JPH06167118A - Construction by use of large size units of external wall panel for tower and hanging device - Google Patents

Construction by use of large size units of external wall panel for tower and hanging device

Info

Publication number
JPH06167118A
JPH06167118A JP34557792A JP34557792A JPH06167118A JP H06167118 A JPH06167118 A JP H06167118A JP 34557792 A JP34557792 A JP 34557792A JP 34557792 A JP34557792 A JP 34557792A JP H06167118 A JPH06167118 A JP H06167118A
Authority
JP
Japan
Prior art keywords
tower
traverser
floor
building
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP34557792A
Other languages
Japanese (ja)
Inventor
Hiroyuki Yamamoto
裕行 山本
Kazuo Fukazawa
和夫 深沢
Takao Yamaoka
隆夫 山岡
Teruo Sasaki
照夫 佐々木
Masahito Matsukawa
正仁 松川
Kazumi Yamane
一三 山根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP34557792A priority Critical patent/JPH06167118A/en
Publication of JPH06167118A publication Critical patent/JPH06167118A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PURPOSE:To accurately and safely construct a tower in a short interval, by attaching large size panel units assembled on the ground for external walls of the tower by lifting up them to the uppermost floor after tower frames are erected on the uppermost floor. CONSTITUTION:A plurality of external aluminum wall panels for a tower are attached to the front face of steel substrates framed as a lattice to form a large size unit A on the ground floor S. And the tower frames 1 are erected on the uppermost floor 2 of a steel skeleton multi-floor building. The large size panel unit A is lifted up to the uppermost floor 2 by a lifter like a winch, a tower crane 6, etc. The substrates are attached to the panthouse 1 and the periphery of the tower frames 1 is covered with the units A to construct the external wall 3 of the penthouse 1.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、屋上に構築された塔屋
の外壁(屋上設備類の目隠しとなる外壁)を構築するた
めの工法とそれに使用する吊下げ装置に関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction method for constructing an outer wall of a tower house (an outer wall that serves as a blind for rooftop equipment) constructed on a rooftop, and a suspension device used therefor.

【0002】[0002]

【従来の技術】従来、アルミ等のパネルを用いて、塔屋
の外壁を構築するにあたっては、屋上スラブに塔屋を構
築した後、塔屋外壁用のパネルを単材の形で搬入し、施
工階でパネルに組み立てて、これを塔屋に取り付けると
いったノックダウン方式によって施工されていた。
2. Description of the Related Art Conventionally, when building an outer wall of a tower building using panels such as aluminum, after building the tower shop on the rooftop slab, the panel for the outdoor wall of the tower is carried in in the form of a single material, It was constructed by a knockdown method of assembling it into a panel and attaching it to the tower.

【0003】従って、塔屋の構築後に、パネルの組立て
が行われることになり、しかも、高層建物や超高層建物
の最上階という危険な作業状況の下で、単材をパネルに
組み立てるため、施工期間が長くかかるばかりでなく、
精度の高い施工が難しく、安全確保の面でも問題があっ
た。
Therefore, after the construction of the tower, the panels will be assembled, and furthermore, under the dangerous work situation of the top floor of a high-rise building or a super high-rise building, the single material is assembled into the panel, so the construction period Not only takes a long time,
Highly accurate construction is difficult, and there was a problem in terms of ensuring safety.

【0004】[0004]

【発明が解決しようとする課題】本発明は、上記の点に
留意してなされたものであって、その目的とするところ
は、アルミ等のパネルを用いて、塔屋の外壁を短期間に
精度良く安全に施工できる工法とその工法に好適な吊下
げ装置を提供することにある。
SUMMARY OF THE INVENTION The present invention has been made with the above points in mind. The object of the present invention is to use a panel made of aluminum or the like to accurately measure the outer wall of a tower building in a short period of time. An object of the present invention is to provide a construction method that can be installed safely and well, and a suspension device suitable for the construction method.

【0005】[0005]

【課題を解決するための手段】上記の目的を達成するた
めに本発明が講じた技術的手段は次のとおりである。即
ち、第1発明による塔屋外壁用パネルの大型ユニット化
工法は、塔屋外壁用のパネルを下部地盤面で組み立てて
大型ユニット化しておき、屋上に塔屋を構築した後、前
記のパネル大型ユニットを屋上に吊り上げて、塔屋に取
り付けることにより、塔屋外壁を構築することを特徴と
するものである。尚、第1発明において、下部地盤面と
は、地面の他、低層部の屋上スラブを包含する意味であ
る。つまり、低層部の上に、塔屋付きの高層部を建てる
建物の場合には、低層部の屋上スラブの上で前記パネル
大型ユニットを作製するようにしてもよい。
The technical means taken by the present invention to achieve the above object are as follows. That is, in the method for converting a large panel unit for a tower outdoor wall according to the first aspect of the invention into a large unit by assembling a panel for a tower outdoor wall on the lower ground surface, a tower roof is constructed on the roof, and then the panel large unit is mounted on the roof. It is characterized by constructing an outdoor wall of the tower by hoisting it up and mounting it on the tower. In the first invention, the lower ground surface means not only the ground but also the rooftop slab of the low-rise part. That is, in the case of a building in which a high-rise part with a tower is built on the low-rise part, the large panel unit may be manufactured on the rooftop slab of the low-rise part.

【0006】第2発明による吊下げ装置は、先端部に固
定滑車が装着され且つ構造体の上端部に着脱自在に構成
された複数個の上部治具と、横長直線状の第1トラバー
サーと、前記固定滑車と第1トラバーサーに装着された
動滑車とにわたって巻き掛けられ且つチェーンブロック
により長さ調節可能に構成されたワイヤーロープを介し
て第1トラバーサーに連結された横長直線状の第2トラ
バーサーと、第1トラバーサーを上部治具の近くまで吊
り上げた状態で上部治具に吊り下げ支持させる短寸の吊
り具とを備え、前記上部治具には、各々、第2トラバー
サーを載置した状態で固定する固定手段を設けてあるこ
とを特徴としている。
The suspending device according to the second aspect of the present invention comprises a plurality of upper jigs each having a fixed pulley attached to the tip thereof and detachably attached to the upper end of the structure, and a first traverser having a horizontally long linear shape. A horizontally elongated second traverser connected to the first traverser through a wire rope which is wound around the fixed pulley and the moving pulley attached to the first traverser and is adjustable in length by a chain block; And a short suspender for suspending and supporting the first traverser on the upper jig in a state where the first traverser is suspended near the upper jig, and the second traverser is placed on each of the upper jigs. It is characterized in that fixing means for fixing is provided.

【0007】[0007]

【作用】第1発明の構成によれば、パネルの組立て、大
型ユニット化が、施工階ではなく、下部地盤面で行われ
るため、安全で作業性が良く、短期間に高品質の製品が
得られ、しかも、パネル大型ユニットを、塔屋の構築
後、屋上に吊り上げて、塔屋に取り付けるので、パネル
大型ユニットを、塔屋の構築に先行して、あるいは塔屋
の構築作業と並行して、作製することができ、この面か
らも工期が短縮されることになる。
According to the structure of the first aspect of the invention, panel assembly and large-scale unit assembly are performed not on the construction floor but on the lower ground surface, so safe and workable, and high-quality products can be obtained in a short period of time. In addition, since the large panel unit is to be hung on the roof and attached to the tower after building the tower, the panel large unit should be produced prior to building the tower or in parallel with the building of the tower. Therefore, the construction period will be shortened from this aspect as well.

【0008】第2発明の構成によれば、1台の吊下げ装
置を使用して、建物各面でのパネル大型ユニットのスラ
イドアップを短時間に容易かつ安全に行える。即ち、建
物一側面でのスライドアップが完了し、吊下げ装置を建
物の他の側面に盛り替えるにあたっては、第1トラバー
サーを上部治具の近くまで吊り上げた状態で吊り具を介
して上部治具に吊り下げ支持させ、且つ、第2トラバー
サーは上部治具に載置して固定することにり、吊下げ装
置全体をコンパクトな状態に収納できる。そして、この
状態で、構造体に対する上部治具の固定を解き、吊下げ
装置全体を、建物の他の側面にタワークレーン等の揚重
装置で移動させ、その面におけるパネル大型ユニットA
のスライドアップに使用することができる。従って、盛
り替えの都度、第1,第2トラバーサー、固定滑車、動
滑車、吊り具等の分割、組立てを行う必要がなくなるの
で、盛り替えを短時間に能率良く行え、また、高所での
盛り替え作業が減少するため、余裕をもった作業がで
き、安全性向上につながることになる。
According to the structure of the second invention, it is possible to easily and safely slide up the large panel unit on each surface of the building in a short time by using one suspension device. That is, when the slide-up on one side of the building is completed and the hanging device is replaced on the other side of the building, the first traverser is lifted up to the vicinity of the upper jig and the upper jig is lifted through the lifting tool. The second traverser can be stored in a compact state by suspending and supporting the second traverser on the upper jig and fixing it. Then, in this state, the upper jig is unfixed from the structure, and the entire suspension device is moved to the other side of the building by a lifting device such as a tower crane.
Can be used for slide ups. Therefore, it is not necessary to divide and assemble the first and second traversers, fixed pulleys, moving pulleys, and hanging equipments each time the refilling is performed, so that the refilling can be performed efficiently in a short time and at high places. Since the refilling work is reduced, it is possible to work with a margin and improve safety.

【0009】[0009]

【実施例】以下、第1発明の一実施例を図1、図2に基
づいて説明する。図1において、1は屋上2に構築され
た塔屋であり、塔屋1には、屋上設備類(空調機器やエ
レベータ機械室、電気室等)が配設されている。3は塔
屋1の外壁(屋上設備類の目隠しとなる外壁)であり、
塔屋1の周囲に取り付けたパネル大型ユニットAによっ
て構成されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the first invention will be described below with reference to FIGS. In FIG. 1, reference numeral 1 denotes a tower house constructed on a rooftop 2, and the tower house 1 is provided with rooftop facilities (air conditioning equipment, elevator machine room, electric room, etc.). 3 is an outer wall of the tower house 1 (an outer wall that is a blindfold for rooftop equipment),
It is composed of a large panel unit A mounted around the tower 1.

【0010】前記パネル大型ユニットAは、図2に示す
ように、格子状に枠組みされた鋼製の下地4aの前面に
適当な幅Lを有する必要枚数の塔屋外壁用アルミパネル
4bを取り付けて構成したものであり、塔屋1の一側面
に対応する横幅と上下幅を有している。5はパネル大型
ユニットAを吊り上げるのに使用されるトラバーサーで
あり、下地4aに着脱自在に連結されている。
As shown in FIG. 2, the large panel unit A is constructed by attaching a necessary number of aluminum panels 4b for outdoor tower walls having an appropriate width L to the front surface of a steel base 4a framed in a grid pattern. It has a horizontal width and a vertical width corresponding to one side surface of the tower 1. Reference numeral 5 denotes a traverser used for lifting the large panel unit A, which is detachably connected to the base 4a.

【0011】塔屋外壁3を構築するにあたっては、塔屋
1の構築に先行して、或いは、塔屋1の構築作業と並行
して、図1の(イ)に示すように、下部地盤面Sで前記
パネル大型ユニットAを作製し、このパネル大型ユニッ
トAをウインチやタワークレーン6等の揚重装置によ
り、屋上2に吊り上げ、前記下地4aを塔屋1に適当な
固定手段(ボルト・ナット、溶接等)により取り付け
て、塔屋1の周囲四面をパネル大型ユニットAで覆い、
図1の(ロ)に示すように、塔屋外壁3を構築するので
ある。
In constructing the tower outdoor wall 3, prior to the construction of the tower building 1 or in parallel with the construction work of the tower building 1, as shown in FIG. A large panel unit A is produced, and the large panel unit A is hoisted by a lifting device such as a winch or a tower crane 6 to be hung on the roof 2 and the base 4a is fixed to the tower 1 by appropriate fixing means (bolts, nuts, welding, etc.). And cover the four sides of the tower 1 with the large panel unit A,
As shown in FIG. 1B, the tower outdoor wall 3 is constructed.

【0012】尚、上記の実施例では、パネル大型ユニッ
トAを塔屋1の一側面に対応した寸法の平面状に形成し
たが、塔屋1の面積が小さい場合は、立体的な形状(例
えば塔屋外壁を平面視においてコ字状やL字状に二分し
たような形状に形成してもよく、図3に示すように、塔
屋1の周囲四面を囲繞する筒状に形成してもよい。
In the above embodiment, the large panel unit A is formed in a flat shape having a size corresponding to one side of the tower 1, but when the area of the tower 1 is small, a three-dimensional shape (for example, a tower outdoor wall) is formed. May be formed in a U-shape or an L-shape in a plan view, or may be formed in a tubular shape surrounding four peripheral surfaces of the tower 1, as shown in FIG.

【0013】図4〜図7は、第1発明の他の実施例を示
す。この実施例は、第1発明を鉄骨造多層建物の全天候
施工法に適用したものであり、塔屋1の構築に先行して
下部地盤面(低層部の屋上スラブ)Sで作製したパネル
大型ユニットAを施工階までスライドアップさせる途中
も、当該パネル大型ユニットAを鉄骨工事溶接作業の防
風対策として利用する点に特徴がある。
4 to 7 show another embodiment of the first invention. In this embodiment, the first invention is applied to an all-weather construction method for a steel-framed multi-storey building, and prior to the construction of the tower building 1, a large panel unit A made of a lower ground surface (rooftop slab in the lower part) S It is characterized in that the large panel unit A is used as a windbreak countermeasure for steel frame construction welding work even while sliding up to the construction floor.

【0014】より詳しく説明すると、図中の7は鉄骨造
多層建物の骨格となる柱や梁の鉄骨である。鉄骨7の建
方は、一般的な積層工法により、複数階分(例えば、3
層分)を1節として下から順に行われる。
More specifically, 7 in the drawing is a steel frame of a pillar or a beam which is a skeleton of a multi-story steel building. The steel frame 7 can be erected in multiple floors (for example, 3
It is performed in order from the bottom with 1 layer as a section.

【0015】Bは、鉄骨建方を行う都度、最上階に設け
られた止水床であり、当該止水床Bにより各節屋根面が
構成され、内部が降雨に対して遮蔽される。止水床Bと
しては、種々の具体的構成を採用できるが、図示の実施
例では、図6に示すように、床用の本設材(床型枠)で
あるデッキプレート29を梁鉄骨の上に水密状に敷設して
前記止水床Bを構成している。止水床Bに形成される資
材搬入・搬出用の仮設開口a、階段室b等の開口部には
着脱自在な蓋体(図示せず)を設けて、降雨時には蓋体
で開口部を閉塞するようにしてある。タワークレーン6
が止水床Aを貫通する位置に設けられる場合、例えば、
タワークレーン用開口cを貫通するタワークレーン6の
マストにタワークレーン用開口cよりも大きなスカート
状の庇(雨よけ)を設ける等して、降雨時に雨水が入り
込まないように雨仕舞いを施すものとする。
B is a waterproof floor provided on the uppermost floor every time a steel frame is built, and the waterproof floor B constitutes each node roof surface and shields the interior from rainfall. Although various concrete configurations can be adopted as the still water floor B, in the illustrated embodiment, as shown in FIG. 6, the deck plate 29, which is the main installation material (floor formwork) for the floor, is made of beam steel. The waterproof floor B is constructed by laying in a watertight manner on the top. A removable lid (not shown) is provided at the openings such as the temporary opening a for loading and unloading materials and the staircase b formed on the water blocking floor B, and the opening is closed by the lid when it rains. I am doing it. Tower crane 6
Is provided at a position penetrating the water stop floor A, for example,
The mast of the tower crane 6 penetrating through the tower crane opening c is provided with a skirt-shaped eave (rain shelter) larger than the tower crane opening c to prevent rainwater from entering during rainfall. .

【0016】前記パネル大型ユニットAは、ウインチ又
はタワークレーン6で吊り上げられ、施工階までスライ
ドアップされるものであるが、塔屋1が構築されるま
で、鉄骨7の側面に取り付けられて、各節壁面を構成し
ており、内部を横降り雨と風に対して遮蔽している。こ
のパネル大型ユニットAは、図5に示すように、下地4
aの上部に鋼製のシート下地8aを連結し、その前面に
広告等に供するアピール用シート8bを貼り付けて構成
してあるが、これらのシート下地8a及びアピール用シ
ート8bは塔屋外壁3を構築する際には取り去られるも
のであり、パネル大型ユニットAにとって必要不可欠の
構成要素ではない。30は各節壁面の四隅に設けられた幅
狭の風通しネットである。風通しネット30は、内部の換
気を行って、溶接作業等を行う際の作業環境を良好に維
持する役目を果たすものであるが、各節壁面全体として
の横降り雨や風の遮蔽機能を損なわないように可及的に
幅狭に形成される。
The large panel unit A is hoisted by a winch or a tower crane 6 and slid up to the construction floor. It is attached to the side surface of the steel frame 7 until the tower building 1 is constructed, It forms the wall surface and shields the inside from rain and wind. As shown in FIG. 5, this large panel unit A has a base 4
The sheet base 8a made of steel is connected to the upper part of a, and the appeal sheet 8b used for advertisement or the like is pasted on the front surface of the steel base 8a and the appeal sheet 8b. It is removed when building, and is not an essential component for the large panel unit A. 30 is a narrow ventilation net provided at the four corners of each node wall. The ventilation net 30 serves to maintain the working environment in good condition by performing ventilation inside and performing welding work, but impairs the function of shielding side rain and wind from the entire wall surface of each node. It is formed as narrow as possible so that it does not exist.

【0017】Cは、窓ガラスの嵌め込まれたアルミ製の
カーテンウォールである。カーテンウォールCは、予
め、下部地盤面(低層部の屋上スラブ)Sでの組立て作
業により大型ユニット化されており、鉄骨建方の進行に
つれて、ウインチ又はタワークレーン6で吊り上げら
れ、下方の節から順次、建て込まれる。Dは、パネル大
型ユニットAのスライドアップ後、カーテンウォールC
が建て込まれるまで鉄骨側面に貼られる安全ネットであ
る。
C is an aluminum curtain wall fitted with a window glass. The curtain wall C is made into a large unit in advance by an assembling work on the lower ground surface (rooftop slab of the low-rise portion) S, and is lifted by a winch or a tower crane 6 as the steel frame construction progresses, and from the lower node. Will be built in sequence. D is the curtain wall C after sliding up the large panel unit A
It is a safety net that is attached to the side of the steel frame until it is built.

【0018】鉄骨造多層建物の全天候施工法の工程を説
明すると、次の通りである。 図7の(イ)に示すように、1節の鉄骨建方を行い、
最上階のデッキプレートを水密状に敷き込んで止水床B
を構成する。止水床Bにより1節目の各節屋根面が構成
され、内部が降雨に対して遮蔽されることになる。しか
る後、パネル大型ユニットAを鉄骨7の側面に取り付け
る。これにより、1節目の各節壁面が構成され、内部が
横降り雨と風に対して遮蔽されることになる。この状態
で、内部(二点斜線で示す部分)の現場溶接作業を行
う。 図7の(ロ)に示すように、2節の鉄骨建方を行う。
1節の場合と同じように、最上階のデッキプレートを水
密状に敷き込んで止水床Bを構成し、当該止水床Bによ
り2節目の各節屋根面を構成する。しかる後、パネル大
型ユニットAを上方へスライドアップし、2節の鉄骨の
側面に取り付けて、2節目の各節壁面を構成する。 図7の(ハ)に示すように、2節の内部(二点斜線で
示す部分)の現場溶接作業を行う。次いで、大型ユニッ
ト化したカーテンウォールCを1節の鉄骨側面に建て込
み、鉄骨工事以降の全天候施工壁面を構成する。 上記の〜の工程を繰り返し、最後に、図7の
(ニ)に示すように、屋上の所定の位置にパネル大型ユ
ニットAを建て込み、塔屋の外壁3を構成する。
The process of the all-weather construction method for a steel multi-story building will be described below. As shown in (a) of Fig. 7, the steel frame erection of Section 1 is performed,
Water-tight floor B by laying the deck plate on the top floor watertight
Make up. The water-stop floor B constitutes each node roof surface of the first node, and the inside is shielded against rainfall. After that, the large panel unit A is attached to the side surface of the steel frame 7. As a result, each node wall surface of the first node is configured, and the inside is shielded from side rain and wind. In this state, the internal welding work (indicated by the two-dot diagonal line) is performed. As shown in (b) of FIG. 7, the steel frame erection of Section 2 is performed.
Similar to the case of Section 1, the top floor deck plate is laid in a watertight manner to form a water-stop floor B, and the water-stop floor B forms each node roof surface of the second section. After that, the large panel unit A is slid up and attached to the side surface of the steel frame of Section 2 to form each section wall surface of Section 2. As shown in FIG. 7C, the on-site welding work is performed on the inside of the section 2 (portion indicated by a two-dot diagonal line). Next, the curtain wall C, which is made into a large unit, is built on the side surface of the steel frame of Section 1 to construct a weatherproof wall surface after the steel frame construction. The above steps (1) to (5) are repeated, and finally, as shown in (d) of FIG.

【0019】上記の実施例によれば、上からの降雨に対
して遮蔽されるだけでなく、横降り雨や風に対しても遮
蔽されるため、鉄骨工事の中で大きな工期ウエイトを占
める現場溶接作業が天候に左右されずに行えるのであ
る。しかも、屋上設備類の目隠しとなる塔屋外壁用のパ
ネルの大型ユニットAを先行して作製し、これを各節壁
面として利用するため、本設材が有効に利用されて経済
的であると共に、塔屋外壁3を短期間に且つ安全に構築
できることになる。
According to the above-mentioned embodiment, not only is it shielded from rainfall from above, but it is also shielded from side rain and wind, so that a site that occupies a large construction period weight in steel frame construction. Welding work can be performed regardless of the weather. Moreover, since the large unit A of the panel for the outdoor wall of the tower, which will be a blindfold for the rooftop equipment, is manufactured in advance and used as each node wall surface, the main construction material is effectively used and it is economical, The tower outdoor wall 3 can be constructed safely in a short period of time.

【0020】尚、この実施例では、パネル大型ユニット
Aのスライドアップ時の盛り替え時間の短縮、安全確保
のために、次のような工夫を施してある。即ち、図8、
図9に示すように、パネル大型ユニットAの下地4aや
シート下地8aに、多数の鋼製腕木10を縦軸芯P周りで
回動自在に枢設し、これらの鋼製腕木10を大梁鉄骨9a
及び小梁鉄骨9bに載置してボルト11止めすることによ
り、パネル大型ユニットAの仮受け(鉄骨7側面への取
付け)を行うように構成してある。そして、パネル大型
ユニットAをスライドアップするに際しては、鋼製腕木
10と大梁鉄骨9a及び小梁鉄骨9bとのボルト連結を解
き、図10に示すように、鋼製腕木10を縦軸芯P周りに
小梁鉄骨9bの外側まで回動させ、この状態で、鋼製腕
木10ごと、パネル大型ユニットAをスライドアップする
ように構成してある。
In this embodiment, the following measures are taken in order to shorten the refilling time when the large panel unit A is slid up and ensure safety. That is, FIG.
As shown in FIG. 9, a large number of steel arms 10 are rotatably pivoted around a longitudinal axis P on the base 4a and the seat base 8a of the large panel unit A, and these steel arms 10 are attached to the girder steel frame. 9a
Also, the large panel unit A is temporarily received (mounted on the side surface of the steel frame 7) by being mounted on the cross beam steel frame 9b and fixed with the bolts 11. And when sliding up the large panel unit A, the steel arms
The bolt connection between 10 and the girder steel frame 9a and the girder steel frame 9b is released, and as shown in FIG. 10, the steel arm 10 is rotated around the longitudinal axis P to the outside of the girder steel frame 9b, and in this state, The large unit A of the panel is slid up together with the steel arms 10.

【0021】従って、パネル大型ユニットAを仮受けす
る部材がパネル大型ユニットAと同時にスライドアップ
することになり、多数の仮受け用部材を単品で上方の鉄
骨節まで運搬して取り付ける場合に比して、盛り替え時
間が大幅に減少し、工期の短縮につながり、落下の危険
もなくなるのである。尚、図8に示す12は、下地4aや
シート下地8aの背面側に突設した係止片13,14を上下
方向摺動自在に案内することにより、スライドアップ時
のパネル大型ユニットAの面外方向への振れ止めを行う
ガイドレールである。
Therefore, the member for temporarily receiving the large panel unit A slides up at the same time as the large panel unit A, compared to the case where a large number of temporary receiving members are individually transported to the upper steel skeleton and attached. As a result, the refilling time is greatly reduced, the construction period is shortened, and the risk of falling is eliminated. Reference numeral 12 shown in FIG. 8 is a surface of the large panel unit A at the time of sliding up by guiding the locking pieces 13 and 14 projecting on the back side of the base 4a or the sheet base 8a so as to be slidable in the vertical direction. This is a guide rail that prevents the steady rest.

【0022】図8、図11、図12は、上記の工法に好
適に使用できる吊下げ装置Eを示している。この吊下げ
装置Eは、先端部に固定滑車15が装着され且つ構造体
(この実施例では、角筒状の鉄骨柱である。)の上端部
に着脱自在に構成された4個の上部治具16と、シャック
ル17等を介してパネル大型ユニットAに連結可能に構成
されたH型鋼よりなる横長直線状の第1トラバーサー18
と、前記固定滑車15と第1トラバーサー18に装着された
動滑車19とにわたって巻き掛けられ且つチェーンブロッ
ク20により長さ調節可能に構成されたワイヤーロープ21
を介して第1トラバーサー18に連結されたH型鋼よりな
る横長直線状の第2トラバーサー22と、第1トラバーサ
ー18を上部治具16の近くまで吊り上げた状態で上部治具
16に吊り下げ支持させる玉掛けワイヤー等の短寸の吊り
具23とを備えている。23aは吊り具23の先端に装着され
たフックである。
FIG. 8, FIG. 11 and FIG. 12 show a suspension device E that can be suitably used in the above construction method. In this suspension device E, a fixed pulley 15 is attached to the tip end thereof, and four upper jigs detachably configured to the upper end of the structure (in this embodiment, a rectangular tubular steel frame column). Tool 16 and a horizontally long linear first traverser 18 made of H-shaped steel that is configured to be connectable to a large panel unit A via a shackle 17 or the like.
And a wire rope 21 wound around the fixed pulley 15 and a moving pulley 19 mounted on the first traverser 18, and the length of which can be adjusted by a chain block 20.
A horizontal traverse second traverser 22 made of H-shaped steel and connected to the first traverser 18 via a
A short suspender 23 such as a sling wire for suspending and supporting the suspension 16 is provided. Reference numeral 23a is a hook attached to the tip of the hanging device 23.

【0023】上部治具16は、H型鋼材よりなる水平な腕
部16aと、その下方に連設した一対の鋼製の脚部16bと
を備え、鉄骨柱接合用のエレクションピース24等を利用
して、脚部16bを構造体(鉄骨柱等)にボルト・ナット
25で固定するように構成されている。腕部16aの上面に
は、タワークレーン6等の揚重装置で吊り下げ支持する
ための孔あきプレート26が設けられており、下面には前
記ワイヤーロープの一端を連結するための孔あきプレー
ト27が設けられている。
The upper jig 16 is provided with a horizontal arm portion 16a made of H-shaped steel material and a pair of steel leg portions 16b continuously provided below the horizontal arm portion 16a. Then, attach the legs 16b to the structure (steel column, etc.) with bolts and nuts.
It is configured to be fixed at 25. A perforated plate 26 for suspending and supporting the hoisting device such as the tower crane 6 is provided on the upper surface of the arm 16a, and a perforated plate 27 for connecting one end of the wire rope is provided on the lower surface. Is provided.

【0024】そして、前記上部治具16には、各々、第2
トラバーサー22を載置した状態で固定する固定手段とし
て、腕部16aの上面の所定位置にボルト孔が形成されて
おり、腕部16aに載置した第2トラバーサー22の下フラ
ンジをボルト・ナット28で締付け固定するように構成し
てある。
The upper jig 16 has a second
As a fixing means for fixing the traverser 22 in a mounted state, a bolt hole is formed at a predetermined position on the upper surface of the arm 16a, and the lower flange of the second traverser 22 mounted on the arm 16a is attached to the bolt / nut 28. It is configured to be fixed by tightening with.

【0025】この吊下げ装置Eを使用すれば、建物各面
でのパネル大型ユニットAのスライドアップを迅速に容
易かつ安全に行うことができる。即ち、パネル大型ユニ
ットAは、鉄骨の側面に設けられたガイドレール12に沿
ってスライドアップされるので、水平方向に対して傾き
があると、ガイドレール12と係止片13,14との間にこじ
れが生じて円滑なスライドが妨げられるが、上記の吊下
げ装置Eを使用すれば、チェーンブロック20で各ワイヤ
ーロープ21の長さを調節することにより、第1トラバー
サー18の水平度を修正できるため、ガイドレール12と係
止片13,14との間でこじれが発生せず、円滑なスライド
アップが可能である。
By using this suspension device E, the large panel unit A can be slid up quickly and easily and safely on each side of the building. That is, since the large panel unit A is slid up along the guide rail 12 provided on the side surface of the steel frame, if there is an inclination with respect to the horizontal direction, the large panel unit A will be placed between the guide rail 12 and the locking pieces 13 and 14. Twisting occurs and smooth sliding is hindered, but if the above hanging device E is used, by adjusting the length of each wire rope 21 with the chain block 20, the levelness of the first traverser 18 is corrected. Therefore, twisting does not occur between the guide rail 12 and the locking pieces 13 and 14, and smooth slide-up is possible.

【0026】しかも、建物一側面でのスライドアップが
完了し、吊下げ装置Eを建物の他の側面に盛り替えるに
あたっては、図11に示すように、第1トラバーサー18
を上部治具16の近くまで吊り上げた状態で吊り具23によ
り上部治具16に吊り下げ支持させ、且つ、第2トラバー
サー22は上部治具16の腕部16aに載置して、ボルト・ナ
ット28で固定し、装置全体をコンパクトな状態に収納で
きる。この状態で、エレクションピース24とのボルト連
結を解き、図12に示すように、吊下げ装置E全体を、
建物の他の側面にタワークレーン6等の揚重装置で移動
させ、その面におけるパネル大型ユニットAのスライド
アップに使用することができる。
Moreover, when the slide-up on one side surface of the building is completed and the suspension device E is replaced on the other side surface of the building, as shown in FIG. 11, the first traverser 18 is used.
Is suspended near the upper jig 16, and is suspended and supported by the upper jig 16 by the lifting tool 23, and the second traverser 22 is placed on the arm portion 16a of the upper jig 16 and the bolts and nuts are attached. By fixing with 28, the entire device can be stored in a compact state. In this state, the bolt connection with the erection piece 24 is released, and as shown in FIG.
It can be moved to the other side of the building by a lifting device such as a tower crane 6 and used for sliding up the large panel unit A on that side.

【0027】従って、盛り替えの都度、第1,第2トラ
バーサー18,22、固定滑車15、動滑車19、吊り具23等
を、分割したり組み立てたりする必要がなくなり、盛り
替えを短時間に能率良く行え、しかも、高所での盛り替
え作業が減少するため、余裕をもった作業ができ、安全
性向上にもつながるのである。
Therefore, it is not necessary to divide or assemble the first and second traversers 18, 22, the fixed pulley 15, the movable pulley 19, the hangings 23, etc. every time the refilling is performed, and the refilling can be done in a short time. The work can be done efficiently, and since the work of refilling at high places is reduced, it is possible to work with plenty of room and improve safety.

【0028】[0028]

【発明の効果】請求項1によれば、パネルの組立て、大
型ユニット化が、施工階ではなく、下部地盤面で行われ
るため、安全で作業性が良く、短期間に高品質の製品が
得られ、しかも、パネル大型ユニットを、塔屋の構築
後、下階より随時、屋上に吊り上げて、塔屋に取り付け
るので、パネル大型ユニットを、塔屋の構築に先行し
て、あるいは塔屋の構築作業と並行して、作製すること
ができ、この面からも工期が大幅に短縮されることにな
る。従って、塔屋の外壁を短期間に精度良く安全に施工
できる効果がある。請求項2によれば、1台の吊下げ装
置を使用して、建物各面でのパネル大型ユニットのスラ
イドアップを短時間に容易かつ安全に行える効果があ
る。
According to the first aspect of the present invention, panel assembly and large-scale unit assembly are performed not on the construction floor but on the lower ground surface, so safe and workable, and high-quality products can be obtained in a short period of time. In addition, since the large panel unit is installed on the roof from the lower floor at any time after building the tower building, it is attached to the tower building, so the large panel unit can be constructed prior to building the tower building or in parallel with the tower building work. Therefore, the manufacturing period can be greatly shortened also from this aspect. Therefore, there is an effect that the outer wall of the tower can be constructed accurately and safely in a short period of time. According to the second aspect, it is possible to easily and safely slide up the large panel unit on each surface of the building in a short time by using one suspension device.

【図面の簡単な説明】[Brief description of drawings]

【図1】第1発明に係る塔屋外壁用パネルの大型ユニッ
ト化工法を説明する概略側面図である。
FIG. 1 is a schematic side view illustrating a large-scale unitized construction method for a tower outdoor wall panel according to the first invention.

【図2】要部の一部切欠き正面図である。FIG. 2 is a partially cutaway front view of a main part.

【図3】第1発明の他の実施例を示す概略側面図であ
る。
FIG. 3 is a schematic side view showing another embodiment of the first invention.

【図4】第1発明の他の実施例を示す斜視図である。FIG. 4 is a perspective view showing another embodiment of the first invention.

【図5】要部の一部切欠き正面図である。FIG. 5 is a partially cutaway front view of a main part.

【図6】鉄骨各節の最上階の止水床の概略平面図であ
る。
FIG. 6 is a schematic plan view of a water stop floor on the top floor of each section of the steel frame.

【図7】鉄骨造多層建物の全天候施工法の工程説明図で
ある。
FIG. 7 is a process explanatory view of an all-weather construction method for a steel frame multi-story building.

【図8】要部の一部切欠き側面図である。FIG. 8 is a partially cutaway side view of a main part.

【図9】要部の側面図である。FIG. 9 is a side view of a main part.

【図10】要部の平面図である。FIG. 10 is a plan view of a main part.

【図11】第2発明の実施例を示す吊下げ装置の収納状
態における側面図である。
FIG. 11 is a side view of the suspension device according to the second embodiment of the present invention in a stored state.

【図12】吊下げ装置の盛り替え作業を説明する概略斜
視図である。
FIG. 12 is a schematic perspective view illustrating a refilling operation of the suspension device.

【符号の説明】[Explanation of symbols]

A…パネル大型ユニット、1…塔屋、2…屋上、3…塔
屋外壁、15…固定滑車、16…上部治具、18…第1トラバ
ーサー、19…動滑車、20…チェーンブロック、21…ワイ
ヤーロープ、22…第2トラバーサー、23…短寸の吊り
具。
A ... Large panel unit, 1 ... Tower house, 2 ... Rooftop, 3 ... Tower outdoor wall, 15 ... Fixed pulley, 16 ... Upper jig, 18 ... First traverser, 19 ... Moving pulley, 20 ... Chain block, 21 ... Wire rope , 22 ... Second traverser, 23 ... Short-sized suspenders.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 佐々木 照夫 大阪市中央区本町4丁目1番13号 株式会 社竹中工務店大阪本店内 (72)発明者 松川 正仁 大阪市中央区本町4丁目1番13号 株式会 社竹中工務店大阪本店内 (72)発明者 山根 一三 大阪市中央区本町4丁目1番13号 株式会 社竹中工務店大阪本店内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Teruo Sasaki 4-1-1 Honmachi, Chuo-ku, Osaka Stock company Takenaka Corporation Osaka Main store (72) Masahito Matsukawa 4-1-1 Honmachi, Chuo-ku, Osaka No. 13 Stock Company Takenaka Corporation Osaka Main Store (72) Inventor Ichizo Yamane 4-1-1 Hommachi, Chuo-ku, Osaka City Stock Company Takenaka Corporation Osaka Main Store

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 塔屋外壁用のパネルを下部地盤面で組み
立てて大型ユニット化しておき、屋上に塔屋を構築した
後、前記のパネル大型ユニットを屋上に吊り上げて、塔
屋に取り付けることにより、塔屋外壁を構築することを
特徴とする塔屋外壁用パネルの大型ユニット化工法。
1. A tower outdoor wall is constructed by assembling a panel for a tower outdoor wall on a lower ground surface into a large unit, constructing a tower shop on the roof, and then lifting the panel large unit on the roof and attaching it to the tower shop. A large-scale unitized construction method for panels for tower outdoor walls, which is characterized by the construction of
【請求項2】 先端部に固定滑車が装着され且つ構造体
の上端部に着脱自在に構成された複数個の上部治具と、
横長直線状の第1トラバーサーと、前記固定滑車と第1
トラバーサーに装着された動滑車とにわたって巻き掛け
られ且つチェーンブロックにより長さ調節可能に構成さ
れたワイヤーロープを介して第1トラバーサーに連結さ
れた横長直線状の第2トラバーサーと、第1トラバーサ
ーを上部治具の近くまで吊り上げた状態で上部治具に吊
り下げ支持させる短寸の吊り具とを備え、前記上部治具
には、各々、第2トラバーサーを載置した状態で固定す
る固定手段を設けてあることを特徴とする吊下げ装置。
2. A plurality of upper jigs each having a fixed pulley attached to a tip end thereof and detachably attached to an upper end portion of a structure,
A first traverser having a horizontally long straight line, the fixed pulley and the first
The first traverser and the second traverser, which is horizontally long and is wound around the moving pulley attached to the traverser and is connected to the first traverser through a wire rope whose length is adjustable by a chain block, A short suspender for suspending and supporting the upper jig in a state of being lifted close to the jig, each upper jig being provided with a fixing means for fixing the second traverser in a mounted state. A hanging device characterized by being provided.
JP34557792A 1992-11-30 1992-11-30 Construction by use of large size units of external wall panel for tower and hanging device Pending JPH06167118A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP34557792A JPH06167118A (en) 1992-11-30 1992-11-30 Construction by use of large size units of external wall panel for tower and hanging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP34557792A JPH06167118A (en) 1992-11-30 1992-11-30 Construction by use of large size units of external wall panel for tower and hanging device

Publications (1)

Publication Number Publication Date
JPH06167118A true JPH06167118A (en) 1994-06-14

Family

ID=18377539

Family Applications (1)

Application Number Title Priority Date Filing Date
JP34557792A Pending JPH06167118A (en) 1992-11-30 1992-11-30 Construction by use of large size units of external wall panel for tower and hanging device

Country Status (1)

Country Link
JP (1) JPH06167118A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104100095A (en) * 2013-04-12 2014-10-15 中建四局第三建筑工程有限公司 Method and device for mounting large-sized operating platform between two tower buildings
CN115370096A (en) * 2022-08-26 2022-11-22 陕西建工鼎盛装饰有限公司 Installation and construction method for oversized space dry-hanging wall surface based on large-scale clear water concrete slabs

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104100095A (en) * 2013-04-12 2014-10-15 中建四局第三建筑工程有限公司 Method and device for mounting large-sized operating platform between two tower buildings
CN104100095B (en) * 2013-04-12 2016-08-03 中建四局第三建筑工程有限公司 A kind of method installing large operation platform between two high buildings
CN115370096A (en) * 2022-08-26 2022-11-22 陕西建工鼎盛装饰有限公司 Installation and construction method for oversized space dry-hanging wall surface based on large-scale clear water concrete slabs
CN115370096B (en) * 2022-08-26 2023-10-24 陕西建工鼎盛装饰有限公司 Large-sized clear water concrete slab-based ultra-large space dry-hanging wall surface mounting construction method

Similar Documents

Publication Publication Date Title
CN110748139B (en) Hanging basket support system
JPH07292986A (en) Device and method for constructing long-span roof
JPH06167118A (en) Construction by use of large size units of external wall panel for tower and hanging device
US3292313A (en) Tensile system of building construction
JPH0571225A (en) Temporarily set roof of complete weather type
JP3950800B2 (en) Suspension scaffold
KR100301573B1 (en) Safety fence for building construction
JPH05133016A (en) Peripheral supporting self-rising type building engineering method
JP2942879B2 (en) Temporary house for all-weather construction
JP3066460B2 (en) How to build a tower
JPH09317185A (en) Construction method of housing
JP2964373B2 (en) All-weather construction method for steel multi-story buildings
JP2736616B2 (en) Building unit
KR102655505B1 (en) Extendable and variable gondola
JPH08165791A (en) Vertically movable type scaffold
JPH06212804A (en) Method of construction of aluminum curtain wall large-sized unit and suspending jig
JP2557161B2 (en) Roof unit with parapet
RU2312960C1 (en) Method to erect additional stories for building reconstruction
CN109098453B (en) Outer wall surface installation and construction process of sandwich board of steel structure factory building
JPH0755777B2 (en) Elevator installation method and installation work floor equipment
JP2007107352A (en) House construction method, house and lift device
JP2004076525A (en) Temporary stage
JP2839977B2 (en) Curtain wall unit assembly equipment
JP2919827B1 (en) All-weather temporary scaffolding device and method of using all-weather temporary scaffolding device
JP2562398Y2 (en) Orientation fixing fixture