JPH052717Y2 - - Google Patents
Info
- Publication number
- JPH052717Y2 JPH052717Y2 JP17289387U JP17289387U JPH052717Y2 JP H052717 Y2 JPH052717 Y2 JP H052717Y2 JP 17289387 U JP17289387 U JP 17289387U JP 17289387 U JP17289387 U JP 17289387U JP H052717 Y2 JPH052717 Y2 JP H052717Y2
- Authority
- JP
- Japan
- Prior art keywords
- reinforcing bar
- reinforcement
- tunnel
- assembly
- reinforcing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 230000003014 reinforcing effect Effects 0.000 description 23
- 230000002787 reinforcement Effects 0.000 description 11
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 238000009434 installation Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 229910052742 iron Inorganic materials 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
Description
【考案の詳細な説明】
(考案が属する技術分野)
本考案は、コンクリートの直打ちによりトンネ
ル覆工を施工するときに用いる配筋用の治具に関
する。[Detailed description of the invention] (Technical field to which the invention belongs) The present invention relates to a reinforcement jig used when constructing a tunnel lining by directly pouring concrete.
(考案の課題とその特徴点)
シールド使用のトンネル工事においては、従来
はセグメントを用いて覆工を施工していたが、最
近はコンクリートの直打ちによる覆工の施工も行
われるようになつてきた。(Issues of the design and its features) In tunnel construction using shields, linings were traditionally constructed using segments, but recently, linings have also been constructed by directly pouring concrete. Ta.
本考案は、コンクリートの直打ちによりトンネ
ル覆工を施工するときに便利な配筋用治具を提供
することを目的としているものであつて、その構
成上の特徴は実用新案登録請求の範囲に記載した
とおりである。 The purpose of this invention is to provide a reinforcing jig that is convenient when constructing tunnel linings by directly pouring concrete, and its structural features are within the scope of the utility model registration claim. As described.
本考案の配筋用治具は、予め、地上、トンネル
内等の適宜場所において、その組立筋取付用金具
に組立筋の端を着脱自在に固着し、この組立筋を
介してそれぞれ適宜長さの周方向と軸方向の鉄筋
を組み立てて鉄筋ユニツトを形成しておき、これ
を所定設置場所に移動させて、その鉄筋ユニツト
を先に設置されている鉄筋ユニツトと接続して、
トンネル覆工の配筋を行うものである。 In the reinforcing bar arrangement jig of the present invention, the ends of the assembling bars are removably fixed to the assembling bar attachment fittings in advance at an appropriate location on the ground, inside a tunnel, etc. Assemble the reinforcing bars in the circumferential and axial directions to form a reinforcing bar unit, move this to a predetermined installation location, connect that reinforcing bar unit with the previously installed reinforcing bar unit,
This is to arrange reinforcement for tunnel lining.
(図面による考案の具体的説明)
本考案の一実施例の説明図である第1図〜第5
図において、配筋用治具1は、四隅に配した組立
筋取付用金具2を帯鉄板3で連結して方形枠状に
形成され、かつ、一方向にトンネルの断面の曲率
に略等しい曲率で弧状に湾曲しており、その裏側
(前記湾曲の曲率中心側)の中央部には中間の帯
鉄板4を介して孔明きの突片5が取り付けられ、
配筋用治具1を移動させるときはこの突片5を掴
んで行うようになつている。(Specific explanation of the invention using drawings) Figures 1 to 5 are explanatory diagrams of an embodiment of the invention.
In the figure, the reinforcing bar arrangement jig 1 is formed into a rectangular frame shape by connecting assembly reinforcing bar attachment fittings 2 placed at the four corners with iron band plates 3, and has a curvature in one direction that is approximately equal to the curvature of the cross section of the tunnel. It is curved in an arc shape, and a perforated projecting piece 5 is attached to the center part of the back side (the side of the center of curvature of the curvature) via an intermediate band iron plate 4,
When moving the reinforcing bar arrangement jig 1, the projecting piece 5 is grasped.
組立筋取付用金具2は、組立筋(丸鋼)の一端
を一時的に締付け固定することができれば足り、
その具体的構造は任意であるが、図示のものは、
丸鋼に組立筋の一端が入る穴6を設けるとともに
(穴6の内周面には滑り止め用の凹凸を設けるの
が好ましい)、これを縦に2分割し、その一方7
を固定側とし、これに他方(可動側)8をヒンジ
9により連結し、固定側と可動側とに亙つて締付
けボルト10を貫通させている。 It is sufficient that the assembly bar mounting bracket 2 can temporarily tighten and fix one end of the assembly bar (round steel).
The specific structure is arbitrary, but the one shown is
In addition to providing a hole 6 in the round steel into which one end of the assembly bar is inserted (it is preferable to provide an uneven surface on the inner circumferential surface of the hole 6 to prevent slipping), it is divided vertically into two parts, and one of the holes 7
is defined as a fixed side, and the other side (movable side) 8 is connected to this by a hinge 9, and a tightening bolt 10 is passed through the fixed side and the movable side.
前述の配筋用治具1には、地上やトンネル内の
適宜場所等において、第6図、第7図に例示する
ような態様で鉄筋ユニツト11を取り付けるが、
このときは、各組立筋取付用金具2の穴6にそれ
ぞれ組立筋12の一端を挿入して締付け固定した
後、これら組立筋12を介してトンネル周方向の
鉄筋13とトンネル軸方向の鉄筋14を所定の配
列で組み立てる。 The reinforcing bar unit 11 is attached to the aforementioned reinforcement jig 1 at an appropriate location on the ground or in a tunnel in a manner as illustrated in FIGS. 6 and 7.
At this time, after inserting one end of the assembly reinforcement 12 into the hole 6 of each assembly reinforcement fitting 2 and tightening and fixing it, the reinforcement 13 in the tunnel circumferential direction and the reinforcement 14 in the tunnel axial direction are inserted through the assembly reinforcement 12. Assemble in a predetermined arrangement.
鉄筋ユニツト11を取り付けた配筋用治具1は
適宜手段で図示しないシールドのテール部内に搬
入し、エレクターで突片5を掴んで所定設置場所
に移動させ、鉄筋ユニツト11を先に設置した鉄
筋ユニツトに接続し、接続が終われば組立筋12
を組立筋取付用金具2から外し、空になつた配筋
用治具1は新たに鉄筋ユニツトを取り付けるため
に所定場所に送る。 The reinforcing bar arrangement jig 1 with the reinforcing bar unit 11 attached thereto is carried into the tail part of the shield (not shown) by an appropriate means, and the protruding piece 5 is grabbed by an erector and moved to a predetermined installation location, and the reinforcing bar unit 11 is attached to the previously installed reinforcing bar. Connect it to the unit, and once the connection is completed, the assembly bar 12
is removed from the assembly bar attachment fitting 2, and the empty bar arrangement jig 1 is sent to a predetermined location for installing a new reinforcing bar unit.
なお、鉄筋ユニツト相互の接続は、対応する鉄
筋13相互と鉄筋14相互をそれぞれ重ね継手で
接続して行うが、継手を一断面に集中させないた
めに、鉄筋13,14の組立時にこれらの端を図
示のように揃えないのが好ましい。 Note that the reinforcing bars units are connected to each other by connecting the corresponding reinforcing bars 13 and 14 with lap joints, but in order to avoid concentrating the joints on one cross section, these ends are connected when assembling the reinforcing bars 13 and 14. Preferably, they are not aligned as shown.
(考案の効果)
本考案の配筋用治具は以上のようなものである
から、その上に所定の鉄筋ユニツトを組み立てる
ことも、また、その鉄筋ユニツトを所定の設置場
所に移動させることも、共に容易であり、これを
用いることにより、トンネルの覆工を直打ちのコ
ンクリートで形成する場合の配筋作業を極めて能
率良く行うことができる。(Effects of the invention) Since the reinforcing bar arrangement jig of the present invention is as described above, it is not possible to assemble a specified reinforcing bar unit on it or move the reinforcing bar unit to a specified installation location. Both of these methods are easy to use, and by using this method, reinforcement work can be carried out extremely efficiently when the lining of a tunnel is formed of directly cast concrete.
第1図は本考案の一実施例の平面図、第2図は
同じく正面図、第3図は同じく側面図、第4図は
組立筋取付用金具の一例の平面図、第5図は同じ
く側面図、第6図は鉄筋ユニツトを取り付けた状
態の平面図、第7図は同じく断面図である。
1……配筋用治具、2……組立筋取付用金具、
5……突片。
Fig. 1 is a plan view of an embodiment of the present invention, Fig. 2 is a front view, Fig. 3 is a side view, Fig. 4 is a plan view of an example of the assembly bar mounting bracket, and Fig. 5 is the same. A side view, FIG. 6 is a plan view with the reinforcing bar unit attached, and FIG. 7 is a sectional view. 1...Jig for reinforcing reinforcement, 2...Bracket for attaching assembly reinforcement,
5...Protrusion.
Claims (1)
方形枠状に形成され、かつ、一方向に弧状に湾曲
しており、裏側中央部には移動時把持用の突片を
設けたことを特徴とするトンネル覆工の配筋用治
具。 Arrange assembly bar mounting brackets at least in the four corners,
A rebar arrangement jig for tunnel lining, which is formed in the shape of a rectangular frame, curved in an arc shape in one direction, and provided with a protruding piece for gripping during movement at the center of the back side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP17289387U JPH052717Y2 (en) | 1987-11-12 | 1987-11-12 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP17289387U JPH052717Y2 (en) | 1987-11-12 | 1987-11-12 |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0179700U JPH0179700U (en) | 1989-05-29 |
JPH052717Y2 true JPH052717Y2 (en) | 1993-01-22 |
Family
ID=31464842
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP17289387U Expired - Lifetime JPH052717Y2 (en) | 1987-11-12 | 1987-11-12 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH052717Y2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000023286A (en) * | 1998-07-02 | 2000-01-21 | Murata Mfg Co Ltd | Speaker |
-
1987
- 1987-11-12 JP JP17289387U patent/JPH052717Y2/ja not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH0179700U (en) | 1989-05-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH052717Y2 (en) | ||
JP2754473B2 (en) | Construction method of cylindrical reinforced concrete septic tank body | |
JP3861196B2 (en) | Bracket for protruding scaffold | |
JP2545626Y2 (en) | PC beam | |
JP3299596B2 (en) | Construction method of reinforced concrete retaining wall using large precast plate. | |
JP2505729Y2 (en) | Shield tunnel waterproof structure | |
JP2575865Y2 (en) | Lower reinforcement support for pillar for assembling foundation reinforcement | |
JPH0622054Y2 (en) | Concrete stop | |
JP2566206Y2 (en) | Reinforced spacer combined suspension bolt rail | |
CN215292510U (en) | Tunnel arch-shaped brick connecting and reinforcing structure | |
JPH0953384A (en) | Propulsive reaction receiver of shield machine | |
JP2001090487A (en) | Tunnel lining work | |
JP2520179Y2 (en) | Support leg attachment / detachment structure for secondary lining formwork | |
KR100288983B1 (en) | Unit panel for slip form to form lining wall of vertical tunnel | |
JPS5849237Y2 (en) | Suspension fittings for PC concrete piles | |
JPH0118757Y2 (en) | ||
JPS6020755Y2 (en) | Rebar anchoring structure | |
JP2629496B2 (en) | Construction method of structure | |
JP3052022B2 (en) | Reinforcing panel mounting machine | |
JP2552315Y2 (en) | Carbon fiber reinforced concrete facade panels | |
JPH08218395A (en) | Joint structure of pile-column foundation | |
JPH0236846Y2 (en) | ||
JPS5942445Y2 (en) | Step temporary structure in concrete formwork | |
JPH0348969Y2 (en) | ||
JPH0219471Y2 (en) |