JPH07310447A - Executing method of prefabricated bathroom - Google Patents

Executing method of prefabricated bathroom

Info

Publication number
JPH07310447A
JPH07310447A JP6126819A JP12681994A JPH07310447A JP H07310447 A JPH07310447 A JP H07310447A JP 6126819 A JP6126819 A JP 6126819A JP 12681994 A JP12681994 A JP 12681994A JP H07310447 A JPH07310447 A JP H07310447A
Authority
JP
Japan
Prior art keywords
block
mortar
floor
base
bathtub
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP6126819A
Other languages
Japanese (ja)
Other versions
JP3297873B2 (en
Inventor
Tadashi Hanaoka
忠 花岡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AOI KOGYO KK
Original Assignee
AOI KOGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by AOI KOGYO KK filed Critical AOI KOGYO KK
Priority to JP12681994A priority Critical patent/JP3297873B2/en
Publication of JPH07310447A publication Critical patent/JPH07310447A/en
Application granted granted Critical
Publication of JP3297873B2 publication Critical patent/JP3297873B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Residential Or Office Buildings (AREA)
  • Bathtubs, Showers, And Their Attachments (AREA)
  • Building Environments (AREA)

Abstract

PURPOSE:To greatly improve the extent of heat insulating property of a bathtub and a wash place, and simultaneously shorten a construction period and eliminate a fear of leak of water as well as to make a feeling of depth so as to be securable. CONSTITUTION:An earth floor 98 is graded in making a door sill 102 as the reference, and mortar 104 is spread over this graded earth floor 98, thereby creating a horizontal base standardized with the door sill 102. Plural bedsill blocks made of foamed plastics are set up on the base of this created mortar 104, a foamed plastic tub receiver is set up with each bedsill block as the support member, and the surface of an inner wall of a bathroom and the floor surface of a wash place made of foamed plastics are all covered with a waterproof sheet 105 spreading. A specified drainage slope is installed on a floor surface of the wash place covered with the waterproof sheet 105, spreading another mortar 106. Subsequently tiles are set to the wash place spread by the mortar 106, the inner wall covered with the waterproof sheet 105 and an outer surface exposed part of the tub receiver 31, respectively. Then a bathtub is inserted into this tub receiver 31 and secured tight.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、木造一戸建の家屋を対
象とした新築及びリフォームに好適な組立式浴室の施工
方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a prefabricated bathroom suitable for new construction and remodeling of a single-family wooden house.

【0002】[0002]

【従来の技術】一般に木造一戸建の家屋を対象とした従
来工法による本格浴室は、モルタルにタイル張りした基
本構造であって、工期が長く、工費も割高ではあるが、
浴槽や洗い場の形状、大きさ、配置などを自由に設計で
き、浴槽もタイル張り、ステンレス製、桧造りなど自由
に選択できて重厚感も得られる。しかしその反面、浴槽
や洗い場の下は一般に土間に剥出しとなっているため、
冬季や寒冷地等においては寒気が直接伝わって浴槽の湯
温が低下し易く、また洗い場が冷え込むなどの問題があ
った。また、防水性にも難点があり、洗い場や壁際など
から漏水して土台や根太が腐り易いという問題もあっ
た。
2. Description of the Related Art Generally, a conventional full-scale bathroom for a wooden single-family house has a basic structure of tiled mortar, which requires a long construction period and is expensive.
You can freely design the shape, size, and layout of the bathtub and washroom. You can also select the bathtub such as tiled, stainless steel, or cypress structure, and you can get a solid feeling. However, on the other hand, the bottom of the bathtub and washroom is generally exposed in the soil,
In the winter and cold regions, cold air is directly transmitted, and the hot water temperature in the bathtub is apt to decrease, and there is a problem that the washing place becomes cold. In addition, there is a problem in waterproofness, and there is also a problem that the base and joists are likely to rot due to water leakage from a washing place or a wall.

【0003】そこで近年、防水性及び気密性に優れ、し
かも従来工法に比べて工期が短く、工費も割安なユニッ
トバス工法による浴室が一部に普及している。しかしこ
のユニットバス工法は、予め所定の規格寸法で工場生産
された合成樹脂製のフロアユニット、壁面ユニット、バ
スタブ等を相互に組付けるものであって、浴室の設計に
自由度が殆ど無く、重厚感も得られない。また浴槽や洗
い場の下が土間に剥出しとなっている点では従来工法と
変わりがないので、冬季や寒冷地等において浴槽の湯温
が低下し易く、洗い場が冷え込むなどの問題は解決され
ていない。
[0003] In recent years, therefore, bathrooms using the unit bath method, which is excellent in waterproofness and airtightness, has a shorter construction period than conventional construction methods, and is cheap in construction cost, have been widely used. However, this unit bath method assembles floor units, wall units, bathtubs, etc., made of synthetic resin, which were factory-manufactured in advance with predetermined standard dimensions, to each other, and there is almost no freedom in the design of the bathroom, and the I can't get a feeling. In addition, since there is no difference from the conventional method in that the bottom of the bathtub or washroom is exposed to the soil, the hot water temperature in the bathtub tends to drop in winter or cold regions, and problems such as cooling of the washroom have been solved. Absent.

【0004】このような事情から、浴槽や洗い場、ある
いは浴室全体の保温性を向上するようにした種々の技術
が提案されている。例えば、浴槽内の湯温低下を防止す
る技術としては、発泡スチロール等の円柱状心材の表面
を耐熱性樹脂等で覆った保温器を浴槽内の湯面にて浮か
べる技術(実開昭63年197483号公報参照)や、
独立気泡の発泡体からなる板状断熱材で構成された上蓋
及び中蓋を設け、該中蓋を湯面に浮かべ、該上蓋で浴槽
上面を覆う技術(実開平5年21788号公報参照)が
提案されている。
Under these circumstances, various techniques have been proposed for improving the heat retaining property of the bathtub, the washing room, or the bathroom as a whole. For example, as a technique for preventing a decrease in the temperature of hot water in a bathtub, a technique of floating a heat insulator in which a surface of a cylindrical core material such as styrofoam is covered with a heat-resistant resin or the like on the surface of the hot water in the bathtub (Actual development Sho 63, 197483) No.), or
A technique is provided in which an upper lid and an inner lid made of a plate-shaped heat insulating material made of closed-cell foam are provided, the inner lid is floated on the molten metal surface, and the upper surface of the bathtub is covered with the upper lid (see Japanese Utility Model Publication No. 21788/1993). Proposed.

【0005】また浴槽自体を保温する技術としては、フ
ァスナーやホック等の接続具により相互に接続されるこ
とで袋状をなすシート状の断熱材で浴槽本体を包む技術
(実開昭53年149467号公報参照)や、浴槽の外
面にスチレンー無水マレイン酸共重合樹脂からなる発泡
粒子を層状に接着する技術(実開昭55年118691
号公報参照)、半耐熱性のウレタン系発泡材等を素材と
してやや硬く発泡加工された断熱材で浴槽外面を覆う技
術(実開昭62年183783号公報参照)、浴槽本体
を熱伝導率の低い材料で形成すると共にその外周面を発
泡スチロール等の断熱材で覆う技術(実開昭59年26
790号公報参照)、浴槽本体を矩形の外槽と人体の着
座姿勢に沿う曲面に底面を形成した内槽とからなる二重
構造とし、両者間の断熱空間に発泡スチロールを注入す
る技術(実開昭58年154690号公報参照)、浴槽
本体の底部及び周璧部を矩形函体状の発泡スチロール等
の保温材で包む技術(実開平2年16181号公報参
照)、発泡合成樹脂材でボックス状に形成された浴槽用
受材内に浴槽を填込む技術(特開平2年140118号
公報参照)などが提案されている。
As a technique for keeping the bath itself warm, a technique for wrapping the bathtub body with a sheet-shaped heat insulating material which is in the shape of a bag by being connected to each other by a connecting tool such as a fastener or a hook (Actual development: 149467). (See Japanese Laid-Open Patent Publication No. 11), or a technique in which foamed particles made of a styrene-maleic anhydride copolymer resin are adhered to the outer surface of the bath in a layered manner (Act.
(See Japanese Patent Publication No. 183783), a technique of covering the outer surface of the bathtub with a slightly hard foaming insulating material made of a semi-heat resistant urethane foam material (see Japanese Utility Model Publication No. 183783/1987), Technology of forming with low material and covering the outer peripheral surface with heat insulating material such as styrofoam.
No. 790), a bathtub body has a double structure consisting of a rectangular outer tub and an inner tub with a bottom surface formed on a curved surface that conforms to the sitting posture of the human body, and a technique for injecting styrofoam into the heat insulating space between the two (actual opening) (See Japanese Patent Publication No. 154690 in 1983), a technique of wrapping the bottom portion and the peripheral wall portion of the bathtub body with a heat insulating material such as a styrofoam in the shape of a rectangular box (see Japanese Utility Model Publication No. 16181 of Kaikai Hei 2), and a box-shaped synthetic resin material. There has been proposed a technique (see Japanese Patent Laid-Open No. 140118/1990) for filling a bath into the formed bath receiving material.

【0006】さらに、浴室全体を保温する技術として
は、バスユニット本体とその周囲及び下方を覆う外槽と
の間の断熱空間に、取付け用土台と共に注入発泡断熱材
層を充填する技術(実開昭62年134489号公報参
照)や、浴槽底部及び浴室床部の下方の土台構造を、上
方からモルタル層、独立気泡構造の非吸水性合成樹脂発
泡体よりなる断熱材層、モルタル層として浴槽及び浴室
床部を保温する技術(実開平4年101469号公報参
照)、浴槽底部及び洗い場床下に断熱板を設置すると共
に、浴槽の外周近傍から洗い場の床内部に臨む熱伝導板
を設けて浴槽及び洗い場の保温を図る技術(特開平5年
196240号公報参照)、ユニットバスを支持する架
台の下方を発泡樹脂製板で覆うことにより床下の冷気を
遮断して浴室の保温を図る技術(特開平5年59824
号公報参照)などが提案されている。
Further, as a technique for keeping the whole bathroom warm, a technique for filling an insulating foam space between the main body of the bath unit and the outer tub covering the surroundings and a lower part thereof with an installation foam base and an injection foam insulation layer (actually developed) (Refer to Japanese Patent Publication No. 134489 of 1987) or the base structure below the bath bottom and the bathroom floor from above, the mortar layer, the heat insulating layer made of a non-water-absorbing synthetic resin foam having a closed cell structure, and the tub as a mortar layer. Technology for keeping the floor of the bathroom warm (see Japanese Utility Model Publication No. 104169/1992), heat insulating plates are installed at the bottom of the bathtub and under the floor of the washing room, and a heat conduction plate is provided from the vicinity of the outer periphery of the bathtub to the inside of the floor of the washing room. A technique for keeping the washing room warm (see Japanese Patent Application Laid-Open No. 196240/1993). A foam resin plate covers the lower part of the frame supporting the unit bath to block cold air under the floor and keep the bathroom warm. Promote technology (JP-5 years 59,824
(See Japanese Patent Publication) and the like have been proposed.

【0007】[0007]

【発明が解決しようとする課題】ところで、前記各公報
に記載の従来技術は、浴槽や洗い場などを保温すること
はできても、漏水対策が不十分であるとか、ユニットバ
スにしか適用できず重厚感が得にくいとか、断熱処理の
施工に手間がかかるなどの問題があり、充分な解決策と
は言い難い。
By the way, the prior arts described in the above publications can be applied only to a unit bath because the measures against water leakage are insufficient, although the bathtub, the washing place, etc. can be kept warm. It is hard to say that it is a sufficient solution, because there are problems that it is difficult to obtain a solid feeling, and that it takes time and effort to carry out heat insulation treatment.

【0008】そこで本発明は、浴槽及び洗い場の保温性
を格段に向上することができると共に、工期が短く、漏
水のおそれれがなく、重厚感も得られる組立式浴室の施
工方法を提供することを目的とする。
[0008] Therefore, the present invention provides a method of constructing a prefabricated bathroom which can significantly improve the heat retaining properties of a bathtub and a washing room, has a short construction period, is free from the risk of water leakage, and provides a solid feeling. With the goal.

【0009】[0009]

【課題を解決するための手段】この目的のため本発明に
よる組立式浴室の施工方法は、沓摺を基準として土間を
整地する土間整地工程と、整地された土間にモルタルを
散布して沓摺を基準とした水平な基盤を造成する乾式基
盤造成工程と、造成されたモルタルの基盤上に発泡樹脂
製の複数の土台ブロックを設置し、各土台ブロックを支
持部材として発泡樹脂製のタブ受け及び洗い場床受けプ
レートを設置する断熱処理工程と、壁ボードの表面及び
発泡樹脂製の洗い場床受け面を覆って防水シートを張る
防水処理工程と、上記防水シートで覆われた洗い場床受
け面に所定の排水勾配を設けてモルタルを張る洗い場モ
ルタル張り工程と、上記モルタル張りの洗い場、防水シ
ートで覆われた壁ボード、タブ受けの外面露出部に乾式
タイルを張る乾式タイル張り工程と、上記タブ受け内に
バスタブを挿入固定するバスタブ設置工程とを備えるこ
とを基本的な手段としている。
For this purpose, a method of constructing a prefabricated bathroom according to the present invention comprises a soil leveling step for leveling the soil with reference to the leveling and a mortar spraying on the leveled soil. A dry base formation process for forming a horizontal base based on the above, and a plurality of base blocks made of foam resin are installed on the base of the formed mortar, and each base block is used as a support member for the tab receiver made of foam resin and Insulation process of installing the washing floor support plate, waterproofing process of covering the surface of the wall board and the washing resin floor receiving surface made of foam resin with a waterproof sheet, and the washing floor receiving surface covered with the above waterproof sheet A mortar installation process where a mortar is installed by providing a drainage gradient, and a mortar installation process above, a mortar installation place, a wall board covered with a waterproof sheet, and a dry tile where a dry tile is placed on the exposed external surface of the tab receiver. And yl tension step, is a basic means further comprising a bathtub installation step of inserting fixing the tub in the receptacle above the tab.

【0010】ここで、前記土台ブロックは、断面U字形
の複数のUブロック及びこれを切断した切断ブロックの
組合せ構造としたことを具体的手段としている。
Here, the concrete means is that the base block has a combined structure of a plurality of U blocks having a U-shaped cross section and a cutting block obtained by cutting the U blocks.

【0011】また、前記各Uブロックの上面肩部には、
上記洗い場床受けプレートを填込み支持する切欠き溝を
設けたことも具体的手段とし、この切欠き溝は、上記壁
ボードに固定されるコーナアングルの填込み溝を兼用す
ることも具体的手段としている。
The upper shoulders of the U blocks are
A concrete means is to provide a notch groove for fitting and supporting the washing floor support plate, and the notch groove also serves as a corner groove fitting groove fixed to the wall board. I am trying.

【0012】さらに、前記洗い場床受けプレートを切欠
き溝に填込み支持する各Uブロックは、開口部を下にし
てモルタルの基盤上に設置したことも具体的手段として
いる。
Further, as a concrete means, each U block for supporting the washing floor floor receiving plate by fitting it into the notch groove is installed on the base of the mortar with its opening facing down.

【0013】一方、前記タブ受けは、長手方向に沿って
2分割したタブ受け半体の合わせ構造としたことも具体
的手段としている。
On the other hand, the tab receiver has a specific structure in which the tab receiver halves are divided into two along the longitudinal direction.

【0014】ここで、前記発泡樹脂製の土台ブロック、
タブ受け、洗い場床受けプレートは、スチレン系樹脂、
フェノール系樹脂、尿素系樹脂、ウレタン系樹脂などの
発泡性樹脂を素材として型内発泡、押出成形等により予
め工場生産されるもので、比重が極めて小さく軽量であ
りながら充分な圧縮強度を有し、特に高い断熱性を有す
る。
Here, the base block made of the foamed resin,
The tub support and washroom floor support plate are made of styrene resin,
Factory-produced by in-mold foaming, extrusion molding, etc., using a foaming resin such as phenolic resin, urea resin, urethane resin, etc. as a material, it has a very small specific gravity and is lightweight, yet has sufficient compressive strength. , With particularly high thermal insulation.

【0015】[0015]

【作用】前述の基本的な手段を採用した本発明による組
立式浴室の施工方法では、バスタブの下方が、土間上に
造成されたモルタルの基盤上に設置される土台ブロック
及びその上に設置されるタブ受けによって断熱処理さ
れ、洗い場の下方は、上記土台ブロック及びこれに支持
して設置される洗い場床受けプレートによって断熱処理
される。
In the method of constructing a prefabricated bathroom according to the present invention which employs the above-mentioned basic means, the lower part of the bathtub is installed on the base block installed on the base of the mortar formed on the earth and the base block. Insulation is performed by the tub holder that is installed, and the lower part of the washroom is heat-insulated by the base block and the washroom floor support plate installed to support the base block.

【0016】ここで断熱処理工程は、乾式基盤造成工程
により土間上に造成されたモルタルの基盤に各土台ブロ
ック、タブ受け、洗い場床受けプレートを順次設置する
ことを内容とするから作業が簡単である。また各土台ブ
ロック、タブ受け、洗い場床受けプレートは発泡樹脂製
であり、比重が極めて小さく超軽量であって弾力性もあ
ることから、施工に際しての運搬や設置に殆ど労力がか
からず、誤って足元に落としても怪我をすることがなく
安全である。
[0016] Here, the heat insulation treatment process is simple in that each base block, tab receiver, and wash floor support plate are sequentially installed on the mortar base formed on the soil by the dry base formation process. is there. In addition, each base block, tub support, and wash floor support plate are made of foam resin, have a very small specific gravity, are ultra-lightweight, and have elasticity. It is safe without being injured even if dropped to your feet.

【0017】洗い場の表面、壁ボードの表面、タブ受け
の外面露出部には乾式タイル張り工法によって乾式タイ
ルが張られるので、工期が短いにも拘らず、浴室は重厚
感のあるものとなる。
Since dry tiles are put on the surface of the washing room, the surface of the wall board, and the exposed portion of the outer surface of the tub holder by the dry tile construction method, the bathroom has a heavy feeling despite the short construction period.

【0018】前記乾式タイルで覆われた壁ボードの表面
及び洗い場床受け面の上面は、防水シートで覆われるの
で、漏水のおそれれがない。
Since the surface of the wall board covered with the dry tile and the upper surface of the wash floor receiving surface are covered with the waterproof sheet, there is no risk of water leakage.

【0019】[0019]

【実施例】以下、本発明の一実施例を添付の図面を参照
して具体的に説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be specifically described below with reference to the accompanying drawings.

【0020】図1及び図2は、一実施例による組立式浴
室の施工方法における断熱処理工程で使用するブロック
部材等を示す斜視図である。図1では、符号11はフロ
ントUブロック、12は左Uブロック、13は右Uブロ
ック、14と15はセンターUブロック、16はテイル
サイドブロック、17はヘッドサイドブロック、18は
タブ受け底、19はヘッドトップ、20、21、22は
渡しブロック、23は端部処理材をそれぞれ示し、これ
らのブロックにより浴室の土台から床面までの空間を埋
めるためのユニットが構成されている。
FIG. 1 and FIG. 2 are perspective views showing block members and the like used in the heat insulating treatment step in the method of constructing an assembled bathroom according to one embodiment. In FIG. 1, reference numeral 11 is a front U block, 12 is a left U block, 13 is a right U block, 14 and 15 are center U blocks, 16 is a tail side block, 17 is a head side block, 18 is a tab receiving bottom, 19 Is a head top, 20, 21, and 22 are transfer blocks, and 23 is an end treatment material, and these blocks constitute a unit for filling a space from the base of the bathroom to the floor.

【0021】また、図2では、符号31はタブ受け、3
2は左エプロンパネル、33は左エプロンサポートパネ
ル、34はエプロンサイドパネル、35は右エプロンパ
ネル、36は右エプロンサポートパネル、37はエプロ
ンサイドパネル、38はテイルフレキ、39はトップフ
レキをそれぞれ示している。これらの部材により、図1
で示した土台のユニットに載置するバスタブを固定する
ためのユニットが構成されている。
Further, in FIG. 2, reference numeral 31 designates a tab receiver and 3
2 is a left apron panel, 33 is a left apron support panel, 34 is an apron side panel, 35 is a right apron panel, 36 is a right apron support panel, 37 is an apron side panel, 38 is tail flex, 39 is top flex, respectively. There is. With these members, FIG.
A unit for fixing the bathtub placed on the base unit shown in is constructed.

【0022】そして、図3では、図1で示した複数のブ
ロックを浴室の土間に敷きつめ、各ブロックの上面が同
じ高さになるようにして土台のユニットを組み立てた後
で、バスタブ受けのユニットをこの土台ユニットの上に
載置する状態を示すものである。このバスタブ受けのユ
ニットは、図2で示す分解した状態から組み立てられて
おり、タブ受け底18の上面に搭載されるようになって
いる。
In FIG. 3, the plurality of blocks shown in FIG. 1 are spread over the soil of the bathroom, and the base unit is assembled so that the upper surfaces of the blocks are at the same height. The figure shows a state in which is mounted on the base unit. The bathtub receiving unit is assembled from the disassembled state shown in FIG. 2 and is mounted on the upper surface of the tab receiving bottom 18.

【0023】前記各ブロック部材は、テイルフレキ3
8、トップフレキ39を除き(テイルフレキ38、トッ
プフレキ39は硬質で薄肉の合成樹脂で形成されてい
る)発泡スチロールの材料で形成されている。この材質
としては、例えばブタン、ペンタン等の発泡剤が含浸さ
れた粒状のスチレン系樹脂を原料とした水蒸気加熱によ
る枠内発泡、または押出成形により、あるいはブロック
状やプレート状に形成されているものを熱線カッターな
どで2次加工することで得られるJIS9511A類と
同等の発泡スチロール製のものである。そしてこれらの
各ブロック部材は、単位体積重量が10kgf/m3 で
あって比重が極めて小さく超軽量であると共に、圧縮歪
を1%程度とした圧縮強度は2〜9tf/m3 であって
充分な圧縮強度を有し、また特に高い断熱性を有してい
る。
Each of the block members has a tail flex 3
8. Except for the top flex 39 (the tail flex 38 and the top flex 39 are made of a hard and thin synthetic resin), they are made of a polystyrene foam material. This material is, for example, foamed in a frame by steam heating using a granular styrene resin impregnated with a foaming agent such as butane or pentane, or extruded, or formed in a block shape or a plate shape. It is made of styrofoam equivalent to JIS 9511A obtained by secondary processing of the above with a hot wire cutter or the like. Each of these block members has a unit volume weight of 10 kgf / m3, an extremely small specific gravity and an ultralight weight, and a compressive strength of 2% to 9 tf / m3 with a compression strain of about 1%. It has strength and particularly high heat insulation.

