JPH0586810A - Load control method for composite power generating plant and device therefor - Google Patents

Load control method for composite power generating plant and device therefor

Info

Publication number
JPH0586810A
JPH0586810A JP3243445A JP24344591A JPH0586810A JP H0586810 A JPH0586810 A JP H0586810A JP 3243445 A JP3243445 A JP 3243445A JP 24344591 A JP24344591 A JP 24344591A JP H0586810 A JPH0586810 A JP H0586810A
Authority
JP
Japan
Prior art keywords
load
plant
gas turbine
turbines
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP3243445A
Other languages
Japanese (ja)
Other versions
JP3007724B2 (en
Inventor
Shuji Saito
修二 斎藤
Tsugio Hashimoto
継男 橋本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP3243445A priority Critical patent/JP3007724B2/en
Publication of JPH0586810A publication Critical patent/JPH0586810A/en
Application granted granted Critical
Publication of JP3007724B2 publication Critical patent/JP3007724B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/16Combined cycle power plant [CCPP], or combined cycle gas turbine [CCGT]

Landscapes

  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

PURPOSE:To economically control the number of gas turbines to be operated at high efficiency by conducting a plant load lowering operation to a target load of a plant with all of the gas turbines when the plant load is decreased, and maintaining the target load with the required gas turbines after the target load is achieved. CONSTITUTION:In a composite power generating plant, a plurality of gas turbines 3a-3c are disposed in parallel. Exhaust heat of the gas turbines 3a-3c is recovered in exhaust heat recovery boilers 5a-5c, respectively. One steam turbine 6 is driven by steam generated by heating in the recovery boilers 5a-5c. The three gas turbines 3a-3c drop load until a plant load becomes 50%. When the plant load becomes 50%, the gas turbine 3a further drops the load, to be stopped. The residual gas turbines 3b, 3c perform operation for maintaining the plant load at 50%.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は複合発電プラントの負荷
制御方法及びその装置に係り、特に、ガスタービンの運
転台数を増減して負荷制御を行うのに好適な負荷制御方
法及びその装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a load control method and apparatus for a combined cycle power plant, and more particularly to a load control method and apparatus suitable for load control by increasing or decreasing the number of operating gas turbines.

【0002】[0002]

【従来の技術】複数のガスタービンを有する複合発電プ
ラントを高効率且つ経済的に運用する場合、ガスタービ
ンの運転台数を制御する。特公昭60−523号公報記
載の従来技術では、各電力系統下の個々の発電プラント
に与えられる給電指令とガスタービン運転台数別の最大
可能出力とを比較した結果、或いは、ガスタービン起動
停止時の熱損失とガスタービン運転台数別の熱効率変化
分とを比較した結果、或いは、ガスタービン起動停止回
数によるガスタービンの寿命消費率等により、与えられ
た給電指令に対する最適なガスタービン運転台数を選択
している。
2. Description of the Related Art When operating a combined cycle power plant having a plurality of gas turbines with high efficiency and economy, the number of operating gas turbines is controlled. In the conventional technique described in Japanese Patent Publication No. 60-523, the result of comparison between the power supply command given to each power plant under each power system and the maximum possible output for each operating number of gas turbines, or when the gas turbine is started or stopped The optimum number of operating gas turbines for a given power supply command is selected based on the result of comparing the heat loss of the is doing.

【0003】[0003]

【発明が解決しようとする課題】上記従来技術は、ガス
タービンの運転台数増減の要否の判断と運転台数の決定
方法については最適の回答を与えるものであるが、ガス
タービン運転台数増減時にいかに各ガスタービン個々を
運転するかについてまで配慮していないという問題があ
る。
The above-mentioned prior art gives optimum answers regarding the determination of whether or not the number of operating gas turbines needs to be increased or decreased and the method of determining the number of operating gas turbines. There is a problem in that it does not consider whether to operate each gas turbine individually.

【0004】本発明の目的は、ガスタービンの運転台数
を増減してプラント負荷の増減に対処するに際し高効率
且つ経済的にガスタービンの運転を制御する負荷制御方
法及びその装置を提供することにある。
An object of the present invention is to provide a load control method and apparatus for controlling the operation of gas turbines with high efficiency and economically when the number of operating gas turbines is increased or decreased to cope with the increase or decrease of plant load. is there.

【0005】[0005]

【課題を解決するための手段】上記目的は、複数のガス
タービンと、任意台数の排熱回収ボイラと、任意台数の
蒸気タービンとで構成される複合発電プラントの前記ガ
スタービンの運転台数を増減させる負荷制御において、
プラント負荷が減少したとき、プラントの目標負荷まで
ガスタービン全台にてプラント負荷降下運転を行い、目
標負荷到達後は所要のガスタービンのみ負荷降下または
停止して残りのガスタービンで前記目標負荷を維持する
運転を行うことで、達成される。(請求項1,7の発
明) 上記目的はまた、プラント負荷が減少したとき、所要の
ガスタービンのみ負荷降下または停止し、残りのガスタ
ービンでプラント目標負荷になるように運転すること
で、達成される。(請求項2,8の発明) 上記目的はまた、プラント負荷が減少したとき、所要の
ガスタービンのみ負荷降下または停止し、残りのガスタ
ービンでプラント目標負荷までプラント負荷降下運転を
行い、その後、目標負荷を維持する運転を行うことで、
達成される。(請求項3,9の発明) 上記目的はまた、プラント負荷が増加したとき、運転継
続中のガスタービンは当該ガスタービン負荷を継続し、
停止中のガスタービンは前記ガスタービン負荷を目標負
荷として起動,負荷上昇を行い、追加起動したガスター
ビンが前記目標負荷に到達してから運転継続中のガスタ
ービンと並列運転に入り、その後、運転中のガスタービ
ン全台にてプラント負荷制御を行うことで、達成され
る。(請求項4,10の発明) 上記目的はまた、プラント負荷が増加したとき、運転継
続中のガスタービンを制御してプラントの目標負荷に移
行させ、停止中のガスタービンは起動後に前記目標負荷
まで負荷上昇し、追加起動したガスタービンが目標負荷
到達後に運転継続中のガスタービンと並列運転に入り、
その後、運転中のガスタービン全台にてプラント負荷制
御を行うことで、達成される。(請求項5,11の発
明) 上記目的はまた、プラント負荷が増加したとき、運転継
続中のガスタービンを制御してプラントの目標負荷に移
行させ、停止中のガスタービンは起動後に運転継続中の
ガスタービン負荷または同一運転状態まで負荷上昇し、
同一負荷または同一運転状態になったとき追加起動した
ガスタービンと運転継続中のガスタービンとを並列運転
し、その後、運転中のガスタービン全台にてプラント負
荷制御を行うことで、達成される。(請求項6,12の
発明)
The above-mentioned object is to increase or decrease the number of operating gas turbines of a combined cycle power plant composed of a plurality of gas turbines, an arbitrary number of exhaust heat recovery boilers, and an arbitrary number of steam turbines. Load control,
When the plant load decreases, the plant load reduction operation is performed on all the gas turbines up to the target load of the plant, and after reaching the target load, only the required gas turbine is lowered or stopped and the remaining gas turbine is set to the target load. This is achieved by maintaining operation. (Inventions of Claims 1 and 7) The above object is also achieved by operating only the required gas turbines so that the load is reduced or stopped when the plant load decreases and the remaining gas turbines operate so as to reach the plant target load. To be done. (Invention of Claims 2 and 8) In addition, when the plant load is reduced, only the required gas turbine is lowered or stopped, and the remaining gas turbines perform the plant load reduction operation to the target load of the plant, and thereafter, By operating to maintain the target load,
To be achieved. (Invention of Claims 3 and 9) The above-mentioned object is also that when the plant load increases, the gas turbine under continuous operation continues the gas turbine load,
The stopped gas turbine starts and increases the load by using the gas turbine load as a target load, and after the additionally started gas turbine reaches the target load, the gas turbine is put into parallel operation with the gas turbine that is continuing operation, and then the operation is performed. This is achieved by controlling the plant load on all of the middle gas turbines. (Invention of Claims 4 and 10) In addition, when the plant load increases, the above object is to control the gas turbine during continuous operation to shift to the target load of the plant, and to stop the gas turbine after the start-up of the target load. The load rises up to, and the additionally started gas turbine enters parallel operation with the gas turbine that is continuing operation after reaching the target load.
After that, this is achieved by performing plant load control on all operating gas turbines. (Invention of Claims 5 and 11) In addition, when the plant load increases, the above object is to control the gas turbine under continuous operation so as to shift to the target load of the plant, and the gas turbine under shutdown continues to operate after starting. The gas turbine load or the load increase to the same operating condition,
This is achieved by operating the gas turbine that has been additionally started when the load is the same or in the same operating state and operating the gas turbine in parallel, and then performing plant load control on all operating gas turbines. .. (Inventions of Claims 6 and 12)

【0006】[0006]

【作用】プラント負荷が減少したとき、プラントの目標
負荷までガスタービン全台にてプラント負荷降下運転を
行い或いはその中の所要のガスタービンのみ停止し、目
標負荷到達後は所要のガスタービンのみ負荷降下または
停止して残りのガスタービンで前記目標負荷を維持する
運転を行うことで、ガスタービン運転台数減時のプラン
ト負荷追従を必要最小限の時間で行う。
[Operation] When the plant load decreases, the plant load down operation is performed on all the gas turbines up to the target load of the plant, or only the required gas turbine among them is stopped, and after reaching the target load, only the required gas turbine is loaded. By performing the operation of lowering or stopping and maintaining the target load in the remaining gas turbines, the plant load following when the number of operating gas turbines decreases is performed in the necessary minimum time.

【0007】プラント負荷が減少したとき、所要のガス
タービンのみ負荷降下または停止し、残りのガスタービ
ンでプラント目標負荷までプラント負荷降下運転を行
い、その後、目標負荷を維持する運転を行うことで、ガ
スタービン運転台数減時の操作を必要最小限にする。
When the plant load decreases, only the required gas turbine is lowered or stopped, the remaining gas turbines perform the plant load reduction operation up to the plant target load, and then perform the operation for maintaining the target load. Minimize the operation when the number of operating gas turbines decreases.

【0008】プラント負荷が増加したとき、運転継続中
のガスタービンは当該ガスタービン負荷を継続し、停止
中のガスタービンは前記ガスタービン負荷を目標負荷と
して起動,負荷上昇を行い、追加起動したガスタービン
が前記目標負荷に到達してから運転継続中のガスタービ
ンと並列運転に入り、その後、運転中のガスタービン全
台にてプラント負荷制御を行うことで、ガスタービン運
転台数増時の操作を必要最小限にする。
When the plant load increases, the gas turbine under continuous operation continues the gas turbine load, and the stopped gas turbine starts and increases the load with the gas turbine load as a target load. After the turbine reaches the target load, it enters into parallel operation with the gas turbine that is still in operation, and after that, by performing plant load control on all operating gas turbines, the operation when increasing the number of operating gas turbines is performed. Minimize it as necessary.

【0009】プラント負荷が増加したとき、運転継続中
のガスタービンを制御してプラントの目標負荷に移行さ
せ、停止中のガスタービンは起動後に前記目標負荷まで
負荷上昇し、追加起動したガスタービンが目標負荷到達
後に運転継続中のガスタービンと並列運転に入り、その
後、運転中のガスタービン全台にてプラント負荷制御を
行うことで、ガスタービン運転台数増時の操作完了にて
所定のプラント目標負荷にする。
When the load on the plant increases, the gas turbine under continuous operation is controlled to shift to the target load of the plant, and the gas turbine under stop increases its load up to the target load after startup, and the additionally started gas turbine is After the target load is reached, parallel operation is started with the gas turbine in operation, and then the plant load control is performed for all operating gas turbines. To load.

【0010】プラント負荷が増加したとき、運転継続中
のガスタービンを制御してプラントの目標負荷に移行さ
せ、停止中のガスタービンは起動後に運転継続中のガス
タービン負荷または同一運転状態まで負荷上昇し、同一
負荷または同一運転状態になったとき追加起動したガス
タービンと運転継続中のガスタービンとを並列運転し、
その後、運転中のガスタービン全台にてプラント負荷制
御を行うことで、ガスタービン運転台数増時の操作完了
まで、安定したプラント負荷を得る。
When the plant load increases, the gas turbine in continuous operation is controlled to shift to the target load of the plant, and the gas turbine in stop is loaded to the gas turbine load in continuous operation after startup or to the same operating state. Then, when the same load or the same operating state is reached, the gas turbine that has been additionally started and the gas turbine that is still operating are operated in parallel,
Then, by performing plant load control on all operating gas turbines, a stable plant load is obtained until the operation is completed when the number of operating gas turbines is increased.

【0011】[0011]

【実施例】以下、本発明の一実施例を図面を参照して説
明する。図7は、多軸型の複合発電プラントの構成図で
ある。この複合発電プラントでは、3台のガスタービン
3a,3b,3cを並列に設置し、各ガスタービン3
a,3b,3cの排熱を夫々排熱回収ボイラ5a,5
b,5cにて回収して、各排熱回収ボイラ5a,5b,
5cにて加熱して得た蒸気にて1台の蒸気タービン6を
駆動するようになっている。各ガスタービン5a(5
b,5cにおいても同様なので、5aの系統についての
み説明を行うが、他の5b,5cの系統でも同様であ
る。)には空気圧縮器1aが同軸に取り付けられてい
る。空気圧縮器1aの回転により大気中の空気Aaが加
圧されて燃焼器2a内に送り込まれ、ここで燃料Faと
共に燃焼される。燃焼ガスはガスタービン3aに入り、
ここで機械動力を発生して発電機4aで電気エネルギー
に変換する。ガスタービン3aで仕事を終えた高温排ガ
スは排熱回収ボイラ5aに導かれ、ここで水がこの高温
排ガスと熱交換して蒸気となる。排熱回収ボイラ5aを
出た排ガスは、煙突10を経由して大気中に放出され
る。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings. FIG. 7 is a configuration diagram of a multi-axis combined power plant. In this combined cycle power plant, three gas turbines 3a, 3b, 3c are installed in parallel and each gas turbine 3
Exhaust heat of a, 3b, 3c is respectively collected by the exhaust heat recovery boilers 5a, 5a.
b, 5c to recover the exhaust heat recovery boilers 5a, 5b,
One steam turbine 6 is driven by the steam obtained by heating at 5c. Each gas turbine 5a (5
Since the same applies to b and 5c, only the system of 5a will be described, but the same applies to the other systems of 5b and 5c. ), An air compressor 1a is coaxially attached. The air Aa in the atmosphere is pressurized by the rotation of the air compressor 1a and is sent into the combustor 2a, where it is burned together with the fuel Fa. Combustion gas enters the gas turbine 3a,
Here, mechanical power is generated and converted into electric energy by the generator 4a. The hot exhaust gas that has finished its work in the gas turbine 3a is guided to the exhaust heat recovery boiler 5a, where water exchanges heat with the hot exhaust gas to become steam. The exhaust gas emitted from the exhaust heat recovery boiler 5a is released into the atmosphere via the chimney 10.

【0012】排熱回収ボイラ5aで発生した蒸気は、蒸
気止弁11aを経由して他のボイラ5b,5cからの蒸
気と共に主蒸気管14に集められ、蒸気タービン入口弁
13を通り蒸気タービン6に入る。ここで発生した機械
動力は発電機7にて電気エネルギーに変換される。蒸気
タービン6で仕事を終えた排気蒸気は、復水器8にて復
水となり、給水ポンプ9により排熱回収ボイラ5aに給
水される。また、何等かの条件により排熱回収ボイラ5
aで発生する蒸気が余剰となった場合には、タービンバ
イパス弁12aが開弁しタービンバイパス管15を通し
て余剰の蒸気を復水器8に排出する。
The steam generated in the exhaust heat recovery boiler 5a is collected in the main steam pipe 14 together with the steam from the other boilers 5b and 5c via the steam stop valve 11a, passes through the steam turbine inlet valve 13 and the steam turbine 6 to go into. The mechanical power generated here is converted into electric energy by the generator 7. The exhaust steam that has finished its work in the steam turbine 6 becomes condensed water in the condenser 8 and is supplied to the exhaust heat recovery boiler 5a by the water supply pump 9. Also, depending on some conditions, the exhaust heat recovery boiler 5
When the steam generated in “a” becomes excessive, the turbine bypass valve 12 a opens and the surplus steam is discharged to the condenser 8 through the turbine bypass pipe 15.

【0013】斯かる多軸型の複合発電プラントの運用の
一つとして、特公昭60−523号公報記載のガスター
ビン運転台数制御があり、プラントを高効率且つ経済的
に運用するうえで不可欠である。このガスタービン運転
台数制御を行うに際し、本実施例では、以下の様にして
ガスタービンの負荷制御を行う。
As one of the operations of such a multi-axis type combined power generation plant, there is a gas turbine operating unit number control described in Japanese Patent Publication No. 60-523, which is indispensable for operating the plant highly efficiently and economically. is there. When performing the control of the number of operating gas turbines, in the present embodiment, the load control of the gas turbine is performed as follows.

【0014】図1は、本発明の第1実施例(請求項1,
7に対応)に係る負荷制御におけるプラント負荷PL,
蒸気タービン負荷STL,ガスタービン負荷GTLの時
間変化を示すグラフである。本実施例では、プラント負
荷PL1を時間t0〜t1までに100%から50%に減
少させるに当り、ガスタービン3aを停止させ、残りの
ガスタービン3b,3cで運転する。そこで先ず、プラ
ント負荷PL1が50%になるまで3台のガスタービン
3a,3b,3cで負荷降下し、時間t1で50%にな
ったとき、ガスタービン3aを更に負荷降下して停止さ
せ、残りのガスタービン3b,3cでプラント負荷PL
1が50%を維持するように、蒸気タービン負荷STL1
の降下に伴い、ガスタービン負荷GTL1b,GTL1c
の負荷上昇運転を行う。これにより、時間t2に、蒸気
タービン6の負荷STL1とガスタービン3b,3cの
負荷GTL1b,GTL1cも整定する。
FIG. 1 shows a first embodiment of the present invention (claim 1,
Plant load PL in load control according to
It is a graph which shows the time change of steam turbine load STL and gas turbine load GTL. In this embodiment, the gas turbine 3a is stopped and the remaining gas turbines 3b and 3c are operated when the plant load PL1 is reduced from 100% to 50% by the time t0 to t1. Therefore, first, the load is lowered by the three gas turbines 3a, 3b, 3c until the plant load PL1 becomes 50%, and when it becomes 50% at time t1, the gas turbine 3a is further lowered and stopped, and the remaining Plant load PL with the gas turbines 3b, 3c of
1 to maintain 50%, steam turbine load STL1
Gas turbine load GTL1b, GTL1c
Perform the load increase operation of. As a result, the load STL1 of the steam turbine 6 and the loads GTL1b and GTL1c of the gas turbines 3b and 3c are also settled at time t2.

【0015】蒸気タービン6の負荷STL1の特性は、
複合発電プラントの特徴である排熱回収ボイラ5a,5
b,5cで発生する蒸気の応答遅れによるものである。
従って、この応答遅れをカバーするため、ガスタービン
3a,3b,3cの負荷GTL1は、一時的に降下し、
運転継続するガスタービン3b,3cの負荷GTL1b,
GTL1cのみ、ガスタービン運転台数継続減完了後の整
定負荷(時間t2における負荷)まで上昇するものであ
る。
The characteristic of the load STL1 of the steam turbine 6 is:
Exhaust heat recovery boiler 5a, 5 which is a feature of the combined cycle power plant
This is due to the delay in the response of steam generated in b and 5c.
Therefore, in order to cover this response delay, the load GTL1 of the gas turbines 3a, 3b, 3c temporarily drops,
Load GTL1b of the gas turbines 3b and 3c that continue to operate,
Only GTL1c is increased to the settling load (load at time t2) after the continuous reduction of the number of operating gas turbines.

【0016】尚、蒸気タービン6の負荷STL1を時間
t1にて整定させる場合(時間t2と同一の負荷)は、図
7におけるタービンバイパス弁12a,12b,12c
のいずれか少なくとも最低1つを開弁し、蒸気タービン
6に入る蒸気の一部を直接復水器8に流すことで可能と
なる。この場合、プラント負荷PL1が50%に達する
時間はt1より早くなるため、ガスタービン3b,3c
の負荷GTL1b,GTL1cの降下量を小さくすることが
できる。
When the load STL1 of the steam turbine 6 is settled at time t1 (the same load as at time t2), the turbine bypass valves 12a, 12b, 12c in FIG.
It is possible to open at least one of the above and allow a part of the steam entering the steam turbine 6 to flow directly to the condenser 8. In this case, since the time required for the plant load PL1 to reach 50% is earlier than t1, the gas turbines 3b, 3c
The load GTL1b and GTL1c can be reduced in a small amount.

【0017】図2は本発明の第2実施例(請求項2,8
に対応)に係る負荷制御におけるプラント負荷PL,蒸
気タービン負荷STL,ガスタービン負荷GTLの時間
変化を示すグラフである。本実施例では、プラント負荷
を100%から50%に減少させるとき、ガスタービン
3aを負荷降下して停止させ、残りのガスタービン3
b,3cでプラント負荷が50%となるように運転す
る。一般に、ガスタービン3a,3b,3cの停止時の
負荷変化率と、通常運転中の負荷変化率が同一値となっ
ているため、ガスタービン3aを時間t0から停止操作
しても、プラント負荷PLが50%に達した自転から停
止操作しても、その負荷特性は同様なものとなる(図1
のGTL1a=図2のGTL2a)。従って、運転継続を
行うガスタービン3b,3cの負荷GTL2b,GTL
2cと蒸気タービン6の負荷STL2とプラント負荷PL
2とは図1と同じ特性となる。また、図1と同様に、タ
ービンバイパス弁12a,12b,12cのいずれか少
なくとも最低1つを開弁した場合においても同様の特性
となる。
FIG. 2 shows a second embodiment of the present invention (claims 2, 8).
Is a graph showing a time change of the plant load PL, the steam turbine load STL, and the gas turbine load GTL in the load control according to (1). In the present embodiment, when the plant load is reduced from 100% to 50%, the gas turbine 3a is lowered and stopped, and the remaining gas turbine 3
Operate so that the plant load becomes 50% in b and 3c. In general, the load change rate when the gas turbines 3a, 3b, 3c are stopped and the load change rate during normal operation have the same value, so even if the gas turbine 3a is stopped from the time t0, the plant load PL Even if the rotation is stopped after the rotation reaches 50%, the load characteristics are similar (Fig. 1
GTL1a = GTL2a in FIG. 2). Therefore, the loads GTL2b, GTL of the gas turbines 3b, 3c that continue the operation
2c and load STL2 of steam turbine 6 and plant load PL
2 has the same characteristics as in FIG. Similar to FIG. 1, the same characteristics are obtained when at least one of the turbine bypass valves 12a, 12b, 12c is opened.

【0018】図3は、本発明の第3実施例(請求項3,
9に対応)に係る負荷制御におけるプラント負荷PL,
蒸気タービン負荷STL,ガスタービン負荷GTLの時
間変化を示すグラフである。この実施例では、運転継続
するガスタービン3b,3cの負荷をガスタービン運転
台数減完了後のガスタービン3b,3cの整定負荷を目
標として負荷降下させるものである。即ち、図2の第2
実施例において時間t4にて整定するガスタービン3
b,3cの負荷GTL2b,GTL2cを、本実施例で
は、予め時間t0にて負荷降下目標して与える。この目
標負荷に達した時間t5以降は、ガスタービン3b,3
cの負荷GTL3b,GTL3cは一定となり、蒸気ター
ビン6の負荷STL3の降下に伴い、プラント負荷PL3
も降下し、時間t6にて整定する。尚、本実施例におい
ても、第1,第2実施例と同様に、タービンバイパス弁
12a,12b,12cのいずれか少なくとも最低1つ
を開弁することで、同様の特性を得ることができる。
FIG. 3 shows a third embodiment of the present invention (claim 3,
Corresponding to 9), the plant load PL in the load control according to
It is a graph which shows the time change of steam turbine load STL and gas turbine load GTL. In this embodiment, the load of the gas turbines 3b, 3c that continues to operate is lowered with the target of the settling load of the gas turbines 3b, 3c after the reduction of the number of operating gas turbines. That is, the second of FIG.
Gas turbine 3 settling at time t4 in the embodiment
In the present embodiment, the loads GTL2b and GTL2c of b and 3c are given as load reduction targets at time t0 in advance. After time t5 when this target load is reached, the gas turbines 3b, 3
The loads GTL3b and GTL3c of c become constant, and as the load STL3 of the steam turbine 6 drops, the plant load PL3
Also descends and settles at time t6. In this embodiment as well, similar to the first and second embodiments, the same characteristics can be obtained by opening at least one of the turbine bypass valves 12a, 12b, 12c.

【0019】図4は、本発明の第4実施例(請求項4,
10に対応)に係る負荷制御におけるプラント負荷P
L,蒸気タービン負荷STL,ガスタービン負荷GTL
の時間変化を示すグラフであり、ガスタービン3aが停
止している状態からプラント負荷が増加したときの制御
に関するものである。本実施例では、プラント負荷PL
4を時間t0からt11までに50%から100%に増加さ
せるに当り、ガスタービン3aを追加起動するものであ
る。そして、ガスタービン3aが起動し負荷運転に入っ
た時点でのガスタービン3b,3c負荷GTL4b,GT
L4cを負荷待機または負荷固定とし、この負荷を目標負
荷として、ガスタービン3aの負荷上昇を行う。ガスタ
ービン3aの負荷GTL4aが負荷GTL4b,GTL4cと
同じになり(勿論、若干のプラスマイナスの裕度は許容
する。)、図7に示す排熱回収ボイラ5aから発生する
蒸気の条件が成立したならば(圧力,温度,流量等のい
ずれか少なくとも最低1つの状態量が、排熱回収ボイラ
5b,5cからの蒸気の状態量と同等または許容偏差内
になること。)、蒸気止弁11aを時間t8の時点で開
弁して、蒸気タービン6にその発生蒸気を流入する。つ
まり、3台のガスタービンの並列運転に入る。ガスター
ビン3aが起動してから蒸気止弁11aが開弁するまで
の間は、排熱回収ボイラ5aで発生する蒸気をタービン
バイパス弁12aを介して復水器8に流すタービンバイ
パス運転を行う。
FIG. 4 shows a fourth embodiment of the present invention (claim 4).
Corresponding to 10) plant load P in load control
L, steam turbine load STL, gas turbine load GTL
Is a graph showing the change over time, and relates to control when the plant load increases from the state in which the gas turbine 3a is stopped. In this embodiment, the plant load PL
When increasing 4 from 50% to 100% from time t0 to time t11, the gas turbine 3a is additionally started. Then, the gas turbines 3b, 3c load GTL4b, GT at the time when the gas turbine 3a starts up and enters the load operation
The load of the gas turbine 3a is increased by setting L4c as a standby or fixed load and using this load as a target load. If the load GTL4a of the gas turbine 3a becomes the same as the loads GTL4b and GTL4c (of course, a slight margin of plus or minus is allowed), and if the conditions of the steam generated from the exhaust heat recovery boiler 5a shown in FIG. 7 are satisfied. If (at least one state quantity of any one of pressure, temperature, flow rate, etc. is equal to or within an allowable deviation of the state quantity of steam from the exhaust heat recovery boilers 5b, 5c), the steam stop valve 11a is turned on. At time t8, the valve is opened and the generated steam flows into the steam turbine 6. That is, the parallel operation of the three gas turbines is started. During the period from the start of the gas turbine 3a to the opening of the steam stop valve 11a, the turbine bypass operation in which the steam generated in the exhaust heat recovery boiler 5a is passed to the condenser 8 via the turbine bypass valve 12a is performed.

