JPH10231559A - Center pillar provided with beam steel frame, and construction method for mixed structure using same - Google Patents
Center pillar provided with beam steel frame, and construction method for mixed structure using sameInfo
- Publication number
- JPH10231559A JPH10231559A JP4857497A JP4857497A JPH10231559A JP H10231559 A JPH10231559 A JP H10231559A JP 4857497 A JP4857497 A JP 4857497A JP 4857497 A JP4857497 A JP 4857497A JP H10231559 A JPH10231559 A JP H10231559A
- Authority
- JP
- Japan
- Prior art keywords
- steel
- column
- center pillar
- steel frame
- pillar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、柱を鉄筋コンクリ
ート(RC)造とすると共に、梁を鉄骨(S)造とした
混合構造物における、梁鉄骨付き芯柱の構造およびそれ
による混合構造物の構築方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a mixed structure in which a pillar is made of reinforced concrete (RC) and a beam is made of steel (S). Concerning the construction method.
【0002】[0002]
【従来の技術】従来、柱をRC造とし梁をS造とする混
合構造物の構築方法としては、柱の中心部に芯柱を先行
して建て込んで、該芯柱に鉄骨梁を接合することによ
り、柱もS造の建物と同様に能率良く構築することがで
きるようにした工法が開発されている。2. Description of the Related Art Conventionally, as a method of constructing a mixed structure in which a column is made of RC and a beam is made of S, a core column is first erected at the center of the column, and a steel beam is joined to the core column. By doing so, a construction method has been developed in which pillars can be efficiently constructed similarly to S-shaped buildings.
【0003】[0003]
【発明が解決しようとする課題】しかしながら、上記従
来の混合構造物の構築方法は、鋼管から成る芯柱に、鉄
骨梁を接合したり支えるためのブラケットを予め付設し
て置かなければならないため、搬送に嵩張るだけでな
く、芯柱に対する鉄骨梁の接合位置が予め決められてい
るため、受注生産しか出来ない等の問題点があった。However, according to the above-mentioned conventional method of constructing a mixed structure, a bracket for joining or supporting a steel beam must be attached to a core column made of a steel pipe in advance. In addition to being bulky for transportation, there is a problem in that since the joint position of the steel frame beam with respect to the core column is determined in advance, only order-made production can be performed.
【0004】本発明は、上記従来の問題点を解決するた
めになされたもので、その目的とするところは、製造原
価や運送費等を大幅に低減できるだけでなく、工期を短
縮することもできる梁鉄骨付き芯柱および混合構造物の
構築方法を提供することにある。[0004] The present invention has been made to solve the above-mentioned conventional problems, and its object is to not only significantly reduce manufacturing costs and transportation costs, but also shorten the construction period. It is an object of the present invention to provide a method of constructing a core column with a steel beam and a mixed structure.
【0005】[0005]
【課題を解決するための手段】本発明の梁鉄骨付き芯柱
は、鉄筋コンクリート柱と鉄骨梁から構成される混合構
造物の該鉄筋コンクリート柱の中心部に建て込むための
芯柱であって、上記鉄骨梁を接合するための梁鉄骨の貫
挿用部材に貫挿され、所定位置において該貫挿用部材と
の間隙に充填材を充填して上記梁鉄骨を一体化して成る
ことを特徴とする。上記芯柱は、鋼管内に芯柱コンクリ
ートを充填して構成されている。According to the present invention, there is provided a core column with a steel beam for a beam, which is to be built at the center of the reinforced concrete column of a mixed structure composed of a reinforced concrete column and a steel beam. It is characterized in that it is inserted into a penetrating member of a beam steel frame for joining a steel beam, and a filler is filled in a gap between the beam member at a predetermined position and the beam steel frame is integrated. . The core pillar is configured by filling core pillar concrete in a steel pipe.