【0024】前記の土台ユニットの主要なブロックであ
るフロントUブロック11、左Uブロック12、右Uブ
ロック13、センターUブロック14、15、テイルサ
イドブロック16、ヘッドサイドブロック17はそれぞ
れ共通する素材から形成されている。これは工場などで
各ブロックを製造する際に型を共通させて、大量に安価
に製造することができるようにしたためである。図4、
図5はこれらのブロックを成形する前の材料としての共
通素材ブロック45を示すものであり、図5は図4中の
XーXの方向に矢視した断面図である。この共通素材ブ
ロック45はその断面が特異な形状となっており、断面
四角形の細長い材料をその上部の左右の角部をその長さ
方向に長方形に削り取った切欠き溝46を形成し、その
底面から上方に向けて逆U字形をなったU字空洞47を
形成してある。このため、共通素材ブロック45はその
断面(図5)では正方形の左右角が削り取られ(例え
ば、幅20mm、深さ30mmとなるように除去されて
いる)、下面から上方にはドーム状のトンネル形状とな
ったU字空洞47が削り取られ、左右の両側は上下に垂
れ下がった支持脚48となっている。この共通素材ブロ
ック45の高さ及び幅は約335mmに設定してあり、
その長さは適度な長さ(例えば、2〜3m)に設定して
ある。
The front U block 11, left U block 12, right U block 13, center U blocks 14, 15, tail side block 16 and head side block 17, which are the main blocks of the base unit, are made of common materials. Has been formed. This is because it is possible to mass-produce each block at a low cost by sharing a mold when manufacturing each block. Figure 4,
FIG. 5 shows a common material block 45 as a material before molding these blocks, and FIG. 5 is a cross-sectional view taken in the direction of XX in FIG. The common material block 45 has a peculiar cross section, and a notched groove 46 is formed by cutting a long and slender material having a quadrangular cross section into a rectangular shape in the left and right corners thereof, and the bottom surface thereof. A U-shaped cavity 47 having an inverted U-shape is formed from the top to the top. Therefore, in the cross-section (FIG. 5) of the common material block 45, the left and right corners of the square are scraped off (for example, removed so as to have a width of 20 mm and a depth of 30 mm), and a dome-shaped tunnel is formed upward from the lower surface. The U-shaped cavity 47 having the shape is scraped off, and the left and right sides are the support legs 48 that hang vertically. The height and width of this common material block 45 are set to about 335 mm,
The length is set to an appropriate length (for example, 2 to 3 m).

【0025】この共通素材ブロック45は、図5で示し
た断面形状となるように、生産工場などにおいて型枠に
材料を流し込んで発泡させるか、図5で示した断面形状
をした引き抜き穴から押し出して形成させてある。この
共通素材ブロック45は前日したように発泡スチロール
で形成してあるため、必要とする長さ、形状に熱線カッ
ターや刃物で切断することができる。そして、切断した
後の部材を熱加工するか接着剤により結合することによ
り、必要とする形状の部材に加工することができるもの
である。
The common material block 45 is made to have the cross-sectional shape shown in FIG. 5 by pouring the material into a mold in a production plant or the like to foam or extruding from the drawing hole having the cross-sectional shape shown in FIG. Have been formed. Since this common material block 45 is formed of styrofoam as the day before, it can be cut into a required length and shape with a hot wire cutter or a blade. Then, the cut member can be heat-processed or bonded by an adhesive to be processed into a member having a required shape.

【0026】この共通素材ブロック45を使用して前記
フロントUブロック11は形成することができる。この
フロントUブロック11は、共通素材ブロック45を必
要とする長さに切断した形状であり、その長さは約10
00mmとなるようにこの実施例では設定されている。
The front U block 11 can be formed by using the common material block 45. The front U block 11 has a shape in which the common material block 45 is cut to a required length, and the length thereof is about 10
In this embodiment, it is set to be 00 mm.

【0027】センターUブロック14、15はフロント
Uブロック11と同様に共通素材ブロック45を使用し
て形成してある。これらのセンターUブロック14、1
5は、共通素材ブロック45を必要とする長さに切断し
た形状であり、その長さは約650mmとなるようにこ
の実施例では設定されている。
The center U blocks 14 and 15 are formed by using a common material block 45 like the front U block 11. These center U blocks 14, 1
Reference numeral 5 is a shape obtained by cutting the common material block 45 into a required length, and the length is set to be about 650 mm in this embodiment.

【0028】左Uブロック12は共通素材ブロック45
を使用して形成してあり、この左Uブロック12では図
6に示すように左長部材51と左短部材52の2つから
構成される。この左長部材51は共通素材ブロック45
を約985mmの長さに切断したものであり、図6中で
左端を45度の角度で反時計方向に上下から切断してあ
り、長さ方向とは傾斜した切断面aが形成されている。
また、左短部材52は共通素材ブロック45を約335
mmの長さに切断したものであり、図6中で右端を45
度の角度で時計方向に上下から切断してあり、長さ方向
とは傾斜した切断面bが形成されている。この図6で示
した左長部材51と左短部材52をその切断面aとbが
密着するように接触させ、この切断面aとbで両者を結
合し、図7で示す左Uブロック12に組み立てる。この
ため、左長部材51と左短部材52とは結合線cにより
連結され、左Uブロック12はその軸線が直交した形状
となり、U字空洞53は左Uブロック12の下部でL字
形に折れ曲がっているが、その空間は連続した構造とな
る。また、左Uブロック12の上面には一端が左短部材
52により直角に曲げられた止め溝54と、左Uブロッ
ク12の2つの辺をL字形に連続した廻り溝55とが形
成されたことになる。
The left U block 12 is a common material block 45.
The left U block 12 is composed of two members, a left long member 51 and a left short member 52, as shown in FIG. This left long member 51 is a common material block 45.
Is cut into a length of about 985 mm, and the left end in FIG. 6 is cut from above and below in a counterclockwise direction at an angle of 45 degrees, and a cut surface a inclined with respect to the length direction is formed. .
In addition, the left short member 52 has a common material block 45 of about 335
It was cut into a length of mm, and the right end in FIG.
It is cut from above and below in a clockwise direction at an angle of degrees, and a cut surface b that is inclined with respect to the length direction is formed. The left long member 51 and the left short member 52 shown in FIG. 6 are brought into contact with each other so that the cut surfaces a and b are in close contact with each other, and the two are joined at the cut surfaces a and b, and the left U block 12 shown in FIG. Assemble to. Therefore, the left long member 51 and the left short member 52 are connected by the connecting line c, the left U block 12 has a shape in which the axes thereof are orthogonal to each other, and the U-shaped cavity 53 is bent into an L shape at the lower portion of the left U block 12. However, the space has a continuous structure. Further, on the upper surface of the left U block 12, a stop groove 54 whose one end is bent at a right angle by the left short member 52, and a turning groove 55 which is continuous with two sides of the left U block 12 in an L shape are formed. become.

【0029】右Uブロック13は共通素材ブロック45
を使用して形成してあり、この右Uブロック13では図
8に示すように右長部材58と右短部材59の2つから
構成される。この右長部材58は共通素材ブロック45
を約985mmの長さに切断したものであり、図8中で
右端を45度の角度で時計方向に上下から切断してあ
り、長さ方向とは傾斜した切断面dが形成されている。
また、右短部材59は共通素材ブロック45を約335
mmの長さに切断したものであり、図8中で左端を45
度の角度で反時計方向に上下から切断してあり、長さ方
向とは傾斜した切断面eが形成されている。この図8で
示した右長部材58と右短部材59をその切断面dとe
が密着するように接触させ、この切断面dとeで両者を
結合し、図9で示す右Uブロック13に組み立てる。こ
のため、右長部材58と右短部材59とは結合線fによ
り連結され、右Uブロック13はその軸線が直交した形
状となり、U字空洞60は右Uブロック13の下部でL
字形に折れ曲がっているが、その空間は連続した構造と
なる。また、右Uブロック13の上面には一端が右短部
材59により直角に曲げられた止め溝61と、右Uブロ
ック13の2つの辺をL字形に連続した廻り溝62とが
形成されたことになる。なお、右長部材58の側面であ
って、右短部材59とは反対の位置に排水パイプ穴63
が貫通させてある。
The right U block 13 is a common material block 45.
The right U block 13 is composed of two right long members 58 and right short members 59, as shown in FIG. This right long member 58 is a common material block 45
Is cut into a length of about 985 mm, and the right end in FIG. 8 is cut from above and below in a clockwise direction at an angle of 45 degrees, and a cut surface d inclined with respect to the length direction is formed.
Further, the right short member 59 has a common material block 45 of about 335
It was cut to a length of mm, and the left end in FIG.
It is cut from above and below in a counterclockwise direction at an angle of degrees, and a cut surface e inclined with respect to the length direction is formed. The right long member 58 and the right short member 59 shown in FIG.
Are contacted so as to be in close contact with each other, the two are joined by the cut surfaces d and e, and the right U block 13 shown in FIG. 9 is assembled. Therefore, the right long member 58 and the right short member 59 are connected by the connecting line f, the right U block 13 has a shape in which the axes thereof are orthogonal to each other, and the U-shaped cavity 60 is L below the right U block 13.
Although it is bent in a letter shape, the space has a continuous structure. Further, on the upper surface of the right U block 13, a stop groove 61 whose one end is bent at a right angle by the right short member 59 and a turning groove 62 in which two sides of the right U block 13 are continuous in an L shape are formed. become. It should be noted that the drain pipe hole 63 is provided on the side surface of the right long member 58 at a position opposite to the right short member 59.
Is penetrated.

【0030】テイルサイドブロック16は共通素材ブロ
ック45を使用して形成してあり、このテイルサイドブ
ロック16では図10に示すようにテイル部材65と閉
鎖部材66の2つから構成される。このテイル部材65
は共通素材ブロック45を約715mmの長さに切断し
たものであり、図10中で左端を45度の角度で時計方
向に切り込み、その後に長さ方向と直角となるように切
り込んだ『く』字形をした切断面gが形成されており、
この切断面gの平面は切り取る前のテイル部材65の左
端より約80mmの深さにしてある。また、閉鎖部材6
6は共通素材ブロック45を約335mmの長さに切断
したものであり、図10中でその左端を45度の角度で
反時計方向に切り込み、次いで共通素材ブロック45の
長さ方向と平行となるように切り込んだ『く』字形をし
た切断面hが形成されている。この閉鎖部材66の厚み
は約80mmとなるように設定してある。この図10で
示したテイル部材65と閉鎖部材66をその切断面gと
hが密着するように接触させ、この切断面gとhで両者
を結合し、図11で示すテイルサイドブロック16に組
み立てる。この組み立てられたテイルサイドブロック1
6では、そのU字空洞68の一端は閉鎖部材66によっ
て閉止された長方形状をしており、テイルサイドブロッ
ク16の2つの辺をL字形に連続した廻り溝67が形成
されたことになる。
The tail side block 16 is formed by using a common material block 45. The tail side block 16 is composed of a tail member 65 and a closing member 66 as shown in FIG. This tail member 65
Is a common material block 45 cut into a length of about 715 mm, and the left end in FIG. 10 is cut clockwise at an angle of 45 degrees, and then cut to be perpendicular to the length direction. A cut face g having a letter shape is formed,
The plane of the cut surface g is about 80 mm deep from the left end of the tail member 65 before being cut out. Also, the closing member 6
6 is the common material block 45 cut into a length of about 335 mm, the left end of which is cut in a counterclockwise direction at an angle of 45 degrees in FIG. 10, and then becomes parallel to the length direction of the common material block 45. A cut surface h having a V-shape is formed. The thickness of the closing member 66 is set to be about 80 mm. The tail member 65 and the closing member 66 shown in FIG. 10 are brought into contact with each other so that the cut surfaces g and h thereof are in close contact with each other, and the cut surfaces g and h are joined together to be assembled into the tail side block 16 shown in FIG. . This assembled tail side block 1
In FIG. 6, one end of the U-shaped cavity 68 has a rectangular shape closed by the closing member 66, and the two sides of the tail side block 16 are formed with a continuous groove 67 having an L shape.

【0031】ヘッドサイドブロック17は共通素材ブロ
ック45を使用して形成してあり、このテイルサイドブ
ロック16では図12に示すようにヘッド部材71と止
め部材72の2つから構成される。このヘッド部材71
は共通素材ブロック45を約715mmの長さに切断し
たものであり、図12中で左端を45度の角度で時計方
向に切り込み、その後に長さ方向と直角となるように切
り込んだ『く』字形をした切断面kが形成されており、
さらにその長さ方向と平行となるように直線状に切断さ
れている。このため、ヘッド部材71は共通素材ブロッ
ク45の半分が残った形状となり、約190mmの幅と
なっている。また、止め部材72は共通素材ブロック4
5を約335mmの長さに切断したものであり、図12
中でその右端を45度の角度で時計方向に切り込み、次
いで共通素材ブロック45の長さ方向と平行となるよう
に切り込んだ『く』字形をした切断面mが形成されてい
る。この止め部材72の厚みは約80mmとなるように
設定してある。また、ヘッド部材71の上面の2か所に
は上下に給湯水パイプ穴74が貫通してあり、止め部材
72の側面には排水パイプ穴75が水平に貫通してあ
る。この図12で示したヘッド部材71と止め部材72
をその切断面kとmが密着するように接触させ、この切
断面kとmで両者を結合し、図13で示すヘッドサイド
ブロック17に組み立てる。この組み立てられたヘッド
サイドブロック17では、全体がL字形に曲げられた外
形をしており、その周囲にはL字形に連続した廻り溝7
3が形成されたことになる。
The head side block 17 is formed by using a common material block 45, and the tail side block 16 is composed of a head member 71 and a stopper member 72 as shown in FIG. This head member 71
Is a common material block 45 cut into a length of about 715 mm, and the left end in FIG. 12 is cut clockwise at an angle of 45 degrees, and then cut to make a right angle with the length direction. A cut surface k in the shape of a letter is formed,
Further, it is cut linearly so as to be parallel to the length direction. Therefore, the head member 71 has a shape in which half of the common material block 45 remains, and has a width of about 190 mm. Further, the stopper member 72 is the common material block 4
5 is cut into a length of about 335 mm.
The right end is cut in a clockwise direction at an angle of 45 degrees, and then cut so as to be parallel to the length direction of the common material block 45 to form a “m” -shaped cut surface m. The thickness of the stopper member 72 is set to be about 80 mm. Further, hot water supply water pipe holes 74 are vertically penetrated at two positions on the upper surface of the head member 71, and drainage pipe holes 75 are horizontally penetrated at the side surfaces of the stopper member 72. The head member 71 and the stopper member 72 shown in FIG.
Are brought into close contact with the cut surfaces k and m, the cut surfaces k and m are joined together, and the head side block 17 shown in FIG. 13 is assembled. In this assembled head side block 17, the entire outer shape is bent into an L-shape, and the surrounding groove 7 continuous in an L-shape is formed around the outer shape.
3 has been formed.

【0032】図14で示すタブ受け底18はバスタブ4
0の底面を受け止める作用をするものであり、開口が上
を向いた『コ』字形をしており、両側は開放している。
このため、両側が折り曲げられた樋状をしており、その
高さは約335mm、幅は約715mm、長さは約10
00mmに設定されている。そして、このタブ受け底1
8の起立した側壁の一方の外側の角には切欠き溝77が
形成されている。
The tab receiving bottom 18 shown in FIG. 14 is the bathtub 4
It acts to receive the bottom of 0, and the opening has a "U" shape with the top facing upward, and both sides are open.
Therefore, it has a gutter shape with both sides bent, and its height is about 335 mm, width is about 715 mm, and length is about 10 mm.
It is set to 00 mm. And this tab receiving bottom 1
A cutout groove 77 is formed at one of the outer corners of the standing side wall of FIG.

【0033】次に、ヘッドトップ19は図15で示さ
れ、このヘッドトップ19は壁面部材81とパイプ押さ
え82とから構成されている。この壁面部材81は高さ
約335mm、長さ約660mm、厚み約145mmと
なった立方形をした発泡スチロールの材料により、一方
の側面よりその中心に向けて凹部83が形成してあり、
その中央部分が薄肉となっている。この壁面部材81の
上面中央から下方に向けてコ字形をした挿入溝84が開
口してあり、この挿入溝84の底の中央には排水パイプ
を接触させる半円溝85が形成してある。また、パイプ
押さえ82はやや正方形をしており、その幅、高さは挿
入溝84とほぼ同じ形状に設定してあり、パイプ押さえ
82の下面の中央には排水パイプを接触させる半円溝8
6が形成してある。
Next, the head top 19 is shown in FIG. 15, and this head top 19 comprises a wall member 81 and a pipe retainer 82. The wall member 81 has a recess 83 formed from one side surface toward the center thereof by a material of cubic polystyrene foam having a height of about 335 mm, a length of about 660 mm and a thickness of about 145 mm.
The central part is thin. A U-shaped insertion groove 84 is opened downward from the center of the upper surface of the wall member 81, and a semicircular groove 85 for contacting a drainage pipe is formed in the center of the bottom of the insertion groove 84. The pipe retainer 82 has a slightly square shape, and the width and height thereof are set to be substantially the same as that of the insertion groove 84. The center of the lower surface of the pipe retainer 82 is a semicircular groove 8 for contacting a drainage pipe.
6 is formed.

【0034】渡しブロック20、21、22は、発泡ス
チロールの厚板を適当な長さに切断して使用するもので
あり、実施例では厚さ約30mm、幅約150mm、長
さ約650mmの長板状に設定してある。また、端部処
理材10は、切欠き溝46を埋めて土台のユニットの表
面を平坦にならす作用をするものであり、高さ約30m
m、幅約20mm、長さ約1000mmの長棒状に設定
してある。
The transfer blocks 20, 21, and 22 are used by cutting a styrofoam thick plate into an appropriate length, and in the embodiment, a long plate having a thickness of about 30 mm, a width of about 150 mm, and a length of about 650 mm. It is set in a shape. The end treatment material 10 has a function of filling the notch groove 46 and flattening the surface of the base unit, and has a height of about 30 m.
m, a width of about 20 mm, and a length of about 1000 mm are set in a long rod shape.

【0035】次に、タブ受け31は図16でその外形が
示され、実施例では呼び寸法1400の耐熱合成樹脂製
のバスタブ40が挿入できるように高さ約350mm、
幅約715mm、長さ約1250mmの長方形の中央が
上下に貫通した枠状をしている。このタブ受け31の中
央にある長方形の開口はその上部から下方に向けて少し
傾斜した傾斜面89が形成してあり、この傾斜面89に
より下方に向けて少し絞られている。そして、タブ受け
31の短辺の側面にはそれぞれ位置決め凸部91、92
が突起させてあり、タブ受け31の上面の周囲には連続
した切欠き溝90が形成してある。さらに、タブ受け3
1の図12中の左側の短辺の側面の下面には正方形の係
合溝93が切り欠いてあり、この係合溝93には正方形
をした点検蓋94が挿入できるようになっている。な
お、図17は図16中におけるYーYに矢視した断面図
であり、図18は図16中におけるZーZに矢視した断
面図である。
Next, the outer shape of the tab receiver 31 is shown in FIG. 16, and in the embodiment, the height is about 350 mm so that the bathtub 40 made of heat-resistant synthetic resin having a nominal size of 1400 can be inserted.
The center of a rectangle having a width of about 715 mm and a length of about 1250 mm has a frame shape that vertically penetrates. The rectangular opening at the center of the tab receiver 31 is formed with an inclined surface 89 that is inclined slightly downward from the upper portion thereof, and is slightly narrowed downward by the inclined surface 89. Then, the positioning projections 91 and 92 are provided on the short side surfaces of the tab receiver 31, respectively.
And a continuous cutout groove 90 is formed around the upper surface of the tab receiver 31. In addition, tab holder 3
A square engagement groove 93 is cut out on the lower surface of the side surface of the short side on the left side in FIG. 12 of FIG. 1, and a square inspection lid 94 can be inserted into this engagement groove 93. 17 is a sectional view taken along the line YY in FIG. 16, and FIG. 18 is a sectional view taken along the line ZZ in FIG.

【0036】左エプロンパネル32、左エプロンサポー
トパネル33及びエプロンサイドパネル34は、前記タ
ブ受け31の短辺の側面に突起した位置決め凸部91の
枠組構成されるものである。エプロンサイドパネル34
の高さ、長さは位置決め凸部91のそれとほぼ同じに設
定してあり、左エプロンパネル32と左エプロンサポー
トパネル33を位置決め凸部91とエプロンサイドパネ
ル34のそれぞれの端面に密着させることにより内部が
空間の長方体が形成される。そして、テイルフレキ38
は、前記左エプロンパネル32、左エプロンサポートパ
ネル33、エプロンサイドパネル34及び位置決め凸部
91により構成される長方体の枠組の上面の開口を覆
い、これらの上面に載置される長板状をした薄肉の合成
樹脂製の板材である。
The left apron panel 32, the left apron support panel 33, and the apron side panel 34 constitute a frame structure of a positioning convex portion 91 protruding from the short side surface of the tab receiver 31. Apron side panel 34
The height and length of are set to be substantially the same as that of the positioning projection 91, and the left apron panel 32 and the left apron support panel 33 are brought into close contact with the respective end surfaces of the positioning projection 91 and the apron side panel 34. A rectangular parallelepiped with a space inside is formed. And tail flex 38
Covers an opening on the upper surface of a rectangular frame composed of the left apron panel 32, the left apron support panel 33, the apron side panel 34, and the positioning projection 91, and is a long plate-like member placed on these upper surfaces. It is a thin synthetic resin plate material.

