JPH07239056A - Working method for underground buried pipe - Google Patents

Working method for underground buried pipe

Info

Publication number
JPH07239056A
JPH07239056A JP6066350A JP6635094A JPH07239056A JP H07239056 A JPH07239056 A JP H07239056A JP 6066350 A JP6066350 A JP 6066350A JP 6635094 A JP6635094 A JP 6635094A JP H07239056 A JPH07239056 A JP H07239056A
Authority
JP
Japan
Prior art keywords
pipe
working
ground
work
underground buried
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP6066350A
Other languages
Japanese (ja)
Inventor
Tamio Yamagishi
民夫 山岸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NIKKO KENSETSU KK
TAMU TEC KK
Original Assignee
NIKKO KENSETSU KK
TAMU TEC KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NIKKO KENSETSU KK, TAMU TEC KK filed Critical NIKKO KENSETSU KK
Priority to JP6066350A priority Critical patent/JPH07239056A/en
Publication of JPH07239056A publication Critical patent/JPH07239056A/en
Pending legal-status Critical Current

Links

Landscapes

  • Sewage (AREA)
  • Earth Drilling (AREA)
  • Branch Pipes, Bends, And The Like (AREA)

Abstract

PURPOSE:To economically perform the working for an underground buried pipe in a short term of work by inserting a pipe body for work into a wall-surface protecting pipe body to surround the work scheduled position for an underground buried pipe to form a work space isolated from the ground, and applying work to the underground buried pipe within the work space. CONSTITUTION:A wall-surface protecting pipe body 2 is inserted under pressure nearly vertical from the ground towards a scheduled underground buried pipe and the high- pressure water from a high-pressure water generating device on the ground is jetted out towards the surface of the ground from a jet nozzle 4 at the tip of a lance 3 inserted into the wall-surface protecting pipe body 2 to dig the surface of the ground and to form earth and sand into mud. The mud is sucked up to the ground through a mud suction pipe 5 and discharged so as to dig down. A pipe body 6 for work is inserted into a digging hole (a) and at the same time an annular seal member 8 is inserted along the inner wall of the wall-surface protecting pipe body 2, and then the tip of the pipe body 6 for work is brought into close contact with the surface of a buried pipe (b) through an annular seal member 7 into which water or air is injected to form a work space within the digging hole (a), so that immediately various work may be applied to the work scheduled position (c) of the buried pipe (b).

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は地下埋設管の工作方法に
関し、上水道、下水道、ガスなどの配管や電話回線など
を通すための地下埋設管に対して、分岐などを設けたり
破損部分を補修したりするなどの工作を施すための方法
に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing an underground buried pipe, in which a branch or the like is provided or a damaged portion is repaired for an underground buried pipe for passing water supply, sewerage, gas pipes and telephone lines. The present invention relates to a method for performing work such as doing.

【0002】[0002]

【従来の技術】従来、上水道、下水道、ガスなどの配
管、或いは電話回線などを通すための地下埋設管に工作
を加えようとする場合、工作予定位置の周辺の地盤を地
上から掘削して土砂を取り除き、地下埋設管を広く露出
させたうえで作業を進めることが普通であった。しかし
この方法は、地下埋設管に生じた破損を補修する場合の
ように掘削すべき位置が予め正確に決定できないときは
仕方がないが、分岐管等を設ける場合のように工作を加
える位置が決まっているときは、地下埋設管を広く露出
させるように掘削することは作業量が増えるばかりでな
く工期も長くなり、不経済であるうえに周辺地域への影
響も無視できない。
2. Description of the Related Art Conventionally, when it is attempted to add work to pipes for water supply, sewerage, gas, etc., or underground pipes for passing telephone lines, etc., the ground around the planned work position is excavated from the ground and the earth and sand are excavated. It was usual to remove the ground and expose the underground pipe to a wide extent before proceeding with the work. However, this method is unavoidable when the position to be excavated cannot be accurately determined in advance, such as when repairing a damage that has occurred in an underground buried pipe, but when adding a branch pipe, etc. When it is decided, excavating the underground buried pipe so as to expose it widely not only increases the amount of work, but also lengthens the construction period, which is uneconomical and its impact on the surrounding area cannot be ignored.

【0003】[0003]

【発明が解決しようとする課題】そこで本発明は、工作
予定位置が予め決定されているような場合に地盤の掘削
範囲を最小限に抑えることができる工法を採用して、地
下埋設管に工作を加えるのに充分な広さの作業用空間を
確保することにより、工期が短くて経済的な地下埋設管
の工作方法を提供することを目的とした。
SUMMARY OF THE INVENTION Therefore, the present invention employs a construction method capable of minimizing the excavation range of the ground when the planned work position is determined in advance, and works on the underground buried pipe. The purpose of the present invention is to provide an economical underground burying pipe construction method with a short construction period by securing a working space of a sufficient size for adding the above.

【0004】[0004]

【課題を解決するための手段】上記の目的を達成するた
めに本発明の地下埋設管の工作方法は、地下埋設管の工
作予定位置に向かって地上から掘削孔を形成すると共に
該掘削孔内に壁面保護管体を挿入する工程と、前記掘削
孔の底面に露出した地下埋設管部分の外壁面形状を測定
する工程と、前記外壁面形状と相補的な形状の先端部に
膨張可能な中空の環状シール部材を備え且つ前記壁面保
護管体より小径の作業用管体を準備する工程と、該作業
用管体を前記壁面保護管体内に挿入して地下埋設管の工
作予定位置を囲み地盤から遮断された作業用空間を形成
する工程と、該作業用空間内で地下埋設管に工作を施す
工程とを含んでなる。
In order to achieve the above object, a method of working an underground buried pipe according to the present invention is to form an excavation hole from the ground toward a planned working position of the underground buried pipe, and A step of inserting a wall protection pipe into the hollow wall, a step of measuring the outer wall shape of the underground buried pipe portion exposed at the bottom of the excavation hole, and a hollow expandable at the tip of a shape complementary to the outer wall shape. And a step of preparing a work tube having a smaller diameter than the wall surface protection tube body, and inserting the work tube body into the wall surface protection tube body to enclose the planned working position of the underground buried pipe The method comprises the steps of forming a working space that is blocked from the above, and a step of working a buried underground pipe in the working space.

【0005】[0005]

【作用】本発明の地下埋設管の工作方法は、地上から掘
削孔の壁面保護管体を挿入しながら地下埋設管に向かっ
て掘削孔を形成することによって工作予定位置を露出さ
せ、次いで地下埋設管の工作予定位置の外壁面形状を測
定し、先端部を前記の外壁面形状に相補的な形状とした
うえに膨張可能な中空の環状シール部材を先端部に取り
付けた作業用管体を、壁面保護管体内に挿入して環状シ
ール部材を地下埋設管の外壁面と密着させることによ
り、工作予定位置を囲んで地盤から遮断された作業用空
間を形成するものである。かかる本発明によれば、掘削
する土砂量が少なくても作業に充分な広さの空間を確保
することが容易であり、しかも地下水位が高くても容易
に止水できる。
According to the method of working an underground burial pipe of the present invention, the planned working position is exposed by forming the digging hole toward the underground burial pipe while inserting the wall protection pipe body of the digging hole from the ground, and then burial underground. Measuring the outer wall surface shape of the planned working position of the pipe, a working tubular body having a hollow annular seal member which is inflatable at the tip portion, in addition to the tip portion having a shape complementary to the outer wall surface shape, By inserting the annular sealing member into the wall surface protection pipe and bringing the annular seal member into close contact with the outer wall surface of the underground buried pipe, a working space surrounded by the ground is formed around the planned work position. According to the present invention, it is easy to secure a space large enough for work even if the amount of earth and sand to be excavated is small, and furthermore, even if the groundwater level is high, water can be stopped easily.

【0006】[0006]

【実施例】本発明の地下埋設管の工作方法を図によって
説明する。図1は地上から地下埋設管の工作予定位置に
向かって掘削孔を形成する工程を示すが、先ず地盤1の
中に埋設してある埋設管bの工作予定位置、例えば枝管
を分岐して設けるための開口部穿口予定位置などに向か
って、地上からほぼ垂直に壁面保護管体2を圧入する。
そして少し壁面保護管体2の先端部が地盤1内に進入し
たならば、地上に別途に用意した高圧水発生装置から高
圧ホースなどによって導いた高圧水を、壁面保護管体2
の内部に挿入したランス3の先端に設けたジェットノズ
ル4から地盤面に向かって噴射し、地盤面を掘り崩すと
共に掘り崩された土砂を泥状化する。一方生成した泥水
を、壁面保護管体2の内部に同様に挿入した吸泥管5を
介し地上に吸い上げて排出することにより、地盤面を掘
り下げる。次いで更に壁面保護管体2を地盤1内に圧入
して、上記と同様の操作を繰り返しながら地盤の掘削を
進め、壁面保護管体2によって囲まれた掘削孔aを形成
する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A method of working an underground buried pipe according to the present invention will be described with reference to the drawings. FIG. 1 shows a process of forming a drill hole from the ground toward a planned working position of an underground buried pipe. First, a planned working position of a buried pipe b buried in the ground 1, for example, a branch pipe is branched. The wall surface protection tube body 2 is press-fitted substantially vertically from the ground toward the planned opening position for providing the opening.
If the tip of the wall surface protection tube 2 slightly enters the ground 1, high pressure water introduced by a high pressure hose or the like from a high pressure water generator separately prepared on the ground will be used for the wall surface protection tube 2
It is jetted toward the ground surface from a jet nozzle 4 provided at the tip of a lance 3 inserted inside the lance 3, and the ground surface is dug down and the digged earth and sand is turned into a mud. On the other hand, the generated mud is sucked up and discharged to the ground through the mud suction pipe 5 that is similarly inserted inside the wall surface protection pipe body 2 to dig down the ground surface. Next, the wall surface protection pipe body 2 is further press-fitted into the ground 1, and the excavation of the ground is advanced by repeating the same operation as described above to form the excavation hole a surrounded by the wall surface protection pipe body 2.

【0007】このようにして壁面保護管体2全体が地盤
1内に圧入されてもまだ掘削孔aの深さが予定に達しな
いときは、その後端に別に用意した単位管体を結合する
ことによって壁面保護管体2を延長して掘削を継続する
か、又は掘削孔aの底面から前記の壁面保護管体2より
径が小さい壁面保護管体2′を地盤1内に圧入して前記
と同様に掘削を継続する。こうして掘削孔aの底面に埋
設管bの面が露出したならば、その露出部分の形状を測
定して予め予想された埋設管bの工作予定位置cの形状
と比較し、工作予定位置cが露出していることを確認し
たうえで、掘削孔aの底面に露出した埋設管bの面の立
体形状を測定し記録する。
In this way, if the depth of the excavation hole a still does not reach the planned level even if the entire wall surface protection tube 2 is press-fitted into the ground 1, a separately prepared unit tube should be connected to the rear end thereof. The wall protection pipe 2 is extended to continue excavation, or the wall protection pipe 2'having a smaller diameter than the wall protection pipe 2 is press-fitted into the ground 1 from the bottom surface of the excavation hole a, and Similarly, continue excavation. If the surface of the buried pipe b is exposed at the bottom surface of the excavation hole a in this way, the shape of the exposed portion is measured and compared with the shape of the planned working position c of the buried pipe b, which is predicted in advance. After confirming that it is exposed, the three-dimensional shape of the surface of the buried pipe b exposed on the bottom surface of the excavation hole a is measured and recorded.

【0008】次に上記の記録に基づいて、壁面保護管体
2より小径であって壁面保護管体2の内側に挿入するた
めの作業用管体6の先端部6aの形状を決定するが、こ
の先端部6aの形状は掘削孔aの底面に露出した埋設管
bの面の立体形状と相補的でなければならない。こうし
た先端部6aは作業用管体6とは別体として用意された
ものを適宜に選択して作業用管体6の端部に取り付ける
ようにしたものであってもよく、或いは作業用管体6自
体の先端を埋設管bの面の立体形状と相補的な形状に加
工したものであってもよい。
Next, based on the above-mentioned record, the shape of the tip portion 6a of the working pipe body 6 having a smaller diameter than the wall surface protection pipe body 2 and inserted into the wall surface protection pipe body 2 is determined. The shape of the tip portion 6a must be complementary to the three-dimensional shape of the surface of the buried pipe b exposed on the bottom surface of the drill hole a. The tip portion 6a may be one prepared separately from the working tube body 6 and appropriately selected and attached to the end portion of the working tube body 6, or the working tube body. The tip of 6 itself may be processed into a shape complementary to the three-dimensional shape of the surface of the buried pipe b.

【0009】こうして用意された先端部6aには、空気
や水等のような流体を注入することによって膨張するよ
うな中空の環状シール部材7を取り付けておき、壁面保
護管体2の内側に作業用管体6を挿入したときに、埋設
管bの面と作業用管体6の先端とが環状シール部材7を
介して密着できるようにしておく。更に作業用管体6の
外面と壁面保護管体2の内面との間を封止するための環
状シール部材8を作業用管体6の外面に設けて置いても
よく、この場合の環状シール部材8の構造は上記の環状
シール部材7と同様なものであってもよい。
A hollow annular seal member 7 that expands by injecting a fluid such as air or water is attached to the tip portion 6a thus prepared, and a work is performed inside the wall surface protection tube body 2. The surface of the buried pipe b and the tip of the working pipe body 6 can be brought into close contact with each other via the annular seal member 7 when the working pipe body 6 is inserted. Further, an annular seal member 8 for sealing between the outer surface of the work tube body 6 and the inner surface of the wall surface protection tube body 2 may be provided and placed on the outer surface of the work tube body 6. In this case, the annular seal member is provided. The structure of the member 8 may be the same as that of the annular seal member 7 described above.

【0010】上記のように準備された作業用管体6は掘
削孔a内に挿入されるが、そのときには環状シール部材
8も壁面保護管体2の内壁に沿って挿入され、次いで作
業用管体6の先端が環状シール部材7を介して埋設管b
の面に密着し、また作業用管体6と壁面保護管体2の間
も環状シール部材8によって封止されて、掘削孔a内に
図2及び図3に示すような作業用空間が形成される。此
の作業用空間は周囲の地盤から保護されていて水や土砂
等の流入の恐れがなく、直ちに埋設管bの工作予定位置
cに穿孔するなどの各種の工作を施すことができる。
The working pipe body 6 prepared as described above is inserted into the excavation hole a. At that time, the annular seal member 8 is also inserted along the inner wall of the wall surface protecting pipe body 2, and then the working pipe body. The tip of the body 6 is embedded in the buried pipe b via the annular seal member 7.
Of the work pipe body 6 and the wall surface protection pipe body 2 are also sealed by the annular seal member 8 to form a work space as shown in FIGS. 2 and 3 in the excavation hole a. To be done. Since this working space is protected from the surrounding ground, there is no fear of inflow of water, earth and sand, etc., and it is possible to immediately perform various works such as drilling at the planned work position c of the buried pipe b.

【0011】[0011]

【発明の効果】本発明の地下埋設管の工作方法によれ
ば、地盤を広く掘り返すことなく地下埋設管に対して工
作を施すに必要な広さの作業用空間を簡便な手順で形成
することができ、工事の期間を短縮することが容易であ
るほか作業経費を低減できる効果がある。
According to the method for working an underground buried pipe of the present invention, it is possible to form a working space of a size necessary for working on the underground buried pipe by a simple procedure without digging up the ground widely. As a result, the construction period can be shortened easily and the work cost can be reduced.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の地下埋設管の工作方法における地上か
ら掘削孔を形成する工程の説明図である。
FIG. 1 is an explanatory view of a process of forming an excavation hole from the ground in the method for working an underground buried pipe of the present invention.

【図2】本発明の地下埋設管の工作方法において形成さ
れた作業用空間の構造を示す説明図である。
FIG. 2 is an explanatory view showing the structure of a working space formed in the method for working an underground buried pipe of the present invention.

【図3】本発明の地下埋設管の工作方法において形成さ
れた作業用空間の構造を示す図2の要部の部分断面図で
ある。
FIG. 3 is a partial cross-sectional view of an essential part of FIG. 2 showing a structure of a working space formed in the method for working an underground buried pipe of the present invention.

【符号の説明】[Explanation of symbols]

1 地盤 2,2′ 壁面保護管体 3 ランス 4 ジェットノズル 5 吸泥管 6 作業用管体 6a 先端部 7 環状シール部材 8 環状シール部材 a 掘削孔 b 埋設管 c 工作予定位置 1 Ground 2, 2'Wall surface protection pipe body 3 Lance 4 Jet nozzle 5 Mud suction pipe 6 Working pipe body 6a Tip part 7 Annular seal member 8 Annular seal member a Excavation hole b Buried pipe c Planned work position

───────────────────────────────────────────────────── フロントページの続き (51)Int.Cl.6 識別記号 庁内整理番号 FI 技術表示箇所 F16L 41/08 ─────────────────────────────────────────────────── ─── Continuation of the front page (51) Int.Cl. 6 Identification code Internal reference number FI technical display area F16L 41/08

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 地下埋設管の工作予定位置に向かって地
上から掘削孔を形成すると共に該掘削孔内に壁面保護管
体を挿入する工程と、前記掘削孔の底面に露出した地下
埋設管部分の外壁面形状を測定する工程と、前記外壁面
形状と相補的な形状の先端部に膨張可能な中空の環状シ
ール部材を備え且つ前記壁面保護管体より小径の作業用
管体を準備する工程と、該作業用管体を前記壁面保護管
体内に挿入して地下埋設管の工作予定位置を囲み地盤か
ら遮断された作業用空間を形成する工程と、該作業用空
間内で地下埋設管に工作を施す工程とを含む地下埋設管
の工作方法。
1. A step of forming an excavation hole from the ground toward a planned working position of an underground excavation pipe and inserting a wall protection pipe into the excavation hole, and an underground embedding pipe portion exposed at the bottom of the excavation hole. The step of measuring the outer wall surface shape, and the step of preparing a working tube body having a hollow annular seal member at the tip of a shape complementary to the outer wall surface shape and having a diameter smaller than that of the wall surface protection tube body. And a step of inserting the working pipe body into the wall surface protecting pipe body to form a working space that surrounds the planned working position of the underground buried pipe and is shielded from the ground, and to the underground buried pipe in the working space. A method of working an underground buried pipe, including a step of performing work.
【請求項2】 地盤に対して壁面保護管体を圧入すると
共に該壁面保護管体内に露出した地盤面に高圧水噴射を
行い、生成する土砂混合液を吸い上げることにより掘削
孔を形成する、請求項1に記載の地下埋設管の工作方
法。
2. The excavation hole is formed by press-fitting the wall surface protection pipe body into the ground and performing high-pressure water injection on the ground surface exposed in the wall surface protection pipe body to suck up the generated soil-sand mixture liquid. Item 1. A method for manufacturing an underground buried pipe according to Item 1.
【請求項3】 相互に着脱可能な単位管体を結合して組
み立てられた壁面保護管体を用いる、請求項1又は2に
記載の地下埋設管の工作方法。
3. The method for working an underground buried pipe according to claim 1, wherein a wall surface protection pipe body assembled by connecting mutually removable unit pipe bodies is used.
【請求項4】 交換可能な先端部と本体部とから組み立
てられた作業用管体を用いる、請求項1乃至3のいずれ
かに記載の地下埋設管の工作方法。
4. The method for working an underground buried pipe according to claim 1, wherein a working pipe body assembled from a replaceable tip portion and a main body portion is used.
【請求項5】 作業用管体外面と壁面保護管体内面とが
環状シール部材を介し密着して設けられる、請求項1乃
至4のいずれかに記載の地下埋設管の工作方法。
5. The method for working an underground buried pipe according to claim 1, wherein the outer surface of the working pipe body and the inner surface of the wall surface protection pipe are provided in close contact with each other via an annular seal member.
JP6066350A 1994-02-28 1994-02-28 Working method for underground buried pipe Pending JPH07239056A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6066350A JPH07239056A (en) 1994-02-28 1994-02-28 Working method for underground buried pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6066350A JPH07239056A (en) 1994-02-28 1994-02-28 Working method for underground buried pipe

Publications (1)

Publication Number Publication Date
JPH07239056A true JPH07239056A (en) 1995-09-12

Family

ID=13313331

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6066350A Pending JPH07239056A (en) 1994-02-28 1994-02-28 Working method for underground buried pipe

Country Status (1)

Country Link
JP (1) JPH07239056A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009114852A (en) * 2004-10-26 2009-05-28 Shin Nihon Kogyo:Kk Excavating construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009114852A (en) * 2004-10-26 2009-05-28 Shin Nihon Kogyo:Kk Excavating construction method

Similar Documents

Publication Publication Date Title
JPH0630750B2 (en) Device for protecting garbage dumps against stray leakage water and method of using the same
JPH07239056A (en) Working method for underground buried pipe
JP2005120622A (en) Construction method of underground structure
JP3452961B2 (en) Installation method of buried pipe subsidence observation rod
JPH11152986A (en) Protection method for shielding excavation in section covered with thin soil layer
JP2866498B2 (en) Cavity making method and apparatus for underground structure corrosion investigation
JPH09316986A (en) Construction method for joining mounting pipe with buried sewage main pipe using double sheath pipe
JP2511943B2 (en) How to repair underground pipes
JP2001182496A (en) Water leakage measure of tunnel
JP4059732B2 (en) Entrance packing device and water stopping method in start shaft
JP2777267B2 (en) Underground tunnel joining method and shaft shaft used for the method
JP2001323779A (en) Pipe burial propulsion construction method
JP2636139B2 (en) Wellhead sealing device
JPS6314138B2 (en)
JP2001159288A (en) Vertical shaft excavating device and vertical shaft excavating method
JP3110927B2 (en) Backfill injection method in propulsion method
JP2773000B2 (en) Leakage prevention method for unused supply pipes
JP2760754B2 (en) Method of protruding installation of grounding rod from underground conduit for cable and grounding rod used in this method
JP2644001B2 (en) Repair method for underground pipes
JPH0718162B2 (en) Water stop packer device for anchor method
JPS6027198Y2 (en) Shield tail seal device
JP3511429B2 (en) Replacement of existing buried pipes
KR20230047673A (en) the improvement structure and this formation method of the oscillation work outlet facilitating the input of the propulsion pipe
JPH0692654B2 (en) Ground improvement method from inside the shield tunnel and segment for shield tunnel used in the method
JP2932957B2 (en) Underground joint structure of shield machine