JPH0535904U JP9322991U JP9322991U JPH0535904U JP H0535904 U JPH0535904 U JP H0535904U JP 9322991 U JP9322991 U JP 9322991U JP 9322991 U JP9322991 U JP 9322991U JP H0535904 U JPH0535904 U JP H0535904U
Authority
JP
Japan
Prior art keywords
unit room
bolt
nut
frame member
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP9322991U
Other languages
Japanese (ja)
Other versions
JPH0744642Y2 (en
Inventor
信夫 根塚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Misawa Homes Co Ltd
Original Assignee
Misawa Homes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Misawa Homes Co Ltd filed Critical Misawa Homes Co Ltd
Priority to JP9322991U priority Critical patent/JPH0744642Y2/en
Publication of JPH0535904U publication Critical patent/JPH0535904U/en
Application granted granted Critical
Publication of JPH0744642Y2 publication Critical patent/JPH0744642Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

(57)【要約】 【目的】 予め階上及び階下のユニットルームの連結部
分にボルト・ナットを取付けておき、階上のユニットル
ームの設置時に、ユニットルームの外側から、ボルト・
ナットを締付け固定することにより、簡単にかつ短時間
で連結可能とすると共に、搬送時や連結時のボルト・ナ
ットの脱落を防止する。 【構成】 下部に貫通形成したボルト挿入用の連結孔4
0と、全面を開口して形成したボルト締付け操作部42
とを含む箱状の連結金物16を、上方のユニットルーム
14の床パネル22側端面に固定し、下部の連結孔40
に挿入して下方に突出させたボルト18を、下方のユニ
ットルーム12の壁パネル24上端に位置する枠材58
に貫通させ、枠材58の下面側に設けたナット20に螺
合させて連結するユニットルームの連結構造であって、
ナット20は、筒状のナット本体54を前記枠材58に
貫通させ、ナット本体54の上部外周に形成したフラン
ジ部56を前記枠材58上面に当接させると共に、ナッ
ト本体54の下端部にボルト60を螺合させて枠材58
に固定される。
(57) [Summary] [Purpose] Attach bolts and nuts to the connecting parts of the upper and lower unit rooms in advance, and install the bolts and nuts from the outside of the unit room when installing the upper unit room.
By tightening and fixing the nuts, it is possible to connect easily and in a short time, and prevent the bolts and nuts from falling off during transportation or connection. [Structure] Connection hole 4 for inserting bolts formed through the lower part
0 and a bolt tightening operation part 42 formed by opening the entire surface
The box-shaped connecting hardware 16 including and is fixed to the end surface of the upper unit room 14 on the floor panel 22 side, and the lower connecting hole 40
The bolt 18 which is inserted into the lower part of the unit room 12 and protrudes downward is attached to the frame member 58 located at the upper end of the wall panel 24 of the lower unit room 12.
A connecting structure of a unit room, which is connected to the nut 20 provided on the lower surface side of the frame member 58 by being threaded through
In the nut 20, the tubular nut main body 54 is passed through the frame member 58, the flange portion 56 formed on the outer periphery of the upper portion of the nut main body 54 is brought into contact with the upper surface of the frame member 58, and at the lower end portion of the nut main body 54. The frame material 58 by screwing the bolt 60
Fixed to.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

本考案は、工業化住宅におけるユニットルームの連結構造に関し、特に階上及 び階下のユニットルーム同士を連結するに適したユニットルームの連結構造に関 する。 The present invention relates to a unit room connection structure in an industrialized house, and more particularly to a unit room connection structure suitable for connecting upper and lower floor unit rooms.

【0002】[0002]

【従来の技術】[Prior Art]

近年、建築物等においては、工業化が進められている。 In recent years, industrialization has progressed in buildings and the like.

【0003】 特に工期の短縮、現場施工の容易性などから、ユニット工法が広く取り入れら れ、このユニット工法においては、予め工場で組み立て生産した箱状のユニット ルームを現場に搬送して、現場で複数のユニットルームを組み付けることによっ て、住宅などを建築するようにしている。In particular, the unit construction method is widely adopted in terms of shortening the construction period, easiness of site construction, and the like. In this unit construction method, a box-shaped unit room preassembled and manufactured in a factory is transported to the scene and By assembling multiple unit rooms, we are constructing houses.

【0004】 そして、従来ではこのようなユニットルーム同士を積み重ねて上下に連結固定 する場合、階下のユニットルームの壁パネル上端と階上のユニットルームの床パ ネルとをボルト・ナットを用いて室内側から締付け操作して連結固定するように していた。In the conventional case, when stacking such unit rooms and connecting and fixing the unit rooms up and down, the upper end of the wall panel of the unit room below and the floor panel of the unit room upstairs are connected to each other by using bolts and nuts. It was designed to be connected and fixed by tightening from the inside.

【0005】[0005]

【考案が解決しようとする課題】[Problems to be solved by the device]

前記従来例においては、階上及び階下のユニットルームを積み重ねた状態にお いて、階下のユニットルームの壁パネルと、階上のユニットルームの床パネルと をユニットルームの室内側からボルト・ナットにて締付け固定するようにしてい たため、取り付けようとする階上のユニットルームを階下のユニットルーム上に 載置位置決めした後、作業者がユニットルーム内に入り込んでボルト・ナットの 締付け作業を行なわなければならず、ユニットルームの載置位置決め作業と、ボ ルト・ナットの締付け作業とを別々の段階で行なわなければならないため、作業 に手間がかかり、それだけ作業時間も延びることとなるという問題があった。 In the above-mentioned conventional example, when the upper and lower unit rooms are stacked, the wall panel of the lower unit room and the floor panel of the upper unit room are connected to the bolts and nuts from the inside of the unit room. Since the unit room on the upper floor to be installed is placed and positioned on the unit room downstairs, the worker must enter the unit room and tighten the bolts and nuts. However, since the mounting / positioning work of the unit room and the bolt / nut tightening work must be performed in different stages, there is a problem that the work is troublesome and the work time is extended accordingly. ..

【0006】 また、連結用のボルト・ナットは、工場出荷段階で予め各ユニットルームに取 付けておくのが、部品管理上、現場施工工程の省略上有利であるが、座金やナッ ト等を予め取付ける場合、接着によると、接着剤の固化までに時間がかかり、し かも接着のための圧締作業が必要となって面倒であり、更にはユニットルームの 搬送時の衝撃や連結時のボルトの当接により脱落してしまう恐れがあった。In addition, it is advantageous to attach the bolts and nuts for connection to each unit room in advance at the factory shipment stage, in order to manage parts and to omit the on-site construction process, but washers, nuts, etc. In case of pre-mounting, it takes time to solidify the adhesive and it is troublesome because the adhesive needs to be clamped for adhesion. Furthermore, the impact during transportation of the unit room and the bolt during connection are required. There was a risk that it would fall out due to the contact of.

【0007】 本考案は、前記問題点に鑑みてなされたものであって、その目的は、予め階上 及び階下のユニットルームの連結部分にボルト・ナットを取付けておき、階上の ユニットルームの設置時に、ユニットルームの外側から、ボルト・ナットを締付 け固定することにより、簡単にかつ短時間で連結可能とすると共に、搬送時や連 結時にボルト・ナットが脱落することのないユニットルームの連結構造を提供す ることにある。The present invention has been made in view of the above problems, and an object thereof is to attach bolts and nuts to the connecting portions of the upper and lower unit rooms in advance, and to install the bolts and nuts in the upper unit room. At the time of installation, the bolts and nuts can be easily and quickly connected by tightening and fixing the bolts and nuts from the outside of the unit room, and the bolts and nuts do not fall off during transportation or connection. To provide the connection structure of.

【0008】[0008]

【課題を解決するための手段】[Means for Solving the Problems]

前記目的を達成するために、本考案のユニットルームの連結構造は、 少なくとも下部に貫通形成したボルト挿入用の連結孔と、全面を開口して形成 したボルト締付け操作部とを含む箱状の連結金物を、上下に連結する上方のユニ ットルームの床パネル側端面に形成した凹部内に固定し、前記連結金物に形成し た下部の連結孔に挿入して下方に突出させたボルトを、下方のユニットルームの 壁パネル上端に位置する枠材に貫通させ、前記枠材の下面側に設けたナットに螺 合させて連結するユニットルームの連結構造であって、 前記ナットは、筒状のナット本体を前記枠材に貫通させ、前記ナット本体の上 部外周に形成したフランジ部を前記枠材上面に当接させると共に、前記ナット本 体の下端部にボルトを螺合させて枠材に固定されることを特徴としている。 In order to achieve the above-mentioned object, the unit room connection structure of the present invention is a box-shaped connection including at least a connection hole for inserting a bolt formed at a lower portion thereof and a bolt tightening operation part formed by opening the entire surface. Fix the hardware in the recess formed on the end surface of the floor panel side of the upper unit room that is vertically connected, and insert the bolts inserted into the lower connection holes formed in A connecting structure of a unit room, which is penetrated through a frame material located at an upper end of a wall panel of a unit room and screwed and connected to a nut provided on a lower surface side of the frame material, wherein the nut is a tubular nut body. Through the frame material, the flange portion formed on the outer periphery of the upper part of the nut body is brought into contact with the upper surface of the frame material, and a bolt is screwed to the lower end portion of the nut body to be fixed to the frame material. Ruko It is characterized in.

【0009】[0009]

【作用】[Action]

予め工場出荷段階において、階上のユニットルームの床パネル側端面に凹部を 形成し、この凹部内に連結金物の開口を外側に向けて挿入し固定する。この場合 、連結金物の下部の連結孔にボルトを挿入しておけば、脱落することはない。 In advance at the factory shipment stage, a recess is formed in the end face of the unit room on the floor side on the floor panel side, and the opening of the metal fitting is inserted and fixed in this recess. In this case, if the bolt is inserted into the connecting hole at the bottom of the connecting metal object, it will not fall off.

【0010】 また、階下のユニットルームの壁パネル上端には、前記ボルトと螺合するナッ トを取付けておく。この場合、前記ナットは、筒状のナット本体を前記壁パネル 上端の枠材に貫通させ、前記ナット本体の上部外周に形成したフランジ部を前記 枠材上面に当接させると共に、前記ナット本体の下端部にボルトを螺合させて枠 材に固定される。従って、ナットは、簡単かつ短時間で壁パネルに確実に固定さ れ、脱落するようなことはない。In addition, a nut that is screwed into the bolt is attached to the upper end of the wall panel of the unit room downstairs. In this case, in the nut, the tubular nut body is penetrated through the frame material at the upper end of the wall panel, the flange portion formed on the upper outer periphery of the nut body is brought into contact with the upper surface of the frame material, and It is fixed to the frame material by screwing a bolt to the lower end. Therefore, the nut is securely fixed to the wall panel easily and in a short time and does not fall off.

【0011】 次に、各ユニットルームに連結金物、ボルト・ナット等を取付けた状態で、各 ユニットルームをトラック等の搬送手段により、建築現場に搬送する。Next, each unit room is transported to a building site by a transporting means such as a truck with the connecting hardware, bolts and nuts, etc. attached to each unit room.

【0012】 次いで、建築現場において、基礎上に1階のユニットルームを載置固定し、こ の1階のユニットルーム上に2階のユニットルームを載置する。この場合、2階 のユニットルームに取付けた連結金物の下部より突出させたボルトを、1階のユ ニットルームの壁パネル上端に取付けたナットに対して位置決めし、連結金物の 締付け操作部からボルトを操作して締め付ければ、ユニットルームの外側から、 ユニットルームの位置合わせと同時に連結固定もなし得、施工時間も短縮化し得 ることとなるものである。Next, at the construction site, the unit room on the first floor is placed and fixed on the foundation, and the unit room on the second floor is placed on the unit room on the first floor. In this case, position the bolt protruding from the bottom of the metal fitting installed in the unit room on the second floor with respect to the nut installed on the upper end of the wall panel of the unit room on the first floor, and then tighten the bolt from the tightening operation part of the metal fitting. By operating and tightening, it is possible to connect and fix the unit room at the same time from the outside of the unit room, and it is possible to shorten the construction time.

【0013】[0013]

【実施例】【Example】

以下、本考案の好適な実施例について図面を参照しながら詳細に説明する。 Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the drawings.

【0014】 図1〜図3は、本考案の一実施例を示す図である。1 to 3 are views showing an embodiment of the present invention.

【0015】 この実施例では、基礎10上に1階のユニットルーム12を設置し、その1階 のユニットルーム12の上に2階のユニットルーム14を設置するもので、前記 1階のユニットルーム12と2階のユニットルーム14との連結に連結金物16 及びボルト18、ナット20を用いるようにしている。In this embodiment, the unit room 12 on the first floor is installed on the foundation 10, and the unit room 14 on the second floor is installed on the unit room 12 on the first floor. A connecting metal piece 16, a bolt 18 and a nut 20 are used to connect the 12 and the unit room 14 on the second floor.

【0016】 1階及び2階のユニットルーム12、14は、床パネル22上に壁パネル24 を立設固定し、これら壁パネル24にて形成される壁部の上開口部分には天井材 26を取付け、予め工場で箱状に組み付けられた状態で建築現場に搬送されるよ うになっている。なお、2階のユニットルーム14の上部には、図示せぬ屋根パ ネルが取付けられるようになっている。In the unit rooms 12 and 14 on the first and second floors, a wall panel 24 is erected and fixed on a floor panel 22, and a ceiling material is provided at an upper opening portion of a wall portion formed by these wall panels 24. Is installed and is assembled in a box in advance at the factory and then transported to the construction site. A roof panel (not shown) can be attached to the upper part of the unit room 14 on the second floor.

【0017】 連結金物16は、前面を開口して形成した箱状のもので、左右両側の側部28 と、上下部30、32と、これら側部28、上下部30、32を連結する奥壁部 34とを曲折形成した状態となっている。The connecting hardware 16 is a box-like member formed by opening the front surface, and has side portions 28 on both left and right sides, upper and lower portions 30 and 32, and a back portion that connects these side portions 28 and the upper and lower portions 30 and 32. The wall portion 34 and the wall portion 34 are bent and formed.

【0018】 側部28には、それぞれ予め工場等において床パネル22に取付けておくため の2つのネジ止め用の取付孔36が形成されるようになっている。The side portion 28 is formed with two mounting holes 36 for screwing, which are mounted on the floor panel 22 in advance in a factory or the like.

【0019】 上下部30、32には、ボルト18等を挿入させるための連結孔38、40が 貫通形成されるようになっている。Connection holes 38 and 40 for inserting the bolts 18 and the like are formed through the upper and lower portions 30 and 32, respectively.

【0020】 側部28、上下部30、32及び奥壁部34に囲まれる部分は前面を開口にし た空間として形成され、前記上下部30、32の連結孔38、40を貫通したボ ルト18等を前面側より締付けるための締付け操作部42として形成されるよう になっている。A portion surrounded by the side portion 28, the upper and lower portions 30 and 32, and the back wall portion 34 is formed as a space having an opening on the front surface, and the bolt 18 penetrating the connecting holes 38 and 40 of the upper and lower portions 30 and 32. Etc. are formed as a tightening operation portion 42 for tightening the same from the front side.

【0021】 また、この連結金物16は、予め工場において2階のユニットルーム14の床 パネル22側端部に取付けられるもので、この床パネル22の外周側端に位置す る芯材44は、壁パネル24のほぼ半分の厚さに設定され、さらにその側端面に は、連結金物16を取り付ける凹部46を形成し、その凹部46内に開口を外側 に向けた状態で、かつ左右両側の取付孔36を介して連結金物16をネジ止めす るようにしている。Further, the connecting hardware 16 is attached in advance to the floor panel 22 side end of the unit room 14 on the second floor in the factory, and the core material 44 located at the outer peripheral side end of the floor panel 22 is The thickness of the wall panel 24 is set to approximately half, and a concave portion 46 for mounting the connecting metal piece 16 is formed on the side end surface thereof. The concave portion 46 is mounted with the opening facing outward and on both left and right sides. The connecting hardware 16 is screwed through the hole 36.

【0022】 なお、2階のユニットルーム14の壁パネル24の下辺に位置する枠材48に は、予め工場において上部側の連結孔38よりボルト50が挿通され、枠材48 の上面側よりナット52にて締付けることにより、連結金物16が連結されるよ うになっている。In the frame member 48 located on the lower side of the wall panel 24 of the unit room 14 on the second floor, bolts 50 are previously inserted through the connecting holes 38 on the upper side in the factory, and nuts are inserted from the upper surface side of the frame member 48. By tightening at 52, the connecting hardware 16 is connected.

【0023】 そして、前記連結金物16の下部側の連結孔40に、締付け操作部42側から 、ボルト18が挿入され、この状態で工場から建築現場に搬送されるようになっ ている。Then, the bolt 18 is inserted from the tightening operation portion 42 side into the connecting hole 40 on the lower side of the connecting metal piece 16, and in this state, the bolt 18 is conveyed to the construction site from the factory.

【0024】 また、1階のユニットルーム12側には、前記2階のユニットルーム14の連 結金物16より垂下させたボルト18と対応する位置の壁パネル24の上端部に 、前記ボルト18と螺合するナット20を、予め工場において取付けるようにし ている。On the side of the unit room 12 on the first floor, at the upper end of the wall panel 24 at a position corresponding to the bolt 18 hung from the connector 16 of the unit room 14 on the second floor, The nut 20 to be screwed is attached in advance at the factory.

【0025】 このナット20は、筒状のナット本体54と、このナット本体54の上部外周 に形成したフランジ部56とから構成されるようになっている。ナット本体54 は、1階のユニットルーム12の壁パネル24を構成する上端部の枠材58を貫 通し得る長さに設定され、前記枠材58の貫通孔に挿通させるようになっている 。フランジ部56は、前記ナット本体54の上部外周にあって、前記枠材58の 上面に当接しナット本体54が下方に抜け落ちないようにしている。そして、前 記ナット本体54の下端部に座金62を装着し、短めのボルト60を螺合させて 、フランジ部56と座金62にて枠材58を挟み込むことによって、ナット本体 54を枠材58に固定するようにしている。The nut 20 is composed of a tubular nut body 54 and a flange portion 56 formed on the outer periphery of the upper portion of the nut body 54. The nut main body 54 is set to have a length that allows the frame member 58 at the upper end portion of the wall panel 24 of the unit room 12 on the first floor to penetrate therethrough, and is inserted into the through hole of the frame member 58. The flange portion 56 is located on the outer periphery of the upper portion of the nut body 54 and contacts the upper surface of the frame member 58 to prevent the nut body 54 from falling out. Then, a washer 62 is attached to the lower end portion of the nut body 54 described above, a short bolt 60 is screwed, and the frame member 58 is sandwiched between the flange portion 56 and the washer 62. It is fixed to.

【0026】 そして、これら1階のユニットルーム12及び2階のユニットルーム14を施 工現場に搬送し、施工現場において連結固定するもので、その連結は次の様にし て行なう。Then, the unit room 12 on the first floor and the unit room 14 on the second floor are transported to the construction site and fixedly connected at the construction site. The connection is performed as follows.

【0027】 先ず、1階のユニットルーム12をクレーン等にて吊り下げ、基礎10上迄移 動させて、基礎10上に載置固定する。First, the unit room 12 on the first floor is hung by a crane or the like, moved to the base 10, and placed and fixed on the base 10.

【0028】 次に、2階のユニットルーム14をクレーン等にて吊り上げ、1階のユニット ルーム12上まで移動させ、1階のユニットルーム12の壁パネル40上端部に 取付けたナット20と、2階のユニットルーム14の床パネル22に取り付けた 連結金物16の下部側の連結孔40より突出させたボルト18との位置合せを行 ないながら、2階のユニットルーム14を1階のユニットルーム12の壁パネル 24上に載置する。Next, the unit room 14 on the second floor is lifted by a crane or the like and moved to above the unit room 12 on the first floor, and the nut 20 attached to the upper end of the wall panel 40 of the unit room 12 on the first floor and the nut 20 While aligning with the bolt 18 protruding from the connecting hole 40 on the lower side of the connecting hardware 16 attached to the floor panel 22 of the unit room 14 on the first floor, the unit room 14 on the second floor is connected to the unit room 12 on the first floor. It is mounted on the wall panel 24 of.

【0029】 そして、この状態で、連結金物16より突出させたボルト18が1階のユニッ トルーム12の壁パネル24に取付けたナット20と一致し、かつ連結金物16 の開口が外側に向いているので、その締め付け操作部42よりボルト18を締め 付ければ1階のユニットルーム12と2階のユニットルーム14との連結固定が 容易になし得るものである。Then, in this state, the bolt 18 protruding from the connecting metal fitting 16 matches the nut 20 attached to the wall panel 24 of the unit room 12 on the first floor, and the opening of the connecting metal fitting 16 faces outward. Therefore, if the bolt 18 is tightened from the tightening operation portion 42, the unit room 12 on the first floor and the unit room 14 on the second floor can be connected and fixed easily.

【0030】 このように、1階のユニットルーム12及び2階のユニットルーム14との連 結固定を連結金物16を用いてそれぞれ外側から容易に行なうことができ、かつ 施工時間の短縮化にもつながるものである。また、1階のユニットルーム12側 のナット20は、壁パネル24に確実に固定されているので、衝撃によって脱落 するような恐れもない。As described above, the connection and the fixation with the unit room 12 on the first floor and the unit room 14 on the second floor can be easily performed from the outside using the connecting hardware 16, and the construction time can be shortened. It is connected. Further, since the nut 20 on the unit room 12 side of the first floor is securely fixed to the wall panel 24, there is no fear that it will fall off due to an impact.

【0031】 前記実施例においては、1階のユニットルーム及び2階のユニットルームの連 結固定について説明したが、この例に限られるものではなく、例えば2階以上の ユニットルームの連結にも適応し得るものである。In the above-mentioned embodiment, the connection and fixation of the unit room on the first floor and the unit room on the second floor have been described. It is possible.

【0032】[0032]

【考案の効果】[Effect of the device]

以上説明したように、本考案は、予め工場出荷段階において、階上のユニット ルームの床パネル側端面に連結金物の開口を外側に向けて固定し、その下部の連 結孔にボルトを挿入すると共に、階下のユニットルームの壁パネル上端に、前記 ボルトと螺合するナットを取付けることとしたため、ユニットルームの外側から 、ユニットルームの位置合わせと同時に連結固定もなし得、施工時間も短縮化し 得るという効果がある。 As described above, according to the present invention, at the factory shipment stage, the opening of the connecting metal piece is fixed to the end surface of the floor panel side of the upper unit room toward the outside, and the bolt is inserted into the lower connecting hole. At the same time, since a nut that screws with the above-mentioned bolt is attached to the upper end of the wall panel of the unit room below, it is possible to align and fix the unit room from the outside of the unit room at the same time, and shorten the construction time. There is an effect.

【0033】 また、前記ナットは、筒状のナット本体を前記壁パネル上端の枠材に貫通させ 、前記ナット本体の上部外周に形成したフランジ部を前記枠材上面に当接させる と共に、前記ナット本体の下端部にボルトを螺合させて枠材に固定されるため、 簡単かつ短時間で壁パネルに確実に固定され、搬送時や連結時の衝撃による脱落 を防止することができるという効果がある。In the nut, the tubular nut body is passed through the frame material at the upper end of the wall panel, and the flange portion formed on the outer periphery of the upper portion of the nut body is brought into contact with the upper surface of the frame material. Since it is fixed to the frame material by screwing the bolt to the lower end of the main body, it can be securely fixed to the wall panel easily and in a short time, and it is possible to prevent it from falling off due to impact during transportation or connection. is there.

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案の一実施例に係るユニットルームの連結
構造を示す斜視図である。
FIG. 1 is a perspective view showing a unit room connection structure according to an embodiment of the present invention.

【図2】図1の連結部分の断面図である。FIG. 2 is a cross-sectional view of a connecting portion of FIG.

【図3】ナットの取付け状態を示す分解斜視図である。FIG. 3 is an exploded perspective view showing a mounted state of a nut.

【符号の説明】[Explanation of symbols]

12 1階のユニットルーム 14 2階のユニットルーム 16 連結金物 18 ボルト 20 ナット 24 壁パネル 40 連結孔 42 締付け操作部 54 ナット本体 56 フランジ部 58 枠材 60 ボルト
MH016802
12 1st floor unit room 14 2nd floor unit room 16 Connecting hardware 18 Bolt 20 Nut 24 Wall panel 40 Connecting hole 42 Tightening operation part 54 Nut main body 56 Flange part 58 Frame material 60 Bolt
MH016802

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 少なくとも下部に貫通形成したボルト挿
入用の連結孔と、全面を開口して形成したボルト締付け
操作部とを含む箱状の連結金物を、上下に連結する上方
のユニットルームの床パネル側端面に形成した凹部内に
固定し、前記連結金物に形成した下部の連結孔に挿入し
て下方に突出させたボルトを、下方のユニットルームの
壁パネル上端に位置する枠材に貫通させ、前記枠材の下
面側に設けたナットに螺合させて連結するユニットルー
ムの連結構造であって、 前記ナットは、筒状のナット本体を前記枠材に貫通さ
せ、前記ナット本体の上部外周に形成したフランジ部を
前記枠材上面に当接させると共に、前記ナット本体の下
端部にボルトを螺合させて枠材に固定されることを特徴
とするユニットルームの連結構造。
1. A floor of an upper unit room for vertically connecting a box-shaped connecting metal article including a bolt insertion connecting hole formed at least in a lower portion and a bolt tightening operation portion formed by opening the entire surface. Fix the bolt in the recess formed on the end face on the panel side, insert it into the lower connecting hole formed in the connecting metal object and project it downwards, and penetrate the frame material located at the upper end of the wall panel of the lower unit room. A connecting structure of a unit room that is screwed and connected to a nut provided on a lower surface side of the frame member, wherein the nut has a tubular nut body penetrating the frame member, and an outer periphery of an upper portion of the nut body. The unit room connecting structure characterized in that the flange portion formed on the frame member is brought into contact with the upper surface of the frame member, and a bolt is screwed to the lower end portion of the nut body to be fixed to the frame member.
JP9322991U 1991-10-16 1991-10-16 Unit room connection structure Expired - Lifetime JPH0744642Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9322991U JPH0744642Y2 (en) 1991-10-16 1991-10-16 Unit room connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9322991U JPH0744642Y2 (en) 1991-10-16 1991-10-16 Unit room connection structure

Publications (2)

Publication Number Publication Date
JPH0535904U true JPH0535904U (en) 1993-05-18
JPH0744642Y2 JPH0744642Y2 (en) 1995-10-11

Family

ID=14076717

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9322991U Expired - Lifetime JPH0744642Y2 (en) 1991-10-16 1991-10-16 Unit room connection structure

Country Status (1)

Country Link
JP (1) JPH0744642Y2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016056618A (en) * 2014-09-11 2016-04-21 パナソニックIpマネジメント株式会社 Building unit and building

Also Published As

Publication number Publication date
JPH0744642Y2 (en) 1995-10-11

Similar Documents

Publication Publication Date Title
JPH0744642Y2 (en) Unit room connection structure
JPH0744641Y2 (en) Unit room connection structure
JP2612658B2 (en) Panel structure connection structure
JPH0356569Y2 (en)
JPH0636082Y2 (en) House wall structure
JPH0120410Y2 (en)
JP2530213Y2 (en) Balcony mounting structure
JPH08165725A (en) Wall panel assembly construction and wall panel
KR20220114190A (en) Post fixing device of prefabricated building
JP2590796Y2 (en) Fixed structure of floor panel
JPH0729127Y2 (en) Ceiling panel mounting structure
JPH042267Y2 (en)
JPS6132016Y2 (en)
JPH042266Y2 (en)
JP2537341Y2 (en) Building ceiling joist fastening structure and joist receiving bracket
JPH03287935A (en) Structure for mounting overhang balcony
JPH0455128Y2 (en)
JP3040925U (en) Wood unit building
JPH0334968Y2 (en)
JPH05214771A (en) Hanging tool connecting structure for roof unit
JP2001098647A (en) Upper and lower floor joint structure of unit building
JPH03191148A (en) Method of fitting panel for corner
JPH0532465U (en) Unit room drainage pipe connection structure
JPH0688430A (en) Hardware receiving suspender and attachment structure therefor
JPH08209799A (en) Handrail for balcony of unit type building

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19960326