Joint structure of columns and beams in precast reinforced concrete structures

Info

Publication number
JPH0711202Y2
JPH0711202Y2 JP13062889U JP13062889U JPH0711202Y2 JP H0711202 Y2 JPH0711202 Y2 JP H0711202Y2 JP 13062889 U JP13062889 U JP 13062889U JP 13062889 U JP13062889 U JP 13062889U JP H0711202 Y2 JPH0711202 Y2 JP H0711202Y2
Authority
JP
Japan
Prior art keywords
reinforced concrete
beams
precast reinforced
column
columns
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP13062889U
Other languages
Japanese (ja)
Other versions
JPH0368203U (en
Inventor
正太郎 石河
俊彦 大岡
敏生 猿木
規和 浅井
Original Assignee
豊田総建株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 豊田総建株式会社 filed Critical 豊田総建株式会社
Priority to JP13062889U priority Critical patent/JPH0711202Y2/en
Publication of JPH0368203U publication Critical patent/JPH0368203U/ja
Application granted granted Critical
Publication of JPH0711202Y2 publication Critical patent/JPH0711202Y2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Description

【考案の詳細な説明】 〔産業上の利用分野〕 本考案はプレキャスト鉄筋コンクリート構造における柱
と梁の結合構造に関する。
DETAILED DESCRIPTION OF THE INVENTION [Industrial field of application] The present invention relates to a joint structure of columns and beams in a precast reinforced concrete structure.

〔従来技術〕[Prior art]

従来、プレキャスト鉄筋コンクリート構造における柱と
梁の結合方法として、第4図及び第5図に示すように、
プレキャスト鉄筋コンクリート製の柱1の上端面の縁部
にプレキャスト鉄筋コンクリート製の梁2の端部を載置
し、柱1の上端に突出した主筋3を接合空間部4に位置
させ、梁2の端部に突出した主筋5を柱1上の前記接合
空間部4内に位置させ、かつ帯筋6を配した後、その接
合空間部4内にコンクリートを現場打ちし、そのコンク
リートを養生、硬化させて柱と梁の結合をしているのが
一般的である。
Conventionally, as a method of connecting columns and beams in a precast reinforced concrete structure, as shown in FIG. 4 and FIG.
The end of the beam 2 made of precast reinforced concrete is placed on the edge of the upper end surface of the column 1 made of precast reinforced concrete, and the main bar 3 projecting at the upper end of the column 1 is positioned in the joint space 4 and the end of the beam 2 is placed. After arranging the main bar 5 protruding in the inside of the joint space 4 on the pillar 1 and arranging the stirrups 6, concrete is cast in-situ in the joint space 4 to cure and cure the concrete. It is common to connect columns and beams.

〔考案が解決しようとする課題〕[Problems to be solved by the device]

前記従来の結合方法によると、接合空間部4に強度に影
響する比較的多量の現場打ちコンクリートが必要となる
ため、比較的強固なコンクリート型枠を要する上にその
コンクリートの硬化時間が必要となり工期が長くなる問
題がある。また、接合空間部4内において柱主筋と梁主
筋が交叉するため、柱主筋及び梁主筋の配置を考慮しな
ければならず、例えば第4図に示すように4本の梁を柱
上で接合する場合には、対向する梁相互の梁主筋が干渉
しないように位置を相互にずらさなければならず、多種
の梁を用意する必要がある。
According to the above-mentioned conventional joining method, since a relatively large amount of cast-in-place concrete that influences the strength is required in the joining space portion 4, a relatively strong concrete formwork is required and the hardening time of the concrete is required, which leads to a construction period. Has the problem of becoming longer. Further, since the column main bars and the beam main bars intersect in the joint space 4, it is necessary to consider the arrangement of the column main bars and the beam main bars. For example, as shown in FIG. 4, four beams are joined on the pillar. In this case, the positions of the beams must be shifted from each other so that the beam main bars of the beams facing each other do not interfere with each other, and it is necessary to prepare various types of beams.

本考案はプレキャスト鉄筋コンクリート製の柱と梁を溶
接によって接合できるようにして上記の問題点を解決す
ることを目的とするものである。
An object of the present invention is to solve the above problems by making it possible to join columns and beams made of precast reinforced concrete by welding.

