retaining wall
mountain retaining
cement milk
concrete
members
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP5089818A
Other languages
Japanese (ja)
Other versions
JP2631066B2 (en
Inventor
Hiroyasu Ooka
裕保 大岡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toda Corp
Original Assignee
Toda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toda Corp filed Critical Toda Corp
Priority to JP5089818A priority Critical patent/JP2631066B2/en
Publication of JPH06299562A publication Critical patent/JPH06299562A/en
Application granted granted Critical
Publication of JP2631066B2 publication Critical patent/JP2631066B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

PURPOSE:To improve the quality of an earth retaining wall and shorten the construction period thereof by a method wherein cement milk is poured into earth and sand in a continuous excavated hole to be mixed therewith and thereafter PC earth retaining wall members are successively installed, and after the curing of the cement milk, a form is fixed to the members and concrete is placed to form a body. CONSTITUTION:Cement milk is poured into a row of continuously excavated holes to be mixed and stirred with earth and sand therein, and PC earth retaining wall members 10 are erected in the holes to form a wall. After a mixture of the cement milk is cured, a sheet for curing 13 adhered to the front surfaces of the members 10 is separated and forms for forming a body are fixed by using screw holes 12 for a separator and concrete is placed into the forms and the forms are removed after the concrete is cured, whereby the members 10 are made integral to the body. As a result, the quality of the earth retaining wall is improved and construction work can be simplified.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、地中壁工法の応用に関
し、PC版を使用した地下矩体構築工法に関するもので
ある。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an application of an underground wall construction method, and relates to an underground rectangular structure construction method using a PC plate.

【0002】[0002]

【従来の技術】従来のコンクリート地中壁を利用して、
地下矩体を構築する場合、先ずベントナイト泥水などの
安定液を使用して地中に所定の幅の溝を連続して掘削
し、その中に鉄筋かごを建て込んだ後、コンクリートを
打設する。このようにして構築された連続地中壁を利用
して、地下矩体が構築される場合があった。
2. Description of the Related Art Utilizing a conventional concrete underground wall,
When constructing an underground rectangular body, first use a stabilizing solution such as bentonite muddy water to continuously excavate a groove of a specified width in the ground, build a reinforced cage in it, and then place concrete. . In some cases, underground rectangular bodies were constructed using the continuous underground wall constructed in this way.

【0003】[0003]

【発明が解決しようとする課題】しかし、上述のような
従来のコンクリート地中壁を構築する工法においては、
地中溝内の安定液とレディミックストコンクリートとの
置換作業および、鉄筋かごの挿入作業に際して高度の施
工管理が必要であった。つまり、高度の施工管理を行わ
ないと品質にバラツキが出てしまうという欠点が存在し
た。更に、このような山留壁を利用して地下矩体を構築
する場合に、その掘削や表面処理等が困難であった。
However, in the conventional method of constructing a concrete underground wall as described above,
A high level of construction management was required for the work of replacing the stabilizing liquid in the underground trench with ready-mixed concrete and the work of inserting the reinforcing steel cage. In other words, there is a drawback that quality will vary if high-level construction management is not performed. Furthermore, when constructing an underground rectangular parallelepiped using such a mountain retaining wall, excavation and surface treatment were difficult.

【0004】本発明の目的は、従来のこのような山留壁
を利用した地下矩体構築工法の問題点に鑑み、連結でき
る形状のPC山留壁を使用し、PC山留板の表面に貼着
してある養生シートを掘削前に取り外し、掘削を容易に
すると共にセパレータ用螺子穴にフォームタイを取り付
け型枠の組み付けを容易とした地下矩体構築工法を提供
することにある。
The object of the present invention is to solve the problems of the conventional method of constructing an underground rectangular body using such a mountain retaining wall, to use a PC mountain retaining wall having a connectable shape, and to mount it on the surface of the PC retaining plate. An object of the present invention is to provide an underground rectangular structure construction method in which the adhered curing sheet is removed before excavation to facilitate excavation and a form tie is attached to the separator screw hole to easily assemble the formwork.

【0005】[0005]

【課題を解決するための手段】上記目的を達成するため
に、本発明の地下矩体構築工法は、掘削機械により地中
に連続した穴列を隣合う穴と一部重複して形成する工程
と、該穴列にセメントミルクを投入し原位置の土と混合
攪拌する工程と、該セメントミルクと土を攪拌した中に
PC山留壁部材を順次重ね合わせて繋いでゆく工程と、
該セメントミルクと土の混合体が硬化した後、PC山留
壁部材の前面に貼着した養生シートを剥離してPC山留
壁を構築する工程と、構築されたPC山留壁の前壁に形
成されたセパレータ用螺子穴にフォームタイを螺着し、
PC山留壁から所定位置離れた位置に型枠を固定する工
程と、該形成した型枠内にコンクリートを打設する工程
と、打設したコンクリートが硬化した後、型枠を取り外
す工程とから成る事を特徴とする。
In order to achieve the above object, the underground rectangular body construction method of the present invention is a step of forming a continuous hole row in the ground by an excavating machine so as to partially overlap adjacent holes. And a step of adding cement milk to the row of holes and mixing and stirring it with the soil in situ, and a step of successively stacking and connecting PC mountain retaining wall members while stirring the cement milk and soil,
After the mixture of the cement milk and soil is hardened, a step of peeling the curing sheet attached to the front surface of the PC mountain retaining wall member to construct a PC mountain retaining wall, and a front wall of the constructed PC mountain retaining wall Screw the foam tie into the screw hole for the separator formed in
From the step of fixing the form at a position distant from the PC retaining wall, the step of placing concrete in the formed form, and the step of removing the form after the placed concrete has hardened. It is characterized by

【0006】[0006]

【作用】本発明に係る地下矩体構築工法では、PC山留
壁を利用して地下矩体を構築するので、掘削が容易であ
ると共に、養生シートにより掘削面をきれい構成する事
ができる。
In the method for constructing an underground rectangular body according to the present invention, since the underground rectangular body is constructed by using the PC mountain retaining wall, excavation is easy, and the excavation surface can be cleanly constructed by the curing sheet.

【0007】[0007]

【実施例】以下、本発明の地下矩体構築工法について、
図面を参照しつつ説明する。図1は、本発明の地下矩体
構築工法に使用するPC山留壁部材を示す一部切欠き斜
視図、図2は、その平面図、図3は、その正面図であ
る。ここで、PC山留壁部材10は、上端部に吊りフッ
ク11が取り付けてある。また、表面部には、複数のセ
パレーター用螺子穴12が形成されると共に、養生シー
ト13が貼着されている。PC山留壁部材10の一側端
部には、順次重ね合わせて繋いでゆく為の凹部10aが
形成されている。更に、裏面には、補強のためのリブ1
0bが立設されている。
[Embodiment] The construction method of underground rectangular body of the present invention will be described below.
A description will be given with reference to the drawings. FIG. 1 is a partially cutaway perspective view showing a PC mountain retaining wall member used in the underground rectangular structure construction method of the present invention, FIG. 2 is a plan view thereof, and FIG. 3 is a front view thereof. Here, a hanging hook 11 is attached to the upper end of the PC mountain retaining wall member 10. A plurality of separator screw holes 12 are formed on the surface portion, and a curing sheet 13 is attached. At one end of the PC mountain retaining wall member 10, there is formed a recess 10a for sequentially overlapping and connecting. Furthermore, on the back side, there is a rib 1 for reinforcement.
0b is erected.

【0008】図4〜図7は、本発明の地下矩体構築工法
の一実施例を示す説明図である。ここで、先ず図外のア
ースオーガー等の掘削機械により安定液を注入しながら
地中に連続した穴列14を隣合う穴と一部重複して形成
する。次に、該穴列14にセメントミルクを投入し原位
置の土と混合攪拌し、安定液と置換する。
4 to 7 are explanatory views showing an embodiment of the method for constructing an underground rectangular body of the present invention. Here, first, a hole row 14 that is continuous in the ground is partially overlapped with an adjacent hole while pouring a stabilizing liquid by an excavating machine such as an earth auger (not shown). Next, cement milk is put into the hole array 14 and mixed and stirred with the soil at the original position to replace the stabilizing liquid.

【0009】セメントミルクと土を攪拌した中にPC山
留壁部材を順次重ね合わせて繋いで連続壁を構築する。
この際、図4に示すようにPC山留壁部材10の上面に
設けられた吊りフック11に、クレーンのワイヤー15
を掛ける。また、PC山留壁部材10の表面部に形成さ
れた、セパレーター用螺子穴12の一つに姿勢制御する
ための仮フック16を螺着し、ワイヤー17を掛け渡し
PC山留壁部材の凹部10aに次のPC山留壁部材の隅
部が重なり合うようにする(図4,5参照)。
While cement milk and soil are stirred, PC mountain retaining wall members are successively stacked and connected to form a continuous wall.
At this time, as shown in FIG. 4, the wire 15 of the crane is attached to the hanging hook 11 provided on the upper surface of the PC mountain retaining wall member 10.
Multiply Further, a temporary hook 16 for attitude control is screwed into one of the screw holes 12 for the separator formed on the surface of the PC mountain retaining wall member 10, and a wire 17 is laid over the recessed portion of the PC mountain retaining wall member. The corner of the next PC mountain retaining wall member overlaps 10a (see FIGS. 4 and 5).

【0010】前記セメントミルクと土の混合体が硬化し
た後、PC山留壁部材10の前面に貼着した養生シート
13を剥離してPC山留壁を構築する(図6参照)。こ
の様に構築されたPC山留壁の前壁に配設されたセパレ
ータ用螺子穴12にフォームタイ18を螺着し、PC山
留壁から所定位置離れた位置に型枠19を固定する(図
8参照)。そして、該形成した型枠19内にコンクリー
ト20を打設する。更に、打設したコンクリート20が
硬化した後、型枠を取り外し地下矩体を構築する。
After the mixture of the cement milk and the soil is hardened, the curing sheet 13 attached to the front surface of the PC mountain retaining wall member 10 is peeled off to construct a PC mountain retaining wall (see FIG. 6). A foam tie 18 is screwed into the screw hole 12 for the separator arranged on the front wall of the PC mountain retaining wall thus constructed, and the form 19 is fixed at a position apart from the PC mountain retaining wall by a predetermined position ( (See FIG. 8). Then, concrete 20 is placed in the formed formwork 19. Furthermore, after the cast concrete 20 is hardened, the formwork is removed to construct an underground rectangular body.

【0011】このようにして、PC山留壁を構築した
後、の壁面を利用して地下矩体を構築するので、工期を
短縮できると共に山留壁の品質向上を図る事ができる。
また、山留壁の表面は、養生シート13を剥離するだけ
でよいので、作業が容易であると共に、きれいに仕上げ
る事ができる。
In this way, after the PC mountain retaining wall is constructed, the underground wall is constructed using the wall surface of, so that the construction period can be shortened and the quality of the mountain retaining wall can be improved.
Moreover, since the surface of the mountain retaining wall only needs to be peeled off the curing sheet 13, the work is easy and the surface can be finished neatly.

【0012】図9,10は、PC山留壁部材10を継ぎ
足す場合について説明する。PC山留壁部材10の寸法
が短い場合、部材の上部にジョイント金物23を取り付
け、下端にジョイント用凹部10−2を有したPC山留
壁部材10−1を接続する。図9に示すようにジョイン
ト金物23を利用して取り付け、腹起こし材22を配設
してもよい。
FIGS. 9 and 10 explain the case where the PC mountain retaining wall member 10 is added. When the dimension of the PC mountain retaining wall member 10 is short, the joint metal piece 23 is attached to the upper portion of the member, and the PC mountain retaining wall member 10-1 having the joint recess 10-2 is connected to the lower end thereof. As shown in FIG. 9, a joint metal piece 23 may be used for attachment and the belly-raising member 22 may be arranged.

