to insert), The facing edges of the covering member 6 are overlapped.

【0019】然るのち、コンクリートを打設する。After that, concrete is poured.

【0020】上記コンクリートの打設後設定時間経過す
ると、破砕剤Aが膨脹して注入管4を拡径する(拡径し
やすいために、硬質合成樹脂製パイプの周壁にスリット
8が設けてある)ので、硬化コンクリートの注入管4を
界とした部分を切断する。
After a lapse of a set time after the concrete is poured, the crushing agent A expands to expand the diameter of the injection pipe 4 (slits 8 are provided on the peripheral wall of the hard synthetic resin pipe for easy expansion of the diameter). ), So that the portion of the hardened concrete that uses the injection pipe 4 as a boundary is cut.

【0021】上記の切断は、場所打ち杭1の軸線に対し
直角になる。しかして、図4に示すように切断された上
方のコンクリート塊状物Bを上方に抜き取る。
The above cutting is perpendicular to the axis of the cast-in-place pile 1. Then, the upper concrete block B cut as shown in FIG. 4 is extracted upward.

【0022】上記コンクリート塊状物Bの撤去方法は、
コンクリート塊状物Bの外周に重機のワイヤを巻付け、
ワイヤの巻取りによって上方に引き抜く。
The method for removing the concrete block B is as follows.
Wrap the wire of a heavy machine around the periphery of the concrete block B,
Pull up by winding the wire.

【0023】このとき、被い部材6によりコンクリート
塊状物Bと縦筋3’との結合がないため、スムーズにコ
ンクリート塊状物Bを引き抜くことができると共に、被
い部材6が共に引き抜かれて縦筋3’が露出する。
At this time, since the concrete block B and the vertical streak 3'are not joined by the cover member 6, the concrete block B can be smoothly pulled out, and the cover member 6 is pulled out together to vertically. The muscle 3'is exposed.

【0024】なお、図2に示すように奇数の被い部材3
の両側面内又は外角縁か翼片10を突出させて、偶数の
被い部材6に翼片10を外接させておくと、コンクリー
トの打設にともない縦筋3’が外周方向に若干押し逃が
されても、被い部材6の内側と外側とのコンクリートが
分離される。
As shown in FIG. 2, the odd number of covering members 3
If the winglets 10 are circumscribed on the even-numbered covering members 6 by projecting the winglets 10 on both side surfaces or on the outer corner edges of the winglets, the vertical streaks 3'are slightly pushed outward in the direction of concrete placement. Even if it is removed, the concrete inside and outside the cover member 6 is separated.

【0025】また、注入管4は、図2に示すように径の
異なる環状に屈曲して並べると共に内側の注入管4と外
側の注入管4を接続金具12により接続したが、多数本
並列に並べて使用することもある。
As shown in FIG. 2, the injection pipes 4 are bent and arranged in an annular shape having different diameters, and the inner injection pipe 4 and the outer injection pipe 4 are connected by a connecting fitting 12. Sometimes used side by side.

【0026】なお、上記の破砕剤Aには、特開平2−1
6213号公報に示すように、例えばカルシウム・アル
ミノ・フエライトと遊離酸化カルシウム及び酸化マグネ
シウムを基本成分とし、これに遅延剤としてホウ酸塩な
どを添加したものである。そして、遅延剤の種類及び添
加量を適宜変えることによって水和膨脹圧の発生時間を
調整することができる。
The above-mentioned crushing agent A is described in JP-A 2-1.
As disclosed in Japanese Patent No. 6213, for example, calcium alumino ferrite, free calcium oxide and magnesium oxide are used as basic components, and borate is added as a retarder. Then, the generation time of the hydration expansion pressure can be adjusted by appropriately changing the type and amount of the retarder added.

【0027】(第2実施例)第1実施例と同様に場所打
ちコンクリート1を形成するコンクリート打設途中に、
頭端残置部分と頭端不要部分との界に軸線を横切るよう
両端閉鎖(例えば栓や押し潰して閉鎖してある)パイプ
11を所要本数配置する。
(Second Embodiment) As in the case of the first embodiment, during the concrete pouring during the formation of the cast-in-place concrete 1,
A required number of pipes 11 having both ends closed (for example, closed by squeezing a plug or the like) are arranged so as to cross the axis in a field between the head end remaining portion and the head end unnecessary portion.

【0028】上記のパイプ11は、硬質合成樹脂などが
用いられ、閉鎖端は、図6に示すように場所打ち杭1の
外周に一面或は若干突出するよう位置させ、針金5を介
し縦筋3’に支持させてある。
The pipe 11 is made of a hard synthetic resin or the like, and the closed end thereof is positioned on the outer periphery of the cast-in-place pile 1 as shown in FIG. It is supported by 3 '.

