JPH05230874A - Reinforced concrete column shearing reinforcing method - Google Patents

Reinforced concrete column shearing reinforcing method

Info

Publication number
JPH05230874A
JPH05230874A JP7352892A JP7352892A JPH05230874A JP H05230874 A JPH05230874 A JP H05230874A JP 7352892 A JP7352892 A JP 7352892A JP 7352892 A JP7352892 A JP 7352892A JP H05230874 A JPH05230874 A JP H05230874A
Authority
JP
Japan
Prior art keywords
column
steel
hoop
plate
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP7352892A
Other languages
Japanese (ja)
Other versions
JP2813264B2 (en
Inventor
Toshio Fujiwara
敏夫 藤原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP7352892A priority Critical patent/JP2813264B2/en
Publication of JPH05230874A publication Critical patent/JPH05230874A/en
Application granted granted Critical
Publication of JP2813264B2 publication Critical patent/JP2813264B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PURPOSE:To enhance the reinforcement arranging work efficiency and obviate welders so as to shorten the construction period and reducing the cost by obviating the shearing reinforcing work of a steel-framed reinforced concrete column at its column-beam joint parts at a construction site. CONSTITUTION:Plate like hoops 1 formed by bending band iron plates of thickness and width with the required design strength into arrow mark shape are welded to four corners of the column-beam joint part of a steel framed column A. After completing steel frame erection, the specified number of column main reinforcements a, a' are inserted into each plate like hoop 1 welded to each of four corners of the steel framed column A, and the respective main reinforcements a, a' are brought into contact with the plate like hoop 1. Closing type hoop reinforcements 2 are further disposed in such a way as to surround column main reinforcements a, a' excluding the ones at the column-beam joint parts.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、鉄骨鉄筋コンクリート
造柱梁接合部における鉄筋コンクリート柱の剪断補強方
法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for shearing and reinforcing a reinforced concrete column in a steel-framed reinforced concrete column-beam joint.

【0002】[0002]

【従来の技術】従来、鉄骨鉄筋コンクリート造柱梁接合
部における鉄筋コンクリート柱の剪断補強方法は、図4
と図5に示す方法で実施されている。図4(a)は鉄骨
鉄筋コンクリート造柱梁接合部における鉄筋コンクリー
ト柱の剪断補強方法を示す平断面図、図4(b)は同柱
の剪断補強に使用する割りフープの平面図、図5は同柱
の縦断面図である。鉄骨鉄筋コンクリート造柱の配筋
は、鉄骨建方完了後、鉄骨柱Aの四隅に夫々3本の柱主
筋a、a’を配置し、先づ柱梁接合部を除く柱部分の柱
主筋a、a’を囲繞してロ字状フープ筋2を配筋して剪
断補強をする。次いで柱梁接合部は、予め鉄骨柱に交差
する四方向の鉄骨梁BのウエブB’に割りフープ筋1’
の配筋位置に所定間隔で貫通穴B1 を穿孔しておき、夫
々の前記貫通穴B1 にL字型の割りフープ筋1’の長片
1’aを挿入して、各割りフープ筋1’の長片1’aと
単片1’bの両端を重複した状態で仮結束し、同重複し
た仮結束部分を溶接接合してロ字状フープを形成し、以
下同様にして割りフープ筋1’で形成したロ字状フープ
を配筋して柱梁接合部の柱主筋a、a’を囲繞すること
で、柱主筋a、a’とコアコンクリートcを拘束し、柱
梁接合部コンクリートの剪断ひびわれ幅の拡大防止をす
ることにより剪断補強をしている。
2. Description of the Related Art Conventionally, a method of shearing a reinforced concrete column in a steel-framed reinforced concrete column-beam joint has been described in FIG.
And the method shown in FIG. FIG. 4 (a) is a plan sectional view showing a shear reinforcement method of a reinforced concrete column at a steel-reinforced concrete column-beam joint, FIG. 4 (b) is a plan view of a split hoop used for shear reinforcement of the column, and FIG. 5 is the same. It is a longitudinal cross-sectional view of a pillar. After the steel frame has been erected, the steel-framed reinforced concrete columns are arranged with three column main bars a and a ′ at the four corners of the steel column A, and the column main bar a excluding the column-beam joints is first Surrounding a ′, the square hoop muscle 2 is arranged to perform shear reinforcement. Next, the beam-column joint is divided into webs B'of the steel beams B in four directions that intersect the steel columns in advance, and the hoop reinforcement 1 '
The through holes B 1 are drilled at predetermined intervals at the bar arrangement positions, and the long piece 1′a of the L-shaped split hoop muscle 1 ′ is inserted into each of the through holes B 1 to form each split hoop muscle. The long piece 1'a and the single piece 1'b of 1'are temporarily bound together with both ends overlapping, and the overlapped temporary binding portions are weld-joined to form a square hoop. By arranging the square-shaped hoop formed by the streak 1'and surrounding the column main bars a and a'of the beam-column joint, the column main bars a and a'and the core concrete c are constrained, and the beam-column joint Shear reinforcement is performed by preventing the expansion of the width of concrete cracks.

【0003】[0003]

【発明が解決しようとする課題】前記従来の鉄骨鉄筋コ
ンクリート造柱梁接合部における鉄筋コンクリート柱の
剪断補強方法では、鉄骨梁BのウエブB’に穿孔してお
いた夫々の貫通穴B1 に、L字型の割りフープ筋1’の
長片1’aを挿入して、各割りフープ筋1’の長片1’
aと単片1’bの両端部分を重複した状態で仮結束し、
同重複した仮結束部分を溶接接合してロ字状フープを形
成し、以下同様にして割りフープ筋1’で形成したロ字
状フープを配筋して柱梁接合部の柱主筋a、a’を囲繞
することで剪断補強をしている。従って作業工程が多く
複雑で面倒であり作業効率が悪かった。かつ溶接作業の
ため溶接工を別途必要とする等の問題があった。本発明
は、前記従来技術の有する問題点に鑑みて提案されたも
ので、その目的とする処は、作業現場での鉄骨鉄筋コン
クリート造柱梁接合部における柱の剪断補強作業を不要
とすることにより、配筋作業を効率化し溶接工を不要と
して工期の短縮とコストの低減を可能とした鉄筋コンク
リート柱の剪断補強方法を提供することにある。
In the conventional shear reinforcement method for a reinforced concrete column in a steel-frame-reinforced-column-column-joint, the through holes B 1 formed in the web B ′ of the steel beam B are replaced by L Insert the long piece 1'a of the character-shaped split hoop muscle 1'to insert the long piece 1'of each split hoop muscle 1 '.
a and a piece 1'b of both ends are temporarily bound together in an overlapping state,
The overlapping temporary binding portions are weld-joined to form a square hoop, and the square hoop formed by the split hoop muscle 1'is laid out in the same manner as described below to form the main pillar a, a of the beam-column joint. 'Is surrounded by shear reinforcement. Therefore, many work steps are complicated and troublesome and work efficiency is poor. Moreover, there is a problem that a welding person is separately required for the welding work. The present invention has been proposed in view of the above problems of the prior art, the object of which is to eliminate the need for shear reinforcement work of the column in the steel frame reinforced concrete column beam joint at the work site. The purpose of the present invention is to provide a method for shearing reinforcement of reinforced concrete columns, which makes the work of arranging work more efficient and does not require welding, thus shortening the construction period and reducing costs.

【0004】[0004]

【課題を解決するための手段】本発明は、鉄骨鉄筋コン
クリート造柱梁接合部における鉄筋コンクリート柱の剪
断補強方法において上記目的を達成したものである。そ
のため、所要設計強度を有する厚さと幅の帯鉄板を矢印
型に曲げ加工して形成した板状フープを、鉄骨柱の柱梁
接合部の四隅にそれぞれ溶着しておき、鉄骨建方完了
後、前記鉄骨柱の四隅に溶着した夫々の板状フープ内に
所定本数の柱主筋を挿入して、各柱主筋を板状フープに
当接し、さらに前記柱梁接合部以外の柱主筋を囲繞して
閉鎖型フープ筋を配筋する
DISCLOSURE OF THE INVENTION The present invention has achieved the above object in a method of shearing a reinforced concrete column in a steel-framed reinforced concrete column-beam joint. Therefore, the plate-shaped hoops formed by bending the steel strip with a thickness and width having the required design strength into an arrow shape are welded to the four corners of the beam-column joints of the steel column, respectively, and after the steel frame construction is completed, Inserting a predetermined number of column main bars in each plate-shaped hoop welded to the four corners of the steel column, abutting each column main bar to the plate-shaped hoop, and further surrounding the column main bars other than the beam-column joints. Arrange closed hoop muscles

【0005】[0005]

【作用】本発明によれば、所要設計強度を有する厚さと
幅の帯鉄板を矢印型に曲げ加工して形成した板状フープ
を、鉄骨柱の柱梁接合部の四隅にそれぞれ溶着した構造
であるので、前記板状フープが柱主筋とコアコンクリー
トを拘束し、柱梁接合部コンクリートの剪断ひびわれ幅
の拡大防止をすることにより鉄骨鉄筋コンクリート造柱
梁接合部における鉄筋コンクリート柱の剪断補強をす
る。従って鉄骨建方完了後、前記鉄骨柱の四隅に溶着し
た夫々の板状フープ内に所定本数の柱主筋を挿入し、前
記板状フープの先端突部にコーナーの主筋を当接し、先
端部辺と屈折点に内側の主筋を当接するとともに、前記
柱梁接合部分以外の柱主筋を囲繞して閉鎖型フープ筋を
配筋することにより柱の剪断補強が可能となり、現場で
の柱梁接合部の鉄筋コンクリート柱の剪断補強作業を不
要とする。
According to the present invention, a plate-shaped hoop formed by bending a steel strip having a thickness and width having a required design strength into an arrow shape is welded to each of the four corners of a beam-column joint of a steel column. Therefore, the plate-shaped hoop restrains the column main bar and the core concrete, and prevents the shear crack width of the column-beam joint concrete from expanding, thereby reinforcing the shear of the reinforced concrete column at the steel-frame reinforced concrete column-beam joint. Therefore, after the steel frame erection is completed, insert a predetermined number of column main bars in each plate hoop welded to the four corners of the steel frame column, abut the corner main bar to the tip protrusion of the plate hoop, and tip side While the inner main bar is in contact with the refraction point and the main bar other than the beam-column joint is surrounded and the closed hoop bar is reinforced, shear reinforcement of the column becomes possible, and the beam-column joint at the site. No need for shear reinforcement work for reinforced concrete columns.

【0006】[0006]

【実施例】本発明の鉄骨鉄筋コンクリート造柱梁接合部
における鉄筋コンクリート柱の剪断補強方法を説明す
る。鉄筋コンクリート柱の剪断補強方法で使用する板状
フープ1は、図3に示すように、所要設計強度を有する
厚さと幅の帯鉄板を矢印型に曲げ加工して形成したもの
で、鉄筋コンクリート柱のコーナーの主筋aと当接する
位置の先端突部1aで90度に曲げ、更に最も内側に位
置する主筋a’と当接する位置の屈折点1cで135度
に曲げ、前記先端突部1aと屈折点1c間に両先端部辺
1bを有しかつ両屈折点1cから外に突出する両側辺1
dを有するように構成される。前記板状フープ1は鉄骨
工場で鉄骨柱Aの柱梁接合部の四隅に、夫々の板状フー
プ1の先端突部1aをコーナーの柱主筋aと当接するよ
う位置させ、かつ前記柱Aの高さ方向に亙って所定間隔
に複数枚の板状フープ1を鉄骨柱フランジA’に板状フ
ープ1の側辺1dの先端を突合わせ又は隅肉溶接で溶着
する。なお各板状フープ1の両側辺1dの外端は、鉄骨
柱AのフランジA’に溶着する。
EXAMPLE A method for shearing and reinforcing a reinforced concrete column in a steel-framed reinforced concrete column-beam joint of the present invention will be described. As shown in Fig. 3, the plate-shaped hoop 1 used in the shear reinforcement method for reinforced concrete columns is formed by bending an iron strip with a thickness and width that has the required design strength into an arrow shape. Of the tip protrusion 1a at the position where it abuts the main bar a, and at the bending point 1c at the position where it abuts the innermost main bar a ', bends at 135 degrees. Both sides 1 having both ends 1b between them and projecting outward from both refraction points 1c
configured to have d. The plate-shaped hoops 1 are located at the four corners of the beam-column joint of the steel-framed column A at the steel frame factory so that the tip projections 1a of the plate-shaped hoops 1 are brought into contact with the column main bars a of the corners, and A plurality of plate-shaped hoops 1 are welded to the steel column flange A ′ by abutting the ends of the side edges 1d of the plate-shaped hoop 1 or by fillet welding at predetermined intervals in the height direction. The outer ends of both side edges 1d of each plate-shaped hoop 1 are welded to the flange A ′ of the steel column A.

【0007】図1乃至図2は本発明の鉄骨鉄筋コンクリ
ート造柱梁接合部における鉄筋コンクリート柱の剪断補
強方法の一実施例を示す平断面図及び同縦断面図であ
る。本発明の方法による鉄骨鉄筋コンクリート造柱の配
筋をする場合、前記鉄骨柱Aを建方するとともにその四
方向に鉄骨梁Bを交差させた後、鉄骨柱Aの四隅に溶着
した夫々の板状フープ1内に3本の柱主筋a、a’を挿
入し、前記板状フープ1の先端突部1aにコーナーの主
筋aを当接し、前記板状フープ1の屈折点1cに内側の
主筋a’を当接して配置する。さらに鉄骨柱Aに対し、
柱梁接合部を除く柱主筋a、a’を囲繞して閉鎖型フー
プ筋2を配筋する。なお本実施例では夫々の板状フープ
1内に3本の柱主筋a、a’を挿入しているが、柱主筋
a、a’が3本以上のときには屈折点1cと先端突部1
a間の先端部辺1bに、増加した内側の主筋a’を当接
させて配設すればよい。
1 and 2 are a plan sectional view and a longitudinal sectional view showing an embodiment of the method for shearing reinforcement of a reinforced concrete column in a steel-framed reinforced concrete column-beam joint of the present invention. When arranging a steel reinforced concrete column by the method of the present invention, after constructing the steel column A and intersecting the steel beams B in the four directions, each plate shape welded to the four corners of the steel column A The three main pillars a and a'are inserted into the hoop 1, the corner main bars a are brought into contact with the tip projections 1a of the plate-shaped hoop 1, and the inner main bars a are attached to the bending points 1c of the plate-shaped hoop 1. 'Abut and place. Furthermore, for steel column A,
The closed type hoop muscles 2 are arranged around the column main bars a and a ′ excluding the beam-column joints. In this embodiment, three column main reinforcements a and a'are inserted into each plate-shaped hoop 1. However, when the number of column main reinforcements a and a'is three or more, the bending point 1c and the tip projection 1 are formed.
The increased inner main bar a ′ may be brought into contact with the tip side 1b between a and disposed.

【0008】前記板状フープ1は所要設計強度を有する
厚さと幅の帯鉄板で形成され、かつ鉄骨柱Aのフランジ
A’に所定間隔で複数枚溶着されているので、板状フー
プ1が柱主筋a、a’とコアコンクリートcを拘束し、
かつ柱梁接合部コンクリートの剪断ひびわれ幅の拡大防
止をすることにより鉄骨鉄筋コンクリート造柱梁接合部
における鉄筋コンクリート柱の剪断補強をする。従っ
て、鉄骨建方完了後、鉄骨柱Aの四隅に溶着した夫々の
板状フープ1内に3本の柱主筋a、a’を挿入し、前記
板状フープ1の先端突部1aにコーナーの主筋aを当接
し、前記板状フープ1の屈折点1cに内側の主筋a’当
接して、柱梁接合部を除く柱主筋a、a’を囲繞して閉
鎖型フープ筋2を配筋することにより柱の剪断補強が可
能となり、現場での柱梁接合部の鉄筋コンクリート柱の
剪断補強作業を不要とする。
The plate-shaped hoop 1 is formed of a band iron plate having a thickness and width having a required design strength, and a plurality of the plate-shaped hoops are welded to the flange A'of the steel frame column A at predetermined intervals. Restrain the main bars a, a'and the core concrete c,
Moreover, the shear crack width of the concrete-column joints is prevented from expanding and the reinforcement of the reinforced concrete columns in the steel-framed reinforced concrete column-column joints is strengthened. Therefore, after the steel frame construction is completed, the three column main bars a and a ′ are inserted into the respective plate-shaped hoops 1 welded to the four corners of the steel-framed column A, and the corners are inserted into the tip projections 1 a of the plate-shaped hoop 1. The main bar a is brought into contact, the inner main bar a'is brought into contact with the inflection point 1c of the plate-shaped hoop 1, the column main bars a and a'excluding the beam-column joint are surrounded, and the closed hoop line 2 is arranged. This makes it possible to reinforce the columns by shearing and eliminates the need for on-site shear reinforcement work for reinforced concrete columns at beam-column joints.

【0009】[0009]

【発明の効果】本発明によれば、板状フープが柱主筋と
コアコンクリートを拘束し、柱梁接合部コンクリートの
剪断ひびわれ幅の拡大防止をすることにより鉄骨鉄筋コ
ンクリート造柱梁接合部における鉄筋コンクリート柱の
剪断補強をするので、鉄骨建方完了後、鉄骨工場で柱鉄
骨の四隅に溶着した夫々の板状フープ内に所定本数の柱
主筋を挿入し、前記板状フープの先端突部にコーナーの
主筋を当接し、先端部辺と屈折点に内側の主筋を当接し
て、柱梁接合部以外の柱主筋を囲繞して閉鎖型フープ筋
を配筋することにより柱の剪断補強ができる。よって、
現場での柱梁接合部の鉄筋コンクリート柱の剪断補強作
業が簡略化され、剪断補強の作業効率が向上し、工期の
短縮とコストの低減を可能にする。
EFFECTS OF THE INVENTION According to the present invention, the plate-shaped hoop restrains the main reinforcement of the column and the core concrete, and prevents the shear crack width of the concrete of the beam-column joint from expanding. After the steel frame construction is completed, insert a predetermined number of column main bars into each plate hoop welded to the four corners of the column steel frame at the steel frame factory, and add the corner reinforcement to the tip projection of the plate hoop. The shear reinforcement of the column can be performed by abutting the main reinforcement, abutting the inner main reinforcement on the tip side and the inflection point, surrounding the main reinforcement other than the beam-column joint and arranging the closed hoop reinforcement. Therefore,
Shear reinforcement work for reinforced concrete columns at beam-column joints at the site is simplified, work efficiency of shear reinforcement is improved, and it is possible to shorten the construction period and cost.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明による鉄筋コンクリート柱の剪断補強方
法の一実施例を示す平断面図である。
FIG. 1 is a plan sectional view showing an embodiment of a method for shear reinforcement of a reinforced concrete column according to the present invention.

【図2】図2の縦断面図である。FIG. 2 is a vertical sectional view of FIG.

【図3】本発明に使用する板状フープの一実施例を示す
斜視図である。
FIG. 3 is a perspective view showing an embodiment of a plate-shaped hoop used in the present invention.

【図4】従来の鉄筋コンクリート柱の剪断補強方法の実
施例を示す平断面図(a)と、従来方法に使用する割り
フープ筋の平面図である。
FIG. 4 is a plan sectional view (a) showing an example of a conventional shear reinforcement method for a reinforced concrete column and a plan view of a split hoop reinforcement used in the conventional method.

【図5】図4(a)の縦断面図である。FIG. 5 is a vertical cross-sectional view of FIG.

【符号の説明】[Explanation of symbols]

A 鉄骨柱 B 鉄骨梁 a 柱主筋 1 板状フープ 2 閉鎖型フープ筋 A Steel column B B Steel beam a Column main muscle 1 Plate hoop 2 Closed hoop muscle

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 鉄骨鉄筋コンクリート造柱梁接合部にお
ける鉄筋コンクリート柱の剪断補強方法において、所要
設計強度を有する厚さと幅の帯鉄板を矢印型に曲げ加工
して形成した板状フープを、鉄骨柱の柱梁接合部の四隅
にそれぞれ溶着しておき、鉄骨建方完了後、前記鉄骨柱
の四隅に溶着した夫々の板状フープ内に所定本数の柱主
筋を挿入して、各主筋を板状フープに当接し、さらに前
記柱梁接合部以外の柱主筋を囲繞して閉鎖型フープ筋を
配筋することを特徴とする鉄筋コンクリート柱の剪断補
強方法。
1. A method of shearing a reinforced concrete column in a steel-reinforced reinforced concrete column-beam joint, wherein a plate-shaped hoop formed by bending a strip steel plate having a required design strength in a thickness and width into an arrow shape is used. After welding each of the four corners of the beam-column joint, and after completing the steel frame construction, insert a predetermined number of column main bars into the plate hoops welded to the four corners of the steel column, and insert each main bar into the plate hoop. A method for shearing reinforcement of a reinforced concrete column, characterized in that the closed type hoop reinforcement is arranged by surrounding the column main bars other than the column-beam joints.
JP7352892A 1992-02-25 1992-02-25 Shear reinforcement method for reinforced concrete columns Expired - Fee Related JP2813264B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7352892A JP2813264B2 (en) 1992-02-25 1992-02-25 Shear reinforcement method for reinforced concrete columns

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7352892A JP2813264B2 (en) 1992-02-25 1992-02-25 Shear reinforcement method for reinforced concrete columns

Publications (2)

Publication Number Publication Date
JPH05230874A true JPH05230874A (en) 1993-09-07
JP2813264B2 JP2813264B2 (en) 1998-10-22

Family

ID=13520831

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7352892A Expired - Fee Related JP2813264B2 (en) 1992-02-25 1992-02-25 Shear reinforcement method for reinforced concrete columns

Country Status (1)

Country Link
JP (1) JP2813264B2 (en)

Also Published As

Publication number Publication date
JP2813264B2 (en) 1998-10-22

Similar Documents

Publication Publication Date Title
KR20210003315A (en) Column form system using deckplate form
JP2021098939A (en) Elevated rigid frame bridge and elevated rigid frame bridge construction method
JPH0441829A (en) Pillar/beam joint and its execution method
JPH05230874A (en) Reinforced concrete column shearing reinforcing method
JPH0519384Y2 (en)
KR20090093540A (en) Construction system using form-less method
JPS627339B2 (en)
JPH06136822A (en) Column and girder joint construction of reinforced steel frame concrete construction
KR102379888B1 (en) Method For Assembling Reinforced Concrete Columns Using Prefabricated Assembly
JP5777060B2 (en) PCa member and PCa method
JPH084203A (en) Steel framed reinforcement beam and execution method thereof
JP2614000B2 (en) Basics of steel frame
JPS61102939A (en) Connection of precast concrete member
JP2010065449A (en) Concrete beam with opening
JPS6198870A (en) Construction method of precast reinforced concrete earthquake-proof wall
JPH02274938A (en) Combining method for src column
JPH0414524A (en) Arranging of reinforcing bar in frame of strip footing
JPS6139457B2 (en)
JP2910551B2 (en) Lap joint method of main reinforcement of SRC column
JPH03151429A (en) Reinforcement preassembled beam with formwork and working method thereof
CN115075571A (en) Construction method of steel reinforced concrete wall beam oblique node with flange additionally arranged on one side
JPS6229673A (en) Construction of reinforced concrete pillar
JPH10231559A (en) Center pillar provided with beam steel frame, and construction method for mixed structure using same
JPH0442501B2 (en)
JPH06185137A (en) Steel beam joining structure with reinforced concrete earthquake resisting wall

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20070807

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 10

Free format text: PAYMENT UNTIL: 20080807

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 11

Free format text: PAYMENT UNTIL: 20090807

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 11

Free format text: PAYMENT UNTIL: 20090807

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100807

Year of fee payment: 12

LAPS Cancellation because of no payment of annual fees