【0013】この様にした場合、山留壁の強度を増す事
ができると共に、より深い山留壁を作る事ができる。
In this case, the strength of the mountain retaining wall can be increased and a deeper mountain retaining wall can be manufactured.

【0014】図11は、本発明の地下矩体構築工法で入
隅Aと出隅Bを構築する場合の実施例を示す説明図であ
る。ここで、入隅Aを構築する場合、PC山留壁部材1
0の凹部10aに次のPC山留壁部材10の先端部を直
角になるように配設する。この様に配設すると、直角の
入隅Aが構築される。また、出隅Bを構築する場合、出
隅専用のPC山留壁部材10−3を使用し、次のPC山
留壁部材10が直角に突出するように継いで行く。この
ように、PC山留壁部材10−3及び10を配設する事
により、出隅Bが構築できる。
FIG. 11 is an explanatory view showing an embodiment in which the inside corner A and the outside corner B are constructed by the underground rectangular body construction method of the present invention. Here, when constructing the entry corner A, the PC Yamadome wall member 1
The leading end portion of the next PC mountain retaining wall member 10 is disposed in the 0 recessed portion 10a so as to be orthogonal. With this arrangement, a right angled corner A is constructed. Further, when constructing the projected corner B, the PC mountain retaining wall member 10-3 dedicated to the projected corner is used, and the next PC mountain retaining wall member 10 is connected so as to project at a right angle. In this way, the projected corner B can be constructed by disposing the PC mountain retaining wall members 10-3 and 10.

【0015】尚、本発明の地下矩体構築工法は、以上の
実施例に限る事なく、本発明の技術思想に基づいて種々
の変形例が可能である。
The method for constructing an underground rectangular body of the present invention is not limited to the above embodiment, and various modifications can be made based on the technical idea of the present invention.

【0016】[0016]

【発明の効果】以上説明したように、本発明の地下矩体
構築工法では、掘削機械により地中に連続した穴列を隣
合う穴と一部重複して形成する工程と、該穴列にセメン
トミルクを投入し原位置の土と混合攪拌する工程と、該
セメントミルクと土を攪拌した中にPC山留壁部材を順
次重ね合わせて繋いでゆく工程と、該セメントミルクと
土の混合体が硬化した後、PC山留壁部材の前面に貼着
した養生シートを剥離してPC山留壁を構築する工程
と、構築されたPC山留壁の前壁に形成されたセパレー
タ用螺子穴にフォームタイを螺着し、PC山留壁から所
定位置離れた位置に型枠を固定する工程と、該形成した
型枠内にコンクリートを打設する工程と、打設したコン
クリートが硬化した後、型枠を取り外す工程とから成る
ので、施工工期の短縮を図ると共に、山留め壁の品質を
向上する事が出来る。また、養生シートはPCコンクリ
ートの養生だけでなく、取り外す事により、掘削を容易
かつきれいにできる。更に、型枠用セパレータのインサ
ートを利用してワイヤーを結び付ければ、組み付けに際
しての位置決めが容易となる。
As described above, in the underground rectangular body construction method of the present invention, a step of forming a continuous hole row in the ground by an excavating machine so as to partially overlap adjacent holes, and the hole row A step of adding cement milk and mixing and stirring it with in-situ soil; a step of sequentially stacking and connecting PC mountain retaining wall members while stirring the cement milk and soil; and a mixture of the cement milk and soil After curing, the step of peeling off the curing sheet attached to the front surface of the PC mountain retaining wall member to construct the PC mountain retaining wall, and the screw hole for the separator formed in the front wall of the constructed PC mountain retaining wall After the form tie is screwed to the PC and the mold is fixed at a position separated from the PC mountain retaining wall by a predetermined position, the concrete is cast in the formed mold, and after the cast concrete is hardened. Since it consists of the process of removing the formwork, the construction period is short. Along with the attempt to, it is possible to improve the quality of the earth retaining wall. In addition, the curing sheet can be used not only for curing PC concrete but also for removing it by excavating it easily and cleanly. Further, if the wires are tied together by using the insert of the formwork separator, the positioning at the time of assembling becomes easy.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の地下矩体構築工法に使用するPC山留
壁部材を示す一部切欠き斜視図である。
FIG. 1 is a partially cutaway perspective view showing a PC mountain retaining wall member used in an underground rectangular structure construction method of the present invention.

【図2】本発明の地下矩体構築工法に使用するPC山留
壁部材を示す平面図である。
FIG. 2 is a plan view showing a PC mountain retaining wall member used in the underground rectangular structure construction method of the present invention.

【図3】本発明の地下矩体構築工法に使用するPC山留
壁部材を示す正面図である。
FIG. 3 is a front view showing a PC mountain retaining wall member used in the underground rectangular structure construction method of the present invention.

【図4】本発明の地下矩体構築工法の一実施例を示す説
明図である。
FIG. 4 is an explanatory view showing an example of an underground rectangular body construction method of the present invention.

【図5】本発明の地下矩体構築工法の一実施例を示す説
明図である。
FIG. 5 is an explanatory diagram showing an example of an underground rectangular body construction method of the present invention.

【図6】本発明の地下矩体構築工法の一実施例を示す説
明図である。
FIG. 6 is an explanatory view showing an embodiment of the underground rectangular body construction method of the present invention.

【図7】本発明の地下矩体構築工法の一実施例を示す説
明図である。
FIG. 7 is an explanatory view showing an example of an underground rectangular body construction method of the present invention.

【図8】本発明の地下矩体構築工法の一実施例を示す説
明図である。
FIG. 8 is an explanatory view showing an example of an underground rectangular body construction method of the present invention.

【図9】本発明の地下矩体構築工法の一実施例を示す説
明図である。
FIG. 9 is an explanatory diagram showing an example of an underground rectangular body construction method according to the present invention.

【図10】本発明の地下矩体構築工法の一実施例を示す
説明図である。
FIG. 10 is an explanatory view showing an example of an underground rectangular body construction method of the present invention.

【図11】本発明の地下矩体構築工法で入隅Aと出隅B
を構築する場合の実施例を示す説明図である。
FIG. 11 is an entrance corner A and an exit corner B in the underground rectangular structure construction method of the present invention.
It is explanatory drawing which shows the Example at the time of constructing.

【符号の説明】[Explanation of symbols]

10 PC山留壁部材 10−1 PC山留壁部材 10−2 ジョイント用凹部 10−3 出隅用PC山留壁部材 10a 凹部 10b リブ 11 吊りフック 12 セパレーター用螺子穴 13 養生シート 14 穴列 15 ワイヤー 16 仮フック 17 ワイヤー 18 フォームタイ 19 型枠 20 コンクリート 21 ブラケット 22 腹起こし材 23 ジョイント金物 10 PC Yamadome Wall Member 10-1 PC Yamadome Wall Member 10-2 Joint Recess 10-3 Outer Corner PC Yamadome Wall Member 10a Recess 10b Rib 11 Hanging Hook 12 Separator Screw Hole 13 Curing Sheet 14 Hole Row 15 Wire 16 Temporary hook 17 Wire 18 Form tie 19 Formwork 20 Concrete 21 Bracket 22 Raised material 23 Joint hardware

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 掘削機械により地中に連続した穴列を隣
合う穴と一部重複して形成する工程と、該穴列にセメン
トミルクを投入し原位置の土と混合攪拌する工程と、該
セメントミルクと土を攪拌した中にPC山留壁部材を順
次重ね合わせて繋いでゆく工程と、該セメントミルクと
土の混合体が硬化した後、PC山留壁部材の前面に貼着
した養生シートを剥離してPC山留壁を構築する工程
と、構築されたPC山留壁の前壁に形成されたセパレー
タ用螺子穴にフォームタイを螺着し、PC山留壁から所
定位置離れた位置に型枠を固定する工程と、該形成した
型枠内にコンクリートを打設する工程と、打設したコン
クリートが硬化した後、型枠を取り外す工程とから成る
事を特徴とする地下矩体構築工法。
1. A step of forming a continuous row of holes in the ground by an excavating machine so as to partially overlap adjacent holes, and a step of adding cement milk to the row of rows and mixing and stirring with soil in situ. A step of successively stacking and connecting PC cement retaining wall members while stirring the cement milk and soil, and after adhering the mixture of the cement milk and soil, pasting on the front surface of the PC mountain retaining wall members. A step of peeling off the curing sheet to construct a PC mountain retaining wall, and a form tie is screwed into a screw hole for a separator formed on the front wall of the constructed PC mountain retaining wall, and is separated from the PC mountain retaining wall at a predetermined position Characterized by the following steps: fixing the formwork at a fixed position, placing concrete in the formed formwork, and removing the formwork after the placed concrete is hardened. Body construction method.
JP5089818A 1993-04-16 1993-04-16 Underground rectangular body construction method Expired - Fee Related JP2631066B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5089818A JP2631066B2 (en) 1993-04-16 1993-04-16 Underground rectangular body construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5089818A JP2631066B2 (en) 1993-04-16 1993-04-16 Underground rectangular body construction method

Publications (2)

Publication Number Publication Date
JPH06299562A true JPH06299562A (en) 1994-10-25
JP2631066B2 JP2631066B2 (en) 1997-07-16

Family

ID=13981335

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5089818A Expired - Fee Related JP2631066B2 (en) 1993-04-16 1993-04-16 Underground rectangular body construction method

Country Status (1)

Country Link
JP (1) JP2631066B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101322089B1 (en) * 2012-06-12 2013-10-28 원창숙 Precast concrete construction method for establishing structure in ground

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101322089B1 (en) * 2012-06-12 2013-10-28 원창숙 Precast concrete construction method for establishing structure in ground

Also Published As

Publication number Publication date
JP2631066B2 (en) 1997-07-16

Similar Documents

Publication Publication Date Title
JP2001295298A (en) Foundation for columnar structure and its work execution method
JP2004232328A (en) Structure of half precast type arch culvert and its construction method
JPH09324431A (en) Construction method of basement
JPH06299562A (en) Method for constructing underground body
JPH06129189A (en) Segment-based vertical column construction method
JPH10299003A (en) Foundation work using precast concrete member
JPH0721196B2 (en) Reverse construction method of underground structure
KR20190081605A (en) Installation structure and method of precast concrete culvert
JPS6335923A (en) Basement and its construction
JPH09242091A (en) Construction method for underground structure
JPH0258440B2 (en)
JPH11323966A (en) Footing block for retaining wall
JPH03228921A (en) Execution method for concrete foundation work
JPH0517956A (en) Concrete form and building foundation execution method using this concrete form
JPS6290445A (en) Block for foundation and its manufacture
JPH073781A (en) Method for constructing foundation footing on cast-in-place concrete pile head
JPH022764Y2 (en)
JP2002047670A (en) Construction method for underground tank and shear transfer mechanism
JP2540099B2 (en) Underground structure and its construction method
JPH10195886A (en) Foundation construction method
JPH0539611A (en) Method for building underground housing chamber
JP2001323485A (en) Method of constructing underground structure
JPS6243013B2 (en)
JPH02186018A (en) Building method for retaining wall and foundation block thereof
JPH0579045A (en) Constructing method for concrete foundation

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees