JPH0466485A - Device for suspending guide rail for elevator - Google Patents

Device for suspending guide rail for elevator

Info

Publication number
JPH0466485A
JPH0466485A JP17759690A JP17759690A JPH0466485A JP H0466485 A JPH0466485 A JP H0466485A JP 17759690 A JP17759690 A JP 17759690A JP 17759690 A JP17759690 A JP 17759690A JP H0466485 A JPH0466485 A JP H0466485A
Authority
JP
Japan
Prior art keywords
rail
suspending
rails
guide rail
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP17759690A
Other languages
Japanese (ja)
Other versions
JP2526720B2 (en
Inventor
Akio Komaba
駒場 章雄
Takeshi Osawa
大沢 毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2177596A priority Critical patent/JP2526720B2/en
Publication of JPH0466485A publication Critical patent/JPH0466485A/en
Application granted granted Critical
Publication of JP2526720B2 publication Critical patent/JP2526720B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B19/00Mining-hoist operation
    • B66B19/002Mining-hoist operation installing or exchanging guide rails

Abstract

PURPOSE:To shorten the period of time required for installation of guide rails by connecting one side of grooved rail suspending fitting with which guide rails are fastened to both ends of a suspending frame thus serving the purpose with only one suspending fitting, and fastening a rail hanger supported on the floor of a machine room to the suspending fitting. CONSTITUTION:Rail suspending fittings 21A and 21B are formed into a groove shape, and a suspending frame 23 is fastened to one side of the suspending fittings 21A and 21B through a hole 21c. The upper ends of guide rails 1A and 1B are connected with the member composed of a suspending fittings 21A and 21B, the suspending frame 23 and a suspending fitting 27 (hereinafter referred to as suspending fitting 23), and rail hangers 29A and 29B are fastened. After that, the suspending frame 23 is suspended by a length of rails 2A and 2B of an interme diate portion, and the upper ends of the following rails are connected to the lower ends of the rails 2A and 2B with batten plates 3A, 3B, respectively. Similarly, rails are sequentially connected and suspended. Guide bodies 37A and 37B are inserted into rail fixing holes 36A and 36B, respectively. The unified rails are supported by a supporting plate crossed over the rail fixing holes 36A and 36B with fastening fittings 31A and 31B. Subsequently, the rails are centered and fastened to rail brackets, after which the suspending frame 23 or the like are removed. Using only one suspending frame makes the working easy.

Description

【発明の詳細な説明】 [産業上の利用分野] この発明はエレベータ−の据付は時にガイドレルをつり
上げる装置に関するものである。
DETAILED DESCRIPTION OF THE INVENTION [Industrial Field of Application] This invention relates to a device for lifting guide rails, which are sometimes used in the installation of elevators.

[従来の技術] 第5図および第6図は、例えば特開昭6l−37679
q公報に示されたエレベータ−用ガイドレールのつり上
げ装置を示す図で、第5図は斜視図、第6図はレール6
出し作業の説明用平面図である。
[Prior art] Figures 5 and 6 are, for example, disclosed in Japanese Patent Application Laid-open No. 61-37679.
Figure 5 is a perspective view and Figure 6 is a perspective view of a lifting device for an elevator guide rail shown in Publication Q.
FIG. 3 is a plan view for explaining the unloading work.

図中、flAl (IB)は昇降路内に互いに並立する
最上部のガイドレール、+2Al (2Blはガイドレ
ールNU fiB)の下端に目板(3A) (3B)に
より接続された中間部のガイドレール、(4Al (4
B)は最−L部のガイドレール(IA) (IB)の上
端部にクリップf5A) (58)で締結されたつり板
、(6A) (6B)はガイドレール(1^)tlB+
の両側に配置され、つり板(4^) f48+相互を結
合するつり枠、(7Al f78+はつり枠(6^1 
f6Bl相互を結合するつりブラケット、(8Al (
1)18)はつりブラケット(7^1 (7Blに設け
られたアイボルト、 (9)はアイボルト(8A) (
8Blに掛けられた玉掛はローブ、(10)は玉掛はロ
ーブ(9)に掛けられたシャックルで、ウィンチローブ
(1))に結合されている。
In the figure, flAl (IB) is the uppermost guide rail that is parallel to each other in the hoistway, and +2Al (2Bl is the guide rail NU fiB) is the middle guide rail that is connected to the lower end by battens (3A) and (3B). , (4Al (4
B) is a suspension plate fastened to the upper end of the Lmost guide rail (IA) (IB) with a clip f5A) (58), (6A) (6B) is the guide rail (1^) tlB+
The suspension plate (4^) f48+ is placed on both sides of the suspension frame, (7Al f78+ is the suspension frame (6^1
Suspension bracket that connects f6Bl to each other, (8Al (
1) 18) Hanging bracket (7^1 (Eye bolt provided on 7Bl, (9) is eye bolt (8A) (
The sling attached to 8Bl is a lobe, and the sling (10) is a shackle attached to the lobe (9), which is connected to the winch lobe (1).

