JPH0349211Y2 - - Google Patents
Info
- Publication number
- JPH0349211Y2 JPH0349211Y2 JP1984166079U JP16607984U JPH0349211Y2 JP H0349211 Y2 JPH0349211 Y2 JP H0349211Y2 JP 1984166079 U JP1984166079 U JP 1984166079U JP 16607984 U JP16607984 U JP 16607984U JP H0349211 Y2 JPH0349211 Y2 JP H0349211Y2
- Authority
- JP
- Japan
- Prior art keywords
- base
- roofing
- roof
- piece
- tile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 239000000463 material Substances 0.000 claims description 31
- 239000000758 substrate Substances 0.000 claims description 19
- 239000002023 wood Substances 0.000 claims description 3
- 239000002184 metal Substances 0.000 description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 6
- 238000010276 construction Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000005452 bending Methods 0.000 description 2
- 230000000630 rising effect Effects 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000009751 slip forming Methods 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
Landscapes
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
Description
【考案の詳細な説明】
〔技術分野〕
本考案は瓦を精度よくかつ能率よく段葺可能と
する瓦段葺用下地に関する。[Detailed Description of the Invention] [Technical Field] The present invention relates to a base for tiling roof tiles that enables tiles to be tiered with high accuracy and efficiency.
従来、瓦を段葺状に敷設するには、ふき土を用
いて順次積重ねるか、又は瓦後端の突起を係止す
る引掛け桟を順次野地板を取付けたうえ敷設して
いた。従つて、ふき土を用いるものは、位置合わ
せが困難である他、瓦の固定能力に劣り、又引掛
け桟を用いるものも、引掛け桟の位置合わせ、固
定に手間取るとともに、いづれのものも、瓦等は
野地板にいわば直接敷設するため、瓦間の〓間又
は瓦の割れ等により、雨水は容易に家屋に浸入
し、家屋を汚損するという問題点もある。
Conventionally, in order to lay tiles in a tiered manner, they were stacked one after another using spreading soil, or hook bars that lock the protrusions at the rear ends of the tiles were sequentially attached to roofing boards and then laid. Therefore, those that use covered soil are difficult to align and have poor ability to fix tiles, and those that use hanging bars take time to align and fix the hanging bars, and both methods are difficult to align. Since tiles are laid directly on the roofing board, rainwater can easily enter the house due to gaps between the tiles or cracks in the tiles, causing damage to the house.
本考案は、瓦を載置できかつその取付けにより
瓦勾配で傾斜する基板を具え、瓦葺施工の能率化
を計るとともに、施工品質を安定化できかつ屋根
葺作業の標準化をも可能とする瓦段葺用下地の提
供を目的としている。
The present invention is a tile step that is equipped with a substrate on which tiles can be placed and that is tilted at the tile slope when installed, and that not only improves the efficiency of tile roofing construction, but also stabilizes construction quality and standardizes roofing work. The purpose is to provide a base for roofing.
以下本考案の一実施例を図面に基づき説明す
る。
An embodiment of the present invention will be described below based on the drawings.
第1〜5図において、本考案の瓦段葺用下地1
は、瓦を載置しかつ傾斜した野地板9上に軒先B
側から後方に向かつて順次並置される瓦段葺用下
地1であつて、木質材からなる基板3の前縁部
に、野地板9に下端が当接する前下地材4を固定
しており、又基板3上面の後方部から後で隣り合
う瓦段葺用下地の前下地材4上面の前方部に至る
中水切り金具19が配される。その略中間位置に
中下地材5を下設するとともに、瓦段葺用下地1
は、屋根ケラバ水切り金具10と、前水切り金具
11とを併用することにより、屋根ケラバA、軒
先Bを水切りしている。又瓦段葺用下地1には先
水切り金具17とが用いられる。 In Figures 1 to 5, the base material for tiled roofing of the present invention 1
The roof tiles are placed and the eaves B is placed on the sloped field board 9.
This is a base material 1 for tiled roofing that is arranged side by side sequentially from the side toward the rear, and a front base material 4 whose lower end abuts a shedding board 9 is fixed to the front edge of a base plate 3 made of wood material. Further, a draining metal fitting 19 is arranged extending from the rear part of the upper surface of the substrate 3 to the front part of the upper surface of the front base material 4 of the base material for the tiled roof that will be adjacent later. A middle base material 5 is laid down approximately in the middle position, and a base material 1 for tiled roofing is installed.
The roof verge A and the eaves B are drained by using a roof verge drainer fitting 10 and a front drainer fitting 11 together. Further, a draining metal fitting 17 is used for the base 1 for the tiled roof.
前記基板3は、瓦R1の縦長さよりもやや短寸
の横長長尺片であり、その前縁には、前記前下地
材4が形成される。又前下地材4と中下地材5と
は、野地板9上に載置することにより、基板3を
瓦勾配に保ちうるように、中下地材5は前下地材
4に比して小高さに形成される。又前下地材4、
中下地材5はその下面が、ともに野地板9の上面
に位置し、しかも基板3を、前記野地板9の勾配
と異なる前記瓦勾配とするために、該下端面は斜
めに欠切され、これにより、前下地材4、中下地
板5は、第1〜3図に示すように断面非矩形の台
形状をなす。又載置によつて基板3の後尾部は野
地板9上面に当接できる。 The substrate 3 is a horizontally long piece that is slightly shorter than the vertical length of the tile R1, and the front base material 4 is formed on the front edge thereof. In addition, the front base material 4 and the middle base material 5 are placed on the roof board 9, so that the middle base material 5 has a small height compared to the front base material 4 so that the board 3 can be maintained at a tiled slope. is formed. Also, front base material 4,
Both of the lower surfaces of the middle base material 5 are located on the upper surface of the shedding board 9, and in order to make the substrate 3 have the tile slope different from the slope of the shedding board 9, the lower end surface is cut out diagonally, As a result, the front base material 4 and the middle base plate 5 have a trapezoidal shape with a non-rectangular cross section, as shown in FIGS. 1 to 3. Also, by placing the board 3, the rear part of the board 3 can come into contact with the upper surface of the shedding board 9.
前記前水切り金具11は、野地板9の軒先部上
面に沿う小巾の載置片29の前縁に、軒先A前面
で垂下しかつ下端に内向きの折曲げ部を有する垂
下片30を設けるとともに、後縁部に小高さの立
上げ片31を設けた鋼板製の長尺折曲げ体であ
り、又立上げ片31の上端には、その前面に折返
す折曲げ部を形成する。 The front draining fitting 11 is provided with a hanging piece 30 that hangs down in front of the eaves A and has an inwardly bent part at the lower end, on the front edge of the narrow mounting piece 29 along the upper surface of the eaves of the roof board 9. In addition, it is a long bent body made of a steel plate with a raised piece 31 of a small height provided at the rear edge, and a bent part that is folded back to the front surface is formed at the upper end of the raised piece 31.
又先水切り金具17と中水切り金具19とは、
夫々基板3の前縁部に載置される巾狭の載置片2
9A,29Bの前縁に、前記前下地材4と略同高
さの垂下片30A,30Bを設けており、又中水
切り金具19は、前記垂下片30Bの下端に前に
突出する突片34を一体に連設する。 Also, the front drainer fitting 17 and the middle drainer fitting 19 are as follows:
Narrow mounting pieces 2 each placed on the front edge of the substrate 3
At the front edges of 9A and 29B, hanging pieces 30A and 30B are provided which are approximately the same height as the front base material 4, and the draining fitting 19 has a projecting piece 34 which projects forward at the lower end of the hanging piece 30B. are installed in succession.
然して、瓦段葺用下地1は、第2図に示すごと
く、たる木8の上面に架設される前記野地板9上
に、軒先B側に途切れ部を有して、順次上方に隣
接しかつその上面に防水用のルーフイング33を
その軒先Bの先端まで敷設する。さらに、第3図
に示すごとく、前記垂下片30を軒先Bに沿わせ
て配される前記前水切り金具11の前記立上げ片
31を、最下段の瓦段葺用下地1の前下地材4の
前面に近接させる。又先水切り金具17を、その
垂下片30Aが立上げ片31の前に位置するよう
に、最下段の瓦段葺用下地1の基板3上に取付
け、かつその上方の各瓦段葺用下地1の基板3前
縁には、中水切り金具19を、垂下片30Bがそ
の前面を覆うごとく載置する。しかる後、各基板
3に、例えば2枚重ねに瓦R1,R1を敷設する
とともに、その上方部に、半分の縦長さの瓦R2
を取付けることにより段葺きする。なお瓦R1は
通常の波瓦を用いるときには、その側端部で2枚
重となるごとく、配設される。 As shown in FIG. 2, the base 1 for tiled roofing has a discontinuous part on the side of the eaves B on the roofing board 9 installed on the top surface of the rafters 8, and is successively adjacent to and adjacent to the top of the roof board 9. A waterproof roofing 33 is laid on the upper surface up to the tip of the eaves B. Furthermore, as shown in FIG. 3, the upright piece 31 of the front draining fitting 11, which is arranged so that the hanging piece 30 is aligned with the eaves B, is attached to the front base material 4 of the base material 1 for tiled roofing at the lowest level. close to the front of the In addition, the draining fitting 17 is installed on the substrate 3 of the bottom tile tier roofing base 1 so that its hanging piece 30A is located in front of the rising piece 31, and each tile tier roofing base above it is attached. A drainer fitting 19 is placed on the front edge of the first substrate 3 so that the hanging piece 30B covers the front surface thereof. After that, on each board 3, for example, tiles R1 and R1 are laid in two layers, and a tile R2 of half the vertical length is placed on the upper part.
Stepped roofing is achieved by installing . In addition, when the tile R1 is a normal corrugated tile, it is arranged so that the tile R1 is doubled at its side end.
又瓦段葺用下地1、前水切り金具11は、その
側端を、野地板9の側面である屋根ケラバAに略
面一に位置するごとく配設され、その屋根ケラバ
Aの部分を屋根ケラバ水切り金具10を用いて水
切りする。 In addition, the base 1 for tiled tiered roofing and the front draining fitting 11 are arranged so that their side ends are located substantially flush with the roof verge A, which is the side surface of the roof board 9, and the roof verge A is connected to the roof verge A. Drain the water using the drainer fitting 10.
屋根ケラバ水切り金具10は、本例では、軒先
側に取付く前の屋根ケラバ水切り金具10Aと、
その後方部で連続する後の屋根ケラバ水切り金具
10B……とを含み、ともにカラー鋼板などの防
錆金属板の折り曲げにより形成される。 In this example, the roof verge draining fitting 10 includes a roof verge draining fitting 10A before being attached to the eaves side,
It includes a rear roof verge draining fitting 10B that is continuous at the rear thereof, and both are formed by bending a rust-proof metal plate such as a colored steel plate.
前、後の屋根ケラバ水切り金具10A,10B
は、前記瓦段葺用下地1の側面に沿い立上がるこ
とにより基板33と野地板9との間の〓間を遮蔽
する立片12,12と、その上端に形成されかつ
前記瓦R1,R2の上方で屋根内方に突出する覆
片13とを有する基部14を具える。なお本例で
は、基部14は、覆片13の端縁で折返し外片、
内片を互いに当接させた2枚重ね体として形成さ
れる。 Front and rear roof verge draining fittings 10A, 10B
These are standing pieces 12, 12 that stand up along the side surface of the tile step roofing base 1 to shield the space between the base plate 33 and the roofing board 9, and the tiles R1, R2 formed on the upper ends thereof. It comprises a base 14 having a cover 13 projecting inwardly above the roof. In addition, in this example, the base 14 is a folded outer piece at the edge of the cover piece 13,
It is formed as a two-layered body with inner pieces in contact with each other.
又立片12にはその外片と面一に、屋根ケラバ
Aを覆う側水切り片16を連続して形成してい
る。なお後の屋根ケラバ水切り金具10Bの側水
切り片16には、その下縁前方部に、夫々軒先側
に位置する各屋根ケラバ水切り金具10A,10
Bの側水切り片16下端を挿入するコ字部35を
形成する。 Furthermore, a side draining piece 16 that covers the roof verge A is continuously formed on the vertical piece 12 so as to be flush with the outer piece. Note that the side draining piece 16 of the later roof verge draining fitting 10B has respective roof verge draining fittings 10A, 10 located on the eaves side at the lower edge front part thereof.
