JPH0641979A - Foundation of steelwork frame - Google Patents

Foundation of steelwork frame

Info

Publication number
JPH0641979A
JPH0641979A JP21846292A JP21846292A JPH0641979A JP H0641979 A JPH0641979 A JP H0641979A JP 21846292 A JP21846292 A JP 21846292A JP 21846292 A JP21846292 A JP 21846292A JP H0641979 A JPH0641979 A JP H0641979A
Authority
JP
Japan
Prior art keywords
foundation
base
column
pillar
reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP21846292A
Other languages
Japanese (ja)
Other versions
JP2614000B2 (en
Inventor
Taiyo Kinoshita
大洋 木下
Kenji Furuumi
賢二 古海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiwa House Industry Co Ltd
Original Assignee
Daiwa House Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiwa House Industry Co Ltd filed Critical Daiwa House Industry Co Ltd
Priority to JP4218462A priority Critical patent/JP2614000B2/en
Publication of JPH0641979A publication Critical patent/JPH0641979A/en
Application granted granted Critical
Publication of JP2614000B2 publication Critical patent/JP2614000B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

PURPOSE:To simply arrange reinforment work, dispense with stud bolt, save labor, shorten construction period, and further dispense with charging many mandays at one time in a foundation work. CONSTITUTION:A pillar 2 of steelwork frame is built on the base part 7a of an independent footing 7. The pedestal is reinforced with reinforcing plates 12 of angle steel, and T-shaped reinforforced joint metal fittings 13 are fitted thereon. The straps 17, 18 of the reinforcements 14, 15 of a footing beam 8 are joined to the reinforced joint metal fitting 13 by means of bolts. Footing upper concrete is jointly placed on the base part 7a of the independent footing 7 so as to bury the pedestal together with winding reinforcements 22, 23 arranged around the pedestal.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、中高層の住宅その他
の建物等における鉄骨架構の基礎に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to the foundation of a steel frame structure in middle- and high-rise houses and other buildings.

【0002】[0002]

【従来の技術】従来、鉄骨架構における柱脚の固定構造
として、図5に示すように柱52を基礎51の中へ埋め
込む構造、または図6に示すように柱脚部に根巻コンク
リート65を設ける構造が一般に採用されている。
2. Description of the Related Art Conventionally, as a structure for fixing a column base in a steel frame structure, as shown in FIG. 5, a column 52 is embedded in a foundation 51, or as shown in FIG. The structure provided is generally adopted.

【0003】図5の例は、独立基礎51のベース部51
aを先に打ち、その上に柱52を建てて、柱52の根巻
配筋53および地中梁54の配筋(図示せず)を施した
後に、基礎上部51bのコンクリート、および地中梁5
4のコンクリートを打設したものである。図6の例は、
独立基礎61および地中梁64の工事を完了した後に、
柱62を建てた構造である。柱62には根巻配筋63を
施し、根巻コンクリート65を後打ちする。何れの例に
おいても、柱脚には柱52,62の固定を確実にするた
めのスタッドボルト56,66が多数設けられる。5
7,67はベースプレート、58,68はアンカーボル
トを各々示す。
In the example of FIG. 5, the base portion 51 of the independent foundation 51 is shown.
a is first struck, the pillar 52 is built on it, and after the root winding reinforcement 53 and the underground beam 54 reinforcement (not shown) of the pillar 52 are given, the concrete of the foundation upper part 51b and the underground Beam 5
The concrete of No. 4 was cast. The example in FIG.
After completing the construction of the independent foundation 61 and the underground beam 64,
It is a structure in which columns 62 are built. The pillar 62 is provided with a wrapping bar 63, and the wrapping concrete 65 is post-cast. In any of the examples, the pedestal is provided with a large number of stud bolts 56 and 66 for securely fixing the columns 52 and 62. 5
Reference numerals 7 and 67 are base plates, and 58 and 68 are anchor bolts.

【0004】[0004]

【発明が解決しようとする課題】これら図5および図6
の従来例は、何れも地中梁54,64の配筋を行うにつ
き、その位置決めに柱52,62を利用することはでき
ず、配筋作業に手間がかかるうえ、熟練した鉄筋工が必
要になる。しかも、柱52,62の堅固な固定のために
は、多数のスタッドボルト56,66を打つことが必要
になり、これらのために施工時間が長くなる。また、図
5の例では、柱52と地中梁54との取り合い部で、地
中梁54の配筋と根巻配筋53やスタッドボルト56等
が入り混じって煩雑となり、より一層配筋作業が難しく
なる。
The problems to be solved by the present invention are shown in FIGS.
In each of the conventional examples, since the underground beams 54 and 64 are laid out, it is not possible to use the columns 52 and 62 for positioning them, and it takes time and labor for the laying work, and a skilled reinforcing bar work is required. become. Moreover, in order to firmly fix the columns 52 and 62, it is necessary to hit a large number of stud bolts 56 and 66, which increases the construction time. Further, in the example of FIG. 5, at the joint between the column 52 and the underground beam 54, the reinforcement of the underground beam 54 and the root winding reinforcement 53, the stud bolt 56, etc. are mixed, and the reinforcement becomes even more complicated. Work becomes difficult.

【0005】さらに、図6の例の場合は、基礎工事の終
了後に柱62を建てるので、工期の短縮のためには、基
礎工事に人工数を一度に多く投入して基礎工事を早く終
わらせる必要があり、鉄筋工や型枠工の手配が難しい。
しかも、床面レベルFLよりも上方で、柱脚部の周囲に
根巻コンクリート65が突出するため、この突出部分が
室内にへの突出部となったり、壁材等の設置の邪魔にな
ることがある。
Further, in the case of the example of FIG. 6, since the pillars 62 are built after the completion of the foundation work, in order to shorten the construction period, a large number of artificial numbers are put into the foundation work at one time to finish the foundation work early. It is necessary, and it is difficult to arrange rebar and formwork.
In addition, since the root-wrapping concrete 65 projects around the column base above the floor level FL, this projecting portion becomes a projecting portion into the room or interferes with the installation of wall materials or the like. There is.

【0006】この発明の目的は、配筋作業が簡単に行
え、かつスタッドボルトを要せずに柱脚の堅固な固定が
行えて、省力化、工期の短縮が図れ、さらに基礎工事で
の人工数を一度に多く投入することが不要な鉄骨架構の
基礎を提供することである。
[0006] The object of the present invention is to easily perform bar arrangement work, and to firmly fix the column base without requiring stud bolts, which saves labor and shortens the construction period. It is to provide a foundation for a steel frame structure that does not require a large number of inputs at one time.

【0007】[0007]

【課題を解決するための手段】この発明の基礎は、鉄骨
架構の柱を独立基礎のベース部上に建て、その柱脚に鉄
筋接合金物を取付け、この鉄筋接合金物に鉄筋コンクリ
ート基礎梁の配筋をボルト接合したものである。前記独
立基礎のベース部上には、柱脚をその周囲の根巻配筋と
共に埋め込む基礎上部コンクリートを設ける。
The foundation of the present invention is to construct a column of a steel frame on the base portion of an independent foundation, attach a rebar-bonded metal fitting to the column base, and arrange a reinforced concrete foundation beam on the rebar-bonded metal fitting. It is a bolt joint. On the base portion of the independent foundation, a foundation upper concrete is provided in which the column base is embedded together with the surrounding wrapping reinforcement.

【0008】[0008]

【作用】この構成によると、柱脚に設けた鉄筋接合金物
に、基礎梁の配筋の端部をボルト接合するので、基礎梁
配筋の端部が柱に対して位置決め状態に接合される。そ
のため基礎梁の配筋作業が簡単に行え、また基礎梁配筋
の工場におけるプレ配筋も可能になる。また、基礎梁配
筋を前記鉄筋接合金物で柱と接合するので、柱の固定が
堅固となり、柱脚部のスタッドボルトが省略できる。さ
らに、独立基礎のベース部の構築後に建方を行い、その
後に基礎の残り部分を構築することになるので、基礎工
事での人工数を一度に多く投入することが不要となる。
According to this structure, since the end portion of the reinforcing bar of the foundation beam is bolted to the reinforcing bar joining metal member provided on the column base, the end portion of the reinforcing bar of the foundation beam is joined to the column in a positioned state. . Therefore, the reinforcement work of the foundation beam can be easily performed, and the pre-arrangement of the foundation beam reinforcement in the factory becomes possible. Further, since the foundation beam reinforcement is joined to the column with the reinforcing bar joining hardware, the column is firmly fixed and the stud bolt of the column base can be omitted. Furthermore, since the construction will be performed after the base part of the independent foundation is constructed and then the remaining part of the foundation will be constructed, it is not necessary to invest a large number of man-hours in the foundation construction at one time.

【0009】[0009]

【実施例】この発明の一実施例を図1ないし図4に基づ
いて説明する。鉄骨架構1は、住宅またはビル等の建物
の骨組みとなるものであり、角形鋼管からなる柱2をH
形鋼からなる梁3で接合したラーメン構造に構成され
る。柱2と梁3との接合は、柱2の周囲に設けた補強ア
ングル4とスプリットティー5とによるボルト接合とし
てある。鉄骨架構全体の基礎6は、各柱2に設けた独立
基礎7と、隣合う独立基礎7を接続する基礎梁である地
中梁8とで構成される。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described with reference to FIGS. The steel frame 1 serves as a frame of a building such as a house or a building, and a column 2 made of a square steel pipe is used as an H
It is configured as a rigid frame structure joined by beams 3 made of shaped steel. The pillar 2 and the beam 3 are joined to each other by a bolt joint using a reinforcing angle 4 and a split tee 5 provided around the pillar 2. The foundation 6 of the entire steel frame structure is composed of an independent foundation 7 provided on each pillar 2 and an underground beam 8 which is a foundation beam connecting adjacent independent foundations 7.

【0010】各独立基礎7は、基礎ベース部7aと、後
打ちの基礎上部コンクリート7b(図3,図4)とで構
成される。基礎ベース部7aは、杭(図示せず)上に打
設され、あるいは直接基礎とされ、内部にベース配筋
(図示せず)等が埋め込まれる。柱2は、基礎ベース部
7a上に建てられ、ベースプレート9が基礎ベース部7
aのアンカーボルト11に接合される。柱2の基礎埋め
込み部分の上部は、アングル材からなる4個の補強板1
2を4隅に配置して外面を囲み、その外面にT形の鉄筋
接合金物13を横向きに突出させて設けてある。これら
鉄筋接合金物13は、補強板12と共にワンサイドボル
ト20等で柱2に接合される。
Each independent foundation 7 is composed of a foundation base portion 7a and a post-casting foundation upper concrete 7b (FIGS. 3 and 4). The foundation base portion 7a is cast on a pile (not shown) or directly serves as a foundation, and a base reinforcement (not shown) and the like are embedded inside. The pillar 2 is built on the foundation base portion 7a, and the base plate 9 is attached to the foundation base portion 7a.
It is joined to the anchor bolt 11 of a. The upper part of the foundation embedded part of the pillar 2 is the four reinforcing plates 1 made of angle materials.
2 are arranged at four corners to surround the outer surface, and a T-shaped rebar joining metal piece 13 is provided on the outer surface so as to project sideways. These reinforcing bar joining hardware 13 are joined to the pillar 2 together with the reinforcing plate 12 by the one side bolt 20 or the like.

【0011】地中梁8は、上下の主筋14,15とスタ
ラップ16とを配筋してコンクリート21を打設した鉄
筋コンクリート梁であり、各主筋14,15の端部に
は、羽子板17,18が溶接される。これら羽子板1
7,18は、鉄筋接合金物13のウェブ上面およびベー
スプレート9の上面にボルト・ナット19で接合する。
なお、鉄筋接合金物13、ベースプレート9、および各
羽子板17,18には、所定位置に予めボルト挿通孔を
明けておく。
The underground beam 8 is a reinforced concrete beam in which upper and lower main reinforcing bars 14 and 15 and stapling 16 are laid out and concrete 21 is laid. The end portions of the main reinforcing bars 14 and 15 have battled boards 17 and 18, respectively. Are welded. These battledore 1
7 and 18 are joined to the upper surface of the web of the reinforcing bar joint metal 13 and the upper surface of the base plate 9 with bolts and nuts 19.
In addition, a bolt insertion hole is made in advance at a predetermined position in the reinforcing bar joining hardware 13, the base plate 9, and the battledore plates 17, 18.

【0012】柱2の柱脚部の外周には、基礎ベース部7
aに予め埋め込んだ打継ぎ補強兼用の根巻縦筋22を立
ち上げ、その周囲に根巻フープ筋23を配筋する。これ
ら根巻筋22,23と共に、柱2の脚部を基礎上部コン
クリート7bに埋め込む。
On the outer circumference of the pillar base of the pillar 2, a base base 7 is formed.
The vertical winding wire 22 for double-joint reinforcement also embedded in a is raised, and the peripheral winding hoop muscle 23 is arranged around it. The leg portion of the column 2 is embedded in the foundation upper concrete 7b together with these neck curls 22 and 23.

【0013】図4は施工手順を示す。まず、同図(A)
の基礎ベース部7aを構築する。この場合、杭打ち後に
ベース配筋、根巻縦筋22、およびアンカーボルト11
をセットし、基礎コンクリートを打設することで基礎ベ
ース部7aを構築する。この基礎ベース部7a上に、
(B)のように柱2を建て、そのベースプレート9をア
ンカーボルト11にナットで締め付ける。柱2には、建
方前に予め工場等で補強板12および鉄筋接合金物13
を接合しておき、あるいは建方後に補強板12および鉄
筋接合金物13を接合する。
FIG. 4 shows a construction procedure. First, the same figure (A)
The basic base portion 7a of is constructed. In this case, after the pile driving, the base reinforcement, the vertical winding of the root winding 22, and the anchor bolt 11
Is set and the foundation concrete is placed to construct the foundation base portion 7a. On this foundation base part 7a,
The pillar 2 is built as shown in (B), and the base plate 9 is fastened to the anchor bolt 11 with a nut. The pillar 2 is provided with a reinforcing plate 12 and a reinforcing bar joint metal 13 in a factory or the like before being built.
Or the reinforcing plate 12 and the reinforcing bar joining hardware 13 are joined after erection.

【0014】この鉄筋接合金物13に、同図(C)のよ
うに地中梁8の主筋14の羽子板17(図2)をボルト
止めし、下側の主筋15の羽子板18をベースプレート
9にボルト止めする。また、柱2の周囲に根巻フープ筋
23を配筋する。なお、地中梁8の主筋14,15とス
タラップ16とは、工場等でプレ配筋しておくことが望
ましい。このように配筋が終わった後、基礎上部コンク
リート7bと地中梁8の基礎コンクリート21とを打設
し、同図(D)のように独立基礎7と地中梁8とでなる
基礎が構築される。
The reinforcement bar 17 of the main bar 14 of the underground beam 8 (FIG. 2) is bolted to the reinforcing bar joining hardware 13 as shown in FIG. 2C, and the battlement plate 18 of the lower main bar 15 is bolted to the base plate 9. Stop. Further, a root-wrap hoop muscle 23 is arranged around the column 2. It is desirable that the main reinforcements 14 and 15 of the underground beam 8 and the stapling 16 be pre-arranged in a factory or the like. After the reinforcement is finished in this way, the foundation upper concrete 7b and the foundation concrete 21 of the underground girder 8 are placed, and the foundation consisting of the independent foundation 7 and the underground girder 8 is formed as shown in FIG. Be built.

【0015】この構成の基礎によると、独立基礎7のベ
ース部7aの構築後に柱2の建方を行い、その後に基礎
6の残り部分を構築することになるため、基礎工事での
人工数を一度に多く投入しなくても良く、鉄筋工や型枠
工の手配が行い易い。また、柱2に鉄筋接合金物13を
介して地中梁8の主筋14,15をボルト接合するの
で、配筋が行い易く、施工が簡単である。しかも、地中
梁8の配筋がシンプルな構成となり、地中梁8の型枠の
加工や組立も簡単になる。また、柱2に地中梁8の主筋
14,15を接合するため、スタッドボルトを打つこと
なく柱脚部の堅固な固定が行え、これによっても施工性
が良くなる。
According to the foundation of this structure, since the pillar 2 is constructed after the base portion 7a of the independent foundation 7 is constructed, and the rest of the foundation 6 is constructed after that, the artificial number in the foundation construction is reduced. It is not necessary to put many in one time, and it is easy to arrange reinforcement work and formwork. In addition, since the main bars 14 and 15 of the underground beam 8 are bolted to the pillar 2 through the reinforcing bar joint metal 13, the bar arrangement is easy and the construction is simple. Moreover, the reinforcement of the underground beam 8 has a simple structure, and the processing and assembly of the formwork of the underground beam 8 are also easy. Further, since the main bars 14 and 15 of the underground beam 8 are joined to the pillar 2, the pillar leg portion can be firmly fixed without hitting the stud bolt, which also improves the workability.

【0016】さらに、柱2に設けた鉄筋接合金物13と
取り合うため、地中梁8の配筋14〜16をプレ配筋で
き、工場で加工することができる。そのため、現場での
省力化が図れ、かつ配筋作業に熟練した鉄筋工を必要と
しない。また、プレ配筋の場合、鉄骨建方時にセットす
ることが可能であり、そのセット作業には鉄筋工を必要
としない。そのため、鉄筋工の不足ぎみとなっている現
状に対処できる。この基礎によると、これらの種々の利
点により省力化が図れ、工期短縮につながる。
Further, since the reinforcing bar joining metal fitting 13 provided on the pillar 2 is fitted, the reinforcing bars 14 to 16 of the underground beam 8 can be pre-arranged and can be processed in a factory. Therefore, it is possible to save labor on site, and it is not necessary to have a skilled reinforcing bar worker for the bar arrangement work. Further, in the case of pre-arrangement, it is possible to set at the time of constructing the steel frame, and the setting work does not require a reinforcing bar work. Therefore, it is possible to deal with the current situation where there is a shortage of reinforcing bars. According to this foundation, labor saving can be achieved due to these various advantages, leading to shortening of the construction period.

【0017】なお、前記実施例では地中梁8のコンクリ
ート打設を現場で行うようにしたが、地中梁8は予めコ
ンクリートを打ってプレキャスト化しておいても良い。
また、鉄筋接合金物13は図示の例に限らず、種々の構
成のものが使用できる。
In the above embodiment, the concrete beam 8 is cast on site, but the underground beam 8 may be precast by precasting concrete.
Further, the reinforcing bar joining hardware 13 is not limited to the example shown in the figure, and various structures can be used.

【0018】[0018]

【発明の効果】この発明の鉄骨架構の基礎は、柱に設け
た鉄筋接合金物に基礎梁の配筋をボルト接合するので、
基礎梁の配筋作業が簡単になる。しかも、基礎梁の配筋
を柱と接合するので、柱の固定が堅固となり、柱脚部の
スタッドボルトが省略できる。これらのため省力化が図
れ、工期の短縮につながる。また、独立基礎のベース部
の構築後に建方を行い、その後に基礎の残り部分を構築
することになるため、基礎工事での人工数を一度に多く
投入することが不要となり、鉄筋工や型枠工の手配が容
易となる。
EFFECTS OF THE INVENTION In the foundation of the steel frame structure of the present invention, since the reinforcement of the foundation beam is bolted to the reinforcing bar joint metal provided on the column,
Reinforcement work of foundation beams becomes easy. Moreover, since the reinforcement of the foundation beam is joined to the column, the column is firmly fixed, and the stud bolt of the column base can be omitted. As a result, labor can be saved and the construction period can be shortened. In addition, since the construction of the base part of the independent foundation is done after the construction, and the rest of the foundation is constructed after that, it is not necessary to invest a large number of artificial man-hours in the foundation work at one time, and the reinforcement work and mold Arrangement of frame work becomes easy.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の一実施例にかかる基礎および鉄骨架
構の斜視図である。
FIG. 1 is a perspective view of a foundation and a steel frame structure according to an embodiment of the present invention.

【図2】その基礎の部分拡大破断斜視図である。FIG. 2 is a partially enlarged cutaway perspective view of the foundation.

【図3】同基礎の部分側面図である。FIG. 3 is a partial side view of the foundation.

【図4】同じくその工程説明図である。FIG. 4 is an explanatory view of the same process.

【図5】従来例の断面図である。FIG. 5 is a cross-sectional view of a conventional example.

【図6】他の従来例の断面図である。FIG. 6 is a cross-sectional view of another conventional example.

【符号の説明】[Explanation of symbols]

1…鉄骨架構、2…柱、3…梁、6…基礎、7…独立基
礎、7a…ベース部、7b…基礎上部コンクリート、8
…地中梁、9…ベースプレート、11…アンカーボル
ト、12…補強板、13…鉄筋接合金物、14,15…
地中梁の主筋、22…根巻縦筋、23…根巻フープ筋
1 ... Steel frame structure, 2 ... Column, 3 ... Beam, 6 ... Foundation, 7 ... Independent foundation, 7a ... Base part, 7b ... Foundation upper concrete, 8
... Underground beam, 9 ... Base plate, 11 ... Anchor bolt, 12 ... Reinforcing plate, 13 ... Reinforcing bar joint hardware, 14, 15 ...
Underground beam main bar, 22 ... Nemaki vertical bar, 23 ... Nemaki hoop bar

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 鉄骨架構の柱を独立基礎のベース部上に
建て、その柱脚に鉄筋接合金物を取付け、この鉄筋接合
金物に鉄筋コンクリート基礎梁の配筋をボルト接合し、
前記独立基礎のベース部上に、前記柱脚およびこの柱脚
周囲の根巻配筋を埋め込んだ基礎上部コンクリートを設
けた鉄骨架構の基礎。
1. A column of a steel frame structure is built on a base portion of an independent foundation, a reinforced joint metal fitting is attached to the column base, and a reinforcement of a reinforced concrete foundation beam is bolted to the reinforced joint metal fitting,
A foundation of a steel frame structure in which, on the base portion of the independent foundation, a foundation upper concrete in which the column base and the root winding reinforcement around the column base are embedded is provided.
JP4218462A 1992-07-24 1992-07-24 Basics of steel frame Expired - Lifetime JP2614000B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4218462A JP2614000B2 (en) 1992-07-24 1992-07-24 Basics of steel frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4218462A JP2614000B2 (en) 1992-07-24 1992-07-24 Basics of steel frame

Publications (2)

Publication Number Publication Date
JPH0641979A true JPH0641979A (en) 1994-02-15
JP2614000B2 JP2614000B2 (en) 1997-05-28

Family

ID=16720287

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4218462A Expired - Lifetime JP2614000B2 (en) 1992-07-24 1992-07-24 Basics of steel frame

Country Status (1)

Country Link
JP (1) JP2614000B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013185425A (en) * 2012-03-12 2013-09-19 Tokai Corp Bar arrangement structure and bar arrangement construction method of steel structure building/concrete foundation beam
JP6950068B1 (en) * 2020-10-27 2021-10-13 株式会社サクシス Residential building

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0449329A (en) * 1990-06-18 1992-02-18 Daiwa House Ind Co Ltd Pedestal construction of steel framed column

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0449329A (en) * 1990-06-18 1992-02-18 Daiwa House Ind Co Ltd Pedestal construction of steel framed column

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013185425A (en) * 2012-03-12 2013-09-19 Tokai Corp Bar arrangement structure and bar arrangement construction method of steel structure building/concrete foundation beam
JP6950068B1 (en) * 2020-10-27 2021-10-13 株式会社サクシス Residential building
JP2022070390A (en) * 2020-10-27 2022-05-13 株式会社サクシス Residential building

Also Published As

Publication number Publication date
JP2614000B2 (en) 1997-05-28

Similar Documents

Publication Publication Date Title
JPH09209451A (en) Joint construction of up and down columns with beam and joint method
JP2915897B1 (en) Building construction method
JPH0641979A (en) Foundation of steelwork frame
JPH0434161A (en) Centrifugally molded hollow pc concrete column and column construction method
JPH08284311A (en) Precast concrete column member in composite structure, and construction of building using it
JP2000345719A (en) Reinforcing method of through opening in existing bearing wall
JP2000160687A (en) Construction method for composite structure and precast concrete column
JP2967452B2 (en) Building construction methods and lightweight floor slabs
JPH0598653A (en) Steel pipe concrete pillar in underground inverter construction method
JPH0681415A (en) Construction of steel structure
JPH03275839A (en) Connection construction of reinforced concrete column and steel beam
JP2990216B2 (en) Construction method of reinforced concrete building
JPH02167937A (en) Connecting work of steel plate-concrete structure
JPH05125761A (en) Constructing method of composite structure
JP3284383B2 (en) Support hardware for SRC beam construction
JPH05331863A (en) Fixing method of steel frame column
JPH0688349A (en) Connection structure of pc girder and post
JPH0623514B2 (en) Construction method of reinforced steel frame composite building frame
JPH02229337A (en) Constructing technique for concrete column
JPH03187436A (en) Supporting member for construction pillar of reinforced concrete building
JPH0261238A (en) Steel plate concrete method
JPH02304133A (en) Building method for steelframe and reinforcing bar concrete structure
JPH0544219A (en) Base structure for steel-framed column and construction thereof
JPH1068133A (en) Construction method of foundation structure in lightweight building
JPH1181694A (en) Aseismatic reinforcing construction method for structure

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090227

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090227

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100227

Year of fee payment: 13

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 13

Free format text: PAYMENT UNTIL: 20100227

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 14

Free format text: PAYMENT UNTIL: 20110227

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 14

Free format text: PAYMENT UNTIL: 20110227

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120227

Year of fee payment: 15

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120227

Year of fee payment: 15

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130227

Year of fee payment: 16

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 16

Free format text: PAYMENT UNTIL: 20130227