【0029】また、それぞれの縦筋3’のパイプ11か
ら上方の全長には、第1実施例と同様に被い部材6が被
せてある。
Further, a covering member 6 is put on the entire length of each vertical line 3'above the pipe 11 in the same manner as in the first embodiment.

【0030】しかして、コンクリートを打設する。Then, concrete is poured.

【0031】上記打設したコンクリートが硬化したの
ち、まずパイプ11の端を露出させ、次いでパイプの端
に楔を打ち込んで頭端部を軸線に対し直角に割る。
After the cast concrete is hardened, first the end of the pipe 11 is exposed, and then a wedge is driven into the end of the pipe to divide the head end at a right angle to the axis.

【0032】上記切断された上方のコンクリート塊状物
Bを第1実施例と同様に上方に撤去して、縦筋3’を露
出させる。
The cut upper concrete block B is removed upward as in the first embodiment to expose the vertical streaks 3 '.

【0033】[0033]

【効果】以上のように、この発明に係る場所打ち杭の頭
端処理方法を使用することにより、注入管の拡径やパイ
プ内に打ち込む楔によって杭頭端部の残置部分と不要部
分との界を切断し、切断された上方コンクリート塊状物
は、縦筋とコンクリートとの結合を上記縦筋に上方に引
き抜き可能に被せてある被い部材による阻止のため、極
めてスムーズに抜き取って撤去することができる。
[Effect] As described above, by using the method for treating the head end of the cast-in-place pile according to the present invention, the diameter of the injection pipe and the wedge driven into the pipe cause the remaining portion and the unnecessary portion of the pile head end. The boundary is cut, and the cut upper concrete lumps should be removed very smoothly because the covering member that covers the vertical bars and the concrete so that the vertical bars can be pulled upwards is blocked by the covering member. You can

【0034】このため、極めて短時間に杭頭端を処理す
ることができ、著しいコストの低減をはかることができ
る。
Therefore, the pile head end can be treated in an extremely short time, and the cost can be remarkably reduced.

【図面の簡単な説明】[Brief description of drawings]

【図1】第1実施例の場所打ち杭の正面図FIG. 1 is a front view of a cast-in-place pile according to a first embodiment.

【図2】図1のX−X線に沿う断面図FIG. 2 is a sectional view taken along line XX of FIG.

【図3】被い部材の斜視図FIG. 3 is a perspective view of a cover member.

【図4】縦筋を露出させた正面図FIG. 4 is a front view with the vertical stripes exposed.

【図5】第2実施例の要部を示す一部切欠拡大正面図FIG. 5 is a partially cutaway enlarged front view showing a main part of the second embodiment.

【図6】同上の平面図FIG. 6 is a plan view of the above.

【符号の説明】[Explanation of symbols]

A 破砕剤 B コンクリート塊状物 1 場所打ち杭 2 削孔 3 鉄筋籠 3’縦筋 4 注入管 5 針金 6 被い部材 11 パイプ A Crushing agent B Concrete block 1 Cast-in-place pile 2 Drilling hole 3 Reinforcing bar cage 3'Vertical bar 4 Injection pipe 5 Wire 6 Covering member 11 Pipe

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 場所打ち杭のコンクリート打設途中に頭
端残置部分と不要部分との界に硬化不要コンクリートの
押し上げ用破砕剤の注入管を縦筋に支持させて配置し、
また、上記それぞれの縦筋の上記注入管から上方の全長
を上方に引き抜き可能な被い部材により被い、然るのち
コンクリートを打設し、設定時間経過後作用する破砕剤
の膨張によりコンクリートの注入管を界とした部分を切
断し、切断線の上方コンクリート塊状物と共に被い部材
を上方に撤去して縦筋を露出させるようにした場所打ち
杭の頭端処理方法。
1. An injection pipe for a crushing agent for pushing up concrete that does not require hardening is arranged in the boundary between the remaining portion of the head end and the unnecessary portion while the concrete is being cast into a cast-in-place pile, while being supported by a vertical bar.
In addition, the vertical length of each of the vertical lines is covered with a covering member capable of pulling out the entire length above, and then concrete is poured, and after the set time elapses, the crushing agent acts to expand the concrete. A method for treating the head end of a cast-in-place pile, in which the part with the injection pipe as a boundary is cut, and the covering member is removed upward together with the concrete block above the cutting line to expose the vertical streaks.
【請求項2】 場所打ち杭のコンクリート打設途中に頭
端残置部分と不要部分との界に軸線を横切って杭の外周
に閉鎖端を位置させた中空管を縦筋に支持させ、また、
上記それぞれの縦筋の上記中空管から上方の全長を上方
に引き抜き可能な被い部材により被い、然るのちコンク
リートを打設し、次いで打設した硬化コンクリートを上
記中空管の部分に打撃を加えて軸線に対し直角に割り、
割った上方のコンクリート塊状物と共に被い部材を上方
に撤去して縦筋を露出させるようにした場所打ち杭の頭
端処理方法。
2. A hollow pipe having a closed end located on the outer periphery of the pile is supported by a vertical bar while crossing the axis in the field between the head end remaining portion and the unnecessary portion during the concrete casting of the cast-in-place pile. ,
The vertical length of each of the vertical bars is covered with a cover member capable of pulling out the entire length above from the hollow pipe, and then concrete is poured into the hollow pipe. Hit and split at right angles to the axis,
A method for treating the head end of a cast-in-place pile in which the cover member is removed upward together with the cracked concrete block to expose the vertical streaks.
JP21963491A 1991-08-30 1991-08-30 Head end treating method for cast-in-place pile Pending JPH0559721A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21963491A JPH0559721A (en) 1991-08-30 1991-08-30 Head end treating method for cast-in-place pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21963491A JPH0559721A (en) 1991-08-30 1991-08-30 Head end treating method for cast-in-place pile

