JPH054786A - Elevator guide rail connecting method and device therefor - Google Patents

Elevator guide rail connecting method and device therefor

Info

Publication number
JPH054786A
JPH054786A JP15710491A JP15710491A JPH054786A JP H054786 A JPH054786 A JP H054786A JP 15710491 A JP15710491 A JP 15710491A JP 15710491 A JP15710491 A JP 15710491A JP H054786 A JPH054786 A JP H054786A
Authority
JP
Japan
Prior art keywords
guide rail
guide rails
hoistway
guide
solvent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP15710491A
Other languages
Japanese (ja)
Inventor
Toshimitsu Suyama
山 俊 光 須
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP15710491A priority Critical patent/JPH054786A/en
Publication of JPH054786A publication Critical patent/JPH054786A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B19/00Mining-hoist operation
    • B66B19/002Mining-hoist operation installing or exchanging guide rails

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

PURPOSE:To automate the installation of guide rails by spraying a solvent to the rust preventives applied tenon parts of guide rail connecting pars, and fitting the tenon parts to each other while vibrating the guide rail to remove rust preventives. CONSTITUTION:The lower end of a guide rail 6b is moved above a lowest guide rail 6a to perform the positioning of the guide rail 6b and to perform vertical centering with the lowest guide rail 6a. The solvent of rust preventives is then sprayed to the connecting parts of the guide rails 6a, 6b, and the centering tenon 6b3 of the guide rail 6b is engagedly dropped into the centering groove 6a4 provided at the top end part of the lowest guide rail 6a while vibrating the guide rail 6b by an exciter. The fitting of the guide rails 6a, 6b can be thereby performed automatically and surely.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、エレベータ昇降路内壁
面に据付けるガイドレールの連結方法及びその連結装置
に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for connecting guide rails to be installed on the inner wall surface of an elevator hoistway, and a connecting device therefor.

【0002】[0002]

【従来の技術】一般に、高層建物における人や物の昇降
用のエレベータは、図13に示すように、垂直方向に延
びる昇降路1に配設されているゴンドラ2を、昇降路1
の頂部に設けられた懸垂機構3によって上下するように
構成されている。
2. Description of the Related Art Generally, an elevator for raising and lowering a person or an object in a high-rise building has a gondola 2 arranged in a vertically extending hoistway 1 as shown in FIG.
It is configured to move up and down by a suspension mechanism 3 provided on the top of the.

【0003】上記ゴンドラ2は懸垂機構3から下された
ロープ4の下端に吊下されており、上記ロープ4の他端
にはバランスウエイト5が吊下されている。また、上記
ゴンドラ2およびバランスウエイト5は、昇降路1の内
面側に立設されたガイドレール6,7にそれぞれ両側部
が係合案内されるようにしてあり、上記懸垂機構3の作
動によって、ゴンドラ2が上記ガイドレール6に沿って
案内されながら昇降するように構成されている。
The gondola 2 is suspended from the lower end of a rope 4 suspended from a suspension mechanism 3, and a balance weight 5 is suspended from the other end of the rope 4. Both sides of the gondola 2 and the balance weight 5 are engaged and guided by guide rails 6 and 7 which are provided upright on the inner surface side of the hoistway 1, and by the operation of the suspension mechanism 3, The gondola 2 is configured to move up and down while being guided along the guide rails 6.

【0004】上記ガイドレール6および7は図14およ
び図15に示すように建物の昇降路1の内壁面に取付け
られるが、この取付に際しては、図16に示すように昇
降路1の底部にダンパー台6aを設置し、そのダンパー
台6aの両端にガイドレール6を立て、アンカボルト8
によって取付金具9を昇降路壁面に固定した後、屋上等
に配設されたウインチによってガイドレール6を吊り下
げ、このウインチで吊り下げられたガイドレール6の下
端に中継金具10を介して次のガイドレールを連結し、
この連結を繰り返して全てのガイドレールを吊り上げた
後、昇降路1内に組立てられた足場等を利用しながら、
基準位置から垂下されたピアノ線を基準として昇降路内
壁面の所定位置に取付金具9をアンカボルト8によって
固定し、その取付金具9に上記ガイドレール6をレール
ブラケット11およびシム等を介して固定することによ
り、上記ガイドレールの敷設が行なわれている。
The guide rails 6 and 7 are mounted on the inner wall surface of the hoistway 1 of the building as shown in FIGS. 14 and 15. At the time of mounting, the dampers are attached to the bottom of the hoistway 1 as shown in FIG. The base 6a is installed, and the guide rails 6 are set up at both ends of the damper base 6a.
After fixing the mounting metal fitting 9 to the wall surface of the hoistway by means of a winch arranged on the rooftop or the like, the guide rail 6 is hung, and the lower end of the guide rail 6 hung by this winch is connected to the next end via a relay metal fitting 10. Connect the guide rails,
After repeating this connection and lifting all the guide rails, while using the scaffolds assembled in the hoistway 1,
The mounting bracket 9 is fixed by an anchor bolt 8 at a predetermined position on the inner wall surface of the hoistway with the piano wire hanging from the reference position as a reference, and the guide rail 6 is fixed to the mounting bracket 9 via a rail bracket 11 and a shim or the like. By doing so, the guide rail is laid.

【0005】ところで、各ガイドレール6の端部にはほ
ぞの溝および突起が形成されており、上下に配列された
ガイドレールのほぞを互いに嵌合し、中継金具10で互
いに固定することによって上記連結が行なわれている。
By the way, a tenon groove and a protrusion are formed at the end of each guide rail 6, and the tenons of the guide rails arranged vertically are fitted to each other and fixed to each other by the relay metal fitting 10. The connection is being made.

【0006】しかしながら、このように足場を組立てて
その足場上に作業者が乗って作業をするものにおいて
は、作業者が作業内容が変る毎に足場上を昇り降りして
移動する必要があり、多大の労力と時間を費すばかりで
なく、最近のような超高層ビルにおいては高所での不完
全な足場上での作業のため、作業者の安全性の保持が難
しく、作業者の疲労度が大きい等の問題がある。
[0006] However, in such a scaffold assembled and a worker rides on the scaffold in this way, the worker needs to move up and down on the scaffold every time the work content changes. Not only does it take a lot of labor and time, but it is difficult to maintain the safety of workers due to work on imperfect scaffolding at high places in modern skyscrapers, which causes fatigue of workers. There is a problem such as a high degree.

【0007】そこで、上記問題を解消するため、昇降路
内に昇降可能な作業台枠を配設した昇降路内作業装置も
提案されている(特開昭58−193876号)。
Therefore, in order to solve the above problem, a hoistway working device in which a hoisting work frame is provided in the hoistway is also proposed (Japanese Patent Laid-Open No. 58-193876).

【0008】[0008]

【発明が解決しようとする課題】ところが、上述の如き
従来の装置においては、レール連結作業において上下の
ガイドレールの心出し用のほぞ部に塗布されている防錆
剤を除去する手段がないため、ぼぞの防錆剤を事前に手
作業で去しているが、ほぞの隙間はほとんどないため、
防錆剤の除去にはかなりの手間がかかり、レール連結の
自動化の重大な障害になっている。
However, in the conventional device as described above, there is no means for removing the rust preventive agent applied to the centering tenon of the upper and lower guide rails in the rail connecting work. , I have manually removed the anti-corrosion agent from the groove in advance, but since there is almost no gap in the tenon,
It takes a lot of time to remove the rust preventive agent, which is a serious obstacle to automation of rail connection.

【0009】本発明はこのような点に鑑み、エレベータ
ガイドレールの連結作業において、ガイドレール連結部
に固着している防錆剤の除去を人手によらず、自動的に
除去しながらレールの連結を行ない得る連結方法及び連
結装置を得ることを目的とする。
In view of the above-mentioned problems, the present invention, in the work of connecting elevator guide rails, does not manually remove the rust preventive agent fixed to the guide rail connecting portion, but automatically removes the rust preventive agent while connecting the rails. It is an object of the present invention to obtain a connecting method and a connecting device capable of performing the above.

【0010】[0010]

【課題を解決するための手段】第1の発明は、エレベー
タ昇降路内壁面に据付けるガイドレールの連結方法にお
いて、互いに連結される上下のガイドレールの連結部に
おける防錆剤が塗布されているほぞ部に溶剤をスプレー
塗布し、上記連結されるガイドレールを加振器により振
動させて防錆剤を排除しながら、上下のガイドレールの
ほぞを互いに嵌合させることを特徴とするものであり、
第2の発明は、エレベータ昇降路の頂部から吊設された
昇降ワイヤによって昇降路内を上下動可能に配設された
移動基台と、上記移動基台に左右方向および前後方向軸
腺回りの旋回可能に装着された可動フレームと、その可
動フレームに装着され、ガイドレール敷設場所に吊り下
げられたガイドレールを案内支持するガイドレール把持
機構と、上記可動フレームに装着され、ガイドレールの
位置決めピン、ガイドレールを連結する中継金具のねじ
締機構、上下のガイドレール連結部に塗布されている防
錆剤塗布部に対し溶剤を噴霧する溶剤噴霧装置、及び上
記ガイドレール位置決めピンを介して連結されるガイド
レールの嵌合部に振動を加える加振機構とを有する作業
ロボットとを有することを特徴とする。
According to a first aspect of the present invention, in a method for connecting guide rails installed on an inner wall surface of an elevator hoistway, a rust preventive agent is applied to a connecting portion of upper and lower guide rails connected to each other. The tenon part is sprayed with a solvent, and the guide rails connected to each other are vibrated by a vibrator to remove the rust preventive agent, while the tenons of the upper and lower guide rails are fitted to each other. ,
A second aspect of the present invention is a moving base arranged to be movable up and down in the hoistway by an elevating wire hung from the top of the elevator hoistway; A movable frame that is mounted so as to be rotatable, a guide rail gripping mechanism that is mounted on the movable frame and that guides and supports a guide rail that is suspended at a guide rail installation location, and a positioning pin for the guide rail that is mounted on the movable frame. , Screwing mechanism of relay metal fittings that connect the guide rails, solvent spraying device that sprays the solvent to the rust preventive agent coating parts that are applied to the upper and lower guide rail connecting parts, and the guide rail positioning pins. And a work robot having a vibrating mechanism for applying vibration to the fitting portion of the guide rail.

