JPH0342090Y2 - - Google Patents

Info

Publication number
JPH0342090Y2
JPH0342090Y2 JP12529185U JP12529185U JPH0342090Y2 JP H0342090 Y2 JPH0342090 Y2 JP H0342090Y2 JP 12529185 U JP12529185 U JP 12529185U JP 12529185 U JP12529185 U JP 12529185U JP H0342090 Y2 JPH0342090 Y2 JP H0342090Y2
Authority
JP
Japan
Prior art keywords
bridge
inspection
rail
guide rail
vehicle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP12529185U
Other languages
Japanese (ja)
Other versions
JPS6235011U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP12529185U priority Critical patent/JPH0342090Y2/ja
Publication of JPS6235011U publication Critical patent/JPS6235011U/ja
Application granted granted Critical
Publication of JPH0342090Y2 publication Critical patent/JPH0342090Y2/ja
Expired legal-status Critical Current

Links

Description

【考案の詳細な説明】 産業上の利用分野 本考案は橋梁に配備される点検装置に係わり、
特に橋体下面に沿つて広範囲の点検をを可能にす
る橋梁点検装置に関する。
[Detailed description of the invention] Industrial application field This invention relates to an inspection device installed on a bridge.
In particular, the present invention relates to a bridge inspection device that enables wide-range inspection along the underside of a bridge body.

従来の技術 橋梁を含めた構造物の点検のために専用の点検
車を対象とする構造物に関連配備することは従来
より提案されている。このような従来技術を示す
一例として特開昭58−33612号がある。これによ
れば走行レールを配設し、この走行レールに沿つ
て点検車を移動させ、所定位置にて点検車を確実
にロツクして所要の作業を行えるようにする技術
が開示されている。
BACKGROUND OF THE INVENTION It has been proposed in the past to deploy a dedicated inspection vehicle to inspect structures including bridges. An example of such a conventional technique is Japanese Patent Application Laid-Open No. 58-33612. According to this publication, a technique is disclosed in which a traveling rail is provided, an inspection vehicle is moved along the traveling rail, and the inspection vehicle is reliably locked at a predetermined position so that required work can be performed.

橋梁の点検に関しては、橋体全幅にわたる長い
点検作業台を橋脚間で長手方向へ移動させる構
成、或いは比較的小さい点検作業車を橋体下部に
長手方向に配列した複数の平行な軌条に取付けて
移動させる構成が知られている。このような構成
における点検作業車の待機およびセツト方法に関
しては、道路上に橋梁点検車を配し、作業に際し
て点検車を橋体下部に配備したレールにセツトす
る方法が知られている。
For bridge inspections, a long inspection platform spanning the entire width of the bridge body can be moved longitudinally between the piers, or a relatively small inspection vehicle can be attached to multiple parallel rails arranged longitudinally at the bottom of the bridge body. Configurations for moving are known. As for a method of waiting and setting an inspection work vehicle in such a configuration, a method is known in which a bridge inspection vehicle is placed on the road and the inspection vehicle is set on a rail provided under the bridge body during work.

従来技術の問題点 橋体全幅にわたる長い点検作業台を橋脚間で長
手方向へ移動させる構成によれば、点検作業台が
非常に大型となり、強大な移動動力を必要とする
欠点がある。また移動制御も複雑となる。しかも
取付け構造も大型となり、設備費用が非常に高く
なるとともに全体として極めて大きな重量を橋体
に付加する欠点がある。このために点検作業車を
小型にすると、点検作業車による橋体の幅方向に
関する点検範囲が小さくなるため、幅方向に複数
の点検作業車を配設してそれぞれ橋体の長手方向
へ移動可能に構成しなければならない。このた
め、幅広い橋体には複数台の点検作業車が必要と
なり、設備費用が増大する。
Problems with the Prior Art According to the configuration in which a long inspection platform that spans the entire width of the bridge body is moved in the longitudinal direction between the piers, the inspection platform becomes very large and has the drawback of requiring a large amount of moving power. Furthermore, movement control becomes complicated. Furthermore, the mounting structure becomes large, which increases the equipment cost and adds an extremely large weight to the bridge body as a whole. For this purpose, if the inspection vehicle is made smaller, the inspection range in the width direction of the bridge body by the inspection vehicle becomes smaller, so multiple inspection vehicles can be arranged in the width direction and each vehicle can move in the longitudinal direction of the bridge body. must be configured. For this reason, multiple inspection vehicles are required for wide bridge bodies, which increases equipment costs.

一方、道路上に橋梁点検車を配して待機させる
方法では、点検作業に際して一時的に橋体上の交
通規制が必要なうえ、幅広い橋体に対してはその
下部中央付近の軌条に対してセツトすることが困
難となる。
On the other hand, with the method of placing bridge inspection vehicles on the road and having them wait, it is necessary to temporarily restrict traffic on the bridge body during inspection work. It becomes difficult to set.

何れにしても、従来技術では点検作業車を効率
的に使用して広い範囲の点検を実施可能にするよ
うな、操作および構造が簡単で設備費用を低減で
きる実用性に優れた装置は提案されていなかつ
た。
In any case, the prior art has not proposed a highly practical device that is simple to operate and have a simple structure, reduces equipment costs, and allows inspections to be carried out over a wide range of areas by efficiently using an inspection work vehicle. I wasn't there.

考案の目的 本考案の目的は上述の欠点を解消し、構造が簡
単で、設備費用が安価であり、しかも小型の点検
作業車を使用して効率良い点検作業を実施可能に
する実用性に優れた橋梁点検装置を提供すること
である。
Purpose of the invention The purpose of the present invention is to solve the above-mentioned drawbacks, to have a simple structure, low equipment cost, and to be highly practical by allowing efficient inspection work to be carried out using a small inspection work vehicle. The purpose of the present invention is to provide a bridge inspection device with improved performance.

考案の概要 本考案では、複数対の軌条を橋体の幅方向に間
隔を隔てて橋体の長手方向へ併設するとともに、
小型の点検作業車がこれらの軌条間で横動して容
易に軌条変更できるようになし、これにより最少
限の台数の点検作業車により橋体下面の全域を効
率良く点検できるようにしたのである。
Summary of the invention In this invention, multiple pairs of rails are installed in the longitudinal direction of the bridge body at intervals in the width direction of the bridge body.
A small inspection vehicle was able to move laterally between these rails to easily change the rails, making it possible to efficiently inspect the entire area under the bridge body using a minimum number of inspection vehicles. .

更に詳しくは、本考案による橋梁点検装置は、
橋体下部に長手方向へ配設された複数対の平行な
主軌条と、橋台や橋脚に水平に取付けられた移設
作業台もしくは係留台と、 前記移設作業台もしくは係留台の上部にて橋体
の幅方向に配設された移動用軌条と、 前記移設作業台もしくは係留台の上方位置にて
前記主軌条と連続するように橋体の下部に着脱自
在に取付けられる案内用軌条と、 点検員が乗り込むための小型の点検作業車であ
つて、下部に前記移動用軌条と係脱される移動用
車輪を、また上部に前記主軌条または案内用軌条
に対して点検作業車を移動可能に懸架するための
懸架移動部をそれぞれ有するとともに、前記移動
用軌条上に前記移動用車輪を係合させて点検作業
車が移動可能に支持される降下位置と、前記主軌
道に連続するように位置せる前記案内用軌条によ
り懸架された状態の上昇位置との間で点検作業車
を前記案内用軌条と一緒に昇降させるための昇降
手段を備えている点検作業車と、 を有して構成されたことを特徴とする。
More specifically, the bridge inspection device according to the present invention has the following features:
A plurality of pairs of parallel main rails arranged longitudinally at the bottom of the bridge body, a relocation work platform or mooring platform installed horizontally on the bridge abutment or pier, and a bridge body at the top of the relocation work platform or mooring platform. a guide rail that is removably attached to the lower part of the bridge body so as to be continuous with the main rail at a position above the relocation work platform or mooring platform; and an inspector. It is a small inspection work vehicle for a person to ride on, and has moving wheels that can be connected to and disengaged from the moving rail at the lower part, and a suspension on the upper part so that the inspection work vehicle can be moved with respect to the main rail or the guide rail. and a lowered position where the inspection work vehicle is movably supported by engaging the moving wheels on the moving rail, and positioned so as to be continuous with the main track. an inspection work vehicle equipped with a lifting means for raising and lowering the inspection work vehicle together with the guide rail between a raised position suspended by the guide rail; It is characterized by

以下に本考案の好ましい実施例とせる橋梁点検
装置について図面を参照して詳しく説明する。
A bridge inspection device according to a preferred embodiment of the present invention will be described in detail below with reference to the drawings.

図示実施例の構成の説明 第1図は本考案による点検装置を備えた一例と
せる橋梁を示している。この橋梁は、一対の橋台
1の中間に1つの橋脚2が配置され、これらの間
に橋体3,3を載置させて取付けた構造とされて
いる。この橋体3は、第2図に示すようその幅方
向に沿つて平行な3本の桁部材4,4,4および
これらを連結する補強梁4′より構成されている。
Description of the structure of the illustrated embodiment FIG. 1 shows an example of a bridge equipped with an inspection device according to the present invention. This bridge has a structure in which one pier 2 is placed between a pair of abutments 1, and bridge bodies 3 are placed between them. As shown in FIG. 2, this bridge body 3 is composed of three girder members 4, 4, 4 parallel to each other along its width direction and a reinforcing beam 4' connecting these girder members.

本考案によりこの橋体3はその下部に、即ちこ
こでは各桁部材4の下部に、橋体3の長手方向へ
延びた平行な主軌条5を有している。ここでは各
桁部材4の下部両側に設けられた主軌条5が互い
に組合つて対を構成している。これらの主軌条5
はここでは「I」形断面の部材とされている。
According to the invention, the bridge body 3 has in its lower part, here below each girder member 4, a parallel main rail 5 extending in the longitudinal direction of the bridge body 3. Here, the main rails 5 provided on both sides of the lower part of each girder member 4 are combined with each other to form a pair. These main rails 5
is here assumed to be a member with an "I" shaped cross section.

(第3図および第6図参照) また第1図に示すように、橋台1の側壁には桁
部材4の下方位置に移設作業台もしくは係留台6
が配備されている。移設作業台もしくは係留台6
は橋体3の幅方向へ配向されており、その上部に
は点検作業車7を後述のように橋体の幅方向へ移
動させて軌条変更を行わせるための一対の移動用
軌条6a(第5図参照)が配備されている。これ
らの移設作業台もしくは係留台6には図示してい
ないが橋体上部から適当な梯子等により点検員が
降りられるようになつている。
(See Figures 3 and 6.) Also, as shown in Figure 1, on the side wall of the abutment 1 there is a work platform or mooring platform 6 that can be relocated to the lower position of the girder member 4.
is in place. Relocation workbench or mooring platform 6
are oriented in the width direction of the bridge body 3, and a pair of moving rails 6a (No. (see Figure 5) is installed. Although not shown in the drawings, these relocation work platforms or mooring platforms 6 are designed so that inspectors can get down from the upper part of the bridge body using a suitable ladder or the like.

本考案においては、以下に説明するように通常
は何れかの移設作業台6の上方に点検作業車7が
待機して配置され、作業に利用される。また第2
図に示すように作業に際しては点検作業車7は一
対の主軌条5により後述するように懸架され、橋
体の長手方向へ移動されるとともに平行な主軌条
5の間で軌条交換を行われるのである。
In the present invention, as will be explained below, an inspection work vehicle 7 is usually placed on standby above one of the relocation work platforms 6 and used for work. Also the second
As shown in the figure, during the work, the inspection work vehicle 7 is suspended by a pair of main rails 5 as will be described later, and is moved in the longitudinal direction of the bridge body, and the rails are exchanged between the parallel main rails 5. be.

第3図に示すように、この点検作業車7は長い
小型な箱形とされ、下部両端に移動用車輪8,8
を有している。これらの移動用車輪の少なくとも
1つは例えば減速機付モータ9によりチエーン1
0を介して駆動される駆動用車輪とされている。
これらの移動用車輪8は第5図に示すように点検
作業車7が降下された時に移設作業台もしくは係
留台6上の移動用軌条6aに係合し、点検作業車
7を全体として橋体3の幅方向へ移動できるよう
になつている。また第3図および第4図に示すよ
うに、点検作業車7の両側面にはここでは流体圧
または機械圧の作動シリンダ装置とせる昇降装置
11,11が備えられている。これらの昇降装置
11の作動ロツド11aは下方へ伸長できるよう
になつており、その伸長作動によつて作動ロツド
下端が移設作業台もしくは係留台6上に当接さ
れ、更に伸長作動されることにより点検作業車7
全体が上昇できるようになつている。更に、この
点検作業車7は上部に一対の懸架移動部12を備
えている。この懸架移動部12は、ここでは点検
作業車7の両側面上に取付けられる連結桿13
と、この連結桿13を吊持するように連結され、
主軌条5(後述する案内用軌条に対しても同様)
に対して移動可能に懸架されるように構成されて
いる台車部分14とを含んで構成されている。こ
こでは台車部分14は第6図(後述する案内用軌
条50に対して懸架された状態で示されている
が)により明確となるように、「I」形断面の主
軌条5を両側から挟むように対向させて配置され
た車輪15,15を有し、これらの車輪15,1
5が主軌条5の下部壁5′上に乗つて移動可能と
されているとともに横方向への脱落を防止してい
る。符号16,16で示す車輪は主軌条5の下面
に当接して上下動を防止する補助車輪である。ま
た、少なくとも1つの台車部分14には第6図に
示すようにモータ17が備えてあり、車輪15を
駆動して点検作業車7全体を主軌条5に沿つて移
動できるようになつている。更に、左右の台車部
分14,14はフレームにて連結されている。
As shown in FIG. 3, this inspection work vehicle 7 has a long and small box shape, and has wheels 8, 8 for transportation at both ends of the lower part.
have. At least one of these moving wheels is connected to the chain 1 by a motor 9 with a reducer, for example.
It is a driving wheel that is driven through 0.
These moving wheels 8 engage with the moving rails 6a on the relocation work platform or mooring platform 6 when the inspection vehicle 7 is lowered, as shown in FIG. It is designed to be able to move in the width direction of 3. Further, as shown in FIGS. 3 and 4, both sides of the inspection work vehicle 7 are provided with lifting devices 11, 11, which here are hydraulic or mechanical actuating cylinder devices. The operating rods 11a of these lifting devices 11 are designed to be able to extend downward, and when they are extended, the lower ends of the operating rods come into contact with the relocation work platform or the mooring platform 6, and when they are further extended, Inspection work vehicle 7
The whole thing is ready to rise. Furthermore, this inspection work vehicle 7 is equipped with a pair of suspension moving parts 12 on the upper part. This suspended moving part 12 is connected to connecting rods 13 attached to both sides of the inspection work vehicle 7.
and are connected so as to suspend this connecting rod 13,
Main rail 5 (same for guide rail described later)
The carriage part 14 is configured to be movably suspended relative to the carriage part 14. Here, the bogie portion 14 sandwiches the main rail 5 having an "I" cross section from both sides, as shown in FIG. 6 (shown suspended from a guide rail 50 to be described later) The wheels 15, 15 are arranged opposite to each other, and these wheels 15, 1
5 is movable by riding on the lower wall 5' of the main rail 5, and is prevented from falling off in the lateral direction. Wheels 16, 16 are auxiliary wheels that come into contact with the lower surface of the main rail 5 to prevent vertical movement. Further, at least one truck portion 14 is equipped with a motor 17 as shown in FIG. 6, which drives the wheels 15 so that the entire inspection work vehicle 7 can be moved along the main rail 5. Further, the left and right truck portions 14, 14 are connected by a frame.

本考案の大きな特徴として、第6図に示すよう
に主軌条5と同様な断面形状の案内用軌条50が
備えられている。この案内用軌条50は主軌条5
と連続するように位置させて橋体3(ここでは桁
部材4)に着脱自在に固定できるようになされて
いる。即ち、主軌条5は移設作業台もしくは係留
台6の直上には延長されておらず、この部分の軌
条を案内用軌条50が代用するようになつてい
る。この案内用主軌条の固定のために、ここでは
第4図および第6図に見られるように橋体3に固
定されたハンガービーム20に取付けられた取付
け板21の穴22と、案内用軌条50の上部に固
定された取付け板23の穴24とを一致させ、ピ
ン25を挿通させて固定する構造が採用されてい
る。
As a major feature of the present invention, as shown in FIG. 6, a guide rail 50 having the same cross-sectional shape as the main rail 5 is provided. This guide rail 50 is the main rail 5
It is arranged such that it can be removably fixed to the bridge body 3 (here, the girder member 4) by being positioned so as to be continuous with the bridge body 3 (here, the girder member 4). That is, the main rail 5 does not extend directly above the relocation workbench or the mooring platform 6, and the guide rail 50 is designed to replace this portion of the rail. In order to fix the main guide rail, here, as shown in FIGS. 4 and 6, holes 22 in the mounting plate 21 attached to the hanger beam 20 fixed to the bridge body 3 and the guide rail A structure is adopted in which the holes 24 of the mounting plate 23 fixed to the upper part of the mounting plate 50 are aligned with each other, and the pins 25 are inserted and fixed.

実施例の作動の説明 前述の装置において、点検作業車7は通常は案
内用軌条50に対して台車部分14の車輪15を
係合させて組合された状態で点検や最塗装作業に
利用される。作業しない場合には移設作業台もし
くは係留台6の移動用軌条6a上にて待機される
か、または案内用軌条50を橋体3に固定した状
態で待機される。
Description of the operation of the embodiment In the above-mentioned apparatus, the inspection work vehicle 7 is normally used for inspection and repainting work in an assembled state with the wheels 15 of the truck portion 14 engaged with the guide rail 50. . When not working, it is kept on standby on the moving rail 6a of the relocation workbench or mooring platform 6, or with the guiding rail 50 fixed to the bridge body 3.

点検作業に際し、先ず点検作業車7が案内用軌
条50とともに移動用軌条6a上に待機されてい
る場合、橋体の幅方向の何れかの所望の主軌条5
の位置へ移動させる。この状態で位置決めした
後、昇降装置11を作動させ、点検作業車7およ
び案内用軌条50を一緒に上昇させ、案内用軌条
50を前記ハンガービーム20の取付け板21に
対して取付け、固定する。この状態で、案内用軌
条50は主軌条5と連続するように位置される。
このために案内用軌条50および主軌条5の互い
に当接せる端部を斜めに形成することが好まし
く、何れか一方には位置決め用のガイド板5″を
上端に固着しておくとよい(第6図参照)。
During inspection work, if the inspection work vehicle 7 is waiting on the moving rail 6a together with the guide rail 50, first move the main rail 5 to any desired main rail 5 in the width direction of the bridge body.
Move it to the position. After positioning in this state, the lifting device 11 is operated to raise the inspection work vehicle 7 and the guide rail 50 together, and the guide rail 50 is attached and fixed to the mounting plate 21 of the hanger beam 20. In this state, the guide rail 50 is positioned so as to be continuous with the main rail 5.
For this purpose, it is preferable that the ends of the guide rail 50 and the main rail 5 that come into contact with each other be formed obliquely, and it is preferable that a guide plate 5'' for positioning be fixed to the upper end of one of the guide rails 50 and the main rail 5. (See Figure 6).

しかる後。モータ17の付勢制御により主軌条
5に沿つて点検作業車7を移動させ、その端部へ
の移動の間に点検を実施する。第1図の実施例で
は、1つの主軌条5に沿つた点検が終了した後、
再び移設作業台もしくは係留台6の上方位置へ引
き戻し、昇降装置11を作動させて点検作業車7
を降下させ、しかる後移動用軌条6aに沿つて次
の主軌条5の位置へ移動させ、再び前述の操作に
よつてその主軌条5付近の点検を実施する。
After that. The inspection work vehicle 7 is moved along the main rail 5 by energizing control of the motor 17, and inspection is performed while moving to the end thereof. In the embodiment shown in FIG. 1, after the inspection along one main rail 5 is completed,
The inspection work vehicle 7 is pulled back again to the position above the relocation work platform or mooring platform 6, and the lifting device 11 is activated.
is lowered, and then moved along the movement rail 6a to the next main rail 5 position, and the area around that main rail 5 is inspected again by the above-described operation.

ここで、例えば第1図に示すように橋体3の下
側で橋脚2の上端中央に点検作業車7が移動でき
る空間2′がある場合には、主軌条5を連続させ
て配置できる。この場合には、橋脚2の両側を1
台の点検作業車7で点検できるため、橋梁全体の
点検を1台で行うことが可能となる。
Here, for example, as shown in FIG. 1, if there is a space 2' below the bridge body 3 at the center of the upper end of the pier 2 in which the inspection work vehicle 7 can move, the main rails 5 can be arranged continuously. In this case, both sides of pier 2 should be
Since the inspection can be performed using two inspection work vehicles 7, it becomes possible to inspect the entire bridge with one vehicle.

考案の効果 本考案によれば、比較的小型で軽量の点検作業
車を使用し、橋梁下面をほぼ全域の点検、補修、
塗装等を確実且つ安全に行える。しかも点検作業
車を極めて効率よく使用でき、且つ設備費用等が
安価にできる。
Effects of the invention According to the invention, a relatively small and lightweight inspection vehicle can be used to inspect, repair, and repair almost the entire underside of a bridge.
Painting, etc. can be performed reliably and safely. Moreover, the inspection vehicle can be used extremely efficiently, and equipment costs can be reduced.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本考案による橋梁点検装置を備えた橋
梁全体を示す正面図。第2図は第1図の橋梁の横
断面図。第3図は本考案による橋梁点検装置の拡
大せる正面図。第4図は本考案による橋梁点検装
置の横断面図。第5図は橋梁点検装置における点
検作業車の昇降状態を示す概略横断面図。第6図
は本考案による橋梁点検装置の全体的な一部破断
せる斜視図。 1…橋台、2…橋脚、3…橋体、4…桁部材、
5…主軌条、6…移設作業台もしくは係留台、6
a…移動用軌条、7…点検作業車、8…移動用車
輪、9…減速機付モータ、10…チエーン、11
…昇降装置、11…a作動ロツド、12…懸架移
動部、13…連結桿、14…台車部、15…車
輪、16…補助車輪、17…モータ、20…ハン
ガービーム、21,23…取付け板、22,24
…穴、25…ピン、50…案内用軌条。
FIG. 1 is a front view showing the entire bridge equipped with the bridge inspection device according to the present invention. Figure 2 is a cross-sectional view of the bridge in Figure 1. Figure 3 is an enlarged front view of the bridge inspection device according to the present invention. FIG. 4 is a cross-sectional view of the bridge inspection device according to the present invention. FIG. 5 is a schematic cross-sectional view showing the ascending and descending states of the inspection work vehicle in the bridge inspection device. FIG. 6 is a partially cutaway perspective view of the entire bridge inspection device according to the present invention. 1... Bridge abutment, 2... Pier, 3... Bridge body, 4... Girder member,
5... Main rail, 6... Relocation work platform or mooring platform, 6
a...Movement rail, 7...Inspection work vehicle, 8...Movement wheels, 9...Motor with reducer, 10...Chain, 11
...Lifting device, 11...A operation rod, 12...Suspension moving part, 13...Connection rod, 14...Dolly part, 15...Wheel, 16...Auxiliary wheel, 17...Motor, 20...Hanger beam, 21, 23...Mounting plate , 22, 24
...hole, 25...pin, 50...guide rail.

Claims (1)

【実用新案登録請求の範囲】 (1) 橋体下部に長手方向に配設された複数対の平
行な主軌条と、 橋台や橋脚に水平に取付けられた移設作業台
もしくは係留台と、 前記移設作業台もしくは係留台の上部にて橋
体の幅方向に配設された移動用軌条と、 前記移設作業台もしくは係留台の上方位置に
て前記主軌条と連続するように橋体下部に着脱
自在に取付けられる案内用軌条と、 点検員が乗り込むための小型の点検作業車で
あつて、下部に前記移動用軌条と係脱される移
動用車輪を、また上部に前記主軌条または案内
用軌条に対して点検作業車を移動可能に懸架す
るための懸架用移動部をそれぞれ有するととも
に、前記移動用軌条上に前記移動用車輪を係合
させて点検作業車が移動可能に支持される下降
位置と、前記主軌条に連続するように位置する
前記案内用軌条により懸架された状態の上昇位
置との間で点検作業車を前記案内用軌条と一緒
に昇降させるための昇降手段を備えている点検
作業車と、 を有して構成されたことを特徴とする橋梁点検
装置。 (2) 前記懸架移動用車輪が駆動車輪を含んでいる
実用新案登録請求の範囲第1項記載の橋梁点検
装置。 (3) 橋脚の上部中央に前記点検作業車が移動でき
る空間が形成されている場合、この空間を通し
て少なくとも1つの前記主軌条が配置されてい
る実用新案登録請求の範囲第1項記載の橋梁点
検装置。 (4) 前記案内用軌条がその上部に設けた取付け板
に形成せる穴を、橋体下部に設けた取付け板に
形成せる穴に一致させてピンを挿通することで
着脱自在に取付けるように構成されている実用
新案登録請求の範囲第1項記載の橋梁点検装
置。 (5) 前記昇降手段が、点検作業車に設けたシリン
ダと、先端を前記移設作業台もしくは係留台に
当設させるように上下方向に配向された作動ロ
ツドとを有して構成された作動シリンダとされ
ている実用新案登録請求の範囲第1項記載の橋
梁点検装置。 (6) 前記主軌条および案内用軌条が「I」形断面
とされ、前記懸架移動部がこれらの軌条の両側
に対向配置された車輪を軸支せる台車部分と、
点検作業車を吊持するために該台車の下部に取
付けられた連結桿とを有して構成されている実
用新案登録請求の範囲第1項記載の橋梁点検装
置。
[Scope of Claim for Utility Model Registration] (1) A plurality of pairs of parallel main rails arranged in the longitudinal direction at the bottom of the bridge body, a relocation work platform or mooring platform installed horizontally on the bridge abutment or pier, and the aforementioned relocation. A moving rail arranged in the width direction of the bridge body at the upper part of the work platform or mooring platform, and a removable rail attached to the lower part of the bridge body so as to be continuous with the main rail at a position above the relocation work platform or mooring platform. A small inspection work vehicle for an inspector to board, with a guide rail attached to the main rail or guide rail on the lower part, and a moving wheel that is connected to and detached from the moving rail on the lower part, and a guide rail attached to the main rail or the guide rail on the upper part. and a lowered position where the inspection vehicle is movably supported by engaging the transportation wheels on the transportation rail. , Inspection work comprising a lifting means for raising and lowering the inspection work vehicle together with the guide rail between a raised position suspended by the guide rail located so as to be continuous with the main rail. A bridge inspection device comprising: a vehicle; (2) The bridge inspection device according to claim 1, wherein the suspended moving wheels include drive wheels. (3) In the case where a space is formed in the center of the upper part of the bridge pier in which the inspection work vehicle can move, at least one of the main rails is arranged through this space. Device. (4) The guide rail is configured to be removably attached by aligning the hole formed in the mounting plate provided at the top with the hole formed in the mounting plate provided at the bottom of the bridge body and inserting a pin through it. A bridge inspection device according to claim 1 of the claimed utility model registration. (5) An operating cylinder in which the elevating means includes a cylinder provided on the inspection work vehicle and an operating rod oriented in the vertical direction so that its tip is brought into contact with the relocation work platform or mooring platform. A bridge inspection device according to claim 1 of the utility model registration claim. (6) a bogie portion in which the main rail and the guide rail have an “I”-shaped cross section, and the suspension moving portion pivotally supports wheels arranged opposite to each other on both sides of these rails;
The bridge inspection device according to claim 1, which is a registered utility model, and comprises a connecting rod attached to the lower part of the truck for suspending the inspection vehicle.
JP12529185U 1985-08-15 1985-08-15 Expired JPH0342090Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12529185U JPH0342090Y2 (en) 1985-08-15 1985-08-15

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12529185U JPH0342090Y2 (en) 1985-08-15 1985-08-15

Publications (2)

Publication Number Publication Date
JPS6235011U JPS6235011U (en) 1987-03-02
JPH0342090Y2 true JPH0342090Y2 (en) 1991-09-04

Family

ID=31018059

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12529185U Expired JPH0342090Y2 (en) 1985-08-15 1985-08-15

Country Status (1)

Country Link
JP (1) JPH0342090Y2 (en)

Also Published As

Publication number Publication date
JPS6235011U (en) 1987-03-02

Similar Documents

Publication Publication Date Title
EP0099450A1 (en) Road pavement testing apparatus
US5940916A (en) Bridge span-by-span construction apparatus and method
US4809615A (en) Method and apparatus for re-railing working platforms
JPH0342090Y2 (en)
JPH03110208A (en) Mobile scaffold device for bridge and assembling method for same
JPH033616Y2 (en)
JP2927731B2 (en) PC girder transfer device
JP6873435B2 (en) Suspended scaffolding and its erection method
CN2337186Y (en) Hoisting machine for ecrecting bridge flooring
JP2673165B2 (en) Mobile scaffolding equipment for bridges
CN216377240U (en) Truss car for railway bridge deck system in steel truss girder
CN217352191U (en) Novel bridge girder erection machine for wharf
JPH07102531A (en) Method and device for overhanging installation of bridge
JPH073728A (en) Removal of overhead bridge and bridge girder and device therefor
JPS6335053Y2 (en)
KR100304538B1 (en) Traveling equipment of truck for works on lower part of bridge
CN212247887U (en) Portable single-rail bridge girder erection machine
CN214828467U (en) Self-propelled block hoisting and transporting equipment
JPS6035604Y2 (en) bridge inspection vehicle
CN108643038B (en) Inspection device and inspection method for truss bridge
CN113979318A (en) Truss car for railway bridge deck system in steel truss girder and using method thereof
KR20010086836A (en) Telescopical Trolley Car for Inspection
JPS6356362B2 (en)
JPH01192693A (en) Bridge crane
RU2001133976A (en) The method of loading self-propelled equipment on a railway platform and a railway vehicle for implementing the method