Publications (1)

Publication Number Publication Date
JPH0559721A true JPH0559721A (en) 1993-03-09

Family

ID=16738603

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21963491A Pending JPH0559721A (en) 1991-08-30 1991-08-30 Head end treating method for cast-in-place pile

Country Status (1)

Country Link
JP (1) JPH0559721A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH073780A (en) * 1993-06-18 1995-01-06 Kajima Corp Method for treating head of cast-in-place concrete pile

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS49114205A (en) * 1973-03-07 1974-10-31
JPS61122322A (en) * 1984-11-16 1986-06-10 Onoda Cement Co Ltd Method of destroying cast-in-place concrete pile head
JPS6221924A (en) * 1985-07-22 1987-01-30 Onoda Cement Co Ltd Breaking of in-site concrete pile head
JPS6327488A (en) * 1986-07-18 1988-02-05 Banyu Pharmaceut Co Ltd Substituted-1,3-dithiolane derivative and use thereof
JPH02115408A (en) * 1988-10-24 1990-04-27 Fujita Corp Method of processing head of reclaiming pile
JPH02266018A (en) * 1988-07-04 1990-10-30 Sumitomo Cement Co Ltd Pile-head treating method of cast-in-place pile by use of stabilizing liquid

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS49114205A (en) * 1973-03-07 1974-10-31
JPS61122322A (en) * 1984-11-16 1986-06-10 Onoda Cement Co Ltd Method of destroying cast-in-place concrete pile head
JPS6221924A (en) * 1985-07-22 1987-01-30 Onoda Cement Co Ltd Breaking of in-site concrete pile head
JPS6327488A (en) * 1986-07-18 1988-02-05 Banyu Pharmaceut Co Ltd Substituted-1,3-dithiolane derivative and use thereof
JPH02266018A (en) * 1988-07-04 1990-10-30 Sumitomo Cement Co Ltd Pile-head treating method of cast-in-place pile by use of stabilizing liquid
JPH02115408A (en) * 1988-10-24 1990-04-27 Fujita Corp Method of processing head of reclaiming pile

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH073780A (en) * 1993-06-18 1995-01-06 Kajima Corp Method for treating head of cast-in-place concrete pile

Similar Documents

Publication Publication Date Title
JPH0559721A (en) Head end treating method for cast-in-place pile
JPS6354093B2 (en)
KR101105853B1 (en) Constructing method of cast-in-place concrete pile using mold case
JPH03107017A (en) Pile head treatment method for cast-in-place concrete pile
CN113089669A (en) Pile head breaking device for large-diameter cast-in-place pile and using method thereof
JPS6145726B2 (en)
JPH0444516A (en) Grouting method in front end of cast-in place concrete pile
JP2931476B2 (en) How to cut the head of an underground continuous wall
JP7515116B2 (en) How to remove existing concrete piles
JPH11236769A (en) Breaking method for increase of reinforced concrete building
JP3368254B2 (en) Concrete pile head treatment method
JP2931475B2 (en) Concrete structure head shaving method
JP2000120066A (en) Execution method for steel pipe pile
JP2564465B2 (en) Ready-made pile burying method
JP2642585B2 (en) Pile construction method using existing piles
JP4197383B2 (en) Underground continuous wall
JP2741095B2 (en) Pile head treatment method for cast-in-place concrete pile
JP2693027B2 (en) Pile head treatment method for cast-in-place concrete pile
JP2569991B2 (en) Concrete removal method for reinforced concrete joints
JP2000204574A (en) Reconstruction method for underground structure
JP2009121218A (en) Pile head separating method
JPS63523A (en) Treatment of heat of cast-in-place concrete pile
JPH0643219Y2 (en) Core body attached to the inner circumference of the head of a concrete pile
JP2022129955A (en) Removal method of existing concrete pile
JPH0334527B2 (en)