【0020】蒸気止弁11aが開弁し、タービンバイパ
ス弁12aが全閉したならば(時間t9の時点)、ガス
タービン3a,3b,3cは負荷GTL4(ガスタービ
ン運転台数増完了後のプラント目標負荷)となるように
負荷上昇を行う。この過程で、蒸気タービン6の負荷S
TL4は、時間t8から上昇し時間t11で整定する。ま
た、プラント負荷PL4も時間t0から上昇し、時間t11
で整定する特性となる。
When the steam stop valve 11a is opened and the turbine bypass valve 12a is fully closed (at time t9), the gas turbines 3a, 3b, 3c are loaded with GTL4 (the plant target after completion of the increase in the number of operating gas turbines). Load) to increase the load. In this process, the load S of the steam turbine 6
TL4 rises from time t8 and settles at time t11. Further, the plant load PL4 also rises from the time t0 and the time t11
It becomes the characteristic to settle with.

【0021】図5は、本発明の第5実施例(請求項5,
11に対応)に係る負荷制御におけるプラント負荷P
L,蒸気タービン負荷STL,ガスタービン負荷GTL
の時間変化を示すグラフである。本実施例は、第4実施
例と略同様であり、異なる点としては、運転継続中のガ
スタービン3b,3cの負荷GTL5b,GTL5cを時間
t0から最終的な目標であるプラント負荷100%が得
られる負荷まで上昇させるものであり、追加起動したガ
スタービン3aの負荷GTL5aが100%に到達し、図
4の第4実施例と同様に蒸気止弁11aとタービンバイ
パス弁12aを操作し終了した時点(時間t15のの時
点)で、プラント負荷PLが目標負荷まで到達する特性
となる。
FIG. 5 shows a fifth embodiment of the present invention (claims 5 and 5).
(Corresponding to 11), the plant load P in the load control according to
L, steam turbine load STL, gas turbine load GTL
It is a graph which shows the time change of. This embodiment is substantially the same as the fourth embodiment, except that the loads GTL5b and GTL5c of the gas turbines 3b and 3c during the continuous operation are obtained from the time t0 so that the final target plant load is 100%. When the load GTL5a of the additionally started gas turbine 3a reaches 100% and the steam stop valve 11a and the turbine bypass valve 12a are operated and finished as in the fourth embodiment of FIG. At (time t15), the plant load PL has a characteristic of reaching the target load.

【0022】図6は、本発明の第6実施例(請求項6,
12に対応)に係る負荷制御におけるプラント負荷P
L,蒸気タービン負荷STL,ガスタービン負荷GTL
の時間変化を示すグラフである。本実施例では、運転継
続中のガスタービン3b,3cは、追加起動したガスタ
ービン3aの起動操作(図4の第4実施例と同様に、蒸
気止弁11a開と、タービンバイパス弁12a全閉ま
で)が完了する時間18まで、プラント負荷PL6を時間
t0と同一負荷または時間t0にて目標とした任意の負荷
を維持するように制御する。そして、時間t18からガス
タービン3a,3b,3cの全台にてプラント負荷を制
御する。
FIG. 6 shows a sixth embodiment of the present invention (claims 6 and 6).
(Corresponding to 12) plant load P in load control according to
L, steam turbine load STL, gas turbine load GTL
It is a graph which shows the time change of. In the present embodiment, the gas turbines 3b and 3c in continuous operation are operated to start the additionally started gas turbine 3a (the steam stop valve 11a is opened and the turbine bypass valve 12a is fully closed as in the fourth embodiment of FIG. 4). Until the time 18) is completed, the plant load PL6 is controlled so as to maintain the same load as the time t0 or the target arbitrary load at the time t0. Then, from time t18, the plant load is controlled by all the gas turbines 3a, 3b, 3c.

【0023】図8は、一軸型の複合発電プラントの構成
図である。この複合発電プラントでは、ガスタービン3
台3a,3b,3cと各ガスタービン3a,3b,3c
に夫々同軸に連結された3台の蒸気タービン6a,6
b,6cを備え、各ガスタービンの排熱回収ボイラ5
a,5b,5cで発生させた蒸気で夫々の蒸気タービン
6a,6b,6cを個々に駆動する構成となっている。
斯かる構成の複合発電プラントでも、上述した各実施例
における負荷制御方法を適用することが可能である。
FIG. 8 is a block diagram of a uniaxial type combined power generation plant. In this combined cycle power plant, the gas turbine 3
Stands 3a, 3b, 3c and each gas turbine 3a, 3b, 3c
Three steam turbines 6a, 6 coaxially connected to each other
b, 6c, exhaust heat recovery boiler 5 of each gas turbine
The steam turbines 6a, 6b, 6c are individually driven by the steam generated by a, 5b, 5c.
The load control method in each of the above-described embodiments can also be applied to the combined power generation plant having such a configuration.

【0024】尚、図7,図8には複合発電プラントの構
成のみ図示したが、上述した負荷制御方法を実施する負
荷制御装置は、燃焼器,ガスタービン,排熱回収ボイ
ラ,各種弁を制御する図示しない制御盤に組み込み、実
行する。この負荷制御装置は、ディスクリートな電子部
品で組み立てても、また、コンピュータソフトウェアの
形で構成することでもよいことはいうまでもない。
Although only the structure of the combined power generation plant is shown in FIGS. 7 and 8, the load control device for implementing the above-described load control method controls the combustor, the gas turbine, the exhaust heat recovery boiler, and various valves. Install it in a control panel (not shown) and execute it. It goes without saying that this load control device may be assembled with discrete electronic components or may be constructed in the form of computer software.

【0025】[0025]

【発明の効果】請求項1,7または請求項2,8の発明
によれば、ガスタービン運転台数減時のプラント負荷追
従を必要最小限の時間で行うことができる。
According to the first and seventh or second and eighth aspects of the present invention, it is possible to follow the plant load when the number of operating gas turbines is reduced in a necessary minimum time.

【0026】請求項3,9の発明によれば、ガスタービ
ン運転台数減時の操作を必要最小限にすることができ
る。
According to the inventions of claims 3 and 9, it is possible to minimize the operation required when the number of operating gas turbines is reduced.

【0027】請求項4,10の発明によれば、ガスター
ビン運転台数増時の操作を必要最小限にすることができ
る。
According to the inventions of claims 4 and 10, the operation when the number of operating gas turbines is increased can be minimized.

【0028】請求項5,11の発明によれば、ガスター
ビン運転台数増時の操作完了にて所定のプラント目標負
荷にすることが可能となる。
According to the inventions of claims 5 and 11, it is possible to achieve a predetermined plant target load upon completion of operation when the number of operating gas turbines is increased.

【0029】請求項6,12の発明によれば、ガスター
ビン運転台数増時の操作完了まで、安定したプラント負
荷を得ることが可能となる。
According to the inventions of claims 6 and 12, a stable plant load can be obtained until the operation is completed when the number of operating gas turbines is increased.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の第1実施例に係る負荷制御方法(ガス
タービン運転台数減時)におけるプラント負荷,蒸気タ
ービン負荷,ガスタービン負荷の各負荷特性を示すグラ
フである。
FIG. 1 is a graph showing respective load characteristics of a plant load, a steam turbine load, and a gas turbine load in a load control method (when the number of operating gas turbines is reduced) according to the first embodiment of the present invention.

【図2】本発明の第2実施例に係る負荷制御方法(ガス
タービン運転台数減時)におけるプラント負荷,蒸気タ
ービン負荷,ガスタービン負荷の各負荷特性を示すグラ
フである。
FIG. 2 is a graph showing load characteristics of a plant load, a steam turbine load, and a gas turbine load in the load control method (when the number of operating gas turbines is reduced) according to the second embodiment of the present invention.

【図3】本発明の第3実施例に係る負荷制御方法(ガス
タービン運転台数減時)におけるプラント負荷,蒸気タ
ービン負荷,ガスタービン負荷の各負荷特性を示すグラ
フである。
FIG. 3 is a graph showing load characteristics of a plant load, a steam turbine load, and a gas turbine load in the load control method (when the number of operating gas turbines is reduced) according to the third embodiment of the present invention.

【図4】本発明の第4実施例に係る負荷制御方法(ガス
タービン運転台数増時)におけるプラント負荷,蒸気タ
ービン負荷,ガスタービン負荷の各負荷特性を示すグラ
フである。
FIG. 4 is a graph showing respective load characteristics of a plant load, a steam turbine load, and a gas turbine load in a load control method (when the number of operating gas turbines is increased) according to a fourth embodiment of the present invention.

【図5】本発明の第5実施例に係る負荷制御方法(ガス
タービン運転台数増時)におけるプラント負荷,蒸気タ
ービン負荷,ガスタービン負荷の各負荷特性を示すグラ
フである。
FIG. 5 is a graph showing respective load characteristics of a plant load, a steam turbine load, and a gas turbine load in the load control method (when the number of operating gas turbines is increased) according to the fifth embodiment of the present invention.

【図6】本発明の第6実施例に係る負荷制御方法(ガス
タービン運転台数増時)におけるプラント負荷,蒸気タ
ービン負荷,ガスタービン負荷の各負荷特性を示すグラ
フである。
FIG. 6 is a graph showing load characteristics of a plant load, a steam turbine load, and a gas turbine load in the load control method (when the number of operating gas turbines is increased) according to the sixth embodiment of the present invention.

【図7】多軸複合発電プラントの構成図である。FIG. 7 is a configuration diagram of a multi-axis combined cycle power plant.

【図8】1軸型複合発電プラントの構成である。FIG. 8 is a configuration of a single-axis combined power plant.

【符号の説明】[Explanation of symbols]

1a,1b,1c…空気圧縮機、2a,2b,2c…燃
焼器、3a,3b,3c…ガスタービン、4a,4b,
4c,7…発電機、5a,5b,5c…排熱回収ボイ
ラ、6,6a,6b,6c…蒸気タービン、8,8a,
8b,8c…復水器、9,9a,9b,9c…給水ポン
プ、10…煙突、11a,11b,11c…蒸気止弁、
12a,12b,12c…タービンバイパス弁、13,
13a,13b,13c…蒸気タービン入口弁、14,
14a,14b,14c…主蒸気管、15,15a,1
5b,15c…タービンバイパス管。
1a, 1b, 1c ... Air compressor, 2a, 2b, 2c ... Combustor, 3a, 3b, 3c ... Gas turbine, 4a, 4b,
4c, 7 ... Generator, 5a, 5b, 5c ... Exhaust heat recovery boiler, 6, 6a, 6b, 6c ... Steam turbine, 8, 8a,
8b, 8c ... Condenser, 9, 9a, 9b, 9c ... Water supply pump, 10 ... Chimney, 11a, 11b, 11c ... Steam stop valve,
12a, 12b, 12c ... Turbine bypass valve, 13,
13a, 13b, 13c ... Steam turbine inlet valve, 14,
14a, 14b, 14c ... Main steam pipes, 15, 15a, 1
5b, 15c ... Turbine bypass pipe.

Claims (12)

【特許請求の範囲】[Claims] 【請求項1】 複数のガスタービンと、任意台数の排熱
回収ボイラと、任意台数の蒸気タービンとで構成される
複合発電プラントの前記ガスタービンの運転台数を増減
させる負荷制御方法において、プラント負荷が減少した
とき、プラントの目標負荷までガスタービン全台にてプ
ラント負荷降下運転を行い、目標負荷到達後は所要のガ
スタービンのみ負荷降下または停止して残りのガスター
ビンで前記目標負荷を維持する運転を行うことを特徴と
する複合発電プラントの負荷制御方法。
1. A load control method for increasing or decreasing the number of operating gas turbines of a combined cycle power plant comprising a plurality of gas turbines, an arbitrary number of exhaust heat recovery boilers, and an arbitrary number of steam turbines. When the load decreases, the plant load reduction operation is performed on all the gas turbines up to the target load of the plant, and after the target load is reached, only the required gas turbine is lowered or stopped and the remaining gas turbines maintain the target load. A load control method for a combined cycle power plant characterized by performing operation.
【請求項2】 複数のガスタービンと、任意台数の排熱
回収ボイラと、任意台数の蒸気タービンとで構成される
複合発電プラントの前記ガスタービンの運転台数を増減
させる負荷制御方法において、プラント負荷が減少した
とき、所要のガスタービンのみ負荷降下または停止し、
残りのガスタービンでプラント目標負荷になるように運
転することを特徴とする複合発電プラントの負荷制御方
法。
2. A load control method for increasing or decreasing the number of operating gas turbines of a combined cycle power plant comprising a plurality of gas turbines, an arbitrary number of exhaust heat recovery boilers, and an arbitrary number of steam turbines. When the load decreases, only the required gas turbine is lowered or stopped,
A load control method for a combined cycle power plant, comprising operating the remaining gas turbines so as to reach a plant target load.
【請求項3】 複数のガスタービンと、任意台数の排熱
回収ボイラと、任意台数の蒸気タービンとで構成される
複合発電プラントの前記ガスタービンの運転台数を増減
させる負荷制御方法において、プラント負荷が減少した
とき、所要のガスタービンのみ負荷降下または停止し、
残りのガスタービンでプラント目標負荷までプラント負
荷降下運転を行い、その後、目標負荷を維持する運転を
行うことを特徴とする複合発電プラントの負荷制御方
法。
3. A load control method for increasing or decreasing the number of operating gas turbines of a combined cycle power plant comprising a plurality of gas turbines, an arbitrary number of exhaust heat recovery boilers, and an arbitrary number of steam turbines. When the load decreases, only the required gas turbine is lowered or stopped,
A load control method for a combined cycle power plant, which comprises performing a plant load reduction operation to a plant target load with the remaining gas turbines, and then performing an operation to maintain the target load.
【請求項4】 複数のガスタービンと、任意台数の排熱
回収ボイラと、任意台数の蒸気タービンとで構成される
複合発電プラントの前記ガスタービンの運転台数を増減
させる負荷制御方法において、プラント負荷が増加した
とき、運転継続中のガスタービンは当該ガスタービン負
荷を継続し、停止中のガスタービンは前記ガスタービン
負荷を目標負荷として起動,負荷上昇を行い、追加起動
したガスタービンが前記目標負荷に到達してから運転継
続中のガスタービンと並列運転に入り、その後、運転中
のガスタービン全台にてプラント負荷制御を行うことを
特徴とする複合発電プラントの負荷制御方法。
4. A load control method for increasing or decreasing the number of operating gas turbines of a combined cycle power plant comprising a plurality of gas turbines, an arbitrary number of exhaust heat recovery boilers, and an arbitrary number of steam turbines. When the gas turbine load increases, the gas turbine under operation continues the gas turbine load, and the stopped gas turbine starts and increases the load with the gas turbine load as the target load. A method for controlling load of a combined cycle power plant, comprising: performing parallel operation with a gas turbine that is operating continuously after reaching the point of ???, and then performing plant load control on all operating gas turbines.
【請求項5】 複数のガスタービンと、任意台数の排熱
回収ボイラと、任意台数の蒸気タービンとで構成される
複合発電プラントの前記ガスタービンの運転台数を増減
させる負荷制御方法において、プラント負荷が増加した
とき、運転継続中のガスタービンを制御してプラントの
目標負荷に移行させ、停止中のガスタービンは起動後に
前記目標負荷まで負荷上昇し、追加起動したガスタービ
ンが目標負荷到達後に運転継続中のガスタービンと並列
運転に入り、その後、運転中のガスタービン全台にてプ
ラント負荷制御を行うことを特徴とする複合発電プラン
トの負荷制御方法。
5. A load control method for increasing or decreasing the number of operating gas turbines of a combined cycle power plant comprising a plurality of gas turbines, an arbitrary number of exhaust heat recovery boilers, and an arbitrary number of steam turbines. Is increased, the gas turbine during operation is controlled to shift to the target load of the plant, the gas turbine in stop increases the load to the target load after startup, and the additionally started gas turbine operates after reaching the target load. A load control method for a combined cycle power generation plant, which comprises performing parallel operation with an ongoing gas turbine and then performing plant load control on all operating gas turbines.
【請求項6】 複数のガスタービンと、任意台数の排熱
回収ボイラと、任意台数の蒸気タービンとで構成される
複合発電プラントの前記ガスタービンの運転台数を増減
させる負荷制御方法において、プラント負荷が増加した
とき、運転継続中のガスタービンを制御してプラントの
目標負荷に移行させ、停止中のガスタービンは起動後に
運転継続中のガスタービン負荷または同一運転状態まで
負荷上昇し、同一負荷または同一運転状態になったとき
追加起動したガスタービンと運転継続中のガスタービン
とを並列運転し、その後、運転中のガスタービン全台に
てプラント負荷制御を行うことを特徴とする複合発電プ
ラントの負荷制御方法。
6. A load control method for increasing or decreasing the number of operating gas turbines of a combined cycle power plant comprising a plurality of gas turbines, an arbitrary number of exhaust heat recovery boilers, and an arbitrary number of steam turbines. Is increased, the gas turbine under continuous operation is controlled to shift to the target load of the plant, and the gas turbine under stop increases the load to the gas turbine load during continuous operation after startup or the same operating condition, When a gas turbine that is additionally started when the same operating state is reached and a gas turbine that is still operating are operated in parallel, then plant load control is performed on all operating gas turbines. Load control method.
【請求項7】 複数のガスタービンと、任意台数の排熱
回収ボイラと、任意台数の蒸気タービンとで構成される
複合発電プラントの前記ガスタービンの運転台数を増減
させる負荷制御装置において、プラント負荷が減少した
とき、プラントの目標負荷までガスタービン全台にてプ
ラント負荷降下運転を行わせる手段と、目標負荷到達後
は所要のガスタービンのみ負荷降下または停止させる手
段と、残りのガスタービンで前記目標負荷を維持する運
転を行わせる手段とを備えることを特徴とする複合発電
プラントの負荷制御装置。
7. A load control device for increasing or decreasing the number of operating gas turbines of a combined cycle power plant comprising a plurality of gas turbines, an arbitrary number of exhaust heat recovery boilers, and an arbitrary number of steam turbines. When the target load of the plant is reduced to a target load of the plant, a means for performing a plant load lowering operation, a means for lowering or stopping only the required gas turbine after reaching the target load, A load control device for a combined cycle power plant, comprising: means for performing an operation for maintaining a target load.
【請求項8】 複数のガスタービンと、任意台数の排熱
回収ボイラと、任意台数の蒸気タービンとで構成される
複合発電プラントの前記ガスタービンの運転台数を増減
させる負荷制御装置において、プラント負荷が減少した
とき、所要のガスタービンのみ負荷降下または停止させ
る手段と、残りのガスタービンでプラント目標負荷にな
るように運転させる手段とを備えることを特徴とする複
合発電プラントの負荷制御装置。
8. A load control device for increasing or decreasing the number of operating gas turbines of a combined cycle power plant comprising a plurality of gas turbines, an arbitrary number of exhaust heat recovery boilers, and an arbitrary number of steam turbines. A load control device for a combined cycle power plant, comprising: a means for lowering or stopping the load of only a required gas turbine when the load decreases; and a means for operating the remaining gas turbines so as to achieve a plant target load.
【請求項9】 複数のガスタービンと、任意台数の排熱
回収ボイラと、任意台数の蒸気タービンとで構成される
複合発電プラントの前記ガスタービンの運転台数を増減
させる負荷制御装置において、プラント負荷が減少した
とき、所要のガスタービンのみ負荷降下または停止させ
る手段と、残りのガスタービンでプラント目標負荷まで
プラント負荷降下運転を行わせる手段と、その後に目標
負荷を維持する運転を行わせる手段とを備えることを特
徴とする複合発電プラントの負荷制御装置。
9. A load control device for increasing or decreasing the number of operating gas turbines of a combined cycle power plant comprising a plurality of gas turbines, an arbitrary number of exhaust heat recovery boilers, and an arbitrary number of steam turbines. When the load is reduced, a means for lowering or stopping the load of only the required gas turbine, a means for performing the plant load lowering operation to the plant target load with the remaining gas turbines, and a means for performing the operation for maintaining the target load thereafter. A load control device for a combined cycle power plant, comprising:
【請求項10】 複数のガスタービンと、任意台数の排
熱回収ボイラと、任意台数の蒸気タービンとで構成され
る複合発電プラントの前記ガスタービンの運転台数を増
減させる負荷制御装置において、プラント負荷が増加し
たとき、運転継続中のガスタービンは当該ガスタービン
負荷を継続させる手段と、停止中のガスタービンを前記
ガスタービン負荷を目標負荷として起動し負荷上昇を行
わせる手段と、追加起動したガスタービンが前記目標負
荷に到達してから運転継続中のガスタービンと並列運転
させる手段と、その後に運転中のガスタービン全台にて
プラント負荷制御を行わせる手段とを備えることを特徴
とする複合発電プラントの負荷制御装置。
10. A load control device for increasing or decreasing the number of operating gas turbines of a combined cycle power plant comprising a plurality of gas turbines, an arbitrary number of exhaust heat recovery boilers, and an arbitrary number of steam turbines. Is increased, the gas turbine under continuous operation means for continuing the gas turbine load, a means for starting the gas turbine under stop with the gas turbine load as a target load to increase the load, and a gas for additional start-up. A composite comprising: a means for operating the gas turbine in parallel with the gas turbine that has continued to operate after the turbine reaches the target load; and a means for performing plant load control on all the operating gas turbines thereafter. Load control device for power plant.
【請求項11】 複数のガスタービンと、任意台数の排
熱回収ボイラと、任意台数の蒸気タービンとで構成され
る複合発電プラントの前記ガスタービンの運転台数を増
減させる負荷制御装置において、プラント負荷が増加し
たとき、運転継続中のガスタービンを制御してプラント
の目標負荷に移行させる手段と、停止中のガスタービン
を起動して前記目標負荷まで負荷上昇させる手段と、追
加起動したガスタービンが目標負荷に到達したときに運
転継続中のガスタービンと並列運転させる手段と、その
後に運転中のガスタービン全台にてプラント負荷制御を
行わせる手段とを備えることを特徴とする複合発電プラ
ントの負荷制御装置。
11. A load control device for increasing or decreasing the number of operating gas turbines of a combined cycle power plant comprising a plurality of gas turbines, an arbitrary number of exhaust heat recovery boilers, and an arbitrary number of steam turbines. Is increased, means for controlling the gas turbine during continuous operation to shift to the target load of the plant, means for starting the stopped gas turbine to increase the load to the target load, and the additionally started gas turbine When the target load is reached, a means for operating in parallel with the gas turbine that is continuing operation, and a means for performing plant load control on all the operating gas turbines thereafter are provided. Load control device.
【請求項12】 複数のガスタービンと、任意台数の排
熱回収ボイラと、任意台数の蒸気タービンとで構成され
る複合発電プラントの前記ガスタービンの運転台数を増
減させる負荷制御装置において、プラント負荷が増加し
たとき、運転継続中のガスタービンを制御してプラント
の目標負荷に移行させる手段と、停止中のガスタービン
を起動して運転継続中のガスタービン負荷または同一運
転状態まで負荷上昇させる手段と、同一負荷または同一
運転状態になったとき追加起動したガスタービンを運転
継続中のガスタービンと並列運転させる手段と、その後
に運転中のガスタービン全台にてプラント負荷制御を行
わせる手段とを備えることを特徴とする複合発電プラン
トの負荷制御装置。
12. A load control device for increasing or decreasing the number of operating gas turbines of a combined cycle power plant comprising a plurality of gas turbines, an arbitrary number of exhaust heat recovery boilers, and an arbitrary number of steam turbines. , The means for controlling the gas turbine under continuous operation and shifting it to the target load of the plant, and the means for starting the gas turbine under stop and increasing the gas turbine load during continuous operation or the same operating state And a means for operating a gas turbine additionally started at the same load or in the same operating state in parallel with a gas turbine in continuous operation, and a means for thereafter performing plant load control in all operating gas turbines. A load control device for a combined cycle power plant, comprising:
JP3243445A 1991-09-24 1991-09-24 Load control method and apparatus for combined cycle power plant Expired - Fee Related JP3007724B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3243445A JP3007724B2 (en) 1991-09-24 1991-09-24 Load control method and apparatus for combined cycle power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3243445A JP3007724B2 (en) 1991-09-24 1991-09-24 Load control method and apparatus for combined cycle power plant

Publications (2)

Publication Number Publication Date
JPH0586810A true JPH0586810A (en) 1993-04-06
JP3007724B2 JP3007724B2 (en) 2000-02-07

Family

ID=17103986

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3243445A Expired - Fee Related JP3007724B2 (en) 1991-09-24 1991-09-24 Load control method and apparatus for combined cycle power plant

Country Status (1)

Country Link
JP (1) JP3007724B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011226489A (en) * 2005-02-22 2011-11-10 Toshiba Corp Electric power-generating and desalination combined plant and operation method of the same
WO2013168684A1 (en) * 2012-05-09 2013-11-14 サンデン株式会社 Exhaust heat recovery device
JP2019120139A (en) * 2017-12-28 2019-07-22 三菱日立パワーシステムズ株式会社 Control device, gas turbine, combined cycle power generation plant, control method and program
JP2020530886A (en) * 2017-12-08 2020-10-29 ミツビシ ヒタチ パワー システムズ アメリカズ インク Power plant with mismatched load unbalanced response

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011226489A (en) * 2005-02-22 2011-11-10 Toshiba Corp Electric power-generating and desalination combined plant and operation method of the same
WO2013168684A1 (en) * 2012-05-09 2013-11-14 サンデン株式会社 Exhaust heat recovery device
CN104271891A (en) * 2012-05-09 2015-01-07 三电有限公司 Exhaust heat recovery device
JP2020530886A (en) * 2017-12-08 2020-10-29 ミツビシ ヒタチ パワー システムズ アメリカズ インク Power plant with mismatched load unbalanced response
JP2019120139A (en) * 2017-12-28 2019-07-22 三菱日立パワーシステムズ株式会社 Control device, gas turbine, combined cycle power generation plant, control method and program

Also Published As

Publication number Publication date
JP3007724B2 (en) 2000-02-07

Similar Documents

Publication Publication Date Title
US5042246A (en) Control system for single shaft combined cycle gas and steam turbine unit
US5203160A (en) Combined generating plant and its start-up control device and start-up control method
EP0236959A2 (en) Method for starting thermal power plant
JPS5923004A (en) Method and device for controlling generator facility of steam turbine
US4329592A (en) Steam turbine control
JP2009150392A (en) Method and device for starting combined cycle power generating system
JP6122775B2 (en) Control device and activation method
JPS58222730A (en) Device for operating generating plant
JP2012233472A (en) Method for operating gas turbine power plant with exhaust gas recirculation type, and gas turbine power plant with exhaust gas recirculation type
JP2000130108A (en) Starting method for combined cycle power plant
JPH0586810A (en) Load control method for composite power generating plant and device therefor
JP2002106305A (en) Starting controller of combined cycle power generation plant
JPH1061412A (en) Controller for combined cycle power plant
JP3641518B2 (en) Steam temperature control method and apparatus for combined cycle plant
JP2019173697A (en) Combined cycle power generation plant and operation method of the same
JPS62294724A (en) Turbine casing cooler for turbocharger
JPS59180014A (en) Method of controlling load in combined cycle power plant
JPH1193618A (en) Steam pressure control method for gas turbine steam cooling system
JP4981509B2 (en) Combined power plant steam turbine operation control system
JPS6243044B2 (en)
JP3699735B2 (en) Control device for gas turbine equipment
JP2585328B2 (en) Operating method of combined plant and apparatus therefor
JP3056880B2 (en) Feedwater heater controller
JPH0565804A (en) Control method for two-stage gas mixing type turbo-generator
JPH0932510A (en) Combined power generation plant control device

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees