JPH07113322A - Management system of construction result - Google Patents

Management system of construction result

Info

Publication number
JPH07113322A
JPH07113322A JP26087493A JP26087493A JPH07113322A JP H07113322 A JPH07113322 A JP H07113322A JP 26087493 A JP26087493 A JP 26087493A JP 26087493 A JP26087493 A JP 26087493A JP H07113322 A JPH07113322 A JP H07113322A
Authority
JP
Japan
Prior art keywords
work
construction
worker
information
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP26087493A
Other languages
Japanese (ja)
Inventor
Koichi Watanabe
紘一 渡辺
Shinichi Aida
信一 相田
Shiro Goto
志郎 後藤
Yuji Abe
裕司 阿部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP26087493A priority Critical patent/JPH07113322A/en
Publication of JPH07113322A publication Critical patent/JPH07113322A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To make clear the construction management, by always clearly understanding the progressing state in a working site and simplifying the work and the construction management and recording the data like names of operators, constructing date and time, etc. CONSTITUTION:Operators equipped with a worker's transmitter and carrying a work-instruction and tools 38 enter in the work floor 32 prior to a water supply piping work for instance and start to work. Next, barcode figures are read out by a barcode reader and input in a data entry terminal 24 from a work computer 36. Next, a work management computer 28 discriminates the specifications of work and outputs the result to a tools-controller 30. Thereafter, the controller 30 transmits a signal for the finished fitting work of piping materials to the terminal 24 and the work computer 36. And the worker's transmitter informs the operator of the finished work. Subsequently, he starts the next work and the progressed state of the constructing work is input in sequence in the entry terminal 24 and the progressed state is recorded one by one in the data base.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、建築現場等の作業の進
行状況等を管理する施工実績管理システムに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction record management system for managing the progress of work at a construction site or the like.

【0002】[0002]

【従来の技術】大規模な建築現場等においては、多数の
工事区域で種々の作業が同時に進行する。ビル等の配管
工事を例としても、各階でそれぞれ給水配管、排水配
管、給湯配管等が同時に行われることがある。このよう
なとき、それぞれの工事区域の各工事の施工状態を的確
に把握しようとすると、各作業区域の各工程毎に管理者
を立ち会わせるか、管理者を常に巡回させて各工事区域
の進行状況を常に集計したり記録しなければならない。
2. Description of the Related Art On a large-scale construction site, various works are carried out simultaneously in many construction areas. Even if the piping work for a building is taken as an example, water supply pipes, drainage pipes, hot water supply pipes, etc. may be simultaneously performed on each floor. In such a case, when trying to accurately grasp the construction status of each construction in each construction area, a manager should be present for each process of each work area, or the manager should always go around and proceed in each construction area. The situation must always be tabulated and recorded.

【0003】しかしながら、こような管理方法では、多
数の人員を必要とすると共に、常にそれぞれの工事区域
の施工状態を的確に把握して記録することは困難となっ
ている。
However, such a management method requires a large number of personnel, and it is difficult to always accurately grasp and record the construction status of each construction area.

【0004】[0004]

【発明が解決しようとする課題】本発明は、上記事実を
考慮してなされたものであり、施工状態を的確に把握し
て表示することができる施工実績管理システムを提供す
ることを目的とする。
SUMMARY OF THE INVENTION The present invention has been made in consideration of the above facts, and an object thereof is to provide a construction record management system capable of accurately grasping and displaying the construction state. .

【0005】[0005]

【課題を解決するための手段】本発明の請求項1に係る
施工実績管理システムは、所定の作業領域内の施工図と
共に施工図を形成する個々の部材の施工情報が記録され
かつ部材毎の作業情報を記録可能な記録手段と、作業が
開始されると前記作業領域内に設けられた検出手段によ
って該当する部材の作業情報を検出して前記記録手段に
記録する作業情報入力手段と、前記記録手段に記録され
ている施工情報及び作業情報に応じて前記個々の部材の
表示を変更して前記施工図を表示可能な表示手段と、を
有することを特徴とする。
A construction record management system according to claim 1 of the present invention records construction information of individual members forming a construction drawing together with a construction drawing within a predetermined work area and for each member. A recording means capable of recording work information; a work information input means for detecting work information of a corresponding member by a detection means provided in the work area when the work is started and recording the work information in the recording means; Display means for changing the display of the individual members according to the construction information and the work information recorded in the recording means to display the construction drawing.

【0006】本発明の請求項2に係る施工実績管理シス
テムは、請求項1の施工実績管理システムであって、前
記個々の部材を識別する部材コードをバーコード化して
明示し、前記検出手段に前記バーコードを読み取らせる
ことによって前記作業情報入力手段が作動することを特
徴とする。
A construction record management system according to claim 2 of the present invention is the construction record management system according to claim 1, wherein a member code for identifying each of the individual members is bar-coded and clearly indicated, and the detection means is provided. It is characterized in that the work information input means is operated by reading the bar code.