〔課題を解決するための手段〕[Means for Solving the Problems]

本考案は前記の課題を解決するために、第1の考案は、
プレキャスト鉄筋コンクリート製の柱(7)を、梁との
結合部迄一体成形するとともに、その梁との結合側面に
結合用の鋼板(8)を、その表面を柱外面に露出させて
固設し、また、プレキャスト鉄筋コンクリート製の梁
(12)における前記柱(7)との結合端部には、結合用
の鋼板(13)を、その端面を梁(12)の結合端面に露出
させて固設し、これら両鋼板(8),(13)を相互に接
合してその接合部を溶接(w)にて結合したことを特徴
とするものである。第2の考案は、前記柱(7)におけ
る梁(12)との結合側面に、前記の結合される梁(12)
の先端部下面を支承する引掛り段部(7a)を形成したも
のである。
In order to solve the above problems, the present invention is as follows.
The pillar (7) made of precast reinforced concrete is integrally molded up to the joint with the beam, and the steel plate (8) for joining is fixed to the side of the joint with the beam, the surface of which is exposed to the outer surface of the pillar, and fixed. In addition, a steel plate (13) for connection is fixed to the end of the beam (12) made of precast reinforced concrete, which is connected to the column (7), with its end face exposed at the connection end face of the beam (12). The two steel plates (8) and (13) are joined to each other and the joints are joined by welding (w). A second invention is to connect the beam (12) to the beam (12) on the side of the pillar (7) which is connected to the beam (12).
Is formed with a hook step (7a) for supporting the lower surface of the tip of the.

〔実施例〕〔Example〕

次に第1図及び第2図に示す本考案の第1実施例につい
て説明する。
Next, a first embodiment of the present invention shown in FIGS. 1 and 2 will be described.

7はプレキャスト鉄筋コンクリート製の柱で、梁が結合
される上部側面に沿って鋼板8がその表面を露出して鉛
直状に固設されている。該鋼板8の裏面には、柱7内に
埋設された定着筋9が溶接固着されており、該鋼板8が
柱7に対して強固に定着されている。10は柱主筋、11は
帯筋を示す。12はプレキャスト鉄筋コンクリート製の梁
で、その柱との結合端部に鋼板13が、前記鋼板8に対し
て直交するように鉛直状でかつ一端が露出して設けられ
ている。該鋼板13の埋設部分は梁主筋14に溶接固着され
ており、該鋼板13が梁12に対して強固に定着されてい
る。
A column 7 made of precast reinforced concrete has a steel plate 8 exposed vertically along the upper side surface to which the beam is connected and fixed vertically. A fixing streak 9 embedded in the pillar 7 is welded and fixed to the back surface of the steel plate 8, and the steel plate 8 is firmly fixed to the pillar 7. 10 is the main pillar muscle, and 11 is the stirrups. Reference numeral 12 is a precast reinforced concrete beam, and a steel plate 13 is provided at the end connected to the column so as to be perpendicular to the steel plate 8 and one end thereof is exposed. The embedded portion of the steel plate 13 is welded and fixed to the main beam 14 of the beam, and the steel plate 13 is firmly fixed to the beam 12.

前記柱7と梁12を現場で結合するには、所定位置に起立
させた柱7間に梁12を、その鋼板13を柱7側の鋼板8に
対して直交的に当接して架設し、両鋼板8,13を溶接wに
て結合する。この溶接作業は、柱7と梁12との隙間Dを
通じて行なう。また、梁12側の鋼板13が鉛直に配置さ
れ、その鉛直状の端部の両側で鋼板8と溶接されるた
め、梁12に作用する鉛直荷重の柱7への伝達力が強固に
なる。溶接後は前記隙間D内にモルタルを詰め、防火、
防錆の処理をする。
In order to join the pillar 7 and the beam 12 in the field, the beam 12 is installed between the pillars 7 standing upright at a predetermined position by abutting the steel plate 13 thereof orthogonally to the steel plate 8 on the pillar 7 side, Both steel plates 8 and 13 are joined by welding w. This welding operation is performed through the gap D between the column 7 and the beam 12. Further, since the steel plate 13 on the beam 12 side is vertically arranged and welded to the steel plate 8 on both sides of the vertical end portion thereof, the transmission force of the vertical load acting on the beam 12 to the column 7 is strengthened. After welding, fill the crevice D with mortar to prevent fire,
Take anti-corrosion treatment.

第3図は本考案の第2実施例を示すもので、前記柱7に
おける梁12との結合側面に、前記の結合される梁12の先
端部下面を支承する引掛け段部7aを形成したものであ
る。すなわち、柱7における梁結合部に、柱主体部の直
径より若干小径の角鋼管8aを露出して設けたものであ
る。該角鋼管8aは柱主筋10に溶接固着されている。9は
定着筋である。本実施例によれば、柱7と梁12に固設し
た両鋼板8,13を溶接wにて結合する場合に、梁12の両結
合側端部を両柱7,7の段部7a,7aに引っ掛け載置して梁12
を仮架設することができる。
FIG. 3 shows a second embodiment of the present invention, in which a hooking step portion 7a for supporting the lower surface of the tip end portion of the beam 12 to be joined is formed on the side surface of the pillar 7 where the beam 12 is joined. It is a thing. That is, a square steel pipe 8a having a diameter slightly smaller than the diameter of the main pillar portion is exposed at the beam connecting portion of the pillar 7. The square steel pipe 8a is welded and fixed to the column main bar 10. 9 is a fixed line. According to the present embodiment, when the steel plates 8 and 13 fixed to the pillar 7 and the beam 12 are joined by welding w, the ends of both joints of the beam 12 are connected to the stepped portions 7a of the pillars 7 and 7. Hang it on 7a and place it on the beam 12
Can be temporarily installed.

尚、前記実施例においては、梁12の溶接用鋼板13を垂直
状に配置したが、該鋼板13は梁12の上下部に位置して2
枚水平状に配置してもよい。勿論、該水平状の鋼板13に
は梁主筋14と溶接結合する。
Although the steel plate 13 for welding the beam 12 is arranged vertically in the above-mentioned embodiment, the steel plate 13 is located above and below the beam 12.
You may arrange | position horizontally. Of course, the horizontal steel plate 13 is welded to the main beam 14 of the beam.

〔考案の効果〕[Effect of device]

本考案は以上のような構造であるから、柱と梁との強度
的結合は鋼板の溶接で行なわれ、モルタル又はコンクリ
ートは溶接作業用空間を防火,防錆上から詰める目的で
使用され、これに強度を期待する必要はない。そのた
め、プレキャスト鉄筋コンクリートの柱と梁を、鉄骨の
建方と同じように他の作業に先行させて構築し、その後
にまとめて前記溶接作業用空間をモルタル又はコンクリ
ートで詰めるようにすることもできる。したがって、前
記従来のように多量のコンクリートの硬化を待つ作業に
比べて工期を大幅に短縮でき、工期短縮を目的とするプ
レキャスト鉄筋コンクリート構造に適したものになる。
また、柱と梁との結合においては使用されるモルタルま
たはコンクリートは極めて小量であるからその型枠も極
く軽微なものでよく、型枠の設置に要する作業及び費用
も前記従来のものに比べて軽減できる。また、1本の柱
に同一階の複数本の梁を結合する場合においても、その
梁の主筋が相互に交叉しないので、前記従来のように、
主筋が干渉しないようにずらした多種類の梁を用意する
必要がない。
Since the present invention has the structure as described above, the strength connection between the column and the beam is performed by welding steel plates, and the mortar or concrete is used for the purpose of filling the space for welding work from the viewpoint of fire protection and rust prevention. You don't have to expect strength. Therefore, it is possible to construct columns and beams of precast reinforced concrete prior to other work as in the case of constructing steel frames, and then collectively fill the welding work space with mortar or concrete. Therefore, the work period can be significantly shortened as compared with the conventional work of waiting for the hardening of a large amount of concrete, and the present invention is suitable for a precast reinforced concrete structure for the purpose of shortening the work period.
In addition, since the amount of mortar or concrete used for connecting columns and beams is extremely small, the formwork may be extremely light, and the work and cost required to install the formwork are the same as those of the conventional ones. Can be reduced compared to. In addition, even when a plurality of beams on the same floor are connected to one pillar, the main bars of the beams do not cross each other, so that,
There is no need to prepare multiple types of beams that are offset so that the main bars do not interfere with each other.

第2の考案によれば、上記の効果の外、梁と柱の両鋼板
を溶接する場合に、梁の結合端部を柱に形成した引掛り
段部に載置して梁の仮架設ができるため、梁を一時的に
保持する支保工等が不要である上に、柱に対する梁の位
置決めが正確に行なえる。
According to the second invention, in addition to the above effects, when welding both the steel plates of the beam and the pillar, the joint end of the beam is placed on the hook step formed on the pillar to temporarily erect the beam. Therefore, the supporting work for temporarily holding the beam is not necessary, and the beam can be accurately positioned with respect to the column.

【図面の簡単な説明】[Brief description of drawings]

第1図は本考案の第1実施例を示す平断面図、第2図は
同側断面図である。第3図は本考案の第2実施例を示す
側断面図である。第4図は従来構造を示す平面図、第5
図は同側面図である。 7……柱、8,13……鋼板、12……梁、w……溶接
FIG. 1 is a plan sectional view showing a first embodiment of the present invention, and FIG. 2 is a sectional side view of the same. FIG. 3 is a side sectional view showing a second embodiment of the present invention. FIG. 4 is a plan view showing a conventional structure, and FIG.
The figure is the same side view. 7 …… Column, 8,13 …… Steel plate, 12 …… Beam, w …… Welding

Claims (2)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】プレキャスト鉄筋コンクリート製の柱
(7)を、梁との結合部迄一体成形するとともに、その
梁との結合側面に結合用の鋼板(8)を、その表面を柱
外面に露出させて固設し、また、プレキャスト鉄筋コン
クリート製の梁(12)における前記柱(7)との結合端
部には、結合用の鋼板(13)を、その端面を梁(12)の
結合端面に露出させて固設し、これら両鋼板(8),
(13)を相互に接合してその接合部を溶接(w)にて結
合したことを特徴とするプレキャスト鉄筋コンクリート
構造における柱と梁の結合構造。
1. A column (7) made of precast reinforced concrete is integrally molded up to the joint with a beam, and a steel plate (8) for coupling is formed on the side of the beam, and the surface of the column is exposed on the outer surface of the column. The steel plate (13) for joining is exposed at the joining end face of the beam (12) at the joining end portion of the beam (12) made of precast reinforced concrete with the pillar (7). And fixed to both steel plates (8),
A joint structure of columns and beams in a precast reinforced concrete structure, characterized in that (13) are joined to each other and the joints are joined by welding (w).
【請求項2】前記柱(7)における梁(12)との結合側
面に、前記の結合される梁(12)の先端部下面を支承す
る引掛り段部(7a)を形成した請求項1記載のプレキャ
スト鉄筋コンクリート構造における柱と梁の結合構造。
2. A hook step (7a) for supporting the lower surface of the tip of the beam (12) to be connected is formed on the side surface of the column (7) connected to the beam (12). Joint structure of columns and beams in the described precast reinforced concrete structure.
JP13062889U 1989-11-09 1989-11-09 Joint structure of columns and beams in precast reinforced concrete structures Expired - Fee Related JPH0711202Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13062889U JPH0711202Y2 (en) 1989-11-09 1989-11-09 Joint structure of columns and beams in precast reinforced concrete structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13062889U JPH0711202Y2 (en) 1989-11-09 1989-11-09 Joint structure of columns and beams in precast reinforced concrete structures

Publications (2)

Publication Number Publication Date
JPH0368203U JPH0368203U (en) 1991-07-04
JPH0711202Y2 true JPH0711202Y2 (en) 1995-03-15

Family

ID=31678190

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13062889U Expired - Fee Related JPH0711202Y2 (en) 1989-11-09 1989-11-09 Joint structure of columns and beams in precast reinforced concrete structures

Country Status (1)

Country Link
JP (1) JPH0711202Y2 (en)

Also Published As

Publication number Publication date
JPH0368203U (en) 1991-07-04

Similar Documents

Publication Publication Date Title
CN112282048B (en) Steel pipe column and composite beam connecting node and construction method thereof
JPH0711710A (en) Reinforced concrete column and steel frame beam jointing structure and building constructing method
KR20060079949A (en) Hybrid structure system of precast concrete beam and steel beam, precast concrete beam with bracket for connection with steel beam
JPH0711202Y2 (en) Joint structure of columns and beams in precast reinforced concrete structures
JP6849491B2 (en) Exposed column base structure of steel columns and its construction method
JP2537330B2 (en) Precast reinforced concrete columns
JP2864906B2 (en) Precast wall joining method
KR20210004289A (en) Transfer Structure Construction Method Using U-shaped Steel Girder
JPS6195136A (en) Construction of multistoried building skeletal by precast reinforced concrete unit
JP2972955B2 (en) Column and beam joining method and its structure
JPH04371635A (en) Connection of floorslab and post
JPH07139054A (en) Joining method for precast concrete wall plate
JPH0438039Y2 (en)
JPH0327166Y2 (en)
JPS5925931Y2 (en) Composite girder using π-shaped steel
JP2024067147A (en) Construction method for joint structure between reinforced concrete column and steel beam
JPH0823176B2 (en) Steel plate concrete structure joining method
JP2004027647A (en) Steel structure of house, and its construction method
JP2536250Y2 (en) Steel foundation beam
JPH0738517Y2 (en) Reinforcing bar connection structure
JPH0588331B2 (en)
JPH0782817A (en) Building wall structure and its construction work
JPS6131546A (en) Construction of floor slab
JPS62107144A (en) Connection of steel bar unit
JPH0725102U (en) Frame joint structure