JPH07291587A - Tower crane - Google Patents

Tower crane

Info

Publication number
JPH07291587A
JPH07291587A JP10899294A JP10899294A JPH07291587A JP H07291587 A JPH07291587 A JP H07291587A JP 10899294 A JP10899294 A JP 10899294A JP 10899294 A JP10899294 A JP 10899294A JP H07291587 A JPH07291587 A JP H07291587A
Authority
JP
Japan
Prior art keywords
tower
swing lever
end side
leg portion
rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP10899294A
Other languages
Japanese (ja)
Inventor
Takayuki Eguchi
隆幸 江口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Construction Machinery Co Ltd
Original Assignee
Hitachi Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Construction Machinery Co Ltd filed Critical Hitachi Construction Machinery Co Ltd
Priority to JP10899294A priority Critical patent/JPH07291587A/en
Publication of JPH07291587A publication Critical patent/JPH07291587A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To disassemble and assemble a swing lever and carry the disassembled swing lever efficiently and safely. CONSTITUTION:A swing lever 32 is formed by connecting a tip side of a first leg part 33 rotationally fit in a tower boom 7 at its base end side and a tip side of a second leg part 36 rotationally connected by a pin with a base side of the first leg part 33 at its base end side by a pendant rope 39. Thereby, weight of the swing lever 32 is lightened and hanging load ability of a tower crane can be improved. Disassembling and assembling work of the swing lever can be easily and safely performed and also folded first leg part 33 and the second leg part 36 are tied and fixed by the pendant rope 39.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、例えば建設現場におけ
る高所への資材運搬等に好適に用いられるタワークレー
ンに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a tower crane suitable for use in, for example, material transportation to a high place on a construction site.

【0002】[0002]

【従来の技術】一般に、高層ビル等の建設現場において
は、通常、地上から高所への資材運搬等を行うためにタ
ワークレーンが用いられる。
2. Description of the Related Art Generally, at a construction site such as a high-rise building, a tower crane is usually used for carrying materials from the ground to a high place.

【0003】そこで、図5ないし図9に従来技術による
タワークレーンを示す。
Therefore, FIGS. 5 to 9 show a tower crane according to the prior art.

【0004】図において、1は下部走行体、2は該下部
走行体1上に旋回可能に設けられたクレーン本体として
の上部旋回体を示し、該上部旋回体2上には、先端側に
ガイドシーブ3Aを有するA型フレーム3が設けられて
いる。また、該上部旋回体2には、主巻ドラム4,補巻
ドラム5および起伏ドラム6が設けられている。
In the drawing, 1 is a lower traveling body, 2 is an upper revolving body as a crane main body which is rotatably provided on the lower traveling body 1, and on the upper revolving body 2, a guide is provided on the tip side. An A-shaped frame 3 having a sheave 3A is provided. Further, the upper revolving structure 2 is provided with a main winding drum 4, an auxiliary winding drum 5, and an undulating drum 6.

【0005】7は基端側が上部旋回体2の前部に起伏可
能に取付けられたタワーブームで、該タワーブーム7は
骨組構造をもって30m〜45m程度の長さに形成さ
れ、後述のタワーブーム起伏ロープ19を起伏ドラム6
によって巻取る、または巻出すことにより上部旋回体2
に対して起伏する。
Reference numeral 7 denotes a tower boom whose base end side is attached to the front part of the upper swing body 2 so as to be capable of undulating. The tower boom 7 has a frame structure and is formed to have a length of about 30 m to 45 m. Rope 19 undulating drum 6
The upper revolving structure 2 by winding or unwinding by
Undulate against.

【0006】8はタワーブーム7の先端側に俯仰動可能
に取付けられた骨組構造をなすタワージブを示し、該タ
ワージブ8は20m〜40m程度の長さに形成され、後
述のタワージブ起伏ロープ12Bを補巻ドラム5によっ
て巻取る、または巻出すことによりタワーブーム7に対
して俯仰動を行う。
Reference numeral 8 denotes a tower jib having a frame structure attached to the tip end side of the tower boom 7 so as to be able to move up and down. The tower jib 8 is formed to have a length of about 20 m to 40 m and supplements a tower jib hoisting rope 12B described later. The tower boom 7 is lifted and lowered by being wound up or unwound by the winding drum 5.

【0007】9は一端側が主巻ドラム4に巻回された主
巻ロープで、該主巻ロープ9の他端側はタワージブ8の
先端側から垂下される荷吊フック10に巻回されてい
る。そして、主巻ロープ9が主巻ドラム4に巻取られる
ことにより、荷吊フック10が荷物を吊上げるようにな
っている。
Reference numeral 9 denotes a main winding rope whose one end side is wound around the main winding drum 4, and the other end side of the main winding rope 9 is wound around a load hanging hook 10 suspended from the tip end side of the tower jib 8. . The main rope 9 is wound around the main drum 4 so that the load hook 10 can lift the load.

【0008】11,11はタワージブ8の先端側と後述
のスイングレバー20とを連結する2本以上の偶数本か
らなるタワージブ支持ロープ、12,12は一端側が補
巻ドラム5に巻回され、他端側がスイングレバー20に
連結された2本の補巻ロープをそれぞれ示し、該各補巻
ロープ12の途中には、複数のシーブ(図示せず)を有
するタワージブブライドル13と、該タワージブブライ
ドル13との間に後述のタワージブ起伏ロープ12Bが
巻回された複数のシーブ(図示せず)を有するタワージ
ブハンガ14とが配設されている。
Reference numerals 11 and 11 denote tower jib support ropes composed of two or more even numbered ropes for connecting the tip end side of the tower jib 8 and a swing lever 20 to be described later, and 12 and 12 have one end side wound around the auxiliary winding drum 5 and the other. Two auxiliary winding ropes whose end sides are connected to the swing lever 20 are shown, and a tower jib bridle 13 having a plurality of sheaves (not shown) in the middle of each auxiliary winding rope 12, and the tower jib bridle. A tower jib hanger 14 having a plurality of sheaves (not shown) around which a tower jib undulating rope 12B, which will be described later, is wound is provided.

【0009】ここで、各補巻ロープ12は、スイングレ
バー20とタワージブブライドル13とを連結するスイ
ングレバー支持ロープ12Aと、タワージブブライドル
13およびタワージブハンガ14のそれぞれのシーブに
順次巻回された後、補巻ドラム5に巻回されたタワージ
ブ起伏ロープ12Bとから構成されている。
Here, each auxiliary winding rope 12 is sequentially wound around a swing lever supporting rope 12A connecting the swing lever 20 and the tower jib bridle 13 and each sheave of the tower jib bridle 13 and the tower jib hanger 14. After that, the tower jib undulating rope 12B wound around the auxiliary winding drum 5 is formed.

【0010】そして、タワージブ起伏ロープ12Bは補
巻ドラム5に巻取られることにより、タワージブブライ
ドル13とタワージブハンガ14とを接近させてタワー
ジブ8を上向きに起こし、一方、タワージブ起伏ロープ
12Bが補巻ドラム5から巻出されるときには、タワー
ジブブライドル13とタワージブハンガ14とが離間す
るようになり、タワージブ8は下向きに倒されるように
なっている。
When the tower jib undulating rope 12B is wound around the auxiliary winding drum 5, the tower jib bridle 13 and the tower jib hanger 14 are brought close to each other to raise the tower jib 8 upward, while the tower jib undulating rope 12B is supplemented. When unwound from the winding drum 5, the tower jib bridle 13 and the tower jib hanger 14 are separated from each other, and the tower jib 8 is tilted downward.

【0011】15は一端側がタワーブーム7の先端側に
ブラケット16を介して取付けられた2本以上の偶数本
からなるタワーブーム支持ロープ(1本のみ図示)、1
7は該タワーブーム支持ロープ15の他端側に取付けら
れたタワーブームブライドル、18は該タワーブームブ
ライドル17に対向するようにA型フレーム3の先端側
に取付けられたタワーブームハンガをそれぞれ示し、該
タワーブームハンガ18、タワーブームブライドル17
には、タワーブーム起伏ロープ19の一端側が巻回さ
れ、該タワーブーム起伏ロープ19の他端側はガイドシ
ーブ3Aを介して起伏ドラム6に巻回されている。
Reference numeral 15 denotes a tower boom support rope (only one is shown) consisting of two or more even ones, one end side of which is attached to the tip end side of the tower boom 7 via a bracket 16.
7 is a tower boom bridle attached to the other end of the tower boom support rope 15, and 18 is a tower boom hanger attached to the tip side of the A-shaped frame 3 so as to face the tower boom bridle 17. The tower boom hanger 18, tower boom bridle 17
One end side of the tower boom hoisting rope 19 is wound around, and the other end side of the tower boom hoisting rope 19 is wound around the hoisting drum 6 via the guide sheave 3A.

【0012】そして、該タワーブーム起伏ロープ19を
起伏ドラム6に巻取ることにより、タワーブームブライ
ドル17とタワーブームハンガ18とを接近させてタワ
ーブーム7を起こし、また、タワーブーム起伏ロープ1
9を起伏ドラム6から巻出すことにより、タワーブーム
ブライドル17とタワーブームハンガ18とを離間させ
てタワーブーム7を倒すようになっている。
By winding the tower boom hoisting rope 19 around the hoisting drum 6, the tower boom bridle 17 and the tower boom hanger 18 are brought close to each other to raise the tower boom 7, and the tower boom hoisting rope 1
By unwinding 9 from the undulating drum 6, the tower boom bridle 17 and the tower boom hanger 18 are separated from each other, and the tower boom 7 is tilted.

【0013】20は前記タワーブーム7の先端側に回動
可能に取付けられた三角形状のスイングレバーを示し、
該スイングレバー20は、タワージブ8をタワーブーム
7に対して俯仰動させるものである。
Reference numeral 20 denotes a triangular swing lever rotatably attached to the tip end side of the tower boom 7.
The swing lever 20 raises and lowers the tower jib 8 with respect to the tower boom 7.

【0014】ここで、スイングレバー20はタワークレ
ーンの輸送時には分解され、作業時には組立てられて使
用されるので、分解、組立作業や分解後の搬送作業を効
率良く行えるように種々の構造が提案されている。
Since the swing lever 20 is disassembled at the time of transportation of the tower crane and assembled and used at the time of work, various structures have been proposed so that disassembling, assembling work and carrying work after dismantling can be performed efficiently. ing.

【0015】例えば実開昭59−127095号公報に
記載されたスイングレバー20は、図6に示すように、
基端側がブラケット16,16を介してタワーブーム7
の先端側に回動可能に取付けられ、複数の梁21,2
1,…によって補強された第1脚部22と、該第1脚部
22の基端側に回動可能に取付けられ、複数の梁23,
23,…によって補強された第2脚部24と、該第1脚
部22と第2脚部24のそれぞれの先端側に連結される
一対のステー25,25とから構成され、これらはそれ
ぞれ4m〜6m程度の長さを有している。そして、該各
ステー25はほぼ等しい長さをもった第1ステー25A
と第2ステー25Bとに、図9に示す如く連結ピン25
Cで折畳み可能に構成され、該第1ステー25Aと第2
ステー25Bとは、図6、図8に示すように取付ピン2
6によって直線状に延びた状態に保持されている。
For example, the swing lever 20 described in Japanese Utility Model Laid-Open No. 59-127095 has a structure as shown in FIG.
The base end side is the tower boom 7 via the brackets 16 and 16.
Rotatably attached to the tip side of the plurality of beams 21,
A first leg portion 22 reinforced by 1, and a plurality of beams 23 rotatably attached to the base end side of the first leg portion 22.
.., and a pair of stays 25, 25 connected to the tip ends of the first leg 22 and the second leg 24, respectively, which are 4 m each. It has a length of about 6 m. Each stay 25 has a first stay 25A having a substantially equal length.
And the second stay 25B to the connecting pin 25 as shown in FIG.
The first stay 25A and the second stay are configured to be foldable at C.
The stay 25B is the mounting pin 2 as shown in FIGS.
It is held by 6 in a linearly extended state.

【0016】従来技術によるタワークレーンは上述の如
き構成を有しているが、例えば輸送時等においては、図
5に示す作業状態にあるタワーブーム7およびタワージ
ブ8を下記の如き操作により、図7に示す如く地面側に
倒して分解作業を行う。
The tower crane according to the prior art has the above-described structure. For example, at the time of transportation, the tower boom 7 and the tower jib 8 in the working state shown in FIG. As shown in, perform the disassembly work by tilting it to the ground side.

【0017】まず、タワージブ起伏ロープ12Bを補巻
ドラム5から巻出すことにより、タワージブブライドル
13とタワージブハンガ14とを離間させ、タワージブ
8とスイングレバー20とをタワーブーム7側に折畳む
ようにして倒す。そして、タワーブーム起伏ロープ19
を起伏ドラム6から巻出すことにより、タワーブームブ
ライドル17とタワーブームハンガ18とを離間させ、
図7に示すようにスイングレバー20の頂部が地面Gに
接地するまで、タワーブーム7をタワージブ8およびス
イングレバー20と共に地面側に倒す。
First, by unwinding the tower jib undulating rope 12B from the auxiliary winding drum 5, the tower jib bridle 13 and the tower jib hanger 14 are separated from each other, and the tower jib 8 and the swing lever 20 are folded toward the tower boom 7 side. knock down. And tower boom undulating rope 19
The tower boom bridle 17 and the tower boom hanger 18 are separated from each other by unwinding the
As shown in FIG. 7, the tower boom 7 is tilted to the ground side together with the tower jib 8 and the swing lever 20 until the top of the swing lever 20 contacts the ground G.

【0018】このように、タワーブーム7を倒した状態
で、タワーブーム7の先端側に配設されたスイングレバ
ー20の分解作業を行う。
In this way, the swing lever 20 disposed on the tip side of the tower boom 7 is disassembled with the tower boom 7 in a tilted state.

【0019】まず、第1ステー25Aと第2ステー25
Bとの連結部から取付ピン26を取外す。次いで、タワ
ージブ起伏ロープ12Bを補巻ドラム5から巻出してス
イングレバー支持ロープ12Aを緩め、第1脚部22
を、ブラケット16との連結部を支点として図8に示す
矢示A方向に第2脚部24側へと回動させる。
First, the first stay 25A and the second stay 25
Remove the mounting pin 26 from the connecting portion with B. Next, the tower jib undulating rope 12B is unwound from the auxiliary winding drum 5 to loosen the swing lever support rope 12A, and the first leg 22
Is rotated toward the second leg 24 side in the direction of arrow A shown in FIG. 8 with the connecting portion with the bracket 16 as a fulcrum.

【0020】これにより、第1脚部22と第2脚部24
とは、第1ステー25Aと第2ステー25Bとを、連結
ピン25Cを中心にして矢示B方向に折曲げるようにし
て、折畳まれる(図9参照)。そして、第1脚部22の
基端側をブラケット16から取外すと共に、第1脚部2
2の先端側からスイングレバー支持ロープ12Aを、第
2脚部24の先端側からタワージブ支持ロープ11をそ
れぞれ取外すことにより、スイングレバー20は、図9
に示すように折畳み状態となって取外され、この折畳み
状態となったスイングレバー構造体20′は、例えば小
型のクレーン等により輸送車両に搬送される。
As a result, the first leg portion 22 and the second leg portion 24 are
Is folded so that the first stay 25A and the second stay 25B are bent in the arrow B direction around the connecting pin 25C (see FIG. 9). Then, the base end side of the first leg portion 22 is removed from the bracket 16 and the first leg portion 2
By removing the swing lever support rope 12A from the tip end side of 2 and the tower jib support rope 11 from the tip end side of the second leg portion 24, respectively, the swing lever 20 can be moved as shown in FIG.
The swing lever structure 20 'in the folded state is removed as shown in Fig. 2 and is transported to the transportation vehicle by, for example, a small crane.

【0021】また、分解されたスイングレバー構造体2
0′を組立てる場合には、第2脚部24の先端側を接地
させた状態で、第1脚部22の基端側をブラケット16
に取付ける。次いで、第1脚部22の先端側にスイング
レバー支持ロープ12Aを取付け、補巻ドラム5によっ
てタワージブ起伏ロープ12Bを巻取ることにより、第
1脚部22を第2脚部24から開くと共に、第1ステー
25Aと第2ステー25Bとを折畳まれた状態から直線
状に伸長させ、連結部に取付ピン26を取付けることに
より、スイングレバー20を図8に示す三角形状に組立
てる。
Also, the disassembled swing lever structure 2
When assembling 0 ', the base end side of the first leg portion 22 is attached to the bracket 16 while the tip end side of the second leg portion 24 is grounded.
Install on. Next, the swing lever support rope 12A is attached to the tip end side of the first leg portion 22, and the tower jib undulating rope 12B is wound by the auxiliary winding drum 5, thereby opening the first leg portion 22 from the second leg portion 24 and The first stay 25A and the second stay 25B are linearly extended from the folded state, and the attachment pins 26 are attached to the connecting portions, so that the swing lever 20 is assembled into the triangular shape shown in FIG.

【0022】ところで、上述した従来技術では、タワー
クレーンに用いるスイングレバー20を、第1脚部2
2、第2脚部24および両者を連結するステー25から
構成し、該ステー25を第1ステー25Aと第2ステー
25Bとから連結ピン25Cを介して折畳み式に構成し
ているため、ステー25の構造が複雑になり、また、ス
イングレバー20全体の重量が増加し、その結果、タワ
ークレーンの吊荷能力が低下してしまう欠点がある。
By the way, in the above-mentioned prior art, the swing lever 20 used in the tower crane is mounted on the first leg portion 2.
2, the second leg portion 24 and a stay 25 that connects them, and the stay 25 is configured to be foldable from the first stay 25A and the second stay 25B via the connecting pin 25C. Has a disadvantage that the structure thereof is complicated and the weight of the swing lever 20 as a whole is increased, and as a result, the lifting capacity of the tower crane is reduced.

【0023】また、スイングレバー20は、一辺の長さ
が通常4m〜6m程度に形成されるため、スイングレバ
ー20を図8に示す如く接地させた状態でも、第1ステ
ー25Aと第2ステー25Bとの連結部(取付ピン2
6)の地上高さHは2m〜3m以上となり、分解時や組
立時に行う取付ピン26の取付け、取外し作業が高所作
業となって危険を伴うという問題がある。
Further, since the swing lever 20 is normally formed to have a side length of about 4 m to 6 m, the first stay 25A and the second stay 25B can be maintained even when the swing lever 20 is grounded as shown in FIG. Connection part with (mounting pin 2
The ground height H of 6) is 2 m to 3 m or more, and there is a problem that the work of mounting and removing the mounting pin 26 at the time of disassembling or assembling is performed at a high place, which is dangerous.

【0024】また、他の従来技術として、第1脚部と第
2脚部のそれぞれの先端側を鎖で連結するようにした他
のスイングレバーも提案されている。そして、このよう
に構成された他のスイングレバーによれば、上述の如き
危険を伴うステー25に対する取付ピン26の取付け、
取外し作業を不要にでき、分解、組立作業の効率を向上
させることができるだけでなく、スイングレバー全体の
軽量化を図ることができるという利点がある。
As another conventional technique, another swing lever has been proposed in which the tip ends of the first leg and the second leg are connected by chains. Then, according to the other swing lever configured as described above, the mounting pin 26 is attached to the stay 25 with danger as described above,
There is an advantage that the removal work is unnecessary, the efficiency of the disassembly and assembly work can be improved, and the weight of the entire swing lever can be reduced.

【0025】[0025]

【発明が解決しようとする課題】しかし、第1脚部と第
2脚部のそれぞれの先端側を鎖によって連結した他のス
イングレバーでは、輸送時等において第1脚部と第2脚
部とを折畳んだときに鎖が緩んでしまうから、鎖の取扱
いが面倒になり、第1脚部と第2脚部とが輸送時の振動
等で鎖によって損傷されることがある上に、折畳み状態
となったスイングレバー構造体が不安定となり、例えば
小型クレーン等を用いた輸送車両への搬送作業を効率良
く行うことができないだけでなく、その安全性が低下し
てしまうという問題がある。
However, in another swing lever in which the tip ends of the first leg portion and the second leg portion are connected by a chain, the first leg portion and the second leg portion are Since the chain becomes loose when it is folded, handling of the chain becomes troublesome, and the first leg part and the second leg part may be damaged by the chain due to vibration during transportation. The swing lever structure in the state becomes unstable, and there is a problem that not only the transfer work to a transportation vehicle using a small crane or the like cannot be performed efficiently, but also the safety thereof deteriorates.

【0026】本発明は上述した従来技術の問題に鑑みな
されたもので、スイングレバーを軽量化でき、吊荷能力
を向上させることができると共に、スイングレバーの分
解、組立作業や搬送作業を効率良く、かつ安全に行うこ
とができるようにしたタワークレーンを提供することを
目的としている。
The present invention has been made in view of the above-mentioned problems of the prior art. The swing lever can be made lighter in weight, the lifting capacity can be improved, and the swing lever can be disassembled, assembled and transported efficiently. The purpose of the present invention is to provide a tower crane that can be safely operated.

【0027】[0027]

【課題を解決するための手段】上述した課題を解決する
ために、本発明のタワークレーンは、主巻ドラム、補巻
ドラムおよび起伏ドラムを有するクレーン本体と、該ク
レーン本体に起伏可能に取付けられ、前記起伏ドラムに
より起伏されるタワーブームと、該タワーブームの先端
側に俯仰動可能に取付けられたタワージブと、一端側が
前記主巻ドラムに巻回され、他端側が該タワージブの先
端側から垂下される荷吊フックに巻回された主巻ロープ
と、前記タワージブを前記タワーブームに対して俯仰動
させるため、前記タワーブームの先端側に回動可能に設
けられ、支持ロープを介して前記タワージブの先端側に
連結されるスイングレバーと、一端側が前記補巻ドラム
に巻回され、他端側が該スイングレバーに連結される補
巻ロープとから構成される。
In order to solve the above-mentioned problems, a tower crane of the present invention is a crane main body having a main winding drum, an auxiliary winding drum, and a hoisting drum, and is mounted so as to be hoistable on the crane main body. A tower boom that is undulated by the undulating drum, a tower jib that is attached to the tip side of the tower boom so that it can be lifted and lowered, one end side is wound around the main winding drum, and the other end side hangs down from the tip side of the tower jib. The main winding rope wound around the load hanging hook and the tower jib are rotatably provided on the tip end side of the tower boom to raise and lower the tower jib with respect to the tower boom, and the tower jib is provided via a support rope. A swing lever connected to the tip side of the auxiliary winding rope, and an auxiliary winding rope having one end wound around the auxiliary winding drum and the other end connected to the swing lever. It is.

【0028】そして、本発明は、前記スイングレバー
を、基端側が前記タワーブームの先端側に回動可能に取
付けられ、先端側が前記補巻ロープの他端側に連結され
る第1脚部と、基端側が該第1脚部の基端側に回動可能
にピン結合され、先端側が前記支持ロープに連結される
第2脚部と、一定の長さを有し、両端側が該第2脚部の
先端側と前記第1脚部の先端側との少なくとも一方側に
着脱可能に連結されるペンダントロープとから構成した
ことを特徴としている。
According to the present invention, the swing lever includes a first leg portion having a base end side rotatably attached to the tip end side of the tower boom and a tip end side connected to the other end side of the auxiliary winding rope. A second leg part having a base end side rotatably pin-coupled to the base end side of the first leg part, and a tip end side connected to the support rope; and a second leg part having a constant length and both end sides of the second leg part. The pendant rope is detachably connected to at least one of the tip side of the leg and the tip side of the first leg.

【0029】[0029]

【作用】上記構成により、ペンダントロープは可撓性を
有する一定長さのワイヤロープ等で構成されているか
ら、スイングレバーの取付け、取外し作業時には、ペン
ダントロープに邪魔されることなく、第1脚部と第2脚
部とを簡単に折畳むことができる。そして、第1脚部、
第2脚部のうち、いずれか一方からペンダントロープを
取外すことにより、このペンダントロープを用いて、折
畳まれた状態にある第1脚部と第2脚部との先端側を簡
単に束ねることが可能となり、これによって、スイング
レバー全体を搬送作業に適した状態に固定することがで
きる。
With the above structure, since the pendant rope is composed of a flexible wire rope or the like having a certain length, the first leg is not disturbed by the pendant rope when the swing lever is attached or detached. The part and the second leg can be easily folded. And the first leg,
By removing the pendant rope from either one of the second leg portions, the pendant rope can be used to easily bundle the tip ends of the first leg portion and the second leg portion in the folded state. This makes it possible to fix the entire swing lever in a state suitable for carrying work.

【0030】[0030]

【実施例】以下、本発明の実施例を図1ないし図4に基
づき説明する。なお、実施例では前述した図5ないし図
8に示す従来技術と同一の構成要素に同一の符号を付
し、その説明を省略するものとする。
Embodiments of the present invention will be described below with reference to FIGS. In the embodiments, the same components as those of the prior art shown in FIGS. 5 to 8 described above are designated by the same reference numerals, and the description thereof will be omitted.

【0031】図において、31は本発明によるタワーク
レーンを示し、該タワークレーン31は従来技術と同様
に、下部走行体1と、主巻ドラム4、補巻ドラム5およ
び起伏ドラム6を有したクレーン本体としての上部旋回
体2と、該上部旋回体2に起伏可能に取付けられたタワ
ーブーム7と、該タワーブーム7に俯仰動可能に取付け
られたタワージブ8と、一端側が主巻ドラム4に巻回さ
れ、他端側がタワージブ8の先端側から垂下された荷吊
フック10に巻回された主巻ロープ9と、タワーブーム
7に回動可能に設けられ、タワージブ支持ロープ11を
介してタワージブ8の先端側に連結されたスイングレバ
ー32と、一端側が補巻ドラム5に巻回され、他端側が
該スイングレバー32に連結された補巻ロープ12とか
ら大略構成されている。
In the figure, reference numeral 31 denotes a tower crane according to the present invention, and the tower crane 31 has a lower traveling body 1, a crane having a main winding drum 4, a auxiliary winding drum 5 and an undulating drum 6 as in the prior art. An upper revolving structure 2 as a main body, a tower boom 7 attached to the upper revolving structure 2 so as to be able to rise and fall, a tower jib 8 attached to the tower boom 7 so as to be able to move up and down, and one end side is wound around a main winding drum 4. The main winding rope 9 is wound around a load-hanging hook 10 whose other end is hung from the tip end side of the tower jib 8 and the tower boom 7, and the tower boom is rotatably provided. The swing lever 32 is connected to the tip side of the auxiliary winding rope 12 and one end of the swing lever 32 is wound around the auxiliary winding drum 5, and the other end of the auxiliary winding rope 12 is connected to the swing lever 32. That.

【0032】しかし、本発明はスイングレバー32の構
成の点で従来技術とは異なっており、以下、本実施例に
よるスイングレバー32について説明する。
However, the present invention is different from the prior art in the structure of the swing lever 32, and the swing lever 32 according to this embodiment will be described below.

【0033】図中、33は基端側がブラケット16,1
6を介してタワーブーム7の先端側に回動可能に取付け
られた第1脚部を示し、該第1脚部33は、一対の脚部
本体33A,33Aと、該各脚部本体33Aのそれぞれ
の基端側に設けられた基端側取付板33B,33Bと、
各脚部本体33Aの先端側に設けられた先端側取付板3
3C,33Cと、各脚部本体33Aの間に設けられた複
数の梁34,34,…とから構成されている。そして、
各基端側取付板33Bと各ブラケット16とをピン3
5,35によって連結することにより、第1脚部33が
タワーブーム7に対して回動可能に取付けられている。
また、各先端側取付板33Cには、スイングレバー支持
ロープ12A,12Aが取付けられている。
In the figure, 33 is the bracket 16 or 1 on the base end side.
6 shows a first leg portion rotatably attached to the tip end side of the tower boom 7 via 6, and the first leg portion 33 includes a pair of leg body 33A, 33A and each leg body 33A. Base end side mounting plates 33B and 33B provided on the respective base end sides,
Tip side mounting plate 3 provided on the tip side of each leg body 33A
3C, 33C and a plurality of beams 34, 34, ... Provided between each leg body 33A. And
Attach each base end side mounting plate 33B and each bracket 16 to the pin 3
The first leg portion 33 is rotatably attached to the tower boom 7 by being connected by 5, 35.
Swing lever support ropes 12A and 12A are attached to each tip side attachment plate 33C.

【0034】36は基端側が第1脚部33の基端側に回
動可能にピン結合された第2脚部で、該第2脚部36
は、一対の脚部本体36A,36Aと、該各脚部本体3
6Aのそれぞれの先端側に設けられた先端側取付板36
B,36Bと、各脚部本体36Aの間に設けられた複数
の梁37,37,…とから構成されている。そして、各
先端側取付板36Bには、タワージブ支持ロープ11,
11の一端側が取付られ、該各タワージブ支持ロープ1
1の他端側はタワージブ8の先端側に取付けられてい
る。
Reference numeral 36 denotes a second leg portion whose base end side is rotatably pin-connected to the base end side of the first leg portion 33, and the second leg portion 36 is provided.
Is a pair of leg bodies 36A, 36A and each leg body 3
Tip side mounting plate 36 provided on each tip side of 6A
B, 36B and a plurality of beams 37, 37, ... Provided between each leg body 36A. Then, the tower jib support rope 11,
One end side of 11 is attached and each tower jib support rope 1
The other end side of 1 is attached to the tip end side of the tower jib 8.

【0035】38,38は第2脚部36の基端側に位置
して各脚部本体36A上に突設された一対の取付板を示
し、該各取付板38は、第1脚部33と第2脚部36と
を折畳んだとき、後述する各ペンダントロープ39の取
付具39Cが取付けられるようになっている。
Reference numerals 38 and 38 denote a pair of mounting plates located on the base end side of the second leg portion 36 and projectingly provided on each leg portion main body 36A, and each mounting plate 38 is the first leg portion 33. When the second leg portion 36 and the second leg portion 36 are folded, a fixture 39C for each pendant rope 39 described later can be attached.

【0036】39,39は第1脚部33の先端側と第2
脚部36の先端側とを連結するペンダントロープを示
し、該各ペンダントロープ39は、一定の長さを有する
ワイヤロープ39Aと、該ワイヤロープ39Aの一端側
に固定された取付具39Bと、他端側に固定された他の
取付具39Cとから構成されている。そして、各取付具
39Bは第1脚部33の各先端側取付板33Cに、各取
付具39Cは第2脚部36の各先端側取付板36Bにそ
れぞれピン等を介して着脱可能に取付けられている。
Reference numerals 39 and 39 denote the distal end side of the first leg portion 33 and the second leg portion.
A pendant rope that connects the distal end side of the leg portion 36 is shown. Each of the pendant ropes 39 has a wire rope 39A having a fixed length, a fixture 39B fixed to one end side of the wire rope 39A, and the like. It is composed of another fixture 39C fixed to the end side. Then, each attachment 39B is detachably attached to each tip-side attachment plate 33C of the first leg portion 33, and each attachment 39C is attached to each tip-side attachment plate 36B of the second leg portion 36 via a pin or the like. ing.

【0037】このようにして、スイングレバー32は、
第1脚部33、第2脚部36および各ペンダントロープ
39からほぼ三角形状に組立てられる。
In this way, the swing lever 32 is
The first leg portion 33, the second leg portion 36 and each pendant rope 39 are assembled into a substantially triangular shape.

【0038】本発明によるタワークレーン31は、上述
の如く構成されたスイングレバー32を有するもので、
その基本的作動については従来技術によるものと格別差
異はない。
The tower crane 31 according to the present invention has the swing lever 32 constructed as described above,
There is no particular difference in the basic operation thereof from the prior art.

【0039】然るに、本実施例においては、スイングレ
バー32が、基端側がタワーブーム7に回動可能に取付
けられた第1脚部33と、該第1脚部33の基端側取付
板33Bに回動可能に取付けられた第2脚部36とを備
え、第1脚部33の先端側と第2脚部36の先端側とを
ペンダントロープ39によって着脱可能に連結する構成
としたから、例えば輸送時におけるスイングレバー32
の分解、組立作業等を行うにあたって下記の如き作用効
果を得ることができる。
However, in this embodiment, the swing lever 32 has the first leg portion 33 whose base end side is rotatably attached to the tower boom 7, and the base end side attachment plate 33B of the first leg portion 33. The second leg portion 36 rotatably attached to the first leg portion 33 and the second leg portion 36 are detachably connected by the pendant rope 39. For example, the swing lever 32 during transportation
The following operational effects can be obtained in disassembling, assembling work, and the like.

【0040】まず、スイングレバー32の分解作業を行
う場合には、図3に示すようにスイングレバー32を構
成する第2脚部36の先端側取付板36Bが接地するま
で、タワーブーム7を地面側に倒す。この状態で第2脚
部36の先端側取付板36Bからペンダントロープ39
の取付具39Cを取外し、タワージブ起伏ロープ12B
を補巻ドラム5から巻出すことによりスイングレバー支
持ロープ12Aを緩め、第1脚部33をピン35を支点
として、図3に示す矢示A′方向に第2脚部36側へと
回動させる。
First, when the swing lever 32 is disassembled, the tower boom 7 is grounded until the tip end side mounting plate 36B of the second leg portion 36 constituting the swing lever 32 is grounded as shown in FIG. Defeat it to the side. In this state, from the tip side mounting plate 36B of the second leg portion 36 to the pendant rope 39
Remove the attachment 39C from the tower jib undulating rope 12B.
Is unwound from the auxiliary winding drum 5, the swing lever support rope 12A is loosened, and the first leg 33 is rotated toward the second leg 36 side in the arrow A'direction shown in FIG. Let

【0041】このようにして、図4に示すように第1脚
部33と第2脚部36とを折畳んだ後、ピン35を抜い
て第1脚部33をブラケット16から取外すと共に、第
1脚部33の先端側取付板33Cからスイングレバー支
持ロープ12Aを、第2脚部36の先端側取付板36B
からタワージブ支持ロープ11をそれぞれ取外すことに
より、スイングレバー32は、図4に示すように折畳み
状態となってタワーブーム7から取外される。
In this way, as shown in FIG. 4, after the first leg portion 33 and the second leg portion 36 are folded, the pin 35 is pulled out to remove the first leg portion 33 from the bracket 16 and Swing lever support rope 12A from the tip side attachment plate 33C of the first leg portion 33, and the tip side attachment plate 36B of the second leg portion 36.
By removing the tower jib support ropes 11 from, the swing lever 32 is in the folded state as shown in FIG. 4, and is removed from the tower boom 7.

【0042】そして、第1脚部33と第2脚部36とを
折畳んだ状態で、第2脚部36の先端側取付板36Bか
ら取外したペンダントロープ39の取付具39Cを、ボ
ルト等によって第2脚部36に突設された取付板38に
固定する。このとき、ペンダントロープ39を第2脚部
36に固定された各梁37に係合させることにより、第
1脚部33と第2脚部36とが折畳状態に束ねられて固
定されたスイングレバー構造体32′を得ることができ
る。
Then, with the first leg portion 33 and the second leg portion 36 folded, the fixture 39C of the pendant rope 39 removed from the tip side attachment plate 36B of the second leg portion 36 is fixed by a bolt or the like. It is fixed to a mounting plate 38 protruding from the second leg portion 36. At this time, by engaging the pendant rope 39 with each beam 37 fixed to the second leg portion 36, the swing in which the first leg portion 33 and the second leg portion 36 are bundled in a folded state and fixed A lever structure 32 'can be obtained.

【0043】また、スイングレバー構造体32′を組立
てる場合には、第2脚部36の先端側取付板36Bを接
地させた状態で、第1脚部33の基端側取付板33Bを
ピン35を介してブラケット16に取付け、取付板38
からペンダントロープ39の取付具39Cを取外す。次
いで、第1脚部33の先端側取付板33Cにスイングレ
バー支持ロープ12Aを取付け、補巻ドラム5によって
タワージブ起伏ロープ12Bを巻取ることにより、第1
脚部33を第2脚部36から開く。そして、ペンダント
ロープ39の取付具39Cを第2脚部36の先端側取付
板36Bに取付けることにより、スイングレバー32を
図2に示す三角形状に組立てる。
When assembling the swing lever structure 32 ', the base end side mounting plate 33B of the first leg portion 33 is fixed to the pin 35 with the tip side mounting plate 36B of the second leg portion 36 grounded. To the bracket 16 via the mounting plate 38
Remove the attachment 39C of the pendant rope 39 from. Next, the swing lever support rope 12A is attached to the tip side attachment plate 33C of the first leg portion 33, and the tower jib undulating rope 12B is wound by the auxiliary winding drum 5,
The leg 33 is opened from the second leg 36. Then, the swing lever 32 is assembled into the triangular shape shown in FIG. 2 by attaching the attachment 39C of the pendant rope 39 to the tip side attachment plate 36B of the second leg portion 36.

【0044】上述の如く、本実施例によれば、スイング
レバー32の分解時において第1脚部33と第2脚部3
6とを折畳むために、ペンダントロープ39の取付具3
9Cを第2脚部36の先端側取付板36Bから取外す作
業、あるいはスイングレバー32の組立時において第1
脚部33と第2脚部36とを連結するために、ペンダン
トロープ39の取付具39Cを第2脚部36の先端側取
付板36Bに取付ける作業を、地上作業により安全に行
うことができる。
As described above, according to this embodiment, when the swing lever 32 is disassembled, the first leg 33 and the second leg 3 are separated.
Fixture 3 of pendant rope 39 for folding 6 and
9C is removed from the mounting plate 36B on the distal end side of the second leg 36, or when the swing lever 32 is assembled.
In order to connect the leg portion 33 and the second leg portion 36, the work of attaching the attachment 39C of the pendant rope 39 to the tip side attachment plate 36B of the second leg 36 can be safely performed by ground work.

【0045】また、第1脚部33と第2脚部36とが折
畳み状態に束ねられて固定されたスイングレバー構造体
32′を得ることにより、例えば小型クレーン等を用い
た輸送車両への搬送作業を効率良く、しかも安全に行う
ことができる。
Further, by obtaining the swing lever structure 32 'in which the first leg portion 33 and the second leg portion 36 are bundled in a folded state and fixed, it is possible to transfer the swing lever structure 32' to a transportation vehicle using, for example, a small crane. Work can be performed efficiently and safely.

【0046】なお、前記実施例では、ペンダントロープ
39の一端側に設けられた取付具39Bと、他端側に設
けられた取付具39Cとを、第1脚部33の先端側取付
板33Cと、第2脚部36の先端側取付板36Bとに、
それぞれ着脱可能に取付けた場合を例に挙げて説明した
が、例えば、取付具39Bと第1脚部33の先端側取付
板33Cとを着脱不能に(但し回動可能に)取付ける構
成としてもよい。
In the above embodiment, the attachment 39B provided on one end side of the pendant rope 39 and the attachment 39C provided on the other end side are attached to the tip side attachment plate 33C of the first leg portion 33. , To the tip side mounting plate 36B of the second leg portion 36,
The case where they are detachably attached has been described as an example, but for example, the attachment 39B and the tip side attachment plate 33C of the first leg 33 may be attached irremovably (but rotatably). .

【0047】また、前記実施例では、ペンダントロープ
39の取付具39Cを固定する取付板38を、第2脚部
36上に突設した場合を例に挙げて説明したが、例えば
図4中に二点鎖線で示すように、第1脚部33の基端側
取付板33Bに雌ねじ部40等を穿設し、該雌ねじ部4
0に螺入するボルトによって取付具39Cを固定する構
成としてもよい。
In the above embodiment, the case where the mounting plate 38 for fixing the mounting tool 39C of the pendant rope 39 is provided on the second leg 36 so as to project is described as an example. As shown by the chain double-dashed line, a female screw portion 40 or the like is bored in the base end side mounting plate 33B of the first leg portion 33, and the female screw portion 4
The fixture 39C may be fixed by a bolt screwed into 0.

【0048】さらに、取付具39Cを先端側取付板36
Bに固定し、取付具39Bを雌ねじ部40に螺入するボ
ルト等に固定するようにしてもよい。
Further, the attachment 39C is attached to the tip side attachment plate 36.
It may be fixed to B, and the fixture 39B may be fixed to a bolt or the like that is screwed into the female screw portion 40.

【0049】さらにまた、前記実施例では、下部走行体
1を有するタワークレーンを例に挙げて説明したが、本
発明はこれに限らず、例えば下部走行体等を有しない固
定式のタワークレーン等にも適用することができる。
Furthermore, in the above-described embodiment, the tower crane having the lower traveling body 1 is described as an example, but the present invention is not limited to this, and for example, a fixed tower crane having no lower traveling body or the like. Can also be applied to.

【0050】[0050]

【発明の効果】以上詳述した如く本発明によれば、基端
側がタワーブームに回動可能に取付けられた第1脚部の
先端側と、該第1脚部の基端側に回動可能にピン結合さ
れた第2脚部の先端側とを可撓性を有するペンダントロ
ープによって連結することにより、スイングレバーを構
成したから、スイングレバーを軽量化することができ、
タワークレーンの吊荷能力を向上させることができる。
また、スイングレバーの分解時において第1脚部と第2
脚部とを折畳む作業や、スイングレバーの組立時におい
て第1脚部と第2脚部とを連結する作業を、効率良くか
つ安全に行うことができる。
As described above in detail, according to the present invention, the base end side of the first leg is rotatably attached to the tower boom, and the base end side of the first leg is pivoted. Since the swing lever is configured by connecting the distal end side of the second leg portion that is pin-coupled as possible with the flexible pendant rope, it is possible to reduce the weight of the swing lever,
The lifting capacity of the tower crane can be improved.
When the swing lever is disassembled, the first leg and the second
The work of folding the leg portion and the work of connecting the first leg portion and the second leg portion at the time of assembling the swing lever can be efficiently and safely performed.

【0051】さらに、ペンダントロープによって第1脚
部と第2脚部とを折畳み状態に束ねて固定することがで
きるので、折畳まれたスイングレバーを輸送する場合
に、例えば小型クレーン等を用いた輸送車両への搬送作
業を効率良く、しかも安全に行うことができる。
Furthermore, since the first leg portion and the second leg portion can be bundled and fixed in a folded state by the pendant rope, a small crane or the like is used when transporting the folded swing lever. The transfer work to the transportation vehicle can be performed efficiently and safely.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施例によるタワークレーンを示す全
体図である。
FIG. 1 is an overall view showing a tower crane according to an embodiment of the present invention.

【図2】実施例によるスイングレバーを拡大して示す一
部破断の斜視図である。
FIG. 2 is a partially cutaway perspective view showing an enlarged swing lever according to an embodiment.

【図3】実施例によるスイングレバーの分解作業状態を
示す外観図である。
FIG. 3 is an external view showing a swing lever disassembly work state according to the embodiment.

【図4】実施例によるスイングレバーを折畳んだ状態を
示す外観図である。
FIG. 4 is an external view showing a state in which the swing lever according to the embodiment is folded.

【図5】従来技術によるタワークレーンを示す全体図で
ある。
FIG. 5 is an overall view showing a tower crane according to the related art.

【図6】従来技術によるスイングレバーを拡大して示す
一部破断の斜視図である。
FIG. 6 is a partially cutaway perspective view showing an enlarged swing lever according to a conventional technique.

【図7】タワーブーム等を地面側に倒した状態を示すタ
ワークレーンの全体図である。
FIG. 7 is an overall view of a tower crane showing a state in which a tower boom or the like is tilted to the ground side.

【図8】スイングレバーの分解作業状態を示す外観図で
ある。
FIG. 8 is an external view showing a disassembled work state of the swing lever.

【図9】スイングレバーを折畳んだ状態を示す外観図で
ある。
FIG. 9 is an external view showing a state in which a swing lever is folded.

【符号の説明】[Explanation of symbols]

2 上部旋回体(クレーン本体) 4 主巻ドラム 5 補巻ドラム 6 起伏ドラム 7 タワーブーム 8 タワージブ 9 主巻ロープ 10 荷吊フック 11 タワージブ支持ロープ 12 補巻ロープ 12A スイングレバー支持ロープ 12B タワージブ起伏ロープ 32 スイングレバー 33 第1脚部 36 第2脚部 38 取付板 39 ペンダントロープ 40 雌ねじ部 2 Upper revolving structure (crane body) 4 Main winding drum 5 Auxiliary winding drum 6 Elevating drum 7 Tower boom 8 Tower jib 9 Main winding rope 10 Lifting hook 11 Tower jib support rope 12 Auxiliary rope 12A Swing lever support rope 12B Tower jib undulation rope 32 Swing lever 33 First leg 36 Second leg 38 Mounting plate 39 Pendant rope 40 Female thread

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 主巻ドラム、補巻ドラムおよび起伏ドラ
ムを有するクレーン本体と、該クレーン本体に起伏可能
に取付けられ、前記起伏ドラムにより起伏されるタワー
ブームと、該タワーブームの先端側に俯仰動可能に取付
けられたタワージブと、一端側が前記主巻ドラムに巻回
され、他端側が該タワージブの先端側から垂下される荷
吊フックに巻回された主巻ロープと、前記タワージブを
前記タワーブームに対して俯仰動させるため、前記タワ
ーブームの先端側に回動可能に設けられ、支持ロープを
介して前記タワージブの先端側に連結されるスイングレ
バーと、一端側が前記補巻ドラムに巻回され、他端側が
該スイングレバーに連結される補巻ロープとからなるタ
ワークレーンにおいて、前記スイングレバーは、基端側
が前記タワーブームの先端側に回動可能にピン結合さ
れ、先端側が前記補巻ロープの他端側に連結される第1
脚部と、基端側が該第1脚部の基端側に回動可能に取付
けられ、先端側が前記支持ロープに連結される第2脚部
と、一定の長さを有し、両端側が該第2脚部の先端側と
前記第1脚部の先端側との少なくとも一方側に着脱可能
に連結されるペンダントロープとから構成したことを特
徴とするタワークレーン。
1. A crane main body having a main winding drum, an auxiliary winding drum, and a hoisting drum, a tower boom that is mounted to the crane main body so as to be hoisted, and hoists by the hoisting drum, and a tower boom is located on the tip side. A tower jib movably attached to the tower jib, one end of which is wound around the main winding drum, and the other end of which is wound around a load-hanging hook that hangs down from the tip end of the tower jib, and the tower jib is attached to the tower jib. A swing lever that is rotatably provided on the tip side of the tower boom and is connected to the tip side of the tower jib via a support rope for raising and lowering the boom and one end side is wound around the auxiliary winding drum. In the tower crane, the other end side of which is a supplementary rope connected to the swing lever, the swing lever has a base end side of the tower boom. A rotatably pin-coupled to the tip side of the
A leg portion, a second leg portion having a base end side rotatably attached to the base end side of the first leg portion, and a tip end side connected to the support rope; A tower crane comprising a pendant rope detachably connected to at least one of the tip side of the second leg and the tip side of the first leg.
JP10899294A 1994-04-25 1994-04-25 Tower crane Pending JPH07291587A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10899294A JPH07291587A (en) 1994-04-25 1994-04-25 Tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10899294A JPH07291587A (en) 1994-04-25 1994-04-25 Tower crane

Publications (1)

Publication Number Publication Date
JPH07291587A true JPH07291587A (en) 1995-11-07

Family

ID=14498848

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10899294A Pending JPH07291587A (en) 1994-04-25 1994-04-25 Tower crane

Country Status (1)

Country Link
JP (1) JPH07291587A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100354139B1 (en) * 2000-01-15 2002-09-28 주식회사 한진중공업 Device for articulating crane boom
JP2014097866A (en) * 2012-11-14 2014-05-29 Kobelco Cranes Co Ltd Jib fixing method of mobile tower crane
JP2020200136A (en) * 2019-06-07 2020-12-17 コベルコ建機株式会社 Crane strut, folding method of crane strut, and construction method of crane strut
CN112374366A (en) * 2020-11-12 2021-02-19 湖南响箭重工科技股份有限公司 Hoisting system for assembling concrete pump truck supporting leg system and hoisting method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100354139B1 (en) * 2000-01-15 2002-09-28 주식회사 한진중공업 Device for articulating crane boom
JP2014097866A (en) * 2012-11-14 2014-05-29 Kobelco Cranes Co Ltd Jib fixing method of mobile tower crane
JP2020200136A (en) * 2019-06-07 2020-12-17 コベルコ建機株式会社 Crane strut, folding method of crane strut, and construction method of crane strut
CN112374366A (en) * 2020-11-12 2021-02-19 湖南响箭重工科技股份有限公司 Hoisting system for assembling concrete pump truck supporting leg system and hoisting method thereof
CN112374366B (en) * 2020-11-12 2023-02-28 湖南响箭重工科技股份有限公司 Hoisting system for assembling concrete pump truck supporting leg system and hoisting method thereof

Similar Documents

Publication Publication Date Title
JPH07291587A (en) Tower crane
JP2004075294A (en) Jib strut self-assembling method for tower crane
JP4355918B2 (en) Bridge girder temporary support gantry and erection vent using the same
JP3399356B2 (en) crane
JPH092774A (en) Heavy object suspending device
JPH1160167A (en) Tower crane
JP2547044B2 (en) Jib loading and unloading method and device in crane
JP6642112B2 (en) crane
JPH05155580A (en) Method and device for climbing tower crane
JPH07291586A (en) Crane
JP3917236B2 (en) Roughing jib crane
JPH07187574A (en) Jib device of crane
JP2000272876A (en) Folding jib crane
JPH07149498A (en) Counterweight mounting and demounting device for pile driver
WO2024018911A1 (en) Crane and method for assembling and disassembling crane
JP2547040B2 (en) Mounting structure of jib etc. in crane
JPH0736001Y2 (en) Detachable lifting device
JP2542385Y2 (en) Counterweight attachment / detachment equipment for construction work machines
JPH0316877Y2 (en)
JP3036563U (en) Jib crane
JP3234883B2 (en) Luffing jib crane boom suspension structure
JPH092767A (en) Lifting method for escalator truss
JPH0455027Y2 (en)
JP2004256240A6 (en) crane
JP2867242B2 (en) Attachment structure such as jib to the crane's telescopic boom