【0007】[0007]

【作用】本発明の請求項1に記載の施工実績管理システ
ムでは、個々の部材の施工情報と共に施工図を記録手段
に記録しておき、かつ、作業情報入力手段によって作業
情報が入力されると、この作業情報も記録手段に記録し
ている。また、表示手段は、記録手段に記録されている
施工情報、作業情報に応じて、個々の部材の表示を変更
して施工図を表示することができる。
In the construction record management system according to claim 1 of the present invention, the construction drawing is recorded in the recording means together with the construction information of each member, and the work information is inputted by the work information input means. The work information is also recorded in the recording means. Further, the display means can change the display of each member according to the construction information and work information recorded in the recording means to display the construction drawing.

【0008】これによって、工事作業が開始されると検
出手段が該当する部材の作業情報を順次記録手段に入力
して記録し、必要に応じて表示手段に表示することがで
きる。作業情報として、少なくとも作業が完了したか又
は作業中かを記録することにより、表示手段に個々の部
材の何れが作業完了しており、何れの部材の作業を行っ
ているか等の作業の進行状況を瞬時に明瞭に確認するこ
とができる。
Thus, when the construction work is started, the work information of the corresponding member by the detection means can be sequentially input and recorded in the recording means, and can be displayed on the display means as required. By recording at least whether the work has been completed or is in progress as the work information, the progress status of the work such as which of the individual members has been completed and which work is being performed on the display means. Can be confirmed instantly and clearly.

【0009】ここで、本発明の施工図は、例えば、配管
設備において個々の管路材や管路に設けられる機器等の
部材を所定の施工状態に連結して表示したものであり、
施工情報は、部材毎の材質や形状、施工方法等の予め設
計された作業を行う上で必要な情報であり、また、検査
等の施工の完了確認する上で設計上必要な情報である。
また、作業情報は、作業の内容、作業の開始及び終了日
時、作業者、作業方法、作業結果等の設定された作業に
関する種々の情報を用いることができる。
Here, the construction drawing of the present invention is, for example, a display in which, in piping equipment, individual pipe line members and members such as devices provided in pipe lines are connected in a predetermined construction state,
The construction information is information necessary for performing predesigned work such as the material and shape of each member, a construction method, and the like for designing to confirm completion of construction such as inspection.
Further, as the work information, various kinds of information regarding the set work such as the content of the work, the start and end dates and times of the work, the worker, the work method, and the work result can be used.

【0010】本発明の請求項2に記載の施工実績管理シ
ステムでは、予め部材を識別するバーコードを付与し、
このバーコードを読み取ることによって、作業を開始す
る部材、作業の終了した部材を的確に判断し、該当する
部材の作業情報を確実に記録することができる。これに
よって、記録手段に的確に作業情報を記録することがで
き、作業実績の信頼性を向上させることができる。
In the construction record management system according to claim 2 of the present invention, a bar code for identifying a member is provided in advance,
By reading the bar code, it is possible to accurately determine the member that starts the work and the member that has finished the work, and surely record the work information of the corresponding member. Thus, the work information can be accurately recorded in the recording means, and the reliability of the work record can be improved.

【0011】なお、このバーコードは、施工図を作成し
た段階で部材毎に設定して、それぞれの部材に表示した
ものを使用することができ、これによって、各部材の管
理も容易となる。
The bar code can be set for each member at the stage when the construction drawing is prepared, and the one displayed on each member can be used, which facilitates the management of each member.

【0012】[0012]

【実施例】以下、図面を参照して本発明の一実施例を詳
細に説明する。図1には、本発明の施工実績管理システ
ムを備えた作業管理システム10を建設工事現場に設置
したものである。なお、本実施例では、建設工事現場の
作業の一例として給水配管工事を用いて説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described in detail below with reference to the drawings. In FIG. 1, a work management system 10 including the construction record management system of the present invention is installed at a construction site. In this embodiment, a water supply piping work will be used as an example of the work at the construction site.

【0013】この作業管理システム10では、作業者室
である入退場フロア12に作業者がそれぞれ所持してい
るICカード14(図2に示す)に記録されている情報
を読み取るカードリーダ16が設けられている。このI
Cカード14には、作業者を特定する個人IDコード、
作業者の氏名、所属会社、職種、資格、連絡先等が記録
されており、作業者は、このカードリーダ16に各自の
ICカード14を読み込ませて通過し、建設工事現場へ
の入退場を行うようになっている。
In this work management system 10, a card reader 16 for reading information recorded in an IC card 14 (shown in FIG. 2) owned by each worker is provided on an entrance / exit floor 12 which is a worker room. Has been. This I
The C card 14 has a personal ID code for identifying the worker,
The name, affiliated company, occupation, qualification, contact information, etc. of the worker are recorded, and the worker causes his or her IC card 14 to be read by this card reader 16 and passes through to enter or leave the construction site. I am supposed to do it.

【0014】また、入退場フロア12には、カードリー
ダ16と共にカードリーダ16が接続された入退管理端
末18及び作業指示端末20が設けられている。
The entrance / exit floor 12 is provided with a card reader 16 and an entrance / exit management terminal 18 and a work instruction terminal 20 to which the card reader 16 is connected.

【0015】建築工事現場の作業管理フロア22には、
必要な情報を入力するためのデータエントリー端末2
4、作業所内のLANを管理するLANサーバ26、作
業所内の人員、業務等を管理する作業所管理コンピュー
タ28が設けられている。これらの入退管理端末18、
作業指示端末20、データエントリー端末24、LAN
サーバ26及び作業所管理コンピュータ28は、LAN
で接続されている。
On the work management floor 22 at the construction site,
Data entry terminal 2 for entering required information
4. A LAN server 26 for managing the LAN in the work place, and a work place management computer 28 for managing the personnel, work and the like in the work place are provided. These access control terminals 18,
Work instruction terminal 20, data entry terminal 24, LAN
The server 26 and the work place management computer 28 are LAN
Connected by.

【0016】データエントリー端末24には、建築現場
で用いる各種部材、これらの部材を用いた施工図、作業
工程表等の施工及び作業に関するデータが記録されたデ
ータベースが設けられており、必要に応じてLANを構
成する各端末でこのデータベースに記録されているデー
タを読み込むことができると共に、このデータベースに
データを入力することができるようになっている。
The data entry terminal 24 is provided with a database in which data relating to construction and work such as various members used at a construction site, construction drawings using these members, work schedules, etc. are recorded. Each terminal that constitutes the LAN can read the data recorded in this database and can input the data into this database.

【0017】データエントリー端末24には、工具を用
いた作業の状況を管理するための工具系コントローラ3
0が接続されている。この工具系コントローラ30は、
実際の作業現場である作業フロア32に設けられた無線
ユニット34に接続されている。また、この作業フロア
32のそれぞれの作業区域31には、データ等を入力す
るキーボードとデータの送受信を行う送受信機(何れも
図示省略)を備えた作業コンピュータ36が設けられて
いる。この作業コンピュータ36は、無線で工具系コン
トローラ30に接続されている。
The data entry terminal 24 has a tool system controller 3 for managing the status of work using tools.
0 is connected. This tool system controller 30
It is connected to a wireless unit 34 provided on a work floor 32 which is an actual work site. Further, in each work area 31 of the work floor 32, a work computer 36 having a keyboard for inputting data and the like and a transceiver (not shown) for transmitting and receiving data is provided. The work computer 36 is wirelessly connected to the tool system controller 30.

【0018】この作業フロア32では、工具38等を用
いて部材の取付け作業等の施工が行われる。この工具3
8としては、例えばインテリジェントトルクレンチ38
Aが用いられる。このインテリジェントトルクレンチ3
8Aは、締め付けトルクが一定値に達したことを検出す
るセンサ、工具を特定する工具IDコードを記憶したメ
モリ及び所定の情報を送信するトランスミッター(何れ
も図示省略)を備えている。このインテリジェントトル
クレンチ38Aは、ボルト等を締め付けたときに締め付
けトルクが一定値以上に達したことをセンサによって検
出すると、工具IDコード及びボルトの締め付け作業の
完了信号を作業コンピュータ36を介して工具系コント
ローラ30へ送信するようになっている。
On this work floor 32, a work such as a work for attaching members is performed using a tool 38 or the like. This tool 3
8, for example, an intelligent torque wrench 38
A is used. This intelligent torque wrench 3
8A includes a sensor that detects that the tightening torque has reached a certain value, a memory that stores a tool ID code that specifies a tool, and a transmitter that transmits predetermined information (all not shown). When the intelligent torque wrench 38A detects that the tightening torque has reached a certain value or more when tightening a bolt or the like with a sensor, the intelligent torque wrench 38A outputs a tool ID code and a bolt tightening completion signal to the tool system via the work computer 36. It is adapted to be transmitted to the controller 30.

【0019】工具系コントローラ30では、インテリジ
ェントトルクレンチ38Aからの信号を基に、インテリ
ジェントトルクレンチ38Aによって所定回数のボルト
締めが完了したことを確認すると、該当する部材の作業
が終了しと判断して、作業コンピュータ36及びデータ
エントリー端末24へ出力するようになっている。な
お、工具系コントローラ30では、所定時間経過しても
作業が終了したと判断できないときには作業が未完了で
あると判断して、作業コンピュータ36を介して作業者
や、作業現場にいる監督者等に報知するようになってい
る。
When the tool system controller 30 confirms that the intelligent torque wrench 38A has completed bolting a predetermined number of times based on the signal from the intelligent torque wrench 38A, it judges that the work of the corresponding member is completed. , The work computer 36 and the data entry terminal 24. When the tool system controller 30 cannot determine that the work is completed even after a predetermined time has elapsed, the tool controller 30 determines that the work is incomplete, and the worker, the supervisor at the work site, or the like via the work computer 36. It will notify you.

【0020】一方、入退場フロア12の入退管理端末1
8には、作業者毎の個人IDコードがインストールされ
たワーカーズトランスミッター40(図2に示す)を収
容している。作業者が入退場フロア12に入りICカー
ド14をカードリーダ16に読み込ませると、該当する
個人IDコードがインストールされたワーカーズトラン
スミッター40が排出される。作業者は、このワーカー
ズトランスミッター40を装着して作業フロア32へ入
場し、退場するときには、ワーカーズトランスミッター
40を入退管理端末18に戻すようになっている。
On the other hand, the entrance / exit management terminal 1 on the entrance / exit floor 12
A worker's transmitter 40 (shown in FIG. 2) in which a personal ID code for each worker is installed is accommodated in the reference numeral 8. When the worker enters the entrance / exit floor 12 and reads the IC card 14 into the card reader 16, the worker's transmitter 40 in which the corresponding personal ID code is installed is ejected. The worker wears the worker's transmitter 40 to enter the work floor 32, and when leaving the worker's transmitter 40, returns the worker's transmitter 40 to the entrance / exit management terminal 18.