【0006】本発明の混合構造物の構築方法は、上記構
成の梁鉄骨付き芯柱を、鉄筋コンクリート柱の構築位置
のほぼ中心部に建て込み、該梁鉄骨付き芯柱の梁鉄骨の
間に鉄骨梁を架設して、芯柱の周囲に柱鉄筋を配筋する
と共に該柱鉄筋の周囲に柱型枠を組み付けて、柱コンク
リートを打設することを特徴とする。In the method for constructing a mixed structure according to the present invention, the core column with the beam steel structure having the above-mentioned structure is erected at substantially the center of the construction position of the reinforced concrete column, and the steel frame is inserted between the beam steel frames of the core column with the beam steel structure. It is characterized in that a beam is erected, a column reinforcing bar is arranged around a core column, and a column formwork is assembled around the column reinforcing bar, and a column concrete is cast.
【0007】[0007]
【発明の実施の形態】以下、本発明の実施例について図
面を参照しながら説明する。図1において、1は芯柱で
あって、図2に示すように、スパイラル状のリブ1a′
を有するスパイラル鋼管1a内に芯柱コンクリート1b
を充填したプレキャスト部材である。2は鉄骨梁の端部
を接合するための梁鉄骨であって、図3に拡大して示す
ように、十字状の鉄骨部材2aと、該鉄骨部材2aの中
心部を上下に貫通するように一体的に設けられた貫挿用
鋼管2bから構成されている。2cは柱梁接合部パネル
ゾーンの囲み板であり、省略してもよい。Embodiments of the present invention will be described below with reference to the drawings. In FIG. 1, reference numeral 1 denotes a core pillar, as shown in FIG. 2, a spiral rib 1a '.
Pillar concrete 1b in spiral steel pipe 1a having
Is a precast member filled with. Numeral 2 is a beam steel frame for joining the ends of the steel beams, and as shown in an enlarged manner in FIG. 3, a cross-shaped steel member 2a and a vertically extending through the center of the steel member 2a. It is composed of an integrally inserted steel pipe 2b for insertion. 2c is a surrounding plate of the beam-column joint panel zone, and may be omitted.
【0008】図4からも明らかなように、上記芯柱1を
上記梁鉄骨2の貫挿用鋼管2b内に貫挿せしめて、該芯
柱1に対する上記梁鉄骨2の位置を固定した後、該芯柱
1と貫挿用鋼管2bの隙間に膨張モルタル3を充填し
て、芯柱1と梁鉄骨2を一体化する。As is apparent from FIG. 4, after inserting the core column 1 into the steel pipe 2b for penetration of the beam steel 2 and fixing the position of the beam steel 2 with respect to the core column 1, the core column 1 is fixed. The gap between the core column 1 and the steel pipe 2b for insertion is filled with the expansion mortar 3, and the core column 1 and the beam steel frame 2 are integrated.
【0009】この一体化の作業は、例えば、図5に示す
ように、構築現場あるいは製作工場において、所定間隔
に配置された架台Dに上記梁鉄骨2をセットし、該セッ
トされた梁鉄骨2の貫挿用鋼管2bに上記芯柱1を貫挿
させて、膨張モルタル3を充填して行う。[0009] For this integration work, for example, as shown in FIG. 5, the beam steel frame 2 is set on a gantry D arranged at a predetermined interval at a construction site or a manufacturing factory, and the set beam steel frame 2 is set. The mortar 3 is filled by inserting the core column 1 into the steel pipe 2b for insertion.
【0010】上述のように、梁鉄骨2を一体的に取り付
けた芯柱1を、図1に示すように、構築現場の柱の中心
位置に建て込む。4aは基礎あるいは下層階の柱鉄筋4
の柱主筋であり、4bは柱鉄筋4のフープである。As described above, the core pillar 1 to which the steel beams 2 are integrally attached is erected at the center of the pillar at the construction site as shown in FIG. 4a is the column reinforcement 4 of the foundation or lower floor
And 4b is a hoop of the column reinforcing bar 4.
【0011】次に、図6に示すように、上記梁鉄骨2の
鉄骨部材2aの間に鉄骨梁5を建て込んで、本締めを行
う。5′は小梁である。続いて、図7に示すように、柱
主筋4aを建て込むと共に、上記フープ4bを配筋す
る。上記鉄骨梁5上には床スラブデッキ6を敷き込む。Next, as shown in FIG. 6, a steel beam 5 is erected between the steel members 2a of the beam steel member 2 and is fully tightened. 5 'is a small beam. Subsequently, as shown in FIG. 7, the column main reinforcement 4a is erected, and the hoop 4b is arranged. A floor slab deck 6 is laid on the steel beam 5.
【0012】その後、図8に示すように、上記柱鉄筋4
の周囲に柱型枠7を組み付けて、柱コンクリートを打設
する。また、上記床スラブデッキ6上にはスラブ筋8を
配筋する。さらに、上階の柱鉄筋4を配筋する。[0012] Thereafter, as shown in FIG.
Is assembled with the column formwork 7 and the column concrete is cast. Slab bars 8 are arranged on the floor slab deck 6. Further, the upper-column pillar reinforcement 4 is arranged.
【0013】上記実施例の芯柱1のスパイラル鋼管1a
にはスパイラル状のリブ1a′が形成されて、膨張モル
タル3との一体性を強化しているが、本発明の芯柱1
は、これに限定するものではなく、例えば、リング状や
不連続状のリブ、点状突起、凹状のリブや溝、スタッド
溶接等、膨張モルタル3との一体性を強化し得る構成で
あればいずれでもよい。また、スパイラル鋼管1aを省
略して、芯柱コンクリート1bの周表面に、凹凸状のリ
ブや突起、溝等を形成したり、スタッドを付設した構成
であってもよい。The spiral steel pipe 1a of the core column 1 of the above embodiment.
Is formed with a spiral rib 1a 'to enhance the integration with the expanded mortar 3, but the core pillar 1 of the present invention
The present invention is not limited to this. For example, ring-shaped or discontinuous ribs, point-like protrusions, concave ribs and grooves, stud welding, and the like can be used as long as they can enhance the integrity with the expansion mortar 3. Either may be used. Further, the spiral steel pipe 1a may be omitted, and a configuration in which uneven ribs, protrusions, grooves, and the like are formed on the peripheral surface of the core concrete 1b, or studs may be provided.
【0014】上記梁鉄骨2の貫挿用鋼管2bの内面に
も、凹凸を形成したりスタッド等を溶接して、上記膨張
モルタル3との一体化を強化するのが好ましい。また、
上記実施例では、鉄骨部材2aを十字状に構成したが、
鉄筋コンクリート柱の位置に応じて、T字状、L字状あ
るいはI字状等いずれでもよい。It is preferable to form unevenness on the inner surface of the steel pipe 2b for penetration of the beam steel frame 2 or to weld studs or the like to strengthen the integration with the expanded mortar 3. Also,
In the above embodiment, the steel member 2a is formed in a cross shape.
Depending on the position of the reinforced concrete column, it may be T-shaped, L-shaped or I-shaped.
【0015】本発明の貫挿用部材としては、上記貫挿用
鋼管2bに限定するものではなく、例えば、図9に示す
ように、十字状に接合される鉄骨部材2aの内端に角形
筒状体2b′を取り付けて構成してもよい。また、上記
貫挿用鋼管2bは円形に限定するものではなく、角形等
いずれの形状でもよい。さらに、本発明の充填材として
は、上記膨張モルタルの他に、通常のセメントモルタル
や樹脂モルタル、樹脂入りモルタル等、要するに貫挿用
部材と芯柱とを一体化し得る充填材であればいずれの材
料でもよい。The penetration member of the present invention is not limited to the above penetration steel pipe 2b. For example, as shown in FIG. 9, a rectangular tube is attached to the inner end of a steel member 2a joined in a cross shape. The body 2b 'may be attached. Further, the steel pipe 2b for penetration is not limited to a circular shape, and may be any shape such as a square shape. Further, as the filler of the present invention, in addition to the expanded mortar, ordinary cement mortar, resin mortar, resin-containing mortar, and the like, in other words, any filler that can integrate the insertion member and the core pillar It may be a material.
【0016】[0016]
【発明の効果】 芯柱に対する梁鉄骨の取り付け位置を
自由に設定できるため、予め多くの芯柱や梁鉄骨を製造
してストックしておくことが可能となり、製造原価や運
送費等を大幅に低減できるだけでなく、工期を短縮する
ことも可能となった。[Effects of the Invention] Since the mounting position of the beam steel frame with respect to the core column can be freely set, it is possible to manufacture and stock a large number of core columns and beam steel frames in advance, which significantly reduces the manufacturing cost and the transportation cost. Not only can it be reduced, but it is also possible to shorten the construction period.
【図1】本発明の混合構造物の構築方法における芯柱の
建方作業の説明図である。FIG. 1 is an explanatory diagram of an operation of constructing a core column in a method of constructing a mixed structure according to the present invention.
【図2】図1の芯柱の斜視図である。FIG. 2 is a perspective view of the core pillar of FIG.
【図3】図1の梁鉄骨の斜視図である。FIG. 3 is a perspective view of the beam steel frame of FIG. 1;
【図4】柱・梁パネルゾーンの詳細平面図(A)および
縦断面図(B)である。FIG. 4 is a detailed plan view (A) and a longitudinal sectional view (B) of a column / beam panel zone.
【図5】芯柱と梁鉄骨の組み付け方法の説明図である。FIG. 5 is an explanatory diagram of a method of assembling a core column and a beam steel frame.
【図6】本発明の混合構造物の構築方法における梁鉄骨
の建込み作業の説明図である。FIG. 6 is an explanatory diagram of a beam steel frame erection work in the method for constructing a mixed structure according to the present invention.
【図7】本発明の混合構造物の構築方法における梁鉄筋
の建て込み及び床スラブデッキの敷き込み作業の説明図
である。FIG. 7 is an explanatory view of the work of laying a beam reinforcing bar and laying a floor slab deck in the method of building a mixed structure according to the present invention.
【図8】本発明の混合構造物の構築方法における柱型枠
の建て込み及びスラブ筋の配筋作業の説明図である。FIG. 8 is an explanatory view of the work of laying the column formwork and arranging the slab bars in the method of building a mixed structure according to the present invention.
【図9】本発明の貫挿用部材の別の実施例を示す柱・梁
パネルゾーンの平面図である。FIG. 9 is a plan view of a column / beam panel zone showing another embodiment of the insertion member of the present invention.
1 芯柱 1a スパイラル鋼管 1a′スパイラルリブ 1b 芯柱コンクリート 2 梁鉄骨 2a 鉄骨部材 2b 貫挿用鋼管 2b′角形状筒体 2c 囲み板 3 膨張モルタル 4 柱鉄筋 4a 柱主筋 4b フープ 5 鉄骨梁 5′小梁 6 床スラブデッキ 7 柱型枠 8 スラブ筋 D 架台 5 DESCRIPTION OF SYMBOLS 1 Core column 1a Spiral steel tube 1a 'Spiral rib 1b Core column concrete 2 Beam steel 2a Steel member 2b Penetrating steel tube 2b' Square tube 2c Enclosure plate 3 Expansion mortar 4 Column reinforcing bar 4a Column main bar 4b hoop 5 steel beam 5 ' Small beam 6 floor slab deck 7 pillar form 8 slab bar D base 5
Claims (3)
る混合構造物の該鉄筋コンクリート柱の中心部に建て込
むための芯柱であって、上記鉄骨梁を接合するための梁
鉄骨の貫挿用部材に貫挿され、所定位置において該貫挿
用部材との間隙に充填材を充填して上記梁鉄骨を一体化
して成ることを特徴とする梁鉄骨付き芯柱。1. A core pillar for building a mixed structure composed of a reinforced concrete column and a steel beam at the center of the reinforced concrete column, and a member for inserting a beam steel beam for joining the steel beam. A beam-filled pillar with a beam steel frame integrated by filling a gap with the member for insertion at a predetermined position with a filler.
充填して構成されていることを特徴とする請求項1に記
載の梁鉄骨付き芯柱。2. The pillar according to claim 1, wherein the pillar is formed by filling a pillar with concrete in a steel pipe.
芯柱を、鉄筋コンクリート柱の構築位置のほぼ中心部に
建て込み、該梁鉄骨付き芯柱の梁鉄骨の間に鉄骨梁を架
設して、芯柱の周囲に柱鉄筋を配筋すると共に該柱鉄筋
の周囲に柱型枠を組み付けて、柱コンクリートを打設す
ることを特徴とする混合構造物の構築方法。3. The core column with a steel beam according to claim 1 or 2 is erected substantially at the center of the reinforced concrete column, and a steel beam is erected between the steel columns of the core column with a steel beam. A method of constructing a mixed structure, comprising: arranging a column reinforcing bar around a core column, assembling a column form around the column reinforcing bar, and pouring column concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4857497A JPH10231559A (en) | 1997-02-18 | 1997-02-18 | Center pillar provided with beam steel frame, and construction method for mixed structure using same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4857497A JPH10231559A (en) | 1997-02-18 | 1997-02-18 | Center pillar provided with beam steel frame, and construction method for mixed structure using same |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH10231559A true JPH10231559A (en) | 1998-09-02 |
Family
ID=12807180
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP4857497A Pending JPH10231559A (en) | 1997-02-18 | 1997-02-18 | Center pillar provided with beam steel frame, and construction method for mixed structure using same |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH10231559A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006283333A (en) * | 2005-03-31 | 2006-10-19 | Daiwa House Ind Co Ltd | Construction method of reinforced concrete column/steel beam building |
JP2009013592A (en) * | 2007-06-29 | 2009-01-22 | Taisei Corp | Frame assembling method and frame of building |
-
1997
- 1997-02-18 JP JP4857497A patent/JPH10231559A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006283333A (en) * | 2005-03-31 | 2006-10-19 | Daiwa House Ind Co Ltd | Construction method of reinforced concrete column/steel beam building |
JP2009013592A (en) * | 2007-06-29 | 2009-01-22 | Taisei Corp | Frame assembling method and frame of building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH0518003A (en) | Joining method of steel pipe concrete column and half-precast reinforced concrete column | |
JP2001342679A (en) | CONNECTING METHOD FOR PCa BEAM MEMBER AT COLUMN/BEAM JUNCTION AND PCa BEAM MEMBER FOR IT | |
JPH09209451A (en) | Joint construction of up and down columns with beam and joint method | |
JPH11343667A (en) | Structure for fixing column base with underground beam made of reinforced concrete | |
JP3039295B2 (en) | Manufacturing method of prefabricated member of mixed structure | |
JPH10231559A (en) | Center pillar provided with beam steel frame, and construction method for mixed structure using same | |
JPH03132532A (en) | Construction method of precast reinforced concrete column and beam | |
JPH06316964A (en) | Method for constructing joint of precast reinforced concrete column and beam | |
JPH10280541A (en) | Frame of mixed structure and constructing method of the frame | |
JPH1150538A (en) | Building and method for constructing the same | |
JPH0598653A (en) | Steel pipe concrete pillar in underground inverter construction method | |
JP2006169837A (en) | Column-beam joint structure of reinforced concrete construction | |
JPH09177240A (en) | Precast ferro-concrete beam and its installing method | |
JP3159799B2 (en) | Frame construction method of prestressed steel tube concrete structure | |
JPH03275839A (en) | Connection construction of reinforced concrete column and steel beam | |
JP2005002585A (en) | Capital member and rcft pole construction method using the same | |
JPH01287336A (en) | Steel frame reinforced concrete lamination construction | |
JPH06306931A (en) | Construction of steel frame reinforced concrete structure | |
JP2893406B2 (en) | Precast concrete beam-column joining method | |
JPH0366878A (en) | Construction method for precast column and beam and precast anti-seismic wall | |
JPH02274938A (en) | Combining method for src column | |
JP2022012548A (en) | Precast concrete column structure, and construction method of the same | |
JPH04169625A (en) | Joint structure | |
JPH0868115A (en) | Connecting structure for column/beam and construction method for underground skeleton using it | |
JPH032435A (en) | Construction method for jointing column and steel frame reinforced-concrete beam to each other |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
RD04 | Notification of resignation of power of attorney |
Effective date: 20040312 Free format text: JAPANESE INTERMEDIATE CODE: A7424 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20040317 |