JPH0379490B2 - - Google Patents
Info
- Publication number
- JPH0379490B2 JPH0379490B2 JP20964684A JP20964684A JPH0379490B2 JP H0379490 B2 JPH0379490 B2 JP H0379490B2 JP 20964684 A JP20964684 A JP 20964684A JP 20964684 A JP20964684 A JP 20964684A JP H0379490 B2 JPH0379490 B2 JP H0379490B2
- Authority
- JP
- Japan
- Prior art keywords
- formwork
- footing
- column
- support frame
- steel column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000009415 formwork Methods 0.000 claims description 23
- 229910000831 Steel Inorganic materials 0.000 claims description 18
- 239000010959 steel Substances 0.000 claims description 18
- 238000000034 method Methods 0.000 claims description 4
- 238000010276 construction Methods 0.000 description 4
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 4
- 230000003014 reinforcing effect Effects 0.000 description 3
- 239000004570 mortar (masonry) Substances 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Landscapes
- Foundations (AREA)
- Joining Of Building Structures In Genera (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
【発明の詳細な説明】
(産業上の利用分野)
本発明は建築物における鉄骨柱脚の根巻方法に
係るものである。DETAILED DESCRIPTION OF THE INVENTION (Industrial Field of Application) The present invention relates to a method for wrapping the legs of a steel column in a building.
(従来の技術)
従来の鉄骨柱脚の根巻施工に当つては、地盤面
より可成り下つた位置で、フーチング打設前にア
ンカボルトを所定位置にセツトし、鉄骨柱を建入
れ、次いで柱フープを巻付け、型枠をセツトし、
コンクリートを打設したのち型枠を取外して埋戻
しを行つている。(Conventional technology) In conventional root wrapping construction for steel column legs, anchor bolts are set in the predetermined positions at a location considerably below the ground level before the footing is placed, the steel column is erected, and then Wrap the pillar hoop, set the formwork,
After pouring concrete, the formwork is removed and backfilling is performed.
(発明が解決しようとする問題点)
従つて前記従来の方法では工数が繁雑であり、
鉄骨の建方が終了するまで柱周辺の埋戻しができ
ず、足場が悪く、施工性に問題があつた。またア
ンカボルトは地盤面より可成り下つた位置にある
ので、アンカボルトの芯出しが困難で、精度が出
し難い。(Problems to be solved by the invention) Therefore, the conventional method requires a lot of man-hours;
The area around the pillars could not be backfilled until the steel frame was erected, resulting in poor scaffolding and construction problems. Furthermore, since the anchor bolt is located considerably below the ground surface, it is difficult to center the anchor bolt, making it difficult to achieve accuracy.
(問題点を解決するための手段)
本発明はこのような問題点を解決するために提
案されたものであつて、基礎フーチングを施工し
たのち、同フーチング上の所定位置に柱脚支持枠
兼型枠をセツトしてフーチングを埋戻し、次いで
前記支持枠兼型枠内の所定位置に鉄骨柱を建入れ
たのち、同型枠内に柱脚コンクリートを打設する
ことを特徴とする鉄骨柱脚の根巻方法に係るもの
である。(Means for Solving the Problems) The present invention was proposed to solve these problems, and after constructing a foundation footing, a column base support frame is installed at a predetermined position on the footing. A steel column pedestal characterized in that a formwork is set and the footing is backfilled, a steel column is erected at a predetermined position within the supporting frame and formwork, and then column pedestal concrete is poured into the same formwork. This relates to the neck wrapping method.
(作用)及び(発明の効果)
本発明においては前記したように柱脚支持枠兼
型枠を使用し、同型枠を基礎フーチング上の所定
位置にセツトし、同型枠内の所定位置に鉄骨柱を
建入れたのち根巻コンクリートを打設するように
したので、鉄骨柱の建方前に柱型枠のセツト、及
び柱廻りの埋戻しが行われ、柱周辺での足場が良
好となり、作業が自由に行われ、また作業工数が
大幅に縮減される。(Function) and (Effects of the Invention) In the present invention, as described above, a column base supporting frame and formwork is used, the formwork is set at a predetermined position on the foundation footing, and a steel column is placed at a predetermined position within the formwork. After the construction of the steel columns, the concrete was poured, so the column formwork was set and the area around the columns was backfilled before the steel columns were erected. This provided good footing around the columns, allowing for easy work. can be carried out freely, and the number of man-hours required is greatly reduced.
また前記柱脚支持枠兼型枠の採用によつてアン
カボルトは不要になり、柱の芯出しはほぼ地盤面
に当る前記柱脚支持枠兼型枠の上面で行われるの
で、精度が出し易くなる。 In addition, by adopting the column base support frame and formwork, anchor bolts are no longer necessary, and the centering of the column is performed on the top surface of the column base support frame and formwork, which is almost on the ground surface, making it easier to achieve accuracy. Become.
(実施例) 以下本発明を図示の実施例について説明する。(Example) The present invention will be described below with reference to the illustrated embodiments.
1は角筒状の柱脚支持枠兼型枠で、フーチング
2を施工したのち、同フーチング2上に墨出しを
行い、前記支持枠兼型枠用のアンカボルト3をセ
ツトするとともにフーチング2上における柱脚ベ
ース下に敷モルタル4を施工し、前記アンカボル
ト3を介してフーチング2上に柱脚支持枠兼型枠
1をセツトしたのち、フーチング2の埋戻しを行
う。 Reference numeral 1 denotes a rectangular cylindrical pillar support frame and formwork. After constructing the footing 2, marking is done on the footing 2, and anchor bolts 3 for the support frame and formwork are set and the footing 2 is placed on top of the footing 2. A mortar 4 is placed under the column pedestal base, and the column pedestal support frame and formwork 1 is set on the footing 2 via the anchor bolts 3, and then the footing 2 is backfilled.
図中5はフーチング2の埋戻し土、6は基礎杭
の杭頭部である。 In the figure, 5 is the backfill soil of the footing 2, and 6 is the pile head of the foundation pile.
次いで前記型枠1内における敷モルタル4上に
鉄骨柱7を建入れ、同鉄骨柱7側のガゼツトプレ
ート8を、前記型枠1の上端フランジの溝孔に挿
入された仮締ボルト9によつて仮締する。この
際、前記ガゼツトプレート8と前記型枠1の上端
フランジとの間に高低調節ライナを介装する。 Next, the steel column 7 is erected on the mortar 4 in the formwork 1, and the gazette plate 8 on the side of the steel column 7 is inserted into the temporary tightening bolt 9 inserted into the slot in the upper end flange of the formwork 1. Twist and temporarily tighten. At this time, a height adjusting liner is interposed between the gusset plate 8 and the upper end flange of the formwork 1.
かくして鉄骨柱7の建入れ調整が完了したの
ち、前記ボルト9の本締めを行い、前記型枠1内
に柱脚コンクリート10を打設して鉄骨柱の根巻
施工を完了する。 After the erection adjustment of the steel column 7 is thus completed, the bolts 9 are finally tightened, and the column base concrete 10 is poured into the formwork 1 to complete the root wrapping construction of the steel column.
図中11は鉄骨柱7のコツタ、12はフーチン
グ2に埋設され、前記型枠1内に延びる碇着用鉄
筋、13は同鉄筋12を囲繞するフープ筋であ
る。 In the figure, reference numeral 11 indicates a kotsuta of the steel frame column 7, reference numeral 12 indicates a reinforcing bar for anchoring that is buried in the footing 2 and extends within the formwork 1, and reference numeral 13 indicates a hoop reinforcing bar surrounding the reinforcing bar 12.
以上本発明を実施例について説明したが、本発
明は勿論このような実施例にだけ局限されるもの
ではなく、本発明の精神を逸脱しない範囲内で
種々の設計の改変を施しうるものである。 Although the present invention has been described above with reference to embodiments, the present invention is, of course, not limited to such embodiments, and can be modified in various ways without departing from the spirit of the present invention. .
第1図は本発明に係る鉄骨柱脚の根巻方法の一
実施例の実施状況を示す縦断面図、第2図は第1
図の平面図、第3図はその要部斜面図である。
1…柱脚支持枠兼型枠、2…フーチング、7…
鉄骨柱、10…柱脚コンクリート。
FIG. 1 is a longitudinal cross-sectional view showing an embodiment of the method for wrapping the roots of a steel column leg according to the present invention, and FIG.
The plan view shown in the figure, and FIG. 3 is a perspective view of the main part thereof. 1... Column base support frame and formwork, 2... Footing, 7...
Steel column, 10...Column base concrete.
Claims (1)
グ上の所定位置に柱脚支持枠兼型枠をセツトして
フーチングを埋戻し、次いで前記支持枠兼型枠内
の所定位置に鉄骨柱を建入れたのち、同型枠内に
柱脚コンクリートを打設することを特徴とする鉄
骨柱脚の根巻方法。1 After constructing the foundation footing, set the column base support frame/formwork at a predetermined position on the footing, backfill the footing, then erect the steel column at the predetermined position within the support frame/formwork. , a method for wrapping steel column bases, which is characterized by placing column base concrete within the same formwork.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP20964684A JPS6192265A (en) | 1984-10-08 | 1984-10-08 | Root winding method of iron pillar leg |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP20964684A JPS6192265A (en) | 1984-10-08 | 1984-10-08 | Root winding method of iron pillar leg |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS6192265A JPS6192265A (en) | 1986-05-10 |
JPH0379490B2 true JPH0379490B2 (en) | 1991-12-19 |
Family
ID=16576240
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP20964684A Granted JPS6192265A (en) | 1984-10-08 | 1984-10-08 | Root winding method of iron pillar leg |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS6192265A (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0784763B2 (en) * | 1987-07-02 | 1995-09-13 | 東急建設株式会社 | Squirrel-framed formwork for the steel column support in the building |
JPH04155017A (en) * | 1990-10-18 | 1992-05-28 | Misawa Homes Co Ltd | Execution method for foundation of building |
JP2745243B2 (en) * | 1990-11-21 | 1998-04-28 | 株式会社フジタ | Construction method of subway frame reinforced concrete structure. |
JP4847112B2 (en) * | 2005-11-29 | 2011-12-28 | 株式会社マキタ | Gardening hair clipper |
-
1984
- 1984-10-08 JP JP20964684A patent/JPS6192265A/en active Granted
Also Published As
Publication number | Publication date |
---|---|
JPS6192265A (en) | 1986-05-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105821769B (en) | Large-angle inclined leg pier pouring construction method | |
JPH0412111Y2 (en) | ||
JPH0379490B2 (en) | ||
JPS627344B2 (en) | ||
JP3671344B2 (en) | Joint structure between foundation pile and column base and its construction method | |
JPH02164931A (en) | Foundation construction method for building | |
JP3612600B2 (en) | Unit anchor and structural steel foundation beam | |
JP2813605B2 (en) | Construction foundation and construction method | |
JPH02164934A (en) | Foundation construction method | |
JPS646428A (en) | Method for fixing iron base column | |
JPH02164933A (en) | Architecture foundation construction method | |
JP3700119B2 (en) | Pillar construction method | |
JPH09151463A (en) | Column-integrated column base anchoring foundation structire and work execution method therefor | |
JPH02164930A (en) | Foundation structure for building | |
JP2000160687A (en) | Construction method for composite structure and precast concrete column | |
JPH0219450Y2 (en) | ||
JPS6123065Y2 (en) | ||
JPS6123088Y2 (en) | ||
JPH0536037Y2 (en) | ||
JPH0376929A (en) | Steel-framed foundation | |
JPH0384165A (en) | Execution of setting of anchor bolt and setting apparatus therefor | |
JPH0492021A (en) | Foundation structure of building and construction method thereof | |
JPS6041187B2 (en) | How to fix the column base of pre-assembled column reinforcement | |
JPH0416628A (en) | Base construction method and building construction method and base and anchor bolts for base | |
JPH04128430A (en) | Concrete foundation |