【0037】右エプロンパネル35、右エプロンサポー
トパネル36及びエプロンサイドパネル37は、前記タ
ブ受け31の短辺の側面に突起した位置決め凸部92の
枠組構成されるものである。エプロンサイドパネル37
の高さ、長さは位置決め凸部92のそれとほぼ同じに設
定してあり、右エプロンパネル35と右エプロンサポー
トパネル36を位置決め凸部91とエプロンサイドパネ
ル34のそれぞれの端面に密着させることにより内部が
空間の長方体が形成される。そして、トップフレキ39
は、前記右エプロンパネル35右エプロンサポートパネ
ル36及びエプロンサイドパネル37及び位置決め凸部
92により構成される長方体の枠組の上面の開口を覆
い、これらの上面に載置される長板状をした薄肉の合成
樹脂製の板材である。
The right apron panel 35, the right apron support panel 36, and the apron side panel 37 are constructed by a frame of positioning convex portions 92 protruding from the short side surfaces of the tab receiver 31. Apron side panel 37
The height and length of are set to be substantially the same as that of the positioning projection 92, and the right apron panel 35 and the right apron support panel 36 are brought into close contact with the respective end surfaces of the positioning projection 91 and the apron side panel 34. A rectangular parallelepiped with a space inside is formed. And top flexible 39
Covers the openings on the upper surface of the rectangular frame constituted by the right apron panel 35, the right apron support panel 36, the apron side panel 37, and the positioning projections 92, and has a long plate shape placed on these upper surfaces. It is a thin synthetic resin plate material.

【0038】なお、トップフレキ39には、右エプロン
パネル35右エプロンサポートパネル36及びエプロン
サイドパネル37及び位置決め凸部92により構成され
る空間内を垂直に配設させた給湯水のパイプを突出させ
るための水栓穴96を開口してある。この水栓穴96に
は温水と水道水を混合してバスタブ40に給湯するため
の混合水栓(図示せず)が取り付けられる。
In the top flexible member 39, a pipe for supplying hot water is provided which is vertically arranged in the space formed by the right apron panel 35, the right apron support panel 36, the apron side panel 37, and the positioning projection 92. A water faucet hole 96 for opening is opened. A mixing faucet (not shown) for mixing hot water and tap water to supply hot water to the bathtub 40 is attached to the faucet hole 96.

【0039】次に、本発明の一実施例による組立式浴室
の施工方法の各作業工程をリフォームの場合ついて順次
説明する。
Next, each work step of the method for constructing a prefabricated bathroom according to one embodiment of the present invention will be sequentially described for the case of remodeling.

【0040】準備工事としてリフォームする旧浴室を取
り壊して撤去する。まず電気工事として、メインブレー
カを落とし、旧浴室への電気回路を遮断する。そして屋
内配線との接続を外して旧浴室の照明器具を撤去する。
なお、屋内配線の接続端部は絶縁テープで確実に絶縁し
ておく。
[0040] The old bathroom to be renovated as preparatory work is demolished and removed. First, as an electric work, the main breaker is dropped and the electric circuit to the old bathroom is cut off. Then disconnect the indoor wiring and remove the lighting fixtures in the old bathroom.
In addition, the connecting end of the indoor wiring must be insulated with an insulating tape.

【0041】また、上水弁をプラグ止めして旧浴室への
給水を停止し、ガス管をプラグ止めして風呂釜へのガス
の供給を停止し、配水管の開口部をテーピングしてゴミ
が入らないように塞ぐ。そして旧浴室内にある風呂釜、
浴槽などを撤去する。
Further, the water supply valve is plugged to stop the water supply to the old bathroom, the gas pipe is plugged to stop the gas supply to the bath kettle, and the opening of the water pipe is taped to remove dust. Block so that it does not enter. And the bath kettle in the old bathroom,
Remove the bathtub etc.

【0042】さらに、旧浴室の天井板、壁板を外し、野
地、軸組が露出するまで撤去する。また土間98が全部
露出するよう床板を全部撤去する。
Further, the ceiling plate and the wall plate of the old bathroom are removed and removed until the field and the frame are exposed. In addition, all floorboards are removed so that the soil floor 98 is completely exposed.

【0043】旧浴室の取り壊しが済んだら、図1に示す
各ブロックを配置して土台のユニットを組み立てること
になるが、その前に施工の際に必要となる基準面を図1
9により説明する。旧浴室では、野地、軸組を取り壊し
た後には土間98が露出し、土間98の周囲にはブロッ
ク、コンクリートなどで垂直に立ち上げられた基礎99
がある。この基礎99の上面には水平に胴差し100が
乗せてあり、胴差し100の必要な個所には脱衣場に向
けて直角に根太101が載置してある。この根太101
の上で胴差し100と平行になるように脱衣場と浴室の
境界(すなわち、浴室のドアーの部分)には、足で踏み
込むための沓摺102が設けてある。この沓摺102の
上面を組立の基準線Wとし、この基準線Wを零位置と考
え、基準線Wより下方の長さによって各部材の位置を設
定している。
When the old bathroom has been demolished, the blocks shown in FIG. 1 are arranged to assemble the base unit, but before that, the reference plane required for construction is shown in FIG.
This will be described with reference to 9. In the old bathroom, the ground floor 98 is exposed after the field and the frame are demolished, and the foundation 99 is vertically erected with blocks, concrete, etc. around the ground floor 98.
There is. A bodice 100 is placed horizontally on the upper surface of the foundation 99, and joists 101 are placed at required positions on the bodice 100 at right angles toward the dressing room. This joist 101
At the boundary between the dressing room and the bathroom (that is, the door of the bathroom) so as to be parallel to the body 100 on the upper side, there is provided a slide 102 for stepping on with a foot. The upper surface of the slide 102 is used as a reference line W for assembly, the reference line W is considered to be a zero position, and the position of each member is set by the length below the reference line W.

【0044】まず、浴室の壁には天井から基準線Wより
200mm下方の範囲にわたり、防水シート張り用の下
地板である耐水ベニヤ板108を張り付ける。そして給
湯、給水、排水のそれぞれの管工事に必要な配管のスリ
ーブを壁に入れ、シャワー用の給湯、給水の配管工事を
行なう。また壁にはドアー枠及び窓枠を固定し、これら
を避けて壁下地に壁ボードを張る。なお、壁ボードには
換気扇用の排気口を開口する。
First, a water resistant veneer plate 108, which is a base plate for attaching a waterproof sheet, is attached to the wall of the bathroom over a range of 200 mm below the reference line W from the ceiling. Then, the sleeves of the pipes required for hot water supply, water supply, and drainage pipe work are inserted into the wall, and hot water supply for the shower and water supply pipe work are performed. Also, the door frame and window frame are fixed to the wall, and avoiding these, the wall board is stretched over the wall base. An exhaust port for a ventilation fan is opened on the wall board.

【0045】次に本工事として、図19に示すように露
出した土間98を整地し、その表面を転圧して良質の砂
などにより平坦に仕上げる。この土間98の水平位置
は、基準線Wより470mm下方となるように設定す
る。
Next, as the main work, as shown in FIG. 19, the exposed soil 98 is leveled, and the surface thereof is compacted and flattened with good quality sand or the like. The horizontal position of the dirt floor 98 is set to be 470 mm below the reference line W.

【0046】土間98の整地が済んだら、土間98の表
面にドライモルタル104(本実施例ではドライモルタ
ルを使用したが、従来のモルタルでも構わない)を20
mmの厚さに均一に散布し、定規などのならし棒で水平
面に仕上げ、基準線Wより450mm下がった水平な基
盤を造成する。このドライモルタル104が土間98の
湿気などにより固まったならば、そのドライモルタル1
04の必要な位置に給水管、給湯管、排水管などを配置
する。
After the soil 98 has been leveled, dry mortar 104 (dry mortar is used in this embodiment, but conventional mortar may be used) is applied to the surface of the soil 98.
Disperse evenly to a thickness of mm, finish it on a horizontal surface with a leveling rod such as a ruler, and create a horizontal base 450 mm lower than the reference line W. If this dry mortar 104 hardens due to moisture in the soil 98, dry mortar 1
Water supply pipes, hot water supply pipes, drainage pipes, etc. are arranged at necessary positions in 04.

【0047】このようにして乾式による基盤造成の工程
が済んだら、図1で示す各ブロックをドライモルタル1
04上に配設して土台のユニットを組み立てて断熱処理
工程に進む。この工程では図1に示すように、ドアーの
ある浴室入り口側から順次前記フロントUブロック1
1、左Uブロック12、右Uブロック13、センターU
ブロック14、15、テイルサイドブロック16、ヘッ
ドサイドブロック17、タブ受け底18、ヘッドトップ
19をドライモルタル104上に設置して敷き詰める。
すなわち、まず最初に浴室入り口側からみて(従って、
図1と後述する説明では左と右の説明が逆になる)沓摺
102に沿う横向きにフロントUブロック11を設置
し、その左端に左Uブロック12をその左短部材52が
連続するように縦向きに設置し、同様にフロントUブロ
ック11の右端に右短部材59が連続するよう右Uブロ
ック13を縦向きに設置する。
After completion of the step of forming the substrate by the dry method as described above, the blocks shown in FIG.
04, the base unit is assembled, and the heat insulation process is performed. In this process, as shown in FIG. 1, the front U block 1 is sequentially installed from the entrance side of the bathroom with a door.
1, left U block 12, right U block 13, center U
The blocks 14 and 15, the tail side blocks 16, the head side blocks 17, the tab receiving bottoms 18, and the head tops 19 are installed and spread on the dry mortar 104.
That is, first of all, from the bathroom entrance side (hence,
The description of left and right is reversed in FIG. 1 and the following description.) The front U block 11 is installed laterally along the slide 102, and the left U block 12 is connected to the left end of the front U block 12 so that the left short member 52 is continuous. The right U block 13 is installed vertically, and similarly, the right U block 13 is installed vertically so that the right short member 59 is continuous to the right end of the front U block 11.

【0048】続いて、フロントUブロック11の前方の
左Uブロック12と右Uブロック13との間に等間隔を
置いてセンターUブロック14、15を縦向きに設置
し、渡しブロック20を左Uブロック12とセンターU
ブロック14の間に、渡しブロック21を両センターU
ブロック14と15の間に、渡しブロック22を右Uブ
ロック13とセンターUブロック15の間にそれぞれ架
け渡し、各ブロックの角隅に形成してある切欠き溝4
6、止め溝54、61に嵌め込む。また、フロントUブ
ロック11とセンターUブロック14、15の間には、
その切欠き溝46に沿って端部処理材23を埋め込む。
これらの渡しブロック20、21、22、端部処理材2
3により、フロントUブロック11、左Uブロック1
2、右Uブロック13、センターUブロック14、15
による洗い場の床面は平坦となるように形成される。な
お、右Uブロック13とセンターUブロック15の間で
あって、渡しブロック22の先端には切欠き溝46と止
め溝61の間に跨がるようにして排水金物25を埋め込
んでおく(渡しブロック22の長さは他の渡しブロック
20、21よりも少し短く形成してある)。
Subsequently, the center U blocks 14 and 15 are vertically installed at equal intervals between the left U block 12 and the right U block 13 in front of the front U block 11, and the transfer block 20 is left U. Block 12 and center U
Between the blocks 14, the passing blocks 21 are placed at both centers U.
The transfer block 22 is provided between the blocks 14 and 15 and between the right U block 13 and the center U block 15, and the cutout groove 4 formed at the corner of each block is provided.
6, fit in the stop grooves 54, 61. Further, between the front U block 11 and the center U blocks 14 and 15,
The end processing material 23 is embedded along the cutout groove 46.
These transfer blocks 20, 21, 22 and the end treatment material 2
3, the front U block 11 and the left U block 1
2, right U block 13, center U block 14, 15
The floor of the washing area is formed to be flat. In addition, between the right U block 13 and the center U block 15, the drain metal 25 is embedded at the tip of the transfer block 22 so as to straddle between the notch groove 46 and the stop groove 61 (transfer). The length of the block 22 is slightly shorter than the other transfer blocks 20 and 21).

【0049】また、テイルサイドブロック16を左Uブ
ロック12の前方に連続して縦向きに設置し、同様にヘ
ッドサイドブロック17を右Uブロック13の前方に連
続して縦向きに設置する。そしてテイルサイドブロック
16とヘッドサイドブロック17の間にタブ受け底18
を横向きに設置し、このタブ受け底18とヘッドサイド
ブロック17との間にヘッドトップ19を挿入する。こ
の場合、バスタブ40用の排水管は、ヘッドサイドブロ
ック17内に配置されるのであり、これに接続される排
水管はヘッドトップ19の半円溝85と86により形成
された開口を通してタブ受け底18側の内部に引き出さ
れる。この排水管の挿入においては、パイプ押さえ82
を挿入溝84より引出しておき、ヘッドサイドブロック
17から引き廻した排水管の下面を半円溝85に密着さ
せ、その後挿入溝84にパイプ押さえ82を挿入して半
円溝86により排水管の上面を密着し、排水管を半円溝
85と86で上下から押さえることで固定する。またバ
スタブ40用の給水管及び給湯管は、土間98から立ち
上げてヘッドサイドブロック17の給湯水パイプ穴74
を通して上方へ引き出される。
Further, the tail side block 16 is continuously installed vertically in front of the left U block 12, and similarly, the head side block 17 is continuously installed vertically in front of the right U block 13. Then, the tab receiving bottom 18 is provided between the tail side block 16 and the head side block 17.
Is installed sideways, and the head top 19 is inserted between the tab receiving bottom 18 and the head side block 17. In this case, the drainage pipe for the bathtub 40 is arranged in the head side block 17, and the drainage pipe connected to this is through the opening formed by the semicircular grooves 85 and 86 of the head top 19 and the tab receiving bottom. It is pulled out to the inside of 18 side. When inserting the drain pipe, the pipe retainer 82
Is drawn out from the insertion groove 84, the lower surface of the drain pipe drawn around from the head side block 17 is brought into close contact with the semicircular groove 85, and then the pipe retainer 82 is inserted into the insertion groove 84 and the drain pipe of the drain pipe is inserted by the semicircular groove 86. The upper surface is closely attached and the drain pipe is fixed by pressing it with the semicircular grooves 85 and 86 from above and below. Further, the water supply pipe and the hot water supply pipe for the bathtub 40 are raised from the dirt floor 98 and the hot water supply water pipe hole 74 of the head side block 17 is provided.
Is pulled up through.

【0050】このようにして土台のユニットが組み立て
られたならば、図20で示すコーナアングル110を各
ブロックの切欠き溝に挿入して各ブロックが浮かび上が
らないように固定する。このコーナアングル110は合
成樹脂やアルミなどの軽金属で一体となって形成してあ
り、平面状をした固定部111とこの固定部111の一
側に連結した内部中空の断面四角形をした押し込み部1
12とから構成されている。そして、固定部111と押
し込み部112とは一体となるように、例えば引抜き形
成や押出し形成により細長い形状に連続して形成してあ
る。また、固定部111の所定間隔毎には、ネジ穴11
3が開口してある。
After the base unit is assembled in this way, the corner angle 110 shown in FIG. 20 is inserted into the notch groove of each block and fixed so that each block does not rise. The corner angle 110 is integrally formed of a light metal such as synthetic resin or aluminum, and has a planar fixing portion 111 and a push-in portion 1 having an inner hollow cross-section and being connected to one side of the fixing portion 111.
It is composed of 12 and. The fixed portion 111 and the push-in portion 112 are integrally formed in a slender shape by, for example, drawing or extruding so as to be integrated. In addition, the screw holes 11 are provided at predetermined intervals of the fixing portion 111.
3 is open.

【0051】このコーナアングル110により、各ブロ
ックの内でその代表例であるテイルサイドブロック16
を固定する工程を図20において説明しる。このテイル
サイドブロック16の側面は基礎99の側面に密着して
あり、廻り溝67と基礎99の側面により上方に開口し
たコ字形の空間が形成されている。この廻り溝67に押
し込み部112を挿入し、固定部111の裏面を基礎9
9側に密着するように固定する。そして、ネジ穴113
より木ネジ114を挿入し、この木ネジ114を耐水ベ
ニヤ板108にねじ込み、コーナアングル110を固定
する。このコーナアングル110の押し込み部112が
廻り溝67に食い込み、軽い重量のテイルサイドブロッ
ク16が浮き上がるのを防止している。このようにし
て、コーナアングル110を使用し、切欠き溝46、廻
り溝55、廻り溝62、廻り溝67、廻り溝73、切欠
き溝77にそれぞれ押し込み部112を挿入し、各ブロ
ックを土間98に固定する。
With this corner angle 110, the tail side block 16 which is a typical example of each block is shown.
The process of fixing the will be described with reference to FIG. The side surface of the tail side block 16 is in close contact with the side surface of the base 99, and a U-shaped space opened upward is formed by the turning groove 67 and the side surface of the base 99. The push-in portion 112 is inserted into the groove 67, and the back surface of the fixed portion 111 is attached to the base 9
Fix it so that it closely contacts the 9 side. And the screw hole 113
A wood screw 114 is inserted, and the wood screw 114 is screwed into the waterproof veneer plate 108 to fix the corner angle 110. The push-in portion 112 of the corner angle 110 bites into the turning groove 67 and prevents the tail side block 16 having a light weight from rising. In this way, using the corner angle 110, the push-in portions 112 are inserted into the notch groove 46, the turning groove 55, the turning groove 62, the turning groove 67, the turning groove 73, and the notch groove 77, respectively, and each block is inserted into the dirt floor. Fix at 98.

【0052】コーナアングル110による各ブロックの
固定が済んだら、次に、浴室内の壁全体と洗い場側のブ
ロックの表面全域に防水シート105を張り付ける。こ
の防水シート105は浴室の湿気を床下や壁面に侵入す
るのを防止させるためのものであり、壁に固定してある
耐水ベニヤ板108の表面及び洗い場の床面を防水シー
ト105で覆って張る(図19参照)。この場合、耐水
ベニヤ板108へはその最下段から順次上段に向かって
防水シート105を横張りし、洗い場の床面に張る防水
シート105はその周縁部を耐水ベニヤ板108に沿っ
て立ち上げ、耐水ベニヤ板108側の防水シート105
との重ね代を設ける。そして、各防水シート105の接
合部はシール材により目地止めしておく。
After fixing each block by the corner angle 110, next, the waterproof sheet 105 is attached to the entire wall in the bathroom and the entire surface of the block on the washroom side. The waterproof sheet 105 is for preventing moisture in the bathroom from entering the underfloor or the wall surface, and the surface of the waterproof veneer plate 108 fixed to the wall and the floor surface of the washroom are covered with the waterproof sheet 105 ( See FIG. 19). In this case, the waterproof sheet 105 is horizontally stretched from the lowermost stage to the upper stage in order on the waterproof veneer plate 108, and the waterproof sheet 105 stretched on the floor surface of the washing room is raised along its peripheral edge along the waterproof veneer plate 108, and 108 side waterproof sheet 105
And the overlap allowance. Then, the joint portion of each waterproof sheet 105 is fixed with joints by a sealant.

【0053】このような防水処理工程が済んだら、タブ
受け31をタブ受け底18の上面に重ねて接着し、左エ
プロンパネル32、左エプロンサポートパネル33、エ
プロンサイドパネル34を枠組してテイルサイドブロッ
ク16上に重ねて接着し、また右エプロンパネル35、
右エプロンサポートパネル36、エプロンサイドパネル
37を枠組してヘッドサイドブロック17上に重ねて接
着する。そして、土間98から立ち上げてある給湯管、
給水管をそれぞれヘッドサイドブロック17の給湯水パ
イプ穴74を挿通させ、次いでこれらの給湯管、給水管
を右エプロンパネル35、右エプロンサポートパネル3
6、エプロンサイドパネル37によって形成された空間
を垂直に上方に立ち上げる。また、右Uブロック13に
形成してある排水パイプ穴63より排水管を引き出して
立ち上げ、この排水管の上端に排水金物25を接続して
おく。
After the waterproofing process is completed, the tab receiver 31 is overlaid and adhered to the upper surface of the tab receiving bottom 18, and the left apron panel 32, the left apron support panel 33, and the apron side panel 34 are framed to form the tail side. Overlaid on the block 16 and glued again, again the right apron panel 35,
The right apron support panel 36 and the apron side panel 37 are framed and laminated on the head side block 17 and bonded. And the hot water supply pipe that has been launched from the dirt floor 98,
The water supply pipes are respectively inserted through the hot water supply water pipe holes 74 of the head side block 17, and then these hot water supply pipes and water supply pipes are connected to the right apron panel 35 and the right apron support panel 3.
6. The space formed by the apron side panel 37 is vertically raised upward. In addition, the drain pipe is pulled out from the drain pipe hole 63 formed in the right U block 13 to stand up, and the drain metal 25 is connected to the upper end of the drain pipe.

【0054】そして、防水シート105で覆われた洗い
場の床面にモルタル106を張り、このモルタル106
の上面は排水金物25の方向が水下になるように所定の
角度で排水勾配を設定する。この洗い場の基礎となるモ
ルタル張りの工程が済んだら、左エプロンパネル32、
左エプロンサポートパネル33、エプロンサイドパネル
34により構成される四角形となった枠組の開口を覆う
ようにテイルフレキ38を載置する(図3参照)。ま
た、右エプロンパネル35、右エプロンサポートパネル
36、エプロンサイドパネル37により構成される四角
形となった枠組の開口を覆うようにトップフレキ39を
載置する(図3参照)。このトップフレキ39の水栓穴
96より給湯管、給水管の上端を露出させ、給湯管、給
水管には混合水栓を連結する。
Then, mortar 106 is put on the floor surface of the washing place covered with the waterproof sheet 105, and this mortar 106
The drainage gradient is set on the upper surface of the drainage at a predetermined angle so that the direction of the drainage hardware 25 is below the water. After finishing the mortar installation process, which is the basis of this washing area, left apron panel 32,
The tail flex 38 is placed so as to cover the opening of the quadrangular frame constituted by the left apron support panel 33 and the apron side panel 34 (see FIG. 3). Further, the top flexible member 39 is placed so as to cover the opening of the quadrangular frame constituted by the right apron panel 35, the right apron support panel 36, and the apron side panel 37 (see FIG. 3). The hot water supply pipe and the upper end of the water supply pipe are exposed through the water faucet hole 96 of the top flex 39, and a mixed water faucet is connected to the hot water supply pipe and the water supply pipe.

【0055】続いて、図20に示すように、モルタル1
06が張られた洗い場の床面、防水シート105で覆わ
れた耐水ベニヤ板108、タブ受け31の側面、テイル
フレキ38の上面、トップフレキ39の上面にそれぞれ
タイル107を張り付ける(このタイル107の張り付
けは乾式工法による)。その後、換気扇の取付け工事、
天井材の取付け工事を順次行う。
Then, as shown in FIG. 20, mortar 1
The tiles 107 are attached to the floor surface of the washing place where 06 is stretched, the waterproof veneer plate 108 covered with the waterproof sheet 105, the side surface of the tab receiver 31, the upper surface of the tail flex 38, and the upper surface of the top flex 39 (adhesion of this tile 107). Is a dry method). After that, the installation work of the ventilation fan,
Ceiling material installation work will be performed sequentially.

【0056】そして、タブ受け31の中央の大きく開口
している四角形のバス挿入の穴に上方からバスタブ40
を挿入し、バスタブ40をタブ受け31に固定する。こ
のバスタブ40の設置においては、既にヘッドトップ1
9の半円溝85と86からタブ受け底18の内側に向け
て配管してある排水管をバスタブ40の排水穴と接続す
る。このバスタブ40を固定するには、あらかじめタブ
受け底18内にモルタルを充填しておき、タブ受け31
にバスタブ40を挿入し、バスタブ40の底面にモルタ
ルを密着させることで行う。そして、バスタブ40をタ
ブ受け31に固定したならば、バスタブ40のフランジ
部の周囲とタブ受け31の切欠き溝90の隙間をコーキ
ングして充填する。
Then, the bathtub 40 is inserted from above into the square bath insertion hole having a large opening in the center of the tab receiver 31.
Is inserted and the bathtub 40 is fixed to the tab receiver 31. When installing the bathtub 40, the headtop 1 has already been installed.
A drainage pipe, which is piped from the semicircular grooves 85 and 86 of 9 toward the inside of the tab receiving bottom 18, is connected to the drainage hole of the bathtub 40. To fix the bathtub 40, the tub mortar is filled in the tab receiving bottom 18 in advance, and the tab receiving 31
The bathtub 40 is inserted into and the mortar is brought into close contact with the bottom surface of the bathtub 40. When the bathtub 40 is fixed to the tab receiver 31, the gap around the flange of the bathtub 40 and the cutout groove 90 of the tab receiver 31 is caulked and filled.

【0057】このようにして施工された浴室が図21で
示される。この浴室は、脱衣場から浴室方向を視た状態
であり、洗い場と壁面はタイル107が一面に張られて
おり、出窓121側の下にはバスタブ40が配置してあ
る。このバスタブ40の周辺に接近してこのバスタブ4
0に温水、冷水を混合して供給する混合水栓117が設
けてあり、右側の壁にはシャワー用の混合水栓118が
固定してあり、この混合水栓118にはホースを介して
ハンドシャワー119が連結してある。また、天井には
照明灯121と排気口123が固定してある。
The bathroom constructed in this manner is shown in FIG. The bathroom is viewed from the dressing room in the direction of the bathroom. The washing room and the wall are covered with tiles 107, and the bathtub 40 is arranged below the bay 121 side. Close to the bathtub 40 and the bathtub 4
0 is provided with a mixing faucet 117 for mixing hot water and cold water and supplying it, and a mixing faucet 118 for a shower is fixed to the right wall, and this mixing faucet 118 is connected to a hand via a hose. Shower 119 is connected. An illumination lamp 121 and an exhaust port 123 are fixed to the ceiling.

【0058】以上説明した本発明の一実施例の組立式浴
室の施工方法によれば、バスタブ40の下方が、土間9
8上に造成されたモルタル104の基盤上に設置される
タブ受け底18及びその上に設置されるタブ受け31に
よって断熱処理され、洗い場の下方は、上記フロントU
ブロック11、左Uブロック12、右Uブロック13、
センターUブロック14、15及びこれらに支持して設
置される渡しブロック20、21、22によって断熱処
理されるので、バスタブ40及び洗い場の保温性は格段
に向上し、冬期や寒冷地においても快適な入浴環境が得
られる。
According to the method of constructing a prefabricated bathroom according to the embodiment of the present invention described above, the space between the lower part of the bathtub 40 is the dirt floor 9
The tab receiving bottom 18 installed on the base of the mortar 104 formed on 8 and the tab receiving 31 installed on it are heat-insulated.
Block 11, left U block 12, right U block 13,
Since the center U blocks 14 and 15 and the transfer blocks 20, 21 and 22 installed to support them are heat-insulated, the heat retention of the bathtub 40 and the washing area is remarkably improved, and it is comfortable even in the winter and cold regions. A bathing environment is obtained.

【0059】ここで断熱処理工程は、土間98上に造成
されたモルタル104の基盤上にフロントUブロック1
1、左Uブロック12、右Uブロック13、センターU
ブロック14、15、テイルサイドブロック16、ヘッ
ドサイドブロック17、タブ受け底18、タブ受け3
1、渡しブロック20、21、22を順次設置すること
を内容とするので、作業が簡単である。また、上記基盤
造成はドライモルタルを組成とするモルタル104を使
用した乾式工法であり、タイル107の張り付け乾式の
工法であるため、工期が短くて済む。
Here, in the heat insulating treatment step, the front U block 1 is placed on the base of the mortar 104 formed on the soil 98.
1, left U block 12, right U block 13, center U
Blocks 14, 15, tail side block 16, head side block 17, tab receiving bottom 18, tab receiving 3
1, the transfer blocks 20, 21, and 22 are sequentially installed, so that the work is easy. In addition, the above-described foundation construction is a dry construction method using the mortar 104 having a composition of dry mortar, and since the tile 107 is a dry construction method, the construction period is short.

【0060】洗い場の表面、耐水ベニヤ板108の表
面、タブ受け31の露出部にも乾式のタイル107が張
り付けられるので、浴室内は重厚感のある本格的なもの
となる。
Since the dry tiles 107 are attached to the surface of the washing room, the surface of the water resistant veneer plate 108, and the exposed portion of the tab receiver 31, the interior of the bathroom becomes solid and full-scale.

【0061】前記乾式のタイル107で覆われた耐水ベ
ニヤ板108の表面及び洗い場の床面の上面は、防水シ
ート105で覆われるので、漏水のおそれれがなく、家
屋の土台を腐らせることがないので、家屋の耐用年数も
向上する。
Since the surface of the water resistant veneer plate 108 covered with the dry tile 107 and the upper surface of the floor of the washing area are covered with the waterproof sheet 105, there is no risk of water leakage and the base of the house is not spoiled. Therefore, the service life of the house is also improved.

【0062】なお、前記タブ受け31は、長手方向に沿
って2分割して一対のタブ受けを半分づつに製造し、こ
れらの一対のタブ受けを接合することで組み立てる構造
としてもよく、そうすることでバスタブ40の排水口と
排水管との接続が容易に行なえる。
The tab receiver 31 may have a structure in which the tab receiver 31 is divided into two along the lengthwise direction to manufacture a pair of tab receivers in half, and the pair of tab receivers are joined to assemble the tab receivers. Therefore, the drainage port of the bathtub 40 and the drainage pipe can be easily connected.

【0063】[0063]

【発明の効果】以上説明したとおり本発明によれば、バ
スタブの下方が、土間上に造成されたモルタルの基盤上
に設置される土台のユニット及びその上に設置されるタ
ブ受けによって断熱処理され、洗い場の下方は、上記土
台のユニット及びこれに支持して設置される洗い場の床
面のユニットによって断熱処理される。従って、浴槽及
び洗い場の保温性を格段に向上することができ、冬期や
寒冷地においても快適な入浴環境を得ることができる。
As described above, according to the present invention, the lower part of the bathtub is heat-insulated by the base unit installed on the mortar base formed on the earth and the tab receiver installed on the base unit. The lower part of the washing room is heat-insulated by the above-mentioned base unit and the unit of the floor surface of the washing room installed to support it. Therefore, it is possible to remarkably improve the heat retention of the bathtub and the washing place, and it is possible to obtain a comfortable bathing environment even in the winter and cold regions.

【0064】ここで断熱処理工程は、土間上に造成され
たモルタルの基盤上に各土台のユニットである各ブロッ
ク、タブ受けなどを順次設置することで組み立てること
を内容とするので、作業が簡単である。また、上記土間
における基盤の造成はドライモルタルを使用した乾式で
あり、タイル張りも乾式工法であるため、工期を短縮す
ることができる。
Here, the heat insulation treatment step is intended to be assembled by sequentially installing each block, which is a unit of each base, a tab receiver, etc. on the base of the mortar formed on the soil, so that the work is easy. Is. Moreover, since the foundation of the soil is dry type using dry mortar and tiling is a dry type method, the construction period can be shortened.

【0065】洗い場の表面、耐水ベニヤ板の表面、タブ
受けの外面露出部にはタイルが張られるので、重厚感の
ある本格的な浴室を得ることができる。
Since tiles are laid on the surface of the washing room, the surface of the waterproof veneer plate, and the exposed outer surface of the tab receiver, a full-scale bathroom with a solid feeling can be obtained.

【0066】前記タイルで覆われた耐水ベニヤ板の表面
及び洗い場の床面の上面は、防水シートで覆われるの
で、漏水のおそれれがなく、家屋の土台を腐らせること
がないので、家屋の耐用年数も向上することができる。
Since the surface of the waterproof veneer covered with the tiles and the upper surface of the floor of the washroom are covered with the waterproof sheet, there is no fear of water leakage and the base of the house is not spoiled, so that the durability of the house is improved. The number of years can be improved.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明による組立式浴室の施工方法の一実施例
に使用する土台のユニットに使用する各ブロックを配置
した分解斜視図である。
FIG. 1 is an exploded perspective view in which blocks used in a base unit used in an embodiment of a method of constructing an assembled bathroom according to the present invention are arranged.

【図2】本発明による組立式浴室の施工方法の一実施例
に使用するバスタブ固定のユニットに使用する各ブロッ
クを示す分解斜視図である。
FIG. 2 is an exploded perspective view showing each block used in a bathtub-fixed unit used in an embodiment of a method of constructing an assembled bathroom according to the present invention.

【図3】本発明による組立式浴室の施工方法の一実施例
に使用する土台のユニットの上にバスタブ固定のユニッ
トを載置する前の状態を示す各ブロックを配置した分解
斜視図である。
FIG. 3 is an exploded perspective view in which each block is arranged on a base unit used in an embodiment of a method of constructing an assembled bathroom according to the present invention before placing a bathtub fixed unit.

【図4】本発明による組立式浴室の施工方法の一実施例
に使用する共通素材ブロックを示す斜視図である。
FIG. 4 is a perspective view showing a common material block used in one embodiment of a method of constructing a prefabricated bathroom according to the present invention.

【図5】本発明による組立式浴室の施工方法の一実施例
に使用する共通素材ブロックの図4におけるXーXの断
面図である。
5 is a cross-sectional view taken along the line XX in FIG. 4 of the common material block used in one embodiment of the method for constructing the assembled bathroom according to the present invention.

【図6】本発明による組立式浴室の施工方法の一実施例
に使用する左Uブロックの部材を示す斜視図である。
FIG. 6 is a perspective view showing a member of a left U block used in an embodiment of a method of constructing an assembled bathroom according to the present invention.

【図7】本発明による組立式浴室の施工方法の一実施例
に使用する左Uブロックを組立た状態を示す斜視図であ
る。
FIG. 7 is a perspective view showing an assembled state of a left U block used in one embodiment of a method of constructing an assembled bathroom according to the present invention.

【図8】本発明による組立式浴室の施工方法の一実施例
に使用する右Uブロックの部材を示す斜視図である。
FIG. 8 is a perspective view showing a member of the right U block used in one embodiment of the method of constructing a prefabricated bathroom according to the present invention.

【図9】本発明による組立式浴室の施工方法の一実施例
に使用する右Uブロックを組立た状態を示す斜視図であ
る。
FIG. 9 is a perspective view showing the assembled state of the right U block used in one embodiment of the method of constructing an assembled bathroom according to the present invention.