【0011】[0011]

【作用】直前に据付けたガイドレールの頂上に、次のガ
イドレールを連結するに当り、吊り下げられた次のガイ
ドレールと既に据付けられているガイドレールの連結部
に防錆剤の溶剤を溶剤スプレーで塗布し、ガイドレール
の下端のネジ穴に位置決めピンを加振器により加振する
ことによりガイドレールの連結部を加振し、当該部の防
錆剤を排除しながら、上下のガイドレールのほぞ部の嵌
合を行なわせる。しかしてガイドレールの連結に際し、
手作業によってその都度防錆剤の除去を行なう必要がな
い。
[Operation] When connecting the next guide rail to the top of the guide rail installed immediately before, the solvent of the rust preventive agent should be removed from the connection between the next suspended guide rail and the already installed guide rail. Apply spray and shake the positioning pin in the screw hole at the lower end of the guide rail with a vibrator to vibrate the guide rail connecting part and remove the rust preventive agent on that part while removing the upper and lower guide rails. Fit the tenon. Then, when connecting the guide rails,
There is no need to manually remove the rust preventive agent each time.

【0012】[0012]

【実施例】以下、添付図面を参照して本発明の実施例に
ついて説明する。
Embodiments of the present invention will be described below with reference to the accompanying drawings.

【0013】図1および図2において符号20は本発明
の作業装置の移動基台であって、その移動基台20には
上方に延びる2本の梁21aを有する可動フレーム21
が左右方向移動および前後方向軸線回りの旋回が可能に
装着されている。その可動フレーム21の梁の頂端には
吊り具22が設けられており、エレベータ昇降路の頂部
に配設された巻上機(図示せず)から吊設された昇降ワ
イヤ23の下端が上記吊り具22に連結され、昇降ワイ
ヤ23の上下によって移動基台20が昇降されるように
してある。
1 and 2, reference numeral 20 is a movable base of the working apparatus of the present invention, and the movable base 20 has a movable frame 21 having two beams 21a extending upward.
Is mounted so that it can move in the left-right direction and turn around the longitudinal axis. A suspending tool 22 is provided on the top end of the beam of the movable frame 21, and the lower end of the elevating wire 23 suspended from a hoisting machine (not shown) disposed at the top of the elevator hoistway is used to suspend the suspension. The movable base 20 is moved up and down by being connected to the tool 22 and by moving up and down the lifting wire 23.

【0014】上記可動フレーム21の前面側(昇降路の
ガイドレールが据え付けられるべき内壁面と対向する面
側)下部には、第1のガイドレール把持機構30が上下
2段にわたって装着されており(図3、図4)、移動基
台20の背面側には第2のガイドレール把持機構40が
上下2段に装着されている。また、可動フレーム21の
2本の梁21aの間にはその上部に上下2段の第3のガ
イドレール把持機構50が設けられており、さらに移動
基台20上には第1の作業ロボット60および第2の作
業ロボット70が設けられ、また前記第3のガイドレー
ル把持機構50の下方部には第3の作業ロボット80が
装着されている。さらに上記移動基台20の左右両端部
にはそれぞれ移動基台20の固定機構100が装着され
ている。
A first guide rail gripping mechanism 30 is mounted vertically in two steps below the front side of the movable frame 21 (the side facing the inner wall surface where the guide rails of the hoistway are to be installed). (FIGS. 3 and 4), the second guide rail gripping mechanism 40 is mounted on the back side of the moving base 20 in two stages, upper and lower. In addition, between the two beams 21 a of the movable frame 21, a third guide rail gripping mechanism 50 of two upper and lower stages is provided on the upper part thereof, and the first work robot 60 is further provided on the moving base 20. Also, a second work robot 70 is provided, and a third work robot 80 is mounted below the third guide rail gripping mechanism 50. Further, a fixing mechanism 100 for the moving base 20 is attached to each of the left and right ends of the moving base 20.

【0015】図5および図6は、前記第1のガイドレー
ル把持機構の平面図および正面図であって、可動フレー
ム21には、左右方向に延びる案内31に沿い駆動シリ
ンダ32a,32bによって互いに接近或は離間する方
向に移動する1対の可動部材33a,33bが設けられ
ており、その可動部材33a,33bには、ガイドレー
ル6の側面に係合する前後軸線回りに回動するローラ3
4a,34b、およびガイドレール6のくびれ部側面に
係合するローラ35a,35bがそれぞれ装着してあ
る。そして、上記ローラ35a,35bは押し付けシリ
ンダ36a,36bによって左右方向軸線回りに回動可
能に装着されたローラ37にガイドレール6の頂面を押
し付けるようにしてある。
5 and 6 are a plan view and a front view of the first guide rail gripping mechanism, in which the movable frame 21 is approached to each other by drive cylinders 32a and 32b along a guide 31 extending in the left-right direction. Alternatively, a pair of movable members 33a and 33b that move in the direction of separation are provided, and the movable members 33a and 33b are provided with rollers 3 that engage with the side surfaces of the guide rails 6 and that rotate about the longitudinal axis.
4a and 34b and rollers 35a and 35b which engage with the side surfaces of the guide rail 6 at the constricted portion are mounted. The rollers 35a and 35b are configured to press the top surface of the guide rail 6 against the roller 37 that is mounted by the pressing cylinders 36a and 36b so as to be rotatable about the horizontal axis.

【0016】一方、移動基台20の背面側に設けられた
上下2セットの第2のガイドレール把持機構40は、図
7に示すようにそれぞれガイドレール6が挿通可能な間
隙を有するように配設された左右の各フレーム41a,
41bを有しており、その各フレーム41a,41b
に、左右方向に延びる案内42a,42bに沿い駆動シ
リンダ43a,43bによって互いに接近或は離間する
方向に移動する1対の可動部材44a,44bが設けら
れている。その可動部材44a,44bには、ガイドレ
ール6の側面および頂面に係合する前後軸線回りに回動
するつば付きローラ45a,45b、およびガイドレー
ル6のくびれ部側面に係合するローラ46a,46bが
それぞれ装着してあり、そのローラ46a,46bはそ
れぞれ押し付けシリンダ47a,47bによってガイド
レール6をローラ45a,45bのつば部に押し付ける
ようにしてある。
On the other hand, the upper and lower two sets of the second guide rail gripping mechanisms 40 provided on the back side of the movable base 20 are arranged so that the guide rails 6 can be inserted through the respective gaps as shown in FIG. Left and right frames 41a installed,
41b, each frame 41a, 41b thereof
Further, a pair of movable members 44a and 44b are provided which move in the directions toward and away from each other by the drive cylinders 43a and 43b along the guides 42a and 42b extending in the left-right direction. The movable members 44a and 44b include flanged rollers 45a and 45b that rotate around the front and rear axes that engage with the side surfaces and the top surface of the guide rail 6, and rollers 46a that engage with the constricted portion side surface of the guide rail 6. 46b are mounted respectively, and the rollers 46a and 46b press the guide rail 6 against the brim portions of the rollers 45a and 45b by pressing cylinders 47a and 47b, respectively.

【0017】また、可動フレーム21の梁の上部に上下
に2セット設けられた第3のガイドレール把持機構50
は、図2、図3に示すように、それぞれ2本の梁間にま
たぐように装着された平面視コ字状の枠体51を有し、
その枠体51にレール把持具52が移動基台20の前面
側と背面側間を移動可能に装着されている。すなわち、
上記レール把持具52は、駆動装置53によって回動さ
れるねじ軸54等に螺合し、そのねじ軸54の回動によ
ってレール把持具52が第2のガイドレール把持機構4
0の直上部と第1のガイドレール把持機構30の直上部
間を前進或は後退するようにしてある。そして、上記レ
ール把持具52は、第2のガイドレール把持機構40と
同じようにガイドレール6の両側面およびくびれ部に係
合するローラ55を有している。
Further, a third guide rail gripping mechanism 50 is provided above and below the beam of the movable frame 21 in two sets, one above the other.
As shown in FIGS. 2 and 3, each has a frame body 51 having a U-shape in a plan view, which is mounted so as to straddle two beams,
A rail gripping tool 52 is mounted on the frame 51 so as to be movable between the front side and the back side of the moving base 20. That is,
The rail gripping tool 52 is screwed onto a screw shaft 54 or the like that is rotated by the drive device 53, and the rotation of the screw shaft 54 causes the rail gripping tool 52 to move to the second guide rail gripping mechanism 4.
The space between the upper part of 0 and the upper part of the first guide rail gripping mechanism 30 is moved forward or backward. Further, the rail gripping tool 52 has rollers 55 that engage with both side surfaces of the guide rail 6 and the constricted portion similarly to the second guide rail gripping mechanism 40.

【0018】第3の作業ロボット80は図8に示すよう
に構成されている。すなわち、可動フレーム21の2本
の梁21aの前面には、その2本の梁21a間において
前後方向に延びる案内杆81から側方に突設された腕8
2が、上記梁21aに沿って上下動可能に装着されてい
る。
The third work robot 80 is constructed as shown in FIG. That is, on the front surface of the two beams 21a of the movable frame 21, the arms 8 projecting laterally from the guide rod 81 extending in the front-rear direction between the two beams 21a.
2 is mounted so as to be vertically movable along the beam 21a.

【0019】上記両案内杆82の間にはその案内杆82
に装着されたねじ軸83等に縲合され、そのねじ軸83
の回動によりそのねじ軸83に沿って前後動可能な移動
台84が設けられている。その移動台84上には縦軸回
りに回転する回転テーブル85が装着してあり、その回
転テーブル85上には、駆動シリンダ86a,86bに
よって前後方向に進退される一対の位置決めピン87
a,87bと、各位置決めピン87a,87bの下方位
置に配設されたねじ締機構88a,88bと、両位置決
めピン87a,87bの間隔を調整する調整機構89
a,89bが装着されている。
A guide rod 82 is provided between the two guide rods 82.
The screw shaft 83 mounted on the
Is provided with a movable base 84 that can be moved back and forth along the screw shaft 83. A rotary table 85 that rotates around the vertical axis is mounted on the moving table 84, and a pair of positioning pins 87 that are moved forward and backward by the drive cylinders 86a and 86b are mounted on the rotary table 85.
a, 87b, screw tightening mechanisms 88a, 88b arranged below the positioning pins 87a, 87b, and an adjusting mechanism 89 for adjusting the distance between the positioning pins 87a, 87b.
a and 89b are attached.

【0020】また、上記ねじ締機構88a,88bと位
置決めピン保持機構90a,90b間には、図9に示す
ように、加振シリンダ91及び振動板92からなる加振
器93が介装されており、さらに上記位置決めピン保持
機構90a,90bの上方には、防錆剤の溶剤を噴霧す
る溶剤スプレー装置94が装着されている。すなわち、
上記位置決めピン保持機構90a,90bの上方には、
図9に示すように、溶剤タンク94a及びスプレーポン
プ94bが配設されており、そのスプレーポンプ94b
から位置決めピン87aと平行に延びるスプレー94c
が設けられている。
Further, as shown in FIG. 9, a vibrator 93 composed of a vibration cylinder 91 and a vibration plate 92 is interposed between the screw tightening mechanisms 88a and 88b and the positioning pin holding mechanisms 90a and 90b. Further, above the positioning pin holding mechanisms 90a and 90b, a solvent spray device 94 for spraying a solvent of a rust preventive is mounted. That is,
Above the positioning pin holding mechanisms 90a and 90b,
As shown in FIG. 9, a solvent tank 94a and a spray pump 94b are provided, and the spray pump 94b is provided.
94c extending parallel to the positioning pin 87a from the
Is provided.

【0021】しかして、昇降路内壁面へのガイドレール
6aの取付は次のようにして行なわれる。
The guide rail 6a is attached to the inner wall surface of the hoistway in the following manner.

【0022】まず、最下部のガイドレール6aをブラケ
ットによって昇降路内壁面の所定位置に作業員によって
取り付ける。そこで、昇降ワイヤ23で吊下された本作
業装置における移動基台20に設けられた第1のガイド
レール把持機構30の各ローラ34a,34b等を上記
最下部のガイドレール6aに係合し、作業装置をガイド
レール6aに沿って上下動可能とする(図1)。
First, the lowermost guide rail 6a is attached by a bracket to a predetermined position on the inner wall surface of the hoistway by a worker. Therefore, the rollers 34a, 34b, etc. of the first guide rail gripping mechanism 30 provided on the moving base 20 of the working apparatus suspended by the lifting wire 23 are engaged with the lowermost guide rail 6a, The working device can be moved up and down along the guide rail 6a (FIG. 1).

【0023】次に、移動基台20を最下部のガイドレー
ル6aの頂部位置に移動させ、固定機構100を前進さ
せて昇降路内壁面に当接させるとともに、エアパットに
よって吸着させ、移動基台20を昇降路内壁面に固定す
る。それとともに下から2番目のガイドレール6bをガ
イドレール供給機構120に立設し、そのガイドレール
6bの頂部を第2のガイドレール把持機構40のローラ
45a,45b等によって把持し、下から2番目に取付
けられるべきガイドレール6bをワイヤで吊り上げ、図
10に示すように第3の作業ロボット80の位置決めピ
ン87a,87bをガイドレール6bの下端部に設けら
れた上段の連結穴6b1に挿入し、その後ワイヤを少し
ゆるめ、下から2番目に取付けられるべきガイドレール
6bを第3のガイドレール把持機構50のレール把持具
52と上記位置決めピン87a,87bで支持する。
Next, the moving base 20 is moved to the top position of the lowermost guide rail 6a, and the fixing mechanism 100 is advanced to abut against the inner wall surface of the hoistway and sucked by the air pad to move the moving base 20. Is fixed to the inner wall surface of the hoistway. At the same time, the second guide rail 6b from the bottom is erected on the guide rail supply mechanism 120, and the top of the guide rail 6b is gripped by the rollers 45a, 45b of the second guide rail gripping mechanism 40, and the second from the bottom. the guide rail 6b to be attached to the lifting wire, inserted into the positioning pin 87a, the upper connection hole 6b 1 of which is provided with 87b in the lower end portion of the guide rail 6b of the third work robot 80 as shown in FIG. 10 Then, the wire is loosened a little, and the guide rail 6b to be attached second from the bottom is supported by the rail gripping tool 52 of the third guide rail gripping mechanism 50 and the positioning pins 87a, 87b.

【0024】そこで、上記ガイドレール把持機構52と
第3の作業ロボット80の移動台84とを前面側に移動
させ、ガイドレール6bの下端を最下部のガイドレール
6aの上方に移動し、ピアノ線114を基準にして上記
ガイドレール6bの位置姿勢を計測し、最下部のガイド
レール6aと鉛直芯出しする。そして、スプレーポンプ
94bを作動させスプレー94cから防錆剤の溶剤をガ
イドレールの連結部に噴霧するとともに、加振器93の
加振シリンダ91により振動板92及び位置決めピン8
7a,87bを介してガイドレール6bを振動させなが
ら、ガイドレール6bの芯出し用ほぞ6b3 を最下部の
ガイドレール6aの頂端部に設けらられた芯合せ溝6a
4 に落し込むようにして係合させる(図12)。ガイド
レール6bを支持している位置決めピン87a,87b
の先端を、さらに最下部のガイドレール6aの頂部の中
継金具10の連結穴に突き差し、ねじ締機構88a,8
8bによってガイドレール6bの下段の連結穴6b2
ガイドレール6aの連結金具10の下段の連結穴10b
とをボルトにより締結する。その後位置決めピン87
a,87bを引き抜き、ねじ締機構88a,88bをガ
イドレール6bの上段の連結穴6b1 の位置まで移動
し、その連結穴を介してボルトによってさらにガイドレ
ール6bとガイドレール6aの連結金具10とを連結す
る。
Therefore, the guide rail gripping mechanism 52 and the moving base 84 of the third work robot 80 are moved to the front side, and the lower end of the guide rail 6b is moved above the lowermost guide rail 6a, and the piano wire is moved. The position and orientation of the guide rail 6b are measured with reference to 114, and the guide rail 6a at the lowermost portion is vertically aligned. Then, the spray pump 94b is operated to spray the solvent of the rust preventive agent from the spray 94c to the connecting portion of the guide rail, and at the same time, the vibration cylinder 91 of the vibration exciter 93 causes the vibration plate 92 and the positioning pin 8 to be moved.
7a, while vibrating the guide rail 6b through 87b, guide the centering tenon 6b 3 of the rail 6b of the bottom guide rail 6a centering groove 6a provided et the top end of the
Engage as it drops into 4 (Figure 12). Positioning pins 87a and 87b supporting the guide rail 6b
The tip of each of them is further inserted into the connecting hole of the relay metal fitting 10 at the top of the lowermost guide rail 6a, and the screw tightening mechanisms 88a, 8
8b, the lower connecting hole 6b 2 of the guide rail 6b and the lower connecting hole 10b of the connecting fitting 10 of the guide rail 6a.
And are fastened with bolts. Then the positioning pin 87
a, pulling the 87b, screw tightening mechanism 88a, 88b to move to the position of the connecting hole 6b 1 of the upper guide rail 6b, the connecting fitting 10 of the further guide rail 6b and the guide rail 6a by bolts through the connecting holes To connect.

【0025】このようにしてガイドレール6a上に第2
段目のガイドレールを連結すると、移動基台20の固定
機構100が解除され、移動基台20が上記ガイドレー
ル6bに沿ってブラケットの取付位置迄吊り上げられ、
そこでブラケットの昇降路内壁面への固定が行なわれ
る。
In this way, the second guide rail 6a is mounted on the guide rail 6a.
When the guide rails of the stage are connected, the fixing mechanism 100 of the moving base 20 is released, and the moving base 20 is lifted up to the bracket mounting position along the guide rail 6b.
Therefore, the bracket is fixed to the inner wall surface of the hoistway.

【0026】すなわち、一般に防錆剤の膜厚は数μmあ
るため、ガイドレール6の連結部のほぞ6b3 等にこの
防錆剤が付着しているとほぞ部の嵌合ができなくなる
が、上述のように行なうことによって防錆剤が自動的に
除去され、ガイドレールの嵌合を自動的に確実に行なう
ことができる。
That is, since the film thickness of the rust preventive agent is generally several μm, if the rust preventive agent is attached to the tenon 6b 3 of the connecting portion of the guide rail 6, the tenon cannot be fitted. By performing as described above, the rust preventive agent is automatically removed, and the guide rails can be fitted automatically and reliably.

【0027】上記実施例はガイドレールを1本ずつ積み
上げ固定する据付方法の例を示したが、ガイドレールを
昇降路内に全部連結して吊り下げた後に壁面に固定する
方法もある。この場合には、吊り下げたガイドレールの
重量が大きすぎて十分加振することができないので、レ
ール供給機構120にレール把持機構とともに振動シリ
ンダを設け、この振動シリンダによりガイドレールに上
下振動を行なうようにしてもよい。
In the above embodiment, an example of an installation method in which the guide rails are piled up and fixed one by one, but there is also a method in which the guide rails are all connected in the hoistway and suspended, and then fixed to the wall surface. In this case, the weight of the suspended guide rail is too large to sufficiently vibrate. Therefore, the rail supply mechanism 120 is provided with a vibrating cylinder together with the rail gripping mechanism, and the vibrating cylinder vertically vibrates the guide rail. You may do it.

【0028】[0028]

【発明の効果】本発明は上述のように構成したので、エ
レベータガイドレールの連結作業において、ガイドレー
ル端部のほぞに付着している防錆剤を自動的に除去しな
がらレールの連結を行なうことができ、人が近付きにく
い昇降路内の中でのエレベータガイドレール据付を自動
化することができる。
Since the present invention is configured as described above, in the elevator guide rail connecting work, the rails are connected while automatically removing the rust preventive agent adhering to the tenon at the end of the guide rail. It is possible to automate the installation of the elevator guide rail in the hoistway, which is difficult for people to approach.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の概略構成を示す斜視図。FIG. 1 is a perspective view showing a schematic configuration of the present invention.

【図2】本発明の作業装置本体部の斜視図。FIG. 2 is a perspective view of a work device body according to the present invention.

【図3】作業装置の平面図。FIG. 3 is a plan view of a work device.

【図4】作業装置の正面図。FIG. 4 is a front view of the work device.

【図5】第1のガイドレール把持機構の平面図。FIG. 5 is a plan view of a first guide rail gripping mechanism.

【図6】第1のガイドレール把持機構の正面図。FIG. 6 is a front view of a first guide rail gripping mechanism.

【図7】第2のガイドレール把持機構の平面図。FIG. 7 is a plan view of a second guide rail gripping mechanism.

【図8】第3の作業ロボット部の上面斜視図。FIG. 8 is a top perspective view of a third work robot unit.

【図9】第3の作業ロボット部の部分拡大斜視図。FIG. 9 is a partially enlarged perspective view of a third work robot unit.

【図10】位置決めピンの作動説明図。FIG. 10 is an operation explanatory view of a positioning pin.

【図11】ガイドレールの連結部の作動説明図。FIG. 11 is an operation explanatory view of a connecting portion of the guide rail.

【図12】ガイドレールのほぞの嵌合状態を示す図。FIG. 12 is a view showing a fitted state of a guide rail tenon.

【図13】一般的なエレベータの概略構成を示す図。FIG. 13 is a diagram showing a schematic configuration of a general elevator.

【図14】エレベータ昇降路内の正断面図。FIG. 14 is a front cross-sectional view inside the elevator hoistway.

【図15】エレベータ昇降路の半断面図。FIG. 15 is a half cross-sectional view of the elevator hoistway.

【図16】エレベータガイドレール据付作業説明図。FIG. 16 is an explanatory diagram of an elevator guide rail installation work.

【符号の説明】[Explanation of symbols]

6,6a,6b ガイドレール 20 移動基台 80 第3の作業ロボット 87a,87b 位置決めピン 88a,88b ねじ締機構 93 加振器 94 スプレー装置 94a 溶剤タンク 94b スプレーポンプ 94c スプレー 6,6a, 6b Guide rail 20 Moving base 80 Third Work Robot 87a, 87b Positioning pin 88a, 88b screw tightening mechanism 93 shaker 94 spray device 94a solvent tank 94b spray pump 94c spray

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】エレベータ昇降路内壁面に据付けるガイド
レールの連結方法において、互いに連結される上下のガ
イドレールの連結部における防錆剤が塗布されているほ
ぞ部に溶剤をスプレー塗布し、上記連結されるガイドレ
ールを加振器により振動させて防錆剤を排除しながら、
上下のガイドレールのほぞを互いに嵌合させることを特
徴とするエレベータガイドレール連結方法。
1. A method of connecting guide rails to be installed on an inner wall surface of an elevator hoistway, wherein a solvent is spray-applied to a tenon portion to which a rust preventive agent is applied in a connecting portion of upper and lower guide rails connected to each other. While removing the rust preventive agent by vibrating the connected guide rail with a vibrator,
A method for connecting an elevator guide rail, characterized in that the tenons of the upper and lower guide rails are fitted together.
【請求項2】エレベータ昇降路の頂部から吊設された昇
降ワイヤによって昇降路内を上下動可能に配設された移
動基台と、上記移動基台に左右方向および前後方向軸腺
回りの旋回可能に装着された可動フレームと、その可動
フレームに装着され、ガイドレール敷設場所に吊り下げ
られたガイドレールを案内支持するガイドレール把持機
構と、上記可動フレームに装着され、ガイドレールの位
置決めピン、ガイドレールを連結する中継金具のねじ締
機構、上下のガイドレール連結部に塗布されている防錆
剤塗布部に対し溶剤を噴霧する溶剤噴霧装置、及び上記
ガイドレール位置決めピンを介して連結されるガイドレ
ールの嵌合部に振動を加える加振機構とを有する作業ロ
ボットとを有することを特徴とする、エレベータガイド
レール連結装置。
2. A moving base arranged to be movable up and down in the hoistway by an elevating wire hung from the top of the elevator hoistway, and a swivel on the moving base around left and right and longitudinal axis glands. A movable frame that is movably mounted, a guide rail gripping mechanism that is mounted on the movable frame, and that guides and supports a guide rail that is hung at a guide rail installation location, a positioning pin for the guide rail that is mounted on the movable frame, It is connected via the screw tightening mechanism of the relay metal fitting that connects the guide rails, the solvent spraying device that sprays the solvent to the rust preventive application parts that are applied to the upper and lower guide rail connecting parts, and the guide rail positioning pin. An elevator guide rail coupling device, comprising: a work robot having a vibrating mechanism that applies vibration to a fitting portion of the guide rail.
JP15710491A 1991-06-27 1991-06-27 Elevator guide rail connecting method and device therefor Pending JPH054786A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15710491A JPH054786A (en) 1991-06-27 1991-06-27 Elevator guide rail connecting method and device therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15710491A JPH054786A (en) 1991-06-27 1991-06-27 Elevator guide rail connecting method and device therefor

Publications (1)

Publication Number Publication Date
JPH054786A true JPH054786A (en) 1993-01-14

Family

ID=15642322

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15710491A Pending JPH054786A (en) 1991-06-27 1991-06-27 Elevator guide rail connecting method and device therefor

Country Status (1)

Country Link
JP (1) JPH054786A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102730514A (en) * 2011-04-05 2012-10-17 东芝电梯株式会社 Elevator
CN112638810A (en) * 2018-09-06 2021-04-09 三菱电机株式会社 Elevator guide rail machining device and guide rail machining method
US11292694B2 (en) 2018-10-11 2022-04-05 Otis Elevator Company Elevator guide rail support assemblies

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102730514A (en) * 2011-04-05 2012-10-17 东芝电梯株式会社 Elevator
CN112638810A (en) * 2018-09-06 2021-04-09 三菱电机株式会社 Elevator guide rail machining device and guide rail machining method
US11292694B2 (en) 2018-10-11 2022-04-05 Otis Elevator Company Elevator guide rail support assemblies

Similar Documents

Publication Publication Date Title
JPH054786A (en) Elevator guide rail connecting method and device therefor
WO2020035930A1 (en) Construction elevator lifting height extension method and elevator rope lowering jig
JP3034960B2 (en) Equipment installed in hoistway
JP2000274069A (en) Lift for scaffold component member
JPH0739644B2 (en) Construction method of superstructure in elevated structure
JP2775201B2 (en) Lifting member positioning and mounting device for high lift crane
JP2001354374A (en) Lifting device in hoistway of elevator
JP2010150039A (en) Crane girder replacing method and crane girder replacing device
JP2008254834A (en) Main rope replacing method for hydraulic elevator and pulley tool for main rope replacement using the method
JP2989969B2 (en) Exterior scaffolding and exterior construction method
CN109972813A (en) Integrated form integral construction plateform system in a kind of elevator
JPH05330758A (en) Elevator guide rail installation assist device and guide rail installation method
JP5382443B2 (en) How to renew an elevator
JPH10167613A (en) Installation device for elevator guide rail
CN212924182U (en) Aerial normal position self-rotating cantilever hoisting structure of high-rise building PC link plate
JPH08217361A (en) Derailment preventing device for balance weight of elevator
CN219078897U (en) Multipurpose overhead travelling crane overhauls cage
JPH05186161A (en) Lower portion centering device for elevator installation
JP2000351555A (en) Method for replacing elevator main rope
JP3872187B2 (en) Spray fireproof coating method and equipment
JPH10203751A (en) Main rope replacing method of 2:1 roping elevator and device thereof
JPH0529099Y2 (en)
JP2002060158A (en) Installation method for elevator
CN116378386A (en) Floor construction method of attached lifting scaffold
JPH02300081A (en) Installation work method for elevator