JPH03144073A - Reinforcing bar arranging method for reinforced concrete structure - Google Patents

Reinforcing bar arranging method for reinforced concrete structure

Info

Publication number
JPH03144073A
JPH03144073A JP28235089A JP28235089A JPH03144073A JP H03144073 A JPH03144073 A JP H03144073A JP 28235089 A JP28235089 A JP 28235089A JP 28235089 A JP28235089 A JP 28235089A JP H03144073 A JPH03144073 A JP H03144073A
Authority
JP
Japan
Prior art keywords
reinforcing bar
unit
bar unit
reinforcement
bars
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP28235089A
Other languages
Japanese (ja)
Inventor
Katsuya Matsushita
克也 松下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Misawa Homes Co Ltd
Original Assignee
Misawa Homes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Misawa Homes Co Ltd filed Critical Misawa Homes Co Ltd
Priority to JP28235089A priority Critical patent/JPH03144073A/en
Publication of JPH03144073A publication Critical patent/JPH03144073A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To facilitate arrangement of reinforcing bars by a method wherein sheets are arranged at a connection part between latticeform reinforcing bar units erected in parallel along the two units, and a connection part reinforcing bar unit is inserted therebetween. CONSTITUTION:Sheets 7 and 8 in an L-shape in cross section are arranged at the corner of connection between latticeform reinforcing bar units 4a and 4b erected in parallel on a foundation 5 along the reinforcing units 4a and 4b. A connection part reinforcing bar unit 6 in an L-shape in cross section is inserted between the L-shaped sheets 7 and 8. Thereafter, the sheets 7 and 8 are pulled off, and concrete is placed. During insertion of the connection part reinforcing bar unit 6, the connection part reinforcing bar unit is prevented from being hooked by other units 4a and 4b. This constitution improves the efficiency of a reinforcing bar arranging work.

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は、鉄筋コンクリート構造物に係り、特に、配筋
の容易化を図った鉄筋ユニットの間から抜いて配筋方法
に関するものである。
DETAILED DESCRIPTION OF THE INVENTION [Industrial Application Field] The present invention relates to reinforced concrete structures, and particularly relates to a method of arranging reinforcement by removing reinforcement from between reinforcing bar units to facilitate the arrangement of reinforcement.

[従来・の技術] 従来、鉄筋コンクリート構造物を構築する場合、例えば
、その壁体の配筋は、基礎コンクリートを打つ際に、複
数の縦筋を基礎コンクリート内に植え連み、これら縦筋
に、直交するように複数の横筋を溶接等の手段により配
設して格子状に形成し、次いて、壁体と壁体とが交差す
る角部または隅部における壁体の連結部分においては、
壁体側の縦筋の間隔よりも狭い間隔で基礎コンクリート
に、隅角部補強筋(縦筋)を配設しておいて、次いで、
これら隅角部補強筋に、前記横筋に連接されるよよって
連結して、配筋を行っていた。
[Conventional technology] Conventionally, when constructing a reinforced concrete structure, for example, when pouring foundation concrete, a plurality of vertical reinforcements were planted in the foundation concrete, and these vertical reinforcements were connected. , a plurality of horizontal stripes are arranged perpendicularly by means such as welding to form a lattice shape, and then, at the corner where the walls intersect, or at the connecting portion of the walls,
Corner reinforcing bars (vertical bars) are placed in the foundation concrete at intervals narrower than the vertical bars on the wall side, and then,
Reinforcement was performed by connecting these corner reinforcing bars to the transverse reinforcement.

[発明が解決しようとする課題] しかしながら、従来の技術においては、横筋および添え
筋の配設作業を現場ζこおいて行わなければならないの
で、現場作業が繁雑で時間がかかるという問題があった
[Problems to be Solved by the Invention] However, in the conventional technology, the work of arranging the transverse reinforcements and splint reinforcements had to be carried out on-site, so there was a problem that the work on-site was complicated and time-consuming. .

そこで、配筋をユニット化して、現場作業の簡(l化を
図ることが考えられているが、壁体の直線部分の配筋に
ついては、ユニット化が図れるが、I′71部等の連結
部分をユニット化しても、やはり、直線部分と連結部分
の連結作業が一本、−本の添え筋を直線部分と溶接また
は結束線等で連結しなければならず、その配設作業が繁
雑で時間がかかるという問題があった。
Therefore, it has been considered to simplify the on-site work by unitizing the reinforcement arrangement, but it is possible to unitize the reinforcement arrangement in the straight parts of the wall, but the connection of parts such as I'71 Even if the parts are made into units, the work of connecting the straight parts and the connecting parts still requires connecting the two splints with the straight parts by welding or binding wires, and the installation work is complicated. The problem was that it took time.

本発明は、上記事情に鑑みてなされたもので、その目的
は、配筋作業を容易に、しかも短時間に行うことができ
る鉄筋ユニットの間から抜いて配筋方法を提供すること
にある。
The present invention has been made in view of the above circumstances, and an object thereof is to provide a method for arranging reinforcement by removing the reinforcement from between reinforcing bar units, which allows reinforcement work to be performed easily and in a short period of time.

[課題を解決するための手P] この発明は、それぞれ縦筋および横筋からなる格子状に
形成された内側鉄筋ユニットと外側鉄筋ユニットとを、
各方面の壁体が立設される基礎に、それぞれ所定の間隔
をおいて平行に立設し、それら鉄筋の端部における壁体
同士の連結部分に、)夏数の縦筋およびこれら縦筋を連
結する添え筋からなる継手ユニットを各方面の壁体同士
の間の内側鉄筋ユニットと外側鉄筋ユニットとの間に挿
入するようにして壁体同士の鉄筋を連結する鉄筋コンク
リート構造物の配筋方法てあって、 前記継手ユニットを、それぞれの外側鉄筋ユニットおよ
び内側鉄筋ユニットに添う薄板状の板tオを介して壁体
同士の連結部分におけるそれぞれの外側鉄筋ユニットと
内側鉄筋ユニットとの間に落とし込んで、前記板材だけ
を継手ユニットと外側鉄筋ユニットおよび内側鉄筋ユニ
ットの間から抜い外側鉄筋ユニットおよび内側。
[Method P for Solving the Problems] This invention provides an inner reinforcing bar unit and an outer reinforcing bar unit formed in a lattice shape each consisting of vertical bars and horizontal bars,
The walls in each direction are erected in parallel with each other at predetermined intervals on the foundation on which the walls are erected, and at the connecting parts of the walls at the ends of these reinforcing bars, there are vertical reinforcements and these vertical reinforcements. Reinforcement method for reinforced concrete structures that connects the reinforcing bars between walls by inserting a joint unit consisting of splint reinforcement between the inner reinforcing bar unit and the outer reinforcing bar unit between the walls in each direction. The joint unit is dropped between each outer reinforcing bar unit and inner reinforcing bar unit at the connecting portion between the walls through a thin plate-like plate that follows each outer reinforcing bar unit and inner reinforcing bar unit. Then, remove only the plate material from between the joint unit, the outer reinforcing bar unit, and the inner reinforcing bar unit, and remove the outer reinforcing bar unit and the inner reinforcing bar unit.

[作用 ] 本発明に係る鉄筋ユニットの間から抜いて配筋方法によ
れば、現場における配筋作業が外側鉄筋ユニットと内側
鉄筋ユニットの立設、および、外側鉄筋ユニットと内側
鉄筋ユニットの端部におけるその空間に継手ユニットを
落とし込む作業だけでよく、その落とし込みの際には、
薄板状の板材を用いて継手ユニットを外側鉄筋ユニット
と内側鉄筋ユニットとの間に落とし込むので、内側鉄筋
ユニットと外I11鉄筋ユニットとの間に継手ユニット
が引っ掛かることなく円滑に落とし込むことができる。
[Function] According to the reinforcing bar arrangement method according to the present invention, the reinforcing bar arrangement work at the site involves the erection of the outer reinforcing bar unit and the inner reinforcing bar unit, and the end portions of the outer reinforcing bar unit and the inner reinforcing bar unit. All you have to do is drop the joint unit into that space, and when dropping it in,
Since the joint unit is dropped between the outer reinforcing bar unit and the inner reinforcing bar unit using a thin plate material, the coupling unit can be dropped smoothly without being caught between the inner reinforcing bar unit and the outer I11 reinforcing bar unit.

[実施例コ 以下、本発明に係る鉄筋ユニットの間から抜いて配筋方
法を適用した鉄筋コンクリート構造物の構築方法の一実
施例について、構築順序に従って第1図ないし第8図を
参照して説明する。
[Example 1] Hereinafter, an example of a method for constructing a reinforced concrete structure in which the reinforcing bar arrangement method according to the present invention is applied will be described in accordance with the construction order with reference to FIGS. 1 to 8. do.

(1)基礎部および床部の構築工程ならびに壁部鉄筋ユ
ニットの立設工程 まず、第1図に示すように、床部の厚み分だけ地盤を掘
り下げるとともに、床部周囲の壁体基礎を形成する部分
を床部よりさらに低く掘り下げる。
(1) Construction process of the foundation and floor, and erection process of the wall reinforcing bar unit First, as shown in Figure 1, the ground is dug down to the thickness of the floor, and the wall foundation around the floor is formed. Dig the area lower than the floor.

そして、その低く掘り下げた床部周囲1.1に、壁−床
連紡ユニヅト2を配設する。
Then, a wall-floor continuous spinning unit 2 is disposed around the floor portion 1.1 dug low.

この壁−床連結ユニット2は、2本の平行に配設された
下端筋2a、2aと、同平行な上端筋2b2bと、これ
ら上端筋2bおよび下端筋2aとの間に配設され、た腹
筋2 c、 2 cと、これらを連結する帯筋2 d、
 2 d・・・・・・とからなる直方体状の篭状筋に、
床部の鉄筋に連結される床部手筋2eが上端筋2b。
This wall-floor connection unit 2 is arranged between two parallel bottom reinforcements 2a, 2a, a parallel top reinforcement 2b and 2b, and the top reinforcement 2b and bottom reinforcement 2a. Abdominal muscles 2 c, 2 c, and strap muscles 2 d that connect these,
2 A rectangular parallelepiped-shaped cage muscle consisting of d...
The floor reinforcing bars 2e connected to the reinforcing bars on the floor are the upper end reinforcing bars 2b.

2bまたは腹筋2 c、 2 cに掛は渡すように水平
方向に突出して配設され、さらに、壁部の鉄筋に連結さ
れる壁継手筋2f、2「が上端筋2b1腹筋2Cおよび
下端筋2aに連結されて垂直方向に突出するように配設
されている。
2b or abdominal muscles 2c, 2c are arranged so as to protrude horizontally so as to pass over them, and wall joint reinforcements 2f, 2'' connected to the reinforcing bars of the wall are connected to the upper end reinforcements 2b1 the abdominal muscles 2C and the lower end reinforcements 2a. It is connected to and arranged to protrude in the vertical direction.

床部手筋2 e、 2 e・・・・・・は、上端筋およ
び下端筋の2段構成であるとともに、壁継手筋2f、2
f・・は、内側筋および外側筋から構成されている。
Floor reinforcements 2e, 2e... have a two-stage configuration of upper end reinforcements and lower end reinforcements, and wall joint reinforcements 2f, 2e...
f... is composed of the medial muscle and the lateral muscle.

次に、第2図に示すように、床部手筋2 e、 2 e
に、格子状に形成された上下の床部鉄筋ユニット3.3
・・・・・を溶接またはジヨイント部材等を用いて連結
するとともに、壁部鉄筋ユニット4.4を連結する。
Next, as shown in FIG. 2, the floor hand muscles 2 e, 2 e
Upper and lower floor reinforcing bars units formed in a grid pattern 3.3
... are connected by welding or using joint members, etc., and the wall reinforcing bar units 4.4 are connected.

そして、コンクリートを打設し、基礎部および床部を一
体に形成するとと乙に、第3図に示すようにそれぞれの
壁体が構築される基礎5上に、壁部鉄筋ユニット4.4
がそれぞれ立設される。
Then, when concrete is poured and the foundation and floor are integrally formed, wall reinforcement units 4 and 4 are placed on the foundation 5 on which each wall will be constructed, as shown in FIG.
will be erected respectively.

(11)壁体の構築工程 上記のように配設された壁部鉄筋ユニット4゜4は、第
3図に示すように、それぞれ内側鉄筋ユニット4aおよ
び外側鉄筋ユニット4bからなり、それぞれ縦筋Aおよ
び横筋Bからなる格子状に形成されており、上記のよう
に、その縦筋の下端部が117j記床−壁継手ユニット
2の壁継手筋2 e、 2 eに連結されて、基礎コン
クリート内に埋設されているとともに、内(1111鉄
筋ユニット4aと外側鉄筋ユニット4bとが所定の間隔
をおいて平行になるように立設されている。
(11) Wall construction process The wall reinforcing bar unit 4゜4 arranged as described above consists of an inner reinforcing bar unit 4a and an outer reinforcing bar unit 4b, respectively, as shown in FIG. and horizontal reinforcements B, and as mentioned above, the lower ends of the vertical reinforcements are connected to the wall joint reinforcements 2e and 2e of the floor-wall joint unit 2 marked 117j, and The inner (1111) reinforcing bar unit 4a and the outer reinforcing bar unit 4b are erected in parallel with a predetermined interval.

そして、第3図に示す壁体と壁体とのL字状に交差する
連結部分5に、第4図に示すように、それら壁部鉄筋ユ
ニット4.4の内側鉄筋ユニット4aと外側鉄筋ユニッ
ト4bとの間にそれぞれ入る腕筋を有する予めL字状に
形成された継手ユニット6を配設する。
Then, as shown in FIG. 4, the inner reinforcing bar unit 4a and the outer reinforcing bar unit of the wall reinforcing bar units 4. A joint unit 6 previously formed in an L-shape having arm muscles inserted between the joint unit 4b and the joint unit 4b is disposed.

この継手ユニット6は、複数の縦筋6 a、 6 a・
・・をL字状の添え筋6 b、 6 c・・・・・にて
交互に連結して立体的なL字状に形成したものである。
This joint unit 6 includes a plurality of vertical bars 6a, 6a,
... are connected alternately by L-shaped splints 6b, 6c, etc. to form a three-dimensional L-shape.

この継手ユニット6を壁体の内側鉄筋ユニット4aと外
側鉄筋ユニット4bとの間に挿入するときには、第5図
に示すように、壁体交差部における山内側鉄筋ユニット
4a、4aに沿うL字状の鋼板7と、同外側鉄筋ユニッ
ト4b、4bに沿う鋼板8を継手ユニット6の両ff1
11から挾み込むようにして、壁部鉄筋ユニット4.4
の内側鉄筋ユニット4aお、Lび外側鉄筋ユニット4b
の間に落とし込む。
When inserting this joint unit 6 between the inner reinforcing bar unit 4a and the outer reinforcing bar unit 4b of the wall, as shown in FIG. The steel plate 7 of
11, insert the wall reinforcing bar unit 4.4.
Inner reinforcing bar unit 4a, L and outer reinforcing bar unit 4b
drop it in between.

そして、鋼板7.8を上方に引き抜いて、第6図に示す
ように継手ユニット6が配設される。
Then, the steel plate 7.8 is pulled upward, and the joint unit 6 is installed as shown in FIG.

最後に、第7図に示すように、型枠9を壁体の内側鉄筋
ユニット5aおよび外側鉄筋ユニット5bに沿って配設
し、上方からコンクリートを流し込んで、壁体を第8図
のように形成する。
Finally, as shown in Fig. 7, formwork 9 is placed along the inner reinforcing bar unit 5a and outer reinforcing bar unit 5b of the wall, and concrete is poured from above to form the wall as shown in Fig. 8. Form.

しかして、このような鉄筋ユニットの間から抜いて配筋
方法によれば、現場における壁体と壁体との間の配筋を
行う場合、基礎上に立設されfこ内側鉄筋ユニット4a
と外側鉄筋4bとの間に、継手ユニット6を落とし込む
作業だけでよく、その落とし込みの際においても、薄板
状の鋼板78を用いて、内側鉄筋ユニッh4aと外側鉄
筋ユニット4bとの間に継手ユニット6が引っ掛かるこ
となく円滑に落とし込むことができる。
According to this method of placing reinforcement between the reinforcing bar units, when arranging reinforcement between walls on site, the inside reinforcing bar unit 4a that is erected on the foundation is
All that is required is to drop the joint unit 6 between the inner reinforcing bar unit h4a and the outer reinforcing bar unit 4b. 6 can be dropped smoothly without getting caught.

また、上記のように、床−壁継手ユニット2、床部鉄筋
ユニット3、内側鉄筋ユニット4a、外側鉄筋ユニット
4bS継手ユニット6が予め工場等において製作されて
いるので、現場における作業が大幅に簡単化され、その
工期も大幅に短縮することができる。
In addition, as mentioned above, the floor-wall joint unit 2, floor reinforcing bar unit 3, inner reinforcing bar unit 4a, outer reinforcing bar unit 4bS joint unit 6 are prefabricated in a factory, etc., so the work on site is greatly simplified. , and the construction period can be significantly shortened.

なお、上記実* filでは、壁体が17字状に交差す
る角部(第10図)の配筋を例に挙げて説明したが、第
1I図〜第13図に示すように、十字状に交差する部分
、T字状に交差する部分および直線状にて連結される部
分等の継手筋lOを各方面の壁体の内11111鉄筋ユ
ニット4aと外側鉄筋ユニット4bとの間に入るように
各方面の腕筋を有するようにユニット化して上記と同様
に鋼板を用いて挿入するようにしてもよい。
In addition, in the actual * fil above, the reinforcement arrangement at the corner where the wall intersects in a 17-shape (Fig. 10) was explained as an example, but as shown in Figs. The joint reinforcements 10, such as the parts that intersect with each other, the parts that intersect in a T-shape, and the parts that are connected in a straight line, are placed between the 11111 reinforcing bar unit 4a and the outer reinforcing bar unit 4b of the walls in each direction. It may be made into a unit so as to have arm muscles in each direction and inserted using a steel plate in the same manner as above.

[発明の効果] 以上説明したようにこの発明に係る鉄筋ユニットの間か
ら抜いて配筋方法によれば、現場における壁体と壁体と
の間の配筋が、継手ユニットを平行に配設された内側鉄
筋ユニットと外■す鉄筋ユニットとの間に落とし込む作
業だけでよく、その落とし込みの際においてら、薄板状
の板材を用いて、内側鉄筋ユニットと外側鉄筋ユニット
との間に継手ユニットが引っ掛かることなく円滑に落と
し込むことができる。したがって、鉄筋の連結部等にお
ける溶接や結束作業等の連結作業を行う必要がなく、作
業簡単化を図ることができ、大幅な工期短縮を図ること
ができる。
[Effects of the Invention] As explained above, according to the reinforcing bar arrangement method according to the present invention, the reinforcing bars between the walls can be arranged in parallel with the joint units. It is only necessary to insert the joint unit between the inner reinforcing bar unit that has been removed and the reinforcing bar unit that is to be removed. It can be dropped smoothly without getting caught. Therefore, there is no need to perform connection work such as welding or binding work at the joints of reinforcing bars, etc., making it possible to simplify the work and significantly shorten the construction period.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図〜第8図は、この発明に係る鉄筋ユニットの間か
ら抜いて配筋方法の一実施例を示す斜視図であり、第1
図および第2図は基礎および床部の構築工程を示す斜視
図であり、第1図は基礎の隅部鉄筋を配設した状態を示
す斜視図、第2図は床鉄筋を配設した状態を示す斜視図
、第3図〜第8図は壁体の構築工程の示す斜視図であり
、第3図は外側鉄筋および内側鉄筋を配設した状態を示
す斜視図、第4図は隅角部鉄筋を示す斜視図、第5図は
隅角部鉄筋を内側鉄筋と外測鉄筋との間に鋼板を介して
隅角部鉄筋を挿入している状態を示す斜視図、第6図は
鋼板を引き抜いた状態を示す斜視図、第7図はコンクリ
ートを打設している状態を示す斜視図、第8図は壁体が
完成した状態を示す斜視図、第9図〜第12図はそれぞ
れこの発明の配筋方広を用いたコンクリート構造物の平
面図を示すものであり、第9図はL字状の壁体の連結部
分を示す平面図、第10図は十字状の壁体の連結部分を
示す平面図、第11図は壁体の直線部の連結部分を示す
平面図、第12図はT字状の壁体の連結部分を示す平面
図である。 2・・・・・・床−壁連結ユニット、 3・・・・・床部鉄筋ユニット、 4・・・・・・壁部鉄筋、4a・・・・・・内側鉄筋ユ
ニット、4 b・・・ 外側鉄筋ユニット、 ・基礎、 6 ・・・ ・継手ユニット、 8・・・・・・鋼板、 ・型枠。
1 to 8 are perspective views showing one embodiment of the reinforcing bar arrangement method according to the present invention by removing the reinforcing bars from between the reinforcing bar units.
Figure 2 and Figure 2 are perspective views showing the construction process of the foundation and floor, Figure 1 is a perspective view showing the state in which the corner reinforcing bars of the foundation are installed, and Figure 2 is the state in which the floor reinforcing bars are installed. FIGS. 3 to 8 are perspective views showing the construction process of the wall, FIG. 3 is a perspective view showing the outer reinforcing bars and inner reinforcing bars installed, and FIG. 4 is the corner Fig. 5 is a perspective view showing the corner reinforcing bars inserted between the inner reinforcing bars and the outer reinforcing bars via a steel plate, and Fig. 6 shows the corner reinforcing bars inserted between the inner reinforcing bars and the outer reinforcing bars. Figure 7 is a perspective view showing the state in which concrete is being poured, Figure 8 is a perspective view showing the completed wall, and Figures 9 to 12 are respectively This figure shows a plan view of a concrete structure using the square reinforcement of this invention, and FIG. 9 is a plan view showing a connecting part of an L-shaped wall, and FIG. 10 is a plan view of a cross-shaped wall. FIG. 11 is a plan view showing a connecting portion of a linear portion of a wall, and FIG. 12 is a plan view showing a connecting portion of a T-shaped wall. 2... Floor-wall connection unit, 3... Floor reinforcing bar unit, 4... Wall reinforcing bar, 4a... Inner reinforcing bar unit, 4 b...・Outer reinforcing bar unit, ・Foundation, 6... ・Joint unit, 8... Steel plate, ・Formwork.

Claims (1)

【特許請求の範囲】 それぞれ縦筋および横筋からなる格子状に形成された内
側鉄筋ユニットと外側鉄筋ユニットとを、各方面の壁体
が立設される基礎に、それぞれ所定の間隔をおいて平行
に立設し、それら鉄筋の端部における壁体同士の連結部
分に、複数の縦筋およびこれら縦筋を連結する添え筋か
らなる継手ユニットを各方面の壁体同士の間の内側鉄筋
ユニットと外側鉄筋ユニットとの間に挿入するようにし
て壁体同士の鉄筋を連結する鉄筋コンクリート構造物の
配筋方法であって、 前記継手ユニットを、それぞれの外側鉄筋ユニットおよ
び内側鉄筋ユニットに添う薄板状の板材を介して壁体同
士の連結部分におけるそれぞれの外側鉄筋ユニットと内
側鉄筋ユニットとの間に落とし込んで、前記板材だけを
継手ユニットと外側鉄筋ユニットおよび内側鉄筋ユニッ
トの間から抜いて配筋を完了することを特徴とする鉄筋
コンクリート構造物における配筋方法。
[Scope of Claims] An inner reinforcing bar unit and an outer reinforcing bar unit each formed in a lattice shape consisting of vertical bars and horizontal bars are parallel to the foundation on which the walls in each direction are erected at predetermined intervals. A joint unit consisting of a plurality of vertical reinforcements and splint reinforcements that connect these vertical reinforcements is installed at the connecting part between the walls at the ends of these reinforcement bars, and is connected to the inner reinforcement unit between the walls in each direction. A reinforcement arrangement method for a reinforced concrete structure that connects reinforcing bars between wall bodies by inserting them between outer reinforcing bar units, the joint unit being connected to a thin plate-shaped reinforcing bar along each outer reinforcing bar unit and an inner reinforcing bar unit. Reinforcement is placed between each outer reinforcing bar unit and inner reinforcing bar unit at the joint between the walls via a plate, and only the plate is removed from between the joint unit, outer reinforcing bar unit, and inner reinforcing bar unit to complete the reinforcement arrangement. A reinforcement arrangement method for reinforced concrete structures characterized by:
JP28235089A 1989-10-30 1989-10-30 Reinforcing bar arranging method for reinforced concrete structure Pending JPH03144073A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP28235089A JPH03144073A (en) 1989-10-30 1989-10-30 Reinforcing bar arranging method for reinforced concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28235089A JPH03144073A (en) 1989-10-30 1989-10-30 Reinforcing bar arranging method for reinforced concrete structure

Publications (1)

Publication Number Publication Date
JPH03144073A true JPH03144073A (en) 1991-06-19

Family

ID=17651274

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28235089A Pending JPH03144073A (en) 1989-10-30 1989-10-30 Reinforcing bar arranging method for reinforced concrete structure

Country Status (1)

Country Link
JP (1) JPH03144073A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5487251A (en) * 1994-05-06 1996-01-30 Independent Concrete Pipe Apparatus and method for reinforcing cast structures
JP2013036292A (en) * 2011-08-10 2013-02-21 Yamaura Corp Wall type structure of reinforced concrete structure and method of constructing the reinforced concrete structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5487251A (en) * 1994-05-06 1996-01-30 Independent Concrete Pipe Apparatus and method for reinforcing cast structures
JP2013036292A (en) * 2011-08-10 2013-02-21 Yamaura Corp Wall type structure of reinforced concrete structure and method of constructing the reinforced concrete structure

Similar Documents

Publication Publication Date Title
JPH03144073A (en) Reinforcing bar arranging method for reinforced concrete structure
JPH04202940A (en) Wall construction of building and construction method thereof
JPH0285450A (en) Method for jointing precast floor system at the site
JP2786965B2 (en) Precast concrete board for reinforced concrete wall
JP2743003B2 (en) Recessed formwork equipment for concrete formwork construction and its construction method.
JPS61169559A (en) Semi-existing concrete panel using assembled reinforcement
JPS6039401Y2 (en) joint reinforcing bars
JPH0455091Y2 (en)
JPH037447Y2 (en)
JPH0449254Y2 (en)
JPH03279533A (en) Constructing method for rigid-frame type rc super-high building
JPH0513786Y2 (en)
JPH058303B2 (en)
JPH0455090Y2 (en)
JPH0449253Y2 (en)
JPH0455092Y2 (en)
JP2651322B2 (en) Construction method of wall type rigid frame structure
JPH11131692A (en) Unit joint bar
JPS62137322A (en) Foundation for building and its construction
JPH02209523A (en) Form for slope frame and its construction method
JP2978011B2 (en) U-shaped beam formwork and method of constructing beam and beam joint using the same
JPH0547697B2 (en)
JPH11159142A (en) Setting-up method for columnar concrete-block section reinforcing net and cage body for constituting columnar concrete-block section reinforcing net
JPH0853895A (en) Precast concrete slab for floor slab
JP2000303552A (en) Reinforcing cage erecting method