JPH0340169B2 - - Google Patents

Info

Publication number
JPH0340169B2
JPH0340169B2 JP7920086A JP7920086A JPH0340169B2 JP H0340169 B2 JPH0340169 B2 JP H0340169B2 JP 7920086 A JP7920086 A JP 7920086A JP 7920086 A JP7920086 A JP 7920086A JP H0340169 B2 JPH0340169 B2 JP H0340169B2
Authority
JP
Japan
Prior art keywords
sheet pile
pile wall
hole
reinforcing
wall structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP7920086A
Other languages
Japanese (ja)
Other versions
JPS62236922A (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP7920086A priority Critical patent/JPS62236922A/en
Publication of JPS62236922A publication Critical patent/JPS62236922A/en
Publication of JPH0340169B2 publication Critical patent/JPH0340169B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は、矢板壁構造物の補強方法に関する
ものであり、一層詳細には、既設の矢板構造物を
増強する際に好適に使用される補強方法に関する
ものである。
[Detailed Description of the Invention] [Field of Industrial Application] The present invention relates to a method for reinforcing a sheet pile wall structure, and more specifically, a method suitably used when reinforcing an existing sheet pile structure. This relates to a reinforcing method.

〔従来技術〕[Prior art]

従来より、矢板壁構造物は土留や締切などの仮
設用構造物あるいは繋舶岸壁や護岸などの永久構
造物の一部として広範に使用される。
Conventionally, sheet pile wall structures have been widely used as temporary structures such as earth retaining walls and cofferdams, or as part of permanent structures such as mooring quays and seawalls.

この矢板壁構造物は、横方向に並べた多数の鋼
矢板、鋼管矢板などの矢板を所定の深さまで打ち
込んで壁面を形成すると共にこの壁面上部と背部
控え工とをタイロツド等の定着引張部材を介して
緊結し、矢板壁面に働く圧力を控え工と鋼矢板の
根入れ部分に働く土圧により支持する構造となつ
ているが、矢板壁の断面強度が腐蝕等により低下
した際やこの矢板壁構造物を繋船岸壁として使用
した場合に矢板壁前面を浚渫して水深を深くする
際等には矢板壁の補強を行う必要がある。
This sheet pile wall structure is constructed by driving a large number of horizontally arranged sheet piles, such as steel sheet piles and steel pipe sheet piles, to a predetermined depth to form a wall surface.The upper part of the wall surface and the back support are connected using fixed tension members such as tie rods. The structure is such that the pressure acting on the sheet pile wall is supported by the earth pressure acting on the backing work and the embedded part of the steel sheet pile, but when the cross-sectional strength of the sheet pile wall decreases due to corrosion etc. When the structure is used as a mooring quay and the front surface of the sheet pile wall is dredged to deepen the water depth, it is necessary to reinforce the sheet pile wall.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

そこで、このような既設の矢板壁構造物を補強
する手段としては、既存の矢板壁を撤去して造り
直したり、前面に大型の矢板壁を形成して既存の
矢板壁を包み込んだりする方法等が採用されてい
るが、いずれの方法も大工事で費用も嵩むという
問題があり、殊に、繋船岸壁の場合は周辺のバー
スも含めて使用不能となつたりあるいは岸壁法線
の変更に伴う計画手続などに問題が生じるという
欠点があつた。
Therefore, as a means of reinforcing such an existing sheet pile wall structure, there are methods such as removing the existing sheet pile wall and rebuilding it, or forming a large sheet pile wall in front and wrapping it around the existing sheet pile wall. However, both methods have the problem of large-scale construction and high costs.Especially in the case of moored berths, the surrounding berths may become unusable, or plans due to changes in the normal line of the berth may occur. The drawback was that there were problems with procedures.

また、既設の矢板壁構造物の上部工(エプロ
ン)を撤去して裏込め土砂を大量に掘削した後、
定着引張部材を増設する方法も考えられるが、こ
の場合は既設の定着引張部材と控え工とのバラン
スに配慮しながら作業を行う必要があるため極め
て面倒であるだけでなく危険もともなうため実際
的でないという問題点を有していた。
In addition, after removing the superstructure (apron) of the existing sheet pile wall structure and excavating a large amount of backfill earth and sand,
It is possible to add additional anchoring tension members, but in this case, it is not only extremely troublesome, but also dangerous, as the work must be carried out while taking into consideration the balance between the existing anchorage tension members and the backing work, so it is not practical. The problem was that it was not.

〔問題点の解決手段〕[Means for solving problems]

そこで、この発明では前述の問題点を解決する
ために、既設矢板壁構造物の控え工の背部からこ
の控え工および裏込め土砂を介して矢板壁背面に
おける既設引張定着部材の取付位置下方に達する
細孔を穿設し、次に矢板壁に前記細孔と連通する
通孔を開設し、細孔および通孔に引張定着部材を
挿通し、さらにこの引張定着部材の矢板側端部を
支保材を介して矢板壁に定着すると共に他端部側
を引張して控え工の所定個所に定着することによ
り増強を図ろうとするものである。
Therefore, in order to solve the above-mentioned problems, this invention reaches from the back of the backing of the existing sheet pile wall structure to the lower part of the mounting position of the existing tension anchoring member on the back of the sheet pile wall through this backing and backfilling earth. A pore is bored, then a through hole communicating with the pore is opened in the sheet pile wall, a tension anchoring member is inserted into the pore and the through hole, and the end of the tension anchoring member on the sheet pile side is connected to the shoring material. The aim is to strengthen the structure by fixing it to the sheet pile wall via the bolt, and by pulling the other end and fixing it to a predetermined location on the backing work.

なお、この場合、控え工の背部から細孔を穿設
するに際し、控え工の背部の一部を掘削しておけ
ば増設する引張定着部材の定着傾斜角度を緩やか
にすることができるので効果的な補強を行うこと
ができ、さらには細孔は矢板壁の前面もしくは背
面のいずれからも開設することができる。
In this case, when drilling a small hole from the back of the support work, it is effective to excavate a part of the back of the support work because the anchoring angle of the tension anchoring member to be added can be made gentler. Further, the pores can be opened from either the front or back side of the sheet pile wall.

〔作用〕[Effect]

この発明に係る矢板壁構造物の補強方法では、
既設の定着引張部材と新設の定着引張部材とを共
働させて補強を行うものである。
In the method for reinforcing a sheet pile wall structure according to the present invention,
Reinforcement is performed by making the existing anchoring tension member and the newly installed anchoring tension member work together.

〔実施例〕〔Example〕

次に、本発明に係る矢板壁構造物の補強方法の
好適な実施例につき添付図面を参照しながら以下
詳細に説明する。
Next, a preferred embodiment of the method for reinforcing a sheet pile wall structure according to the present invention will be described in detail with reference to the accompanying drawings.

第1図は矢板壁構造物としての既設繋船岸壁を
示すものであり、この繋船岸壁は横方向に並べた
多数の鋼矢板1を海底に打ち込んで岸壁面3を形
成すると共にこの岸壁面3の背部に裏込め土砂5
を介して控え工7を配設し、控え工7と岸壁面3
上部とをタイロツド9を介して緊結することによ
り構成されており、裏込め土砂5上にはエプロン
11が設置されている。
Figure 1 shows an existing mooring quay as a sheet pile wall structure.This mooring quay is constructed by driving a large number of horizontally arranged steel sheet piles 1 into the seabed to form a quay surface 3. Backfill earth and sand 5
A support work 7 is installed through the support work 7 and the quay surface 3.
An apron 11 is installed on top of the backfill earth and sand 5.

このように構成される繋船岸壁を補強するに際
しては、まず、上部コンクリート9背部のエプロ
ン部分を取り除き裏込め土砂5を所定の深さまで
掘削して削孔機13を設置する(第2図参照)。
なお、この場合、控え工側取付け位置を上方にと
る場合はこの掘削工程を省略することもできる。
When reinforcing the mooring quay constructed in this manner, first, the apron portion behind the upper concrete 9 is removed, backfill earth and sand 5 is excavated to a predetermined depth, and a hole drill 13 is installed (see Figure 2). .
In this case, this excavation step can be omitted if the mounting position on the backing work side is set upward.

次に、削孔機13を使用して控え工7、裏込め
土砂5を介して岸壁背面においてタイロツド9の
取付位置下方に達する所定角度の細孔15を穿設
し、この細孔15が岸壁背面に達したらそのまま
の角度で岸壁面3に通孔17を開設する(第3図
参照)。また、通孔17を開設する方法としては
適宜の穿孔機を使用して岸壁面3前方から開設す
ることもできる。
Next, a hole 15 at a predetermined angle is drilled at the back of the quay wall through the backfill 7 and the backfilling earth and sand 5 using the drilling machine 13, reaching below the attachment position of the tie rod 9. When the back surface is reached, a through hole 17 is opened in the quay surface 3 at the same angle (see Fig. 3). Further, as a method of opening the through hole 17, it is also possible to open it from the front of the quay surface 3 using an appropriate drilling machine.

次いで、削孔機13を移動した後控え工7背部
側から新設のタイロツド19を細孔15および通
孔17を介して挿通配置し、このタイロツド19
の一端部を適宜の取着具(図示せず)により腹起
し21を介して岸壁面3に定着すると共に他端部
を適宜の引張装置で引張した状態で控え工7に定
着することにより該岸壁面3と控え工7とを緊結
し、さらに掘削部分を覆土した後エプロンを形成
する(第4図参照)。
Next, after moving the hole drilling machine 13, a newly installed tie rod 19 is inserted from the back side of the backing work 7 through the small hole 15 and the through hole 17, and this tie rod 19 is inserted.
By fixing one end part to the quay wall surface 3 via the belly riser 21 using an appropriate fixture (not shown), and fixing the other end part to the support work 7 while being pulled by an appropriate tension device. After the quay wall surface 3 and the backing work 7 are tied together and the excavated portion is covered with soil, an apron is formed (see Fig. 4).

このような繋船岸壁の補強方法によれば、定着
引張部材を増設するだけなので簡便で工事期間中
でも岸壁の使用が可能であるだけでなく、岸壁法
線の移動もなく、工事費も安価で所期の目的を達
成することができる。
According to this method of reinforcing a moored quay, it is simple and allows the quay to be used even during the construction period because it only requires the addition of fixed tension members, and there is no movement of the quay's normal line, and the construction cost is low and the space can be saved. be able to achieve the objectives of the term.

〔効果〕〔effect〕

先に述べたように本発明方法は控え工、裏込め
土砂および矢板壁に削孔を行つて定着引張部材の
増設を行うだけなので極めて安全にかつ容易に補
強することができるだけでなく、裏込め土砂の除
去を行う必要がないので、増設した定着引張部材
に対する裏込め土砂による曲げ応力の影響も少な
く、従つて、リングジヨイントも不用となり確実
な補強を達成することができる等種々の利点を有
する。
As mentioned earlier, the method of the present invention only involves drilling holes in the support work, backfilling earth and sand, and sheet pile walls and adding anchorage tension members, so not only can reinforcement be extremely safe and easy, but also the backfilling can be done easily. Since there is no need to remove earth and sand, the effect of bending stress due to backfilling earth and sand on the added anchorage tension member is small, and therefore, there is no need for a ring joint, and reliable reinforcement can be achieved. have

以上、本発明方法の好適な実施例として繋船岸
壁の補強方法につき説明したが、本発明方法はこ
の実施例に限定されるものではなく、例えば、ド
ライドツクの場合等は矢板壁前面から控え工に達
する通孔および細孔を穿設してもよく、また、自
立式矢板壁構造物の場合は控え工の新設と併せて
行えば有効な補強方法としても利用でき、さらに
は定着引張部材としてタイロープなどを使用する
等本発明の精神を逸脱しない範囲内において種々
の変更をなし得ることは勿論である。
Although the method of reinforcing a mooring quay has been described above as a preferred embodiment of the method of the present invention, the method of the present invention is not limited to this embodiment. Through-holes and pores may be drilled to reach the wall, and in the case of self-supporting sheet pile wall structures, this can be used as an effective reinforcement method in conjunction with the installation of new buttresses. Furthermore, tie ropes can be used as anchorage tension members. It goes without saying that various changes can be made without departing from the spirit of the invention, such as using the following.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明方法を実施する場合の既設繋船
岸壁の説明図、第2図〜第4図は第1図に示す既
設繋船岸壁の補強方法の説明図である。 1:鋼矢板、3:岸壁面、5:裏込め土砂、
7:控え工、9:タイロツド、11:エプロン、
13:削孔機、15:細孔、17:通孔、19:
タイロツド、21:腹起し。
FIG. 1 is an explanatory diagram of an existing mooring quay in the case of carrying out the method of the present invention, and FIGS. 2 to 4 are explanatory diagrams of a method for reinforcing the existing mooring quay shown in FIG. 1. 1: steel sheet pile, 3: quay surface, 5: backfill earth and sand,
7: Standing work, 9: Tie rod, 11: Apron,
13: Hole drilling machine, 15: Pore, 17: Through hole, 19:
Tirod, 21: Get up on your stomach.

Claims (1)

【特許請求の範囲】 1 控え工の背部からこの控え工および裏込め土
砂を介して矢板壁背面における既設引張定着部材
の取付位置下方に達する細孔を穿設し、次に矢板
壁に前記細孔と連通する通孔を開設し、前記細孔
および通孔に引張定着部材を挿通し、さらにこの
引張定着部材の矢板側端部を支保材を介して矢板
壁に定着すると共に他端部を引張して控え工の所
定個所に定着することを特徴とする矢板壁構造物
の補強方法。 2 控え工の背部から細孔を穿設するに際し、控
え工の背部を予じめ掘削することからなる特許請
求の範囲第1項記載の矢板壁構造物の補強方法。 3 通孔は、矢板壁の前面から開設することから
なる特許請求の範囲第1項又は第2項記載の矢板
壁構造物の補強方法。 4 通孔は、控え工の背部から細孔を穿設する際
矢板壁の背面からそのまま開設することからなる
特許請求の範囲第1項又は第2項記載の矢板壁構
造物の補強方法。
[Scope of Claims] 1. A fine hole is drilled from the back of the support work through the support work and backfilling soil to reach the lower part of the mounting position of the existing tension anchoring member on the back surface of the sheet pile wall, and then the fine hole is drilled in the sheet pile wall. A through hole communicating with the hole is opened, a tension fixing member is inserted into the small hole and the through hole, and the end of the tension fixing member on the sheet pile side is fixed to the sheet pile wall via the shoring material, and the other end is fixed to the sheet pile wall. A method for reinforcing a sheet pile wall structure, the method comprising tensioning and fixing the sheet pile wall structure at a predetermined location on a support structure. 2. The method for reinforcing a sheet pile wall structure according to claim 1, which comprises excavating the back of the backing in advance when drilling the pores from the back of the backing. 3. The method for reinforcing a sheet pile wall structure according to claim 1 or 2, wherein the through hole is opened from the front side of the sheet pile wall. 4. The method for reinforcing a sheet pile wall structure according to claim 1 or 2, wherein the through hole is opened directly from the back side of the sheet pile wall when boring the small hole from the back side of the support work.
JP7920086A 1986-04-08 1986-04-08 Method of reinforcing sheet pile-wall structure Granted JPS62236922A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7920086A JPS62236922A (en) 1986-04-08 1986-04-08 Method of reinforcing sheet pile-wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7920086A JPS62236922A (en) 1986-04-08 1986-04-08 Method of reinforcing sheet pile-wall structure

Publications (2)

Publication Number Publication Date
JPS62236922A JPS62236922A (en) 1987-10-17
JPH0340169B2 true JPH0340169B2 (en) 1991-06-18

Family

ID=13683318

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7920086A Granted JPS62236922A (en) 1986-04-08 1986-04-08 Method of reinforcing sheet pile-wall structure

Country Status (1)

Country Link
JP (1) JPS62236922A (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002275891A (en) * 2001-03-13 2002-09-25 Chem Grouting Co Ltd Construction method of tie rod anchor
JP4911242B2 (en) * 2010-11-29 2012-04-04 株式会社大林組 Reinforcement structure of existing gravity quay
CN106245657B (en) * 2016-08-25 2018-12-18 安徽省城建设计研究总院股份有限公司 A kind of purlin anchor support construction for pattern foundation pit supporting structure

Also Published As

Publication number Publication date
JPS62236922A (en) 1987-10-17

Similar Documents

Publication Publication Date Title
CN102094425B (en) Foundation pit construction method adopting shallow buried depth Larsen steel plate pile as protective cofferdam
CN108457282A (en) Deep water hard rock is without back cover steel sheet pile cofferdam construction method
CN109780325A (en) A kind of water factory's water intaking tunnel submarine pipeline installation method
CN111560962A (en) Backfill area foundation pit supporting structure and construction method thereof
JP3979466B2 (en) Temporary closing method
JP2002047676A (en) Buoyancy preventing structure and its construction method
JP4206165B2 (en) Temporary deadline construction method
JP2002146811A (en) Construction method for underwater structure foundation
CN104499489B (en) Foundation pit construction method
CN104480945B (en) A kind of foundation ditch reversed construction method
JPH06146305A (en) Underwater foundation and installation method thereof
CN110258600A (en) A kind of vertical cofferdam construction engineering method suitable for deep water waters
JP5028781B2 (en) Reinforcing and reinforcing method for existing quay and its reinforcing structure
JPH0340169B2 (en)
JP2697558B2 (en) Independent mountain retaining wall method
CN207659988U (en) Crane beam on rock wall for underground power house present situation foundation reinforcing structure
JP4066340B2 (en) Ground improvement method
JP4780004B2 (en) Reinforcing and reinforcing method for existing quay and its reinforcing structure
CN109629587A (en) Steel caisson pile body structure and construction method for library bank abrupt slope
CN110080249A (en) A kind of pressure filling formula Diaphragm Wall Support Structure and its construction method
JPH0768707B2 (en) Open caisson method
JP3168197B2 (en) Caisson anchor structure and construction method