A U-shaped portion 35 into which the lower end of the side draining piece 16 of B is inserted is formed.
又前記立片12の内片下端には、前記瓦段葺用
下地1と、ルーフイング33を敷設する野地板9
との間で該野地板9に沿つて屋根内方にのびる内
水切り片15を設けるとともに、その外端には、
上面に折返す折返し部を形成する。又後の屋根ケ
ラバ水切り金具10Bには、内水切り片15の根
元部に、各軒先側に位置する屋根ケラバ水切り金
具10A,10Bの内水切り片15の上端部を、
その重なり部分において嵌入する切欠き溝37…
…を形設する。 Further, at the lower end of the inner piece of the vertical piece 12, the base plate 1 for the tile terrace and the roofing board 9 on which the roofing 33 is laid.
An inland water cutout 15 is provided extending inwardly from the roof along the roofing board 9 between the roof board 9 and the outer end thereof.
A folded portion is formed on the top surface. In addition, in the rear roof verge draining fitting 10B, the upper end of the inland draining piece 15 of the roof verge draining fitting 10A, 10B located on each eaves side is attached to the root part of the inland draining piece 15.
Notch groove 37 that fits into the overlapping part...
...to be formed.
なお前の屋根ケラバ水切り金具10Aは、前記
立片12,覆片13の外片及び側水切り片16
を、前水切り金具11の垂下片30の外面まで
夫々延長する断面L字の延長部39を有し、又延
長部39の前面は折曲げ片40により遮蔽する。 Note that your roof verge draining fitting 10A includes the vertical piece 12, the outer piece of the covering piece 13, and the side draining piece 16.
has extension parts 39 each extending to the outer surface of the hanging piece 30 of the front draining fitting 11 and having an L-shaped cross section, and the front surface of the extension part 39 is shielded by a bent piece 40.
他方、後の屋根ケラバ水切り金具10Bは、そ
の上方部に、小高さの折曲げ片41を具え、該折
曲げ片41は、その折曲げにより覆片12との間
を継ぐとともに、内水切り片15が野地板9に載
置された状態において、夫々軒先側に位置する屋
根ケラバ水切り金具10A,10Bの覆片13に
その下縁が当接する。 On the other hand, the later roof verge draining fitting 10B has a small-height bent piece 41 in its upper part, and the bent piece 41 connects with the covering piece 12 by bending, and also serves as an inland water cutting piece. 15 is placed on the shedding board 9, its lower edge abuts against the cover piece 13 of the roof verge draining fittings 10A, 10B located on the eaves side, respectively.
従つて、第5図に示すごとく、前の屋根ケラバ
水切り金具10Aを、その延長部が、前記前水切
り金具11の屋根ケラバA側の端部を覆うごとく
取付けかつその内水切り片15を瓦段葺用下地1
の下方に位置させる。又後の屋根ケラバ水切り金
具10Bを、前記切欠き溝37に下方の屋根ケラ
バ水切り金具10Aの内水切り片15を嵌入させ
かつ側水切り片16下端のコ字部35を前記のご
とく順次嵌入させつつ、後の屋根ケラバ水切り金
具10Bを連設する。 Therefore, as shown in FIG. 5, the front roof verge drainer 10A is installed so that its extension part covers the end of the front roof verge A side of the front roof verge A, and the inner drainer piece 15 is attached to the roof tiles. Base for roofing 1
position it below. In addition, for the later roof verge draining fitting 10B, fit the inner water cutter 15 of the lower roof verge drainer 10A into the notch groove 37, and sequentially fit the U-shaped portion 35 at the lower end of the side drainer 16 as described above. , a rear roof verge draining fitting 10B is installed in succession.
その結果、立片12が前記〓間を遮蔽し又覆片
13は瓦R1,R2の側端部を覆う。さらに上段
に位置する内水切り片15は下段の内水切り片1
5の上方に重なりかつ側水切り片16……は連続
することにより前記屋根ケラバAを覆つて水切り
でき、防水性に優れる屋根を施工性よくかつ精度
よく形成しうる。 As a result, the vertical piece 12 shields the gap, and the covering piece 13 covers the side edges of the roof tiles R1 and R2. Furthermore, the inland water section 15 located at the upper level is the inland water section 1 located at the lower level.
By overlapping above the roof verges A and continuing the side draining pieces 16, they can cover and drain the roof verges A, and a roof with excellent waterproofness can be formed with good workability and accuracy.
第6〜9図は本考案の他の実施例を示す。 6-9 show other embodiments of the invention.
本実施例では、瓦段葺用下地1に加えて他の瓦
段葺用下地2を併用する。 In this embodiment, in addition to the base 1 for tile roofing, another base 2 for tile terrace roofing is used in combination.
瓦段葺用下地1は、その基板3はそのほぼ中間
位置で2分割された基板部3A,3Bを有し、又
基板部3Aは、前記前下地材4の略半分高さの中
下地材5Aの前面かつその略中間高さで形成する
段差18でその後端を支持される。又基板部3B
はその前端を、前記中下地材5Aの上面に固定す
る。 The substrate 3 of the base 1 for tiled roofing has substrate parts 3A and 3B divided into two at approximately the middle position, and the substrate part 3A is a middle base material approximately half the height of the front base material 4. The rear end is supported by a step 18 formed at the front surface of 5A and at approximately the middle height thereof. Also, the board part 3B
The front end thereof is fixed to the upper surface of the intermediate base material 5A.
又基板部3Aで2枚重ねの瓦R1,R1を載置
し、基板部3Bで、一枚の瓦R1を、その下方部
分が基板部3Aの瓦R1と重なるごとく載置でき
る。 Further, two stacked roof tiles R1, R1 can be placed on the substrate section 3A, and one roof tile R1 can be placed on the substrate section 3B so that its lower part overlaps with the roof tile R1 on the substrate section 3A.
他の瓦段葺用下地2は、その基板45が、中下
地材49を介して基板部45A,45Bに2分割
されるとともに、基板部45Aはその前端部を、
前下地材47からややはみ出させて固定され、第
7図に示すごとく、順次隣り合わせて屋根に並設
される。 In another tiled step roof base 2, the base plate 45 is divided into two base parts 45A and 45B via the middle base material 49, and the front end of the base base 45A is
They are fixed so as to slightly protrude from the front base material 47, and are successively arranged side by side on the roof as shown in FIG.
なお本例では、ルーフイング33は、各瓦段葺
用下地1,2上面を覆うとともに、その上方部
を、上段の瓦段葺用下地2の前下地材4下端に挿
入される。又中水切り金具19Aは、下位置の瓦
段葺用下地1,2の基板部3B,45B上の瓦R
1と当接するごとく、その垂下片30Bを小巾に
形成する。 In this example, the roofing 33 covers the upper surface of each tile tier roofing base 1 and 2, and its upper part is inserted into the lower end of the front base material 4 of the upper tile tier roofing base 2. In addition, the draining fitting 19A is attached to the tile R on the base plate portions 3B and 45B of the tile step roofing bases 1 and 2 at the lower position.
The hanging piece 30B is formed to have a small width so as to be in contact with 1.
又瓦段葺用下地1は、第9図に示すように、他
の瓦段葺用下地2とともに、屋根ケラバAから間
〓Gを隔てる該屋根ケラバAの近傍まで敷設さ
れ、又前水切り金具11A、屋根ケラバ水切り金
具10Cを用いて屋根ケラバA、軒先Bを水切り
する。 As shown in FIG. 9, the base 1 for tile terrace roofing is laid along with other base 2 for tile terraces up to the vicinity of the roof verge A that separates the roof verge A from the roof verge A, and the front draining metal fittings 11A, drain roof verge A and eaves B using roof verge drainer fitting 10C.
前水切り金具11Aは、前記前水切り金具11
に比して前記載置片29、垂下片30を前記間〓
Gの長さ分延長した突部32を設けた以外は、載
置片29、垂下片30、立上げ片31を具える前
記前水切り金具11と同構成を有する。 The front drainer metal fitting 11A is the front drainer metal fitting 11.
Compared to the above, the mounting piece 29 and the hanging piece 30 are
It has the same configuration as the front draining fitting 11, which includes a mounting piece 29, a hanging piece 30, and a rising piece 31, except that a protrusion 32 that is extended by the length of G is provided.
又屋根ケラバ水切り金具10Cは、本例では、
長尺の連続体であつて、立片12には、その外片
下端に前記間〓Gと等しい巾寸度の側出片53を
介して、前記側水切り片16を形成している。 In this example, the roof verge draining fitting 10C is as follows:
The vertical piece 12 is a long continuous body, and the side draining piece 16 is formed at the lower end of the outer piece through a side projecting piece 53 having a width equal to the gap G.
又前記覆片13、立片12の各外片は、下地1
を軒先側にこえて延長するとともに、前記側出片
53、側水切り片16には、軒先Bの先端まで延
設した延長部39Aを設けている。なお延長部3
9Aの先端には、折曲げ片40を用い遮蔽する。 In addition, each outer piece of the covering piece 13 and the standing piece 12 is
The side projecting piece 53 and the side draining piece 16 are provided with an extension part 39A extending to the tip of the eaves B. In addition, extension part 3
A bent piece 40 is used to shield the tip of 9A.
瓦段葺用下地1、他の瓦段葺用下地2は、野地
板9上に並置され、瓦R1……を取付けることに
よつて、屋根を形成する。 A base 1 for tile terrace roofing and another base 2 for tile terrace roof are placed side by side on roof board 9, and a roof is formed by attaching tiles R1....
このような、瓦R1,R1を2段に縦に並べて
敷設しうるごとく縦長の基板3を用いることによ
つて、さらに施工能率を向上する。 By using such a vertically elongated substrate 3 that allows tiles R1, R1 to be laid vertically in two stages, construction efficiency is further improved.
叙上のごとく本考案の瓦段葺用下地は、木質材
からなりかつ瓦を載置する基板に、該基板を瓦勾
配に保つ前下地材を設けており、瓦段葺作業の施
工性を高めるとともに、その並置により精度よく
瓦を敷設でき、瓦敷設精度の向上と安定化を計り
屋根葺作業の標準化を果たしうる。又瓦は野地板
に基板を介して取付けられ、又基板は横方向に連
続するとともに上下方向に連続ししかも継ぎ部に
中水切金具が介在することにより、瓦間の〓間又
は瓦が破損したときにも、雨水は基板上面を伝つ
て流過し、家屋内部への雨水の浸入を防いでその
汚損を防止できる。
As mentioned above, the base material for tile roofing of the present invention is made of wood and has a pre-base material on the base plate on which the tile is placed, which maintains the base plate at the slope of the tile, which improves the workability of tile terrace roofing work. In addition to increasing the height, tiles can be laid with high accuracy by juxtaposing them, and by improving and stabilizing tile laying accuracy, it is possible to standardize roofing work. In addition, the tiles are attached to the roofing board through the substrate, and the substrate is continuous both horizontally and vertically, and there is a gutter fitting at the joint, so the gap between the tiles or the tile is damaged. At times, rainwater flows along the top surface of the board, preventing rainwater from entering the inside of the house and preventing it from becoming dirty.
第1図は本考案の一実施例を、使用する他の部
材とともに示す斜視図、第2〜3図はその作用を
示す断面図、第4図は屋根ケラバ部分を示す断面
図、第5図はその取付状態を示す斜視図、第6図
は本考案の他の実施例を示す斜視図、第7〜8図
はその作用を示す断面図、第9図はその屋根ケラ
バを示す断面図、第10図はその取付状態を示す
斜視図である。
1……瓦段葺用下地、3……基板、4……前下
地材、5……中下地材、9……野地板、10,1
0A,10B,10C……屋根ケラバ水切り金
具、19……水切り金具、B……軒先。
Fig. 1 is a perspective view showing an embodiment of the present invention together with other members used, Figs. 2 and 3 are sectional views showing its operation, Fig. 4 is a sectional view showing the roof verge, and Fig. 5. 6 is a perspective view showing another embodiment of the present invention, FIGS. 7 and 8 are sectional views showing its operation, and FIG. 9 is a sectional view showing the roof verge, FIG. 10 is a perspective view showing the attached state. 1...Front base for tiled roofing, 3...Substrate, 4...Front base material, 5...Medium base material, 9...Flying board, 10,1
0A, 10B, 10C... Roof verge draining fittings, 19... Draining fittings, B... Eaves.
Claims (1)
後方に向かつて順次並置される瓦段葺用下地であ
つて、木質材からなりかつ瓦を載置する基板の前
記軒先側に向く前縁部に、野地板に下面を当接し
前記基板を前記野地板の勾配と異なる瓦勾配に保
つことにより断面台形をなす前下地材を固定する
とともに、前記基板の後方部から後で隣り合う瓦
段葺用下地の前記前下地材の前面をのびしかもこ
の瓦段葺用下地の基板上の前方部に至る中水切金
具が配されることを特徴とする瓦段葺用下地。 A base for tiered roof tiles on which tiles are placed and which are placed sequentially from the eaves side toward the rear on an inclined field board, which is made of wood and is placed before the substrate on which the tiles are placed facing the eaves side. The front base material, which has a trapezoidal cross section, is fixed to the edge by abutting its lower surface against the sheathing board and keeping the baseboard at a tile slope different from the slope of the shedding board, and also attaching the adjacent tiles from the rear part of the baseboard to the base plate. A base for tiled roofing, characterized in that a draining fitting is disposed that extends over the front surface of the front base material of the base for tiered roofing and reaches the front part of the substrate of the base for tile terraced roofing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1984166079U JPH0349211Y2 (en) | 1984-10-31 | 1984-10-31 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1984166079U JPH0349211Y2 (en) | 1984-10-31 | 1984-10-31 |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS6180915U JPS6180915U (en) | 1986-05-29 |
JPH0349211Y2 true JPH0349211Y2 (en) | 1991-10-21 |
Family
ID=30723917
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP1984166079U Expired JPH0349211Y2 (en) | 1984-10-31 | 1984-10-31 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0349211Y2 (en) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5632735B2 (en) * | 1972-03-31 | 1981-07-29 | ||
JPS58120951A (en) * | 1982-01-14 | 1983-07-19 | 株式会社 アイジ−技術研究所 | Execution of exterior |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5632735U (en) * | 1979-08-20 | 1981-03-31 |
-
1984
- 1984-10-31 JP JP1984166079U patent/JPH0349211Y2/ja not_active Expired
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5632735B2 (en) * | 1972-03-31 | 1981-07-29 | ||
JPS58120951A (en) * | 1982-01-14 | 1983-07-19 | 株式会社 アイジ−技術研究所 | Execution of exterior |
Also Published As
Publication number | Publication date |
---|---|
JPS6180915U (en) | 1986-05-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH0241622B2 (en) | ||
JPH0349211Y2 (en) | ||
JPS6016546B2 (en) | Eave tile laying equipment | |
JPH0440334Y2 (en) | ||
JPH0730599B2 (en) | Eaves and tile roofs | |
JPH0430249Y2 (en) | ||
JPH0430251Y2 (en) | ||
JP2680212B2 (en) | balcony | |
JP2577624B2 (en) | Ventilated waterproof structure roof | |
JPH0543136Y2 (en) | ||
JPH0139295Y2 (en) | ||
JPS5849298Y2 (en) | Two-tiered rain cutter tiles | |
JPH0348981Y2 (en) | ||
JPS6345461Y2 (en) | ||
JPS6220576Y2 (en) | ||
JPH0430250Y2 (en) | ||
JPH0431374Y2 (en) | ||
JPS5938831Y2 (en) | Drainage structure at the eaves | |
JPH0258664A (en) | Mounting structure for eaves gutter | |
JPH0610018Y2 (en) | The structure of keraba | |
JP4139036B2 (en) | Roof tile structure | |
JPH0411048Y2 (en) | ||
JPS6134422Y2 (en) | ||
JP4078607B2 (en) | Eaves structure of roof with metal tiles | |
JPS6239212Y2 (en) |