JPH06248803A - Construction method of external facing panel in structure - Google Patents

Construction method of external facing panel in structure

Info

Publication number
JPH06248803A
JPH06248803A JP3877593A JP3877593A JPH06248803A JP H06248803 A JPH06248803 A JP H06248803A JP 3877593 A JP3877593 A JP 3877593A JP 3877593 A JP3877593 A JP 3877593A JP H06248803 A JPH06248803 A JP H06248803A
Authority
JP
Japan
Prior art keywords
exterior panel
guide
panel
panels
lifting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP3877593A
Other languages
Japanese (ja)
Inventor
Satoshi Nakayama
聡 中山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maeda Corp
Original Assignee
Maeda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maeda Corp filed Critical Maeda Corp
Priority to JP3877593A priority Critical patent/JPH06248803A/en
Publication of JPH06248803A publication Critical patent/JPH06248803A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PURPOSE:To construct external facing panels safely and efficiently by a small number of persons. CONSTITUTION:A plurality of steel framed columns 1, 2 and 3 are erected in parallel at specific intervals, a rail 4 is so constructed that it bridges over their upper ends of the steel framed columns 1, 2 and 3, and a lifting device 5 is mounted on the rail 4 in the horizontal direction in a slidable manner. Guide panels 7, 8 and 9 having guide grooves 6 are fixed along external sides in the steel framed columns 1, 2 and 3, and an external facing panel 10 is interlocked between the guide grooves 6 and 6 of adjacent guide panels 7, 8 and 9 so that it is capable of sliding up and down. The external facing panel 10 is fixed between the guide panels 7 and 8 in a state to pull up the external facing panel 10 to a specific position with the lifting device 5.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は建造物において外装パネ
ルを施工する方法に関する。
FIELD OF THE INVENTION This invention relates to a method of applying exterior panels in a building.

【0002】[0002]

【従来の技術】周知のように、建造物において外壁とし
て軽量コンクリートや鉄板製の外装パネルを使用する場
合がある。この外装パネルを取り付けるに際してはクレ
ーンを用いるのが一般的であり、外壁の骨組み部分まで
クレーンで外装パネルを吊り上げ、予め取り付け位置で
待機している作業員がこれを受け止めてリベット打ちを
するようにしている。
2. Description of the Related Art As is well known, an exterior panel made of lightweight concrete or an iron plate may be used as an outer wall in a building. When installing this exterior panel, it is common to use a crane.The exterior panel is hung up by the crane to the frame part of the outer wall, and the worker waiting in advance at the installation position catches this and rivets. ing.

【0003】[0003]

【発明が解決しようとする課題】ところが、前記した従
来の方法では、外装パネルの取り付け位置に少なくとも
2人の作業員が待機している必要であり、その一人が外
装パネルの揺れを止めつつ、もう一人がこれをリベット
止めしなければならない。
However, in the above-mentioned conventional method, at least two workers need to be on standby at the mounting position of the exterior panel, and one of them must stop the exterior panel from shaking. The other has to rivet this.

【0004】このため人手がかかるのは勿論、風が強い
場合には危険な作業となる虞がある。また、無風の場合
でもクレーンに吊られた物体は回転を起こし易く、ま
た、完全な水平を維持した状態で吊り上げることも困難
であるため、外装パネルを所定の位置に固定することは
極めて困難である。
For this reason, it is not only labor-intensive, but it may be a dangerous work when the wind is strong. Also, even if there is no wind, the object hung on the crane is likely to rotate, and it is also difficult to lift the object while keeping it perfectly horizontal, so it is extremely difficult to fix the exterior panel in place. is there.

【0005】一方、これらの作業は高所で行われるため
作業内容ができるだけ単純化されることが望まれてい
る。本発明は前記事項に鑑みてなされたもので、風が強
い場合でも少ない人数で安全かつ効率的に実施すること
ができる外装パネルの施工方法を提供することを技術的
課題とする。
On the other hand, since these works are performed at a high place, it is desired that the work contents be simplified as much as possible. The present invention has been made in view of the above matters, and an object thereof is to provide a method of constructing an exterior panel that can be safely and efficiently performed by a small number of people even when wind is strong.

【0006】[0006]

【課題を解決するための手段】本発明は前記技術的課題
を解決するために、建造物の骨組を構成する垂直な鉄骨
柱1、2、3に沿って外装パネル10を張着する方法に
おいて、以下のような方法とした。即ち、 (1)前記鉄骨柱1、2、3を所定の間隔で複数本平行
に立設しておき、前記鉄骨柱1、2、3の各上端を橋絡
するようレール4を渡す。 (2)このレール4に揚重装置5を水平方向にスライド
可能に載置する。 (3)前記鉄骨柱1、2、3における外側面に沿って、
ガイド溝6を有するガイドパネル7、8、9を固定し、
隣合うガイドパネル7、8、9の夫々のガイド溝間6、
6に外装パネル10を上下スライド可能に係止する。 (4)この外装パネル10を前記揚重装置5で所定位置
まで引き上げた状態で、前記外装パネル10をガイドパ
ネル7、8に固定する。 (5)順次外装パネル10を引き上げて隣合うガイドパ
ネル7、8間に外装パネル10を張着する。 (6)この後、前記揚重装置5を水平方向に移動させて
他のガイドパネル8、9間に順次外装パネル10を張着
する。
In order to solve the above-mentioned technical problems, the present invention provides a method for attaching an exterior panel 10 along vertical steel columns 1, 2, 3 constituting a frame of a building. The following method was adopted. That is, (1) a plurality of the steel columns 1, 2 and 3 are erected parallel to each other at a predetermined interval, and the rail 4 is provided so as to bridge the upper ends of the steel columns 1, 2 and 3. (2) The lifting device 5 is placed on the rail 4 so as to be horizontally slidable. (3) Along the outer surface of each of the steel columns 1, 2, and 3,
Fix the guide panels 7, 8 and 9 having the guide groove 6,
Between the guide grooves 6 of the adjacent guide panels 7, 8 and 9,
The exterior panel 10 is locked to 6 so as to be vertically slidable. (4) The exterior panel 10 is fixed to the guide panels 7 and 8 with the exterior panel 10 being pulled up to a predetermined position by the lifting device 5. (5) The exterior panel 10 is pulled up in order and the exterior panel 10 is attached between the adjacent guide panels 7 and 8. (6) After that, the lifting device 5 is moved in the horizontal direction, and the exterior panel 10 is sequentially attached between the other guide panels 8 and 9.

【0007】[0007]

【作用】前記外装パネル10は、ガイドパネル7、8の
ガイド溝6に保持された状態で揚重装置5によって吊り
下げられて順次所定位置に移動する。したがって施工時
に風等によって揺れることもなく、安全な施工が可能で
ある。
The outer panel 10 is suspended by the lifting device 5 while being held in the guide grooves 6 of the guide panels 7 and 8 and sequentially moved to a predetermined position. Therefore, safe construction is possible without shaking due to wind or the like during construction.

【0008】揚重装置5はレール4上を走行できるの
で、一のガイドパネル間の空間に外装パネル10を装着
し終えたら、速やかに次の施工位置に移動し、他の空間
に外装パネル10を装着する作業を開始できる。
Since the lifting device 5 can travel on the rails 4, when the exterior panel 10 is completely mounted in the space between the guide panels, it immediately moves to the next construction position and the exterior panel 10 is placed in the other space. The work of mounting can be started.

【0009】また、外装パネル10は揚重装置5で任意
の位置まで引き上げ一時的に保持することができるの
で、その固定作業を安全かつ効率的に実施することがで
きる。
Further, since the exterior panel 10 can be pulled up to an arbitrary position and temporarily held by the lifting device 5, the fixing work can be carried out safely and efficiently.

【0010】[0010]

【実施例】本発明の実施例を図1ないし図3に基づいて
説明する。この発明は、図1に示すように、建造物の骨
組を構成する垂直な鉄骨柱1、2、3に沿って外装パネ
ル10を全体に張着する方法である。
Embodiments of the present invention will be described with reference to FIGS. As shown in FIG. 1, the present invention is a method in which an exterior panel 10 is entirely attached along vertical steel columns 1, 2 and 3 which constitute a frame of a building.

【0011】前記鉄骨柱1、2、3はH鋼が用いられて
おり、予め所定の間隔で平行に立設されたものであって
建造物の構造体となっている。初めに、前記鉄骨柱1、
2、3の各上端を橋絡するようレール4を渡す。このレ
ール4は、本実施例では構造体の一部となるものである
が、所定の工程が終了した後に取り外すものであっても
よい。
The steel columns 1, 2, and 3 are made of H steel, and are vertically erected in parallel at predetermined intervals to form a structure of a building. First, the steel pillar 1,
Pass rail 4 so that the upper ends of 2 and 3 are bridged. Although the rail 4 is a part of the structure in this embodiment, it may be removed after a predetermined process is completed.

【0012】そして、このレール4に揚重装置5を載置
する。この揚重装置5は電動ウインチであり、ここから
垂下されたワイヤ5aを上下動させることができるよう
になっている。また、この揚重装置5は電動によってレ
ール4上を水平方向(矢示F方向)にスライド可能とな
っている。
Then, the lifting device 5 is placed on the rail 4. The lifting device 5 is an electric winch, and is capable of vertically moving a wire 5a hanging from the winch. Further, the lifting device 5 can be slid on the rail 4 in the horizontal direction (F direction indicated by the arrow) by electric drive.

【0013】前記鉄骨柱1、2、3の外側面、即ち、建
造物の外壁となるべき面にはガイドパネル7、8、9が
夫々固定されている。このガイドパネル7、8、9は前
記鉄骨柱1、2、3に沿って設けられており、外面が化
粧されたH鋼が用いられている。そして、このH鋼の左
右の溝がガイド溝6となっている。
Guide panels 7, 8 and 9 are fixed to the outer surfaces of the steel columns 1, 2, and 3, that is, the surfaces to be the outer walls of the building. The guide panels 7, 8 and 9 are provided along the steel columns 1, 2 and 3 and are made of H steel having a decorative outer surface. The left and right grooves of this H steel are the guide grooves 6.

【0014】このため隣合うガイドパネル7、8、9の
夫々のガイド溝間6、6は向い合うようになっている。
なお、ガイドパネル7、8、9の下端は地面に接するま
での長さとはせず、地面から2m程度の高さで切れてい
る。これは後述の外装パネル10を下から差し入れるた
めのクリアランスを得るためである。
Therefore, the guide grooves 6, 6 of the adjacent guide panels 7, 8, 9 face each other.
In addition, the lower ends of the guide panels 7, 8 and 9 are not set to the length until they come into contact with the ground, and are cut at a height of about 2 m from the ground. This is to obtain a clearance for inserting the exterior panel 10 described below from below.

【0015】前記ガイドパネル7、8、9を完全に固定
した段階で外装パネル10をガイドパネル7、8の夫々
のガイド溝6、6間に差し入れる。ここで外装パネル1
0の全幅はガイド溝6、6間の距離よりも少許狭くなっ
ているのは勿論である。
When the guide panels 7, 8 and 9 are completely fixed, the exterior panel 10 is inserted between the guide grooves 6 and 6 of the guide panels 7 and 8. Exterior panel 1 here
Of course, the total width of 0 is slightly smaller than the distance between the guide grooves 6, 6.

【0016】そしてこの外装パネル10を前記揚重装置
5のワイヤ5aに結び、前記揚重装置5を作動させて所
定位置まで引き上げる。そして所定位置に至った段階
で、前記外装パネル10をガイドパネル7、8に固定す
る。この固定はリベット11、11により行う(図
3)。
Then, the exterior panel 10 is tied to the wire 5a of the lifting device 5, and the lifting device 5 is operated to pull it up to a predetermined position. Then, when reaching the predetermined position, the exterior panel 10 is fixed to the guide panels 7 and 8. This fixing is performed by the rivets 11 and 11 (Fig. 3).

【0017】続いて図3に示すように、順次外装パネル
10を引き上げて隣合うガイドパネル7、8間全面に外
装パネル10を張着する。この後、前記揚重装置5を水
平方向に移動させて未施工のガイドパネル8、9間に前
記手順と同様に順次外装パネル10を張着する。
Subsequently, as shown in FIG. 3, the exterior panel 10 is sequentially pulled up and the exterior panel 10 is attached to the entire surface between the adjacent guide panels 7 and 8. Then, the lifting device 5 is moved in the horizontal direction, and the exterior panel 10 is sequentially attached between the unconstructed guide panels 8 and 9 in the same manner as in the above procedure.

【0018】このようにして、建造物の所定の面が外装
パネル10によって覆われるようにする。以上述べたよ
うに、外装パネル10はガイド溝間6、6間に沿って移
動するため、風の有無に拘らず揺れは完全に抑制され
る。したがって、従来のように一人が外装パネルの揺れ
を止めつつ、もう一人がリベット止めするという分担は
不要となり一人でも作業が可能となる。
In this manner, a predetermined surface of the building is covered with the exterior panel 10. As described above, the exterior panel 10 moves along the space between the guide grooves 6, so that the shaking is completely suppressed regardless of the presence or absence of wind. Therefore, it is unnecessary for one person to stop swaying of the exterior panel and the other one to stop the rivet as in the conventional case, and one person can work.

【0019】しかも、前記揚重装置5を停止させること
で外装パネル10を定位置に仮固定することができるた
め、高所でもリベット打ち作業が行い易い。したがっ
て、作業効率が著しく向上するとともに、安全性も大き
く向上する。
Moreover, by stopping the lifting device 5, the exterior panel 10 can be temporarily fixed in a fixed position, so that the riveting operation can be easily performed even in a high place. Therefore, work efficiency is significantly improved and safety is also significantly improved.

【0020】また、外装パネル10間に、化粧されたガ
イドパネル7が位置することとなるため、外観上外装パ
ネル10が横方向で連続しているかのように見え、意匠
的にも優れたものとなる。
Further, since the makeup guide panel 7 is positioned between the exterior panels 10, it looks as if the exterior panel 10 is continuous in the lateral direction in terms of appearance and is excellent in design. Becomes

【0021】[0021]

【発明の効果】本発明によれば、外装パネルをガイドパ
ネルのガイド溝に保持された状態で移動させ所定位置に
装着するので、少ない人数でも、安全かつ効率的に建造
物の外装施工を行うことができる。
According to the present invention, since the exterior panel is moved while being held in the guide groove of the guide panel and mounted at a predetermined position, even a small number of people can safely and efficiently perform exterior construction of a building. be able to.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例を示す斜視図FIG. 1 is a perspective view showing an embodiment of the present invention.

【図2】本発明の一実施例を示す平面図FIG. 2 is a plan view showing an embodiment of the present invention.

【図3】本発明の一実施例を示す正面図FIG. 3 is a front view showing an embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1、2、3・・鉄骨柱、 4・・レール、 5・・揚重装置、 6・・ガイド溝、 7、8、9・・ガイドパネル、 10・・外装パネル。 1, 2, 3 ... Steel column, 4 ... Rail, 5 ... Lifting device, 6 ... Guide groove, 7, 8, 9 ... Guide panel, 10 ... Exterior panel.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】建造物の骨組を構成する垂直な鉄骨柱に沿
って外装パネルを張着する方法において、 前記鉄骨柱を所定の間隔で複数本平行に立設しておき、
前記鉄骨柱の各上端を橋絡するようレールを渡し、この
レールに揚重装置を水平方向にスライド可能に載置し、
さらに、前記鉄骨柱における外側面に沿って、ガイド溝
を有するガイドパネルを固定し、隣合うガイドパネルの
夫々のガイド溝間に外装パネルを上下スライド可能に係
止し、この外装パネルを前記揚重装置で所定位置まで引
き上げた状態で、前記外装パネルをガイドパネルに固定
し、順次外装パネルを引き上げて隣合うガイドパネル間
に外装パネルを張着した後、前記揚重装置を水平方向に
移動させて他のガイドパネル間に順次外装パネルを張着
することを特徴とする建造物における外装パネルの施工
方法。
1. A method of tensioning an exterior panel along a vertical steel frame column constituting a frame of a building, wherein a plurality of the steel frame columns are erected in parallel at predetermined intervals,
Pass the rail so as to bridge each upper end of the steel frame pillar, and place the lifting device on the rail so as to be horizontally slidable,
Further, a guide panel having a guide groove is fixed along the outer surface of the steel frame pillar, and the exterior panel is slidably locked between the guide grooves of adjacent guide panels, and the exterior panel is lifted. With the weight device raised to a predetermined position, fix the exterior panel to the guide panel, sequentially pull up the exterior panel and attach the exterior panel between adjacent guide panels, and then move the lifting device horizontally. A method for constructing an exterior panel in a building, characterized in that the exterior panel is sequentially attached between other guide panels.
JP3877593A 1993-02-26 1993-02-26 Construction method of external facing panel in structure Pending JPH06248803A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3877593A JPH06248803A (en) 1993-02-26 1993-02-26 Construction method of external facing panel in structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3877593A JPH06248803A (en) 1993-02-26 1993-02-26 Construction method of external facing panel in structure

Publications (1)

Publication Number Publication Date
JPH06248803A true JPH06248803A (en) 1994-09-06

Family

ID=12534673

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3877593A Pending JPH06248803A (en) 1993-02-26 1993-02-26 Construction method of external facing panel in structure

Country Status (1)

Country Link
JP (1) JPH06248803A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4912515B1 (en) * 2008-12-19 2012-04-11 ブルンケベリ インドゥストリュートヴェックリング アーベー Method for attaching a facade member to a multi-storey building
SE2230127A1 (en) * 2022-04-29 2023-10-30 Brunkeberg Systems Ab A method for installing structural elements for a multi-storey building

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4912515B1 (en) * 2008-12-19 2012-04-11 ブルンケベリ インドゥストリュートヴェックリング アーベー Method for attaching a facade member to a multi-storey building
SE2230127A1 (en) * 2022-04-29 2023-10-30 Brunkeberg Systems Ab A method for installing structural elements for a multi-storey building

Similar Documents

Publication Publication Date Title
RU2630503C2 (en) Improved framing for lifting screen
CN105822072A (en) Hoisting construction structure and method for air corridor ceiling
CN105625645B (en) Suspension type steel structure lighting skylight construction method
JP2005171529A (en) Execution method of glass curtain wall
US4378860A (en) Movable staging scaffold system for building construction
JP3250764B2 (en) Building exterior curtain wall assembly equipment
KR100583785B1 (en) Construction-material lift being installed at the outside of the construction-structure
JPH06248803A (en) Construction method of external facing panel in structure
AU2015268774B1 (en) A system for installing façade panels on a building being constructed
JPH09296610A (en) Outside curing unit
JP3438046B2 (en) Exterior curtain wall assembly equipment
JPH0427074A (en) Mounting method of curing net for gondola work
RU2115787C1 (en) Cradle for construction and erection operations
JPH035567A (en) Temporary installation method for working suspension scaffold
RU2116413C1 (en) Mounted platform for work at fronts of buildings
KR200241837Y1 (en) Outer jumping platform easily and descending
JPH08199595A (en) Movable scaffolding for retaining wall construction work
JPH0714007U (en) Curing net for construction work
JPH1144095A (en) Automatic lift for construction, self-lifting type curing net and self-lifting type exterior scaffold
CN117468691A (en) Assembled self-lifting operation platform in elevator shaft and application method thereof
AU2015100194A4 (en) Perimeter Screens
JPH09124272A (en) Hanging device for floor material and laying method for floor material
SU1096360A1 (en) Floor forms
JPH02292440A (en) Outer wall with vertical guide rail for building
JP3106270B2 (en) Pillars for lifting and joining structures and methods for lifting structures