JP3106270B2 - Pillars for lifting and joining structures and methods for lifting structures - Google Patents

Pillars for lifting and joining structures and methods for lifting structures

Info

Publication number
JP3106270B2
JP3106270B2 JP04357997A JP35799792A JP3106270B2 JP 3106270 B2 JP3106270 B2 JP 3106270B2 JP 04357997 A JP04357997 A JP 04357997A JP 35799792 A JP35799792 A JP 35799792A JP 3106270 B2 JP3106270 B2 JP 3106270B2
Authority
JP
Japan
Prior art keywords
lifting
joining
structures
shelf
pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP04357997A
Other languages
Japanese (ja)
Other versions
JPH06193145A (en
Inventor
憲衛 幸村
光博 佐々木
圭二 片山
渡辺  純一
久男 針谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyu Construction Co Ltd
Original Assignee
Tokyu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyu Construction Co Ltd filed Critical Tokyu Construction Co Ltd
Priority to JP04357997A priority Critical patent/JP3106270B2/en
Publication of JPH06193145A publication Critical patent/JPH06193145A/en
Application granted granted Critical
Publication of JP3106270B2 publication Critical patent/JP3106270B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、格納庫、工場等の大空
間建築物の屋根等の構造物を吊上げ、それを柱に接合す
るための技術に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a technique for lifting a structure such as a roof of a large space building such as a hangar or a factory, and joining the structure to a pillar.

【0002】[0002]

【従来の技術】格納庫、工場、イベントホール、体育館
等の大空間建築物の屋根等の構造物を構築する場合に
は、従来からリフトアップ工法が用いられている。リフ
トアップ工法は、上記の屋根等の構造物を接合して建物
を構成するための本設柱のほかに、仮の柱を設け、この
仮設柱により構造物をリフトアップした後に、本設柱に
構造物を接合する工法である。
2. Description of the Related Art When building structures such as roofs of large space buildings such as hangars, factories, event halls, and gymnasiums, a lift-up method has conventionally been used. In the lift-up method, temporary columns are provided in addition to the main columns for constructing the building by joining the above-mentioned structures such as roofs, and after the temporary columns are used to lift the structure, the main columns are lifted. This is a method of joining structures to a building.

【0003】[0003]

【発明が解決しようとする課題】上記の従来技術には、
次のような問題点が存在する。 <イ>仮設柱の施工が必要なため、施工コストが高くな
るとともに、工期の長期化を招くことになる。
SUMMARY OF THE INVENTION The above prior arts include:
The following problems exist. <A> Since the construction of the temporary columns is required, the construction cost is increased and the construction period is prolonged.

【0004】<ロ>構造物を本設柱に接合する際に、仮
設柱から本設柱に構造物を移動する必要があるため、接
合作業が困難となる。
<B> When joining a structure to a main column, it is necessary to move the structure from the temporary column to the main column, which makes the joining operation difficult.

【0005】[0005]

【本発明の目的】本発明は、上記のような問題点を解決
するためになされたもので、仮設柱を不要とし、施工コ
ストの低減、工期の短縮及び接合作業の簡易化を図るこ
とができる構造物の吊上げ・接合用の柱の構造及び構造
物の吊上げ・接合方法を提供することを目的とする。
SUMMARY OF THE INVENTION The object of the present invention is to solve the above-mentioned problems, and eliminates the need for temporary pillars to reduce the construction cost, shorten the construction period, and simplify the joining work. It is an object of the present invention to provide a structure of a pillar for lifting and joining a structure and a method of lifting and joining the structure.

【0006】[0006]

【課題を解決するための手段】即ち、本発明は、構造物
を吊上げて接合するにおいて、支部と、支部の上
から水平方向に張出させ、吊上げた構造物を載置する
棚部と、棚部に鉛直方向に向けて設けた構造物の一部を
通過させることができる空間部と、支部の上部に一体
に設け、吊上げた構造物を接合する接合部とよりなる、
構造物の吊上げ・接合用のである。また、上記の柱を
利用した構造物の吊上げ方法において、接合部の上部に
設置した吊上げ装置により、構造物の一部棚部の空間
部に通過させて構造物の下端を棚部よりも上の高さまで
吊上げた後、構造物を棚部に載置する、構造物の吊上げ
方法である。
Means for Solving the Problems That is, the present invention provides a column for joining by lifting the structure, and the supporting lifting unit causes out Zhang horizontally from the upper supporting region portion, placing the lifting structure thereof And a part of the structure installed vertically on the shelf
A space portion can be passed, provided integrally with the top supporting region portion, the more a joint for joining the lifting structure thereof,
These are columns for lifting and joining structures. Further, in the method of lifting a structure using the above-mentioned column, a part of the structure is partially removed from the space of the shelf by the lifting device installed above the joint.
And lifting the lower end of the structure to a height above the shelf by passing the structure through the section, and then placing the structure on the shelf.

【0007】[0007]

【実施例】以下、図面を参照しながら、本発明の一実施
例について説明する。 [1]柱の構造 図1に示すように、本発明の柱1は、構造物を接合して
建物を構成するための本設柱であり、下から順に支持部
11、棚部12、接合部14の一体構造の鉄筋コンクリ
−ト柱である。
An embodiment of the present invention will be described below with reference to the drawings. [1] Pillar Structure As shown in FIG. 1, a pillar 1 of the present invention is a main pillar for joining a structure to form a building, and a supporting portion 11, a shelf portion 12, and a joining portion in order from the bottom. This is a reinforced concrete pillar having an integral structure of the portion 14.

【0008】<イ>支持部 支持部11は、主に構造物の重量を支持するための部分
であるため、所要の剛性が得られるように断面寸法等を
設計し、構築する。この支持部11は、図2に示すよう
に、地上で組み立てた屋根等の構造物3を吊上げた状態
において、構造物3との間に最低限の吊り上げのための
間隙L1を確保できるように構築する。
<A> Supporting part Since the supporting part 11 is a part for mainly supporting the weight of the structure, the supporting part 11 is designed and constructed to have a required rigidity in terms of its cross-sectional dimensions and the like. As shown in FIG. 2, the supporting portion 11 can secure a minimum gap L1 for lifting the structure 3 such as a roof assembled on the ground when the structure 3 is lifted. To construct.

【0009】<ロ>棚部 図1に示すように、支持部11の上部には、棚部12
を、構造物3の吊上げ側にほぼ水平方向に張出させて形
成する。この棚部12の中間部には空間部13を設け
る。この空間部13は、構造物3の一部が吊上げ時に通
過できる寸法に設計する。所定の高さまで吊上げた構造
物3は、この棚部12上に載置され、構造物3の鉛直荷
重が棚部12を介して支持部11に伝達される。
<B> Shelf As shown in FIG.
Are formed so as to extend substantially horizontally on the lifting side of the structure 3. A space 13 is provided in the middle of the shelf 12. The space 13 is designed to have a size that allows a part of the structure 3 to pass through during lifting. The structure 3 suspended to a predetermined height is placed on the shelf 12, and the vertical load of the structure 3 is transmitted to the support 11 via the shelf 12.

【0010】<ハ>接合部 接合部14は、支持部11の上部に一体に設けた柱部材
であり、支持部11よりも小さい断面寸法を有する。図
2に示すように、支持部11と接合部14との構造物3
の吊上げ側の面の位置は、L2だけ接合部14の面が後
退するように設計する。従って、吊上げ状態の構造物3
と支持部11との隙間L1よりも、接合部14との隙間
L3の方が大きい寸法となる。この隙間L3は、構造物
3と接合部14との接合作業ができるだけのスペースを
確保したものである。そして、構造物3と接合部14と
を接合すると、構造物3の水平荷重が接合部14を介し
て柱1に伝達される。
<C> Joint The joint 14 is a pillar member integrally provided on the upper part of the support part 11 and has a smaller cross-sectional dimension than the support part 11. As shown in FIG. 2, the structure 3 of the support portion 11 and the joint portion 14
Is designed so that the surface of the joint portion 14 is retracted by L2. Therefore, the structure 3 in the lifted state
The gap L3 between the joint portion 14 and the gap L1 between the support portion 11 and the support portion 11 have a larger dimension. The gap L3 secures a space that allows the joining operation between the structure 3 and the joining portion 14 to be performed. When the structure 3 is joined to the joint 14, the horizontal load of the structure 3 is transmitted to the column 1 via the joint 14.

【0011】[2]施工方法 次に、上記のように構成した柱1を利用した構造物の吊
上げ、接合方法について説明する。 <イ>吊上げ装置・吊り治具の設置 接合部14の上部に架台2を設置する。架台2は、構造
物3の吊上げ側及びその反対側に突出させて設置し、吊
上げ側の上部には吊上げ装置21を設置する。吊上げ装
置21にはリフティングジャッキ等を用い、架台2を貫
通させて鋼棒等の吊り材22を垂下させる。吊上げ装置
21は架台2上に1台設け、台数を少なくしてコストダ
ウン及び管理しやすいようにする。そのためには、図2
に示すように、1点で吊り上げることができるように、
特殊な吊り治具31を構造物3に装着する。2点吊りの
場合は、両方の吊上げ装置の調整が難しくなるが、この
ように1点吊りにすると調整が不要となり、吊上げ作業
が容易になる。なお、構造物3の吊上げ時に柱1が吊上
げ側に転倒あるいは変形しないように、架台2の吊上げ
側の反対側に、鋼棒等の反力ロッド23を設ける。この
反力ロッド23は、上端を架台2に固定し、下端を棚部
12の反対側に突設した固定部24に固定する。
[2] Construction Method Next, a method of lifting and joining a structure using the column 1 configured as described above will be described. <B> Installation of lifting device and lifting jig The gantry 2 is installed above the joint 14. The gantry 2 is installed so as to protrude on the lifting side of the structure 3 and on the opposite side thereof, and a lifting device 21 is installed above the lifting side. A lifting jack or the like is used for the lifting device 21, and a hanging member 22 such as a steel rod is made to penetrate through the gantry 2. One lifting device 21 is provided on the gantry 2 to reduce the number and facilitate cost reduction and management. For that, FIG.
So that it can be lifted at one point,
A special hanging jig 31 is mounted on the structure 3. In the case of two-point suspension, it is difficult to adjust both lifting devices. However, in the case of single-point suspension, no adjustment is required, and the lifting operation is facilitated. Note that a reaction rod 23 such as a steel bar is provided on the opposite side to the lifting side of the gantry 2 so that the column 1 does not fall or deform to the lifting side when the structure 3 is lifted. The reaction rod 23 has an upper end fixed to the gantry 2 and a lower end fixed to a fixing portion 24 projecting from the opposite side of the shelf 12.

【0012】<ロ>構造物の吊上げ 柱1は、格納庫等の建物の側壁部の支柱となるため、側
壁部の構築予定位置に複数構築する。次に、対向する柱
1間の地上部において、建物の屋根となる鉄骨トラス構
造等の構造物3を組み立てる。また、構造物3の柱1側
端部の上端に吊り治具31を装着し、この吊り治具31
に吊上げ装置21から垂下させた吊り材22の下端を連
結する。そして、吊上げ装置21を稼働させて、構造物
3を柱1に沿って吊上げる。このとき、柱1の支持部1
1と構造物3との間隙L1は、吊上げに必要な最小限の
寸法が確保され、また接合部14との間隙L3は、接合
に必要な寸法が確保されることになる。
<B> Structure lifting columns 1 are to be provided at the planned positions of the side wall portions because they serve as support columns for the side wall portions of a building such as a hangar. Next, a structure 3 such as a steel truss structure serving as a roof of the building is assembled on the ground portion between the opposing columns 1. Further, a suspending jig 31 is attached to the upper end of the end of the structure 3 on the pillar 1 side.
To the lower end of the suspension member 22 suspended from the lifting device 21. Then, the lifting device 21 is operated to lift the structure 3 along the column 1. At this time, the support part 1 of the pillar 1
The gap L1 between the structure 1 and the structure 3 has a minimum dimension required for lifting, and the gap L3 between the joint 14 has a dimension required for joining.

【0013】<ハ>構造物の接合 構造物3が棚部12間の空間部13を通過し、構造物3
の下端を棚部12よりも高い位置まで吊上げる。そし
て、図3に示すように、棚部12間に受梁5を架け渡
し、その受梁5上等に構造物3を載置する。これによっ
て、構造物3の鉛直荷重を棚部12に預けることができ
る。次に、構造物3と接合部14に、それぞれ鋼板等の
接合部材4、41を取り付ける。そして、これらの接合
部材4、41を連結し、構造物3と接合部4とを一体に
接合することによって、構造物3の水平荷重を接合部1
4に伝達することができる。なお、接合部材4は、構造
物3の吊上げ作業前に予め取り付けておいてもよい。
また、接合部材4は構造物3と接合部14を接合できる
機能を有すればよいため、鋼板のほか、その他の種々の
構造を採用することもできる。
<C> Joining of structures The structure 3 passes through the space 13 between the shelves 12 and
Is lifted to a position higher than the shelf 12. Then, as shown in FIG. 3, the receiving beam 5 is bridged between the shelves 12, and the structure 3 is placed on the receiving beam 5 or the like. Thus, the vertical load of the structure 3 can be stored in the shelf 12. Next, the joining members 4 and 41, such as a steel plate, are attached to the structure 3 and the joining portion 14, respectively. Then, by connecting these joining members 4 and 41 and joining the structure 3 and the joint 4 integrally, the horizontal load of the structure 3 is reduced to the joint 1.
4 can be transmitted. The joining member 4 may be attached in advance before lifting the structure 3.
Also, since the joining member 4 only needs to have a function of joining the structure 3 and the joining portion 14, various other structures other than the steel plate can be adopted.

【0014】[0014]

【本発明の効果】本発明は以上説明したようになるた
め、次のような効果を得ることができる。 <イ>本設柱により構造物の吊上げを行うことができる
ため、仮設柱が不要となる。従って、施工コストの低減
と工期の短縮を図ることができる。
Since the present invention has been described above, the following effects can be obtained. <A> Since the structure can be lifted by the permanent pillar, a temporary pillar is not required. Therefore, it is possible to reduce the construction cost and the construction period.

【0015】<ロ>構造物の吊上げ・接合作業を本設柱
のみで連続して行うことができるため、従来のような仮
設柱から本設柱への移動作業が不要である。そのため、
構造物を本設柱へ接合する作業を簡易化することができ
る。
<B> Since the lifting and joining work of the structure can be continuously performed with only the main pillar, the conventional moving work from the temporary pillar to the main pillar is unnecessary. for that reason,
The work of joining the structure to the main pillar can be simplified.

【0016】<ハ>構造物の鉛直荷重は棚部により受け
ることができ、また構造物の水平荷重は接合部により受
けることができる。そのため、構造物と本設柱との接合
強度を高めることができる。
<C> The vertical load of the structure can be received by the shelf, and the horizontal load of the structure can be received by the joint. Therefore, the joining strength between the structure and the main pillar can be increased.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明の柱の斜視図FIG. 1 is a perspective view of a pillar of the present invention.

【図2】 構造物の吊上げ工程の説明図FIG. 2 is an explanatory view of a structure lifting process.

【図3】 構造物の接合工程の説明図FIG. 3 is an explanatory view of a structure joining process.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 針谷 久男 厚木市妻田1158厚木そりだハイツ1415 (56)参考文献 特開 昭63−197736(JP,A) 特開 平3−197734(JP,A) (58)調査した分野(Int.Cl.7,DB名) E04B 1/30 E04B 1/35 E04G 21/14 - 21/22 ──────────────────────────────────────────────────続 き Continuation of the front page (72) Inventor Hisao Hariya 1158 Tsumada Atsugi Sorida Heights 1415 (56) References JP-A-63-197736 (JP, A) JP-A-3-197734 (JP, A) (58) Fields surveyed (Int.Cl. 7 , DB name) E04B 1/30 E04B 1/35 E04G 21/14-21/22

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 構造物を吊上げて接合する柱において、 支部と、 支部の上部から水平方向に張出させ、吊上げた構造物
を載置する棚部と、 棚部に鉛直方向に向けて設けた構造物の一部を通過させ
ることができる空間部と、 支部の上部に一体に設け、吊上げた構造物を接合する
接合部とよりなる、 構造物の吊上げ・接合用の
1. A column for joining the structure lifting and supporting lifting unit causes out Zhang horizontally from the upper supporting region portion, and a ledge for placing the lifting structure was vertically ledge a space portion capable of passing a portion of the provided the structure towards, integrally formed on the upper supporting region portion, joining the lifting structure thereof
It becomes more pillars for lifting and joining structures and joints.
【請求項2】 請求項1記載の柱を利用した構造物の吊
上げ方法において、 接合部の上部に設置した吊上げ装置により、構造物の一
棚部の空間部に通過させて構造物の下端を棚部より
も上の高さまで吊上げた後、 構造物を棚部に載置する、 構造物の吊上げ方法。
In lifting method wherein a Structure Using pillar of claim 1, wherein, the installation was lifting device to the top of the joint, of the structure one
Part of it is passed through the space portion of the ledge from the shelf to the lower end of the structure
A method of lifting a structure, in which the structure is placed on a shelf after being lifted to a height.
JP04357997A 1992-12-25 1992-12-25 Pillars for lifting and joining structures and methods for lifting structures Expired - Fee Related JP3106270B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP04357997A JP3106270B2 (en) 1992-12-25 1992-12-25 Pillars for lifting and joining structures and methods for lifting structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP04357997A JP3106270B2 (en) 1992-12-25 1992-12-25 Pillars for lifting and joining structures and methods for lifting structures

Publications (2)

Publication Number Publication Date
JPH06193145A JPH06193145A (en) 1994-07-12
JP3106270B2 true JP3106270B2 (en) 2000-11-06

Family

ID=18457016

Family Applications (1)

Application Number Title Priority Date Filing Date
JP04357997A Expired - Fee Related JP3106270B2 (en) 1992-12-25 1992-12-25 Pillars for lifting and joining structures and methods for lifting structures

Country Status (1)

Country Link
JP (1) JP3106270B2 (en)

Also Published As

Publication number Publication date
JPH06193145A (en) 1994-07-12

Similar Documents

Publication Publication Date Title
JPH04111829A (en) Method for constructing large-span roof
JPS6348753Y2 (en)
EP0485317B1 (en) Prefabricated modular construction
JP2909413B2 (en) Suspension device for building exterior walls
JPS61290164A (en) Method and apparatus for supporting beam and slab
JP3106270B2 (en) Pillars for lifting and joining structures and methods for lifting structures
JP3049300B2 (en) Construction method of beam truss in building with overhead traveling crane
US3435583A (en) Method of forming buildings
JP3233822B2 (en) Earthquake-resistant wooden house structure
RU2245430C1 (en) Form erection device for flooring building
JP3187618B2 (en) How to assemble beam reinforcement
JP2690822B2 (en) Steel construction method for low-rise buildings
SU1263793A1 (en) Method of erecting buildings with prefabricated solid skeleton
JP2888913B2 (en) External wall panel mounting method
JPH0714007U (en) Curing net for construction work
JP2808448B2 (en) Roof construction method
JP2572353Y2 (en) Temporary scaffolding for construction
JPH0650032B2 (en) Steel frame elevating ramp
JPS6137426B2 (en)
JPH08333885A (en) Mechanism of lift guide for jumping scaffolding in building construction
JPH05112983A (en) Construction of reinforced concrete building
JPH0642049A (en) Roof unit with parapet
JPH1113141A (en) Constructing method of composite structure
JPH07180345A (en) Bracket scaffolding, and replacement method therefor
JPH0461943B2 (en)

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees