Shear reinforcement method for reinforced concrete columns

Info

Publication number
JP2813264B2
JP2813264B2 JP7352892A JP7352892A JP2813264B2 JP 2813264 B2 JP2813264 B2 JP 2813264B2 JP 7352892 A JP7352892 A JP 7352892A JP 7352892 A JP7352892 A JP 7352892A JP 2813264 B2 JP2813264 B2 JP 2813264B2
Authority
JP
Japan
Prior art keywords
column
reinforced concrete
steel
hoop
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP7352892A
Other languages
Japanese (ja)
Other versions
JPH05230874A (en
Inventor
敏夫 藤原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP7352892A priority Critical patent/JP2813264B2/en
Publication of JPH05230874A publication Critical patent/JPH05230874A/en
Application granted granted Critical
Publication of JP2813264B2 publication Critical patent/JP2813264B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)
  • Joining Of Building Structures In Genera (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、鉄骨鉄筋コンクリート
造柱梁接合部における鉄筋コンクリート柱の剪断補強方
法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of shear-reinforcing a reinforced concrete column at a steel-column reinforced concrete beam-column joint.

【0002】[0002]

【従来の技術】従来、鉄骨鉄筋コンクリート造柱梁接合
部における鉄筋コンクリート柱の剪断補強方法は、図4
と図5に示す方法で実施されている。図4(a)は鉄骨
鉄筋コンクリート造柱梁接合部における鉄筋コンクリー
ト柱の剪断補強方法を示す平断面図、図4(b)は同柱
の剪断補強に使用する割りフープの平面図、図5は同柱
の縦断面図である。鉄骨鉄筋コンクリート造柱の配筋
は、鉄骨建方完了後、鉄骨柱Aの四隅に夫々3本の柱主
筋a、a’を配置し、先づ柱梁接合部を除く柱部分の柱
主筋a、a’を囲繞してロ字状フープ筋2を配筋して剪
断補強をする。次いで柱梁接合部は、予め鉄骨柱に交差
する四方向の鉄骨梁BのウエブB’に割りフープ筋1’
の配筋位置に所定間隔で貫通穴B1 を穿孔しておき、夫
々の前記貫通穴B1 にL字型の割りフープ筋1’の長片
1’aを挿入して、各割りフープ筋1’の長片1’aと
単片1’bの両端を重複した状態で仮結束し、同重複し
た仮結束部分を溶接接合してロ字状フープを形成し、以
下同様にして割りフープ筋1’で形成したロ字状フープ
を配筋して柱梁接合部の柱主筋a、a’を囲繞すること
で、柱主筋a、a’とコアコンクリートcを拘束し、柱
梁接合部コンクリートの剪断ひびわれ幅の拡大防止をす
ることにより剪断補強をしている。
2. Description of the Related Art Conventionally, a method of shear-reinforcing a reinforced concrete column at a steel-column reinforced concrete beam-column joint is shown in FIG.
And the method shown in FIG. FIG. 4A is a plan sectional view showing a method of shear reinforcement of a reinforced concrete column at a steel beam reinforced concrete beam-column joint, FIG. 4B is a plan view of a split hoop used for shear reinforcement of the column, and FIG. It is a longitudinal section of a pillar. After the completion of the steel frame construction, three column main reinforcements a and a 'are arranged at the four corners of the steel column A, and the column main reinforcement a of the column portion except for the beam-column joint is firstly arranged after the completion of the steel frame construction. A square hoop streak 2 is arranged around a ′ to reinforce shearing. Next, the beam-to-column joint is split into webs B 'of the steel beams B in four directions intersecting the steel columns in advance and the hoop bars 1'.
Of the reinforcement position leave drilled through holes B 1 at predetermined intervals, into the through hole B 1 each by inserting a long piece 1'a of the L-shaped split hoop 1 ', the split hoop The 1 'long piece 1'a and the single piece 1'b are temporarily tied together in an overlapping state, and the overlapped temporary tied parts are welded and joined to form a square-shaped hoop, and so on. By arranging a square-shaped hoop formed by the bars 1 'and surrounding the column main bars a and a' of the column-beam joint, the column main bars a and a 'and the core concrete c are restrained, and the column-beam joint is formed. Shear reinforcement is achieved by preventing the expansion of the shear crack width of concrete.

