JPH04166509A - Prevention of degradation of trench wall in artificial island - Google Patents

Prevention of degradation of trench wall in artificial island

Info

Publication number
JPH04166509A
JPH04166509A JP28830490A JP28830490A JPH04166509A JP H04166509 A JPH04166509 A JP H04166509A JP 28830490 A JP28830490 A JP 28830490A JP 28830490 A JP28830490 A JP 28830490A JP H04166509 A JPH04166509 A JP H04166509A
Authority
JP
Japan
Prior art keywords
trench
wall
constructed
excavated
panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP28830490A
Other languages
Japanese (ja)
Other versions
JP2808182B2 (en
Inventor
Mikio Nabeno
鍋野 幹夫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP28830490A priority Critical patent/JP2808182B2/en
Publication of JPH04166509A publication Critical patent/JPH04166509A/en
Application granted granted Critical
Publication of JP2808182B2 publication Critical patent/JP2808182B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

PURPOSE:To prevent the degradation of trench wall by a method in which a blind-like sheathing panel is set on the back side of trench wall to be excavated ahead of filling work and buried to construct an artificial island, and a trench is excavated while supporting the soil pressure of the back side of trench wall by the sheathing panel. CONSTITUTION:A revetment 2 whose lower part is put into the bottom 1 under water and the upper part is projected from the surface of water is constructed on the peripheral edge of an artificial island to be constructed. Guide piles 3 are driven at a given interval into one or both sides of an underground wall to be constructed on the inside of the revetment 2 temporarily closed. The sheathing panel 5 is set between the piles 3, the inside of the revetment 2 is embedded to bury the piles 3 and the panel 5 to construct the island A. A guide wall 6 is constructed connectedly to the upper part of the panel 5 and a trench 7 for underground wall is excavated along the wall 6. In this case, the trench 7 is excavated to a given depth while filling it with a stabilization liquid 8, and a reinforcing bar cage is set in the trench 7. Concrete is then placed to construct the underground wall. The degradation of the trench wall can thus be effectively prevented at low cost by eliminating the need for improving the surrounding ground.

Description

【発明の詳細な説明】 〈産業上の利用分野〉 本発明は人工島に地中壁を構築する技術に関し、詳細に
は溝壁の崩落を防止する方法に関する。
DETAILED DESCRIPTION OF THE INVENTION <Industrial Application Field> The present invention relates to a technique for constructing an underground wall on an artificial island, and specifically relates to a method for preventing collapse of a trench wall.

〈従来の技術〉 埋め立てして構築した人工島に地中壁を構築する場合、
人工島の地盤が不安定なために溝壁の崩落(土塊状崩壊
、肌落ち)が問題となる。
<Conventional technology> When constructing an underground wall on an artificial island constructed by reclaiming land,
Because the ground on artificial islands is unstable, collapse of ditch walls (clump-like collapse, skin falling) is a problem.

そこで、人工島に地中壁を構築する場合は、溝内に高比
重の安定液を満たすことで溝壁の安定を図っている。
Therefore, when constructing underground walls on artificial islands, the trench walls are stabilized by filling the trench with a stabilizing liquid with high specific gravity.

さらに掘削地盤が軟弱であったり、近接構造物への影響
が予想される場合には、地中壁の構築予定地盤の周辺を
地盤改良して強化したり、開削予定の溝壁の背面側に固
化壁や柱列壁を構築する補助工法を採用している。
Furthermore, if the excavated ground is soft or there is a possibility of impact on nearby structures, the area around the ground where the underground wall is planned to be constructed may be improved and strengthened, or the back side of the trench wall to be excavated may be An auxiliary construction method is used to construct solidified walls and columnar walls.

〈本発明が解決しようとする問題点〉 前記した従来の溝壁の崩落防止技術にはつぎのような問
題点がある。
<Problems to be Solved by the Invention> The conventional techniques for preventing the collapse of groove walls described above have the following problems.

〈イ〉 安定液で溝壁の安定を図る方法にあっては、掘
削地盤や水質に応じた安定液の配合管理や安定液の液位
管理が難しい。
<B> In the method of stabilizing trench walls with a stabilizing liquid, it is difficult to control the composition of the stabilizing liquid and the level of the stabilizing liquid depending on the excavated ground and water quality.

〈口〉 補助工法を用いる方法にあっては、工期が長期
化すると共に施工費が増大する問題がある。
<Talking> Methods that use auxiliary construction methods have the problem of prolonging the construction period and increasing construction costs.

〈ハ〉 溝壁の崩落を防止する方法として、人工島をプ
レミックスなどの硬化材で中詰めして構築しておく方法
が考えられる。
<C> As a method of preventing the collapse of the trench wall, it is possible to construct an artificial island by filling it with a hardening material such as premix.

しかし、掘削時における安定液の比重変化や液圧変化が
複合的に生じて、硬化材にクラックを発生し易い。
However, during excavation, changes in the specific gravity of the stabilizing fluid and changes in fluid pressure occur in combination, which tends to cause cracks in the hardened material.

このクラックが進行すると、土塊滑りなどにより溝壁が
崩壊する危険がある。
If this crack progresses, there is a risk that the trench wall will collapse due to soil clod sliding.

〈本発明の目的〉 本発明は以上の問題点を解決するために成されたもので
、その目的とするところは簡易な方法で以て溝壁の崩壊
を防止できる、人工島における溝壁崩落防止方法を提供
することにある。
<Object of the present invention> The present invention was made to solve the above-mentioned problems, and its purpose is to prevent the collapse of the groove wall on an artificial island by a simple method. The purpose is to provide a method of prevention.

〈問題点を解決するための手段〉 すなわち本発明は護岸の内側に中詰めして構築する人工
島において、中詰めに先行して開削予定の溝壁の背面側
に層状の土留パネルを設置し、土留パネルを埋設して人
工島を構築し、その後、土留パネルで溝壁背面の土圧を
支持しながら土留パネルに接近して溝を掘削することを
特徴とする、人工島における溝壁崩落防止方法である。
<Means for solving the problem> In other words, the present invention, in an artificial island constructed by filling the inside of a seawall, installs a layered earth retaining panel on the back side of the trench wall to be excavated prior to filling. , a ditch wall collapse on an artificial island characterized by constructing an artificial island by burying an earth retaining panel, and then excavating a trench close to the earth retaining panel while supporting the earth pressure on the back of the ditch wall with the earth retaining panel. This is a prevention method.

〈本発明の説明〉 以下、図面を参照しながら本発明について説明する。<Description of the present invention> The present invention will be described below with reference to the drawings.

〈イ〉護岸工事(第1図) 構築予定の人工島の周縁に下部を水底1に根入れし、上
部が水上から突出した護岸2を構築する。
<B> Seawall construction (Fig. 1) A seawall 2 will be constructed around the periphery of the artificial island to be constructed, with the lower part embedded in the water bed 1 and the upper part protruding above the water.

護岸2は鋼製、コンクリート製の何れでもよく、またそ
の施工法は公知の工法による。
The seawall 2 may be made of steel or concrete, and its construction method is a known method.

〈口〉ガイド杭の打設(第1図) 仮締切した護岸2の内側で、構築予定の地中壁の両側ま
たは片側に所定の間隔でガイド杭3を打設する。
<Entrance> Driving guide piles (Figure 1) Inside the temporarily closed seawall 2, guide piles 3 are driven at predetermined intervals on both sides or one side of the underground wall to be constructed.

〈ハ〉土留パネルの設置(第1〜3図)つぎに隣り合う
ガイド杭3.3間に土留パネル5を設置する。
<C> Installation of earth retaining panels (Figs. 1 to 3) Next, earth retaining panels 5 are installed between adjacent guide piles 3.3.

第2図に土留パネル5の一例を示す。FIG. 2 shows an example of the retaining panel 5.

土留パネル5は平行に配置した横筋51間に、可撓性を
有するタイローブなどの複数の縦ロープ52を交差させ
て格子状に形成した部材で、各縦ロープ52の上下端が
H鋼などの水平梁53.54に接続している。
The retaining panel 5 is a member formed in a lattice shape by intersecting a plurality of vertical ropes 52 such as flexible tie lobes between horizontal strips 51 arranged in parallel, and the upper and lower ends of each vertical rope 52 are made of H steel or the like. It is connected to horizontal beams 53 and 54.

土留パネル5をガイド杭3に設置するには、上位の水平
梁53をガイド杭3の上部突起に係止して吊り下げ、各
水平梁53.54をはじめ横筋51をガイド杭3に固定
する。
To install the retaining panel 5 on the guide pile 3, the upper horizontal beam 53 is hooked to the upper projection of the guide pile 3 and suspended, and each horizontal beam 53, 54 and the horizontal reinforcement 51 are fixed to the guide pile 3. .

また第3図に示すように各土留パネル5をガイド杭3.
3間に設置する際、水平方向にのびる各横筋51の端部
をラップさせておくとよい。
In addition, as shown in FIG. 3, each earth retaining panel 5 is connected to a guide pile 3.
When installing between the horizontal strips 51, it is preferable to wrap the ends of each horizontal strip 51 extending in the horizontal direction.

〈二〉中詰(第4図) 開削予定の溝壁の背面側に土留パネル5を配置したら、
護岸2の内側に中詰して人工島Aを構築する。
<2> Filling (Fig. 4) After placing the retaining panel 5 on the back side of the trench wall to be excavated,
Build artificial island A by filling it inside seawall 2.

これによりガイド杭3および土留パネル5は埋設される
As a result, the guide pile 3 and earth retaining panel 5 are buried.

中詰材としては例えばプレミックスなどの硬化材4を用
い、土留パネル5の上部に一般土砂41を用いる。
For example, a hardening material 4 such as a premix is used as the filling material, and general earth and sand 41 is used for the upper part of the earth retaining panel 5.

また、一般土砂のみで人工島Aを中詰めする場合もある
There are also cases where the artificial island A is filled with only general earth and sand.

尚、図中6は土留パネル5の上部に連続して構築したガ
イド壁である。
In addition, 6 in the figure is a guide wall constructed continuously on the upper part of the earth retaining panel 5.

〈ホ〉地中壁用溝の掘削(第5図) 人工島Aが完成したら、ガイド壁6に沿って地中壁用の
溝7を掘削する。
<E> Excavation of trench for underground wall (Fig. 5) When artificial island A is completed, trench 7 for underground wall is excavated along guide wall 6.

この際、安定液8を満たしながら所定の深度の溝7を掘
削する。
At this time, the groove 7 of a predetermined depth is excavated while being filled with the stabilizing liquid 8.

安定液8が溝壁に加圧して溝壁の崩壊を抑制する。The stabilizing liquid 8 pressurizes the groove walls to suppress collapse of the groove walls.

これと同時に、土留パネル5が背面の硬化材4または一
般土砂の土庄を支持して溝壁の崩壊を効果的に抑止する
At the same time, the earth retaining panel 5 supports the hardening material 4 or the general earth and sand on the back side, and effectively prevents the trench wall from collapsing.

このように層状の土留パネル5と安定液8とにより、土
塊滑りによる溝7の崩壊を効果的に防止できる。
In this way, the layered earth retaining panel 5 and the stabilizing liquid 8 can effectively prevent the groove 7 from collapsing due to the sliding of the clod.

〈へ〉地中壁の構築(第6図) 溝7の掘削を完了したら、溝7内に鉄筋篭を建て込み、
コンクリートを打設して地中壁Bを構築する。
<<>> Construction of underground wall (Fig. 6) After completing the excavation of trench 7, erect a reinforcing bar cage in trench 7,
Construct underground wall B by pouring concrete.

〈本発明の効果〉 本発明は以上説明したようになるから次の効果が得られ
る。
<Effects of the Present Invention> Since the present invention is as described above, the following effects can be obtained.

〈イ〉 溝の掘削に先行して溝壁の背面側に設置した層
状の土留パネルにより、溝壁の崩壊を効果的に抑止でき
る。
<B> The layered earth retaining panel installed on the back side of the trench wall prior to trench excavation can effectively prevent the trench wall from collapsing.

そのため、安定液の配合や液位を厳しく管理しないで済
む。
Therefore, there is no need to strictly control the composition and liquid level of the stabilizing liquid.

〈口〉 従来のような周辺地盤を補助工法により地盤改
良することが不要となり、工費の低減が図れる。
<Exposure> It is no longer necessary to improve the surrounding ground using auxiliary construction methods as in the past, and construction costs can be reduced.

〈ハ〉 土留パネルが層状であるため、設置時の取り扱
いが容易である。
<C> Because the earth retaining panels are layered, they are easy to handle during installation.

〈二〉 土留パネルの上下の水平梁が鉛直方向の引張抵
抗材として機能するため、大きな土圧の抑止効果を期待
できる。
(2) Since the horizontal beams above and below the earth retaining panel function as vertical tensile resistance materials, a large earth pressure suppression effect can be expected.

〈ホ〉 横筋をラップさせることで、土留パネルに水平
方向の連続性を付与できる。
<E> By wrapping the horizontal stripes, horizontal continuity can be given to the earth retaining panel.

〈へ〉 近接構造物が存在する場合や、軟弱地盤であっ
ても施工することができる。
〈〈〉 It can be constructed even if there are nearby structures or on soft ground.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図:土留パネルを設置するまでの施工法の説明図 第2図:土留パネルの斜視図 第3図:第1図の■−■の断面図 第4図:人工島の中詰時の説明図 第5図:溝掘削時の説明図 第6図:地中壁完成時の説明図 第1図 ■− 第2図 第4図 第5図 Figure 1: Explanatory diagram of the construction method up to the installation of earth retaining panels Figure 2: Perspective view of earth retaining panel Figure 3: Cross-sectional view of ■-■ in Figure 1 Figure 4: Explanatory diagram when filling the artificial island Figure 5: Explanatory diagram for trench excavation Figure 6: Explanatory diagram of completed underground wall Figure 1 ■− Figure 2 Figure 4 Figure 5

Claims (1)

【特許請求の範囲】[Claims] (1)護岸の内側に中詰めして構築する人工島において
、 中詰めに先行して開削予定の溝壁の背面側に土留パネル
を設置し、 土留パネルを埋設して人工島を構築し、 その後、土留パネルで溝壁背面の土圧を支持しながら土
留パネルに接近して溝を掘削することを特徴とする、 人工島における溝壁崩落防止方法。
(1) For artificial islands constructed by filling the inside of the seawall, an earth retaining panel is installed on the back side of the trench wall to be excavated prior to filling, and the earth retaining panel is buried to construct the artificial island. A method for preventing the collapse of a trench wall on an artificial island, characterized by the step of excavating a trench close to the earth retaining panel while supporting the earth pressure on the back side of the trench wall with the earth retaining panel.
JP28830490A 1990-10-29 1990-10-29 Method of preventing groove wall collapse on artificial island Expired - Lifetime JP2808182B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP28830490A JP2808182B2 (en) 1990-10-29 1990-10-29 Method of preventing groove wall collapse on artificial island

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28830490A JP2808182B2 (en) 1990-10-29 1990-10-29 Method of preventing groove wall collapse on artificial island

Publications (2)

Publication Number Publication Date
JPH04166509A true JPH04166509A (en) 1992-06-12
JP2808182B2 JP2808182B2 (en) 1998-10-08

Family

ID=17728439

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28830490A Expired - Lifetime JP2808182B2 (en) 1990-10-29 1990-10-29 Method of preventing groove wall collapse on artificial island

Country Status (1)

Country Link
JP (1) JP2808182B2 (en)

Also Published As

Publication number Publication date
JP2808182B2 (en) 1998-10-08

Similar Documents

Publication Publication Date Title
KR102153902B1 (en) Slurry wall, construction method for the same and wire mesh assembly
JP2000008394A (en) Construction method for underground structure such as underground pit for installation of parking lot
KR100289256B1 (en) Tunnel construction method in shallow toffee area
JPH0768705B2 (en) Soil retaining method and its retaining pile
US6220789B1 (en) Integrated excavation shoring building foundation method
JP2000144769A (en) Method of landslide protection work for preparing housing lot
JPH04166509A (en) Prevention of degradation of trench wall in artificial island
JP2927727B2 (en) Construction method of underground structure
CN205557573U (en) Underground structure
JPH04115024A (en) Sheathing method
JP2874906B2 (en) Shaft construction method
KR102371284B1 (en) Slurry wall, construction method for the same and wire mesh assembly
JP6999483B2 (en) Guide wall and how to build a guide wall
JPS6018769B2 (en) Construction method of underground structure
JPS5851092B2 (en) Earth retaining installation method using advance shoring frame
JP7356889B2 (en) Construction method of structure
JP3027685B2 (en) Earth retaining wall and construction method
JPH07300845A (en) Preventive method against liquefaction of underground linear structure
JPS5921831A (en) Reverse placement work
KR20010048073A (en) The construction method of a concrete retaining wall
JPH10121465A (en) Continuos underground wall engineering method
JP2933546B2 (en) Basement construction method and lower frame material used in the construction method
JPS63142115A (en) Prevention work for liquefaction of ground
JP2524579B2 (en) Reinforcement method of existing retaining wall under water surface
JP2021092109A (en) Construction method for concrete skeleton and underground structure