JPH06147520A - Installing apparatus for floor heating mat - Google Patents

Installing apparatus for floor heating mat

Info

Publication number
JPH06147520A
JPH06147520A JP29358092A JP29358092A JPH06147520A JP H06147520 A JPH06147520 A JP H06147520A JP 29358092 A JP29358092 A JP 29358092A JP 29358092 A JP29358092 A JP 29358092A JP H06147520 A JPH06147520 A JP H06147520A
Authority
JP
Japan
Prior art keywords
mat
floor heating
frame
heating mat
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP29358092A
Other languages
Japanese (ja)
Other versions
JP3179214B2 (en
Inventor
Juichi Takahashi
寿一 高橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Gas Co Ltd
Original Assignee
Tokyo Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Gas Co Ltd filed Critical Tokyo Gas Co Ltd
Priority to JP29358092A priority Critical patent/JP3179214B2/en
Publication of JPH06147520A publication Critical patent/JPH06147520A/en
Application granted granted Critical
Publication of JP3179214B2 publication Critical patent/JP3179214B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Floor Finish (AREA)
  • Steam Or Hot-Water Central Heating Systems (AREA)
  • Central Heating Systems (AREA)
  • Domestic Hot-Water Supply Systems And Details Of Heating Systems (AREA)

Abstract

PURPOSE:To simply install and to bring flooring floors into close contact with each other by providing a mat laying frame having a lateral width to be contained between small floor joists and to be held between the joists at both side trims, and assembling a floor heating mat in a recess for containing the frame. CONSTITUTION:This installing apparatus has a containing recess 11 for containing a floor heating mat 13 on an upper surface, and a mat laying frame 10 formed with trims 12 bent horizontally at upper edges. A lateral width of the recess 11 of the frame 10 is set to a size to be contained between floor joists, and hence the frame 10 is held between the joists at the trims 12. The mat 13 is formed by arranging warm water tubes 14. When the mat 13 is contained in the recess 11 of the frame 10, the upper surface is so formed as to be in plane with the trims 12. According to this, installation of a floor heating can be facilitated, and a flooring floors can be brought into close contact with each other, and hence a floor heating with high heat transfer efficiency is performed.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、温水又は電気ヒータ利
用して床暖房を行うための床暖房マットの施工装置に関
する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a floor heating mat construction device for performing floor heating using hot water or an electric heater.

【0002】[0002]

【従来の技術】従来の床暖房(温水)マット1は図9に
示すように温水チューブ(銅管)2を発泡体3で固定
し、この上面と下面を鋼板4で押えたサンドイッチ構造
で、その施工は図10に示すように小根太5に釘打ちし
た固定金具6上に置く方法である。図中7はフローリン
グ床、8は大引きである。
2. Description of the Related Art A conventional floor heating (warm water) mat 1 has a sandwich structure in which a hot water tube (copper tube) 2 is fixed with a foam 3 as shown in FIG. The construction is a method of placing it on the fixing metal fitting 6 nailed to the small joist 5 as shown in FIG. In the figure, 7 is a flooring floor and 8 is a large pull.

【0003】[0003]

【発明が解決しようとする課題】このため、従来の床暖
房マットにおいては次のような欠点がある。
Therefore, the conventional floor heating mat has the following drawbacks.