(12A) (12B+は昇降路に鉛直に下垂された心
出し用ピアノ線、(■3)はレール6出し治具である。
(12A) (12B+ is a piano wire for centering hanging vertically down the hoistway, (■3) is a jig for taking out the rail 6.

従来のエレベータ−用ガイドレールのつり上げ装置は上
記のように構成され、ウィンチローブ(1)) (1)
)をウィンチ(図示しない)で巻き上げられる。一方、
機械室に設置される巻上機据付は用の機械台(図示しな
い)に受は金具(図示しない)が設けられ、この受は金
具とつりブラケット+7A) (7B)間を、つりボル
ト(図示しない)で結合して仮固定する。
A conventional elevator guide rail lifting device is configured as described above, and includes a winch lobe (1)) (1)
) can be hoisted up with a winch (not shown). on the other hand,
When installing a hoist installed in a machine room, a metal fitting (not shown) is provided on a machine stand (not shown), and this support is connected between the metal fitting and suspension bracket +7A) (7B) by a suspension bolt (not shown). (not) to temporarily fix.

その後、第6図に示すように、レール6出し治具(13
)を用いて、心出し用ピアノ線(12A) (tzo)
を基準にして、ガイドレール(IAI (IB)の心出
し、すなわち位置決めが行なわれる。
After that, as shown in Figure 6, the rail 6 ejecting jig (13
) for centering piano wire (12A) (tzo)
Centering, that is, positioning, of the guide rail (IAI (IB)) is performed with reference to the guide rail (IAI (IB)).

[発明が解決しようとする課題] 上記のような従来のニレベーク−用ガイドレールのつり
一上げ装置では、ガイドレールCIA) FIB)につ
り板+4A) [4B)をクリップ(5A) fsB)
で締結し、つり板+4A) (4B)相互をつり枠(6
A) F6B)で結合し、これをウィンチでつり上げ、
機械室の機械台を仮固定するようにしているため、次の
ような問題点がある。
[Problem to be solved by the invention] In the conventional elm bake guide rail lifting device as described above, the suspension plate +4A) [4B) is clipped (5A) fsB) to the guide rail CIA) FIB).
(4B) and attach each other to the hanging frame (6
A) Join with F6B) and lift this with a winch,
Because the machine stand in the machine room is temporarily fixed, the following problems arise.

■ つり板(4^) f4Bl締結用のクリップ(5^1 
(58+の個数が多くなり、クリップf5A) f5B
lの着脱に時間が掛かる。
■ Hanging plate (4^) Clip for f4Bl fastening (5^1
(The number of 58+ increases, clip f5A) f5B
It takes time to attach and detach the l.

■ 2本のつり枠f6A) f6B)で構成されている
ため、つり上げ装置が重くなり、かつ部品数も多い。そ
のため、つり上げ装置の製作費が高(なると共に、据付
現地での組立ておよび解体に時間が掛かる。
■ Since it is composed of two lifting frames f6A) and f6B), the lifting device is heavy and has many parts. Therefore, the manufacturing cost of the lifting device is high (and it takes time to assemble and disassemble at the installation site).

■ レール6出し治具(13)を使用する際、ガイドレ
ール(lA)(IB)の中心を結ぶ線と、心出し用ピア
ノ線(12A) (12B)との間隔Aが、ガイドレー
ル(IA) (IBIの中心線からつり枠(6A) [
6B+の外縁までの距i!1IIBよりも短いため、心
出し用ピアノ線(12A) (12Blがつり枠(6A
) (6Blに干渉し、レール6出し治具(13)が使
用できない。
■ When using the rail 6 alignment jig (13), the distance A between the line connecting the centers of the guide rails (lA) (IB) and the centering piano wires (12A) (12B) ) (Hanging frame (6A) from the center line of IBI [
Distance i to the outer edge of 6B+! Because it is shorter than 1IIB, centering piano wire (12A) (12Bl is a suspension frame (6A
) (The rail 6 extension jig (13) cannot be used because it interferes with 6Bl.

■ ガイドレール(lA)(lB)は機械台に支持され
るため、機械台が設置された後でないと、ガイドレール
(IA) TIBIのつり上げ作業ができず、エレベー
タ−の据付は手順が制限される。
■ Since the guide rails (lA) and (lB) are supported by the machine stand, the guide rails (IA) and TIBI cannot be lifted until the machine stand is installed, and the procedure for installing the elevator is restricted. Ru.

この発明は上記問題点を解決するためになされたもので
、据付作業時間を短縮することができ、かつ据付は手順
の制限をなくすことができるようにしたエレベータ−用
ガイドレールのつリートげ装置を提供することを目的と
する。
This invention was made to solve the above-mentioned problems, and is an elevator guide rail tensioning device that can shorten the installation work time and eliminate restrictions on installation procedures. The purpose is to provide

[課題を解決するための手段] この発明に係るエレベータ−用ガイドレールのつり上げ
装置は、溝状に形成されたレールつり金具の一側辺をつ
り枠の両端に結合し、並立するガイドレールの上端部を
し〜ルつり金具に締結し、上記つり枠の中央部に山形の
つり具を固定し、これをつり上げ用のローブに結合し、
レールつり金具の底辺に機械室床のレール固定穴を通し
て機械室床に支持される締結具を有するレールつり手を
締結したものである。
[Means for Solving the Problems] An elevator guide rail hoisting device according to the present invention connects one side of a rail hoisting fitting formed in a groove shape to both ends of a hoisting frame, and lifts up parallel guide rails. Fasten the upper end to the hanging fitting, fix the chevron-shaped hanging fitting to the center of the hanging frame, and connect this to the lifting lobe,
A rail hanging hand is fastened to the bottom of the rail hanging fitting, which has a fastener that is supported by the machine room floor through a rail fixing hole in the machine room floor.

また、この発明の別の発明に係るエレベータ−用ガイド
レールのつり上げ装置は、上記のものにおいて、機械室
床のレール固定穴に、レールつり千の締結具が通過する
筒状の案内体を挿通したものである。
Further, in the elevator guide rail lifting device according to another invention of the present invention, in the above device, a cylindrical guide body through which a rail lifting fastener passes is inserted into the rail fixing hole in the machine room floor. This is what I did.

[作 用] この発明においては、ガイドレールが締結される溝状の
レールつり金具の−・側辺をつり枠の両端に結合したた
め、つり枠は1本で済むと共に、つり枠は心出し用ピア
ノ線と干渉しない。また、レルつり会P、に機械室床に
支持されるレールつり手を締結したため、機械台とは関
係なくガイドレールは支持される。
[Function] In this invention, since the sides of the groove-shaped rail suspension fitting to which the guide rail is fastened are connected to both ends of the suspension frame, only one suspension frame is required, and the suspension frame can be used for centering. Do not interfere with piano wire. In addition, since the rail hanging hand supported by the machine room floor is connected to the rail hanging party P, the guide rail is supported regardless of the machine stand.

また、この発明の別の発明においては、機械室床のレー
ル固定穴に、レールつり手の締結具が通過する筒状の案
内体を挿通したため、レールつり手は機械室床下面に衝
突することなく、機械室に導入される。
In addition, in another invention of the present invention, the cylindrical guide through which the fastener of the rail lifting hand passes is inserted into the rail fixing hole in the machine room floor, so that the rail lifting hand does not collide with the lower surface of the machine room floor. Instead, it is introduced into the machine room.

[実施例] 第1図〜第4図は、この発明の一実施例を示す図で、第
1図は斜視図、第2図は最上部のガイドレールの拡大斜
視図、第3図はレールつり金具の拡大斜視図、第4図は
つり具の拡大斜視図であり、従来装置と同様の部分は同
一符号で示す。なお、第6図はこの実施例にも共用され
る。
[Embodiment] Figures 1 to 4 are diagrams showing an embodiment of the present invention, in which Figure 1 is a perspective view, Figure 2 is an enlarged perspective view of the topmost guide rail, and Figure 3 is a view of the rail. FIG. 4 is an enlarged perspective view of the hanging fitting, and parts similar to those of the conventional device are designated by the same reference numerals. Note that FIG. 6 is also used in this embodiment.

図中、(la)はガイドレール[IA) flBlの上
端部に設けられた穴で、目板(3^) f381の取付
用ボルト穴と同ピツチおよび同寸法であり、仮型であけ
られる。(21A) (21B)は底辺と両側辺で溝形
に形成されたレールつり金具で、底辺下部には数種類の
ガイドレールに適合するように長穴(21alが、同じ
く上部には穴f21blが、−側辺には穴(21c)が
、他側辺には八(21dlが、それぞれ設けられており
、長穴(21alおよびガイドレールflA) (IB
Iの穴(la)を通るボルト(22)でガイドレールf
lA) (IBIに締結されている。(23)は両端が
それぞれ座板(24)、ボルト(25)およびナツト(
26)により、穴(21c)を介してレールつり金具(
21^I F21B)の−側辺に締結されたつり枠、(
27)は山形に形成されたつり具で、その両低部には穴
(27a)が、山形部には穴(”27b)が設けられて
おり、穴(27al を通るボルト(28)でつり枠(
23)の中央部に、かつ山形部の突出がレールつり金具
[21A) F21B+の他側辺側に配置されており、
穴(27b)にシャックル(10)を介してウィンチロ
ーブ(1))が結合されている。+29A) (29B
)は穴[21blを通るボルト(30)で、レールつり
金具[21A) (21B)に締結されたレールつり手
で、その上端にはねじ棒、ナツトおよび座金からなる締
結具f31Al (318)が固着されている。(33
)は機械室の床で、揚重穴(34)が設けられ、揚重穴
(34)は閉塞板(35)で閉塞され、ここにウィンチ
ローブ(1))が通るローブ穴(35a)が開口してい
る。(36A) (36B)は機械室の床(33)に設
けられた角穴からなるレール固定穴で、ガイドレール[
IA) (IBIの直上部に配置されている。+37A
) (37Blはレール固定穴(36A)(36B)に
挿入された角筒状の案内体である。
In the figure, (la) is a hole provided at the upper end of the guide rail [IA] flBl, which has the same pitch and dimensions as the bolt hole for attaching the batten (3^) f381, and is drilled using a temporary mold. (21A) and (21B) are rail hanging fittings formed in a groove shape on the bottom and both sides, with a long hole (21al) at the bottom of the bottom to fit several types of guide rails, and a hole f21bl at the top. - A hole (21c) is provided on one side, and a hole (21dl) is provided on the other side, and a long hole (21al and guide rail flA) (IB
Attach the guide rail f with the bolt (22) passing through the hole (la) in I.
(23) has a seat plate (24), a bolt (25) and a nut (25) at each end.
26), the rail hanging fitting (
21^I F21B)
27) is a hanging tool formed in the shape of a chevron, with holes (27a) in both lower parts and a hole (27b) in the chevron part, and a bolt (28) passing through the hole (27al) to attach the hanging frame. (
23), and the protrusion of the chevron portion is arranged on the other side of the rail hanging fitting [21A) F21B+,
A winch lobe (1) is coupled to the hole (27b) via a shackle (10). +29A) (29B
) is a rail hanging hand fastened to the rail hanging fittings [21A) (21B) with a bolt (30) passing through the hole [21bl, and at its upper end there is a fastener f31Al (318) consisting of a threaded rod, nut, and washer. It is fixed. (33
) is the floor of the machine room, where a lifting hole (34) is provided, the lifting hole (34) is closed with a closing plate (35), and a lobe hole (35a) through which the winch lobe (1)) passes is provided. It's open. (36A) (36B) is a rail fixing hole consisting of a square hole provided in the floor (33) of the machine room, and the guide rail [
IA) (Located directly above IBI. +37A
) (37Bl is a rectangular cylindrical guide inserted into the rail fixing holes (36A) (36B).

次に、この実施例の作業手順について説明する。Next, the working procedure of this embodiment will be explained.

まず、ガイドレールCIA) flB) (2A) (
2B)・・・・・の単体を昇降路底部に立てておく。そ
して、つり枠(23)の両側に、レールつり金具(21
A) (21B1をガイドレール(IAI (IB)の
設置間隔およびガイドレール+IA) flBlの寸法
に合わせた間隔で、座板(24)、ボルト(25)およ
びナツト(26)で固定する。このとき、座板(24)
はつり枠(23)の補強とボルト(25)の回動阻止の
役目をする。次に、つり枠(23)の中央部につり具(
27)をボルト(28)で固定し、シャックル(lO)
を介してウィンチローブ(Illを掛ける。
First, guide rail CIA) flB) (2A) (
2B) Stand a single unit at the bottom of the hoistway. Then, on both sides of the suspension frame (23), rail suspension fittings (21
A) (Fix 21B1 with the seat plate (24), bolts (25) and nuts (26) at intervals that match the installation interval of the guide rail (IAI (IB) and guide rail + IA) flBl. At this time , seat board (24)
It serves to reinforce the hanging frame (23) and prevent the bolt (25) from rotating. Next, attach the hanging tool (
27) with the bolt (28) and the shackle (lO)
Hang winch robe (Ill) through.

次に、レールつり金具[21A) (21B)、つり枠
(23)およびつり具(27)からなる部材(以下単に
つり枠(23)という)を昇降路底部から最上階のガイ
ドレール(l^1(IB)の長さ分だけつり上げる。そ
して、その位置で、レールつり金具(21Al F21
B)にガイドレール(IAI (IBIの上端部を接続
する。次に、レールつり金具(21A) (21B)に
レールつり手[29A) F29B)を締結した後、つ
り枠(23)を中間部のガイドレール(2^) F2B
)の長さ分つり上げ、次に来るガイドレルの上端を、ガ
イドレール[2Al fzB)の下端に目板(3A) 
(38)で接続する。
Next, the member consisting of the rail suspension fittings [21A) (21B), the suspension frame (23), and the suspension tool (27) (hereinafter simply referred to as the suspension frame (23)) is moved from the bottom of the hoistway to the guide rail (l^1) on the top floor. (IB). Then, at that position, attach the rail suspension fittings (21Al F21
Connect the upper end of the guide rail (IAI (IBI) to the guide rail (IAI) (B). Next, after fastening the rail hanging hand [29A] F29B) to the rail hanging fittings (21A) (21B), attach the suspension frame (23) to the middle part. Guide rail (2^) F2B
), and then attach the upper end of the next guide rail to the lower end of the guide rail [2Al fzB] with a batten (3A).
Connect with (38).

同様にして、ガイドレールを順次接続しながらつり一上
げ、レールつり手(29Al F29Blが機械室の床
(33)の下面から500開程度の位置に来たら、案内
体(37A) [37B)をレール固定穴(36A1 
F36B)に挿通ずる。そして、レールつり手(29A
+ (29B)の締結具(31A) (31B)を案内
体[37Al F37B+に挿入して案内して、レール
つり手f29A) F29B+が機械室の床(33)の
下面に衝突しないようにする。次に、案内体+37A)
 (3781を外し、順次接続されて1本化されたガイ
ドレールを、レール固定穴(36A) (3681に渡
された支持板(図示しない)に、締結具f31A) (
31Blにより支持する。
In the same way, connect the guide rails one by one and raise the hoist until the rail hoist (29Al F29Bl) is at a position of about 500 mm from the bottom of the machine room floor (33), then remove the guide body (37A) [37B]. Rail fixing hole (36A1
F36B). And the rail handle (29A
+ Insert the fasteners (31A) (31B) of (29B) into the guide body [37Al F37B+ and guide them to prevent the rail handle f29A) F29B+ from colliding with the lower surface of the floor (33) of the machine room. Next, guide +37A)
(Remove 3781 and connect the sequentially connected guide rail into one through the rail fixing hole (36A) (fastener f31A) to the support plate (not shown) passed to 3681) (
Supported by 31Bl.

次に、昇降路下部から、心出し用ピアノ線f12Al 
F12B+を基準にして、レール6出し治具(13)で
ガイドレールを心出しして、昇降路に固定されたレール
ブラケット(図示しない)に締結後、ナツト(26)を
緩めてレールつり金具f21A) F21B)からつり
枠(23)を外し、ボルト(22)を緩めてガイドレ−
ル(IA) (IB)からレールつり金具(21AI 
T21)1)を外す。このとき、つり枠(23)は1本
だけであるから、ナツト(26)およびボルト(22)
を緩める作業は容易である。なお、ボルト(22)を緩
めると同時に、ボルト(30)も緩め、締結具[31A
) f31B)を外して、レールつり手(29Al f
zqB+も撤去される。
Next, from the bottom of the hoistway, use the centering piano wire f12Al.
Using F12B+ as a reference, center the guide rail using the rail 6 extension jig (13) and fasten it to the rail bracket (not shown) fixed to the hoistway, then loosen the nut (26) and attach the rail hanging bracket f21A. ) Remove the suspension frame (23) from F21B), loosen the bolt (22), and remove the guide rail.
(IA) (IB) to rail hanging bracket (21AI)
T21) Remove 1). At this time, since there is only one suspension frame (23), the nut (26) and bolt (22)
Loosening is easy. Note that at the same time as loosening the bolt (22), the bolt (30) is also loosened, and the fastener [31A
) f31B) and remove the rail hanging hand (29Al f
zzB+ will also be removed.

なお、実施例では、レールつり手f29A) (298
)はレールつり金具fzlA) (21B+に締結する
ものとしたが、両者を一体に形成してもよい。
In addition, in the example, the rail hanging hand f29A) (298
) is the rail suspension fitting fzlA) (21B+), but the two may be formed integrally.

[発明の効果] 以上説明したとおりこの発明では、溝状に形成されたレ
ールつり金具の一側辺なつり枠の両側に結合し、ガイド
レールの上端部をレールつり金具に締結し、つり枠の中
央部につり具を固定し、これをつり上げ用のローブに結
合し、レールつり金具に機械室床に支持されるレールつ
り手を締結したので、つり枠は1本で済み、形状がm純
化され、据付現地での組立ておよび解体時間を短縮でき
ると共に、つり枠は心出し用ピアノ線と干渉せずレール
6出し治具による心出し作業ができる効果がある。また
、ガイドレールは機械台と関係なく支持され、エレベー
タ−の据付は手順の制限をなくすことができる効果があ
る。
[Effects of the Invention] As explained above, in this invention, one side of the rail suspension metal fitting formed in a groove shape is connected to both sides of the suspension frame, the upper end of the guide rail is fastened to the rail suspension metal fitting, and the suspension frame is The lifting device was fixed to the center of the machine, connected to the lifting lobe, and the rail lifting hand supported on the machine room floor was fastened to the rail lifting fitting, so only one lifting frame was required, and the shape was simplified. As a result, the assembly and disassembly time at the installation site can be shortened, and the suspension frame does not interfere with the centering piano wire, making it possible to perform centering work using the rail 6 ejecting jig. Further, the guide rail is supported independently of the machine platform, and there is an effect that there are no restrictions on the procedure for installing the elevator.

また、この発明の別の発明では1機械室床のレール固定
穴にレールつり手が通過する筒状の案内体を挿通したの
で、レールつり手は機械室床下面に衝突することなく、
機械室に導入され、ガイドレールの機械室への支持を容
易にできる効果がある。
In addition, in another invention of the present invention, a cylindrical guide body through which the rail lifting hand passes is inserted into the rail fixing hole in the floor of the machine room 1, so that the rail lifting hand does not collide with the lower surface of the machine room floor.
It is introduced into the machine room and has the effect of making it easier to support the guide rail in the machine room.

【図面の簡単な説明】[Brief explanation of drawings]

第1図はこの発明によるエレベータ−用ガイドレールの
つり上げ装置の一実施例を示す斜視図、第2図は第1図
の最上部のガイドレールの拡大斜視図、第3図は同じく
レールつり金具の拡大斜視図、第4図は同じくつり具の
拡大斜視図、第5図は従来のエレベータ−用ガイドレー
ルのつり上げ装置を示す斜視図、第6図はレール6出し
作業の説明用平面図である。 図中、(1([)は最上部のガイドレール、(2八)(
2B)は中間部のガイドレール、(1)1はウィンチロ
ーブ、[21Al +21Blはレールつり金具、(2
3)はつり枠、(27)はつり具、(29Al (29
B+はレールつり手、(31A) f:llB+は締結
具、(33)は機械室の床、+36A)+368+はレ
ール固定穴、+37A) (コ!7B)は案内体である
。 なお図中同一符号は同−又は相当部分を示す。 第 図 第 /l乙 第 図
Fig. 1 is a perspective view showing an embodiment of the elevator guide rail lifting device according to the present invention, Fig. 2 is an enlarged perspective view of the topmost guide rail in Fig. 1, and Fig. 3 is the same rail hanging metal fitting. FIG. 4 is an enlarged perspective view of the lifting tool, FIG. 5 is a perspective view showing a conventional elevator guide rail lifting device, and FIG. 6 is a plan view for explaining the work of taking out the rail 6. . In the figure, (1 ([) is the top guide rail, (28) (
2B) is the intermediate guide rail, (1) 1 is the winch lobe, [21Al +21Bl is the rail hanging bracket, (2)
3) Hanging frame, (27) Hanging tool, (29Al (29
B+ is the rail handle, (31A) f:llB+ is the fastener, (33) is the floor of the machine room, +36A) +368+ is the rail fixing hole, +37A) (ko!7B) is the guide body. Note that the same reference numerals in the figures indicate the same or equivalent parts. Diagram No./l Diagram Otsu

Claims (2)

【特許請求の範囲】[Claims] (1)機械室の床にレール固定穴を設け、昇降路内に並
立するガイドレールと、底辺と両側辺とで溝状に形成さ
れ上記溝の内側を互いに対向して配置され上記底辺が上
記ガイドレールのそれぞれの上端部に締結されたレール
つり金具と、このレールつり金具の一側辺を相互に結合
するつり枠と、このつり枠の中央部に固定され上記レー
ルつり金具の他側辺側に突出する山形に形成されたつり
具と、このつり具の上記山形部に結合されたつり上げ用
のロープと、上記レールつり金具の底辺に固定され上方
に突出する締結具を有し、この締結具が上記機械室の床
のレール固定穴を通して上記機械室の床に支持されるレ
ールつり手とを備えてなるエレベーター用ガイドレール
のつり上げ装置。
(1) A rail fixing hole is provided in the floor of the machine room, and a guide rail is installed in parallel in the hoistway, and the bottom side and both sides are formed into a groove shape, and the insides of the grooves are arranged opposite to each other, and the bottom side is above the A rail hanging bracket fastened to the upper end of each guide rail, a suspension frame that connects one side of the rail hanging bracket to each other, and the other side of the rail hanging bracket fixed to the center of the suspension frame. A hanging tool formed in a chevron shape projecting to the side, a lifting rope connected to the chevron-shaped part of the hanging tool, and a fastening tool fixed to the bottom of the rail hanging metal fitting and projecting upward, the fastening tool and a rail lifting hand supported on the floor of the machine room through a rail fixing hole in the floor of the machine room.
(2)機械室の床のレール固定穴に、レールつり手の締
結具が通過する筒状の案内体を挿通した特許請求の範囲
第1項記載のエレベーター用ガイドレールのつり上げ装
置。
(2) The elevator guide rail lifting device according to claim 1, wherein a cylindrical guide through which a rail lifting hand fastener passes is inserted into the rail fixing hole in the floor of the machine room.
JP2177596A 1990-07-06 1990-07-06 Lifting device for guide rails for elevators Expired - Lifetime JP2526720B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2177596A JP2526720B2 (en) 1990-07-06 1990-07-06 Lifting device for guide rails for elevators

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2177596A JP2526720B2 (en) 1990-07-06 1990-07-06 Lifting device for guide rails for elevators

Publications (2)

Publication Number Publication Date
JPH0466485A true JPH0466485A (en) 1992-03-02
JP2526720B2 JP2526720B2 (en) 1996-08-21

Family

ID=16033763

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2177596A Expired - Lifetime JP2526720B2 (en) 1990-07-06 1990-07-06 Lifting device for guide rails for elevators

Country Status (1)

Country Link
JP (1) JP2526720B2 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5553686A (en) * 1994-12-13 1996-09-10 Otis Elevator Company Installation of elevator rails in a hoistway
KR100398787B1 (en) * 2001-05-02 2003-09-19 윤종경 a flange coupling tube
US7444732B2 (en) 2005-04-27 2008-11-04 Inventio Ag Method for installation of guide rails in an elevator shaft
CN102126661A (en) * 2009-12-17 2011-07-20 东芝电梯株式会社 Inner component setting structure of lifting path and inner component setting method of lifting path
CN102502378A (en) * 2011-11-15 2012-06-20 中建三局建设工程股份有限公司 Climbing elevator for building construction
JP2016141531A (en) * 2015-02-02 2016-08-08 三菱電機ビルテクノサービス株式会社 Elevator device
JP2023055288A (en) * 2021-10-06 2023-04-18 フジテック株式会社 Jig and method for installing elevator guide rail

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5553686A (en) * 1994-12-13 1996-09-10 Otis Elevator Company Installation of elevator rails in a hoistway
KR100398787B1 (en) * 2001-05-02 2003-09-19 윤종경 a flange coupling tube
US7444732B2 (en) 2005-04-27 2008-11-04 Inventio Ag Method for installation of guide rails in an elevator shaft
CN102126661A (en) * 2009-12-17 2011-07-20 东芝电梯株式会社 Inner component setting structure of lifting path and inner component setting method of lifting path
CN102502378A (en) * 2011-11-15 2012-06-20 中建三局建设工程股份有限公司 Climbing elevator for building construction
JP2016141531A (en) * 2015-02-02 2016-08-08 三菱電機ビルテクノサービス株式会社 Elevator device
JP2023055288A (en) * 2021-10-06 2023-04-18 フジテック株式会社 Jig and method for installing elevator guide rail

Also Published As

Publication number Publication date
JP2526720B2 (en) 1996-08-21

Similar Documents

Publication Publication Date Title
JPH0466485A (en) Device for suspending guide rail for elevator
JPH0220354Y2 (en)
JP4260502B2 (en) Elevator hoist replacement jig
JP7156530B2 (en) Elevator safety device replacement method and elevator safety device replacement device
JPH0829913B2 (en) Lightweight cellular concrete panel lifting jig
JPH0734069Y2 (en) Lifting device for car or counterweight in elevator
JPH05229766A (en) Elevating body fixing device for elevator
JP3059899B2 (en) Elevator lifting equipment
JP2748812B2 (en) Guide rail lifting device for elevators
JP2513802B2 (en) Auxiliary device for lifting elevator guide rails
JP2002128415A (en) Method and device for hoisting driving machine to height position in the vicinity of ceiling face in elevator shaft
JP2002060158A (en) Installation method for elevator
JPH10250976A (en) Transportation device for plate type material
JPH056307Y2 (en)
JP4528550B2 (en) Elevator lifting equipment
JP2946068B2 (en) Architectural panel flat hanging equipment
JPH0388685A (en) Method for vertically providing guide rail of elevator
JP3004731U (en) Multi-point hanging jig
JP2005067813A (en) Lifting device and lifting method for winch of elevator
JPH09278332A (en) Lifting jig for elevator doorway device
JPH0597379A (en) Module mounting method and device therefor
JPH04140290A (en) Installation of elevator
JP4343525B2 (en) Elevator hoistway unit
JPH10250964A (en) Frame installation method for passenger conveyor
JPH04260585A (en) Hoist device for elevator guide rail