【0021】図2に示されるように、ワーカーズトラン
スミッター40には、必要な情報を入力可能なテンキー
42、情報を表示する液晶表示器44及び作業者のIC
カード14を挿入する挿入口46が設けられたコントロ
ールユニット48と、インテリジェントトルクレンチ3
8Aの連結コイル38Bに対応する送受信コイル50
が、コード52によって着脱可能に連結されている。
As shown in FIG. 2, the worker's transmitter 40 has a ten-key pad 42 capable of inputting necessary information, a liquid crystal display 44 for displaying the information, and an operator's IC.
A control unit 48 having an insertion opening 46 for inserting the card 14 and an intelligent torque wrench 3
Transmitting / receiving coil 50 corresponding to the connecting coil 38B of 8A
Are removably connected by a cord 52.

【0022】このワーカーズトランスミッター40は、
例えばインテリジェントトルクレンチ38Aを使用する
ときに、インテリジェントトルクレンチ38Aの所定の
位置を把持すると連結コイル38Bとワーカーズトラン
スミッター40の送受信コイル50とが電気的に連結し
て相互に情報の伝達が可能となる。
This worker's transmitter 40 is
For example, when using the intelligent torque wrench 38A, if the intelligent torque wrench 38A is held at a predetermined position, the connection coil 38B and the transmission / reception coil 50 of the worker's transmitter 40 are electrically connected to each other and information can be transmitted to each other. .

【0023】また、作業指示端末20は、入場した作業
者に作業情報を指示するものであり、作業者が装着した
ワーカーズトランスミッター40の送受信コイル50を
作業指示端末20の読取部(図示せず)へ連結すると、
ワーカーズトランスミッター40のコントローラ48に
記憶されている個人IDコードが読み込まれて作業所管
理コンピュータ28へ入力される。作業所管理コンピュ
ータ28では、個人IDコードに対応する作業内容を作
業指示端末20に出力し、この作業指示端末20から作
業者に作業内容を指示する作業指示書(図6参照)とし
てプリントアウトされる。作業者は、この作業指示書の
内容にしたがってインテリジェントトルクレンチ38A
等の工具38及び所定の資材を用いて作業フロア32内
で作業を行うようになっている。
The work instruction terminal 20 is for instructing work information to a worker who has entered, and the transmission / reception coil 50 of the worker's transmitter 40 mounted on the worker is used as a reading section (not shown) of the work instruction terminal 20. When connected to
The personal ID code stored in the controller 48 of the worker's transmitter 40 is read and input to the work place management computer 28. The work place management computer 28 outputs the work content corresponding to the individual ID code to the work instruction terminal 20 and is printed out as a work instruction document (see FIG. 6) for instructing the worker of the work content from the work instruction terminal 20. It The operator uses the intelligent torque wrench 38A according to the contents of this work instruction.
Work is performed on the work floor 32 by using a tool 38 such as the above and predetermined materials.

【0024】図3Aには、給水配管の管路を構成する部
材である管路材54を示している。この管路材54の両
端部には、隣接する管路材54と接続するためのフラン
ジ56が設けられている。この管路材54には、CAD
等によって給水配管を設計する段階で予め識別符号とな
る部材コードが個々に付与されており、CADの図面に
応じて加工されたときに、部材コードをバーコード化し
たバーコード表58が貼付されている。また、それぞれ
のフランジ56の近傍には、この管路材54が何れの管
路材54又はバルブ等の部材に接続するかを示す接続番
号を部材コードと共にバーコード化して表示したバーコ
ード表60(図3B参照)が貼付されている。
FIG. 3A shows a conduit material 54 which is a member constituting the conduit of the water supply piping. Flanges 56 are provided at both ends of the conduit 54 for connecting to the adjacent conduit 54. This conduit material 54 has CAD
The member codes that will be the identification codes are individually given in advance at the stage of designing the water supply pipe by such as, and when processed according to the CAD drawing, the bar code table 58 in which the member codes are bar-coded is attached. ing. Further, in the vicinity of each flange 56, a bar code table 60 in which a connection number indicating which pipe material 54 or a member such as a valve is connected to this pipe material 54 is bar-coded together with the member code and displayed. (See FIG. 3B) is attached.

【0025】図4には、CADによって作成され、デー
タエントリー端末24のデータベースに記録されている
施工図の一例を示している。この施工図は、給水配管を
構成する各管路材54の部材コード112を明示すると
共に、各管路材54ないしバルブ等の部材との接合部分
に接合番号114を明示している。この接合番号114
は、それぞれの管路材54や部材の接合点に連番を付け
たものであり、前記の部材コード112とこの接合番号
114をデータとして組み合わせることにより、どこの
部材のどの接合部分であるかを識別できるようになって
いる。
FIG. 4 shows an example of a construction drawing created by CAD and recorded in the database of the data entry terminal 24. In this construction drawing, the member code 112 of each pipeline 54 that constitutes the water supply pipe is clearly shown, and the joint number 114 is clearly shown at the joint with each pipeline 54 or a member such as a valve. This joint number 114
Is a serial number added to the joint points of the respective pipe line members 54 and members. By combining the member code 112 and the joint number 114 as data, which joint part of which member is present. Can be identified.

【0026】一方、作業者は、作業の開始に先立って管
路材54に貼付されているバーコード表58、60の表
示をバーコードリーダ66によって読み取らせるように
なっている。このバーコードリーダ66によって読み取
られたデータは、作業コンピュータ36、無線ユニット
34、工具系コントローラ30を介してデータエントリ
ー端末24へ送られるようになっている。作業所管理コ
ンピュータ28では、このデータから作業仕様等をデー
タエントリー端末24から読み出して、工具系コントロ
ーラ30へ出力するようになっている。
On the other hand, the operator is made to read the display of the bar code tables 58 and 60 attached to the conduit material 54 by the bar code reader 66 before starting the work. The data read by the barcode reader 66 is sent to the data entry terminal 24 via the work computer 36, the wireless unit 34, and the tool system controller 30. The work place management computer 28 reads out work specifications and the like from this data from the data entry terminal 24 and outputs them to the tool system controller 30.

【0027】この作業仕様は、例えば図5に示されるよ
うに、それぞれの仕様番号116に応じて、作業内容を
示す作業詳細、作業に用いる工具を示す工具種別名、ボ
ルト締めするときの締め付けトルク等の種々の接合部分
に関する情報を予め決定されてデータベースに記録され
たものである。この作業仕様に沿って作業を行うことに
より、所定の品質の施工が可能となるようにしている。
This work specification is, for example, as shown in FIG. 5, work details indicating the work contents, a tool type name indicating a tool used for the work, and a tightening torque when tightening bolts according to each specification number 116. Information about various joints such as is predetermined and recorded in the database. By performing work according to this work specification, it is possible to carry out construction with a predetermined quality.

【0028】また、データエントリー端末24では、工
具系コントローラ30から、作業フロア32内の管路材
に対する作業を開始したか、作業を終了したか等の他作
業に携わった作業者等の作業データが逐一入力されるよ
うになっている。データエントリー端末24では、これ
らの作業情報を管路材54等の部材毎に順次記録してい
る。
Further, in the data entry terminal 24, the work data of the worker or the like engaged in other work such as whether the work for the pipeline material in the work floor 32 has been started or finished from the tool system controller 30. Are input one by one. The data entry terminal 24 sequentially records the work information for each member such as the conduit material 54.

【0029】これらの作業データは、図4に示されるよ
うに、作業所管理コンピュータ28においては、CRT
62の画面上に施工図を表示するときに、管路材54等
の各部材毎に作業完了、作業中、作業が未着の何れであ
るかを明確にして表示することができるようになってい
る(図4参照)。なお、図4では、一例として作業が終
了した管路材54Aに交差線によるハッチングを付して
おり、作業中の管路材54Bに斜線によるハッチングを
付して表示しているが、これに限らず色分け等であって
もよく、CRT62の画面上で明確に識別できるように
表示することができれば、何れの表示方法であってもよ
い。
As shown in FIG. 4, these work data are stored in the CRT in the work place management computer 28.
When displaying the construction drawing on the screen of 62, it becomes possible to clearly indicate for each member such as the pipe material 54, the work completion, the work in progress, and the work not yet arrived. (See FIG. 4). Note that, in FIG. 4, as an example, the pipeline material 54A for which the work has been completed is hatched with cross lines, and the pipeline material 54B under work is shown with hatching for hatching. The display method is not limited to color coding, and any display method may be used as long as it can be clearly displayed on the screen of the CRT 62.

【0030】また、図7及び図8に示されるように、作
業所管理コンピュータ28では、部材コード別及び接合
番号別にデータを整理してプリンタ64からプリントア
ウトすることができるようになっている。なお、図7に
は、接合番号別の作業集計リストの一例を示し、図8に
は、部材コード別の作業集計リストの一例を示してい
る。
Further, as shown in FIGS. 7 and 8, in the work place management computer 28, data can be organized by member code and joint number and printed out from the printer 64. Note that FIG. 7 shows an example of the work total list for each joint number, and FIG. 8 shows an example of the work total list for each member code.

【0031】次に本実施例の作用として、本実施例に適
用した作業管理システム10に設けられ、作業の進行状
況を施工図上に明示する施工実績管理システムについて
説明する。なお、給水配管の施工は、給水配管の管路を
構成する各管路材54のフランジ56を隣接する管路材
54のフランジ56又はバルブ等の他のフランジに、予
め設定されたボルト本数及び締め付けトルクで締結する
ものとしている。
Next, as an operation of this embodiment, a construction performance management system which is provided in the work management system 10 applied to this embodiment and which clearly indicates the progress of the work on the construction drawing will be described. In addition, the construction of the water supply pipe is performed by setting the flange 56 of each pipe material 54 forming the pipe of the water supply pipe to the flange 56 of the adjacent pipe material 54 or another flange such as a valve with a preset number of bolts and It is supposed to be tightened with tightening torque.

【0032】この給水配管工事に先立って作業者は、入
退場フロア12において、ワーカーズトランスミッター
40を装着して、作業指示端末20からプリントアウト
された作業指示書及びこの作業指示書に明示された工具
38(例えばトルクレンチであればインテリジェントト
ルクレンチ38A)を持って作業フロア32へ入場し
て、指示された作業を開始する。
Prior to the water supply piping work, the worker wears the worker's transmitter 40 on the entrance / exit floor 12, and the work instruction sheet printed out from the work instruction terminal 20 and the tool specified in the work instruction sheet. 38 (for example, an intelligent torque wrench 38A in the case of a torque wrench) is brought into the work floor 32 to start the instructed work.

【0033】作業者は、ワーカーズトランスミッター4
0から作業の開始を入力した後に、バーコードリーダ5
8によって、既に作業が終了している管路材54とこの
管路材54に取付ける相手の管路材54のそれぞれに貼
付してあるバーコード表60を読み取る。これらの情報
は、作業コンピュータ36から工具系コントローラ30
を介してデータエントリー端末24へ入力される。作業
所管理コンピュータ28では、この入力された情報から
指示された作業者が間違いなく作業を行うかを判断する
と共に、その部位の作業仕様を工具系コントローラ30
へ出力する。
The worker is the worker's transmitter 4
After entering the start of work from 0, the barcode reader 5
8, the bar code table 60 attached to each of the pipeline 54 for which the work has already been completed and the counterpart pipeline 54 attached to the pipeline 54 is read. These pieces of information are transferred from the work computer 36 to the tool system controller 30.
Is input to the data entry terminal 24 via. The work place management computer 28 determines whether or not the instructed worker will definitely perform the work from the input information, and the work specification of the part is determined by the tool system controller 30.
Output to.

【0034】この後、作業者がインテリジェントトルク
レンチ38Aを用いてボルト締めを開始する。インテリ
ジェントトルクレンチ38Aでは、ボルトを所定のトル
クで締め付ける毎にボルト締め終了の信号を工具系コン
トローラ30へ出力する。工具系コントローラ30で
は、予め設定された作業仕様書に応じた数のボルト締め
を終了すると、データエントリー端末24及び作業コン
ピュータ36へ管路材54の取付け作業が終了した旨の
信号を送信する。
After this, the worker starts bolting using the intelligent torque wrench 38A. The intelligent torque wrench 38A outputs a bolt tightening completion signal to the tool system controller 30 every time the bolt is tightened with a predetermined torque. When the tool system controller 30 finishes bolting the number of bolts according to the preset work specification, it sends a signal to the data entry terminal 24 and the work computer 36 to the effect that the work of attaching the conduit 54 has been completed.

【0035】作業コンピュータ36では、この工具系コ
ントローラ30から終了信号が入力されると、ワーカー
ズトランスミッター40へ作業終了を出力し、ワーカー
ズトランスミッター40の液晶表示器44等に表示し
て、作業者に作業終了を報知する。作業者は、作業の終
了が報知されると、次の作業を開始する。
In the work computer 36, when the end signal is input from the tool system controller 30, the work end is output to the worker's transmitter 40 and displayed on the liquid crystal display 44 or the like of the worker's transmitter 40 to inform the worker. Notify the end. When the worker is notified of the end of the work, the worker starts the next work.

【0036】このような、施工作業の進行状況は順次デ
ータエントリー端末24に入力され、データベースに記
録される。これによって、データベースには、作業の進
行状況が逐一記録される。
The progress status of such construction work is sequentially input to the data entry terminal 24 and recorded in the database. As a result, the progress of work is recorded in the database one by one.

【0037】ここで、図9に示すフローチャートを用い
て、本実施例に適用した施工実績管理システムについて
説明する。なお、図9では、作業所管理コンピュータ2
8のCRT62の画面上に施工実績を表示するためのフ
ローチャートの一例を示している。
Here, the construction result management system applied to this embodiment will be described with reference to the flowchart shown in FIG. In FIG. 9, the work place management computer 2
8 shows an example of a flowchart for displaying the construction record on the screen of the CRT 62 of No. 8.

【0038】最初のステップ200では、作業所管理コ
ンピュータ28において、施工実績をCRT62の画面
上に表示する旨の指示が入力されたかを確認し、表示の
指示が入力されたときには、次のステップ202へ移行
する。このステップ202では、データエントリー端末
24に記録されている施工図データと共に各管路材54
の施工状況に関するデータを読み込んで、CRT62の
画面上に表示する(ステップ204)。このとき、既に
作業の完了している管路材54A、作業中の管路材54
B、作業が未着工の管路材54をそれぞれ区別して表示
する。
In the first step 200, it is confirmed in the work place management computer 28 whether or not an instruction to display the construction record on the screen of the CRT 62 has been input. When the display instruction is input, the next step 202 Move to. In this step 202, each conduit material 54 together with the construction drawing data recorded in the data entry terminal 24
The data relating to the construction status is read and displayed on the screen of the CRT 62 (step 204). At this time, the pipeline material 54A that has already been worked and the pipeline material 54 that is being worked
B, the pipeline 54 for which the work has not been started is displayed separately.

【0039】次のステップ206で工具系コントローラ
30から作業開始が入力されると、作業が開始された管
路材の部材コードに対応したデータを作業中に書き換え
る(ステップ208)と共に、作業者、作業日時等の作
業データを部材コードに対応したデータとして記録し、
CRT60の画面表示を作業中の表示に変更する(ステ
ップ210)。
When the work start is input from the tool system controller 30 at the next step 206, the data corresponding to the member code of the pipe material at which the work is started is rewritten during the work (step 208) and the worker Record work data such as work date and time as data corresponding to material code,
The screen display of the CRT 60 is changed to the working display (step 210).

【0040】また、ステップ212では、作業中の管路
材54Bの所定の作業が完了したこが入力されたかを確
認している。ここで、作業の完了が入力されると、該当
する管路材54Bのデータとして作業が終了したことを
記録する(ステップ214)と共に、CRT62上の画
面表示を作業が終了した表示に変更し(ステップ21
0)、次の作業が入力されるか、施工実績管理の終了が
入力されるまで待機する(ステップ216)。なお、施
工実績管理を行わないときには、CRT62への表示を
行わずに、作業情報に応じて順次データの記録のみを行
うようになっている。
Further, in step 212, it is confirmed whether or not a predetermined work of the pipe material 54B being worked is inputted. Here, when the completion of the work is input, the fact that the work is completed is recorded as the data of the corresponding pipeline material 54B (step 214), and the screen display on the CRT 62 is changed to the display that the work is completed ( Step 21
0), and waits until the next work is input or the end of construction record management is input (step 216). When the construction record management is not performed, the CRT 62 is not displayed, and only the data is sequentially recorded according to the work information.

【0041】このようにして、作業の進行状況に応じて
逐次CRT62の画面上に表示することにより、作業管
理フロア22では、作業フロア32を巡回して確認する
ことなく、作業フロア32内の各作業の進行状況、誰が
何処の作業区域の何の作業をしているか、作業の進行度
合い等を明確に確認することができる。
In this way, by sequentially displaying on the screen of the CRT 62 according to the progress of the work, the work management floor 22 does not need to circulate the work floor 32 to check the work floor 32. It is possible to clearly confirm the progress status of work, who is doing what work in what work area, the progress of work, and the like.

【0042】また、それぞれの管路材54にバーコード
化した識別符号を付与し、作業情報と共にバーコードリ
ーダ66によって表示されたバーコードを読み取るよう
にし、実質的に作業者を介在させないようにしているた
め、何れの管路材54をどのように作業したかを明瞭に
入力することが可能となる。このため、例えば図7及び
図8に示す如き作業集計リストの出力も可能となり明瞭
な施工管理を行うことができる。
Further, each pipe material 54 is provided with a bar coded identification code so that the bar code displayed by the bar code reader 66 can be read together with the work information so that the worker is not substantially involved. Therefore, it is possible to clearly input which pipe line member 54 and how it was worked. Therefore, it is possible to output a work summary list as shown in FIGS. 7 and 8, for example, and clear construction management can be performed.

【0043】なお、本実施例では給水配管作業を例に説
明したが、この後に、水圧検査等の施工後の検査、竣工
後のメンテナンス等の情報も順次入力する用にしてもよ
い。これによって、各部材の加工から竣工後のメンテナ
ンス等を含めて、施工された部材の経歴を全て的確に表
示するこも可能であり、竣工後のメンテナンスも極めて
容易となる。また、施工作業の情報のみならず、個々の
管路材54のデータとして加工時からのデータを順次蓄
積して表示するようにしてもよい。
In the present embodiment, the water supply piping work has been described as an example. However, after this, information such as inspection after construction such as water pressure inspection and maintenance after completion may be sequentially input. As a result, it is possible to accurately display the history of all the members that have been constructed, including the processing of each member, maintenance after completion, etc., and maintenance after completion is also extremely easy. Further, not only information on the construction work but also data from the time of processing may be sequentially accumulated and displayed as the data of the individual pipe line materials 54.

【0044】なお、本実施例では、給水配管を例に取っ
て説明したが、排水配管等の他の配管設備工事はもとよ
り電気設備工事、ひいては一般の建築工事等の他の工事
の施工に用いることができることは勿論である。
In the present embodiment, the water supply pipe has been described as an example, but it is used not only for construction of other plumbing equipment such as drainage piping but also for construction of electrical equipment and other construction such as general construction. Of course, you can do that.

【0045】[0045]

【発明の効果】以上説明した如く、本発明の施工実績管
理システムによれば、作業現場内を巡回して、各作業の
進行状況を確認することなく、作業現場内の何れの作業
であっても、常に明確に進行状況を把握することがで
き、作業及び施工管理の簡略化が可能である。これに加
えて、施工作業が終了した後であっても、作業者、施工
日時等の種々のデータを記録しておくことができるの
で、施工後、竣工後の管理も極めて容易となる優れて効
果を有する。
As described above, according to the construction record management system of the present invention, any work in the work site can be carried out without patrolling the work site and checking the progress of each work. Also, it is possible to always grasp the progress clearly and simplify work and construction management. In addition to this, even after the construction work is completed, various data such as the worker and construction date and time can be recorded, so management after construction and after completion is extremely easy. Have an effect.

【図面の簡単な説明】[Brief description of drawings]

【図1】本実施例に適用した建設工事現場を示す概略構
成図である。
FIG. 1 is a schematic configuration diagram showing a construction site applied to this embodiment.

【図2】入力手段の一例を示す工具及びワーカーズトラ
ンスミッターの概略構成図である。
FIG. 2 is a schematic configuration diagram of a tool and a worker's transmitter showing an example of input means.

【図3】(A)は部材の一例を示す概略斜視図、(B)
はバーコード表の一例を示す概略図である。
3A is a schematic perspective view showing an example of a member, FIG.
FIG. 3 is a schematic diagram showing an example of a bar code table.

【図4】CRTの表示の一例を示す施工図である。FIG. 4 is a construction diagram showing an example of a CRT display.

【図5】作業仕様書の一例を示す概略図である。FIG. 5 is a schematic diagram showing an example of a work specification.

【図6】作業指示書の一例を示す概略図である。FIG. 6 is a schematic diagram showing an example of a work instruction document.

【図7】接合番号別の作業集計リストの一例を示す概略
図である。
FIG. 7 is a schematic diagram showing an example of a work total list for each joint number.

【図8】部材コード別の作業集計リストの一例を示す概
略図である。
FIG. 8 is a schematic diagram showing an example of a work total list for each member code.

【図9】施工実績管理の一例を示すフローチャートであ
る。
FIG. 9 is a flowchart showing an example of construction record management.

【符号の説明】[Explanation of symbols]

10 作業管理システム 26 LANサーバ 28 作業所管理コンピュータ 30 工具系コントローラ 36 作業コンピュータ 38 工具 40 ワーカーズトランスミッター 54 管路材 58、60 バーコード表 62 CRT 66 バーコードリーダ 10 Work management system 26 LAN server 28 Work place management computer 30 Tool system controller 36 Work computer 38 Tool 40 Workers transmitter 54 Pipe material 58, 60 Bar code table 62 CRT 66 Bar code reader

───────────────────────────────────────────────────── フロントページの続き (72)発明者 阿部 裕司 東京都中央区銀座8丁目21番1号 株式会 社竹中工務店東京本店内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Yuji Abe 8-21-1, Ginza, Chuo-ku, Tokyo Stock company Takenaka Corporation Tokyo head office

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 所定の作業領域内の施工図と共に施工図
を形成する個々の部材の施工情報が記録されかつ部材毎
の作業情報を記録可能な記録手段と、 作業が開始されると前記作業領域内に設けられた検出手
段によって該当する部材の作業情報を検出して前記記録
部に記録する作業情報入力手段と、 前記記録手段に記録されている施工情報及び作業情報に
応じて前記個々の部材の表示を変更して前記施工図を表
示可能な表示手段と、 を有することを特徴とする施工実績管理システム。
1. A recording means for recording construction information of individual members forming a construction drawing together with a construction drawing within a predetermined work area and capable of recording work information for each member, and the work when the work is started. A work information input unit that detects work information of a corresponding member by a detection unit provided in the area and records the work information in the recording unit, and the individual work information according to the construction information and the work information recorded in the recording unit. A construction record management system comprising: a display unit capable of changing the display of the member and displaying the construction drawing.
【請求項2】 前記個々の部材を識別する部材コードを
バーコード化して明示し、前記検出手段に前記バーコー
ドを読み取らせることによって前記作業情報入力手段が
作動することを特徴とする請求項1の施工実績管理シス
テム。
2. The work information inputting means is operated by displaying a member code for identifying each of the individual members in a bar code and clearly indicating the bar code, and causing the detecting means to read the bar code. Construction performance management system.
JP26087493A 1993-10-19 1993-10-19 Management system of construction result Pending JPH07113322A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP26087493A JPH07113322A (en) 1993-10-19 1993-10-19 Management system of construction result

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP26087493A JPH07113322A (en) 1993-10-19 1993-10-19 Management system of construction result

Publications (1)

Publication Number Publication Date
JPH07113322A true JPH07113322A (en) 1995-05-02

Family

ID=17353955

Family Applications (1)

Application Number Title Priority Date Filing Date
JP26087493A Pending JPH07113322A (en) 1993-10-19 1993-10-19 Management system of construction result

Country Status (1)

Country Link
JP (1) JPH07113322A (en)

Similar Documents

Publication Publication Date Title
JP4483144B2 (en) Equipment management method
JP3288825B2 (en) Work status management system
JP2006048584A (en) Equipment inspection support system
KR20010110326A (en) Production control system
JP3458770B2 (en) Tool management system
JP2007042014A (en) System and method for monitoring plant condition
US20030046192A1 (en) Distribution management system, distribution management method, and program
JPH07113324A (en) Material management system
JP3174673B2 (en) Progress management system
JPH07113322A (en) Management system of construction result
US11455851B2 (en) Hazardous energy control system
JP2003091316A (en) Remote operation support method
JP3432408B2 (en) Work management system
JP4566846B2 (en) Cable connection display device and cable connection display method
JPH07119306A (en) Execution of work managing system
JP2003241829A (en) Work monitoring system in plant
JP2021089497A (en) Defect management method in production field and management device thereof and management program thereof
EP2916271A1 (en) Method and system for quality assurance of services and computer program product for carrying out the method
KR20080016412A (en) The manufacturing execution data input output module to manage manufactuing execution
JP2002004580A (en) Construction quality inspecting system
JP2887844B2 (en) Remote monitoring device
WO2022249309A1 (en) Progress management server and progress management system
JPH0735300A (en) Connecting state control system
JPH10249678A (en) Manufacturing control system
JP3231853B2 (en) Manufacturing control method of concrete panel