JPH028025Y2 - - Google Patents
Info
- Publication number
- JPH028025Y2 JPH028025Y2 JP1982187670U JP18767082U JPH028025Y2 JP H028025 Y2 JPH028025 Y2 JP H028025Y2 JP 1982187670 U JP1982187670 U JP 1982187670U JP 18767082 U JP18767082 U JP 18767082U JP H028025 Y2 JPH028025 Y2 JP H028025Y2
- Authority
- JP
- Japan
- Prior art keywords
- arm
- soffit
- scaffolding
- present
- attached
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000010276 construction Methods 0.000 claims description 12
- 238000009434 installation Methods 0.000 description 6
- 239000000463 material Substances 0.000 description 5
- 229910000831 Steel Inorganic materials 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 238000001035 drying Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Description
【考案の詳細な説明】
本考案は住宅建築作業の簡便化を図つた工事用
足場取付装置に関する。[Detailed Description of the Invention] The present invention relates to a construction scaffolding installation device that facilitates house construction work.
従来より、建物の建築に際しては屋根、軒先、
軒天井パネル等の施工を安全かつ敏速に行なうた
めに建築物の周囲にパイプや鋼材等を組合せた足
場を形成することが行われている。 Traditionally, when constructing a building, roofs, eaves,
2. Description of the Related Art In order to safely and quickly construct eave ceiling panels, etc., scaffolds made of pipes, steel materials, etc. are constructed around buildings.
しかしながら、パイプ等で足場を組むことは建
築作業とは別の作業を要し、工数がかかるという
難点がある。 However, erecting scaffolding with pipes and the like requires work that is separate from construction work, and has the disadvantage that it takes a lot of man-hours.
またこれらの足場は作業終了後必ず解体しなけ
ればならず手間がかかる。 Furthermore, these scaffolds must be dismantled after the work is completed, which is time-consuming.
さらに足場を形成するために足場材料を調達
し、これを現場に搬入するための運搬車および作
業員を確保する必要があり、そのための人件費が
嵩む等の欠点がある。 Furthermore, it is necessary to procure scaffolding materials in order to form the scaffolding, and to secure transport vehicles and workers to transport the scaffolding materials to the site, which has drawbacks such as increased labor costs.
本考案はこのような従来の欠点を解決するため
になされたもので、足場を組立てたり解体したり
する工数を削減し、足場組み材料をそのまま物干
し等にも使用できる工事用足場取付装置を提供す
ることを目的とするものである。 The present invention was developed to solve these conventional drawbacks, and provides a construction scaffolding installation device that reduces the number of steps required to assemble and dismantle scaffolding, and allows scaffolding materials to be used as they are for drying clothes, etc. The purpose is to
すなわち本考案の工事用足場取付装置は、住宅
の梁に軒天アームが設けられ、この軒天アームに
軒天井パネルが取付けられるとともに下部に係止
部を有する複数個の吊り具が間隔を置いて取付け
られていることを特徴とする。 In other words, in the construction scaffolding installation device of the present invention, an eave ceiling arm is provided on the beam of a house, an eaves ceiling panel is attached to the eave ceiling arm, and a plurality of hanging tools having a locking part at the bottom are spaced apart. It is characterized in that it is installed.
以下本考案の実施例を図面により説明する。 Embodiments of the present invention will be described below with reference to the drawings.
第1図は本考案の一実施例を示す工事用足場取
付装置の設けれられた住宅ユニツトの骨組を示す
斜視図、第2図は工事用足場取付装置の拡大図、
第3図は軒下部の断面説明図、第4図は本考案の
使用の一例を示す斜視図である。 Fig. 1 is a perspective view showing a frame of a housing unit equipped with a construction scaffolding installation device showing one embodiment of the present invention, and Fig. 2 is an enlarged view of the construction scaffolding installation device.
FIG. 3 is an explanatory cross-sectional view of the underside of the eaves, and FIG. 4 is a perspective view showing an example of the use of the present invention.