【0004】a.小根太5の高さはまちまちであり、マ
ット1の厚さ(高さ)は一定であることから、小根太5
とマット1の上面を同一面に施工するためには、固定金
具6の位置で調整する必要がある。このため、施工に多
くの時間と手間がかる。しかし、それでも寸法出しに誤
差が生じることがあり、万一小根太5よりもマット1側
が上に出ていると、フローリング床7を施工できなくな
る。そこで、従来は小根太5よりも少し低い位置にマッ
ト1の上面がくるように固定金具6を取り付けているた
め、施工後はマット1の上面とフローリング床7との間
に隙間aが生じて伝熱性が悪くなり、特に立ち上がりが
悪いという欠点がある。
A. Since the height of the small joist 5 varies, and the thickness (height) of the mat 1 is constant, the small joist 5
In order to construct the upper surface of the mat 1 and the upper surface of the mat 1 on the same surface, it is necessary to adjust the position of the fixing bracket 6. Therefore, it takes a lot of time and labor for construction. However, this may still cause an error in dimensioning, and if the mat 1 side is located above the small joists 5, the flooring floor 7 cannot be constructed. Therefore, conventionally, since the fixing metal fitting 6 is attached so that the upper surface of the mat 1 is located at a position slightly lower than the small joist 5, there is a gap a between the upper surface of the mat 1 and the flooring floor 7 after the construction. It has the disadvantage of poor heat transfer, and especially poor start-up.

【0005】b.経年的に隙間にほこりがたまり、伝熱
性が低下して熱ロスが多くなる。
B. Over time, dust accumulates in the gaps, reducing heat transfer and increasing heat loss.

【0006】本発明の目的は、床暖房マットの施工にお
いて、上記a、bの欠点を解消することである。
An object of the present invention is to eliminate the above disadvantages a and b in the construction of a floor heating mat.

【0007】[0007]

【課題を解決するための手段】本発明に係る床暖房マッ
トの施工装置は次のとおりである。
The construction apparatus for the floor heating mat according to the present invention is as follows.

【0008】上面にマット組み込み用の収容凹部を形成
し、小根太間におさまる横幅を有し、小根太側の上縁の
一部又は全部を水平方向に折り曲げて鍔を形成して成る
マット施工枠と、前記マット施工枠の収容凹部内に組み
込むことができる床暖房マットと、から成る床暖房マッ
トの施工装置。
[0008] A mat construction in which a storage recess for mat incorporation is formed on the upper surface, has a lateral width that can be accommodated between small joists, and a part or all of the upper edge of the small joists is bent horizontally to form a brim. A floor heating mat construction device comprising a frame and a floor heating mat that can be incorporated into the accommodation recess of the mat construction frame.

【0009】なお、床暖房マットとマット施工枠とは一
体に組み合わせてもよいし、施工時に組み合わせるよう
にしてもよい。床暖房マットは温水式及び電気式の両方
を含む。次に、床暖房マットに断熱材を組み合わせる場
合には、マット施工枠の中に先ず断熱材を入れ、この上
に床暖房マットを入れてもよいし、マット施工枠の下面
に接着材にて或いはその他の手段で断熱材を取り付ける
ようにしてもよい。
The floor heating mat and the mat construction frame may be integrally combined, or may be combined at the time of construction. Floor heating mats include both hot water and electric types. Next, when combining the floor heating mat with the heat insulating material, first put the heat insulating material in the mat construction frame, and then put the floor heating mat on this, or use the adhesive on the bottom surface of the mat construction frame. Alternatively, the heat insulating material may be attached by other means.

【0010】[0010]

【作用】マット施工枠の収容凹部内には、例えばあらか
じめ床暖房マット(及び断熱材)を組み込んでおき、こ
れを施工時に現場まで運び、マット施工枠を小根太間に
落し込み、その鍔を小根太の縁に掛ける。次にマット同
士間において配管又は電源端子を接続し、次にこのマッ
ト上にフローリング床等を施工する。フローリング床を
小根太に釘止めする際は、左右の鍔にかからない中央位
置で行う。
[Function] For example, a floor heating mat (and heat insulating material) is installed in advance in the accommodating recess of the mat construction frame, and this is carried to the site during construction, and the mat construction frame is dropped between the small joists and the brim Hang it on the edge of Kota. Next, pipes or power terminals are connected between the mats, and then a flooring or the like is constructed on the mats. When nailing flooring floors to small joists, do it in a central position that does not touch the left and right brims.

【0011】[0011]

【実施例】図1において、10は上面に床暖房マットを
収容するための収容凹部11を形成し、上縁を水平方向
に折り曲げて鍔12を形成したマット施工枠である。な
お、鍔12は上縁全体に沿って形成しても、或いは間隔
をあけて所々に形成してもよい。或いは別途鍔付の受枠
を用意し、この受枠で鍔のないマット施工枠を受け止め
るように構成してもよい。13は温水チューブ14を配
管した床暖房マットにして、このマット13は図2に示
すようにマット施工枠10の収容凹部11内に鍔12と
マット13の上面が同一平面になるように収容される。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS In FIG. 1, reference numeral 10 is a mat construction frame having an accommodation recess 11 for accommodating a floor heating mat formed on the upper surface thereof and an upper edge bent horizontally to form a collar 12. The brim 12 may be formed along the entire upper edge or may be formed at intervals with intervals. Alternatively, a receiving frame with a collar may be prepared separately, and the receiving frame may be configured to receive the mat construction frame without the collar. Reference numeral 13 is a floor heating mat in which a hot water tube 14 is piped, and the mat 13 is housed in the housing recess 11 of the mat construction frame 10 so that the upper surfaces of the brim 12 and the mat 13 are flush with each other. It

【0012】図3はマット施工枠10を深目に形成し、
この収容凹部11内に断熱材15を組み込み、この上に
床暖房マット13を組み込む実施例であって、この組み
合わせた状況は図4に示されている。
In FIG. 3, the mat construction frame 10 is formed deeply,
This is an embodiment in which the heat insulating material 15 is incorporated in the accommodation recess 11, and the floor heating mat 13 is incorporated on the heat insulating material 15. The situation of this combination is shown in FIG.

【0013】図5は上記のようにマット施工枠10の収
容凹部11内に断熱材15を入れるのではなく、収容凹
部11内には床暖房マット13のみを入れ、断熱材15
をマット施工枠10の下面10aに接着剤を用いて貼着
した場合の実施例である。
In FIG. 5, the heat insulating material 15 is not placed in the housing recess 11 of the mat construction frame 10 as described above, but only the floor heating mat 13 is put in the housing recess 11 and the heat insulating material 15 is inserted.
Is an example in the case of being attached to the lower surface 10a of the mat construction frame 10 using an adhesive.

【0014】図6はマット施工枠10内には鍔12を形
成せず、別に設けた受枠10b側に鍔12を形成し、こ
の受枠10bにより鍔なしのマット施工枠10を受け止
めるように構成した実施例である。
In FIG. 6, the flange 12 is not formed in the mat construction frame 10, but the flange 12 is formed on the side of the separately provided receiving frame 10b, and the receiving frame 10b is configured to receive the mat construction frame 10 without the flange. This is an example.

【0015】図7は図1に示した実施例の施工例にし
て、小根太5に鍔12を掛けるようにしてマット施工枠
10を小根太5間に落し込み、これだけで施工を終了す
るもので、フローリング床7は釘の場合には両側の鍔1
2の間に打ち込み、接着剤の場合には鍔12上に貼り付
ける。図8は図3に示した実施例の施工例にして、施工
法は上記図7について説明した場合と同じである。
FIG. 7 shows a construction example of the embodiment shown in FIG. 1, in which the mat construction frame 10 is dropped between the small joists 5 by hanging the brim 12 on the small joists 5, and the construction is completed only by this. In case of nails, the flooring floor 7 is a collar 1 on both sides.
It is driven in between the two, and in the case of an adhesive, it is stuck on the collar 12. FIG. 8 is a construction example of the embodiment shown in FIG. 3, and the construction method is the same as that described with reference to FIG.

【0016】[0016]

【発明の効果】本発明は以上の如き構成から成り、次の
効果を奏する。
The present invention is constructed as described above and has the following effects.

【0017】a.マット施工枠を小根太間に落し込み、
鍔を小根太の上縁に掛けるだけのため、施工が簡単であ
ると共にマットの上面を同一平面内におくことができ
る。よって、例えばフローリング床との間に隙間ができ
ず、立ち上がりと伝熱効率の良い床暖房が可能である。
A. Drop the mat construction frame between the small joists,
Since the collar is simply hung on the upper edge of the small joist, the construction is easy and the upper surface of the mat can be placed in the same plane. Therefore, for example, no space is formed between the floor and the floor, and floor heating with a high rise and heat transfer efficiency is possible.

【0018】b.隙間がないためにほこりが入り込まな
い。よって、経年的に伝熱効率が低下することがない。
B. Dust does not get in because there is no gap. Therefore, the heat transfer efficiency does not decrease with age.

【0019】c.断熱材の施工も簡単である。C. Installation of heat insulating material is also easy.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係るマット施工枠と床暖房マットの斜
視図。
FIG. 1 is a perspective view of a mat construction frame and a floor heating mat according to the present invention.

【図2】床暖房マットをマット施工枠内に一体に組み込
んだ状況の断面図。
FIG. 2 is a cross-sectional view of a situation where a floor heating mat is integrally incorporated in a mat construction frame.

【図3】マット施工枠内に断熱材を一緒に組み込むよう
にした実施例の説明図。
FIG. 3 is an explanatory view of an embodiment in which a heat insulating material is incorporated together in a mat construction frame.

【図4】マット施工枠内に断熱材と床暖房マットを組み
込んだ状況の断面図。
FIG. 4 is a cross-sectional view of a state in which a heat insulating material and a floor heating mat are incorporated in the mat construction frame.

【図5】マット施工枠の下面に断熱材を接着した状況の
説明図。
FIG. 5 is an explanatory view of a situation where a heat insulating material is adhered to the lower surface of the mat construction frame.

【図6】鍔なしマット施工枠を鍔付の受枠で受け止める
ようにした実施例の説明図。
FIG. 6 is an explanatory diagram of an embodiment in which a mat construction frame without a collar is received by a receiving frame with a collar.

【図7】図1に示した実施例の施工例の説明図。FIG. 7 is an explanatory view of a construction example of the embodiment shown in FIG.

【図8】図3に示した実施例の施工例の説明図。FIG. 8 is an explanatory view of a construction example of the embodiment shown in FIG.

【図9】従来の床暖房マットの説明図。FIG. 9 is an explanatory view of a conventional floor heating mat.

【図10】従来の床暖房マットの施工例の説明図。FIG. 10 is an explanatory view of a construction example of a conventional floor heating mat.

【符号の説明】[Explanation of symbols]

5 小根太 10 マット施工枠 11 収容凹部 12 鍔 13 床暖房マット 14 温水チューブ 15 断熱材 5 Koneta 10 Mat construction frame 11 Housing recess 12 Tsuba 13 Floor heating mat 14 Hot water tube 15 Insulation material

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 上面に床暖房マット組み込み用の収容凹
部を形成し、小根太間におさまる横幅を有し、小根太側
の上縁の全部又は一部を水平方向に折り曲げて鍔を形成
して成るマット施工枠と、 前記マット施工枠の収容凹部内に組み込むことができる
床暖房マットと、 から成る床暖房マットの施工装置。
1. A storage recess for incorporating a floor heating mat is formed on the upper surface, and has a width that fits between the small joists, and all or part of the upper edge of the small joists is bent horizontally to form a brim. An apparatus for constructing a floor heating mat, comprising: a mat construction frame made up of the above; and a floor heating mat that can be incorporated into the accommodation recess of the mat construction frame.
【請求項2】 床暖房マットに温水チューブを組み込ん
で成る請求項1記載の床暖房マットの施工装置。
2. The floor heating mat construction apparatus according to claim 1, wherein a hot water tube is incorporated in the floor heating mat.
【請求項3】 床暖房マットに電気ヒータを組み込んで
成る請求項1記載の床暖房マットの施工装置。
3. The floor heating mat construction device according to claim 1, wherein an electric heater is incorporated in the floor heating mat.
【請求項4】 マット施工枠の下面に断熱材を取り付け
て成る請求項1又は請求項2又は請求項3記載の床暖房
マットの施工装置。
4. The floor heating mat construction apparatus according to claim 1, 2 or 3, wherein a heat insulating material is attached to a lower surface of the mat construction frame.
【請求項5】 マット施工枠の中に先ず断熱材を組み込
み、この上に床暖房マットを組み込んで成る請求項1又
は請求項2又は請求項3記載の床暖房マットの施工装
置。
5. The floor heating mat construction apparatus according to claim 1, 2 or 3, wherein a heat insulating material is first incorporated in the mat construction frame, and the floor heating mat is incorporated thereon.
JP29358092A 1992-10-30 1992-10-30 Floor heating mat construction equipment Expired - Lifetime JP3179214B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP29358092A JP3179214B2 (en) 1992-10-30 1992-10-30 Floor heating mat construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP29358092A JP3179214B2 (en) 1992-10-30 1992-10-30 Floor heating mat construction equipment

Publications (2)

Publication Number Publication Date
JPH06147520A true JPH06147520A (en) 1994-05-27
JP3179214B2 JP3179214B2 (en) 2001-06-25

Family

ID=17796575

Family Applications (1)

Application Number Title Priority Date Filing Date
JP29358092A Expired - Lifetime JP3179214B2 (en) 1992-10-30 1992-10-30 Floor heating mat construction equipment

Country Status (1)

Country Link
JP (1) JP3179214B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000001989A1 (en) * 1998-07-02 2000-01-13 Hong, Hae, Soon Panel for air conditioning and room air conditioning system using the panel
CN110552480A (en) * 2019-08-15 2019-12-10 浙江亚厦装饰股份有限公司 Floor heating insulation board and floor heating system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000001989A1 (en) * 1998-07-02 2000-01-13 Hong, Hae, Soon Panel for air conditioning and room air conditioning system using the panel
CN110552480A (en) * 2019-08-15 2019-12-10 浙江亚厦装饰股份有限公司 Floor heating insulation board and floor heating system

Also Published As

Publication number Publication date
JP3179214B2 (en) 2001-06-25

Similar Documents

Publication Publication Date Title
JPH06147520A (en) Installing apparatus for floor heating mat
JP2002333148A (en) Floor panel
JPH08319712A (en) Floor heating structure
JP4559657B2 (en) Floor heating panel structure and manufacturing method thereof
JP2993491B2 (en) Floor heating panel
JP4087658B2 (en) Floor heating panel structure
JPH1163532A (en) Heat-accumulative floor heating unit
JP3321633B2 (en) Roof
JP5103091B2 (en) Building basic insulation structure and construction method
JPH1163531A (en) Heat-accumulative floor heating unit
JP2000074401A (en) Floor heater
JPS6349447Y2 (en)
WO2005005889A1 (en) Floor-heating device
JPS591934A (en) Floor panel for space heating
JP2004076353A (en) Heat insulation air-tight structure
JP2645250B2 (en) Decorative panel
JPH0740898Y2 (en) Floor heating panel
JP2582101Y2 (en) Floor panel
JP2004271106A (en) Floor heating panel and floor heating method using the same
JP2004239492A (en) Heat storage unit and floor heating panel structure
JP2001153382A (en) Heater unit for thermal storage floor heating
JPS6041368Y2 (en) Architectural insulation fasteners
JPH0640766Y2 (en) Panel type floor heating structure
JPH0579650A (en) Layout method of floor heating panel made of non-creaking floor board
JP3021835B2 (en) Flooring unit

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090413

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090413

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100413

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110413

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 11

Free format text: PAYMENT UNTIL: 20120413

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130413

Year of fee payment: 12

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130413

Year of fee payment: 12