JP3234883B2 - Luffing jib crane boom suspension structure - Google Patents

Luffing jib crane boom suspension structure

Info

Publication number
JP3234883B2
JP3234883B2 JP23990598A JP23990598A JP3234883B2 JP 3234883 B2 JP3234883 B2 JP 3234883B2 JP 23990598 A JP23990598 A JP 23990598A JP 23990598 A JP23990598 A JP 23990598A JP 3234883 B2 JP3234883 B2 JP 3234883B2
Authority
JP
Japan
Prior art keywords
boom
sheave
jib
extension
suspension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP23990598A
Other languages
Japanese (ja)
Other versions
JP2000063081A (en
Inventor
寛 大橋
晃 花原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Heavy Industries Construction Crane Co Ltd
Original Assignee
Sumitomo Heavy Industries Construction Crane Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Heavy Industries Construction Crane Co Ltd filed Critical Sumitomo Heavy Industries Construction Crane Co Ltd
Priority to JP23990598A priority Critical patent/JP3234883B2/en
Publication of JP2000063081A publication Critical patent/JP2000063081A/en
Application granted granted Critical
Publication of JP3234883B2 publication Critical patent/JP3234883B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明はラフィングジブクレ
−ンのブ−ム吊り構造に関するものである。
The present invention relates to a boom suspension structure for luffing jib crane.

【0002】[0002]

【従来の技術】図5は従来のラフィングジブクレ−ンの
全体図である。図5で1はブ−ムで、ブ−ムトップ1a
にジブ2が設けられている。3は巻上ロ−プ、4は荷物
吊上用のフックである。5はフロントポスト、6はリヤ
ポストである。7はジブ2のトップとフロントポスト5
間に張られたジブ支持ペンダント、8はフロントポスト
5とリヤポスト6との間に張られたジブ起伏ロ−プであ
る。9はポスト支持ペンダント、10はブ−ム支持ペン
ダントで、ブ−ムトップ1aとライブマスト11間に張
られ、図示しないブ−ム起伏ドラムによって駆動され、
ガントリ−13に支持されたシ−ブを介し駆動されるブ
−ム起伏ロ−プ12によってブ−ムの起伏が行われる。
14はフック巻上ロ−プである。
2. Description of the Related Art FIG. 5 is an overall view of a conventional luffing jib crane. In FIG. 5, reference numeral 1 denotes a boom, and a boom top 1a.
Is provided with a jib 2. Reference numeral 3 denotes a hoisting rope, and 4 denotes a hook for lifting a load. 5 is a front post, and 6 is a rear post. 7 is the top of jib 2 and front post 5
A jib support pendant 8 is provided between the front post 5 and the rear post 6. 9 is a post support pendant, 10 is a boom support pendant, which is stretched between the boom top 1a and the live mast 11, and is driven by a boom hoist drum (not shown).
The boom is raised and lowered by a boom raising and lowering rope 12 driven through a sheave supported by a gantry 13.
Reference numeral 14 denotes a hook winding rope.

【0003】図6は同じく従来のラフィングジブクレ−
ンの全体図である。これは図5と比べ、ブ−ムトップ1
aにブ−ムトップ吊り装置を付加したものである。即ち
ブ−ムトップ吊り装置用のもう一本のフック15aを備
えた巻上ロ−プ15が付加され、これを駆動するロ−プ
を案内するため、ブ−ムトップ1aにブ−ム吊りシ−ブ
16と、これの支軸ならびにガイドシ−ブ17が付加さ
れている。このようにブ−ムトップ1a、ブ−ム吊り装
置用のシ−ブ16やこれを支持する支軸等をつけると、
ブ−ムトップ1aの部材組み込みを含めて、これがない
場合に比べ自重が大きくなり、ブ−ム1の最大長さは短
かくなり、ジブフック4の吊上能力の低下にも影響す
る。
FIG. 6 shows a conventional luffing jib crane.
FIG. This is different from FIG.
This is the one in which a boom top suspension device is added to a. That is, a hoisting rope 15 having another hook 15a for a boom top suspension device is added, and a boom suspension seam is attached to the boom top 1a to guide the rope for driving the same. And a support shaft and a guide sheave 17 thereof. When the boom top 1a, the sheave 16 for the boom suspension device and the support shaft for supporting the same are attached in this manner,
The weight, including the incorporation of the boom top 1a, is greater than in the case without the boom top 1a, the maximum length of the boom 1 is shorter, and the lifting capacity of the jib hook 4 is also affected.

【0004】[0004]

【発明が解決しようとする課題】ラフィングジブクレ−
ン(タワ−クレ−ン)は、通常はジブ吊りだけで作業す
ることが多い。しかし、クレ−ン本体の近くでブ−ム吊
りをする必要とする作業も要求されることがある。この
場合に図6に示すように、ブ−ムトップ1aに従来はシ
−ブ機構を組み込んで対応してきたが、シ−ブ付ブ−ム
トップ1aに組替えるには、ブ−ム2、フロントポスト
5、リヤポスト6、ブ−ムペンダント10を取外さなけ
ればならず組替作業に多大な労力と時間を要した。これ
らを組み込むと、ブ−ムトップ1aの骨組み部材やシ−
ブ支軸等の付加により重量が重くなり、ブ−ム1の長さ
が短かくならざるを得なかった。しかしブ−ム吊り無し
であるならば、当然ブ−ムは長くできるしジブ吊り性能
も良くなるので、ブ−ムトップ1aはシ−ブ無しの簡素
な構造とし、ブ−ム吊りなしの性能を確保しつゝ、ブ−
ム吊りの必要な時にはシ−ブ機構付きの機能をも追加し
てブ−ム吊りをも可能にすることを目的とする。
Problems to be Solved by the Invention
In general, the tower (tray crane) is usually operated only by hanging the jib. However, an operation that requires boom hanging near the crane body may be required. In this case, as shown in FIG. 6, conventionally, a sheave mechanism has been incorporated in the boom top 1a, but in order to change to the boom top 1a with sheave, the boom 2 and the front post are required. 5, the rear post 6, and the boom pendant 10 had to be removed, which required a great deal of labor and time for the replacement work. When these are incorporated, the frame members and the sheath of the beam top 1a are formed.
The addition of the boom shaft and the like increased the weight, and the length of the boom 1 had to be shortened. However, if there is no boom suspension, the boom can naturally be lengthened and the jib suspension performance is improved. Therefore, the boom top 1a has a simple structure without sheave, and the performance without boom suspension is improved. Securing, boo
It is an object of the present invention to add a function with a sheave mechanism when it is necessary to suspend the boom, thereby enabling the suspension of the boom.

【0005】[0005]

【課題を解決するための手段】クレ−ン本体上に設けた
ブ−ム1と、ブ−ムトップ1aに設けたジブ2を備えた
ラフィングジブに於て、ブ−ム1とブ−ムトップ1a間
に着脱可能なシ−ブ付エキステンション18を設けジブ
2によるジブ吊りとブ−ム1によるブ−ム吊りとを可能
にしたものであって、該シ−ブ付エキステンション18
はエキステンションブラケット22と該エキステンショ
ンブラケット22の片側に巻上ロ−プ19用のシ−ブ2
0を、又反対側にガイドシ−ブ21を備え、エキステン
ションブラケット22の上面と下面の四隅にブ−ムトッ
プ1a及びブ−ム1の頂部と結合する接続ラグ23を有
する。
SUMMARY OF THE INVENTION In a luffing jib having a boom 1 provided on a crane main body and a jib 2 provided on a boom top 1a, between the boom 1 and the boom top 1a. A detachable extension 18 with a sheave is provided to enable the jib suspension by the jib 2 and the boom suspension by the boom 1.
Is an extension bracket 22 and a sheave 2 for the hoisting rope 19 on one side of the extension bracket 22.
0 and a guide sheave 21 on the opposite side, and at the four corners of the upper and lower surfaces of the extension bracket 22, there are provided a connecting lug 23 which is connected to the boom top 1a and the top of the boom 1.

【0006】[0006]

【発明の実施の形態】図1にもとずいて説明する。図1
に示すように、本発明はブ−ムトップ1aとブ−ム1の
頂部との間にシ−ブ付エキステンション(シ−ブ付継ぎ
ブ−ム)18を設けたものである。シ−ブ付エキステン
ション18は図2〜図4に示す如く巻上ロ−プ19用の
シ−ブ20及びガイドシ−ブ21とを両端に備えたエキ
ステンションブラケット22と、これをブ−ム1の頂部
とブ−ムトップ1aの下部に接続する接続ラグ23が平
面視四隅上下に固着されている。20aはシ−ブ20の
支軸、21aはガイドシ−ブ21の支軸である。このシ
−ブ付エキステンション18を外し、ブ−ム1とブ−ム
トップ1aとを直接接続すれば、従来の構成となる。
DESCRIPTION OF THE PREFERRED EMBODIMENTS A description will be given based on FIG. FIG.
As shown in FIG. 1, the present invention is provided with an extension with sheave (joint with boom) 18 between the boom top 1a and the top of the boom 1. As shown in FIGS. 2 to 4, the extension 18 with a sheave has an extension bracket 22 provided with a sheave 20 for a hoisting rope 19 and a guide sheave 21 at both ends, and a boom. A connection lug 23 connected to the top of the base 1 and the lower part of the boom top 1a is fixed to the upper and lower four corners in plan view. 20a is a support shaft of the sheave 20, and 21a is a support shaft of the guide sheave 21. If the extension 18 with a sheave is removed and the boom 1 and the boom top 1a are directly connected, a conventional configuration is obtained.

【0007】[0007]

【発明の効果】請求項1の構成にしたので、シ−ブ付エ
キステンション18を必要に応じて着脱し、必要なけれ
ば、これを取外し、ブ−ム吊り無しの作業をし、これを
着ければブ−ム吊りを可能とし、両機能を兼ねさせるこ
とができるので、従来に比べ組替作業に要する多大な労
力時間を少なくすることができる。又シ−ブ付エキステ
ンション18を外すことにより、ブ−ム頂部の構成が簡
略化し、軽量化が可能となるので、ブ−ムの長さを長く
でき、結果としてジブ吊りの性能を上げることができ
る。
According to the construction of the first aspect, the extension 18 with sheave is attached and detached as required, and if not necessary, it is detached, and the work without hanging the boom is carried out. If this is the case, it is possible to suspend the boom, and both functions can be performed, so that a great amount of labor time required for the re-assembly work can be reduced as compared with the conventional art. Also, by removing the extension 18 with the sheave, the construction of the top of the boom can be simplified and the weight can be reduced, so that the length of the boom can be increased, and as a result, the performance of the jib suspension can be improved. Can be.

【図面の簡単な説明】[Brief description of the drawings]

【図1】シ−ブ付エキステンションを備えたラフィング
ジブクレ−ン。
FIG. 1 is a roughing jib crane provided with an extension with a sheave.

【図2】ブ−ム頂部の詳細図。FIG. 2 is a detailed view of a boom top.

【図3】シ−ブ付エキステンションの側面図。FIG. 3 is a side view of an extension with a sheave.

【図4】同じく平面図。FIG. 4 is a plan view of the same.

【図5】公知ラフィングジブクレ−ンの全体側面図。FIG. 5 is an overall side view of a known luffing jib crane.

【図6】ブ−ム吊機構を備えた公知ラフィングジブクレ
−ンの全体側面図。
FIG. 6 is an overall side view of a known luffing jib crane provided with a boom suspension mechanism.

【符号の説明】[Explanation of symbols]

1 ブ−ム 1a ブ−ムトップ 2 ジブ 3 巻上ロ−プ(ジ
ブフック) 4 フック 5 フロントポスト 6 リヤポスト 7 ジブ支持ペンダ
ント 8 ジブ起伏ロ−プ 9 ポスト支持ペン
ダント 10 ブ−ム支持ペンダント 11 ライブマスト 12 ブ−ム起伏ロ−プ 13 ガントリ− 14 巻上ロ−プ(ジブフック) 15 巻上ロ−プ(ブ
−ム吊りフック) 15a フック 16 ブ−ム吊りシ−
ブ 17 ガイドシ−ブ 18 エキステンショ
ン 19 巻上ロ−プ 20 巻上ロ−プ用の
シ−ブ 20a 支軸 21 ガイドシ−ブ 21a 支軸 22 エキステンショ
ンブラケット 23 接続ラグ
DESCRIPTION OF SYMBOLS 1 Boom 1a Boom top 2 Jib 3 Hoisting rope (jib hook) 4 Hook 5 Front post 6 Rear post 7 Jib support pendant 8 Jib hoisting loop 9 Post support pendant 10 Boom support pendant 11 Live mast 12 Boom hoisting rope 13 Gantry 14 Hoisting rope (jib hook) 15 Hoisting rope (boom hanging hook) 15a hook 16 Boom hanging seam
17 Guide sheave 18 Extension 19 Hoisting rope 20 Sheave for hoisting rope 20a Support shaft 21 Guide sheave 21a Support shaft 22 Extension bracket 23 Connection lug

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) B66C 23/42 B66C 23/64 - 23/70 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 7 , DB name) B66C 23/42 B66C 23/64-23/70

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 クレ−ン本体上に設けたブ−ム(1)と、
ブ−ムトップ(1a)に設けたジブ(2)を備えたラフィング
ジブに於て、ブ−ム(1)とブ−ムトップ(1a)間に着脱可
能なシ−ブ付エキステンション(18)を設けジブ(2)によ
るジブ吊りとブ−ム(1)によるブ−ム吊りとを可能にし
たものであって、該シ−ブ付エキステンション(18)はエ
キステンションブラケット(22)と該エキステンションブ
ラケット(22)の片側に巻上ロ−プ(19)用のシ−ブ(20)
を、又反対側にガイドシ−ブ(21)を備え、エキステンシ
ョンブラケット(22)の上面と下面の四隅にブ−ムトップ
(1a)及びブ−ム(1)の頂部と結合する接続ラグ(23)を有
することを特徴とするラフィングジブクレ−ンのブ−ム
吊り構造。
A boom (1) provided on a crane body;
In a luffing jib provided with a jib (2) provided on a boom top (1a), a detachable extension with a sheave (18) is provided between the boom (1) and the boom top (1a). The jib suspension by the jib (2) and the boom suspension by the boom (1) are enabled, and the extension with sheave (18) is provided with an extension bracket (22) and the extension. Sheave (20) for hoisting rope (19) on one side of bracket (22)
And a guide sheave (21) on the opposite side, and a boom top at each of the upper and lower corners of the extension bracket (22).
(1a) and a boom suspension structure for a luffing jib crane, comprising a connecting lug (23) coupled to a top of the boom (1).
JP23990598A 1998-08-26 1998-08-26 Luffing jib crane boom suspension structure Expired - Fee Related JP3234883B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23990598A JP3234883B2 (en) 1998-08-26 1998-08-26 Luffing jib crane boom suspension structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23990598A JP3234883B2 (en) 1998-08-26 1998-08-26 Luffing jib crane boom suspension structure

Publications (2)

Publication Number Publication Date
JP2000063081A JP2000063081A (en) 2000-02-29
JP3234883B2 true JP3234883B2 (en) 2001-12-04

Family

ID=17051605

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23990598A Expired - Fee Related JP3234883B2 (en) 1998-08-26 1998-08-26 Luffing jib crane boom suspension structure

Country Status (1)

Country Link
JP (1) JP3234883B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4940619B2 (en) * 2005-10-11 2012-05-30 コベルコクレーン株式会社 Self-propelled crane
CN110240071A (en) * 2019-06-06 2019-09-17 徐工集团工程机械股份有限公司建设机械分公司 A kind of large pitching angle degree derricking rope wind and winding method

Also Published As

Publication number Publication date
JP2000063081A (en) 2000-02-29

Similar Documents

Publication Publication Date Title
EP0132892B1 (en) Mobile crane
JP6645222B2 (en) How to attach a crane jib
JP4415643B2 (en) crane
JP2004075294A (en) Jib strut self-assembling method for tower crane
JP3234883B2 (en) Luffing jib crane boom suspension structure
JP6638434B2 (en) Crane boom mounting method
JP2003054876A (en) Device and method for attaching and detaching side frame
JP2824032B2 (en) Boom head attachment / detachment device
JP3399356B2 (en) crane
JP3227535B2 (en) Lifting mechanism at the middle of the crane's boom
JP2000118952A (en) Crane device
JPH1160167A (en) Tower crane
JP2598741B2 (en) Lifting work beam device
JP2001310895A (en) Counter weight detaching/attaching device for crawler crane
JP3917236B2 (en) Roughing jib crane
JP2543552Y2 (en) Jib crane
JP3521093B2 (en) Road sheave structure
JPH0455027Y2 (en)
JPH1143290A (en) Boom hoisting device for crane and boom hoisting method
JP2593113Y2 (en) Jib mountable crane truck
JPH0977476A (en) Derricking gear of lattice boom crane
JPH075109Y2 (en) Sheave block device
JPS63180695A (en) Incorporating and overhanging method of luffing jib in expansion boom with luffing jib
JPH066380U (en) Counterweight attachment / detachment device for cranes
JP2779957B2 (en) Lifting device for climbing crane

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20070928

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100928

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100928

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110928

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120928

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130928

Year of fee payment: 12

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees