JPH0585692B2 - - Google Patents

Info

Publication number
JPH0585692B2
JPH0585692B2 JP5399889A JP5399889A JPH0585692B2 JP H0585692 B2 JPH0585692 B2 JP H0585692B2 JP 5399889 A JP5399889 A JP 5399889A JP 5399889 A JP5399889 A JP 5399889A JP H0585692 B2 JPH0585692 B2 JP H0585692B2
Authority
JP
Japan
Prior art keywords
construction machine
temporary
excavation
excavation road
temporary construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP5399889A
Other languages
Japanese (ja)
Other versions
JPH02232418A (en
Inventor
Masao Echizen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHOKUEI SANGYO KK
Original Assignee
SHOKUEI SANGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHOKUEI SANGYO KK filed Critical SHOKUEI SANGYO KK
Priority to JP5399889A priority Critical patent/JPH02232418A/en
Publication of JPH02232418A publication Critical patent/JPH02232418A/en
Publication of JPH0585692B2 publication Critical patent/JPH0585692B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は、地表面を掘削して形成した掘削路の
側壁に土留め用の矢板を安全に取り付ける方法に
関する。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a method for safely attaching sheet piles for retaining earth to the side walls of an excavation path formed by excavating the ground surface.

[従来の技術] 地表面の掘削工事においては、通常、掘削路
(溝)の側壁に、土崩れを防ぐことを目的として
木製や鋼製や矢板が設置される。一般に、矢板の
取り付け工事は、掘削路の両壁面に矢板を仮設
し、該矢板の間にサポート(梁材)を挿入して矢
板を壁面に押圧することにより矢板を固定してい
る。従来、この矢板の取り付け作業は掘削路の内
部に作業員を配置している。
[Background Art] During excavation work on the ground surface, wooden, steel, or sheet piles are usually installed on the side walls of the excavation path (trench) for the purpose of preventing landslides. Generally, in the installation work of sheet piles, the sheet piles are temporarily installed on both wall surfaces of an excavation road, and a support (beam material) is inserted between the sheet piles to press the sheet piles against the wall surface, thereby fixing the sheet piles. Conventionally, this work for installing sheet piles involves placing workers inside the excavation path.

ところが、上記作業においては、矢板が固定さ
れるまで、掘削路内の作業員は、土崩れの防止対
策などが完全に行なわれていない不安全な場所で
作業を行なうことになり、工事中に、土崩れなど
よつて貴重な人命が失われるなどの重大な事故も
暫々発生し、作業員の安全を確保するうえで問題
があつた。
However, in the above work, until the sheet piles are fixed, workers inside the excavation road will be working in an unsafe area where measures to prevent landslides have not been completely taken, and , serious accidents such as landslides and other accidents resulting in the loss of precious lives occurred for a while, and there were problems in ensuring the safety of workers.

[発明の解決課題] 本発明は従来の上記問題を解決するものであ
り、掘削路の両側壁に矢板を設置するに際し、矢
板を固定するまでの間、掘削路内に作業員を配置
せず、地表から矢板の取付け作業を操作し、安全
に矢板の仮設工事を行なうことができる方法を提
供することを目的とする。
[Problems to be solved by the invention] The present invention solves the above-mentioned conventional problems, and when installing sheet piles on both side walls of an excavation road, there is no need to place a worker inside the excavation road until the sheet piles are fixed. The purpose of the present invention is to provide a method for safely performing temporary sheet pile installation work by operating the sheet pile installation work from the ground surface.

[課題の解決手段] 本発明の土留め用矢板の取り付け方法は、掘削
路の両側壁に矢板を取り付ける方法において、幅
方向に伸縮自在な矩形の枠体であつて、その長辺
部に固定用角材の支持装置を有する仮設機を用
い、該仮設機に固定用角材を取り付けて長辺部が
掘削路の側壁を面するように該仮設機を掘削路底
部に支持し、遠隔操作によつて仮設機の横幅を拡
げて、該仮設機と両側壁との間に挿入した矢板を
掘削路壁面に押付けた後に、両側の固定用角材の
間に固定部材を挿入して該角材を矢板と共に壁面
に押付け固定し、次いで該仮設機の横幅を縮めて
該仮設機を掘削路から引き上げ、上記一連の操作
を繰り返すことを特徴とする。
[Means for Solving the Problems] The method for attaching a sheet pile for earth retaining of the present invention is a method for attaching a sheet pile to both side walls of an excavation road. A temporary construction machine with a support device for square timbers is used, a fixing square timber is attached to the temporary construction machine, the temporary construction machine is supported at the bottom of the excavation road so that the long side faces the side wall of the excavation road, and the construction is carried out by remote control. After expanding the width of the temporary construction machine and pressing the sheet piles inserted between the temporary construction machine and both side walls against the wall surface of the excavation road, a fixing member is inserted between the square timbers for fixing on both sides, and the square timbers are held together with the sheet piles. It is characterized in that it is pressed and fixed against a wall surface, then the width of the temporary construction machine is reduced, the temporary construction machine is pulled up from the excavation road, and the above series of operations are repeated.

本発明は、幅方向に伸縮自在な矩形の枠体であ
つて、その長辺部に固定用角材を取り付けるため
の支持装置を有する仮設機を用いる。該仮設機の
一例としては、枠状本体の長辺部が伸縮自在な短
辺部によつて相互に連結されており、該長辺部の
内側面には、該長辺部に沿つて固定用角板を把持
する支持装置が装着されており、更に該短辺部を
伸縮して枠状本体の横幅を拡大縮小する作動装置
を備えた仮設機が用いられる。該仮設機には操作
部が接続され、該操作部は地表に導かれる。
The present invention uses a temporary construction machine that is a rectangular frame that can be expanded and contracted in the width direction, and that has a support device for attaching a fixing square piece to the long side of the frame. As an example of the temporary machine, the long sides of the frame-like body are connected to each other by a stretchable short side, and the inner surface of the long side has a fixed part along the long side. A temporary construction machine is used, which is equipped with a support device for gripping the square plate, and is further equipped with an actuation device that expands and contracts the short sides to increase and decrease the width of the frame-like body. An operating section is connected to the temporary machine, and the operating section is guided to the ground surface.

矢板の取り付けの際、まず上記仮設機の長辺部
に固定用角材を取り付ける。
When installing the sheet piles, first attach the fixing squares to the long sides of the temporary structure.

次に、地表面を掘削した掘削路の中に上記仮設
機を挿入し、その長辺部が側壁に面するように該
仮設機を掘削路底部付近に設置する。該仮設機の
長辺部および該長辺部に取り付けた固定用角材と
掘削路両側壁との隙間に、土留め用矢板を地表か
ら掘削路底部に向けて差し込む。隙間全体に土留
め用矢板を差し込んだ後、地表から操作部を通じ
て伸縮自在部を作動させ、該仮設機を、その幅方
向に拡げ、掘削路の両側壁に固定用角材を矢板と
共に押し付ける。固定用角材と矢板を両側の壁面
に緩みが無くなるまで押圧した後に仮設機の作動
を停止し、この時点で作業員を配置し掘削路の両
壁面に押圧固定した固定用角材の間に一定数のサ
ポートを取り付け、両側に突つ張る様に固定す
る。サポートが完全に固定されると固定用角材の
支持装置を解除する。次に、該仮設機を縮小して
その形状を元に戻すと、固定用角材は押付位置に
固定されたまま仮設機から外れるので、この状態
で該仮設機を掘削路外の地表面へ引き上げる。
Next, the above-mentioned temporary construction machine is inserted into the excavation road where the ground surface has been excavated, and the temporary construction machine is installed near the bottom of the excavation road so that its long side faces the side wall. Insert the earth retaining sheet pile from the ground surface toward the bottom of the excavation road into the gap between the long side of the temporary construction machine, the fixing square material attached to the long side, and both side walls of the excavation road. After inserting the retaining sheet pile into the entire gap, the extensible part is operated from the ground surface through the operation part, the temporary construction machine is expanded in its width direction, and the fixing square members are pressed together with the sheet pile against both side walls of the excavation road. After pressing the fixing square timbers and sheet piles against the walls on both sides until there is no loosening, the operation of the temporary construction machine is stopped, and at this point, a worker is placed to place a fixed number of square timbers between the square timbers and the sheet piles that have been pressed and fixed to both walls of the excavation road. Attach the supports and secure them so that they are stretched on both sides. When the support is completely fixed, the support device of the fixing square beam is released. Next, when the temporary machine is scaled down and returned to its original shape, the fixing squares will be removed from the temporary machine while being fixed in the pressed position, and in this state the temporary machine will be pulled up to the ground surface outside the excavation road. .

これら一連の作業を繰返して行なうことによ
り、掘削路の必要な路長にわたり土留め用矢板を
取り付ける。
By repeating this series of operations, the earth retaining sheet piles are installed over the required length of the excavated road.

[実施例] 以下に図面に基づき本発明の具体的な実施例を
説明する。図面第1図は、仮設機を設置した掘削
路の断面図。第2図は、第1図の状態に土留め用
矢板を設定した掘削路断面図。第3図は、第2図
の平面図。第4図は、仮設機を作動させた状態の
掘削路の断面図である。
[Example] Specific examples of the present invention will be described below based on the drawings. Figure 1 is a cross-sectional view of the excavation road where the temporary equipment was installed. FIG. 2 is a sectional view of an excavation road with earth retaining sheet piles set in the state shown in FIG. 1. FIG. 3 is a plan view of FIG. 2. FIG. 4 is a sectional view of the excavation path with the temporary construction machine in operation.

第3図に示すように、仮設機10は矩形の枠体
であつて、その長辺部10aに固定用角材6を把
持する支持装置11が設けられている。該長辺部
を連結する短辺部10bには伸縮自在部15が形
成されている。更に両側の長辺部10aの間には
伸縮動力部16が介設されており、該伸縮動力部
16の伸縮によつて該仮設機の幅が拡大縮小され
る。なお、該仮設機10には吊金具12が設けら
れており、また長辺部10aの両端には側方に突
き出した突起部13が形成されている。
As shown in FIG. 3, the temporary construction machine 10 is a rectangular frame body, and a support device 11 for holding the fixing square member 6 is provided on the long side portion 10a. A telescopic portion 15 is formed on the short side portion 10b that connects the long side portions. Furthermore, a telescopic power section 16 is interposed between the long sides 10a on both sides, and the width of the temporary machine is expanded or contracted by the expansion and contraction of the telescopic power section 16. The temporary machine 10 is provided with a hanging fitting 12, and protrusions 13 protruding laterally are formed at both ends of the long side portion 10a.

地表面1を掘削して形成された掘削路の側面2
に土留め用矢板7を布設する工事に際し、まず上
記仮設機10の支持装置11に固定用角材6を取
り付ける。固定用角材6を取り付けた仮設機10
を吊り金具12を介して、掘削路上部より掘削路
底部3付近まで吊り下げ安定させる。次に、固定
用角材6と掘削路側面2の間の隙間4に、掘削路
外地表面1より掘削路底部3に向け、土留め用の
矢板7を差し込む。隙間4全体に矢板7を差し込
んだ後に、伸縮動力部16に、掘削路外地表面1
より作動信号を送り、伸縮自在部15を伸長さ
せ、仮設機10の横幅を拡げる。この結果、仮設
機10の長辺部10aと共に固定用角材6が掘削
路左右側面2に向かつて移動され、固定用角材6
および土留め用矢板7が、掘削路左右側面2に押
圧される。なお、第4図に示すように、長辺部両
側端に設けた突起部13は矢板6の側端に突き出
し、矢板7の横方向へのずれを防止する。該角材
6および矢板7が緩みが無くなるまで押圧された
段階で仮設機10の作動を停止し、この時点で掘
削路内に作業員を配置し、掘削路両側の側面2に
押付けられた固定用角材6の間に一定数のサポー
ト20を取り付け、突つ張るように固定する。サ
ポート20を完全に固定した後に、固定用角材6
を支持している支持装置11を解除する。次に仮
設機10の横幅を縮小してその形状を元に戻す
と、固定用角材は押付位置に固定されたまま仮設
機から外れる。その後、該仮設機10を地表に引
き上げる。
Side surface 2 of the excavation road formed by excavating the ground surface 1
When constructing the earth retaining sheet piles 7, the fixing square timbers 6 are first attached to the support device 11 of the temporary construction machine 10. Temporary construction machine 10 with fixing square material 6 attached
is stabilized by suspending it from the top of the excavation road to near the bottom 3 of the excavation road via the hanging fitting 12. Next, a sheet pile 7 for retaining earth is inserted into the gap 4 between the fixing square beam 6 and the excavation road side surface 2 from the excavation road outer ground surface 1 toward the excavation road bottom 3. After inserting the sheet pile 7 into the entire gap 4, the telescopic power unit 16
sends an activation signal to extend the telescoping portion 15 and widen the width of the temporary construction machine 10. As a result, the fixing square bar 6 is moved toward the left and right sides 2 of the excavation road together with the long side part 10a of the temporary construction machine 10, and the fixing square bar 6 is moved toward the left and right sides 2 of the excavation road.
And the retaining sheet pile 7 is pressed against the left and right side surfaces 2 of the excavation road. As shown in FIG. 4, the protrusions 13 provided at both ends of the long side protrude from the side ends of the sheet pile 6 to prevent the sheet pile 7 from shifting in the lateral direction. When the square timbers 6 and the sheet piles 7 are pressed until they are no longer loose, the operation of the temporary construction machine 10 is stopped, and at this point a worker is placed inside the excavation road, and the fixing machine 10 is pressed against the sides 2 on both sides of the excavation road. A fixed number of supports 20 are installed between the square members 6 and fixed so as to be stretched. After completely fixing the support 20, fixing square material 6
Release the support device 11 supporting the . Next, when the width of the temporary construction machine 10 is reduced and its shape is restored to its original shape, the fixing square material is removed from the temporary construction machine while being fixed at the pressed position. After that, the temporary machine 10 is pulled up to the ground surface.

引き続き、仮設機10に固定用角材6を取り付
けて、第4図中点線で示すように、掘削路の上部
に吊下げ、上記一連の操作を繰返すことにより固
定角材6およびサポート20により矢板7の下部
と上部が掘削路の壁面に押圧固定される。掘削路
の路長に亘り、上記操作を繰返す。
Subsequently, the fixing square beams 6 are attached to the temporary construction machine 10 and suspended above the excavation road as shown by the dotted line in FIG. The lower and upper parts are pressed and fixed to the wall of the excavation road. Repeat the above operation over the length of the excavation path.

[発明の効果] 以上のように、本発明は掘削路内に矢板を取り
付ける作業において、土留め施工が行なわれてい
ない不安全な掘削路内に作業員を配置する必要が
なく、作業員の安全を確保しながら矢板を設置で
きるという重要な目的を達成することができる。
[Effects of the Invention] As described above, the present invention eliminates the need for workers to be placed in an unsafe excavation road where earth retaining construction has not been carried out in the work of installing sheet piles in an excavation road, and the work of installing sheet piles in an excavation road is simplified. The important purpose of being able to install sheet piles while ensuring safety can be achieved.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は、仮設機を設置した掘削路の断面図。
第2図は、第1図の状態に土留め用矢板を設定し
た掘削路の断面図。第3図は、第2図実施例の平
面図。第4図は、仮設機を作動させた状態の掘削
路の断面図。 1……地表面、2……掘削路側面、3……掘削
路底部、4……隙間、6……固定用角材、7……
土留め用矢板、10……仮設機、11……支持装
置、12……吊り金具。
Figure 1 is a cross-sectional view of the excavation road where the temporary equipment was installed.
FIG. 2 is a sectional view of an excavation road with earth retaining sheet piles set in the state shown in FIG. 1. FIG. 3 is a plan view of the embodiment shown in FIG. FIG. 4 is a sectional view of the excavation path with the temporary construction machine in operation. 1... Ground surface, 2... Excavation road side, 3... Excavation road bottom, 4... Gap, 6... Fixing square material, 7...
Earth retaining sheet pile, 10...temporary construction machine, 11...support device, 12...hanging metal fittings.

Claims (1)

【特許請求の範囲】[Claims] 1 掘削路の両側壁に矢板を取り付ける方法にお
いて、幅方向に伸縮自在に矩形に枠体であつて、
その長辺部に固定用角材の支持装置を有する仮設
機を用い、該仮設機に固定用角材を取り付けて長
辺部が掘削路の側壁を面するように該仮設機を掘
削路底部に支持し、遠隔操作によつて仮設機の横
幅を拡げて、該仮設機と両側壁との間に挿入した
矢板を掘削路壁面に押付けた後に、両側の固定用
角材の間に固定部材を挿入して該角材を矢板と共
に壁面に押付け固定し、次いで該仮設機の横幅を
縮めて該仮設機を掘削路から引き上げ、上記一連
の操作を繰り返すことを特徴とする土留め用矢板
の取り付け方法。
1. In a method of attaching sheet piles to both sides of an excavation road, a rectangular frame that can be expanded and contracted in the width direction,
Using a temporary construction machine that has a support device for fixing square pieces on its long side, attach the fixing square pieces to the temporary machine and support the temporary machine at the bottom of the excavation road so that the long side faces the side wall of the excavation road. Then, the width of the temporary construction machine is expanded by remote control, and the sheet piles inserted between the temporary construction machine and both side walls are pressed against the excavation road wall surface, and then the fixing members are inserted between the fixing blocks on both sides. A method for attaching a sheet pile for retaining earth, characterized by pressing and fixing the square timber together with the sheet pile against a wall surface, then reducing the width of the temporary construction machine, pulling the temporary construction machine out of the excavation road, and repeating the above series of operations.
JP5399889A 1989-03-06 1989-03-06 Safe application method of wooden sheet pile for sheathing Granted JPH02232418A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5399889A JPH02232418A (en) 1989-03-06 1989-03-06 Safe application method of wooden sheet pile for sheathing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5399889A JPH02232418A (en) 1989-03-06 1989-03-06 Safe application method of wooden sheet pile for sheathing

Publications (2)

Publication Number Publication Date
JPH02232418A JPH02232418A (en) 1990-09-14
JPH0585692B2 true JPH0585692B2 (en) 1993-12-08

Family

ID=12958277

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5399889A Granted JPH02232418A (en) 1989-03-06 1989-03-06 Safe application method of wooden sheet pile for sheathing

Country Status (1)

Country Link
JP (1) JPH02232418A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2622035B2 (en) * 1991-03-27 1997-06-18 佐藤工業株式会社 Earth retaining method and earth retaining material

Also Published As

Publication number Publication date
JPH02232418A (en) 1990-09-14

Similar Documents

Publication Publication Date Title
US4911580A (en) Apparatus and method for raising and supporting a building
JP2684155B2 (en) Excavation method used for construction of underground structures
KR101103909B1 (en) A wale system for supporting earth retaining wall
KR100648409B1 (en) A method of construction for temporary retaining wall
KR101026583B1 (en) A wale system for supporting earth retaining wall
JPH0585692B2 (en)
KR102457616B1 (en) Safety reinforcement structure of timbering temparary facility structure
JPH0545632Y2 (en)
JPH08120676A (en) Earth retaining timbering detaching method and device therefor
JP3673921B2 (en) Preload panel retaining ring
JPS6024753Y2 (en) Support for preventing gutter collapse
JPH0346612B2 (en)
JP2000257069A (en) Earth retaining and earth retaining construction method
KR102548906B1 (en) Supporting part of permanent waling and under ground structure construction method using it
JPH04194224A (en) Advancing method for open shield machine and device thereof
JP2791262B2 (en) Multifunctional excavator reinforcement equipment
JPS6310250B2 (en)
JPH08134912A (en) Timbering member
JPH10266209A (en) Locking structure of cut beam for sheathing/timbering
JPH0342111Y2 (en)
JPH0726561A (en) Earth retaining device
KR101627708B1 (en) Apparatus and method for closing an opening of building slab formed by the interference with the temporary structure
JPH0529248Y2 (en)
JP2955423B2 (en) Cutting beam device
JPS6126460Y2 (en)