JPH0718233B2 - Formwork construction method for concrete structures - Google Patents

Formwork construction method for concrete structures

Info

Publication number
JPH0718233B2
JPH0718233B2 JP62163787A JP16378787A JPH0718233B2 JP H0718233 B2 JPH0718233 B2 JP H0718233B2 JP 62163787 A JP62163787 A JP 62163787A JP 16378787 A JP16378787 A JP 16378787A JP H0718233 B2 JPH0718233 B2 JP H0718233B2
Authority
JP
Japan
Prior art keywords
formwork
support
concrete
constructing
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP62163787A
Other languages
Japanese (ja)
Other versions
JPS646464A (en
Inventor
洋一 芝
Original Assignee
洋一 芝
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 洋一 芝 filed Critical 洋一 芝
Priority to JP62163787A priority Critical patent/JPH0718233B2/en
Publication of JPS646464A publication Critical patent/JPS646464A/en
Publication of JPH0718233B2 publication Critical patent/JPH0718233B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) この発明は、コンクリート構造物における型枠の施工方
法に関するものである。
TECHNICAL FIELD The present invention relates to a method for constructing a formwork in a concrete structure.

(従来の技術) 従来、コンクリート構造物を構築する場合、型枠工事の
うち、水平方向への型枠移動は、レール等を使用して種
々な工法が行われている。
(Prior Art) Conventionally, in the case of constructing a concrete structure, in the formwork construction, a horizontal movement of the formwork has been performed by various construction methods using rails or the like.

上下方向への型枠移動については、 イ.小さな型枠を数多く組み合わせ所定の大きさの型枠
を組み立て、 ロ.組み立てた型枠の中にコンクリートを打ち込む、 ハ.所定の強度が出た後型枠をバラバラに解体する、 ニ.バラバラにした小さな型枠を次の組み立て場所に運
搬する、 ホ.小さな型枠を数多く組み合わせ所定の大きさの型枠
を組み立てる。
For moving the formwork in the vertical direction, please refer to a. Assemble a large number of small formwork to assemble a formwork of a predetermined size. Pour concrete into the assembled form, c. After the predetermined strength is achieved, dismantle the formwork into pieces, d. Transport the disassembled small formwork to the next assembly place, e. A large number of small molds are combined to form a mold of a specified size.

以上の工程の繰り返し作業が普通の型枠工事である。Repetitive work of the above process is an ordinary formwork.

しかしながら、ある程度大規模の工事になると、型枠を
大型化してクレーン等で引き上げる、 型枠を鋼製化して油圧ジャッキ等大掛かりな装置を使用
して型枠を押し上げる。
However, if it is a large-scale construction to some extent, the formwork is enlarged and pulled up by a crane or the like, or the formwork is made of steel and a large-scale device such as a hydraulic jack is used to push up the formwork.

しかし、クレーン等の作業においては、外部足場が必要
である、型枠の大型化が吊り上げ荷重の関係で制限を受
ける、これが一番の難点であり、クレーンをセットでき
るだけの場所が必要である、強風等の作業性に制限を受
ける、クレーン代等工事単価が高くなる。
However, in the work such as cranes, an external scaffold is required, the enlargement of the formwork is limited due to the lifting load, this is the most difficult point, and a place where the crane can be set is necessary, The work unit price for cranes, etc., which is restricted by workability such as strong winds, becomes high.

また、大掛かりな装置による工事の場合は言うまでもな
く莫大な工事費を必要とし、かつ、転用が難しく使用頻
度が非常に低い。
Further, needless to say, the construction work with a large-scale device requires enormous construction cost, is difficult to divert, and is rarely used.

以上のような観点からダム,擁壁,煙突,橋脚等、上に
延びる構造物の場合工事費が多くかかるのを常としてい
るのが現状である。
From the above viewpoints, it is the usual practice that construction costs are high for dams, retaining walls, chimneys, bridge piers, and other structures that extend upward.

(発明が解決しようとする問題点) そこでこの発明は、上記の欠点を除去し、従来より広く
使用されている材料である合板型枠,鋼製型枠等、普通
の市販材料を使用し、材料の転用と型枠材料費の低減を
はかり、また、工法が単純なため専門作業員を必要とせ
ず、労務費の低減、作業性の向上、工期の短縮化が図れ
る,コンクリート構造物における型枠の施工方法を提供
するものである。
(Problems to be solved by the invention) Therefore, the present invention eliminates the above-mentioned drawbacks and uses ordinary commercially available materials such as plywood form, steel form, etc., which have been widely used in the past, The diversion of materials and the cost of formwork materials are reduced, and because the construction method is simple, no specialized workers are required, which reduces labor costs, improves workability, and shortens the construction period. A method for constructing a frame is provided.

〔発明の構成〕[Structure of Invention]

(問題点を解決するための手段) 以下、この考案の一実施例を図面に従って説明すると、
型枠(1)の背部に、一又は複数本の支柱(2)を設
け、該支柱と型枠とは係合し、かつ、スライド自在に設
け、該型枠(1)を施工箇所にセットし、コンクリート
(C)を打設し、該コンクリート(C)が固形後、コン
クリートより(C)型枠(1)を脱型し、支柱(2)に
係合されている型枠(1)を、動力により上方にスライ
ド移動させ、再び該型枠をセットし、この工程を繰り返
すものより構成される。
(Means for Solving Problems) An embodiment of the present invention will be described below with reference to the drawings.
One or a plurality of columns (2) are provided on the back of the mold (1), the columns and the mold are engaged with each other, and the columns are slidably provided, and the frame (1) is set at a construction site. Then, the concrete (C) is cast, and after the concrete (C) is solid, the (C) formwork (1) is demolded from the concrete and the formwork (1) engaged with the column (2). Is slid upward by power, the mold is set again, and this process is repeated.

尚、支柱(2)は、最初は固定脚(2a)で基礎の部分に
アンカーボルト(2c)で固定しておき、型枠(2)によ
りコンクリート(C)が形成されてからは該コンクリー
ト(C)にアンカーボルト(2c)で一時固定し、また、
倒れ防止のため上方で支柱を支持する鎹状の止め具(2
d)をコンクリート(C)にアンカーボルト(2c)で固
定しておくものである。
In addition, the support pillar (2) is first fixed to the foundation part by the anchor bolts (2c) with the fixing legs (2a), and after the concrete (C) is formed by the formwork (2), the concrete ( Temporarily fix it to the C) with anchor bolts (2c).
A hook-shaped stopper (2
d) is fixed to concrete (C) with anchor bolts (2c).

また、型枠(1)と支柱(2)との係合手段の一例とし
ては、第4図に示すように、支柱(2)側をH鋼を使用
し、型枠(1)側には該H鋼の片面に係合するZ型金具
(1a)を設け、型枠が支柱に係合された状態でスライド
するよう移動可能に設け、該溝部の両側に締めつけボル
ト(1b)をそれぞれ設けることにより、脱型時に型枠
(1)をコンクリート(C)より容易に脱型するもので
ある。(8)は支柱に設けた足場である。
Further, as an example of the engaging means between the mold (1) and the support (2), as shown in FIG. 4, H steel is used on the support (2) side, and on the form (1) side, A Z-shaped metal fitting (1a) that engages with one surface of the H steel is provided, the mold is movably provided so as to slide in a state of being engaged with a support, and tightening bolts (1b) are provided on both sides of the groove. As a result, the mold frame (1) is more easily demolded than the concrete (C) at the time of demolding. (8) is a scaffold provided on the column.

また、型枠(1)及び支柱(2)の移動手段は、種々考
えられるが、その一例としては支柱と型枠の上端部に、
また、強度の出たコンクリート壁面と支柱(2)の下端
部付近に、それぞれチェーンブロック(3a)(3b)を設
け、フリーの型枠(1)をチェーンブロック(3a)で吊
り上げたり、フリーの支柱(2)をチェーンブロック
(3b)で吊り上げるものである。
Further, various moving means of the form (1) and the support (2) are conceivable, and one example thereof is at the upper ends of the support and the form.
Also, provide chain blocks (3a) and (3b) near the strong concrete wall surface and the lower ends of the columns (2), and lift the free formwork (1) with the chain block (3a), or The column (2) is suspended by the chain block (3b).

更に、第5図に示すように、支柱(2)側にスクリュー
シャフト(5)を設け、該支柱の上端部にモーター
(6)を設け該スクリューシャフト(5)に噛み合う雌
ネジ(7)を型枠(1)側に設けて移動させたり、第6
図に示すように油圧シリンダー(4)により移動てもよ
い。しかし、これらの手段に限定されることはない。
Further, as shown in FIG. 5, a screw shaft (5) is provided on the column (2) side, a motor (6) is provided on the upper end of the column, and a female screw (7) meshing with the screw shaft (5) is provided. It is installed on the side of the mold (1) and moved,
It may be moved by a hydraulic cylinder (4) as shown. However, it is not limited to these means.

(作用) 次に、この発明の作用を説明すると、まず、施工箇所に
配筋作業を終え〔配筋の必要がない場合もある〕両側に
支柱(2)に係合された型枠(1)を設け(第1図では
片側しか表していない)、これら型枠間にはセパレータ
ー(間隔保持具)をボルト適数個で固定(セット)して
設け、型枠(1)(1)間にコンクリート(C)を打設
し、該コンクリートに所定の強度が出たら支柱に取り付
けた締めつけ用締めつけボルト(1b)を緩めて脱型し、
型枠を支柱とはフリーの状態にして型枠(1)を支柱
(2)に係合された状態で該支柱に案内されて上方にチ
ェーンブロック(3a)等の移動手段で上方に移動させて
再び型枠をセットするものである。
(Operation) Next, the operation of the present invention will be described. First, the work of arranging the construction site is completed [there may be no need of arranging] the form (1) engaged with the columns (2) on both sides. ) Is provided (only one side is shown in FIG. 1), and a separator (spacing holder) is fixed (set) between these molds by a proper number of bolts, and is provided between the molds (1) (1). Concrete (C) is placed on the concrete, and when the concrete shows a predetermined strength, loosen the tightening bolts (1b) attached to the columns and remove from the mold.
With the form frame free of the support, the form (1) is engaged with the support (2) and guided by the support to move upward by a moving means such as a chain block (3a). Then, the formwork is set again.

そして、支柱(2)を上方に移動させる場合には型枠
(1)をコンクリート壁面に固定した状態で締めつけボ
ルト(1b)を緩め、型枠(1)と支柱(2)をフリーの
状態にし、支柱(2)を上方に移動させ所定の位置でボ
ルト等でコンクリート壁面に固定するものである。
When moving the support (2) upward, loosen the tightening bolts (1b) while fixing the form (1) to the concrete wall, and free the form (1) and the support (2). The pillar (2) is moved upward and fixed to the concrete wall surface with a bolt or the like at a predetermined position.

この発明は、この動作を繰り返して行うものである。The present invention repeats this operation.

(発明の効果) この発明によると、既存の型枠が使用できるため材料費
は安価であり、また、作業は容易かつ、簡単であり専門
の作業員を必要とせず、労務費の低減を図ることがで
き、またこの方法によると、水平方向への制限がなく必
要に応じて支柱を設置することにより幾らでも型枠の大
型化が図れ、極めて有益なる効果を奏する。
(Effects of the Invention) According to the present invention, since the existing formwork can be used, the material cost is low, and the work is easy and simple, no specialized worker is required, and the labor cost is reduced. According to this method, there is no restriction in the horizontal direction, and the columns can be installed as needed to increase the size of the formwork as much as possible, which is extremely useful.

【図面の簡単な説明】[Brief description of drawings]

第1図は、この発明の一実施例を示す一部欠截側面図、
第2図(a)(b)(c)(d)(e)(f)は、順
次、この発明の施工方法の一実施例を示す説明図、第3
図(a)は、第2図(a)の一部欠截正面図、第3図
(b)は、第2図(e)の一部欠截正面図、第3図
(c)は、第2図(f)の一部欠截正面図、第4図は、
この発明の要部拡大断面図、第5図及び第6図は、この
発明の他の実施例を示す一部欠截側面図である。 1……型枠、1a……Z型金具、1b……締めつけボルト、
2……支柱、2a……回動自在の固定脚、3a,3b……チェ
ーンブロック、4……油圧シリンダー、5……スクリュ
ーシャフト、6……モーター、7……雌ネジ、8……足
場、C……コンクリート、
FIG. 1 is a partially cutaway side view showing an embodiment of the present invention,
2 (a), (b), (c), (d), (e), and (f) are explanatory views sequentially showing an embodiment of the construction method of the present invention, and FIG.
2 (a) is a partially cutaway front view, FIG. 3 (b) is a partially cutaway front view of FIG. 2 (e), and FIG. 3 (c) is The partially cutaway front view of FIG. 2 (f) and FIG.
FIG. 5 and FIG. 6 are enlarged cross-sectional views of a main part of the present invention, which are partially cutaway side views showing another embodiment of the present invention. 1 …… Form, 1a …… Z type metal fitting, 1b …… Tightening bolt,
2 ... Post, 2a ... Rotatable fixed leg, 3a, 3b ... Chain block, 4 ... Hydraulic cylinder, 5 ... Screw shaft, 6 ... Motor, 7 ... Female screw, 8 ... Scaffold , C …… Concrete,

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】型枠(1)の背部に、一本又は複数本のH
鋼からなる支柱(2)を設け、型枠(1)と支柱(2)
とを、一時固定又は離脱するための締めつけボルト(1
b)を有するZ型金具(1a)を取り付けた型枠を、支柱
に対してスライド可能に設け、施工個所に支柱を固定す
ることにより型枠をセットして後、コンクリートを打設
し、コンクリートが固化後、締めつけボルトを緩めて支
柱と係合された型枠を動力により上方にスライド移動さ
せ、再び該型枠をセットし、この工程を繰り返すことを
特徴とするコンクリート構造物における型枠の施工方
法。
1. One or a plurality of Hs on the back of the mold (1)
A support (2) made of steel is provided, and the formwork (1) and the support (2) are provided.
Tightening bolts (1
The form fitted with the Z-shaped metal fitting (1a) having b) is provided slidably with respect to the support, and the form is set by fixing the support to the construction site, and then concrete is poured and concrete is poured. After solidification, loosen the tightening bolts and slide the formwork engaged with the support column upward by power, set the formwork again, and repeat this process, Construction method.
【請求項2】動力は、チェーンブロックまたは、油圧シ
リンダーまたは、スクリューシャフトであることを特徴
とする請求項1記載のコンクリート構造物における型枠
の施工方法。
2. The method for constructing a formwork in a concrete structure according to claim 1, wherein the power is a chain block, a hydraulic cylinder or a screw shaft.
【請求項3】支柱(2)の下端部に、回動自在の固定脚
(2a)を設けたことを特徴とする請求項1記載のコンク
リート構造物における型枠の施工方法。
3. A method for constructing a formwork for a concrete structure according to claim 1, wherein a rotatable fixing leg (2a) is provided at a lower end portion of the column (2).
【請求項4】支柱(2)に、足場(8)を装着したこと
を特徴とする請求項1または3記載のコンクリート構造
物における型枠の施工方法。
4. The method of constructing a formwork for a concrete structure according to claim 1, wherein a scaffold (8) is attached to the support column (2).
JP62163787A 1987-06-29 1987-06-29 Formwork construction method for concrete structures Expired - Lifetime JPH0718233B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP62163787A JPH0718233B2 (en) 1987-06-29 1987-06-29 Formwork construction method for concrete structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP62163787A JPH0718233B2 (en) 1987-06-29 1987-06-29 Formwork construction method for concrete structures

Publications (2)

Publication Number Publication Date
JPS646464A JPS646464A (en) 1989-01-11
JPH0718233B2 true JPH0718233B2 (en) 1995-03-01

Family

ID=15780699

Family Applications (1)

Application Number Title Priority Date Filing Date
JP62163787A Expired - Lifetime JPH0718233B2 (en) 1987-06-29 1987-06-29 Formwork construction method for concrete structures

Country Status (1)

Country Link
JP (1) JPH0718233B2 (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58123969A (en) * 1982-01-21 1983-07-23 住友建設株式会社 Method and apparatus for constructing high concrete construction
JPS5965162A (en) * 1982-10-06 1984-04-13 西松建設株式会社 Apparatus for continuously constructing concrete wall
JPS6031449U (en) * 1983-08-10 1985-03-04 株式会社大林組 Self-lifting formwork device

Also Published As

Publication number Publication date
JPS646464A (en) 1989-01-11

Similar Documents

Publication Publication Date Title
JP3940211B2 (en) Construction method of horizontal beams for concrete main tower.
CA1235921A (en) Form set-up
KR100377868B1 (en) pier construction method using Pier scaffolding
JPH0718233B2 (en) Formwork construction method for concrete structures
CN114414354A (en) Temporary support test device for large-span box girder erection
JP2829363B2 (en) Formwork equipment for pillar construction
KR20030069899A (en) Prestressed composite double-T girder bridge
KR20040102272A (en) Prestressed concrete double-t beam bridge & formwork applying incremental launching method
KR200341053Y1 (en) Prestressed composite double-T girder bridge
JP2799793B2 (en) Formwork equipment for retaining wall construction
JPH0336362B2 (en)
JP2000160834A (en) Step-up construction of concrete caisson
JPH0649982A (en) Formwork unit and its construction
CN118007543A (en) Pier climbing frame turnover formwork construction device and construction method
JPH0642184A (en) Construction of skeleton using half precast floor board
JPH07268813A (en) Construction method of concrete structure
JPS59122667A (en) Method and apparatus for constructing mold frame of ceiling slab concrete inclined to longitudinal direction
SU1361276A2 (en) Shiftable modular forms
JPS61191763A (en) Construction of pc panel for balcony using large beam floor mold frame
JPS59217867A (en) Moving mold frame apparatus by bolt support system for constructing concrete structure
JPH0584740U (en) Scaffolding / formwork lifting device
JPS6314903A (en) Arch ring execution method in concrete arch bridge
KR0131857B1 (en) Construction method for nuclear power plant turbine building using scaffold materials
CN115125996A (en) Underground house construction technology based on assembled combined die
JPH0681461A (en) Building method for concrete structure

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080301

Year of fee payment: 13