【図10】本発明による組立式浴室の施工方法の一実施
例に使用するテイルサイドブロックの部材を示す斜視図
である。
FIG. 10 is a perspective view showing members of a tail side block used in one embodiment of a method of constructing an assembled bathroom according to the present invention.

【図11】本発明による組立式浴室の施工方法の一実施
例に使用するテイルサイドブロックを組立た状態を示す
斜視図である。
FIG. 11 is a perspective view showing an assembled state of a tail side block used in one embodiment of a method of constructing an assembled bathroom according to the present invention.

【図12】本発明による組立式浴室の施工方法の一実施
例に使用するヘッドサイドブロックの部材を示す斜視図
である。
FIG. 12 is a perspective view showing a member of a head side block used in an embodiment of a method of constructing an assembled bathroom according to the present invention.

【図13】本発明による組立式浴室の施工方法の一実施
例に使用するヘッドサイドブロックを組立た状態を示す
斜視図である。
FIG. 13 is a perspective view showing an assembled state of a head side block used in one embodiment of a method of constructing an assembled bathroom according to the present invention.

【図14】本発明による組立式浴室の施工方法の一実施
例に使用するタブ受け底を示す斜視図である。
FIG. 14 is a perspective view showing a tab receiving bottom used in one embodiment of a method of constructing an assembled bathroom according to the present invention.

【図15】本発明による組立式浴室の施工方法の一実施
例に使用するヘッドトップの部材を分離した状態を示す
斜視図である。
FIG. 15 is a perspective view showing a state in which the members of the head top used in the embodiment of the method of constructing the assembled bathroom according to the present invention are separated.

【図16】本発明による組立式浴室の施工方法の一実施
例に使用するタブ受けを示す斜視図である。
FIG. 16 is a perspective view showing a tab receiver used in an embodiment of a method of constructing an assembled bathroom according to the present invention.

【図17】本発明による組立式浴室の施工方法の一実施
例に使用するタブ受けの断面を示し、図16中のYーY
の断面図である。
FIG. 17 is a cross-sectional view of a tab receiver used in an embodiment of a method for constructing a prefabricated bathroom according to the present invention, showing YY in FIG.
FIG.

【図18】本発明による組立式浴室の施工方法の一実施
例に使用するタブ受けの断面を示し、図16中のZーZ
の断面図である。
FIG. 18 is a cross-sectional view of a tab receiver used in an embodiment of a method of constructing a prefabricated bathroom according to the present invention, showing a section ZZ in FIG. 16;
FIG.

【図19】本発明による組立式浴室の施工方法での洗い
場の床面の構成と基準線の位置関係を示す断面図であ
る。
FIG. 19 is a cross-sectional view showing the configuration of the floor surface of the washroom and the positional relationship between the reference lines in the method of constructing a prefabricated bathroom according to the present invention.

【図20】本発明による組立式浴室の施工方法の一実施
例に使用するコーナーアングルの構成とブロックの押さ
え状態を示す斜視図である。
FIG. 20 is a perspective view showing a configuration of a corner angle used in an embodiment of a method of constructing an assembled bathroom according to the present invention and a block pressing state.

【図21】本発明による組立式浴室の施工方法で完成し
た浴室を脱衣場から視た状態を示す透視図である。
FIG. 21 is a perspective view showing a bathroom completed by the method for constructing a prefabricated bathroom according to the present invention as viewed from a dressing room.

【符号の説明】[Explanation of symbols]

11 フロントUブロック 12 左Uブロック 13 右Uブロック 14 センターUブロック 15 センターUブロック 16 テイルサイドブロック 17 ヘッドサイドブロック 18 タブ受け底 19 ヘッドトップ 20 渡しブロック 21 渡しブロック 22 渡しブロック 23 端部処理材 25 排水金物 31 タブ受け 32 左エプロンパネル 33 左エプロンサポートパネル 34 エプロンサイドパネル 35 右エプロンパネル 36 右エプロンサポートパネル 37 エプロンサイドパネル 38 テイルフレキ 39 トップフレキ 40 バスタブ 98 土間 102 沓摺 104 モルタル 106 モルタル 108 耐水ベニヤ板 105 防水シート 106 タイル 110 コーナアングル 11 Front U Block 12 Left U Block 13 Right U Block 14 Center U Block 15 Center U Block 16 Tail Side Block 17 Head Side Block 18 Tab Receiving Bottom 19 Head Top 20 Handing Block 21 Handing Block 22 Handing Block 23 End Treatment Material 25 Drainage hardware 31 Tab holder 32 Left apron panel 33 Left apron support panel 34 Apron side panel 35 Right apron panel 36 Right apron support panel 37 Apron side panel 38 Tail flex 39 Top flex 40 Bath tub 98 Soil 102 Slag slide 104 Mortar 106 Mortar 108 Water resistant veneer board 105 Tarpaulin 106 Tile 110 Corner Angle

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 沓摺を基準として土間を整地する土間整
地工程と、 整地された土間にモルタルを散布して沓摺を基準とした
水平な基盤を造成する乾式基盤造成工程と、 造成されたモルタルの基盤上に発泡樹脂製の複数の土台
ブロックを設置し、各土台ブロックを支持部材として発
泡樹脂製のタブ受け及び洗い場床受けプレートを設置す
る断熱処理工程と、 壁ボードの表面及び発泡樹脂製の洗い場床受け面を覆っ
て防水シートを張る防水処理工程と、 上記防水シートで覆われた洗い場床受け面に所定の排水
勾配を設けてモルタルを張る洗い場モルタル張り工程
と、 上記モルタル張りの洗い場,防水シートで覆われた壁ボ
ード,タブ受けの外面露出部に乾式タイルを張る乾式タ
イル張り工程と、 上記タブ受け内にバスタブを挿入固定するバスタブ設置
工程とを備えることを特徴とする組立式浴室の施工方
法。
1. A soil leveling process for leveling soil between sands as a reference, and a dry base formation process for spraying mortar between the soils to create a horizontal base based on the sands. A plurality of base blocks made of foamed resin are installed on the base of the mortar, and a heat treatment process of installing the tab receiver and the wash floor floor support plate made of foamed resin with each base block as a support member, the surface of the wall board and the foamed resin Water-proofing process of covering the wash-floor floor receiving surface with a waterproof sheet, and a wash-room mortar applying step of applying a predetermined drainage gradient on the wash-floor receiving surface covered with the above-mentioned waterproof sheet, and a mortar applying step. Washing area, wall board covered with tarpaulin, dry tiling process of placing dry tiles on the exposed external surface of the tab holder, and buster inserting and fixing the bathtub inside the tab holder. A method of constructing a prefabricated bathroom, characterized by comprising a step of installing a tub.
【請求項2】 上記各土台ブロックは、断面U字形のU
ブロック及びこれを切断した切断ブロックの組合せ構造
としたことを特徴とする請求項1記載の組立式浴室の施
工方法。
2. Each of the base blocks has a U-shaped cross section.
The method for constructing a prefabricated bathroom according to claim 1, wherein the block and a cutting block obtained by cutting the block are combined.
【請求項3】 上記各Uブロックの上面肩部には、上記
洗い場床受けプレートを填込み支持する切欠き溝を設け
たことを特徴とする請求項2記載の組立式浴室の施工方
法。
3. The method of constructing a prefabricated bathroom according to claim 2, wherein a cutout groove for accommodating and supporting the wash floor support plate is provided in the upper shoulder of each U block.
【請求項4】 上記切欠き溝は、上記壁ボードに固定さ
れるコーナアングルの填込み溝を兼用することを特徴と
する組立式浴室の施工方法。
4. The method for constructing a prefabricated bathroom, wherein the cutout groove also serves as a groove for fitting a corner angle fixed to the wall board.
【請求項5】 上記洗い場床受けプレートを切欠き溝に
填込み支持する各Uブロックは、開口部を下にしてモル
タルの基盤上に設置したことを特徴とする請求項3記載
の組立式浴室の施工方法。
5. The prefabricated bathroom according to claim 3, wherein each of the U-blocks for supporting the wash-floor floor receiving plate by fitting it into the notch groove is installed on the base of the mortar with the opening portion facing downward. Construction method.
【請求項6】 上記タブ受けは、長手方向に沿って2分
割したタブ受け半体の合わせ構造としたことを特徴とす
る請求項1記載の組立式浴室の施工方法。
6. The method of constructing a prefabricated bathroom according to claim 1, wherein the tab receiver has a structure in which a half of the tab receiver is divided into two along the longitudinal direction.
JP12681994A 1994-05-17 1994-05-17 Construction method of prefabricated bathroom Expired - Fee Related JP3297873B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12681994A JP3297873B2 (en) 1994-05-17 1994-05-17 Construction method of prefabricated bathroom

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12681994A JP3297873B2 (en) 1994-05-17 1994-05-17 Construction method of prefabricated bathroom

Publications (2)

Publication Number Publication Date
JPH07310447A true JPH07310447A (en) 1995-11-28
JP3297873B2 JP3297873B2 (en) 2002-07-02

Family

ID=14944739

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12681994A Expired - Fee Related JP3297873B2 (en) 1994-05-17 1994-05-17 Construction method of prefabricated bathroom

Country Status (1)

Country Link
JP (1) JP3297873B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010159909A (en) * 2009-01-08 2010-07-22 Sanyo Electric Co Ltd Air conditioner

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010159909A (en) * 2009-01-08 2010-07-22 Sanyo Electric Co Ltd Air conditioner

Also Published As

Publication number Publication date
JP3297873B2 (en) 2002-07-02

Similar Documents

Publication Publication Date Title
US3686815A (en) Method for building construction
US1683600A (en) Building construction
KR100698848B1 (en) Floor panel
KR20120000702A (en) Prefabricating permanent form unit with light weight materials and wall construction method using the same
JP3297873B2 (en) Construction method of prefabricated bathroom
KR100623965B1 (en) Sandwiches panel for roof construction
JPH08289852A (en) Structure for assembling type bathroom and executing method therefor
KR20110083890A (en) Draining assembly for condensation water, draining structure of damp-proof wall panel and construction method using the same
JP4672444B2 (en) Waterproof pan for renovation
KR100354718B1 (en) Prefabricated Bathroom with the Integrated Polyurethane Wall
FR2602808A1 (en) Modular element of composite construction, for the rapid installation of insulating, partitioning or lining partitions, which is fixed or dismantlable, in the form of a half-timber panel, and system for fitting such elements together
JPH08312171A (en) Waterproof pan for bath room
KR102182549B1 (en) Insulation wall with improved airtightness
KR102387380B1 (en) Floor system for bathroom
TWI783442B (en) Hygiene unit structure and method for implementing same
JP2001227119A (en) Roof top construction method for wooden house
KR20190017118A (en) Insulation Provided Deadline Core
KR200347888Y1 (en) Sandwiches panel for roof construction
KR200398407Y1 (en) Floor panel
KR100259422B1 (en) Method of constructing unit bathroom
JPH086891Y2 (en) Insulation wall panels
KR100301524B1 (en) Insulation Boards for Heating Pipes_
JPH10140694A (en) Composite structural material
KR20170051997A (en) Assembled walls containing the membrane and assembled wall construction method
JPH0335764Y2 (en)

Legal Events

Date Code Title Description
S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313113

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees