JPH073068B2 - Underwater pile driving method and its equipment - Google Patents

Underwater pile driving method and its equipment

Info

Publication number
JPH073068B2
JPH073068B2 JP63059353A JP5935388A JPH073068B2 JP H073068 B2 JPH073068 B2 JP H073068B2 JP 63059353 A JP63059353 A JP 63059353A JP 5935388 A JP5935388 A JP 5935388A JP H073068 B2 JPH073068 B2 JP H073068B2
Authority
JP
Japan
Prior art keywords
ruler frame
horizontal
vertical
pile
temporary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP63059353A
Other languages
Japanese (ja)
Other versions
JPH01235720A (en
Inventor
英二 酒井
力一 原田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tobishima Corp
Original Assignee
Tobishima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tobishima Corp filed Critical Tobishima Corp
Priority to JP63059353A priority Critical patent/JPH073068B2/en
Publication of JPH01235720A publication Critical patent/JPH01235720A/en
Publication of JPH073068B2 publication Critical patent/JPH073068B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、防波堤、シーバース、養殖施設等各種杭立脚
型構造物用あるいはその他の用途のための杭を、水底地
盤に打設する水中杭打ち工法とその装置の改良に関す
る。
DETAILED DESCRIPTION OF THE INVENTION [Industrial field of application] The present invention relates to an underwater pile for driving piles for various pile standing structures such as breakwaters, sea berths, and aquaculture facilities, or for other uses into a subseabed. Improvement of the driving method and its equipment.

〔従来の技術〕[Conventional technology]

従来この種の工法として、第12図(イ)(ロ)に示すよ
うに、所要本数の仮設杭(H鋼)1を水底地盤Gに打ち
込み、それの水面から突出した上端部にH鋼あるいはチ
ャンネル鋼等の鋼材2を縦横に横架して構成した井桁状
枠体3を利用し、その目を形成する鋼材2を導材とし
て、鋼管杭等の杭aを打ち込む方法、あるいはまた、第
13図(イ)(ロ)に示すように、予め、陸上で製作され
た鋼製ジャケット5を、杭打設現場に曳航し、その縦円
筒6を導材として、杭aを打ち込む方法が知られてい
る。
Conventionally, as a construction method of this type, as shown in FIG. 12 (a) and (b), the required number of temporary piles (H steel) 1 are driven into the water bottom ground G, and H steel or A method of driving a pile a, such as a steel pipe pile, using a double girder-shaped frame body 3 configured by horizontally and horizontally straddling a steel material 2 such as channel steel, and using the steel material 2 forming the eyes as a conducting material, or
As shown in Figs. 13 (a) and 13 (b), a method is known in which a steel jacket 5 manufactured on land is towed to a pile driving site in advance and the vertical cylinder 6 is used as a guide material to drive the pile a. Has been.

〔発明が解決しようとする問題点〕[Problems to be solved by the invention]

しかし、前者は、井桁状枠体3を構成する縦横の鋼材2
によって、局部的に杭aを支持案内するだけであるた
め、その杭aを予定地点に正確に建て込むことが難しい
とか、打設中に杭aが傾斜し易い等の不都合を生じ、杭
心間隔や杭の鉛直性を精度良く保つことが困難であっ
た。
However, in the former case, the horizontal and vertical steel materials 2 that make up the cross-shaped frame 3
Therefore, since the pile a is only locally supported and guided, it is difficult to accurately build the pile a at a planned point, and the pile a tends to incline during driving. It was difficult to maintain the spacing and the verticality of the piles accurately.

また、後者の場合は、前者のような不都合はないがジャ
ケット5の製作自体が難しいとともに、製作費が高くな
る。また、ジャケット5を水平に設置することが杭打設
の必須条件であるが、そのために、傾斜地盤ではまずそ
れを水平に均す作業を必要とするという問題があった。
Further, in the latter case, although there is no inconvenience as in the former case, the production of the jacket 5 itself is difficult and the production cost is high. Further, it is an indispensable condition for pile driving that the jacket 5 is installed horizontally, but for this reason, there is a problem that the sloped ground first requires the work of leveling it horizontally.

本発明の目的は、上記従来方法の欠点を解決し、杭を予
定地点に正確に建て込み、また鉛直方向の杭打ち精度を
向上させることにある。
An object of the present invention is to solve the above-mentioned drawbacks of the conventional method, to accurately install a pile at a planned point, and to improve the accuracy of driving a pile in the vertical direction.

〔問題点を解決するための手段〕[Means for solving problems]

本発明水中杭打ち工法においては、まず、複数本の仮設
杭7を水底地盤Gに打設し、その各仮設杭7の水面突出
上端に仮設縦梁8および仮設横梁8′を横架して仮設基
台Aを設置する。
In the underwater pile driving method of the present invention, first, a plurality of temporary piles 7 are driven into the water bottom ground G, and the temporary vertical beam 8 and the temporary horizontal beam 8'are laid across the water projecting upper end of each temporary pile 7. Install the temporary base A.

次に、格子体を構成する複数本の縦梁11と横梁12とが形
成する複数のコーナー部分の中の特定の複数のもの例え
ば131〜134,141〜144,151〜154を、縦横に所要の間隔を
置いて配置される杭aの建て込み予定位置に正確に一致
する関係位置にしてなる水平配置定規枠体Bを、上記仮
設基台Aに搭載する。
Next, a plurality of specific ones among a plurality of corner portions formed by the plurality of vertical beams 11 and the horizontal beams 12 forming the lattice body, for example, 13 1 to 13 4 , 14 1 to 14 4 , 15 1 to 15 The horizontally arranged ruler frame B having 4 as a relational position that exactly matches the planned building position of the piles a arranged vertically and horizontally at a required interval is mounted on the temporary base A.

複数本の梁材17,17′および連結桟18,18′によって一体
に組み立てた機枠22内に、複数本の円筒体231〜234を、
縦横に所要の間隔を置いて配置される杭aの建て込み予
定位置の中の横一列のものに正確に一致する関係位置に
列設してなる垂直打込み定規枠体Cを、上記複数本の円
筒体231〜234を上記水平配置定規枠体Bの当該列を形成
するコーナー部分131〜134、141〜144または151〜154
正確に一致させて該水平配置定規枠体Bに搭載固定す
る。
In the machine frame 22 integrally assembled by the plurality of beam members 17, 17 'and the connecting bars 18, 18', the plurality of cylindrical bodies 23 1 to 23 4 ,
The vertical driving ruler frame C is arranged in a relational position that exactly corresponds to one in a horizontal row among the planned construction positions of the piles a to be vertically and horizontally arranged at a required interval. The cylinders 23 1 to 23 4 are precisely aligned with the corner portions 13 1 to 13 4 , 14 1 to 14 4 or 15 1 to 15 4 which form the row of the horizontal arrangement ruler frame B, and the horizontal arrangement ruler. Mounted and fixed on the frame B.

杭aを、上記垂直打込み定規枠体Cの円筒体231〜234
その上方から挿入し、該円筒体231〜234および対応一致
しているコーナー部分131〜134,141〜144,151〜154を通
じて水底地盤上に建て込むとともに打設する。
The stakes a, the insert from above the cylindrical body 23 1-23 4 vertical driving ruler frame C, the cylindrical body 23 1-23 4 and the corresponding matched to that corner portion 131-134, 14 1 ~ 14 4 , 15 1 ~ 15 4 will be built and placed on the water bottom ground.

そのあと、上記垂直打込み定規枠体Cを、その各円筒体
231〜234が、上記水平配置定規枠体Bの次列の各コーナ
ー部分131〜134、141〜144または151〜154に正確に一致
する位置に移動設置し、上記と同じ要領によって次列の
杭aを建て込み打設する。
After that, the vertical driving ruler frame C is attached to each of the cylindrical bodies.
23 1 to 23 4 are moved and installed at positions exactly matching the corner portions 13 1 to 13 4 , 14 1 to 14 4 or 15 1 to 15 4 of the next row of the horizontally arranged ruler frame B, and The pile a of the next row is built and driven by the same procedure as the above.

本発明水中杭打ち装置は、 水底地盤Gに打設した複数本の仮設杭7の水面突出上
端に仮設縦梁8および仮設横梁8′を横架して形成した
仮設基台Aと、 格子体を構成する複数本の縦梁11と横梁12とが形成す
る複数のコーナー部分の中の特定の複数のもの131〜1
34,141〜144,151〜154を、縦横に所要の間隔を置いて配
置される杭aの建て込み予定位置に正確に一致する関係
位置にしてなる水平配置定規枠体Bと、 複数本の梁材17,17′,18,18′および連結桟19,20,2
0′,21によって一体に組み立てた機枠22内に、複数本の
円筒体231〜234を、縦横に所要の間隔を置いて配置され
る杭aの建て込み予定位置の中の横一列のものに正確に
一致する関係位置に列設してなる垂直打込み定規枠体C
とからなり、かつ 仮設基台A上に水平配置定規枠体Bを搭載するととも
に、その水平配置定規枠体B上に垂直打込み定規枠体C
を搭載し、杭aを、垂直打込み定規枠体Cの円筒体231
〜234および対応一致している水平配置定規枠体のコー
ナー部分131〜134,141〜144,151〜154を通じて水底地盤
Gに建て込むとともに打設するようにしてなる。
The underwater pile driving apparatus according to the present invention includes a temporary base A formed by horizontally laying a vertical vertical beam 8 and a horizontal horizontal beam 8'on the water projecting upper ends of a plurality of temporary piles 7 cast on a water bottom ground G; a plurality of longitudinal beams 11 and a plurality of specific ones 13 1 to 1 of a plurality of corner portions cross beam 12 and is formed to constitute the
Horizontally arranged ruler frame B in which 3 4 , 14 1 to 14 4 and 15 1 to 15 4 are brought into a relational position that exactly corresponds to a planned build-up position of the pile a which is arranged at required intervals in length and width And multiple beam members 17,17 ', 18,18' and connecting bars 19,20,2
0 ', in the machine frame 22 being assembled together by 21, the cylinder 23 1-23 4 a plurality of, one horizontal row in like an anchor intended location of the piles a which are arranged at predetermined intervals in the vertical and horizontal Vertically driven ruler frame C that is arranged in a row at a relative position that exactly matches that of
And the horizontally arranged ruler frame B is mounted on the temporary base A, and the vertically driven ruler frame C is mounted on the horizontally arranged ruler frame B.
Mounted, the piles a, cylinder 23 1 of the vertical driving ruler frame C
To 23 4 and the corresponding matched to that horizontally disposed ruler frame corners 131-134 of formed by 14 1 to 14 4, 15 1 to 15 4 to pouring with Tatekomu the sea bed soil G through.

〔作用〕[Action]

本発明水中杭打ち工法によれば、仮設基台上の水平配置
定規枠体と、さらにその上の垂直打込み定規枠体によっ
て、杭を、予定位置に正確に一致させて建て込むことが
でき、かつその鉛直性を正確に維持しながら、当該水底
地盤に容易に打ち込むことができる。
According to the underwater pile driving method of the present invention, by the horizontally arranged ruler frame body on the temporary base, and further by the vertically driven ruler frame body, the pile can be erected while being exactly aligned with the planned position, Moreover, it can be easily driven into the subseabed while maintaining its verticality accurately.

また、その杭打ちは、垂直打込み定規枠体を水平配置定
規枠体上に移動することにより、次順位の予定位置に、
繰り返し簡単に実施できるものである。
In addition, the stakeout is moved to the next scheduled position by moving the vertically driven ruler frame body onto the horizontally arranged ruler frame body.
It can be repeated easily.

さらに、水平配置定規枠体を仮設基台上に順次移動する
ことによって、該水平配置定規枠体の大きさに関係なし
に、広範囲の水域における杭打ちを行うことができる。
Further, by sequentially moving the horizontally arranged ruler frame body onto the temporary base, it is possible to perform pile driving in a wide water area regardless of the size of the horizontally arranged ruler frame body.

本発明水中杭打ち装置によれば、水平配置定規枠体が、
陸上で別途製作しておくことができるから、従来のよう
に、現場の仮設台自体に杭建て込み予定位置を区画形成
するのと違い、製作作業が極めて簡単になるとともに、
上記のように、仮設基台上に移動して繰り返し使用でき
るメリットは大きい。
According to the underwater pile driving device of the present invention, the horizontally arranged ruler frame is
Since it can be manufactured separately on land, unlike the conventional case where the planned pile building position is sectioned and formed on the temporary stand itself, the manufacturing work is extremely easy and
As described above, the merit that it can be moved to the temporary base and used repeatedly is great.

また、垂直打込み定規枠体が、仮設基台上、さらに正確
には、上記水平配置定規枠体上に搭載使用することによ
って、杭の鉛直支持を精度高く可能にするもので、従来
周知の前記ジャケット5のように製作自体が難しいと
か、製作費が高くなるとか、さらにまた、ジャケット5
を当該水底地盤に水平設置する面倒な作業を必要としな
い。
In addition, the vertically driven ruler frame enables the vertical support of the pile with high accuracy by mounting and using it on the temporary base, more precisely, on the horizontally arranged ruler frame. It's difficult to manufacture like the jacket 5, the cost of manufacturing is high, and again, the jacket 5
It does not require the troublesome work of horizontally installing the

〔実施例〕〔Example〕

Aは、構築しようとする杭立脚型構造物の構築水域に設
置した仮設基台で、それは、複数本のH鋼仮設杭7……
を水底地盤Gに所要の配置、例えば方形輪郭線に沿って
所要の間隔で打設し、それらの水面突出上端にH鋼仮設
縦梁8および同横梁8′を跨架するとともに、上記方形
輪郭線内を横切る適宜の仕切り線上に打設したH鋼仮設
補強杭9……の水中突出上端にH鋼仮設補強横梁10を跨
架してなる。
A is a temporary base installed in the construction water area of the pile standing structure to be constructed, which is a plurality of H steel temporary piles 7 ...
Are placed on the water bottom ground G at a required position, for example, along a rectangular contour line at a required interval, and the H steel temporary vertical beam 8 and the horizontal beam 8'are straddled over the water-projecting upper ends thereof, and An H steel temporary reinforcement cross beam 10 is laid across the underwater protruding upper end of an H steel temporary reinforcement pile 9 ... Cast on an appropriate partition line crossing the inside of the wire.

この仮設基台Aは、後記の水平配置定規枠体Bと、該水
平配置定規枠体B上に載置する後記垂直打込み定規枠体
Cとを搭載支持するためのものであり、したがって、前
記した従来工法における井桁状枠体3とは異なり、杭a
の建て込み予定位置を鋼材により区画形成するようなこ
とはしていない。
This temporary base A is for mounting and supporting a horizontally arranged ruler frame B, which will be described later, and a vertically driven ruler frame C, which will be mounted on the horizontally arranged ruler frame B, as described above. Unlike the double girder frame 3 in the conventional construction method, the pile a
The planned location for building is not divided by steel.

そのため、この仮設基台Aの構築そのものは、従来工法
の井桁状枠体3を、水底地盤に打ち込んだ仮設杭(H
鋼)1の水中突出上端部に正確に組み立てなければなら
ない場合にくらべて、非常に容易なものである。
Therefore, the construction of the temporary base A itself is the construction of the temporary pile (H
This is much easier than if the upper end of the steel 1 must be accurately assembled.

上記の水平配置定規枠体Bは、複数本の縦梁11と横梁12
(本実施例ではいずれもH鋼使用)を所要の間隔で縦横
に組んでなる格子体は、縦梁11と横梁12が形成する複数
のコーナー部分の中の特定のもの、例えば、第5図の13
1〜134,141〜144,151〜154が、縦横に所要の間隔をおい
て配置される杭打aの建て込み予定位置に正確に一致す
るようにして、予め陸上において製作しておくものであ
る。
The above horizontal arrangement ruler frame B includes a plurality of vertical beams 11 and horizontal beams 12.
The lattice body formed by vertically and horizontally assembling (using H steel in the present embodiment) at required intervals is a specific one of a plurality of corner portions formed by the vertical beam 11 and the horizontal beam 12, for example, FIG. Of 13
Preliminarily produced on land so that 1 to 13 4 , 14 1 to 14 4 , 15 1 to 15 4 exactly correspond to the planned construction positions of the pile driving a arranged vertically and horizontally at a required interval. It is something to keep.

なお、縦梁11相互面および横梁12相互間には山形鋼製の
補強杆を斜めに架設してある。
A reinforcing rod made of chevron steel is obliquely installed between the mutual surfaces of the vertical beams 11 and between the horizontal beams 12.

垂直打込み定規枠体Cは、上側左右の梁材17,17′と下
側左右の梁材18,18′(本実施例ではいずれもH鋼使
用)を縦長四角形の各角部分に配置し、これらを、上面
連結桟19……、前後面連結桟20……,20′……、および
左右側面連結桟21……によって一体に組み立てた状態の
機枠22内に、上下を開口してなる鋼管製の円筒体231〜2
34を所要の間隔で列設起立してなる。
In the vertical driving ruler frame C, upper and left beam members 17, 17 'and lower left and right beam members 18, 18' (in this embodiment, H steel is used) are arranged at each corner of a vertically long quadrangle, The top and bottom are opened in the machine frame 22 in the state where these are integrally assembled by the upper surface connecting bar 19 ..., the front and rear surface connecting bars 20 ..., 20 '..., and the left and right side connecting bars 21. Cylindrical body made of steel pipe 23 1 ~ 2
3 4 are erected in rows at required intervals.

この垂直打込み定規枠体Cは、上記した円筒体231〜234
の配置位置を、縦横に所要の間隔を置いて配置される杭
aの建て込み予定位置の中の横一列のものに正確に一致
するようにして、予め陸上において製作しておくもので
ある。
The vertical driving ruler frame C is cylinder 23 1-23 4 described above
The piles are prepared beforehand on land so that they are exactly aligned with the ones in the horizontal row of the planned positions of the piles a to be arranged vertically and horizontally with a required space.

なお、各円筒体231〜234は、その上下端部を上側左右の
梁材17,17′及び下側左右の梁材18,18′に接続片24,25
を介し溶接固定されている。また、各円筒体231〜23
4は、その上面開口を上向きに拡開するガイド26を備え
ている。
The upper and lower ends of each of the cylindrical bodies 23 1 to 23 4 are connected to upper and left beam members 17, 17 ′ and lower left and right beam members 18, 18 ′ by connecting pieces 24, 25.
It is fixed by welding. Further, the cylindrical body 23 1-23
The guide 4 is provided with a guide 26 that expands its upper opening upward.

当該水域における杭aの建て込み打設は次のようにして
行う。
The pile a in the water area will be built and installed as follows.

その水域に前述のようにして設置した仮設基台Aに、ま
ず、水平配置定規枠体Bをクレーンを使用して搭載し
(第3図、第5図)、続いてその水平配置定規枠体Bの
上に垂直打込み定規枠体Cを同じくクレーンを使って搭
載固定する(第4図)。
First, the horizontally arranged ruler frame B is mounted on the temporary base A installed in the water area as described above by using a crane (Figs. 3 and 5), and then the horizontally arranged ruler frame is arranged. Mount vertically fixed ruler frame C on B using the same crane and fix it (Fig. 4).

その水平配置定規枠体Bの搭載は、縦梁11と横梁12が形
成する前記特定のコーナー部分131〜134,141〜144,151
〜154が、杭aの建て込み予定位置に正確に一致するよ
うに行い、さらにまた、垂直打込み定規枠体Cの搭載
は、円筒体231〜234が、水平配置定規枠体Bの第1列目
の上記コーナー部分131〜134に正確に一致するように行
うものである。
The horizontally arranged ruler frame B is mounted so that the specific corner portions 13 1 to 13 4 , 14 1 to 14 4 , 15 1 formed by the vertical beams 11 and the horizontal beams 12 are mounted.
~ 15 4 is carried out so as to exactly match the planned build-up position of the pile a, and the vertical driving ruler frame C is mounted on the cylinders 23 1 to 23 4 by the horizontal arrangement ruler frame B. This is performed so that the corner portions 13 1 to 13 4 in the first row are exactly aligned with each other.

そして、クレーンで吊った杭aを、垂直打込み定規枠体
Cの円筒体231のその上方から挿入して(第10図)、水
底地盤G上に建て込み、公知の手法により所要の杭打機
で該水底地盤Gに打ち込む(第11図)。
Then, the pile a which hung by a crane and inserted from above the cylindrical body 23 1 of the vertical driving ruler frame C (FIG. 10), like an anchor on the sea bed soil G, the required pile in a known manner Drive into the bottom ground G with a machine (Fig. 11).

この場合、杭aの円筒体231への挿入は、その上面開口
に備えた上向きに拡開するガイド26により案内されるの
で極く容易であるとともに、打込み中の杭aは円筒体23
1に支持案内されるから鉛直性を精度良く保つことがで
きるものである。
In this case, insertion into the cylinder 23 1 of the pile a, since it is guided by a guide 26 which widens upwards with its upper opening with a very easy, pile a in implantation cylinder 23
Since it is supported and guided by 1 , the verticality can be accurately maintained.

同じ要領によって、円筒体232〜234を通じて第1列目の
杭aを次々と打設し、そのあと、垂直打込み定規枠体C
をクレーンで一旦吊り上げて打設した各杭aの上端部か
ら外し、円筒体231〜234が、上記水平配置定規枠体Bの
第2列目のコーナー部分141〜144に正確に一致する位置
に設置固定し、その円筒体231〜234を通じ上記と同じ要
領で杭打aを打設する(第1図)。
The same way, the pile a first row one after another and Da設through cylinder 23 2-23 4, Then, the vertical driving ruler frame C
Was removed from the upper ends of the piles a that were once hoisted and placed by a crane, and the cylindrical bodies 23 1 to 23 4 were accurately placed on the corner portions 14 1 to 14 4 of the second row of the horizontally arranged ruler frame B. installed fixed to the matching position and pouring the pile a in the same manner as described above through the cylindrical body 23 1-23 4 (Figure 1).

同様にして、上記水平定規枠体Bのコーナー部分151〜1
54にも杭aを順次打設する。
Similarly, the corner portions of the horizontal ruler frame B 15 1 to 1
Sequentially pouring the pile a to 5 4.

これにより、一連の杭打ち作業を終了するが、水平配置
定規枠体Bの形状や大きさは、当然のことながら本実施
例のものに限られることなく、また、杭aを打設しよう
とする水域に仮設基台Aを適宜延長設置しておき、その
上面に水平配置定規枠体Bを移動し、上記の杭打ち作業
を繰り返せば、任意の広い範囲において所望の杭打ちを
行うことができること明らかである。
This completes a series of pile driving work, but the shape and size of the horizontally arranged ruler frame B are naturally not limited to those of the present embodiment, and it is intended to drive the pile a. If the temporary base A is properly extended and installed in the water area to be moved, the horizontally arranged ruler frame B is moved to the upper surface thereof, and the above-mentioned pile driving work is repeated, desired pile driving can be performed in an arbitrary wide range. It is clear that you can do it.

〔発明の効果〕〔The invention's effect〕

以上述べたところから明らかなように、本発明水中杭打
ち工法によれば、仮設基台上の水平配置定規枠体と、さ
らにその上の垂直打込み定規枠体によって、杭を、予定
位置に正確に一致させて建て込むことができ、かつその
鉛直性を正確に維持しながら、当該水底地盤に容易に打
ち込むことができる。
As is clear from the above description, according to the underwater pile driving method of the present invention, the pile is accurately positioned at the planned position by the horizontally arranged ruler frame body on the temporary base and the vertically driven ruler frame body further thereon. It can be built in line with, and can be easily driven into the subseabed while maintaining its verticality accurately.

また、その杭打ちは、垂直打込み定規枠体を水平配置定
規枠体上に移動することにより、次順位の予定位置に、
繰り返し簡単に実施できるものである。
In addition, the stakeout is moved to the next scheduled position by moving the vertically driven ruler frame body onto the horizontally arranged ruler frame body.
It can be repeated easily.

さらに、水平配置定規枠体を仮設基台上に順次移動する
ことによって、該水平配置定規枠体の大きさに関係なし
に、広範囲の水域における杭打ちを行うことができる。
Further, by sequentially moving the horizontally arranged ruler frame body onto the temporary base, it is possible to perform pile driving in a wide water area regardless of the size of the horizontally arranged ruler frame body.

本発明水中杭打ち装置によれば、水平配置定規枠体が、
陸上で別途製作しておくことができるから、従来のよう
に、現場の仮設台自体に杭建て込み予定位置を区画形成
するのと違い、製作作業が極めて簡単となるとともに、
上記のように、仮設基台上に移動して繰り返し使用でき
るメリットは大きい。
According to the underwater pile driving device of the present invention, the horizontally arranged ruler frame is
Since it can be manufactured separately on land, unlike the conventional case where the planned pile-in position is sectioned and formed on the temporary stand on site, the manufacturing work is extremely easy and
As described above, the merit that it can be moved to the temporary base and used repeatedly is great.

また、垂直打込み定規枠体が、仮設基台上、さらに正確
には、上記水平配置定規枠体上に搭載使用することによ
って、杭の鉛直支持を精度高く可能にするもので、従来
周知の前記ジャケット5のように製作自体が難しいと
か、製作費が高くなるとか、さらにまた、ジャケット5
を当該水底地盤に水平設置する面倒な作業を必要としな
い。
In addition, the vertically driven ruler frame enables the vertical support of the pile with high accuracy by mounting and using it on the temporary base, more precisely, on the horizontally arranged ruler frame. It's difficult to manufacture like the jacket 5, the cost of manufacturing is high, and again, the jacket 5
It does not require the troublesome work of horizontally installing the

以上要するに、本発明にれば、杭を予定地点に正確に建
て込むことが難しいとか、打設中に杭が傾斜し易い等の
不都合を生じるとか、杭心間隔や杭の鉛直性を精度良く
保つことが困難であるというような従来工法における諸
々の欠点がすべて解消されるとともに、当該水底地盤を
予め水平に均す作業を必要とするというようなこともな
く、杭打ちの作業性および経済性は、従来にくらべ格段
に改良される。
In short, according to the present invention, it is difficult to accurately build the pile at the planned point, or the disadvantages such as the pile is likely to be inclined during driving, the pile center interval and the verticality of the pile are accurately obtained. All the drawbacks of the conventional method, such as difficulty in maintaining, are eliminated, and there is no need to preliminarily level the water bottom ground in advance, and the workability and economy of pile driving are improved. The sex is significantly improved as compared with the conventional one.

【図面の簡単な説明】[Brief description of drawings]

図面は本発明の実施例を示すもので、第1図は杭打ち作
業中の全体斜視図、第2図は仮設基台の側面図、第3図
は上記仮設基台上に水平配置定規枠体を搭載する状態の
側面図、第4図はさらに上記水平配置定規枠体上に垂直
打ち込み定規枠体を搭載する状態の側面図、第5図は水
平配置定規枠体の平面図、第6図は垂直打ち込み定規枠
体の平面図、第7図は同上の側面図、第8図は同上の側
面図、第9図は第7図のI−I線拡大断面図、第10図は
杭を建て込む状態の側面図、第11図は杭を打設している
状態の側面図、第12図(イ)(ロ)は仮設杭に井桁状枠
体を構築して行う従来工法を説明するための側面図およ
び平面図、第13図(イ)(ロ)は鋼製ジャケットを使用
して行う従来工法を説明するための側面図および平面図
である。 a……杭、A……仮設基台、B……水平配置定規枠体、
C……垂直打込み定規枠体、G……水底地盤、11……縦
梁、12……横梁、131〜134,141〜144,151〜154……特定
のコーナー部分、17,17′,18,18′……梁材、19,20,2
0′,21……連結桟、22……機枠、231〜234……円筒体、
26……ガイド。
The drawings show an embodiment of the present invention. Fig. 1 is an overall perspective view during pile driving, Fig. 2 is a side view of a temporary base, and Fig. 3 is a ruler frame horizontally arranged on the temporary base. FIG. 4 is a side view showing a state in which a body is mounted, FIG. 4 is a side view in which a vertically driven ruler frame body is further mounted on the horizontally arranged ruler frame body, and FIG. 5 is a plan view of a horizontally arranged ruler frame body, and FIG. The figure is a plan view of a vertically driven ruler frame, Fig. 7 is a side view of the same as above, Fig. 8 is a side view of the same as above, Fig. 9 is an enlarged cross-sectional view taken along line I-I of Fig. 7, and Fig. 10 is a pile. Fig. 11 is a side view of the state where the piles are built, Fig. 11 is a side view of the state where the piles are being laid, and Figs. 12 (a) and (b) are explanations of the conventional method of constructing the cross girder frame on the temporary piles. FIGS. 13 (a) and 13 (b) are a side view and a plan view for explaining a conventional construction method using a steel jacket. a: pile, A: temporary base, B: horizontally arranged ruler frame,
C: Vertically driven ruler frame, G: Underwater ground, 11 ... Vertical beam, 12 ... Horizontal beam, 13 1 ~ 13 4 , 14 1 ~ 14 4 , 15, 1 ~ 15 4 ...... Specific corner part, 17,17 ′, 18,18 ′ …… Beam material, 19,20,2
0 ', 21 ...... Connecting bar, 22 ...... machine frame, 23 1 ~ 23 4 ...... cylindrical body,
26 …… Guide.

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 昭62−32096(JP,A) 特開 昭61−162630(JP,A) 実開 昭55−76226(JP,U) ─────────────────────────────────────────────────── ─── Continuation of the front page (56) References JP 62-32096 (JP, A) JP 61-162630 (JP, A) Actual development 55-76226 (JP, U)

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】複数本の仮設杭を水底地盤に打設し、その
各仮設杭の水面突出上端に仮設縦梁および仮設横梁を横
架して仮設基台を設置すること、 格子体を構成する複数本の縦梁と横梁とが形成する複数
のコーナー部分の中の特定の複数のものを、縦横に所要
の間隔を置いて配置される杭の建て込み予定位置に正確
に一致する関係位置にしてなる水平配置定規枠体を、上
記仮設基台に搭載すること、 複数本の梁材および連結桟によって一体に組み立てた機
枠内に、複数本の円筒体を、縦横に所要の間隔を置いて
配置される杭の建て込み予定位置の中の横一列のものに
正確に一致する関係位置に列設してなる垂直打込み定規
枠体を、上記複数本の円筒体を上記水平配置定規枠体の
当該列を形成する上記コーナー部分に正確に一致させて
該水平配置定規枠体に搭載固定すること、 杭を、上記垂直打込み定規枠体の円筒体にその上方から
挿入し、該円筒体および対応一致しているコーナー部分
を通じて水底地盤上に建て込むとともに打設すること、 そのあと、上記垂直打込み定規枠体を、その各円筒体
が、上記水平配置定規枠体の次列の各コーナー部分に正
確に一致する位置に移動設置し、上記と同じ要領によっ
て次列の杭を建て込み打設することを特徴とする水中杭
打ち工法。
1. A temporary base is installed by placing a plurality of temporary piles on a submerged ground, and installing a temporary vertical beam and a horizontal crossbeam at the water projecting upper end of each temporary pile to construct a temporary base. A specific position among the corners formed by the multiple vertical beams and horizontal beams that exactly matches the planned building position of the piles that are arranged at the required vertical and horizontal intervals. Install the horizontally arranged ruler frame on the above-mentioned temporary base, and in the machine frame integrally assembled by multiple beam members and connecting bars, place multiple cylinders vertically and horizontally at the required intervals. The vertical driving ruler frame body is constructed by arranging the piles of the plurality of cylinders in the horizontal arrangement ruler frame, which are arranged in the related positions that exactly correspond to the ones in the horizontal row in the planned building positions of the piles to be placed. The horizontal alignment must be exactly aligned with the corners that form the row of the body. Mounted and fixed on the ruler frame body, insert the pile into the cylinder of the above-mentioned vertically driven ruler frame body from above, and build and piling it on the submarine ground through the cylinder body and corresponding corner parts. After that, move the vertical driving ruler frame body to a position where each cylinder exactly matches the corner portion of the next row of the horizontally arranged ruler frame body, and install it in the next row by the same procedure as above. Underwater pile driving method, which is characterized by building and driving the piles.
【請求項2】水底地盤に打設した複数本の仮設杭の水面
突出上端に仮設縦梁および仮設横梁を横架して形成した
仮設基台と、 格子体を構成する複数本の縦梁と横梁とが形成する複数
のコーナー部分の中の特定の複数のものを、縦横に所要
の間隔を置いて配置される杭の建て込み予定位置に正確
に一致する関係位置にしてなる水平配置定規枠体と、 複数本の梁材および連結桟によって一体に組み立てた機
枠内に、複数本の円筒体を、縦横に所要の間隔を置いて
配置される杭の建て込み予定位置の中の横一列のものに
正確に一致する関係位置に列設してなる垂直打込み定規
枠体とからなり、 かつ、仮設基台上に水平配置定規枠体を搭載するととも
に、その水平配置定規枠体上に垂直打込み定規枠体を搭
載し、杭を、垂直打込み定規枠体の円筒体および対応一
致している水平配置定規枠体のコーナー部分を通じて水
底地盤に建て込むとともに打設するようにしてなること
を特徴とする水中杭打ち装置。
2. A temporary base, which is formed by bridging a temporary vertical beam and a horizontal horizontal beam on the water projecting upper ends of a plurality of temporary piles cast on a submarine ground, and a plurality of vertical beams constituting a lattice. Horizontal placement ruler frame that makes specific multiple ones of the multiple corners formed by the horizontal beam into the relational positions that exactly match the planned building positions of the piles that are placed at the required vertical and horizontal intervals Inside the machine frame that is integrally assembled with the body, multiple beams and connecting bars, multiple cylindrical bodies are arranged in the horizontal and vertical rows with the required spacing vertically and horizontally. It is composed of a vertical driving ruler frame body that is lined up in a relational position that exactly matches that of the above, and the horizontally arranged ruler frame body is mounted on the temporary base, and the vertically arranged ruler frame body is mounted vertically. It is equipped with a driving ruler frame, and the pile is mounted on a cylinder of a vertical driving ruler frame. Preliminary corresponding consistent with that underwater pile driving apparatus characterized by comprising as to pouring with Tatekomu the sea bed soil through a corner portion of the horizontal arrangement ruler frame.
JP63059353A 1988-03-15 1988-03-15 Underwater pile driving method and its equipment Expired - Fee Related JPH073068B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63059353A JPH073068B2 (en) 1988-03-15 1988-03-15 Underwater pile driving method and its equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63059353A JPH073068B2 (en) 1988-03-15 1988-03-15 Underwater pile driving method and its equipment

Publications (2)

Publication Number Publication Date
JPH01235720A JPH01235720A (en) 1989-09-20
JPH073068B2 true JPH073068B2 (en) 1995-01-18

Family

ID=13110826

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63059353A Expired - Fee Related JPH073068B2 (en) 1988-03-15 1988-03-15 Underwater pile driving method and its equipment

Country Status (1)

Country Link
JP (1) JPH073068B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5908430B2 (en) * 2013-04-02 2016-04-26 大成建設株式会社 Underwater pile fixing structure
JP7034890B2 (en) * 2018-11-12 2022-03-14 鹿島建設株式会社 How to place piles
JP7132977B2 (en) * 2020-06-23 2022-09-07 五洋建設株式会社 Guide material support member and pile driving method using the same

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5576226U (en) * 1978-11-15 1980-05-26
JPS61162630A (en) * 1985-01-08 1986-07-23 Kawasaki Steel Corp Method and device of driving pile
JPS6232096A (en) * 1985-08-05 1987-02-12 鹿島建設株式会社 Method of positioning template

Also Published As

Publication number Publication date
JPH01235720A (en) 1989-09-20

Similar Documents

Publication Publication Date Title
US4653962A (en) Retaining wall construction and method of manufacture
JPH0756140B2 (en) Retaining wall structure construction method and retaining wall structure
JPH073068B2 (en) Underwater pile driving method and its equipment
US4923334A (en) Lost casing for constructing a rigid structure upon the bottom of a body of water
JPH0657741A (en) Earth retaining wall
CN114922132A (en) High-pile wharf upper structure part materialized construction method based on combined inclined piles
KR100375821B1 (en) Blocks for Constructing a Breast Wall, and Method of Constructing the Breast Wall
JPH0684622B2 (en) Parent-side Yokoyaita method
JPH0421874Y2 (en)
JPH0711620A (en) Construction method of artificial ground
JP3060195B2 (en) Construction method of steel basement reinforced concrete continuous underground wall
JPS6290445A (en) Block for foundation and its manufacture
JPH0460018A (en) Retaining wall and constructing method thereof
JP2936130B2 (en) Construction method of steel frame concrete structure
JPH0226014B2 (en)
JP2700637B2 (en) Slope stable structure
JPS6268926A (en) Construction for underwater reinforced concrete
JPS5819111Y2 (en) Hull for sludge hardening treatment that can be increased and decreased
JPH056602B2 (en)
JPH067162Y2 (en) Steel pile guide formwork equipment for underwater foundation construction
SU1052609A1 (en) Made-up boom
JPH01165819A (en) Construction of steel sheet pile wall
JP2818845B2 (en) Comb-type continuous wall and its construction method
JPH08209659A (en) Construction method for erosion and torrent control dam
JPH03176512A (en) Retaining method