【0003】[0003]

【発明が解決しようとする課題】前記従来の鉄骨鉄筋コ
ンクリート造柱梁接合部における鉄筋コンクリート柱の
剪断補強方法では、鉄骨梁BのウエブB’に穿孔してお
いた夫々の貫通穴B1 に、L字型の割りフープ筋1’の
長片1’aを挿入して、各割りフープ筋1’の長片1’
aと単片1’bの両端部分を重複した状態で仮結束し、
同重複した仮結束部分を溶接接合してロ字状フープを形
成し、以下同様にして割りフープ筋1’で形成したロ字
状フープを配筋して柱梁接合部の柱主筋a、a’を囲繞
することで剪断補強をしている。従って作業工程が多く
複雑で面倒であり作業効率が悪かった。かつ溶接作業の
ため溶接工を別途必要とする等の問題があった。本発明
は、前記従来技術の有する問題点に鑑みて提案されたも
ので、その目的とする処は、作業現場での鉄骨鉄筋コン
クリート造柱梁接合部における柱の剪断補強作業を不要
とすることにより、配筋作業を効率化し溶接工を不要と
して工期の短縮とコストの低減を可能とした鉄筋コンク
リート柱の剪断補強方法を提供することにある。
In [0006] The shear reinforcement method of the conventional steel reinforced concrete beam-column reinforced concrete columns at the junction, the through hole B 1 each which had been drilled in the web B 'of the steel beam B, L Insert the long piece 1'a of the U-shaped split hoop muscle 1 'and insert the long piece 1' of each split hoop muscle 1 '
a and the both ends of the single piece 1'b are temporarily bound in an overlapping state,
The overlapped temporary binding portions are welded and joined to form a square-shaped hoop, and similarly, the square-shaped hoop formed by the split hoop bar 1 'is arranged in the same manner to reinforce the column main bars a, a of the beam-column joint. 'To provide shear reinforcement. Therefore, the number of work steps is complicated and troublesome, and work efficiency is poor. In addition, there is a problem that a welder is separately required for welding work. The present invention has been proposed in view of the above-mentioned problems of the prior art, and the object thereof is to eliminate the need for shear reinforcement work on columns at steel-frame reinforced concrete beam-column joints at work sites. It is another object of the present invention to provide a method of shear reinforcement of a reinforced concrete column, which makes it possible to shorten the construction period and reduce the cost by making the work of arranging a bar efficient and eliminating the need for a welder.

【0004】[0004]

【課題を解決するための手段】本発明は、鉄骨鉄筋コン
クリート造柱梁接合部における鉄筋コンクリート柱の剪
断補強方法において上記目的を達成したものである。そ
のため、所要設計強度を有する厚さと幅の帯鉄板を矢印
型に曲げ加工して形成した板状フープを、鉄骨柱の柱梁
接合部の四隅にそれぞれ溶着しておき、鉄骨建方完了
後、前記鉄骨柱の四隅に溶着した夫々の板状フープ内に
所定本数の柱主筋を挿入して、各柱主筋を板状フープに
当接し、さらに前記柱梁接合部以外の柱主筋を囲繞して
閉鎖型フープ筋を配筋する
SUMMARY OF THE INVENTION The present invention has achieved the above object in a method for shear reinforcement of a reinforced concrete column at a joint of a steel reinforced concrete column and beam. For this reason, plate-shaped hoops formed by bending an iron plate of thickness and width having the required design strength in the shape of an arrow are welded to the four corners of the beam-column joint of the steel column, and after completion of the steel frame construction, A predetermined number of column main reinforcements are inserted into the respective plate-shaped hoops welded to the four corners of the steel column, each column main reinforcement abuts on the plate-shaped hoop, and further surrounds the column main reinforcement other than the column-beam joint. Arrange closed hoop muscles

【0005】[0005]

【作用】本発明によれば、所要設計強度を有する厚さと
幅の帯鉄板を矢印型に曲げ加工して形成した板状フープ
を、鉄骨柱の柱梁接合部の四隅にそれぞれ溶着した構造
であるので、前記板状フープが柱主筋とコアコンクリー
トを拘束し、柱梁接合部コンクリートの剪断ひびわれ幅
の拡大防止をすることにより鉄骨鉄筋コンクリート造柱
梁接合部における鉄筋コンクリート柱の剪断補強をす
る。従って鉄骨建方完了後、前記鉄骨柱の四隅に溶着し
た夫々の板状フープ内に所定本数の柱主筋を挿入し、前
記板状フープの先端突部にコーナーの主筋を当接し、先
端部辺と屈折点に内側の主筋を当接するとともに、前記
柱梁接合部分以外の柱主筋を囲繞して閉鎖型フープ筋を
配筋することにより柱の剪断補強が可能となり、現場で
の柱梁接合部の鉄筋コンクリート柱の剪断補強作業を不
要とする。
According to the present invention, a plate-shaped hoop formed by bending an iron strip having a required design strength and a thickness and a width into an arrow shape is welded to each of the four corners of a beam-column joint of a steel column. Therefore, the plate-shaped hoop restrains the column main reinforcement and the core concrete, and prevents the shear crack width of the beam-column joint concrete from expanding, thereby strengthening the shear strength of the reinforced concrete column at the steel-frame reinforced concrete beam-column joint. Therefore, after the completion of the steel frame construction, a predetermined number of column main reinforcements are inserted into the respective plate-shaped hoops welded to the four corners of the steel column, and the main reinforcements of the corners are brought into contact with the tip projections of the plate-shaped hoops, and the tip side The inner reinforcement is brought into contact with the bending point, and the reinforcement of the column can be strengthened by arranging the closed hoop reinforcement surrounding the column reinforcement other than the column-beam joint, and the column-beam joint at the site No need for shear reinforcement work on reinforced concrete columns.

【0006】[0006]

【実施例】本発明の鉄骨鉄筋コンクリート造柱梁接合部
における鉄筋コンクリート柱の剪断補強方法を説明す
る。鉄筋コンクリート柱の剪断補強方法で使用する板状
フープ1は、図3に示すように、所要設計強度を有する
厚さと幅の帯鉄板を矢印型に曲げ加工して形成したもの
で、鉄筋コンクリート柱のコーナーの主筋aと当接する
位置の先端突部1aで90度に曲げ、更に最も内側に位
置する主筋a’と当接する位置の屈折点1cで135度
に曲げ、前記先端突部1aと屈折点1c間に両先端部辺
1bを有しかつ両屈折点1cから外に突出する両側辺1
dを有するように構成される。前記板状フープ1は鉄骨
工場で鉄骨柱Aの柱梁接合部の四隅に、夫々の板状フー
プ1の先端突部1aをコーナーの柱主筋aと当接するよ
う位置させ、かつ前記柱Aの高さ方向に亙って所定間隔
に複数枚の板状フープ1を鉄骨柱フランジA’に板状フ
ープ1の側辺1dの先端を突合わせ又は隅肉溶接で溶着
する。なお各板状フープ1の両側辺1dの外端は、鉄骨
柱AのフランジA’に溶着する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A method of shear reinforcement of a reinforced concrete column at a steel beam reinforced concrete beam-column joint according to the present invention will be described. As shown in FIG. 3, a plate-shaped hoop 1 used in the method of shear reinforcement of a reinforced concrete column is formed by bending an iron plate having a required design strength into a thickness and a width in an arrow shape and forming a corner of the reinforced concrete column. Bent at 90 degrees at the tip projection 1a at a position where it contacts the main bar a, and further bent at 135 degrees at a refraction point 1c at a position where it contacts the innermost main bar a '. Both sides 1 having both front end sides 1b therebetween and projecting outward from both refraction points 1c
d. The plate-shaped hoops 1 are located at the four corners of the beam-column joint of the steel column A at the steel factory, so that the tip protrusions 1a of the respective plate-shaped hoops 1 are in contact with the column main reinforcements a of the corners. A plurality of plate-shaped hoops 1 are welded to the steel column flange A 'at predetermined intervals along the height direction by abutting the ends of the side edges 1d of the plate-shaped hoops 1 or by fillet welding. The outer ends of both sides 1d of each plate-shaped hoop 1 are welded to the flange A 'of the steel column A.

【0007】図1乃至図2は本発明の鉄骨鉄筋コンクリ
ート造柱梁接合部における鉄筋コンクリート柱の剪断補
強方法の一実施例を示す平断面図及び同縦断面図であ
る。本発明の方法による鉄骨鉄筋コンクリート造柱の配
筋をする場合、前記鉄骨柱Aを建方するとともにその四
方向に鉄骨梁Bを交差させた後、鉄骨柱Aの四隅に溶着
した夫々の板状フープ1内に3本の柱主筋a、a’を挿
入し、前記板状フープ1の先端突部1aにコーナーの主
筋aを当接し、前記板状フープ1の屈折点1cに内側の
主筋a’を当接して配置する。さらに鉄骨柱Aに対し、
柱梁接合部を除く柱主筋a、a’を囲繞して閉鎖型フー
プ筋2を配筋する。なお本実施例では夫々の板状フープ
1内に3本の柱主筋a、a’を挿入しているが、柱主筋
a、a’が3本以上のときには屈折点1cと先端突部1
a間の先端部辺1bに、増加した内側の主筋a’を当接
させて配設すればよい。
FIGS. 1 and 2 are a plan sectional view and a longitudinal sectional view, respectively, showing an embodiment of a method of shear-reinforcing a reinforced concrete column at a steel-column reinforced concrete beam-column joint according to the present invention. In the case of arranging the steel reinforced concrete columns according to the method of the present invention, the steel columns A are erected, and after the steel beams B are crossed in the four directions, the respective plate-shaped members are welded to the four corners of the steel columns A. The three main pillars a and a ′ are inserted into the hoop 1, and the main pillar a of the corner is brought into contact with the tip projection 1 a of the plate-shaped hoop 1, and the inner major bar a is bent at the refraction point 1 c of the plate-shaped hoop 1. 'And abut it. Furthermore, for steel column A,
The closed-type hoop bar 2 is arranged so as to surround the column main bars a and a 'excluding the beam-column joint. In this embodiment, three column main bars a and a 'are inserted into each plate-shaped hoop 1. However, when the column main bars a and a' are three or more, the bending point 1c and the tip protrusion 1 are provided.
What is necessary is just to arrange the increased inner main bar a ′ in contact with the tip side 1b between the a.

【0008】前記板状フープ1は所要設計強度を有する
厚さと幅の帯鉄板で形成され、かつ鉄骨柱Aのフランジ
A’に所定間隔で複数枚溶着されているので、板状フー
プ1が柱主筋a、a’とコアコンクリートcを拘束し、
かつ柱梁接合部コンクリートの剪断ひびわれ幅の拡大防
止をすることにより鉄骨鉄筋コンクリート造柱梁接合部
における鉄筋コンクリート柱の剪断補強をする。従っ
て、鉄骨建方完了後、鉄骨柱Aの四隅に溶着した夫々の
板状フープ1内に3本の柱主筋a、a’を挿入し、前記
板状フープ1の先端突部1aにコーナーの主筋aを当接
し、前記板状フープ1の屈折点1cに内側の主筋a’当
接して、柱梁接合部を除く柱主筋a、a’を囲繞して閉
鎖型フープ筋2を配筋することにより柱の剪断補強が可
能となり、現場での柱梁接合部の鉄筋コンクリート柱の
剪断補強作業を不要とする。
The plate-shaped hoop 1 is formed of a steel strip having a thickness and a width having a required design strength and is welded to the flange A 'of the steel column A at a predetermined interval. Restrain main bars a, a 'and core concrete c,
In addition, by reinforcing the shear crack width of the beam-column joint, the shear reinforcement of the reinforced concrete column at the steel-frame reinforced concrete beam-column joint is prevented. Therefore, after completion of the steel frame construction, the three main pillars a and a ′ are inserted into the respective plate-shaped hoops 1 welded to the four corners of the steel column A, and the corners are inserted into the tip protrusions 1a of the plate-shaped hoop 1. The main bar a is abutted, the inner main bar a ′ abuts on the bending point 1c of the plate-shaped hoop 1, and the closed hoop bar 2 is arranged so as to surround the column main bars a and a ′ excluding the beam-column joint. This makes it possible to reinforce the columns by shearing, eliminating the need for on-site shear reinforcement of reinforced concrete columns at beam-column joints.

【0009】[0009]

【発明の効果】本発明によれば、板状フープが柱主筋と
コアコンクリートを拘束し、柱梁接合部コンクリートの
剪断ひびわれ幅の拡大防止をすることにより鉄骨鉄筋コ
ンクリート造柱梁接合部における鉄筋コンクリート柱の
剪断補強をするので、鉄骨建方完了後、鉄骨工場で柱鉄
骨の四隅に溶着した夫々の板状フープ内に所定本数の柱
主筋を挿入し、前記板状フープの先端突部にコーナーの
主筋を当接し、先端部辺と屈折点に内側の主筋を当接し
て、柱梁接合部以外の柱主筋を囲繞して閉鎖型フープ筋
を配筋することにより柱の剪断補強ができる。よって、
現場での柱梁接合部の鉄筋コンクリート柱の剪断補強作
業が簡略化され、剪断補強の作業効率が向上し、工期の
短縮とコストの低減を可能にする。
According to the present invention, the plate-shaped hoop restrains the main column and the core concrete, and prevents the width of the shear crack of the concrete at the beam-column joint, thereby preventing the width of the concrete from increasing at the steel-column reinforced concrete beam-column joint. After completion of the steel frame construction, a predetermined number of column main bars are inserted into each of the plate-shaped hoops welded to the four corners of the column steel frame at the steel-frame factory, and corners are formed at the tip protrusions of the plate-shaped hoops. The main reinforcement is abutted, the inner main reinforcement is in contact with the tip side and the bending point, and the closed main hoop reinforcement is arranged around the column main reinforcement other than the beam-column joint, thereby reinforcing the column by shearing. Therefore,
The on-site shear reinforcement work of reinforced concrete columns at beam-to-column joints is simplified, the work efficiency of shear reinforcement is improved, and the construction period and cost can be reduced.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明による鉄筋コンクリート柱の剪断補強方
法の一実施例を示す平断面図である。
FIG. 1 is a plan sectional view showing one embodiment of a method for shear reinforcement of a reinforced concrete column according to the present invention.

【図2】図2の縦断面図である。FIG. 2 is a longitudinal sectional view of FIG.

【図3】本発明に使用する板状フープの一実施例を示す
斜視図である。
FIG. 3 is a perspective view showing one embodiment of a plate-shaped hoop used in the present invention.

【図4】従来の鉄筋コンクリート柱の剪断補強方法の実
施例を示す平断面図(a)と、従来方法に使用する割り
フープ筋の平面図である。
FIG. 4 (a) is a plan sectional view showing an example of a conventional method for shear reinforcement of a reinforced concrete column, and FIG. 4 (b) is a plan view of a split hoop used in the conventional method.

【図5】図4(a)の縦断面図である。FIG. 5 is a longitudinal sectional view of FIG.

【符号の説明】[Explanation of symbols]

A 鉄骨柱 B 鉄骨梁 a 柱主筋 1 板状フープ 2 閉鎖型フープ筋 A steel column B steel beam a pillar main bar 1 plate hoop 2 closed hoop bar

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 鉄骨鉄筋コンクリート造柱梁接合部にお
ける鉄筋コンクリート柱の剪断補強方法において、所要
設計強度を有する厚さと幅の帯鉄板を矢印型に曲げ加工
して形成した板状フープを、鉄骨柱の柱梁接合部の四隅
にそれぞれ溶着しておき、鉄骨建方完了後、前記鉄骨柱
の四隅に溶着した夫々の板状フープ内に所定本数の柱主
筋を挿入して、各主筋を板状フープに当接し、さらに前
記柱梁接合部以外の柱主筋を囲繞して閉鎖型フープ筋を
配筋することを特徴とする鉄筋コンクリート柱の剪断補
強方法。
1. A method of shear-reinforcing a reinforced concrete column at a steel-reinforced reinforced concrete column-to-column joint, wherein a plate-shaped hoop formed by bending a strip having a required thickness and a width having a required design strength into an arrow shape is formed. After welding is completed at the four corners of the beam-column joint, after completion of the steel frame construction, a predetermined number of column main reinforcements are inserted into the respective plate-shaped hoops welded to the four corners of the steel column, and each main reinforcement is formed into a plate-shaped hoop. A reinforcing reinforcement for a reinforced concrete column, characterized in that a closed-type hoop reinforcement is arranged surrounding the column main reinforcement other than the column-beam joint.
JP7352892A 1992-02-25 1992-02-25 Shear reinforcement method for reinforced concrete columns Expired - Fee Related JP2813264B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7352892A JP2813264B2 (en) 1992-02-25 1992-02-25 Shear reinforcement method for reinforced concrete columns

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7352892A JP2813264B2 (en) 1992-02-25 1992-02-25 Shear reinforcement method for reinforced concrete columns

Publications (2)

Publication Number Publication Date
JPH05230874A JPH05230874A (en) 1993-09-07
JP2813264B2 true JP2813264B2 (en) 1998-10-22

Family

ID=13520831

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7352892A Expired - Fee Related JP2813264B2 (en) 1992-02-25 1992-02-25 Shear reinforcement method for reinforced concrete columns

Country Status (1)

Country Link
JP (1) JP2813264B2 (en)

Also Published As

Publication number Publication date
JPH05230874A (en) 1993-09-07

Similar Documents

Publication Publication Date Title
KR102357050B1 (en) Column form system using deckplate form
JP2813264B2 (en) Shear reinforcement method for reinforced concrete columns
JPH0441829A (en) Pillar/beam joint and its execution method
JPH0711156B2 (en) Method for joining reinforced concrete columns and steel beams
JP2001049739A (en) Reinforcement structure of column-to-beam connection part
JP3652480B2 (en) Fixed steel column base using T-shaped steel anchor frame
JPS6312987B2 (en)
JP3008795B2 (en) Joint structure of reinforced concrete beams
JP3284391B2 (en) Reinforced concrete frame and construction method
JP3035205U (en) Column / beam joining device
JPH06136822A (en) Column and girder joint construction of reinforced steel frame concrete construction
JP2998450B2 (en) Connection method between PC beam and column
JPS61102939A (en) Connection of precast concrete member
KR200294215Y1 (en) A Steel Beam-Column Connetion Device With Rib, Dog-bone And Partial Welding
JP3611473B2 (en) Reinforcement method for beam-column joint of steel reinforced concrete structure
JP2560965Y2 (en) Column / beam joint structure
JPH06316964A (en) Method for constructing joint of precast reinforced concrete column and beam
JPS6139457B2 (en)
JP2893406B2 (en) Precast concrete beam-column joining method
JPH0414524A (en) Arranging of reinforcing bar in frame of strip footing
JPH0439954Y2 (en)
JP3102488U (en) Shear reinforcement
JP2732113B2 (en) PC column / beam joining method
JPH0231186B2 (en)
JPS5830987B2 (en) Rebar assembly method

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20070807

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 10

Free format text: PAYMENT UNTIL: 20080807

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 11

Free format text: PAYMENT UNTIL: 20090807

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 11

Free format text: PAYMENT UNTIL: 20090807

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100807

Year of fee payment: 12

LAPS Cancellation because of no payment of annual fees