図において、符号1は住宅ユニツトを示し、こ
の住宅ユニツト1は上下妻梁2,3と上下桁梁
4,5の4隅を柱6で一体に結合して略箱型形状
に形成したものである。 In the figure, reference numeral 1 indicates a housing unit, and this housing unit 1 is formed into a substantially box shape by integrally connecting the four corners of upper and lower girders 2 and 3 and upper and lower girder beams 4 and 5 with pillars 6. be.
この略箱型形状の住宅ユニツトの側面から張り
出して軒天井となる軒天パネル7が取付けられ
る。軒天パネル7は住宅ユニツトに張り出して固
定された軒天アーム9に取付けられている。この
軒天アーム9の両端部は住宅ユニツト1の上部に
強固に固定されて大きな構造耐力を有するものに
なされている。 A soffit panel 7 is attached to protrude from the side surface of this approximately box-shaped housing unit and serve as the soffit. The soffit panel 7 is attached to an soffit arm 9 that extends and is fixed to the housing unit. Both ends of the eave ceiling arm 9 are firmly fixed to the upper part of the housing unit 1 to have a large structural strength.
軒天アーム9の上部、例えば上梁2への接合は
第3図に示すようにフツク金具13で係止し、ボ
ルト14または溶接等で固定するのが好ましい。 It is preferable to connect the upper part of the eave ceiling arm 9 to the upper beam 2, for example, by locking it with a hook fitting 13 as shown in FIG. 3, and fixing it with bolts 14 or welding.
8は下部にリング状の係止部81を有する吊り
具で、吊り具8は軒天パネル7を貫通し軒天アー
ム9の任意個所にボルト締めで固定されている。 Reference numeral 8 denotes a hanging device having a ring-shaped locking portion 81 at its lower part, and the hanging device 8 passes through the eaves ceiling panel 7 and is fixed to an arbitrary location on the eaves ceiling arm 9 by bolting.
また吊り具8は先端にパイプ10等を通すこと
のできるリングまたはフツク等からなる係止部8
1を有し、上部を鉄骨からなる軒天アーム9にボ
ルトで取付られている。 In addition, the hanging device 8 has a locking portion 8 consisting of a ring or a hook through which the pipe 10 or the like can be passed.
1, the upper part of which is attached to an eave ceiling arm 9 made of a steel frame with bolts.
図中、15は天井パネル、16は屋根パネル、
17は屋根瓦を示す。 In the figure, 15 is a ceiling panel, 16 is a roof panel,
17 indicates a roof tile.
例えば、ユニツト住宅の工事は第4図に示すよ
うに、住宅ユニツト1を土台の上に設置して組立
て、この上に本考案の工事用足場取付装置を有す
る住宅ユニツトを設置し、この吊り具8にパイプ
10を通し、このパイプ10に梯子11や足場板
12を取付けて足場を形成し、軒天の施工、雨樋
の取付け等の作業を行なう。 For example, in the construction of a unit house, as shown in Figure 4, the housing unit 1 is installed and assembled on the foundation, the housing unit having the construction scaffolding installation device of the present invention is installed on top of this, and this hanging device is installed. A pipe 10 is passed through the pipe 8, a ladder 11 and a scaffold board 12 are attached to the pipe 10 to form a scaffold, and work such as constructing the eaves and installing rain gutters is performed.
本考案の軒天アーム9の中実体であつてもよい
が、例えば断面約コ字形の溝形鋼からなり、吊り
金具が受ける加重を基準として必要とされる厚さ
のものが選ばれて用いられる。 Although it may be the solid body of the eave ceiling arm 9 of the present invention, it may be made of channel steel with an approximately U-shaped cross section, and a thickness that is selected based on the load that the hanging bracket will receive is selected and used. It will be done.
以上のように構成されることにより本考案は、
現場での足場組みや解体の工数を削減でき建築費
用を大幅に削減できる。 By being configured as described above, the present invention has the following features:
The number of man-hours needed to assemble and dismantle scaffolding on site can be reduced, significantly reducing construction costs.
また、軒天アームが住宅の梁に設けられ、この
軒天アームに軒天井パネルが取付けられるととも
に吊り具が取付けられているから、吊り具に大き
な力が作用しても大丈夫なものとなり、しかも足
場材料が少なくて済み、輸送費を削減できる。 In addition, the soffit arm is installed on the beam of the house, and the soffit panel is attached to the soffit arm, as well as the hanging equipment, so it can withstand even if a large force is applied to the hanging equipment. Less scaffolding materials are required, reducing transportation costs.
さらに吊り具を工事終了後、そのまま物干竿引
掛け具等に使用することができ、極めて有効に使
用することができる。 Furthermore, after the construction work is completed, the hanging tool can be used as it is as a clothesline hooking tool, etc., and can be used extremely effectively.
第1図は本考案の一実施例を示す斜視図、第2
図は本考案の要部を示す斜視図、第3図は本考案
の取付け状態を説明する断面説明図、第4図は本
考案の一実施例を説明する使用状態の説明図であ
る。
1……住宅ユニツト、2,3……妻梁、4,5
……桁梁、7……軒天パネル、8……吊り具、9
……軒天アーム、81……係止部。
Fig. 1 is a perspective view showing one embodiment of the present invention;
The figure is a perspective view showing the essential parts of the present invention, FIG. 3 is a sectional explanatory view illustrating the installed state of the present invention, and FIG. 4 is an explanatory view illustrating an embodiment of the present invention in a usage state. 1... Housing unit, 2, 3... Gable, 4, 5
... Girder beam, 7 ... Eaves ceiling panel, 8 ... Hanging tool, 9
...Eaves top arm, 81...Locking part.
Claims (1)
ームに軒天井パネルが取付けられるとともに下部
に係止部を有する複数個の吊り具が間隔を置いて
取付けられていることを特徴とする工事用足場取
付装置。 A construction work characterized in that a soffit arm is provided on the beam of a house, a soffit panel is attached to the soffit arm, and a plurality of hanging devices each having a locking part at the bottom are attached at intervals. Scaffolding attachment device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP18767082U JPS5989944U (en) | 1982-12-10 | 1982-12-10 | Construction scaffolding installation device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP18767082U JPS5989944U (en) | 1982-12-10 | 1982-12-10 | Construction scaffolding installation device |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS5989944U JPS5989944U (en) | 1984-06-18 |
JPH028025Y2 true JPH028025Y2 (en) | 1990-02-26 |
Family
ID=30405047
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP18767082U Granted JPS5989944U (en) | 1982-12-10 | 1982-12-10 | Construction scaffolding installation device |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS5989944U (en) |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS515245Y2 (en) * | 1971-05-31 | 1976-02-13 | ||
JPS50134921U (en) * | 1974-04-20 | 1975-11-06 |
-
1982
- 1982-12-10 JP JP18767082U patent/JPS5989944U/en active Granted
Also Published As
Publication number | Publication date |
---|---|
JPS5989944U (en) | 1984-06-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20050066609A1 (en) | Preassembled roof and floor deck panel system | |
JPH028025Y2 (en) | ||
JP2980199B2 (en) | Building structure | |
JP3275087B2 (en) | Folding roof unit and roof construction method | |
JPH06185121A (en) | Assembling unit house and execution thereof | |
JP2557161B2 (en) | Roof unit with parapet | |
JPH0358415B2 (en) | ||
JPH07145651A (en) | Roof construction in unit building and roof construction method | |
JP4260318B2 (en) | Roof structure | |
JPH0124264Y2 (en) | ||
JP2598008Y2 (en) | Floor structure and bundle of steel building balcony | |
JPH04371643A (en) | Roof structure | |
GB2355274A (en) | Roofing with prefabricated panels | |
WO2023164741A1 (en) | A construction system and method of use thereof | |
GB2584912A (en) | A modular pitched roof | |
JP2801850B2 (en) | Roof structure and construction method | |
JP2503452Y2 (en) | Scaffold structure for construction of industrialized houses | |
JPH05133046A (en) | Roof panel for building | |
JPH0454018B2 (en) | ||
JPH11303203A (en) | Erection method of two-storied wooden house | |
JP2002081131A (en) | Construction method for building | |
JPH04371642A (en) | Roof structure | |
JPH06146609A (en) | All weather type temporary shed | |
JPH07268951A (en) | Assembling type outer corridor and its execution method | |
JPH0544287A (en) | Roof panel bearing structure |