JPH0270806A - Inspecting and repairing device for bridge - Google Patents

Inspecting and repairing device for bridge

Info

Publication number
JPH0270806A
JPH0270806A JP22048088A JP22048088A JPH0270806A JP H0270806 A JPH0270806 A JP H0270806A JP 22048088 A JP22048088 A JP 22048088A JP 22048088 A JP22048088 A JP 22048088A JP H0270806 A JPH0270806 A JP H0270806A
Authority
JP
Japan
Prior art keywords
bridge
scaffold
vehicle
work
inspection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP22048088A
Other languages
Japanese (ja)
Inventor
Masaru Kaneko
勝 金子
Kiyomi Sasaki
清美 佐々木
Sadachika Mizuta
水田 定親
Hiroshi Hashimoto
紘 橋本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Seiryo Engineering Co Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Seiryo Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd, Seiryo Engineering Co Ltd filed Critical Mitsubishi Heavy Industries Ltd
Priority to JP22048088A priority Critical patent/JPH0270806A/en
Publication of JPH0270806A publication Critical patent/JPH0270806A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

PURPOSE:To make the inspection and repairing of bridge easier by a method in which an operating scaffold supported through a scaffold mover and a fitting part on a vehicle is positioned right below a bridge and the scaffold is separated from the mover to be allowed to travel along the bridge. CONSTITUTION:An operating scaffold 9 to be moved along a bridge on a supporter 1a on the bridge side in a detachable manner, a vehicle 2 to travel on the bridge, a scaffold mover provided on the vehicle, and a fitting part 14 to detachably attach the scaffold 9 are provided. The scaffold 9 supported through the fitting parts 11 and 12 is positioned right below the bridge 1 by the mover on the vehicle, and a traveler 15 on the scaffold 9 side is put on rails 1a provided on both sides of the bridge 1. The fitting part 14 is released to separate the scaffold 9 and the vehicle 2. The scaffold 9 can thus travel right below the bridge 1 for inspection and repairing.

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明はIa梁の点検・補修装置に関するものである。[Detailed description of the invention] (Industrial application field) The present invention relates to a device for inspecting and repairing Ia beams.

(従来の技術) 従来の橋梁の点検・補修装置を第7図により説明すると
、(1)が橋梁、(2)が車両(トラックマウントのシ
ャシ)、(3)が同車両(2)上に取付けたターンテー
ブル、(4)が同ターンテーブル(3)の旋回ベアリン
グ、(5)がアウトリガ−1(7)が同ターンテーブル
(3)上に起伏可能に取付けた伸縮ブーム、(6)がブ
ームシリンダ、(8)が同伸縮ブーム(7)の先端に取
付けた上下方向に伸縮可能な伸縮ブーム、(9)が同伸
縮ブーム(8)の先端に取付けた作業足場で、車両(2
)が橋梁(1)上に走行したときに、アウトリガ−(5
)により車両(2)を安定させ、伸縮ブーム(7)を伸
張させるとともに倒伏させ、また伸縮ブーム(8)を上
下方向に伸縮させ5作業足場(9)を橋梁(1)の直下
に位置させて、橋梁(1)の下側塗装面を検査したり、
その部分の溶接クランクを点検、補修したりするよ前記
第7図の橋梁の点検・補修装置では、(1)作業足場(
9)を支える車両(2)がアウトリガ−(5)により支
持されたまま、橋梁(1)上を占有するので、交通渋滞
を引き起こす、(■)作業足場(9)の!I¥i梁長手
方向への移動時に車両(2)を前進させる必要があり1
作業足場(9)の移動が繁雑である。(I[I)伸縮ブ
ーム(7) (8)及び作業足場(9)が片持ち支持構
造になっており1強度を高めるために大断面部材を必要
とする。また先端部(作業足場(9))での動荷重によ
る振れが大きくて。
(Prior art) A conventional bridge inspection/repair device is explained using Fig. 7. (1) is a bridge, (2) is a vehicle (truck-mounted chassis), and (3) is a vehicle (2) on the same vehicle. The attached turntable, (4) is the swing bearing of the turntable (3), (5) is the outrigger 1 (7) is the telescopic boom attached to the turntable (3) so that it can be raised and lowered, and (6) is the A boom cylinder, (8) is a telescopic boom that can be extended and retracted in the vertical direction attached to the tip of the telescopic boom (7), and (9) is a work scaffold attached to the tip of the telescopic boom (8).
) runs on the bridge (1), the outrigger (5
) to stabilize the vehicle (2), extend and lower the telescopic boom (7), extend and retract the telescopic boom (8) vertically, and position the work platform (9) directly below the bridge (1). to inspect the lower painted surface of the bridge (1),
Inspect and repair the welded crank in that area.The bridge inspection/repair equipment shown in Figure 7 uses (1) work scaffolding (
The vehicle (2) supporting the work scaffold (9) occupies the bridge (1) while being supported by the outrigger (5), causing traffic congestion. (■) Work scaffolding (9)! I¥i It is necessary to move the vehicle (2) forward when moving in the longitudinal direction of the beam 1
Moving the work scaffold (9) is complicated. (I [I) The telescoping booms (7) (8) and the work scaffold (9) have a cantilever support structure and require large cross-section members to increase strength. Also, there was a large amount of vibration due to the dynamic load at the tip (work platform (9)).

作業に支障を来す上に、危険である。(TV)小型の橋
梁の下側塗装面を検査したり、その部分の溶接クランク
を点検、補修したりするときには、使用できても、大型
橋梁の点検、補修には、不向きであった。
Not only does it interfere with work, but it is also dangerous. (TV) Although it could be used to inspect the lower painted surface of small bridges and inspect and repair the welded cranks in those areas, it was not suitable for inspecting and repairing large bridges.

そこで大型橋梁の点検、補修時には9点検、補修個所に
仮設足場を3■み1作業者が同足場上で点検。
Therefore, when large bridges are inspected and repaired, 9 inspections are carried out, and 3 temporary scaffoldings are set up at the repaired areas, and 1 worker performs inspections on the same scaffolding.

補修作業を行うようにしている。 ところが最近は、大
型橋梁が数多く作られて、高所で行われる点検、補修作
業の量が膨大になって来ており3作業の安全性、省力化
、費用節減に対する要求が高まっているが、前記のよう
に点検、補修作業の度ごとに高所に足場を組み、また点
検、補修作業が終ったときに3分解するのでは、危険を
伴う。また多くの手間と時間を要して2作業能皐が悪い
上に、多大の費用を要するという問題があった。
Repair work is being carried out. Recently, however, many large bridges have been constructed, and the amount of inspection and repair work that must be carried out at high places has become enormous.Therefore, there is an increasing demand for safety, labor saving, and cost reduction in the three types of work. As mentioned above, it is dangerous to erect scaffolding at a high place every time inspection or repair work is to be carried out, and then to disassemble it three times when the inspection or repair work is completed. In addition, there was a problem that it required a lot of effort and time, had poor performance in two operations, and required a large amount of cost.

本発明は前記の問題点に対処するもので、橋梁側の支持
部材に着脱自在に支持されて同橋梁の直下を同橋梁に沿
い移動可能な作業足場と、同橋梁上を走行可能な車両と
、同車両上に設けられた作業足場用移動装置と、同作業
足場用移動装置に上記作業足場を着脱自在に取付ける取
付装置とを具えていることを特(ilとした橋梁の点検
・補修装置に係わり、その目的とする処は、小型の橋梁
は勿論のこと大型の1,1梁でも9点検、補修を迅速に
The present invention addresses the above-mentioned problems, and includes a work scaffold that is removably supported by a supporting member on the bridge side and can be moved directly under the bridge along the bridge, and a vehicle that can run on the bridge. , a bridge inspection/repair device characterized in that it is equipped with a working scaffold moving device provided on the same vehicle, and a mounting device for detachably attaching the working scaffold to the working scaffold moving device. The objective is to quickly inspect and repair not only small bridges but also large beams.

安全に行うことができる改良された橋梁の点検・本発明
の橋梁の点検・補修装置は前記のように橋梁側の支持部
材に庁脱自在に支持されて同も1梁の直下を同111梁
に沿い移動可能な作業足場と、同もつ梁上を走行可能な
車両と、同車両上に設けられた作業足場用移動装置と、
同作業足場用移動装置に上記作業足場を着n’、’i、
自在に取付ける取付装置とを具えており、車両が橋梁上
に走行して、停止したときに、車両上の作業足場用移動
装置が取付装置を介し支持した作業足場を橋梁の直下に
位置させて、同作業足場側の走行装置を橋梁側の軌道部
材上に乗せ9次いで取付装置が解除されて、車両側の作
業足場用移動装置と作業足場とが分離され。
Improved bridge inspection that can be carried out safely - The bridge inspection and repair device of the present invention is removably supported by the support member on the bridge side as described above, and the bridge inspection and repair device of the present invention is removably supported by the support member on the bridge side, and the bridge inspection and repair device of the present invention is removably supported by the support member on the bridge side, and the bridge inspection and repair device of the present invention A work scaffold that can be moved along a beam, a vehicle that can run on a beam having the same, and a moving device for the work scaffold installed on the vehicle;
Attach the above-mentioned work scaffold to the work scaffold moving device n', 'i,
It is equipped with a mounting device that can be freely attached, and when the vehicle runs on the bridge and stops, the work scaffold moving device on the vehicle positions the supported work scaffold directly under the bridge via the mounting device. Then, the traveling device on the work scaffold side is placed on the track member on the bridge side, and the mounting device is then released, and the work scaffold moving device on the vehicle side and the work scaffold are separated.

それからは作業足場が橋梁の直下を橋梁に沿い自走して
1点検、補(H’lが行われ、また点検、補修が終われ
ば、上記と逆の要領で作業足場が回収されるので、小型
の橋梁は勿論のこと大型の橋梁でも。
After that, the work scaffolding will run along the bridge directly under the bridge and perform one inspection and repair (H'l), and once the inspection and repair are completed, the work scaffold will be recovered in the reverse manner to the above. Not only small bridges but also large bridges.

点検、補修が迅速に、安全に行われる。Inspections and repairs can be done quickly and safely.

(実施例1) 次に本発明の橋梁の点検・補修装置を第1.23図に示
す一実施例により説明すると、(1)が橋梁、 (2)
が車輪(18)を有する車両(トラックマウントのシャ
シ)、 (3)が同車両(2)上に取付けたターンテー
ブル、(4)が同ターンテーブル(3)の旋回ベアリン
グ、 (17)がアウトリガ−9(7)が同ターンテー
ブル(3)上に起伏可能に取付けた伸縮ブーム、(6)
がブームシリンダ、 (811)が同伸1宿ブーム(7
)の先端に取付けた上下方向に伸縮可能な伸縮ブーム、
 (8b)が同伸縮ブーl、(8a)の先端に取付けた
旋回装置、 (8c )が同旋回装置(8b)に取付け
たテーブル、 (II)(+2)が同テーブル(8c)
に取付けた取付装置、(9)が作業足場で、同作業足場
(9)が同取付装置(11)(12)を介して着脱自在
に取付られるようになっている。また(14)が上記作
業足場(9)に設けた連結装置、 (15)が同作業足
場(9)に設けた走行車’FQ 、 (1(i )が同
作業足場(9)に設けた手摺である。
(Example 1) Next, the bridge inspection/repair device of the present invention will be explained using an example shown in Fig. 1.23. (1) is a bridge, (2)
is a vehicle (truck-mounted chassis) with wheels (18), (3) is a turntable mounted on the vehicle (2), (4) is a swing bearing of the turntable (3), and (17) is an outrigger. -9 (7) is a telescopic boom attached to the turntable (3) so that it can be raised and lowered, (6)
is the boom cylinder, (811) is the boom (7)
) A telescopic boom that can be extended and retracted in the vertical direction attached to the tip of the
(8b) is the same telescopic boob L, the swivel device attached to the tip of (8a), (8c) is the table attached to the same swivel device (8b), (II) (+2) is the same table (8c)
The mounting device (9) attached to the work scaffold is a work scaffold, and the work scaffold (9) can be detachably attached via the mounting devices (11) and (12). In addition, (14) is the coupling device installed on the work scaffold (9), (15) is the traveling vehicle'FQ installed on the work scaffold (9), and (1(i) is the connection device installed on the work scaffold (9)). It's a handrail.

(作用) 次に前記橋梁の点検・補修装置の作用を第2゜3図によ
り説明する。車両(2) (2)が橋梁(1)上に車両
(2) (2)が走行して停止したときに、アウトリガ
−(17)を張り出して、車両(2) (2)を固定す
る。
(Function) Next, the function of the bridge inspection/repair device will be explained with reference to FIG. 2-3. When the vehicle (2) (2) runs on the bridge (1) and stops, the outrigger (17) is extended to fix the vehicle (2) (2).

このとき、II+、両(2) (2)は、テーブル(8
c) (8c)上に取付装置(11) (12)を介し
て作業足場(9)(9)を取付けている状態にある。次
いで同各車両(2)で伸縮ブーム(7)を伸張させると
ともに倒伏させ、また伸縮ブーム(8a)を上下方向に
伸縮させて1作業足場(9)をh= 梁(1)の直下に
位置させる。この操作により9作業足場(9) (9)
の走行小輪(15) (15)が橋梁(1)の両側に設
けた走行路(la) (la)の上に乗る。
At this time, II+, both (2) (2) is the table (8
c) Working scaffolds (9) (9) are being installed on (8c) via attachment devices (11) (12). Next, each vehicle (2) extends and lowers the telescopic boom (7), and also extends and contracts the telescopic boom (8a) in the vertical direction to position one work platform (9) directly below the beam (1). let With this operation, 9 work scaffolds (9) (9)
The running small wheels (15) (15) ride on the running paths (la) (la) provided on both sides of the bridge (1).

次いで作業足場(9) (9)を連結装置(14)によ
り連結して、互いを一体化する。なお第2図の例では。
The working scaffolds (9) (9) are then connected by means of a connecting device (14) to integrate them with each other. In the example shown in Figure 2.

同連結装置(14)に油圧ジヤツキを使用している。A hydraulic jack is used for the connection device (14).

以上の操作で作業足場(9) (9)が橋¥(1)の直
下位置に走行可能に支持されたことになるが、この状態
になると、取付装置(11) (12)が解除されて2
作業足場(9) (9)側と車両(2) (2)側とが
分離され(第3図参照)、それ以後は1作業足場(9)
 (9)が橋梁(1)の両側に設けた走行路(la) 
(la)に沿い自走して1点検・補修が行われる。一方
1作業足場(9)(9)から分離した車両(2) (2
)は、橋梁(1)の上に止まっている必要がなく、直ち
に橋梁(1)から退去する。なお第3図のり、tを可変
にすることにより、各種の橋梁(1)に使用可能になる
。また橋梁(1)に鉄道軌道が敷設されている場合には
、前記各機器が鉄道車両に設けられて、同様の作用が行
われる。
With the above operations, the work scaffolding (9) (9) is supported in a movable position directly under the bridge (1), but in this state, the mounting devices (11) (12) are released. 2
The work scaffold (9) (9) side and the vehicle (2) (2) side are separated (see Figure 3), and after that, there is only one work scaffold (9)
Travel path (la) provided by (9) on both sides of bridge (1)
One inspection and repair will be carried out by driving along (la). On the other hand, the vehicle (2) separated from the 1 work scaffold (9) (9) (2
) does not need to remain on the bridge (1) and immediately leaves the bridge (1). By making the glue and t in FIG. 3 variable, it can be used for various types of bridges (1). Moreover, when a railway track is laid on the bridge (1), each of the above-mentioned devices is installed in a railway vehicle and the same effect is performed.

(実施例■) 第4図は9作業足場(9)を分離せずに一体に構成する
一方、同作業足場(9)の上部にベースフレーム(20
)を設け、同ベースフレーム(20)の両側に伸縮フレ
ーム(21)(21)を設け、上記ベースフレーム(2
0)内に上記伸縮フレーム(21) (21)を伸縮さ
せるための油圧ジヤツキ(22) (22)を設け、上
記伸縮フレーム(21)(21)の先端に車輪(23)
 (23)を設け。
(Example ■) Figure 4 shows a structure in which nine work scaffolds (9) are integrated without being separated, while a base frame (20
), and extendable frames (21) (21) are provided on both sides of the base frame (20), and the base frame (20) is
Hydraulic jacks (22) (22) for extending and contracting the telescopic frames (21) (21) are provided inside the telescopic frames (21) (21), and wheels (23) are installed at the tips of the telescopic frames (21) (21).
(23) is provided.

橋!e(1)の両側部(la) (la)に同車輪(2
3) (23)の転動するレール(23) (23)を
設けて1作業足場(9)を橋梁(1)の直下に゛位置さ
せたときに、伸縮フレーム(21)(21)を伸長させ
、車輪(23) (23)をレール(23) (23)
の上に乗せて2作業足場(9)を橋¥、(1)に沿い走
行させるようにしたのち、取付装置(11)を解除して
9作業足場(9)側と車両(2)側とを分離し、それ以
後は1作業足場(9)を橋¥(1)の両側に設けた走行
路(la) (la)に沿い自走させて1点検・補修を
行うようにした他の実施例で、前記実施例と同様の作用
が行われる。なお車輪(23) (23)は。
bridge! The same wheels (2) are placed on both sides (la) (la) of e (1)
3) When the rolling rail (23) (23) (23) is installed and the 1 work scaffold (9) is positioned directly under the bridge (1), the telescopic frame (21) (21) is extended. and the wheels (23) (23) to the rails (23) (23)
Place the 2nd work scaffold (9) on top of the bridge and run it along the bridge (1), then release the mounting device (11) and move the 9th work scaffold (9) side and the vehicle (2) side. Another implementation was to separate the work scaffolding (9) from the bridge and then make one inspection and repair work by moving one work scaffold (9) along the travel path (LA) (LA) provided on both sides of the bridge (1). In the example, the same actions as in the previous example are performed. In addition, the wheels (23) (23) are.

タイヤ式の車輪等に替えても差支えない、また伸縮フレ
ーム(21)及び油圧ジヤツキ(22)も他のリンク等
の機構に替えて差支えない。
There is no problem in replacing it with tire-type wheels, etc., and the telescopic frame (21) and hydraulic jack (22) can also be replaced with other mechanisms such as links.

(実施例■) 第5,6図は、橋梁(1)の下面に複数のl形部材(l
b) (なおこのl形部材(lb)は予め取付けられて
いる場合と点検、補修時に取付けられる場合とがある)
が固定されている場合に適した他の実施例で、同各1形
部材(1b)の下側水平部がレールに使用される。即ち
5作業足場(9) (9)のそれぞれが伸縮可能な3つ
の部分(9a) (9b) (9c)により構成され、
同各作業足場(9)とも内側の部分(9a)にフレーム
(25)が固定され、中間の部分(9b)にフレーム(
25)が着脱自在に取付けられ、同各フレーム(25)
のうち、外側のフレーム(25)の上端部に上記各l形
部材(1b)の下側水平部上を転勤する車輪(26)と
同車輪(26)を駆動するモータ(27)とが設けられ
(Example ■) Figures 5 and 6 show a plurality of L-shaped members (l-shaped members) on the underside of a bridge (1).
b) (This L-shaped member (lb) may be installed in advance or may be installed during inspection or repair.)
In a further embodiment suitable for the case where the 1b is fixed, the lower horizontal part of each 1b is used for the rail. That is, each of the five work scaffolds (9) (9) is composed of three expandable parts (9a) (9b) (9c),
A frame (25) is fixed to the inner part (9a) of each work scaffold (9), and a frame (25) is fixed to the middle part (9b).
25) is removably attached to each frame (25).
A wheel (26) that moves on the lower horizontal part of each L-shaped member (1b) and a motor (27) that drives the wheel (26) are provided at the upper end of the outer frame (25). Rare.

残りの各フレーム(25)の上端部に上記各l形部材(
1b)の下側水平部に係合する逆り形部材(28)が固
定され9作業足場(9) (9)の各部分(9a) (
9b) (9c)の下面に伸縮フレーム(29) (3
0) (31)が取付けられており、各作業足場(9)
の一方を橋梁(1)の直下に位置させて1軍輪(26)
を外側のl形部材(1b)の下側水平部」二に乗せると
ともに逆り形部材(28)を内側のl形部材(Ih)の
下側水平部」二に乗せて、同作業足場(9)を支持し、
同じ要領で作業足場(9)の他方を支持し1次いで同作
業足場(9) (9)を連結装置(14)ににり連結し
1次いで内側の2木のフレーム(25)を取り外す。そ
うすると1作業足場(9) (9)があたかも−台の自
走台車のようになり、橋梁(1)の両側のl形部材(1
b)に沿い自走して1点検・補修を行う。
Each of the above-mentioned L-shaped members (
Each part (9a) of the 9 working scaffold (9) (9) is fixed with an inverted member (28) that engages the lower horizontal part of 1b) (9).
9b) (9c) Telescopic frame (29) (3
0) (31) is installed and each work scaffold (9)
Place one side directly under the bridge (1) and make the 1st ring (26)
on the lower horizontal part 2 of the outer L-shaped member (1b), and place the inverted member (28) on the lower horizontal part 2 of the inner L-shaped member (Ih). 9)
Support the other working scaffold (9) in the same manner, connect the working scaffold (9) to the connecting device (14), and then remove the two inner wooden frames (25). Then, 1 work scaffold (9) (9) becomes like a - platform self-propelled trolley, and the L-shaped members (1) on both sides of the bridge (1)
Carry out 1 inspection and repair by driving along the route b).

(発明の効果) 本発明の橋梁の点検・補修装置は前記のように橋梁側の
支持部材に着脱自在に支持されて同橋梁の直下を同橋梁
に沿い移動可能な作業足場と、同橋梁上を走行可能な車
両と、同車両上に設けられた作業足場用移動装置と、同
作業足場用移動装置に上記作業足場を着脱自在に取付け
ろ取付装置とを具えており、車両が橋梁上に走行して、
停止したときに、車両上の作業足場用移動装置が取付装
置を介し支持した作業足場を橋梁の直下に位置させて、
同作業足場側の走行装置を橋梁側の軌道部村上に乗せ1
次いで取付装置が解除されて、車両側の作業足場用移動
装置と作業足場とが分離されそれからは作業足場が橋梁
の直下を橋梁に沿い自走して2点検、補修が行われ、ま
た点検、補修が終われば、上記と逆の要領で作業足場が
回収されるので、小型の橋梁は勿論のこと大型の41’
7梁でも。
(Effects of the Invention) As described above, the bridge inspection/repair device of the present invention includes a work scaffold that is removably supported by a support member on the bridge side and can be moved directly below the bridge along the bridge; The vehicle is equipped with a vehicle capable of traveling on a bridge, a work scaffold moving device installed on the vehicle, and a mounting device for removably attaching the work scaffold to the work scaffold moving device. Run,
When the vehicle stops, the work scaffold moving device on the vehicle positions the work scaffold supported via the attachment device directly under the bridge,
Place the traveling device on the scaffolding side on the track section Murakami on the bridge side 1
Next, the attachment device is released, the work scaffolding moving device on the vehicle side is separated from the work scaffolding, and the work scaffolding then runs directly under the bridge along the bridge to carry out two inspections, repairs, and inspections. Once the repair is completed, the work scaffolding is recovered in the reverse manner to the above, so it can be used not only for small bridges but also for large 41' bridges.
Even with 7 beams.

点検、補修を迅速に、安全に行うことがでいる効果があ
る。
This has the effect of allowing inspections and repairs to be carried out quickly and safely.

以上本発明を実施例により説明したが、勿論本発明はこ
のような実施例だけに限定されるものでなく1本発明の
精神を逸脱しない範囲内で種々の設計の改変を施しうる
ものである。
Although the present invention has been described above with reference to examples, the present invention is, of course, not limited to these examples, and can be modified in various ways without departing from the spirit of the present invention. .

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明に係わる橋梁の点検・補修装置の一実施
例を示す側面図、第2図は同点検・補修装置を橋梁に取
付けたときの状態を示す側面図。 第3図は車両退去後の同点検・補修装置を示す側面図、
第4図は他の実施例を示す側面図、第5図はさらに他の
実施例の橋梁に対する取付は途中の状態を示す側面図、
第6図は最終状態を示、す側面図、第7図は従来の橋梁
の点検・補(+2装置を示す斜視図である。 (1)  ・・・橋梁、 (la)  ・・・橋梁側の
支持部材(2)・・・車両、 (7)(8a)(8h)
(8c)  ・・・作業足場用移動装置、(9)・・・
作業足場、 (]/I)・・・取付装置。
FIG. 1 is a side view showing an embodiment of the bridge inspection/repair device according to the present invention, and FIG. 2 is a side view showing the state when the same inspection/repair device is attached to the bridge. Figure 3 is a side view showing the same inspection and repair equipment after the vehicle has left;
FIG. 4 is a side view showing another embodiment, and FIG. 5 is a side view showing another embodiment in the middle of being installed on a bridge.
Figure 6 is a side view showing the final state, and Figure 7 is a perspective view showing conventional bridge inspection/repair (+2 equipment). (1)...Bridge, (la)...Bridge side Supporting member (2)...vehicle, (7) (8a) (8h)
(8c)...Moving device for work scaffolding, (9)...
Work scaffold, (]/I)...Mounting device.

Claims (1)

【特許請求の範囲】[Claims] 橋梁側の支持部材に着脱自在に支持されて同橋梁の直下
を同橋梁に沿い移動可能な作業足場と、同橋梁上を走行
可能な車両と、同車両上に設けられた作業足場用移動装
置と、同作業足場用移動装置に上記作業足場を着脱自在
に取付ける取付装置とを具えていることを特徴とした橋
梁の点検・補修装置。
A work scaffold that is removably supported by a supporting member on the bridge side and can be moved directly under the bridge along the bridge, a vehicle that can run on the bridge, and a work scaffold moving device installed on the vehicle. and a mounting device for removably attaching the work scaffold to the work scaffold moving device.
JP22048088A 1988-09-05 1988-09-05 Inspecting and repairing device for bridge Pending JPH0270806A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22048088A JPH0270806A (en) 1988-09-05 1988-09-05 Inspecting and repairing device for bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22048088A JPH0270806A (en) 1988-09-05 1988-09-05 Inspecting and repairing device for bridge

Publications (1)

Publication Number Publication Date
JPH0270806A true JPH0270806A (en) 1990-03-09

Family

ID=16751752

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22048088A Pending JPH0270806A (en) 1988-09-05 1988-09-05 Inspecting and repairing device for bridge

Country Status (1)

Country Link
JP (1) JPH0270806A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100359386B1 (en) * 2000-08-14 2002-11-07 양경택 Method and Apparatus for Inspecting Bridge Structure using Vision System
KR20040019143A (en) * 2002-08-26 2004-03-05 씨에스기계 주식회사 A unmanned inspection device for a bridge

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100359386B1 (en) * 2000-08-14 2002-11-07 양경택 Method and Apparatus for Inspecting Bridge Structure using Vision System
KR20040019143A (en) * 2002-08-26 2004-03-05 씨에스기계 주식회사 A unmanned inspection device for a bridge

Similar Documents

Publication Publication Date Title
JP5056608B2 (en) Retraction removal method and retraction device for mobile work vehicle for cantilever installation
IL114850A (en) Crane for modular bridge construction
JP5394334B2 (en) Construction method of work floor for work at height
CN211547116U (en) A operation car for railway switch is spread and is traded
CN109573851B (en) Arc-shaped roof internode steel truss hanging and installing integrated device and butt-joint hanging method
JP2008162749A (en) Jib crane
CN216040667U (en) Multifunctional telescopic cantilever hanging rack
CN112252099A (en) Operating vehicle for railway turnout replacement and operating method thereof
JPH0270806A (en) Inspecting and repairing device for bridge
JPH0765295B2 (en) Movable scaffolding device for bridge and its assembling method
JPH1018230A (en) Self-traveling type working carriage
CN212387581U (en) Safe supporting device for disassembling crane
CN207498824U (en) A kind of hanger radial type single track bridge inspection car
KR100377529B1 (en) Working platform for bridge construction
KR100367028B1 (en) A self propelled working platform for construction and maintenance of bridge
CN219527334U (en) Bridge side maintenance vehicle
JP2001138797A (en) Vehicle for high lift work
JP3052999B2 (en) Work scaffolding equipment for coal bunkers
JPH03140507A (en) Potable scaffold for bridge girder and its assembling
JP3247181U (en) Rail assembly equipment
JP2018155060A (en) Mobile scaffold device
CN212801234U (en) T roof beam hogging moment prestressing force stretch-draw construction trolley device
JPH0437902B2 (en)
JPS6319308A (en) Inspection and repairing apparatus of bridge
JPS6363685B2 (en)