JPH05112938A - Method of reinforcing earthwork such as subbase reinforcement, filling, slope reinforcement, etc., and form used therefor - Google Patents

Method of reinforcing earthwork such as subbase reinforcement, filling, slope reinforcement, etc., and form used therefor

Info

Publication number
JPH05112938A
JPH05112938A JP30416491A JP30416491A JPH05112938A JP H05112938 A JPH05112938 A JP H05112938A JP 30416491 A JP30416491 A JP 30416491A JP 30416491 A JP30416491 A JP 30416491A JP H05112938 A JPH05112938 A JP H05112938A
Authority
JP
Japan
Prior art keywords
reinforcement
reinforcing
concrete
formwork
reinforcing body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP30416491A
Other languages
Japanese (ja)
Other versions
JP2556635B2 (en
Inventor
Nobukado Matsuzuka
展門 松塚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Matsuya Sogo Kenkyusho KK
Original Assignee
Matsuya Sogo Kenkyusho KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matsuya Sogo Kenkyusho KK filed Critical Matsuya Sogo Kenkyusho KK
Priority to JP3304164A priority Critical patent/JP2556635B2/en
Publication of JPH05112938A publication Critical patent/JPH05112938A/en
Application granted granted Critical
Publication of JP2556635B2 publication Critical patent/JP2556635B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PURPOSE:To make it possible to arrange reinforcing nets accurately and easily on subgrade by fixing a reinforcing body to a reinforcing earth execution place by a concrete block combining the ends of the reinforcing body with a form. CONSTITUTION:A hollow and bottomed form 2 having the surface 4 formed in a concrete block shape, having a block piling projection 7 on the bottom and having a ready-mixed concrete pouring hole 10 is installed on one side section of a reinforcing earth execution place. A reinforcing body insertion section 5 into which a reinforcing body 3 such as reinforcing nets, reinforcing ropes, etc., is inserted is provided to a part of the surface of the form 2. Then, after the end of the reinforcing body 3 is directly or indirectly inserted into the reinforcing body insertion section 5 of the form 2, ready-mixed concrete is placed and filled into the form 2, and the ends of the reinforcing body 3 is combined with a concrete block body. The reinforcing body 3 is fixed to the reinforcing earth execution place by the concrete block body to obtain the reinforcing earth.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、路盤補強、盛土補強、
法面補強等の補強土工法とその工法に用いる合成樹脂等
よりなる型枠に係り、より詳細には、路盤補強、盛土補
強、法面補強等の補強土の施工をするに際して、路床上
に補強網の正確な敷設・張設ができ、かつ熟練性が要ら
ず、施工期間を短縮でき、その作業性を向上させ得るよ
うにした補強土工法とその工法に用いる型枠に関する。
The present invention relates to roadbed reinforcement, embankment reinforcement,
The present invention relates to a reinforced soil construction method such as slope reinforcement and a form made of synthetic resin used for the construction method. More specifically, when constructing reinforced soil such as roadbed reinforcement, embankment reinforcement, slope reinforcement, etc. The present invention relates to a reinforced earth construction method capable of accurately laying and tensioning a reinforcing net, requiring no skill, shortening a construction period, and improving workability thereof, and a formwork used for the construction method.

【0002】[0002]

【従来の技術】従来、路盤補強、盛土補強、法面等の補
強土工法としては、路盤補強、盛土補強等の補強土施工
現場における路床上に補強網(網目構造体)を敷設し、
該補強網の上に路盤材により路盤を設け、該路盤の表面
を路面とする工法が知られている。そして、この工法に
よれば、補強網の網目で、その上下部位における土粒子
のインターロッキンク(アンカリンク)効果によって、
該補強網を路床、路盤の土とで一体化させるので、簡単
な施工でもって、路盤の強化ができる。
2. Description of the Related Art Conventionally, as a reinforced soil construction method for roadbed reinforcement, embankment reinforcement, slopes, etc., a reinforced mesh (mesh structure) is laid on the roadbed at a reinforced soil construction site such as roadbed reinforcement, embankment reinforcement, etc.
A construction method is known in which a roadbed is provided on the reinforcing net by a roadbed material and the surface of the roadbed is used as the road surface. According to this method, the interlocking (anchoring) effect of soil particles in the upper and lower parts of the mesh of the reinforcing net
Since the reinforcing net is integrated with the roadbed and the soil of the roadbed, the roadbed can be reinforced by simple construction.

【0003】ここで、前記補強網としては、通常、延伸
プロセスによる合成高分子を原料とした土木用プラスチ
ック高強度網が用いられ、路床条件、交通量条件、荷重
条件等に応じて一層敷設、多層敷設、あるいは路盤材を
包み込むマットレス等に施工している。
Here, as the reinforcing net, a high-strength net for plastics for civil engineering which is made of a synthetic polymer as a raw material is usually used as the reinforcing net, and one layer is laid according to roadbed conditions, traffic conditions, load conditions, etc. It is applied to multi-layer laying or mattresses that wrap roadbed materials.

【0004】[0004]

【発明が解決しようとする課題】しかし、この補強土工
法の場合、次のような問題がある。すなわち、 補強網の種類によっては、一層敷設、多層敷設の場
合、該補強網の端部が補強度工事中に捲れたりして、補
強網が敷設されていない路床部位の生じることがある。 マットレス施工の場合は、路盤材を覆うための工事
に多くの手数を要する。 補強網の端部を固定するための手数を要する。 路盤、盛土側部の固定に手数を要する。 等の問題がある。
However, this reinforced earthwork method has the following problems. That is, depending on the type of the reinforcing net, in the case of single-layer laying or multi-layer laying, the end portion of the reinforcing net may be rolled during the reinforcement work, resulting in a roadbed portion where the reinforcing net is not laid. In the case of mattress construction, much work is required to cover the roadbed material. It takes time to fix the end of the reinforcing net. It takes time to fix the roadbed and the side of the embankment. There are problems such as.

【0005】ところで、近年、補強土工法において、補
強材の引っ張り効果を利用し、垂直、急勾配の盛土が可
能で、かつコンクリート擁壁のような大きな基礎が不要
な『補強盛土工法』『法面急勾配化工法』が提案されて
いる。そして、この工法によれば、従来のコンクリート
擁壁を用いた盛り土工法に比べ、盛り土用地幅を1/2
程度まで縮小でき、かつ工費を5割程度削減できるとい
う利点を有する。
By the way, in recent years, in the reinforced earth construction method, the "reinforcement embankment method" and "method" can be used by utilizing the pulling effect of the reinforcing material to enable vertical and steep slope embankment and without the need for a large foundation such as a concrete retaining wall. "Surface steep slope construction method" has been proposed. And according to this construction method, the embankment land width is 1/2 compared to the conventional embankment construction method using a concrete retaining wall.
It has the advantage that it can be reduced to a certain degree and that the construction cost can be reduced by about 50%.

【0006】しかし、この工法であっても、周壁部に剛
壁面を形成する必要があるので、該剛壁面の設置、およ
び周壁の形成に手数を要するという問題がある。
However, even with this construction method, since it is necessary to form a rigid wall surface on the peripheral wall portion, there is a problem in that it is troublesome to install the rigid wall surface and to form the peripheral wall.

【0007】そこで、本発明者は、上述した点に鑑み、
種々、研究・試験を行った結果、本発明者が先に提案し
た『コンクリートブロック積み工法とこの工事に用いる
合成樹脂製型枠』(特願平2ー231950号明細書参
照)を利用することで、前述した各課題を解決できるこ
とを究明した。
Therefore, in view of the above points, the present inventor has
As a result of various studies and tests, use of the “concrete block building method and synthetic resin formwork used in this construction” (see Japanese Patent Application No. Hei 2-231950) previously proposed by the present inventor. Then, it was clarified that each of the above-mentioned problems can be solved.

【0008】本発明は、上述した課題に対処して創案し
たものであって、その目的とする処は、路盤補強、盛土
補強、法面補強等の補強土の施工をするに際して、路床
上に補強網の正確な敷設・張設ができ、かつ熟練性が要
らず、施工期間を短縮でき、その作業性を向上させ得る
ようにした補強土工法とその工法に用いる型枠を提供す
ることにある。
The present invention was devised in response to the above-mentioned problems, and the purpose thereof is to apply a reinforced soil such as roadbed reinforcement, embankment reinforcement, slope reinforcement, etc. to the roadbed. To provide a reinforced earth construction method and a formwork used for the construction method that enable accurate laying and tensioning of the reinforcement net, do not require skill, can shorten the construction period, and improve its workability. is there.

【0009】[0009]

【課題を解決するための手段】そして、上記課題を解決
するための手段としての本発明の補強土工法は、補強土
施工箇所の一側部に、表面をコンクリートブロック状に
形成した中空有底で、該底部にブロック積み重ね用嵌合
部を有すると共にコンクリート流下もしくは溢出部を備
え、かつ該表面の一部に補強網、補強ロープ等の補強体
挿入部を有する型枠を、該補強体挿入部が前記補強土施
工箇所の他側部側を向くようにして設置すると共に、該
型枠の該補強体挿入部に補強体の端部を直接または間接
的に挿入した後、該型枠内に生コンクリートを注入・充
填して該補強体の端部を直接または間接的に一体化した
コンクリートブロック体とすると共に、該コンクリート
ブロック体によって該補強体を前記補強土施工箇所に定
着させることにより補強土を得られるようにした構成よ
りなる。
[Means for Solving the Problems] And, as a means for solving the above problems, the reinforced soil construction method of the present invention is a hollow bottomed bottom having a concrete block surface formed on one side of a reinforced soil construction site. In addition, a mold having a block stacking fitting portion at the bottom portion and a concrete flow-down or overflow portion, and a reinforcing body insertion portion such as a reinforcing net or a reinforcing rope on a part of the surface is inserted into the reinforcing body. Installed so that the portion faces the other side of the reinforced soil construction site, and directly or indirectly inserts the end of the reinforcement into the reinforcement insertion portion of the form, A method of injecting and filling fresh concrete into a concrete block to directly or indirectly integrate the ends of the reinforcing body and fixing the reinforcing body to the reinforced soil construction site by the concrete block body Yo The constitution which is configured to obtain a reinforced soil.

【0010】また、本発明の他の補強土工法は、前記発
明において、補強体挿入部を前面上部または後面上部に
備えた型枠を積み重ねると共に、該下側に位置する型枠
の補強体挿入部に補強体の端部を直接または間接的に挿
入した後、上側に位置する型枠を介して下側に位置する
型枠内に生コンクリートを注入・充填し、該補強体の端
部を直接または間接的に一体化したコンクリートブロッ
ク体を得るようにした構成よりなる。
Further, in another reinforcing earthwork method of the present invention, in the above-mentioned invention, the formwork having the reinforcing body inserting portion on the front upper part or the rear surface upper part is stacked, and the reinforcing body insertion of the formwork located below is stacked. After directly or indirectly inserting the end of the reinforcing body into the part, the concrete is poured and filled into the formwork located on the lower side through the formwork located on the upper side, and the end part of the reinforcement body is inserted. The concrete block is directly or indirectly integrated into a concrete block.

【0011】更に、本発明の補強土工法に用いる型枠
は、表面をコンクリートブロック状に形成した中空有底
の型枠の上部に生コンクリート注入・充填用開口部を設
け、また該表面の一部に補強土施工用の補強体挿入部を
設け、かつ底部にブロック積み重ね用嵌合部とコンクリ
ート流下もしくは溢出部を設け、前記型枠内に生コンク
リートを注入・充填し、コンクリートブロックを得られ
るようにした構成よりなる。なお、本明細書において、
『生コンクリート』には、通常の生コンクリートの他
に、コンクリートミルクをも含む。また、ここで、型枠
としては、合成樹脂製、金属製、コンクリート製、板紙
製等によって得ることができる各種のものを含む。
Further, the formwork used in the reinforced soil construction method of the present invention is provided with a fresh concrete pouring / filling opening on the top of a hollow bottomed formwork whose surface is formed in the shape of a concrete block. Part is provided with a reinforcing body insertion part for constructing reinforced soil, and a bottom part is provided with a block stacking fitting part and concrete flowing down or overflowing part, pouring and filling fresh concrete into the formwork to obtain a concrete block It is configured as described above. In the present specification,
"Green concrete" includes concrete milk in addition to normal green concrete. In addition, here, the mold includes various types that can be obtained by synthetic resin, metal, concrete, paperboard and the like.

【0012】[0012]

【作用】本発明の補強土工法は、補強土工事現場におけ
る路床上に、補強網等の補強体を敷設すると共に、該補
強体の端部に、内部にコンクリートを注入することによ
りコンクリートブロック体を形成する型枠を配し、かつ
該補強体の端部を型枠の前面に形成されている補強体挿
入用部に挿入した後、該型枠に生コンクリートを注入・
充填することで、該補強体の端部を一体化したコンクリ
ートブロック体を得ることができ、該補強体を正確でか
つ簡単に配設できると共に、併せて側壁等をも得ること
ができるように作用する。
According to the reinforced earth work method of the present invention, a reinforced body such as a reinforced net is laid on a roadbed at a reinforced earth construction site, and concrete is poured into the end of the reinforced body to inject concrete. After arranging the formwork that forms the, and inserting the end portion of the reinforcement body into the reinforcement body insertion portion formed on the front surface of the formwork, pouring fresh concrete into the formwork.
By filling, it is possible to obtain a concrete block body in which the end portions of the reinforcing body are integrated, so that the reinforcing body can be accurately and easily arranged, and a side wall and the like can also be obtained. To work.

【0013】また、補強土工法に用いる型枠は、内部に
生コンクリートを・注入・充填することで、ブロック体
を得られる形態の型枠であり、型枠前部の補強体挿入用
部に補強体の端部を挿入した後に、生コンクリートを注
入充填し、これを養生することによって、補強体を一体
化した構成を、補強土工法において具体化できるように
作用し、かつ簡単な作業でもって、マットレス施工と同
様の作業ができ、また該補強体の固定作業を省略できる
ようにも作用する。
The formwork used in the reinforced earth method is a formwork in which a block body can be obtained by pouring and filling fresh concrete into the formwork. After inserting the end of the reinforcing body, injecting and filling fresh concrete and curing it, the structure that integrates the reinforcing body works so that it can be embodied in the reinforced earth construction method, and it is a simple work. Therefore, the same work as the mattress construction can be performed, and the work of fixing the reinforcing body can be omitted.

【0014】[0014]

【実施例】以下、図面を参照しながら、本発明を具体化
した実施例について説明する。ここに、図1〜図8は、
本発明の一実施例を示し、図1は本実施例の補強土工法
の作業工程を示す概略断面図、図2は本補強土工法に用
いる型枠の正面図、図3は側面図、図4は平面図、図5
は施工状態を示す側面図、図6は型枠を積み重ねた状態
の斜視図、図7は型枠の拡大斜視図と、補強体挿入部に
補強体を挿入した状態の拡大断面図、図8は補強体とし
てタイロッド継手を用いた場合の説明図である。
Embodiments of the present invention will be described below with reference to the drawings. Here, FIG. 1 to FIG.
1 shows an embodiment of the present invention, FIG. 1 is a schematic sectional view showing a work process of the reinforced earthwork method of the present embodiment, FIG. 2 is a front view of a formwork used in the reinforced earthwork method, FIG. 3 is a side view, and FIG. 4 is a plan view, FIG.
8 is a side view showing a construction state, FIG. 6 is a perspective view showing a state where the molds are stacked, FIG. 7 is an enlarged perspective view of the molds, and an enlarged sectional view showing a state where the reinforcing body is inserted into the reinforcing body inserting portion. [Fig. 3] is an explanatory view when a tie rod joint is used as a reinforcing body.

【0015】本実施例の補強土工法は、路盤を補強する
ための補強土工法であって、概略すると、路床整地工
程、合成樹脂製型枠設置工程、補強体配設工程、
生コンクリート充填工程、路盤材配設工程、次工
程、の六工程よりなる。
The reinforced earthwork method of the present embodiment is a reinforced earthwork method for reinforcing a roadbed, and is roughly summarized as follows: roadbed leveling step, synthetic resin formwork setting step, reinforcement arranging step,
It consists of six steps: the raw concrete filling step, the roadbed material arranging step, and the next step.

【0016】−路床整地工程− 本工程は、路床1を整地する工程である。この工程は、
補強土工法を実施するための準備工程であって、後工程
で使用する合成樹脂製型枠2の設置し、かつ補強体3の
配設、その他工事をスムーズに施工できるように路床1
を均らす工程である。
-Subgrade Leveling Step-This step is a step of leveling the subgrade 1. This process is
It is a preparatory step for carrying out the reinforced earth construction method, in which the synthetic resin formwork 2 used in the subsequent step is installed, the reinforcing body 3 is arranged, and other works can be smoothly carried out.
Is a step of smoothing the.

【0017】−合成樹脂製型枠設置工程− 本工程は、路床整地工程に均らされた路床2の所定箇所
に合成樹脂製型枠2を設置する工程である。すなわち、
合成樹脂製型枠2,2・・を道路、鉄道をつくる左右の
所定箇所に設置すると共に、複数段(通常、二段)積み
重ね・設置する工程である。
-Synthetic Resin Form Setting Step-This step is a step of installing the synthetic resin form 2 at a predetermined location on the roadbed 2 that has been leveled in the roadbed leveling step. That is,
It is a process of installing the synthetic resin molds 2, 2 ... at predetermined places on the left and right where roads and railroads are made, and stacking and installing multiple stages (usually two stages).

【0018】合成樹脂製型枠2は、図2〜図8に示すよ
うに、表面がコンクリートブロック形状と同一に形成さ
れた中空有底の平面矩形状の型枠であって、表表面(換
言すれば、正面側表面)4には、コンクリートブロック
と同様に模様等が形成され、上部には開口部7が形成さ
れ、また後面上部には補強体3の端部3a,3bを挿入
するための補強体挿入部5が形成され、更に底面には嵌
合部を構成する凸部6が形成されている。開口部7は、
積み重ねる他の合成樹脂製型枠2の凸部6と係合させ、
また生コンクリートを注入充填させるための充填口であ
る。また、凸部6は、積み重ねる他の合成樹脂製型枠2
の開口部7と係合させるための係合部で、合成樹脂製型
枠2の周壁面8に対して小さく、かつ下向きに突出した
形状とされている。また、凸部6の表面、換言すれば、
合成樹脂製型枠2の底面9には、1個もしくは複数個の
生コンクリート流下用孔(あるいは溢出孔)10が穿設
されている。
As shown in FIGS. 2 to 8, the synthetic resin mold 2 is a hollow, bottomed, planar rectangular mold whose surface is formed in the same shape as a concrete block. By doing so, a pattern or the like is formed on the front surface 4) similarly to a concrete block, an opening 7 is formed on the upper portion, and the end portions 3a and 3b of the reinforcing body 3 are inserted on the upper rear portion. The reinforcing body insertion part 5 is formed, and the convex part 6 that constitutes the fitting part is further formed on the bottom surface. The opening 7 is
Engage with the convex portion 6 of another synthetic resin mold 2 to be stacked,
It is also a filling port for pouring and filling fresh concrete. In addition, the convex portion 6 is formed of another synthetic resin mold 2 to be stacked.
The engaging portion for engaging with the opening portion 7 of the above is small with respect to the peripheral wall surface 8 of the synthetic resin mold 2 and has a shape protruding downward. In addition, the surface of the convex portion 6, in other words,
The bottom surface 9 of the synthetic resin mold 2 is provided with one or more fresh concrete flow-down holes (or overflow holes) 10.

【0019】ここで、流下用孔10は、コンクリートブ
ロック自体の形状、形態によって相違するが、通常、3
0cm間隔程度に穿設、その大きさは、3〜10cm径
程度とする。しかし、他の大きさ等を選択してもよい。
また、合成樹脂製型枠2の側面上部には、切り込み11
が設けられている。切り込み11は、合成樹脂製型枠
2、2・・を横方向に繋ぐための鉄筋12を設置するた
めの切り込みである。ここで、切り込み11は、V字
型、U字型等他の形状としている。
Here, the flow-down hole 10 is usually 3 although it differs depending on the shape and form of the concrete block itself.
The holes are formed at intervals of 0 cm, and the size is about 3 to 10 cm in diameter. However, other sizes may be selected.
In addition, a notch 11 is formed on the upper side surface of the synthetic resin frame 2.
Is provided. The notch 11 is a notch for installing a reinforcing bar 12 for laterally connecting the synthetic resin molds 2, 2, .... Here, the notch 11 has another shape such as a V shape and a U shape.

【0020】なお、合成樹脂製型枠2は、通常、工場で
予め製作され、その材料としては、ポリエチレン樹脂、
ポリプロピレン樹脂、ポリエステル樹脂(不飽和ポリエ
ステル樹脂)、塩化ビニル樹脂等の熱硬化性樹脂または
熱可塑性樹脂が用いられ、この中でも、FRP等の耐候
性、強度を備えたものがより好ましい。ところで、合成
樹脂製型枠3は、矩形状に限られることなく、円形、三
角形状、その他多角形状体等であってもよく、通常、ト
ラック等の輸送機関で輸送できる種々の大きさの範囲も
のである。
The synthetic resin mold 2 is usually manufactured in advance in a factory, and the material thereof is polyethylene resin,
Thermosetting resins or thermoplastic resins such as polypropylene resin, polyester resin (unsaturated polyester resin) and vinyl chloride resin are used. Among them, those having weather resistance and strength such as FRP are more preferable. By the way, the synthetic resin mold 3 is not limited to a rectangular shape, but may be a circular shape, a triangular shape, or another polygonal shape, and is usually in a range of various sizes that can be transported by a transportation means such as a truck. It is a thing.

【0021】そして、具体的には、合成樹脂製型枠2
a,2bを、路床1の左右位置に補強体挿入部5、5が
対向するように設置し、該設置した下側に位置する合成
樹脂製型枠2a,2bに、更に合成樹脂製型枠2a′,
2b′をそれぞれ凸部6と開口部7とを介して積み重ね
るようにしている。
More specifically, the synthetic resin mold 2
a and 2b are installed at the left and right positions of the roadbed 1 so that the reinforcing body insertion parts 5 and 5 face each other, and the synthetic resin molds 2a and 2b located on the lower side are further provided with synthetic resin molds. Frame 2a ',
2b 'are stacked via the convex portion 6 and the opening portion 7, respectively.

【0022】−補強体配設工程− 本工程は、合成樹脂製型枠2の補強体挿入部5に補強体
3の端部3a,3bを直接または間接的に挿入・配設す
る工程である。すなわち、補強体3の両端部3a,3b
を合成樹脂製型枠3a・・・,3b・・・の補強体挿入
部5に挿入し、また併せて、切り込み11、11・・に
鉄筋12を挿入配置し、また縦方向にも生コンクリート
流下用孔7を介して鉄筋12を立設・配置する工程であ
る(なお、鉄筋の立設・配置は、前工程で行うこともあ
る)。ここで、補強体3としては、前述した延伸プロセ
スによる合成高分子を原料とした土木用プラスチック高
強度網を用い、通常、ポリプロピレン、あるいは高密度
ポリエチレンを原料としたテンサー(三井石化産資製の
補強網材)、その他の合成樹脂製網体、繊維製網体、金
属製網体を用い、該網体の端部を補強体挿入部5に挿入
しやすいように部分的に裂いた構成としている。しか
し、金属製、合成樹脂製、繊維製等のワイヤー,ロープ
その他の耐引っ張り材等を用いることもある。また、必
要に応じて、板体、不織布等を用いてもよい。なお、補
強体3として、例えば、該テンサーを用いない場合は、
通常、タイロッド継手、すなわち、穴開プレート、ボル
ト、あるいは丸穴棒等の継手16を取り付けたアンカー
15(図8参照、なお、図8では孔開プレートよりなる
継手を用いている)を用いて、該アンカーを補強体挿入
部5に挿入し、アンカー15、継手16等よりなるタイ
ロッド継手等を介してワイヤー等の耐引っ張り材よりな
る補強体3を間接的に挿入・配設するようにしている。
-Reinforcement Disposing Step-This step is a step of inserting or arranging the ends 3a and 3b of the reinforcement 3 directly or indirectly into the reinforcement insertion portion 5 of the synthetic resin mold 2. .. That is, both ends 3a, 3b of the reinforcing body 3
Is inserted into the reinforcing body insertion portion 5 of the synthetic resin molds 3a ..., 3b ..., and at the same time, the reinforcing bars 12 are inserted and arranged in the notches 11, 11, ... In this step, the reinforcing bars 12 are erected and arranged through the downflow holes 7 (the reinforcing bars may be erected and arranged in the previous step). Here, as the reinforcing body 3, a high-strength net for civil engineering plastics, which is made of the synthetic polymer obtained by the above-described stretching process, is used, and a tenser (made by Mitsui Kasei Co., Ltd.) usually made of polypropylene or high-density polyethylene is used. (Reinforcing net material), other synthetic resin nets, fiber nets, and metal nets, and the end of the net is partially torn so that it can be easily inserted into the reinforcing member insertion portion 5. There is. However, a wire made of metal, synthetic resin, fiber or the like, rope, or other pull resistant material may be used. Moreover, you may use a board | plate body, a nonwoven fabric, etc. as needed. As the reinforcing body 3, for example, when the tensor is not used,
Usually, a tie rod joint, that is, an anchor 15 to which a joint 16 such as a perforated plate, a bolt, or a round hole bar is attached (see FIG. 8, a joint including a perforated plate is used in FIG. 8) The anchor is inserted into the reinforcing body insertion portion 5, and the reinforcing body 3 made of a pull resistant material such as a wire is indirectly inserted and arranged through a tie rod joint or the like made of the anchor 15 and the joint 16. There is.

【0023】−生コンクリート充填工程− 本工程は、積み重ねた合成樹脂製型枠2a,2a′・
・,2b,2b′・・内に生コンクリートを注入・充填
してコンクリートブロック体を形成する工程である。す
なわち、上側に位置する合成樹脂製型枠2a′,2b′
の開口部5より生コンクリートを注入して、該合成樹脂
製型枠2a′,2b′の生コンクリート流下用孔10を
介して、該生コンクリートを下側に位置する合成樹脂製
型枠2a,2b内に充填し、該生コンクリートが上側に
位置する合成樹脂製型枠2a′,2b′の下部位置に達
した状態で充填を終え、かつ補強体3の端部3a,3b
を直接または間接的に合成樹脂製型枠2内に一体化させ
る工程である。ここで、生コンクリートの強度は、通常
のコンクリートブロックにおけるものと同等の強度のも
のを用いている。そして、合成樹脂製型枠2、2・・内
に充填したコンクリートを養生させ、合成樹脂製型枠
2、2・・と一体化させると共に、補強体3を一体化す
る。また、左右方向は切り込み11、11・・と鉄筋1
2を介してコンクリートが固化・一体化される。なお、
型枠2の側面の切り込み11の下方部位に鉄筋12とコ
ンクリートとが十分に包むようにするための開口部を設
け、コンクリートの充填を確実にするようにしてもよ
い。
-Fresh concrete filling step-This step is for stacking synthetic resin molds 2a, 2a '.
., 2b, 2b '... is a step of pouring and filling fresh concrete to form a concrete block body. That is, the synthetic resin molds 2a ', 2b' located on the upper side
Fresh concrete is poured from the opening 5 of the synthetic resin mold 2a ', 2b' through the holes 10 for flowing down the raw concrete, and the synthetic resin mold 2a located below the raw concrete. 2b, the filling is completed in a state where the green concrete reaches the lower positions of the synthetic resin molds 2a ', 2b' located on the upper side, and the end portions 3a, 3b of the reinforcing body 3 are filled.
Is a step of directly or indirectly integrating it into the synthetic resin mold 2. Here, the strength of green concrete is the same as that of a normal concrete block. Then, the concrete filled in the synthetic resin molds 2, 2, ... Is cured and integrated with the synthetic resin molds 2, 2, .. In addition, the left and right directions are notches 11, 11 ...
Concrete is solidified and integrated through 2. In addition,
An opening may be provided in the side surface of the mold 2 below the notch 11 so that the reinforcing bar 12 and the concrete can be sufficiently wrapped to ensure that the concrete is filled.

【0024】−路盤材配設工程− 本工程は、前工程でコンクリートブロック化された合成
樹脂製型枠2a,2b間に路盤材(土)13を戻し、路
盤を形成すると共に、補強体3をジョイントする工程で
ある。そして、該路盤材13と路床1とは、合成樹脂製
型枠2a,2b間で、補強体3により一体化され、また
路盤材13は、左右の合成樹脂製型枠2a,2bによっ
て、その移動が保持される。なお、本工程は、通常、前
記養生工程と並行して施工するようにしている。
-Roadbed Material Arranging Step-In this step, the roadbed material (soil) 13 is returned between the synthetic resin molds 2a and 2b formed into concrete blocks in the previous step to form the roadbed and the reinforcing member 3 is formed. Is the process of jointing. The roadbed material 13 and the roadbed 1 are integrated by the reinforcing body 3 between the synthetic resin molds 2a and 2b, and the roadbed material 13 is formed by the left and right synthetic resin molds 2a and 2b. The movement is retained. It should be noted that this step is usually performed in parallel with the curing step.

【0025】−次工程− 本工程は、前工程を繰り返して、補強体3を複層敷設す
る工程である。すなわち、前工程である合成樹脂製型
枠設置工程、補強体配設工程、生コンクリート充填
工程、路盤材配設工程の各工程を繰り返すより、合成
樹脂製型枠2a・・、2b・・を順次、積み重ね、かつ
補強体3,3・・を配設し、かつ該補強体3,3・・を
合成樹脂製型枠2,2・・内に一体化し、更に路盤材を
配することで、補強体3,3・・を複層敷設し、所定の
補強土を有する所定の路盤の道路等を得る。ここで、補
強体3,3のジョイントは、一般的には、ラップさせる
構成を採るが、固着する構成としてもよく、また補強体
3として、一枚物を用いてもよい。
-Next Step-This step is a step of laying the reinforcing body 3 in multiple layers by repeating the previous step. That is, the synthetic resin molds 2a ..., 2b ... are replaced by repeating the preceding steps of the synthetic resin mold setting step, the reinforcement disposing step, the fresh concrete filling step, and the roadbed material disposing step. By sequentially stacking and arranging the reinforcing bodies 3, 3, ... And integrating the reinforcing bodies 3, 3, .. In the synthetic resin molds 2, 2, .. .. are laid in multiple layers to obtain a road or the like having a predetermined roadbed with a predetermined reinforced soil. Here, the joints of the reinforcements 3 and 3 generally have a configuration of wrapping, but may have a configuration of being fixed, or the reinforcement 3 may be a single piece.

【0026】そして、本実施例の補強土工法を用いて施
工した結果を、側壁体として土嚢を用いた従来工法との
比較をすると、補強体(テンサー)を一層敷設した場
合、従来例の場合、長さが50m、幅が10mの道路を
施工するのに15日かかったのに対し、本実施例の場合
は10日と、工期を5日間短縮することができた。これ
は、補強体の固定、側壁部を施工にかかる時間等に大き
な施工時間差が生じたことによる。また、本実施例の場
合、補強体が合成樹脂製枠体で形成されるブロック体と
一体化され、そして該補強体の端部の定着状態が良好に
保持され、補強体の敷設作業が軽量作業となり、熟練し
た専門化でなくても容易に施工できることが確認でき
た。
When the result of the construction using the reinforced soil construction method of the present embodiment is compared with the conventional construction method using the sandbag as the side wall, when the reinforcement body (tensor) is further laid, While it took 15 days to construct a road having a length of 50 m and a width of 10 m, the construction period could be shortened to 5 days by 10 days in the case of this example. This is because a large construction time difference occurred in the time required for fixing the reinforcing body and constructing the side wall. Further, in the case of the present embodiment, the reinforcing body is integrated with the block body formed of the synthetic resin frame body, and the fixed state of the end portion of the reinforcing body is maintained well, and the laying work of the reinforcing body is lightweight. It was a work, and it was confirmed that it could be easily constructed without the need for expert specialization.

【0027】なお、本発明は、上述した実施例に限定さ
れるものでなく、本発明の要旨を変更しない範囲内で変
形実施できるものを含む。因みに、前述した実施例で
は、型枠を路床の左右に設置し、該左右の型枠間に路盤
を形成する構成で説明したが、図9に示すように、路床
の一側にのみ型枠を設置し、他側にはアースアンカー1
4で山等に直接固定する構成とすることもできる。ま
た、前述した実施例では、各型枠の全てに補強体3を直
接または間接的に配設した構成で説明したが、二段毎、
三段毎等に補強体3を配設する構成としてもよい。
It should be noted that the present invention is not limited to the above-described embodiments, but includes modifications that can be implemented without departing from the scope of the present invention. Incidentally, in the above-mentioned embodiment, the formwork is installed on the left and right sides of the roadbed, and the roadbed is formed between the left and right formwork. However, as shown in FIG. 9, only on one side of the roadbed. Install a formwork and ground anchor 1 on the other side
It is also possible to directly fix it to a mountain or the like with 4. Further, in the above-described embodiment, the configuration in which the reinforcing body 3 is directly or indirectly arranged on all of the molds has been described.
The reinforcing body 3 may be arranged in every three stages or the like.

【0028】更に、前述した実施例では、補強体挿入部
を型枠の後面上部に設けた構成で説明したが、後面中間
部、前面中間部その他の型枠表面に上向き孔部を設け、
該孔部を補強体挿入部とした構成としてもよい。また、
図10に示すように、法面を補強する形態として実施す
ることもできることは当然で、この場合は、型枠2とし
て、前面上部と後面上部の両方に補強体挿入部5,5を
有し、前面上部の補強体挿入部5では、法面の地盤を補
強する補強体3が挿入一体化されて、法面の地盤中に該
補強体を定着させ、また後面上部においては、前述した
実施例と同様の構成としている。更に、型枠を路盤の上
方位置まで積み重ね、該部位の型枠に防音壁等を形成さ
せる形態としてもよい。
Further, in the above-described embodiment, the reinforcing member insertion portion is provided on the upper rear surface of the mold, but the upward hole is provided on the rear surface middle portion, the front middle portion and the other mold surface.
The hole may be a reinforcing body insertion portion. Also,
As shown in FIG. 10, it goes without saying that the slope can be reinforced, and in this case, the formwork 2 has the reinforcing body insertion portions 5 and 5 at both the upper front surface and the upper rear surface. In the reinforcement insertion portion 5 in the front upper part, the reinforcement 3 for reinforcing the ground on the slope is inserted and integrated, and the reinforcement is fixed in the ground on the slope. The configuration is similar to the example. Further, the form may be stacked up to a position above the roadbed, and a soundproof wall or the like may be formed on the form of the part.

【0029】また、前述した実施例においては、補強体
挿入部を型枠の後面上部に設けた、あるいは形成した構
成で説明したが、該表面の他の箇所、例えば、上面、左
右側面、底面、あるいは角部、隅部等に設けた構成とし
てもよい。更に、該挿入部は穿設孔であってもよい。ま
た、前述した実施例においては、型枠を合成樹脂製型枠
で説明したが、金属製、コンクリート製、板紙製等より
なる構成のものを用いてもよいことは当然である。
Further, in the above-mentioned embodiment, the reinforcing body insertion portion is provided or formed on the upper rear surface of the mold, but it is explained that the reinforcing body insertion portion is formed on other parts of the surface, for example, the upper surface, the left and right side surfaces, the bottom surface. Alternatively, it may be provided at a corner or a corner. Further, the insertion part may be a hole. Further, in the above-described embodiments, the mold is described as a synthetic resin mold, but it goes without saying that a mold made of metal, concrete, paperboard or the like may be used.

【0030】[0030]

【発明の効果】以上の説明より明らかなように、本発明
の補強土工法によれば、補強網の端部を型枠の表面の一
部に形成されている補強体挿入部に挿入した後、該型枠
に生コンクリートを注入・充填することで、該補強体の
端部を直接または間接的に一体化したコンクリートブロ
ック体を得るようにして該補強体を定着するようにした
工法であるので、該補強体を正確でかつ簡単に配設でき
ると共に、併せて側壁等をも簡単に得ることができると
いう効果を有する。
As is apparent from the above description, according to the reinforcing earthwork method of the present invention, after the end portion of the reinforcing net is inserted into the reinforcing body insertion portion formed on a part of the surface of the formwork, , A method of pouring and filling fresh concrete into the formwork to obtain a concrete block body in which the ends of the reinforcement body are directly or indirectly integrated to fix the reinforcement body. Therefore, there is an effect that the reinforcing body can be accurately and easily arranged and, at the same time, a side wall and the like can be easily obtained.

【0031】また、本発明の補強土工法に用いる型枠に
よれば、内部に生コンクリートを・注入・充填すること
で、ブロック体を得られる形態の型枠であるので、型枠
表面の一部に設けられている補強体挿入部に補強体の端
部を直接または間接的に挿入した後に、生コンクリート
を注入充填し、これを養生することによって、該補強体
を一体化した構成を得ることができるという効果を有す
る。また簡単な作業でもって、マットレス施工と同様の
作業ができ、また該補強体の定着作業を省略できるとい
う効果をも有する。
Further, according to the formwork used in the reinforced earthwork method of the present invention, a block body can be obtained by pouring and filling fresh concrete into the formwork. After directly or indirectly inserting the end portion of the reinforcing body into the reinforcing body inserting portion provided in the portion, fresh concrete is poured and filled, and this is cured to obtain a structure in which the reinforcing body is integrated. It has the effect of being able to. Further, it is possible to perform the same work as the mattress construction with a simple work, and also to have an effect that the fixing work of the reinforcing body can be omitted.

【図面の簡単な説明】[Brief description of drawings]

【図1】 本実施例の補強土工法の作業工程を示す概略
断面図である。
FIG. 1 is a schematic cross-sectional view showing a work process of a reinforced earth work method of the present embodiment.

【図2】 本補強土工法に用いる合成樹脂製型枠の正面
図である。
FIG. 2 is a front view of a synthetic resin mold used in the present reinforced earth construction method.

【図3】 側面図である。FIG. 3 is a side view.

【図4】 平面図である。FIG. 4 is a plan view.

【図5】 施工状態を示す側面図である。FIG. 5 is a side view showing a construction state.

【図6】 合成樹脂製型枠を積み重ねた状態の斜視図で
ある。
FIG. 6 is a perspective view showing a state in which synthetic resin molds are stacked.

【図7】 合成樹脂型枠の拡大斜視図と補強体挿入部に
補強体を挿入した状態の拡大断面図である。
FIG. 7 is an enlarged perspective view of a synthetic resin mold and an enlarged cross-sectional view of a state in which a reinforcing body is inserted in a reinforcing body insertion portion.

【図8】 補強体としてタイロッド継手を用いた場合の
説明図である。
FIG. 8 is an explanatory diagram when a tie rod joint is used as a reinforcing body.

【図9】 他の実施例の断面図である。FIG. 9 is a cross-sectional view of another embodiment.

【図10】 他の実施例の断面図である。FIG. 10 is a cross-sectional view of another embodiment.

【符号の説明】[Explanation of symbols]

1・・・路床、2・・・合成樹脂製型枠、3・・・補強
体、4・・・表表面、5・・・補強体挿入部(孔)、6
・・・開口部、7・・・凸部、8・・・合成樹脂製型枠
の周壁面、9・・・合成樹脂製型枠の下面、10・・・
生コンクリート流下用孔、11・・・切り込み、12・
・・鉄筋、13・・・路盤材、14・・・タイロッド、
15・・・アンカー、16・・・継手
DESCRIPTION OF SYMBOLS 1 ... Roadbed, 2 ... Synthetic resin form, 3 ... Reinforcement body, 4 ... Front surface, 5 ... Reinforcement body insertion part (hole), 6
... Opening portion, 7 ... Convex portion, 8 ... Surface wall of synthetic resin mold, 9 ... Lower surface of synthetic resin mold, 10 ...
Holes for flowing down fresh concrete, 11 ... Notches, 12 ...
..Reinforcing bars, 13 ... Roadbed materials, 14 ... Tie rods,
15 ... Anchor, 16 ... Joint

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 補強土施工箇所の一側部に、表面をコン
クリートブロック状に形成した中空有底で、該底部にブ
ロック積み重ね用嵌合部を有すると共にコンクリート流
下もしくは溢出部を備え、かつ該表面の一部に補強網、
補強ロープ等の補強体を挿入する補強体挿入部を有する
型枠を、該補強体挿入部が前記補強土施工箇所の他側部
側を向くようにして設置すると共に、該型枠の該補強体
挿入部に補強体の端部を直接または間接的に挿入した
後、該型枠内に生コンクリートを注入・充填して該補強
体の端部を一体化したコンクリートブロック体とすると
共に、該コンクリートブロック体によって該補強体を前
記補強土施工箇所に定着させることにより補強土を得ら
れるようにしたことを特徴とする路盤補強、盛土、法面
補強等の補強土工法。
1. A hollow bottomed bottom having a concrete block-like surface on one side of a reinforced soil construction site, a block stacking fitting section at the bottom, and a concrete flow-down or overflow section, and Reinforcing mesh on part of the surface,
A formwork having a reinforcement body insertion part for inserting a reinforcement body such as a reinforcement rope is installed so that the reinforcement body insertion part faces the other side of the reinforcement soil construction site, and the reinforcement of the formwork is performed. After directly or indirectly inserting the end portion of the reinforcing body into the body insertion portion, pouring and filling fresh concrete into the formwork to form a concrete block body in which the end portion of the reinforcing body is integrated, A reinforced soil construction method such as roadbed reinforcement, embankment, slope reinforcement, etc., characterized in that a reinforced soil is obtained by fixing the reinforced body to the reinforced soil construction site with a concrete block body.
【請求項2】 補強体挿入部を後面上部または前面上部
に備えた型枠を積み重ねると共に、該下側に位置する型
枠の補強体挿入部に補強体の端部を直接または間接的に
挿入した後、上側に位置する型枠を介して下側に位置す
る型枠内に生コンクリートを注入・充填し、該補強体の
端部を直接または間接的に一体化したコンクリートブロ
ック体を得るようにした請求項1に記載の路盤補強、盛
土、法面補強等の補強土工法。
2. Forming a form having a reinforcing body insertion part on the upper rear surface or the upper front, and inserting the end of the reinforcing body directly or indirectly into the reinforcing body insertion part of the formwork located on the lower side. After that, fresh concrete is poured and filled into the formwork located on the lower side through the formwork located on the upper side, so that a concrete block body in which the ends of the reinforcing body are directly or indirectly integrated is obtained. Reinforced earthwork method such as roadbed reinforcement, embankment and slope reinforcement according to claim 1.
【請求項3】 表面をコンクリートブロック状に形成し
た中空有底の型枠の上部に生コンクリート注入・充填用
開口部を設け、また該表面の一部に補強土施工用の補強
体挿入部を設け、かつ底部にブロック積み重ね用嵌合部
とコンクリート流下もしくは溢出部を設け、前記型枠内
に生コンクリートを注入・充填し、コンクリートブロッ
クを得られるようにした路盤補強、盛土補強等の補強土
施工用型枠。
3. A raw concrete pouring / filling opening is provided in the upper part of a hollow bottomed formwork whose surface is formed in the shape of a concrete block, and a reinforcement insert portion for reinforced soil construction is provided in a part of the surface. Reinforced soil such as roadbed reinforcement, embankment reinforcement, etc., which is provided with a block stacking fitting part and concrete flowing down or overflowing part at the bottom part, and pouring and filling fresh concrete into the formwork to obtain a concrete block Formwork for construction.
JP3304164A 1991-10-22 1991-10-22 Reinforcement soil construction method such as roadbed reinforcement, embankment, slope reinforcement, and formwork used for the construction method Expired - Fee Related JP2556635B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3304164A JP2556635B2 (en) 1991-10-22 1991-10-22 Reinforcement soil construction method such as roadbed reinforcement, embankment, slope reinforcement, and formwork used for the construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3304164A JP2556635B2 (en) 1991-10-22 1991-10-22 Reinforcement soil construction method such as roadbed reinforcement, embankment, slope reinforcement, and formwork used for the construction method

Publications (2)

Publication Number Publication Date
JPH05112938A true JPH05112938A (en) 1993-05-07
JP2556635B2 JP2556635B2 (en) 1996-11-20

Family

ID=17929823

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3304164A Expired - Fee Related JP2556635B2 (en) 1991-10-22 1991-10-22 Reinforcement soil construction method such as roadbed reinforcement, embankment, slope reinforcement, and formwork used for the construction method

Country Status (1)

Country Link
JP (1) JP2556635B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0718679A (en) * 1993-06-30 1995-01-20 Matsuya Sogo Kenkyusho:Kk Method of reinforcing earth work for subbase course reinforcement, fill, slope reinforcement and formwork for concrete block retaining wall

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62160319A (en) * 1986-01-08 1987-07-16 Furii Kogyo Kk Construction work of sheathing wall
JPH02128016A (en) * 1988-11-07 1990-05-16 Kajima Corp Stone masonry retaining wall

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62160319A (en) * 1986-01-08 1987-07-16 Furii Kogyo Kk Construction work of sheathing wall
JPH02128016A (en) * 1988-11-07 1990-05-16 Kajima Corp Stone masonry retaining wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0718679A (en) * 1993-06-30 1995-01-20 Matsuya Sogo Kenkyusho:Kk Method of reinforcing earth work for subbase course reinforcement, fill, slope reinforcement and formwork for concrete block retaining wall

Also Published As

Publication number Publication date
JP2556635B2 (en) 1996-11-20

Similar Documents

Publication Publication Date Title
US5367845A (en) System for building a structure
US3678815A (en) Concrete structural member
US20110296791A1 (en) Interlocking concrete construction method
JPH06193068A (en) Earth retaining method
KR100583294B1 (en) A Facing panel for reinforced earth wall and its construction method
US6808156B2 (en) Method and apparatus for molding concrete into a bridge or other structure
CN109252434A (en) A kind of asphalt pavement structure and its construction method
JPH0849237A (en) Slope face covering structure and mat
JP2556635B2 (en) Reinforcement soil construction method such as roadbed reinforcement, embankment, slope reinforcement, and formwork used for the construction method
JP3251698B2 (en) Tunnel lining element and tunnel construction method using the same
KR100647071B1 (en) The method of constructing bloclk for wall
JPH08177059A (en) Footing block, and integrated method for constructing continuous footing employing footing block
JPH0718679A (en) Method of reinforcing earth work for subbase course reinforcement, fill, slope reinforcement and formwork for concrete block retaining wall
KR20090035951A (en) Retaining wall for easy drainage and it's construction work method thereof
JPH08184016A (en) Execution method of concrete guardrail and mold for concrete guardrail
JPH09105132A (en) Concrete block earth-retaining wall form
JP2731823B2 (en) Wall unit
JPH0480432A (en) Water permeable temporary sheathing material and concrete wall construction method
KR102371639B1 (en) Retaining wall block with improved cohesion
JP2743961B2 (en) Concrete foundation method
JPS6250601B2 (en)
KR20080000510U (en) A support gunny bag for construction
JP2000319884A (en) Reinforced mud wall structure
JPS5936057B2 (en) Slope reinforcement method
JPS59220501A (en) Expanded walking road block and production thereof

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees