JPH06317095A - Tunnel constructing method - Google Patents

Tunnel constructing method

Info

Publication number
JPH06317095A
JPH06317095A JP5136380A JP13638093A JPH06317095A JP H06317095 A JPH06317095 A JP H06317095A JP 5136380 A JP5136380 A JP 5136380A JP 13638093 A JP13638093 A JP 13638093A JP H06317095 A JPH06317095 A JP H06317095A
Authority
JP
Japan
Prior art keywords
tunnel
box
shaped pipe
construction
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP5136380A
Other languages
Japanese (ja)
Other versions
JP3146333B2 (en
Inventor
Tetsuo Manzawa
哲雄 萬澤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP13638093A priority Critical patent/JP3146333B2/en
Publication of JPH06317095A publication Critical patent/JPH06317095A/en
Application granted granted Critical
Publication of JP3146333B2 publication Critical patent/JP3146333B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PURPOSE:To allow constructing a railroad tunnel right under a railroad track under service by fitting by pressure a box-shaped pipe into a sheathing which is placed on each side face timbering, and performing excavation of the natural ground surrounded by upper floor plates substituted with them and the sheathing. CONSTITUTION:Sheathings 9, 9' are placed on both sides of a tunnel, and its over-part is used and provisional girder seats 14, 14' are built. A box-shaped pipe provided with a friction cut plate over the whole length of the oversurface of the opposing seats 14, 14' is fitted by pressure in a parallel condition approx. at a right angle in the tunnel. The oversurfaces of the foremost parts of upper floor plates 3. 3' fabricated in the pit 13 are put identical to the oversurface of the tail part of this pipe, and the upper floor plates 3. 3' are propelled by a jack, etc., while the friction cut plate is left in place and substituted with box-shaped pipes. The natural ground within the tunnel surrounded by these upper floor plates 3, 3' and sheathings 9, 9' is excavated, and thereby side walls 4..., intermediate walls 8, 8, lower floor plates 6, 6, etc. are built. Thus a transfer track 20 and an annex track 21 as desired are laid.

Description

【発明の詳細な説明】Detailed Description of the Invention

【産業上の利用分野】大都市の交通は混雑が甚だしく,
通勤するサラリーマンには地獄の苦しみである。この混
雑から人々を解放するには,鉄道の増設,道路の新設お
よび踏切道の立体交差新設等が必要である。しかし,こ
の鉄道の増設・新設等には新たに必要となる線路敷の確
保等が,日本のような狭い国土では取得に困難があり,
遅々として工事が進行しないのが現状である。本発明は
この困難な線路敷地の取得を少なくし,営業しながら在
来の鉄道線路の直下にトンネルを建設し,線増線も同時
に建設するという新しいトンネル工法である。
[Industrial application] Traffic in large cities is extremely crowded,
Hell suffers for office workers who commute. To relieve people from this congestion, it is necessary to add railroads, construct new roads, and construct new grade separation at level crossings. However, it is difficult to obtain the track layout, which is newly necessary for the expansion / construction of this railway, in a small land like Japan,
The current situation is that construction work will not proceed late. The present invention is a new tunnel construction method that reduces the acquisition of this difficult track site, constructs a tunnel directly under a conventional railroad track while operating, and constructs an additional line at the same time.

【従来の技術】営業している線路の直下に新しいトンネ
ルを建設する工事は今日までいろいろと実施されてい
る。その1つはシールド工法によるトンネルである。図
1はこの横断面を示している。地上に線路Aがあり地盤
Bの中にシールド工法によりトンネルCを建設した断面
図である。この工法の欠点は地表面の沈下を防止するた
めに土被りDは一般には10m〜30m位必要であって
駅部の工事費が莫大となる欠点がある。また,このほか
に開削工法がある。図2は開削工法における施工断面図
である。線路Aに支障しないように土留工Eを両側に打
設し,工事桁Fを架設して線路を支持する。次に線路A
の下面を掘削し,地下鉄躯体Gを打設し,埋設土Hを投
入して工事桁Fを撤去する。この工法の欠点は鉄道線路
の沈下を防止できないことである。
2. Description of the Related Art Construction work for constructing a new tunnel directly under an operating track has been carried out variously to date. One of them is a tunnel by the shield method. FIG. 1 shows this cross section. It is sectional drawing which built the tunnel C in the ground B by the shield construction method with the track | line A on the ground. The disadvantage of this construction method is that the overburden D is generally required to be about 10 to 30 m in order to prevent the subsidence of the ground surface, and the construction cost of the station portion is enormous. In addition, there is an excavation method. FIG. 2 is a construction sectional view in the excavation method. Soil retaining works E are placed on both sides so as not to interfere with the track A, and construction girders F are installed to support the track. Next is track A
Excavate the bottom surface of the subway, place the subway frame G, put in the buried soil H, and remove the construction girder F. The drawback of this method is that it cannot prevent the subsidence of railway tracks.

【発明が解決しようとする課題】線路の直下に開削工法
でトンネルを建設する場合には,工事桁方式をとらず先
ず線路を移転して更地とし,開削方式で地下構造物を築
造するという方法を取るか,または鉄道の営業を休止し
てから開削するというのが一般的工法である。この工法
では,一時的でも交通難を増加させるか,または新しい
線路敷地を必要とする等の欠点があるので,鉄道線路に
は全く支障することなく,直下にトンネルを建設出来る
工法があればこの問題は解決する。
[Problems to be Solved by the Invention] When constructing a tunnel directly below a railway line by an excavation method, the construction girder method is not taken first, the railway line is first moved to a vacant lot, and an underground structure is constructed by the excavation method. The general method is to take the method or stop the railroad business before digging. This method has drawbacks such as increasing traffic difficulty even temporarily or requiring a new track site, so if there is a method that can build a tunnel directly under the railroad track without any obstacles, The problem is solved.

【問題を解決するための手段】図3は線路直下に角形鉄
道トンネルを建設した場合の断面図である。鉄道トンネ
ル構造物は,天井部分である上床版3,側壁4,4’と
下床版6に分解できる。この図で地下トンネルの建設は
地上部に線路1があるため開削出来ないが,側壁4,
4’は仮に連続地中壁で造るものとすれば,線路の側面
上方から打設することができる。次に,立坑13を掘削
しこの中で上床版を3’の位置に製作して,既に打設し
た側壁4,4’の頭部を加工して桁座5,5’を造り,
ジャッキその他の方法で上床版3’を水平に推進して桁
座5,5’上に上床版3の位置に据え付ける。トンネル
地山7は上床版3,側壁4,4’と3方向を囲まれてい
るから安全に掘削が可能となり,掘削後下床版6を打設
すればトンネル構造物が完成する。上床版3の推進方法
の詳細は実施例において説明する。
[Means for Solving the Problem] FIG. 3 is a cross-sectional view when a rectangular railway tunnel is constructed immediately below a track. The railway tunnel structure can be disassembled into an upper floor slab 3, side walls 4, 4'which are ceiling portions, and a lower floor slab 6. In this figure, the underground tunnel cannot be excavated due to the track 1 on the ground, but the side wall 4,
If 4'is made of a continuous underground wall, it can be placed from above the side surface of the track. Next, the vertical shaft 13 is excavated and the upper floor slab is manufactured at the 3'position in this, and the heads of the already placed side walls 4, 4'are processed to form the girders 5, 5 ',
The upper floor slab 3'is horizontally propelled by a jack or other method and installed at the position of the upper floor slab 3 on the girders 5, 5 '. Since the tunnel ground 7 is surrounded by the upper floor slab 3, the side walls 4, 4'in three directions, it is possible to safely excavate, and if the lower floor slab 6 is placed after the excavation, the tunnel structure is completed. Details of the method for propelling the upper floor slab 3 will be described in the examples.

【作 用】この発明は地山2に掘削による空隙を作ら
ず,地盤の沈下を完全に防止して,トンネルを掘削する
ところに特長がある。このため地上面の鉄道が営業して
いても支障なく工事を続行できるので,いままで全く不
可能と考えられていた土被りの少ない場所に線路の直下
で且つ線路と同方向にトンネルを建設することを実現し
た新工法である。
[Operation] The present invention is characterized in that it does not create a void in the ground 2 due to excavation, completely prevents subsidence of the ground, and excavates a tunnel. Therefore, even if the railway on the ground surface is open, it is possible to continue the construction without any problems. Therefore, a tunnel should be constructed in the same direction as the railway, just below the railway, in a place where there was little overburden, which was considered impossible until now. This is a new construction method that has achieved this.

【実施例】先ずこの工法に使用する箱形パイプについて
説明する。図4は箱形パイプの図で(a)図は縦断面,
(b)図は横断面である。箱形パイプ10の上面に全長
にわたってフリクションカット板11があり,この先端
部分12は箱形パイプ10に接着されている。また側面
には相互に接続できるようにジョイント10’,10”
がある。この接着部分12を切り離せば箱形パイプとフ
リクションカット板11は別々に移動することが出来
る。図5は建設する複線型鉄道トンネルの断面図であ
る。地上面に鉄道線路1があると考える。一般的に地表
面と地下構造物との間の地山2は,市街地に必要な埋設
物のために3m〜4mの空間を必要としている。次に図
5に示すように地下構造物は上床版3,側壁4,4’,
中間壁8,下床版6,トンネル内地山7,7’に分割で
きる。地上面に線路1があるため,これに支障しないよ
うに側壁4の外側に図6横断面図に示すように,先ず鋼
矢板その他の土留工9,9’を打設する。次に線路の両
側に作業用立坑13,13’を設け,線路に並行に打設
された土留工9,9’の頭部を連結して仮桁座14,1
4’を設ける。次にフリクションカット板11を装着し
た箱形パイプ10を仮桁座14,14’上面に接するよ
うに且つほぼトンネルに直角で,図7側面図のように相
接して並行に推進し,箱形パイプ数十本にまとめた作業
の容易な幅Lの箱形パイプ群を打設する。図8で示すよ
うに立坑13で箱形パイプ群の幅Lに合わせて同じ幅の
上床版3を製作し,上床版3の先端部の上面を箱形パイ
プ後端部の上面に合致させて当て,箱形パイプ10とフ
リクションカット板11との接着部12を切断し,フリ
クションカット板11を移動しないように地山2に固定
する。次に上床版3をジャッキその他の方法で矢印の方
向に圧出すれば,フリクションカット板11を残したま
ま箱形パイプ10は立坑13’に移動し,この方法を続
行すれば幅Lの箱形パイプ10群は立坑13’に圧出さ
れ上床版3は仮桁座14,14’上に箱形パイプ10と
置き換えられ,上床版3の推進は完了する。(図9)こ
の場合フリクションカット板11が残るために上部の地
山が移動しない。図9において上床版3と土留工9,
9’によってトンネル上部の荷重は支持されるから,土
留工9,9’に支保工を入れながらトンネル地山7,
7’を掘削し,側壁4,4’,中間壁8,下床版6を打
設すれば,延長Lのトンネル構造物が完成する。軟弱地
盤の場合には土留工9,9’を連続地中壁とすれば掘削
は容易となる。このように駅と駅の中間部のトンネル建
設では,土留工式で施工できるが,駅部のように通路,
ホーム等が線路に近接して築造されるものは,線路の両
側に所要の空間が必要である。図10は空間部を必要と
した駅部の施工を示す横断面図であり,図11は平面図
で,図12は側面図である。この図で説明する。上部の
鉄道線路1,地盤2等を支持するために先ず支持柱15
−1,15−2,15−3,15−4を地上から大口径
現場打ち杭その他の方法により打設し,トンネル掘削の
ため仮土留工22を両側に打設して立坑13,13’を
設け支持柱頭部に桁座16−1,16−2,16−3,
16−4を打設する。次に桁座16−1,16−2の間
に縦桁17−1を架設し,桁座16−3,16−4の間
には縦桁17−2を架設する。次に相い対する縦桁17
−1,17−2,の上面間に接するように,フリクショ
ンカット板11を装着した箱形パイプ群を図6,図7の
例にならって圧入し,次に立坑13内で製作した上床版
3’と置き換えることにより上床版3を架設し,トンネ
ル内の7,7’を支保工を施工しながら掘削し中間柱1
8,下床版6を打設して仮土留工を除去すれば延長Lの
トンネルが施工できる。この方法を繰り返して施工すれ
ば,所要延長のトンネルを建設できるのである。なお,
中間部の施工においても仮に駅間を2Kmとすると,全
区間を土留工方式とすれば工事上の損失が多い。延長が
長くなると土砂,材料の運搬等は距離に比例して費用が
かさむのであるから,中間に立坑を設けるのが得策であ
る。このために駅部方式の支持柱を使用すれば,所要の
位置にトンネル側面に出入口が出来るので,これを利用
して立坑を設けることが出来る。実施例においては複線
鉄道トンネルの建設を例にとって述べたが,鉄道の地下
化工事は線増工事の必要性が原因となっていることが多
い。図13は中間部における複々線工事の場合の断面図
である。土留工9,9’を長尺物とし,上下2層式のト
ンネルとすれば,4線分の建設が同時に出来る。図14
は駅部の施工例で支持柱15−1,15−3等を2層分
の長さで打設すれば同時に4線分のトンネル建設が出来
る。
EXAMPLE First, a box-shaped pipe used in this method will be described. Figure 4 shows a box-shaped pipe (a) is a vertical section,
(B) The figure is a cross section. A friction cut plate 11 is provided on the upper surface of the box-shaped pipe 10 over the entire length, and the tip portion 12 is bonded to the box-shaped pipe 10. In addition, joints 10 ', 10 "are provided on the sides so that they can be connected to each other.
There is. If this adhesive portion 12 is cut off, the box-shaped pipe and the friction cut plate 11 can be moved separately. FIG. 5 is a sectional view of the double-track railway tunnel to be constructed. Consider that there is a railroad track 1 on the ground surface. Generally, the ground 2 between the ground surface and the underground structure requires a space of 3 to 4 m for the buried object required in the urban area. Next, as shown in Fig. 5, the underground structure is the upper floor slab 3, the side walls 4, 4 ',
It can be divided into the intermediate wall 8, the lower floor slab 6, and the ground in the tunnel 7, 7 '. Since there is a line 1 on the ground surface, steel sheet piles and other earth retaining works 9 and 9'are first placed outside the side wall 4 so as not to interfere with this, as shown in the transverse sectional view of FIG. Next, work shafts 13 and 13 'are provided on both sides of the track, and the heads of earth retaining works 9 and 9'which are placed in parallel to the track are connected to connect the temporary girders 14 and 1'.
4'is provided. Next, the box-shaped pipe 10 equipped with the friction cut plate 11 is propelled in parallel with each other as shown in the side view of FIG. A group of box-shaped pipes having a width L, which is easy to work and is assembled into dozens of shaped pipes, is placed. As shown in FIG. 8, an upper floor slab 3 having the same width is manufactured in the vertical shaft 13 in accordance with the width L of the box-shaped pipe group, and the upper surface of the upper end of the upper floor slab 3 is matched with the upper surface of the rear end of the box-shaped pipe. The contact portion 12 between the box-shaped pipe 10 and the friction cut plate 11 is cut, and the friction cut plate 11 is fixed to the natural ground 2 so as not to move. Next, if the upper floor slab 3 is pressed out in the direction of the arrow by a jack or some other method, the box-shaped pipe 10 moves to the vertical shaft 13 'with the friction cut plate 11 left, and if this method is continued, a box of width L The group of shaped pipes 10 is squeezed out into the vertical shaft 13 ', the upper floor slab 3 is replaced with the box-shaped pipes 10 on the temporary girder seats 14 and 14', and the propulsion of the upper floor slab 3 is completed. (FIG. 9) In this case, since the friction cut plate 11 remains, the upper ground does not move. In FIG. 9, the floor slab 3 and the earth retaining work 9,
The load on the top of the tunnel is supported by 9 '.
7'is excavated, and the side walls 4, 4 ', the intermediate wall 8 and the lower floor slab 6 are placed, whereby the tunnel structure of extension L is completed. For soft ground, excavation will be easier if earth retaining works 9, 9'are used as continuous underground walls. In this way, when constructing a tunnel between a station and an intermediate part of the station, it can be constructed by the earth retaining method.
If the platform, etc. is built close to the track, a required space is required on both sides of the track. FIG. 10 is a cross-sectional view showing construction of a station portion that requires a space portion, FIG. 11 is a plan view, and FIG. 12 is a side view. This figure will be described. First of all, in order to support the upper railroad track 1, the ground 2, etc.
-1, 15-2, 15-3, 15-4 are laid from the ground by large-diameter cast-in-place piles or other methods, and temporary earth retaining works 22 are laid on both sides for tunnel excavation. Girders 16-1, 16-2, 16-3,
Place 16-4. Next, a vertical girder 17-1 is installed between the girders 16-1 and 16-2, and a vertical girder 17-2 is installed between the girders 16-3 and 16-4. Next vertical column 17
-1, 17-2, so as to be in contact with the upper surface of the friction cut plate 11, the box-shaped pipe group is press-fitted according to the example of FIGS. By replacing it with 3 ', the upper floor slab 3 is erected and 7,7' in the tunnel is excavated while constructing the support work and the intermediate pillar 1
8. If the lower floor slab 6 is placed and the temporary earth retaining work is removed, an extension L tunnel can be constructed. By repeating this method, a tunnel with the required extension can be constructed. In addition,
Even if the distance between stations is set to 2 km even in the construction of the middle part, there will be a lot of construction loss if the whole area is constructed by the earth retaining method. If the extension is long, transportation of earth and sand and materials will be costly in proportion to the distance, so it is advisable to install a shaft in the middle. For this reason, if a station-type support pillar is used, an entrance can be created on the side of the tunnel at the required position, and a vertical shaft can be installed by using this. Although the construction of the double-track railway tunnel has been described as an example in the embodiments, the underground construction of the railroad is often caused by the necessity of additional line construction. FIG. 13 is a sectional view in the case of double-track construction in the middle part. If the earth retaining works 9 and 9'are made long and a two-layer tunnel is constructed, four lines can be constructed at the same time. 14
In the construction example of the station section, if the supporting pillars 15-1, 15-3, etc. are driven in a length of two layers, a tunnel for four lines can be constructed at the same time.

【発明の効果】本発明は営業中の鉄道線路の直下にトン
ネルを掘削して,鉄道を移転するという不可能と思われ
ていた建設工事を実現した新工法である。この特長の主
なものを挙げれば,在来使用している鉄道の用地を全部
を利用できるため,新規に用地取得の必要がない。非開
削工法で用いられているシールド工法では,セグメント
の外側に生ずる空隙をモルタル注入で防止しているが,
軟弱地盤の場合にはモルタル注入前に既に沈下して上層
地盤に亀裂を生ずることが多い。本工法は上床版と箱形
パイプとの置き換えであるため空隙は生じない。普通ト
ンネル掘削においてはアーチの巻立ての頂部のコンクリ
ート打設が最も弱点である。地山に空隙を残す心配とコ
ンクリートの品質に問題が残る。本工法では明り部即ち
トンネル外で十分な注意の上製作した上床版を置き換え
によりトンネル上床版とするので,品質は良好で安全性
が高い。駅部においても支持柱を利用することで自由な
計画が出来る上,上下2層式に施工するならば,最も望
まれている線路増設工事も同時施工という特長がある。
又,地上の鉄道の地下埋設は鉄道の騒音除去,踏切廃止
による事故防止,鉄道用地の道路への転換による交通上
の利益が大きく,且つ土被りが少ないために工事費が他
の工法に比較して低廉となる。これらを考慮すれば本発
明の社会に与える貢献は大きい。
Industrial Applicability The present invention is a new construction method that realizes a construction work which is considered impossible by excavating a tunnel just below a railroad track which is in operation and relocating the railroad. The main features of this feature are that it is possible to use all the existing railway land, so there is no need to acquire new land. In the shield method used in the non-cutting method, mortar injection is used to prevent voids generated outside the segment.
In the case of soft ground, it often subsides before the injection of mortar and cracks occur in the upper ground. Since this method replaces the upper floor slab and the box-shaped pipe, no void is created. In ordinary tunnel excavation, concrete placement at the top of the arch winding is the weakest point. There is a concern about leaving voids in the ground and problems with the quality of concrete. In this method, the tunnel floor slab is replaced by the floor slab that was manufactured with great care outside the light, that is, outside the tunnel, so the quality is good and the safety is high. Even in the station area, support pillars can be used for flexible planning, and if two-layer construction is used, the most desirable feature is the additional construction of tracks at the same time.
In addition, underground burial of railways on the ground has a large traffic benefit by removing noise from the railways, preventing accidents due to abolition of railroad crossings, and converting railway land to roads, and construction costs are low compared to other construction methods. It becomes cheaper. Considering these, the contribution of the present invention to society is great.

【図面の簡単な説明】[Brief description of drawings]

【図1】シールド工法による地下鉄道断面図[Fig. 1] Cross section of subway line by shield method

【図2】開削工法による施工断面図[Fig. 2] Construction cross-section by the open-cut method

【図3】角形トンネル構造物の断面図FIG. 3 is a sectional view of a rectangular tunnel structure.

【図4】(a)箱形パイプ縦断面図FIG. 4 (a) Vertical sectional view of box-shaped pipe

【図4】(b)箱形パイプ横断面図FIG. 4 (b) Box-shaped pipe cross-sectional view

【図5】複線型鉄道トンネル断面図[Fig. 5] Cross section of double-track railway tunnel

【図6】土留工,箱形パイプ打設横断面図[Fig. 6] Cross section of earth retaining work and box pipe placement

【図7】土留工,箱形パイプ打設側面図[Fig.7] Side view of earth retaining work and box-shaped pipe placement

【図8】箱形パイプと上床版の置き換え方法図[Fig. 8] Diagram of replacement method for box-shaped pipe and upper deck

【図9】中間部地下鉄道トンネル打設完了図[Figure 9] Completion drawing of the construction of the intermediate subway tunnel

【図10】駅部施工方法横断面図[Figure 10] Cross-section of the construction method for the station

【図11】駅部施工方法平面図[Figure 11] Plan view of the construction method for the station

【図12】駅部施工方法側面図[Fig. 12] Side view of construction method for station

【図13】中間部複々線工事断面図[Fig. 13] Cross section of double-track construction in the middle section

【図14】駅部複々線工事断面図[Figure 14] Station section double track construction cross section

【符号の説明】[Explanation of symbols]

A ………‥ 鉄道線路 B ………‥ 地山 C ………‥ シールドによるトンネル D ………‥ 土被り E ………‥ 土留工 F ………‥ 工事桁 H ………‥ 埋設土 1 ………‥ 鉄道線路 2 ………‥
地山 3 3′………‥ 上床版 4,4′……
…‥ 側壁 5,5′ ……… 桁座 6 ……
…‥ 下床版 7 ………‥ トンネル内地山 8 ………‥
中間壁 9,9′ ……… 土留工 10 ……
…‥ 箱形パイプ 10′,10″…… 箱形パイプ側面ジョイント 11 ………‥ フリクションカット板 12 ………‥ フリクションカット板と箱形パイプ
接着部 13,13′………‥ 立坑 14,14′……… 仮桁座 15−1,1
5−2 … 支持柱 15−3,15−4 … 支持柱 16−1,16−2 … 支持柱,桁座 16−3,16−4 … 支持柱,桁座 17−1,1
7−2 … 縦桁 18 ………‥ 中央柱 19 ………
‥ 乗降場 20 ………‥ 移転線路 21 ………
‥ 増設線路 L ………‥ 1回の施工延長 22 …‥…
‥ 仮土留工
A …………… Railroad track B …………… Ground C …………… Shield tunnel D …………… Overburden E …………… Soil retaining work F …………… Construction girder H …………… Buried soil 1 ……………… Railroad track 2 ……………
Chisan 3 3 '……………… Upper floor version 4, 4' ……
… Side wall 5, 5 '……… Girder 6 ……
………… Understory version 7 ……………… Ground inside the tunnel 8 ………………
Middle wall 9,9 '………… Earth retaining work 10 ……
Box pipe 10 ', 10 "... Box pipe side joint 11 ... Friction cut plate 12 ......... Friction cut plate and box pipe joint 13, 13' ... Vertical shaft 14, 14 '......... Temporary Girder 15-1,1
5-2 ... Support pillar 15-3, 15-4 ... Support pillar 16-1, 16-2 ... Support pillar, girder seat 16-3, 16-4 ... Support pillar, girder seat 17-1, 1
7-2… Vertical girder 18 ………… Center pillar 19 ………
・ ・ ・ Boarding area 20 ………… Transfer line 21 ………
・ ・ ・ Extension track L ……………… 1 extension of construction 22 ………
・ ・ ・ Temporary earth retaining work

─────────────────────────────────────────────────────
─────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平成6年1月10日[Submission date] January 10, 1994

【手続補正1】[Procedure Amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】図面の簡単な説明[Name of item to be corrected] Brief description of the drawing

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【図面の簡単な説明】[Brief description of drawings]

【図1】シールド工法による地下鉄道断面図[Fig. 1] Cross section of subway line by shield method

【図2】開削工法による施工断面図[Fig. 2] Construction cross-section by the open-cut method

【図3】角形トンネル構造物の断面図FIG. 3 is a sectional view of a rectangular tunnel structure.

【図4】(a)箱形パイプ縦断面図 (b)箱形パイプ横断面図[FIG. 4] (a) Vertical sectional view of box-shaped pipe (b) Horizontal sectional view of box-shaped pipe

【図5】複線型鉄道トンネル断面図[Fig. 5] Cross section of double-track railway tunnel

【図6】土留工,箱形パイプ打設横断面図[Fig. 6] Cross section of earth retaining work and box pipe placement

【図7】土留工,箱形パイプ打設側面図[Fig.7] Side view of earth retaining work and box-shaped pipe placement

【図8】箱形パイプと上床版の置き換え方法図[Fig. 8] Diagram of replacement method for box-shaped pipe and upper deck

【図9】中間部地下鉄道トンネル打設完了図[Figure 9] Completion drawing of the construction of the intermediate subway tunnel

【図10】駅部施工方法横断面図[Figure 10] Cross-section of the construction method for the station

【図11】駅部施工方法平面図[Figure 11] Plan view of the construction method for the station

【図12】駅部施工方法側面図[Fig. 12] Side view of construction method for station

【図13】中間部複々線工事断面図[Fig. 13] Cross section of double-track construction in the middle section

【図14】駅部複々線工事断面図[Figure 14] Station section double track construction cross section

【手続補正書】[Procedure amendment]

【提出日】平成6年5月18日[Submission date] May 18, 1994

【手続補正1】[Procedure Amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】発明の詳細な説明[Name of item to be amended] Detailed explanation of the invention

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【発明の詳細な説明】 Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】大都市の交通は混雑が甚だしく,
通勤するサラリーマンには地獄の苦しみである。この混
雑から人々を解放するには,鉄道の増設,道路の新設お
よび踏切道の立体交差新設等が必要である。しかし,こ
の鉄道の増設・新設等には新たに必要となる線路敷の確
保等が,日本のような狭い国土では取得に困難があり,
遅々として工事が進行しないのが現状である。本発明は
この困難な線路敷地の取得を少なくし,営業しながら在
来の鉄道線路の直下にトンネルを建設し,線増線も同時
に建設するという新しいトンネル工法である。
[Industrial application] Traffic in large cities is extremely crowded,
Hell suffers for office workers who commute. To relieve people from this congestion, it is necessary to add railroads, construct new roads, and construct new grade separation at level crossings. However, it is difficult to obtain the track layout, which is newly necessary for the expansion / construction of this railway, in a small land like Japan,
The current situation is that construction work will not proceed late. The present invention is a new tunnel construction method that reduces the acquisition of this difficult track site, constructs a tunnel directly under a conventional railroad track while operating, and constructs an additional line at the same time.

【0002】[0002]

【従来の技術】営業している線路の直下に新しいトンネ
ルを建設する工事は今日までいろいろと実施されてい
る。その1つはシールド工法によるトンネルである。図
1はこの横断面を示している。地上に線路Aがあり地
Bの中にシールド工法によりトンネルCを建設した断面
図である。この工法の欠点は地表面の沈下を防止するた
めに土被りDは一般には10m〜30m位必要であって
駅部の工事費が莫大となる欠点がある。また,このほか
に開削工法がある。図2は開削工法における施工断面図
である。線路Aに支障しないように土留工Eを両側に打
設し,工事桁Fを架設して線路を支持する。次に線路A
の下面を掘削し,地下鉄躯体Gを打設し,埋設土Hを投
入して工事桁Fを撤去する。この工法の欠点は鉄道線路
の沈下を防止できないことである。
2. Description of the Related Art Construction work for constructing a new tunnel directly under an operating track has been carried out variously to date. One of them is a tunnel by the shield method. FIG. 1 shows this cross section. Is a sectional view of the construction of the tunnel C by shield method in line A is land mountain B on the ground. The disadvantage of this construction method is that the overburden D is generally required to be about 10 to 30 m in order to prevent the subsidence of the ground surface, and the construction cost of the station portion is enormous. In addition, there is an excavation method. FIG. 2 is a construction sectional view in the excavation method. Soil retaining works E are placed on both sides so as not to interfere with the track A, and construction girders F are installed to support the track. Next is track A
Excavate the bottom surface of the subway, place the subway frame G, put in the buried soil H, and remove the construction girder F. The drawback of this method is that it cannot prevent the subsidence of railway tracks.

【0003】[0003]

【発明が解決しようとする課題】線路の直下に開削工法
でトンネルを建設する場合には,工事桁方式をとらず先
ず線路を移転して更地とし,開削方式で地下構造物を築
造するという方法を取るか,または鉄道の営業を休止し
てから開削するというのが一般的工法である。この工法
では,一時的でも交通難を増加させるか,または新しい
線路敷地を必要とする等の欠点があるので,鉄道線路に
は全く支障することなく,直下にトンネルを建設出来る
工法があればこの問題は解決する。
[Problems to be Solved by the Invention] When constructing a tunnel directly below a railway line by an excavation method, the construction girder method is not taken first, the railway line is first moved to a vacant lot, and an underground structure is constructed by the excavation method. The general method is to take the method or stop the railroad business before digging. This method has drawbacks such as increasing traffic difficulty even temporarily or requiring a new track site, so if there is a method that can build a tunnel directly under the railroad track without any obstacles, The problem is solved.

【0004】[0004]

【問題を解決するための手段】図3は線路直下に角形鉄
道トンネルを建設した場合の断面図である。鉄道トンネ
ル構造物は,天井部分である上床版3,側壁4,4’と
下床版6に分解できる。この図で地下トンネルの建設は
地上部に線路1があるため開削出来ないが,側壁4,
4’は仮に連続地中壁で造るものとすれば,線路の側面
上方から打設することができる。次に,立坑13を掘削
しこの中で上床版を3’の位置に製作して,既に打設し
た側壁4,4’の頭部を加工して桁座5,5’を造り,
ジャッキその他の方法で上床版3’を水平に推進して桁
座5,5’上に上床版3の位置に据え付ける。トンネル
地山7は上床版3,側壁4,4’と3方向を囲まれてい
るから安全に掘削が可能となり,掘削後下床版6を打設
すればトンネル構造物が完成する。上床版3の推進方法
の詳細は実施例において説明する。
[Means for Solving the Problem] FIG. 3 is a cross-sectional view when a rectangular railway tunnel is constructed immediately below a track. The railway tunnel structure can be disassembled into an upper floor slab 3, side walls 4, 4'which are ceiling portions, and a lower floor slab 6. In this figure, the underground tunnel cannot be excavated due to the track 1 on the ground, but the side wall 4,
If 4'is made of a continuous underground wall, it can be placed from above the side surface of the track. Next, the vertical shaft 13 is excavated and the upper floor slab is manufactured at the 3'position in this, and the heads of the already placed side walls 4, 4'are processed to form the girders 5, 5 ',
The upper floor slab 3'is horizontally propelled by a jack or other method and installed at the position of the upper floor slab 3 on the girders 5, 5 '. Since the tunnel ground 7 is surrounded by the upper floor slab 3, the side walls 4, 4'in three directions, it is possible to safely excavate, and if the lower floor slab 6 is placed after the excavation, the tunnel structure is completed. Details of the method for propelling the upper floor slab 3 will be described in the examples.

【0005】[0005]

【作 用】この発明は地山2に掘削による空隙を作ら
ず,地盤の沈下を完全に防止して,トンネルを掘削す
るところに特長がある。このため地上面の鉄道が営業し
ていても支障なく工事を続行できるので,いままで全く
不可能と考えられていた土被りの少ない場所に線路の直
下で且つ線路と同方向にトンネルを建設することを実現
した新工法である。
[Operation] This invention is characterized by excavating the inside of the tunnel by completely preventing subsidence of the ground without forming a void in the ground 2 due to excavation. Therefore, even if the railway on the ground surface is open, it is possible to continue the construction without any problems. Therefore, a tunnel should be constructed in the same direction as the railway, just below the railway, in a place where there was little overburden, which was considered impossible until now. This is a new construction method that has achieved this.

【0006】[0006]

【実施例】先ずこの工法に使用する箱形パイプについて
説明する。図4は箱形パイプの図で(a)図は縦断面,
(b)図は横断面である。箱形パイプ10の上面に全長
にわたってフリクションカット板11があり,この先端
部分12は箱形パイプ10に接着されている。また側面
には相互に接続できるようにジョイント10’,10”
がある。この接着部分12を切り離せば箱形パイプとフ
リクションカット板11は別々に移動するこが出来る。
図5は建設する複線型鉄道トンネルの断面図である。地
上面に鉄道線路1があると考える。一般的に地表面と地
下構造物との間の地山2は,市街地に必要な埋設物のた
めに3m〜4mの空間を必要としている。次に図5に示
すように地下構造物は上床版3,側壁4,4’,中間壁
8,下床版6,トンネル内地山7,7’に分割できる。
地上面に線路1があるため,これに支障しないように側
壁4の外側に図6横断面図に示すように,先ず鋼矢板そ
の他の土留工9,9’を打設する。次に線路の両側に作
業用立坑13,13’を設け,線路に並行に打設された
土留工9,9’の頭部を連結して仮桁座14,14’を
設ける。次にフリクションカット板11を装着した箱形
パイプ10を仮桁座14,14’上面に接するように且
つほぼトンネルに直角で,図7側面図のように相接して
並行に推進し,箱形パイプ数十本にまとめた作業の容易
な幅Lの箱形パイプ群を打設する。
EXAMPLE First, a box-shaped pipe used in this method will be described. Figure 4 shows a box-shaped pipe (a) is a vertical section,
(B) The figure is a cross section. A friction cut plate 11 is provided on the upper surface of the box-shaped pipe 10 over the entire length, and the tip portion 12 is bonded to the box-shaped pipe 10. In addition, joints 10 ', 10 "are provided on the sides so that they can be connected to each other.
There is. The box-shaped pipe and the friction cut plate 11 can be moved separately by separating the adhesive portion 12.
FIG. 5 is a sectional view of the double-track railway tunnel to be constructed. Consider that there is a railroad track 1 on the ground surface. Generally, the ground 2 between the ground surface and the underground structure requires a space of 3 to 4 m for the buried object required in the urban area. Next, as shown in Fig. 5, the underground structure can be divided into an upper floor slab 3, side walls 4, 4 ', an intermediate wall 8, a lower floor slab 6, and a tunnel inner ground 7, 7'.
Since there is a line 1 on the ground surface, steel sheet piles and other earth retaining works 9 and 9'are first placed outside the side wall 4 so as not to interfere with this, as shown in the transverse sectional view of FIG. Next, working shafts 13 and 13 'are provided on both sides of the track, and heads of earth retaining works 9 and 9'which are cast in parallel to the track are connected to provide temporary girders 14 and 14'. Next, the box-shaped pipe 10 equipped with the friction cut plate 11 is propelled in parallel with each other as shown in the side view of FIG. A group of box-shaped pipes having a width L, which are easy to work and are assembled into several dozen shaped pipes, are placed.

【0007】 図8で示すように立坑13で箱形パイプ群
の幅Lに合わせて同じ幅の上床版3を製作し,上床版3
の先端部の上面を箱形パイプ後端部の上面に合致させて
当て,箱形パイプ10とフリクションカット板11との
接着部12を切断し,フリクションカット板11を移動
しないように地山2に固定する。次に上床版3をジャッ
キその他の方法で矢印の方向に圧出すれば,フリクショ
ンカット板11を残したまま箱形パイプ10は立坑1
3’に移動し,この方法を続行すれば幅Lの箱形パイプ
10群は立坑13’に圧出され上床版3は仮桁座14,
14’上に箱形パイプ10と置き換えられ,上床版3の
推進は完了する。(図9)この場合フリクションカット
板11が残るために上部の地山が移動しない。
As shown in FIG . 8, an upper floor slab 3 having the same width is manufactured in the vertical shaft 13 in accordance with the width L of the box-shaped pipe group.
The upper surface of the tip end of the box-shaped pipe is brought into contact with the upper surface of the rear end of the box-shaped pipe, and the adhesive portion 12 between the box-shaped pipe 10 and the friction cut plate 11 is cut to prevent the friction cut plate 11 from moving. Fixed to. Next, if the upper floor slab 3 is pressed out in the direction of the arrow by using a jack or some other method, the box-shaped pipe 10 is left in the vertical shaft 1 with the friction cut plate 11 left.
Moving to 3'and continuing this method, the group of box-shaped pipes 10 having a width L is squeezed out to the shaft 13 ', and the upper deck 3 is fixed to the temporary girder 14,
14 'is replaced by the box-shaped pipe 10, and the propulsion of the upper deck 3 is completed. (FIG. 9) In this case, since the friction cut plate 11 remains, the upper ground does not move.

【0008】 図9において上床版3と土留工9,9’に
よってトンネル上部の荷重は支持されるから,土留工
9,9’に支保工を入れながらトンネル地山7,7’
を掘削し,側壁4,4’,中間壁8,下床版6を打設す
れば,延長Lのトンネル構造物が完成する。軟弱地盤の
場合には土留工9,9’を連続地中壁とすれば掘削は容
易となる。このように駅と駅の中間部のトンネル建設で
は,土留工式で施工できるが,駅部のように通路,ホー
ム等が線路に近接して築造されるものは,線路の両側に
所要の空間が必要である。
[0008] 'Because the load of the tunnel top by being supported, earth retaining Engineering 9,9' top floor plate 3 and the earth retaining Engineering 9,9 9 within the tunnel while putting支保Engineering in natural ground 7, 7 '
By excavating, and placing the side walls 4, 4 ', the intermediate wall 8 and the lower floor slab 6, the tunnel structure of extension L is completed. For soft ground, excavation will be easier if earth retaining works 9, 9'are used as continuous underground walls. In this way, when constructing a tunnel between a station and a station, the earth retaining method can be used. However, if the passage, platform, etc. are built close to the railway like the station, the space required on both sides of the railway is required. is necessary.

【0009】 図10は空間部を必要とした駅部の施工を
示す横断面図であり,図11は平面図で,図12は側面
図である。この図で説明する。上部の鉄道線路1,地
2等を支持するために先ず支持柱15−1,15−2,
15−3,15−4を地上から大口径現場打ち杭その他
の方法により打設し,トンネル掘削のため仮土留工22
を両側に打設して立坑13,13’を設け支持柱頭部に
桁座16−1,16−2,16−3,16−4を打設す
る。次に桁座16−1,16−2の間に縦桁17−1を
架設し,桁座16−3,16−4の間には縦桁17−2
を架設する。次に相い対する縦桁17−1,17−2,
の上面間に接するように,フリクションカット板11を
装着した箱形パイプ群を図6,図7の例にならって圧入
し,次に立坑13内で製作した上床版3’と置き換える
ことにより上床版3を架設し,トンネル内の7,7’を
支保工を施工しながら掘削し中間柱18,下床版6を打
設して仮土留工を除去すれば延長Lのトンネルが施工で
きる。この方法を繰り返して施工すれば,所要延長のト
ンネルを建設できるのである。
FIG . 10 is a cross-sectional view showing construction of a station portion that requires a space portion, FIG. 11 is a plan view, and FIG. 12 is a side view. This figure will be described. Railway line 1 of the upper, first support columns 15-1 and 15-2 in order to support the land mountain 2, and the like,
15-3 and 15-4 were laid from the ground using large-diameter cast-in-place piles or other methods, and temporary earth retaining work for tunnel excavation 22
Are installed on both sides to provide vertical shafts 13 and 13 ', and girder seats 16-1, 16-2, 16-3 and 16-4 are installed on the supporting column heads. Next, a vertical girder 17-1 is installed between the girders 16-1 and 16-2, and a vertical girder 17-2 is installed between the girders 16-3 and 16-4.
Erection. Next, the vertical columns 17-1, 17-2,
The box-shaped pipes fitted with friction cut plates 11 are press-fitted according to the examples of FIGS. 6 and 7 so as to be in contact with the upper surfaces of the upper floors, and then replaced with the upper floor slab 3 ′ manufactured in the vertical shaft 13 A tunnel of extension L can be constructed by erection of the slab 3, excavating 7, 7'in the tunnel while supporting construction, placing the intermediate pillar 18, the lower floor slab 6 and removing the temporary earth retaining work. By repeating this method, a tunnel with the required extension can be constructed.

【0010】 なお,中間部の施工においても仮に駅間を
2Kmとすると,全区間を土留工方式とすれば工事上の
損失が多い。延長が長くなると土砂,材料の運搬等は距
離に比例して費用がかさむのであるから,中間に立坑を
設けるのが得策である。このために駅部方式の支持柱を
使用すれば,所要の位置にトンネル側面に出入口が出来
るので,これを利用して立坑を設けることが出来る。実
施例においては複線鉄道トンネルの建設を例にとって述
べたが,鉄道の地下化工事は線増工事の必要性が原因と
なっていることが多い。図13は中間部における複々線
工事の場合の断面図である。土留工9,9’を長尺物と
し,上下2層式のトンネルとすれば,4線分の建設が同
時に出来る。図14は駅部の施工例で支持柱15−1,
15−3等を2層分の長さで打設すれば同時に4線分の
トンネル建設が出来る。
[0010] It should be noted, and even if the 2Km between stations in the construction of the intermediate portion, a large loss on the construction work if the entire interval and earth retaining application method. If the extension is long, transportation of earth and sand and materials will be costly in proportion to the distance, so it is advisable to install a shaft in the middle. For this reason, if a station-type support pillar is used, an entrance can be created on the side of the tunnel at the required position, and a vertical shaft can be installed by using this. Although the construction of the double-track railway tunnel has been described as an example in the embodiments, the underground construction of the railroad is often caused by the necessity of additional line construction. FIG. 13 is a sectional view in the case of double-track construction in the middle part. If the earth retaining works 9 and 9'are made long and a two-layer tunnel is constructed, four lines can be constructed at the same time. FIG. 14 shows an example of construction of a station section, supporting pillars 15-1,
If 15-3 etc. are cast in a length of two layers, a tunnel for four lines can be constructed at the same time.

【0011】[0011]

【発明の効果】本発明は営業中の鉄道線路の直下にトン
ネルを掘削して,鉄道を移転するという不可能と思われ
ていた建設工事を実現した新工法である。この特長の主
なものを挙げれば,在来使用している鉄道の用地を全部
を利用できるため,新規に用地取得の必要がない。非開
削工法で用いられているシールド工法では,セグメント
の外側に生ずる空隙をモルタル注入で防止しているが,
軟弱地盤の場合にはモルタル注入前に既に沈下して上層
地盤に亀裂を生ずることが多い。本工法は上床版と箱形
パイプとの置き換えであるため空隙は生じない。普通ト
ンネル掘削においてはアーチの巻立ての頂部のコンクリ
ート打設が最も弱点である。地山に空隙を残す心配とコ
ンクリートの品質に問題が残る。本工法では明り部即ち
トンネル外で十分な注意の上製作した上床版を置き換え
によりトンネル上床版とするので,品質は良好で安全性
が高い。駅部においても支持柱を利用することで自由な
計画が出来る上,上下2層式に施工するならば,最も望
まれている線路増設工事も同時施工という特長がある。
又,地上の鉄道の地下埋設は鉄道の騒音除去,踏切廃止
による事故防止,鉄道用地の道路への転換による交通上
の利益が大きく,且つ土被りが少ないために工事費が他
の工法に比較して低廉となる。これらを考慮すれば本発
明の社会に与える貢献は大きい。
Industrial Applicability The present invention is a new construction method that realizes a construction work which is considered impossible by excavating a tunnel just below a railroad track which is in operation and relocating the railroad. The main features of this feature are that it is possible to use all the existing railway land, so there is no need to acquire new land. In the shield method used in the non-cutting method, mortar injection is used to prevent voids generated outside the segment.
In the case of soft ground, it often subsides before the injection of mortar and cracks occur in the upper ground. Since this method replaces the upper floor slab and the box-shaped pipe, no void is created. In ordinary tunnel excavation, concrete placement at the top of the arch winding is the weakest point. There is a concern about leaving voids in the ground and problems with the quality of concrete. In this method, the tunnel floor slab is replaced by the floor slab that was manufactured with great care outside the light, that is, outside the tunnel, so the quality is good and the safety is high. Even in the station area, support pillars can be used for flexible planning, and if two-layer construction is used, the most desirable feature is the additional construction of tracks at the same time.
In addition, underground burial of railways on the ground has a large traffic benefit by removing noise from the railways, preventing accidents due to abolition of railroad crossings, and converting railway land to roads, and construction costs are low compared to other construction methods. It becomes cheaper. Considering these, the contribution of the present invention to society is great.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】トンネルの両側面に土留工を打設し,この
土留工上方部を使用して仮桁座を築造し,相対する仮桁
座の上面に全長にわたってフリクションカット材を配置
した箱形パイプをトンネルにほぼ直角で,且つ並行状態
に圧入打設し,立坑内で製作した上床版の先端部上面を
箱形パイプ後端部上面に合致させて,フリクションカッ
ト材を残置したままジャッキその他で上床版を推進し,
箱形パイプ群と上床版とを置き換え,上床版と土留工に
よって囲まれたトンネル内の地山を掘削し,側壁・中間
壁・下床版等を打設して,トンネルを形成するトンネル
築造方法
1. A box in which earth retaining works are placed on both sides of a tunnel, a temporary girder seat is constructed using the upper portion of the earth retaining work, and friction cut materials are arranged over the entire length on the upper surface of the opposing temporary girder seat. Shaped pipes are press-fitted into the tunnel at a substantially right angle and in parallel, and the upper surface of the upper deck produced in the vertical shaft is aligned with the upper surface of the rear end of the box-shaped pipe, and the friction cut material is left in the jack. In addition, promote the upper deck,
Replace the box-shaped pipe group with the upper deck, excavate the ground in the tunnel surrounded by the upper deck and earth retaining works, and place sidewalls, intermediate walls, lower deck, etc. to build a tunnel. Method
【請求項2】トンネルの両側面に支持柱を所要の間隔に
打設し,掘削に必要な仮土留工も同時に打設し,支持柱
の頭部に桁座を築造し,桁座間に縦桁を架設して,相対
する縦桁上面に全長にわたってフリクションカット材を
配置した箱形パイプをトンネルにほぼ直角で且つ並行状
態に圧入打設し,立坑内で製作した上床版の先端部上面
を箱形パイプ後端部上面に合致させて,フリクションカ
ット材を残置したままジャッキその他で上床版を推進
し,箱形パイプ群と上床版とを置き換え,上床版と支持
柱および仮土留工によって囲まれたトンネル内の地山を
掘削し,側壁・中間柱・下床版等を打設してトンネルを
形成するトンネル築造方法
2. Support pillars are placed on both sides of the tunnel at required intervals, temporary earth retaining work required for excavation is also installed at the same time, and a girder seat is built on the head of the support pillar, and vertical girders are installed between the girder seats. A box-shaped pipe, in which a girder was erected and friction cut material was placed over the entire length of the opposing vertical girders, was press-fitted into the tunnel at a substantially right angle and in parallel, and the upper surface of the tip of the upper deck produced in the vertical shaft was Match the upper surface of the rear end of the box-shaped pipe and propel the upper deck with a jack or the like while leaving the friction cut material, replace the box-shaped pipe group with the upper deck, and enclose the upper deck with supporting columns and temporary earth retaining works. Tunnel excavation method in which the ground is excavated and the side walls, intermediate columns, and lower deck slabs are placed to form the tunnel.
JP13638093A 1993-04-30 1993-04-30 Tunnel construction method Expired - Fee Related JP3146333B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13638093A JP3146333B2 (en) 1993-04-30 1993-04-30 Tunnel construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13638093A JP3146333B2 (en) 1993-04-30 1993-04-30 Tunnel construction method

Publications (2)

Publication Number Publication Date
JPH06317095A true JPH06317095A (en) 1994-11-15
JP3146333B2 JP3146333B2 (en) 2001-03-12

Family

ID=15173805

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13638093A Expired - Fee Related JP3146333B2 (en) 1993-04-30 1993-04-30 Tunnel construction method

Country Status (1)

Country Link
JP (1) JP3146333B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107542477A (en) * 2017-08-16 2018-01-05 中铁隧道勘测设计院有限公司 A kind of subway distribution of the threaded list road of single hole shield space four combination
RU2717324C1 (en) * 2019-07-29 2020-03-20 Открытое акционерное общество "Научно-исследовательский, проектно-изыскательский институт "Ленметрогипротранс" Upper transverse abutment of approach tunnel to operating metro station, constructed without interruption of operation of station with middle and side tunnels
RU2745310C1 (en) * 2020-08-31 2021-03-23 Открытое акционерное общество "Научно-исследовательский, проектно-изыскательский институт "Ленметрогипротранс" Method for creating upper cross-cut abutting joint of approach tunnel to existing metropolitan pilot station constructed without interruption of station operation

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107542477A (en) * 2017-08-16 2018-01-05 中铁隧道勘测设计院有限公司 A kind of subway distribution of the threaded list road of single hole shield space four combination
RU2717324C1 (en) * 2019-07-29 2020-03-20 Открытое акционерное общество "Научно-исследовательский, проектно-изыскательский институт "Ленметрогипротранс" Upper transverse abutment of approach tunnel to operating metro station, constructed without interruption of operation of station with middle and side tunnels
RU2745310C1 (en) * 2020-08-31 2021-03-23 Открытое акционерное общество "Научно-исследовательский, проектно-изыскательский институт "Ленметрогипротранс" Method for creating upper cross-cut abutting joint of approach tunnel to existing metropolitan pilot station constructed without interruption of station operation

Also Published As

Publication number Publication date
JP3146333B2 (en) 2001-03-12

Similar Documents

Publication Publication Date Title
CN103874803B (en) For the method for construction structure, especially build the method for railway in operation or similar item lower channel
JP2006322222A (en) Construction method of large-sectional tunnel
Musso Jacked pipe provides roof for underground construction in busy urban area
CN109555535B (en) Lower-way truss type prestressed pipe curtain structure and construction method
JP4406577B2 (en) Digging road
CN108978673A (en) A kind of foundation pit supporting construction and construction method of viaduct pile foundation underpinning
KR100784201B1 (en) Method for construction of tunnel
JPH06317095A (en) Tunnel constructing method
JP4243418B2 (en) Invert segment for tunnel and shield tunnel lining structure using the segment
KR101234091B1 (en) Method of underground railway crossing over direct installation of precast concrete slab
KR20040098322A (en) None open cut tunnelling of arch type with hume pipe and con'c rib
JP5073960B2 (en) Construction method of underground structure and underground structure
JP2860752B2 (en) Construction method of underpass formation structure and underpass introduction section
KR100443819B1 (en) Underway Tunneling Methods of arch typed Triangle Elementary pipe-roof
JP5167578B2 (en) Construction method for underground structures
CN219909058U (en) Separated island type subway station structure
JPH07197772A (en) Construction method for underground passage introduction section
US468282A (en) Street-railway tunnel and method of constructing the same
CN207295771U (en) One kind is used for the protection of foundation pit pipe trench and temporary road dredges formal similarity
CN117823181A (en) Door-type foundation D-shaped convenient beam overhead system and construction method
AU2004235614A1 (en) Railway tunnel construction method
SUBWAYS Orleans Railway Tunnel in Paris—This extension of the Or
JP2004027798A (en) Method for constructing continuous grade separation
JPH1122366A (en) Building method for tunnel
Field et al. Design and construction of London Bridge station on the Jubilee Line Extension

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees