JP2629496B2 - Construction method of structure - Google Patents
Construction method of structureInfo
- Publication number
- JP2629496B2 JP2629496B2 JP3239549A JP23954991A JP2629496B2 JP 2629496 B2 JP2629496 B2 JP 2629496B2 JP 3239549 A JP3239549 A JP 3239549A JP 23954991 A JP23954991 A JP 23954991A JP 2629496 B2 JP2629496 B2 JP 2629496B2
- Authority
- JP
- Japan
- Prior art keywords
- steel
- floor
- column
- formwork
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Joining Of Building Structures In Genera (AREA)
Description
【0001】[0001]
【産業上の利用分野】この発明は、柱と梁がそれぞれが
鉄筋コンクリートと鉄骨ばりからなる構造物の構築工法
に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a structure in which columns and beams are respectively made of reinforced concrete and steel beams.
【0002】[0002]
【従来の技術】最近のオフィスビルなどの建物は、高層
化に伴って柱を鉄骨鉄筋コンクリート構造、梁を鉄骨構
造とすることが多い。また、建設コストの低減化を図る
ために柱を鉄筋コンクリート構造とし、梁を鉄骨構造と
することもよく行われ、この場合、一階ごとに柱を最初
に構築し、その後にこの柱間に梁を架け渡す作業を最下
階から最上階まで繰り返し行って建物の全階を構築する
のが一般的であった。2. Description of the Related Art In recent buildings such as office buildings, columns are often made of a steel-framed reinforced concrete structure and beams are made of a steel-frame structure in accordance with an increase in height. In order to reduce construction costs, it is common practice to use columns with reinforced concrete structures and beams with steel structures.In this case, columns are first constructed on each floor, and then beams are inserted between these columns. It was common to repeat the work of bridging over from the bottom floor to the top floor to build all floors of the building.
【0003】[0003]
【発明が解決しようとする課題】このため、柱の施工が
終了しても、柱のコンクリートが充分な強度を発現して
からでないと、梁を架け渡すことができないため、工期
の長期化を免れないとう課題があった。かといって、工
期の短縮化を図るために柱のコンクリートが充分な強度
を発現する前に梁を架け渡すには、梁を支持する支保工
を多く必要とし、かつ、支保工の組み立てに多大な労力
を要するという課題があった。For this reason, even if the construction of the pillar is completed, the beam cannot be bridged unless the concrete of the pillar has developed sufficient strength. There was an unavoidable issue. On the other hand, in order to shorten the construction period, in order to bridge the beam before the concrete of the column develops sufficient strength, a large number of supports for supporting the beam are required, and a great deal of There was a problem that required a lot of labor.
【0004】この発明は、以上の課題を解決するために
なされたもので、工期の短縮化、施工の省力化および支
保工の低減化などを可能にした構造物の構築工法を提供
することを目的とする。SUMMARY OF THE INVENTION The present invention has been made to solve the above problems, and an object of the present invention is to provide a method of constructing a structure capable of shortening a construction period, saving labor for construction, and reducing support work. Aim.
【0005】[0005]
【課題を解決するための手段】この発明に係る構造物の
構築工法は、柱と梁がそれぞれ鉄筋コンクリートと鉄骨
ばりからなる構造物の構築工法において、前記柱の主筋
およびフープ筋を複数階にわたって組み立て、前記主筋
の各階の梁接合部に前記鉄骨ばりの端部を接合する梁接
合金物を前記主筋に固定ナットによってそれぞれ取り付
け、次に前記主筋およびフープ筋の周囲に複数枚の鋼製
型枠からなる柱構築用型枠を複数階にわたって組み立
て、次に前記梁接合部間に各階の鉄骨ばりを前記柱構築
用型枠に支持させてそれぞれ架け渡すと共に、その両端
部と前記梁接合金物および前記柱構築用型枠とをそれぞ
れ複数本の本締めボルトと仮締めボルトによって接合
し、次に前記柱構築用型枠内にコンクリートを複数階に
わたって打設し、前記コンクリートが硬化した後、前記
仮締めボルトを取り外して前記柱構築用型枠を解体する
ことを特徴とする。According to a construction method of a structure according to the present invention, a main reinforcement and a hoop reinforcement of a column are assembled over a plurality of floors in a method of constructing a structure in which columns and beams are respectively made of reinforced concrete and steel beams. The beam joints for joining the ends of the steel beams to the beam joints on each floor of the main reinforcement are respectively attached to the main reinforcements with fixing nuts, and then from a plurality of steel forms around the main reinforcements and the hoop reinforcements. Assemble the column-building formwork over a plurality of floors, and then bridge the steel beams of each floor between the beam joints by supporting them on the column-building formwork, as well as the ends and the beam-joining hardware and the The pillar construction form and the plurality of final fastening bolts and temporary fastening bolts are respectively joined together, and then concrete is poured into the pillar construction form over a plurality of floors, After Nkurito is cured, characterized by dismantling the pillar construction for formwork remove the temporary tightening bolt.
【0006】[0006]
【実施例】図1〜図5は、構築中の構造物の一例を示
し、図において、符号1aは鉄筋コンクリート柱1(以下
「柱1」という)のコンクリート中に配筋される主筋、
1bは柱1のコンクリート中に主筋1aの周囲に巻回して配
筋されるフープ筋、2は柱1の各階の梁接合部に主筋1a
に結束線又は主筋1aに螺合される固定ナット(図3参
照)によって水平に仮止めされ、かつ柱1の施工完了と
同時に柱1のコンクリート中に埋設されて一体的に固定
される梁接合金物である。1 to 5 show an example of a structure under construction. In the drawings, reference numeral 1a denotes a main reinforcing bar arranged in the concrete of a reinforced concrete column 1 (hereinafter referred to as "column 1").
1b is a hoop reinforcing bar wound around the main bar 1a in the concrete of the column 1 and 2 is a main bar 1a at the beam joint of each floor of the column 1.
The beam joint is temporarily fixed horizontally by a fixing nut (see FIG. 3) screwed to the binding wire or the main bar 1a, and buried in the concrete of the pillar 1 and fixed integrally with the completion of the construction of the pillar 1. It is hardware.
【0007】また、符号3は柱1を構築するために主筋
1aおよびフープ筋1bの周囲に複数枚の鋼製型枠(メタル
フォーム)3aを複数本の仮締めボルト4a又はクリップ
(図省略)などで連結して矩形断面形に組み立てられる
柱構築用型枠、6は柱1の各階の梁接合部に架け渡さ
れ、かつ上下フランジ6aの端部を梁接合金物2のブラケ
ット2aに複数本の本締めボルト4bで接合することにより
柱1に接合される各階の鉄骨ばり、7は柱構築用型枠3
の各階の梁接合部に形成され、梁接合金物2の上下ブラ
ケット2aを水平に突出する開口部、8は鉄骨ばり6の端
部にその上下フランジ6a,6a に溶接して取り付けられ、
開口部7を塞ぐと同時に鉄骨ばり6端部の剛性を高める
エンドプレート、9は各階の鉄骨ばり6の上に敷設さ
れ、各階の床スラブの一部となるデッキプレートからな
る床構築用型枠、10a は柱構築用型枠3内に打設され、
主筋1aおよびフープ筋1bとで柱1を構成するコンクリー
ト、そして符号10b は床構築用型枠9の上に打設され、
床構築用型枠9と一体の床スラブを構成するコンクリー
トである。Reference numeral 3 denotes a main reinforcement for constructing the pillar 1.
Pillar construction formwork that can be assembled into a rectangular cross-section by connecting a plurality of steel formwork (metal form) 3a around 1a and hoop bar 1b with a plurality of temporary fastening bolts 4a or clips (not shown) , 6 are bridged over the beam joints on each floor of the column 1 and are joined to the column 1 by joining the ends of the upper and lower flanges 6a to the bracket 2a of the beam joining hardware 2 with a plurality of final tightening bolts 4b. Steel beams on each floor, 7 is a formwork 3 for pillar construction
An opening 8 is formed at the beam joint of each floor to project the upper and lower brackets 2a of the beam joint hardware 2 horizontally, 8 is attached to the end of the steel beam 6 by welding to the upper and lower flanges 6a, 6a,
An end plate that closes the opening 7 and increases the rigidity of the end of the steel beam 6 at the same time as the end plate 9. A floor construction formwork 9 is laid on the steel beam 6 of each floor and is a deck plate that becomes a part of the floor slab of each floor. , 10a are cast into the formwork 3 for pillar construction,
Concrete that forms the pillar 1 with the main reinforcement 1a and the hoop reinforcement 1b, and the reference numeral 10b is cast on the floor-building formwork 9,
This is concrete that forms a floor slab integrated with the floor construction formwork 9.
【0008】このような構成において、次にこの発明に
係る構造物の構築工法を順を追って説明する。In such a configuration, a construction method of a structure according to the present invention will be described step by step.
【0009】 最初に、柱1の主筋1aおよびフープ筋
1bを複数階にわたって矩形状に組み立て、かつ各階の梁
接合部に梁接合金物2を取り付ける(図1参照)。梁接
合金物2は主筋1aに結束線又は固定ナット(図3参照)
で水平に仮固定する。First, the main muscle 1a of the column 1 and the hoop muscle
1b is assembled into a rectangular shape over a plurality of floors, and the beam joint hardware 2 is attached to the beam joint of each floor (see FIG. 1). The beam joint hardware 2 is connected to the main bar 1a by a binding wire or a fixing nut (see FIG. 3).
Temporarily fix horizontally.
【0010】この場合、梁接合金物2を主筋1aに固定ナ
ットで固定することにより、鉄骨ばり6の高さ又ははり
成に応じて梁接合金物2のレベルを自由に調整すること
ができる。In this case, the level of the beam joint 2 can be freely adjusted according to the height or the beam of the steel beam 6 by fixing the beam joint 2 to the main bar 1a with a fixing nut.
【0011】 次に、主筋1aおよびフープ筋1bの周囲
に柱構築用型枠3を複数階にわたって矩形断面形に組み
立てる。柱構築用型枠3は複数枚の鋼製型枠3aを仮締め
ボルト4a又はクリップで自立できるように連結しながら
組み立て(図4参照)、この場合、柱構築用型枠3の各
階の梁接合部に開口部7を設け、この開口部7から梁接
合金物2のブラケット2aをそれぞれ水平に突出させる
(図3参照)。Next, a column-building formwork 3 is assembled around the main bar 1a and the hoop bar 1b into a rectangular cross section over a plurality of floors. The pillar-building formwork 3 is assembled while connecting a plurality of steel formworks 3a so as to be self-supporting with temporary fastening bolts 4a or clips (see FIG. 4). In this case, beams on each floor of the pillar-building formwork 3 An opening 7 is provided at the joint, and the brackets 2a of the beam joining hardware 2 are projected horizontally from the opening 7 (see FIG. 3).
【0012】また、隣接する鋼製型枠3aどうしの突き合
わせ部には、スペーサ11を介在することにより(図5参
照)、柱構築用型枠3の脱型に際して、鋼製型枠3aどう
しの接着を防止することにより、鋼製型枠3aをスムーズ
に取り外せるようにする。In addition, a spacer 11 is interposed between the butting portions of the adjacent steel molds 3a (see FIG. 5), so that when the pillar-forming mold 3 is released from the mold, the steel molds 3a are joined together. By preventing the adhesion, the steel mold 3a can be smoothly removed.
【0013】 次に、柱構築用型枠3の各階の梁接合
部間に各階の鉄骨ばり6を架け渡し、かつその両端部を
開口部7に突出された上下梁接合金物2のブラケット2
a,2a間にそれぞれ挿入する。Next, the steel beam 6 of each floor is bridged between the beam joints of each floor of the column-building formwork 3, and both ends of the bracket 2 of the upper and lower beam joint hardware 2 protruding through the opening 7.
Insert between a and 2a respectively.
【0014】そして、各階の鉄骨ばり6の上下フランジ
6aと梁接合金物2のブラケット2aとを複数本の本締めボ
ルト4bによって一体的に接合し、また各階の鉄骨ばり6
の上下フランジ6aと梁接合金物2のブラケット2aと鋼製
型枠3aとを仮締めボルト4aによって一体的に連結する
(図3参照)。The upper and lower flanges of the steel beam 6 on each floor
6a and the bracket 2a of the beam joining hardware 2 are integrally joined by a plurality of final tightening bolts 4b.
The upper and lower flanges 6a, the bracket 2a of the beam joining hardware 2 and the steel formwork 3a are integrally connected by a temporary tightening bolt 4a (see FIG. 3).
【0015】なお、仮締めボルト4aは型枠脱型の際に取
り外し、本締めボルト4bは締め直す。また、各階の鉄骨
ばり6端部の上下フランジ6a,6a 間にエンドプレート8
を予め取り付けておく。The temporary tightening bolt 4a is removed when the mold is removed, and the final tightening bolt 4b is retightened. Also, an end plate 8 is provided between the upper and lower flanges 6a at the end of the steel beam 6 on each floor.
Is attached in advance.
【0016】このようにして、柱1の主筋1a、フープ筋
1b、柱構築用型枠3および鉄骨梁6を2階ないし3階に
わたって組み立てる。また、各階の鉄骨ばり6の上に床
型枠9をそれぞれ敷設し、かつ鉄骨ばり6に溶接するな
どして固定する。In this manner, the main bar 1a of the column 1 and the hoop bar
1b, assemble the column-building formwork 3 and the steel beam 6 over the second or third floor. Further, floor formwork 9 is laid on the steel beam 6 on each floor, and is fixed to the steel beam 6 by welding or the like.
【0017】 次に、柱構築用型枠3内にコンクリー
ト10a を、床型枠9の上にコンクリート10b をそれぞれ
打設し、充分に養生する。そして、コンクリート10a が
充分な強度を発現したら柱構築用型枠3を脱型する。以
下、同様にして、2階ないし3階づつ上階方向に施工し
て建物の全階を構築する。Next, concrete 10a is poured into the column forming form 3 and concrete 10b is put on the floor form 9, and is sufficiently cured. Then, when the concrete 10a exhibits sufficient strength, the formwork 3 for pillar construction is released. Hereinafter, in the same manner, construction is performed in the direction of the second floor or the third floor, and the entire floor of the building is constructed.
【0018】なお、床型枠9は床スラブの一部としてそ
のまま放置するが、柱構築用型枠3の鋼製型枠3aは撤去
し、繰り返し使用する。Although the floor form 9 is left as it is as a part of the floor slab, the steel form 3a of the column-building form 3 is removed and used repeatedly.
【0019】[0019]
【発明の効果】この発明に係る構造物の構築工法は、以
上説明した構成からなるので、以下に記載するような効
果を有する。The construction method for a structure according to the present invention has the above-described configuration, and thus has the following effects.
【0020】 柱構築用型枠は複数枚の鋼製型枠から
組み立てられているので、この柱構築用型枠の上に鉄骨
ばりの端部を直接載せて支持できる。このため、柱構築
用型枠の組み立て後、直ぐに鉄骨ばりをその両端部を柱
用構築型枠に支持させて梁接合部間に架け渡し、この鉄
骨ばりの上に床型枠を設置するなど、その後の作業を続
けて行うことができ。Since the formwork for column construction is assembled from a plurality of steel formwork, the end of the steel beam can be directly placed on the formwork for column construction and supported. For this reason, immediately after assembling the column-building formwork, the steel beam is supported at both ends by the column-formation formwork and bridged between the beam joints, and the floor formwork is installed on the steel beam. , Then you can continue working.
【0021】 また、柱の主筋、フープ筋および柱構
築用型枠を複数階ずつ組み立て、はりを複数階ずつ架け
渡し、そして柱構築用型枠に複数階ずつコンクリートを
打設して複数階ずつ構築するので、躯体工事をきわめて
効率的に行うことができ、工期の大幅短縮化などが図れ
る。In addition, the main reinforcement of the pillar, the hoop reinforcement, and the formwork for pillar construction are assembled by a plurality of floors, the beam is bridged by a plurality of floors, and concrete is cast on the pillar construction form by a plurality of floors, and a plurality of floors are constructed. The construction allows the framing work to be performed very efficiently, and the construction period can be significantly reduced.
【0022】 さらに、梁接合金物は柱の主筋に固定
ナットによって取り付け、鉄骨ばりの端部と梁接合金
物、および鉄骨ばりの端部と柱構築用型枠とは、それぞ
れ複数本の本締めボルトと仮締めボルトによって接合す
るので、部材どうしの接合がし易く、また躯体の自立性
がきわめて高いため、このため鉄骨建て方に似たサイク
ルで躯体工事をきわめて効率的に行うことができ、また
梁接合金物を柱の主筋に固定ナットで固定することによ
り、鉄骨ばりの高さおよびはり成に応じて梁接合金物の
レベルを自由に調整することができる。Further, the beam connecting hardware is attached to the main reinforcement of the column by a fixing nut, and the end of the steel beam and the beam connecting hardware, and the end of the steel beam and the column forming form are each provided with a plurality of final fastening bolts. And temporary fastening bolts, it is easy to join the members together, and the skeleton is extremely self-sustaining, so the skeleton construction can be performed very efficiently in a cycle similar to the steel frame construction method, By fixing the beam connecting hardware to the main reinforcing bar of the column with a fixing nut, the level of the beam connecting hardware can be freely adjusted according to the height and beam formation of the steel beam.
【0023】 柱のコンクリートと床のコンクリート
を別々に打設することにより、柱にのみ高強度コンクリ
ートを打設するなどして経済施工も図れる。By separately casting the concrete of the pillar and the concrete of the floor, economical construction can be achieved by casting high-strength concrete only on the pillar.
【図1】構築中の構造物の一部縦断面図である。FIG. 1 is a partial longitudinal sectional view of a structure under construction.
【図2】構築中の構造物の一部縦断面図である。FIG. 2 is a partial longitudinal sectional view of a structure under construction.
【図3】柱・梁接合部の拡大縦断面図である。FIG. 3 is an enlarged vertical sectional view of a column / beam joint.
【図4】柱・梁接合部の拡大縦断面図である。FIG. 4 is an enlarged vertical sectional view of a column / beam joint.
【図5】鋼製型枠の連結部の縦断面図である。FIG. 5 is a longitudinal sectional view of a connecting portion of the steel formwork.
1…柱(鉄筋コンクリート柱)、1a…主筋、1b…フープ
筋、2…梁接合金物、3…柱構築用型枠、3a…鋼製型枠
(メタルフォーム)、4a…仮締めボルト、4b…本締めボ
ルト、6…鉄骨ばり、6a…上下フランジ、7…開口部、
8…エンドプレート、9…床型枠、10a,10b …コンクリ
ート、11…スペーサ。DESCRIPTION OF SYMBOLS 1 ... pillar (reinforced concrete column), 1a ... main reinforcement, 1b ... hoop reinforcement, 2 ... beam joint metal, 3 ... pillar construction formwork, 3a ... steel formwork (metal form), 4a ... temporary fastening bolt, 4b ... Final tightening bolt, 6: steel beam, 6a: upper and lower flange, 7: opening,
8: End plate, 9: Floor form, 10a, 10b: Concrete, 11: Spacer.
Claims (1)
骨ばりからなる構造物の構築工法において、前記柱の主
筋およびフープ筋を複数階にわたって組み立て、前記主
筋の各階の梁接合部に前記鉄骨ばりの端部を接合する梁
接合金物を前記主筋に固定ナットによってそれぞれ取り
付け、次に前記主筋およびフープ筋の周囲に複数枚の鋼
製型枠からなる柱構築用型枠を複数階にわたって組み立
て、次に前記梁接合部間に各階の鉄骨ばりを前記柱構築
用型枠に支持させてそれぞれ架け渡すと共に、その両端
部と前記梁接合金物および前記柱構築用型枠とをそれぞ
れ複数本の本締めボルトと仮締めボルトによって接合
し、次に前記柱構築用型枠内にコンクリートを複数階に
わたって打設し、前記コンクリートが硬化した後、前記
仮締めボルトを取り外して前記柱構築用型枠を解体する
ことを特徴とする構造物の構築工法。In a method of constructing a structure in which a column and a beam are made of reinforced concrete and a steel beam, respectively, a main reinforcement and a hoop reinforcement of the column are assembled on a plurality of floors, and an end of the steel beam is connected to a beam joint of each floor of the main reinforcement. The beam joining hardware for joining the parts is attached to the main reinforcement with fixing nuts, respectively.Next, a column construction formwork composed of a plurality of steel formwork around the main reinforcement and the hoop reinforcement is assembled over a plurality of floors. A steel beam of each floor is supported by the pillar construction form between the beam joints, and each bridge is bridged, and both ends thereof, the beam joint hardware and the column construction form are respectively tightened with a plurality of final tightening bolts. Joined with temporary fastening bolts, then cast concrete over the plurality of floors in the pillar construction formwork, and after the concrete has hardened, remove the temporary fastening bolts. And dismantling the formwork for constructing a pillar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3239549A JP2629496B2 (en) | 1991-09-19 | 1991-09-19 | Construction method of structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3239549A JP2629496B2 (en) | 1991-09-19 | 1991-09-19 | Construction method of structure |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0579092A JPH0579092A (en) | 1993-03-30 |
JP2629496B2 true JP2629496B2 (en) | 1997-07-09 |
Family
ID=17046465
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP3239549A Expired - Lifetime JP2629496B2 (en) | 1991-09-19 | 1991-09-19 | Construction method of structure |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2629496B2 (en) |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01190842A (en) * | 1988-01-27 | 1989-07-31 | Kajima Corp | Method for constructing reinforced concrete column and steel girder structure |
-
1991
- 1991-09-19 JP JP3239549A patent/JP2629496B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH0579092A (en) | 1993-03-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2629496B2 (en) | Construction method of structure | |
JP2747678B2 (en) | Composite beam | |
KR20210004289A (en) | Transfer Structure Construction Method Using U-shaped Steel Girder | |
JPH0742721B2 (en) | Reinforced concrete column / beam construction method using precast beam members | |
JPH101914A (en) | Method of constructing floor slab of road | |
JP2614000B2 (en) | Basics of steel frame | |
JP2797023B2 (en) | Construction method of beam | |
JP2643641B2 (en) | Building method using PC members | |
JP2707966B2 (en) | Floor construction method using prestressed concrete plate as beam-side formwork | |
JPH0881918A (en) | Pipe and construction method thereof | |
JPH03275839A (en) | Connection construction of reinforced concrete column and steel beam | |
JPH06317015A (en) | Method of assembling beam formwork | |
JP3312945B2 (en) | Construction method of concrete structure | |
JP2578671B2 (en) | Column and beam construction method | |
JP3284383B2 (en) | Support hardware for SRC beam construction | |
JP2000355909A (en) | Construction method for bridge floor | |
JPH05263526A (en) | Construction method of rc construction beam | |
JP3114024B2 (en) | Frame joint structure | |
JPH01190842A (en) | Method for constructing reinforced concrete column and steel girder structure | |
JPS6232303B2 (en) | ||
JPH0673785A (en) | Steel framed reinforced concrete column and construction of this column and steel skeleton beam | |
JPH0531632B2 (en) | ||
JP2709155B2 (en) | ALC floor panel mounting method | |
JP3002681B2 (en) | Building structure | |
JP2814873B2 (en) | How to build a reinforced concrete building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 19970225 |