JPH0243410A - Method for building vertical hole on underground structure - Google Patents

Method for building vertical hole on underground structure

Info

Publication number
JPH0243410A
JPH0243410A JP19487788A JP19487788A JPH0243410A JP H0243410 A JPH0243410 A JP H0243410A JP 19487788 A JP19487788 A JP 19487788A JP 19487788 A JP19487788 A JP 19487788A JP H0243410 A JPH0243410 A JP H0243410A
Authority
JP
Japan
Prior art keywords
pipe
vertical hole
trench
hardened
hardening filler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP19487788A
Other languages
Japanese (ja)
Other versions
JPH0611995B2 (en
Inventor
Yasuharu Kayama
香山 康晴
Toshio Nakamura
敏夫 中村
Minoru Tabata
稔 田畑
Yuji Akasaka
雄司 赤坂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maeda Corp
Original Assignee
Maeda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maeda Corp filed Critical Maeda Corp
Priority to JP19487788A priority Critical patent/JPH0611995B2/en
Publication of JPH0243410A publication Critical patent/JPH0243410A/en
Publication of JPH0611995B2 publication Critical patent/JPH0611995B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

PURPOSE:To build a vertical hole at an approximately same time when hardening filler is cured, by inserting a pipe applied by antifriction agent around it, into unhardened hardening filler filled in drill trench, then pulling this pipe out after hardening. CONSTITUTION:In the process that hardening filler 2 is filled in drill trench 1 and is replaced by stabilizing solution to construct an underground structure, a pipe 4 is inserted in the hardening filler 2 before it is hardened with an inserting/pulling machine 3. The pipe 4 is used by a steel pipe or the like having the sharp shape at the point, which is applied by antifriction agent around it beforehand, and is inserted vertically, as unit pipes with required lengths are connected, in turn, according to the depth of drill trench 1. After the hardening filler 2 is hardened, the pipe 4 is pulled out by the inserting/pulling machine 3 and a vertical hole 5 is constructed. Therefore, at an approximately same time when hardening filler is cured, a vertical hole can be constructed with a low cost.

Description

【発明の詳細な説明】 「産業上の利用分野」 この発明は、地中連続壁などの掘削溝内にコンクリート
、泥水固化物、低強度コンクリートなどの硬化充填材を
充填して安定液と置替える地中構造物構築工法において
、掘削溝底にグラウトなどを実施するための鉛直孔を築
造するようにした工法に関するものである。
Detailed Description of the Invention "Field of Industrial Application" This invention is a method of filling an excavated trench such as an underground continuous wall with a hardened filler such as concrete, solidified mud, or low-strength concrete and placing it with a stabilizing liquid. This relates to a construction method for constructing underground structures that involves constructing a vertical hole at the bottom of an excavation trench for grouting, etc.

「従来の技術、発明が解決せんとする問題点」従来、地
中連続壁の掘削溝に硬化充填材を充填して安定液と置替
える工法において、掘削溝底にクラウドなどを実施する
ための鉛直孔を築造する場合、充填材の硬化後にボーリ
ンクエを実施して鉛直孔を築造する方法、硬化充填材の
打設前に管を掘削溝内に組込んだフレームに支持して所
定位置に設置した後、掘削溝内に硬化充填材を充填する
ことにより管をそのまま鉛直孔とする方法などが実施さ
れている。
``Prior art and problems to be solved by the invention'' Conventionally, in the construction method of filling an excavated trench of an underground continuous wall with hardened filler and replacing it with a stabilizing liquid, When constructing a vertical hole, there is a method of constructing a vertical hole by performing boring after the filler has hardened, and before placing the hardened filler, the pipe is supported in a frame built into the excavation trench and installed in the specified position. There is a method in which the pipe is then turned into a vertical hole by filling the excavated trench with hardened filler.

しかしながら、前者の方法では硬化充填材か硬化して充
分な養生日数か経過した後にポーリングエを行うため、
築造時期が遅くなると共に単位長さ当りの鉛直孔の築造
コストが高く、築造時間も長くなり、しかも硬化充填材
として低強度コンクリートを用いた場合には、ポーリン
グ孔径か大となり、孔壁周辺の硬化充填材を損傷させる
など、構造物の品質劣化を招く欠点かあった。
However, in the former method, poling is performed after the hardened filler has hardened and has been cured for a sufficient number of days.
As the construction period becomes later, the construction cost per unit length of the vertical hole becomes higher and the construction time becomes longer.Moreover, when low-strength concrete is used as a hardened filler, the diameter of the poling hole becomes large, and the area around the hole wall increases. There were drawbacks, such as damage to the hardened filler, which led to deterioration in the quality of the structure.

また、後者の方法では、硬化充填材の流動圧に対して管
を定位置に維持する必要上管を支持するフレームを組込
むため、その施工か容易てなく、また硬化充填材の硬化
後に管を引き抜くことかできず、不経済であるなどの問
題があった。
In addition, in the latter method, a frame is required to maintain the pipe in place against the flow pressure of the hardened filler, and the construction is not easy because it incorporates a frame to support the upper pipe. There were problems such as it being uneconomical as it could only be withdrawn.

「問題点を解決するための手段」 この発明は前記従来の課題を解決するために予め周囲に
減摩剤を塗布した管を、掘削溝内に充填した硬化前の硬
化充填材中に挿入し、この硬化充填材の硬化養生後管を
引抜くことにより、ポーリングエや管の支持フレームの
設置工を行うことなく硬化充填材の養生とほぼ同時に低
コストで鉛直孔の築造が可能で、築造期間を短縮するこ
とかてきると共に、管を埋め残さずに引抜いて再使用が
可能で、しかも低強度コンクリートを用いた場合におい
ても地下構造物の品質劣化な招来することのない合理的
な鉛直孔の築造工法を提案するものである。
"Means for Solving the Problems" In order to solve the above-mentioned conventional problems, the present invention involves inserting a pipe whose periphery is coated with an anti-friction agent in advance into a hardened filler filled in an excavated trench. By pulling out the tube after curing the hardened filler, it is possible to construct a vertical hole at low cost almost simultaneously with curing the hardened filler without having to install a polling tool or support frame for the tube. In addition to shortening the construction period, pipes can be pulled out and reused without being buried, and even if low-strength concrete is used, it is possible to create a rational vertical structure that does not cause quality deterioration of the underground structure. This project proposes a method for constructing holes.

「実施例」 以下この発明を図面に示す実施例について説明すると、
第1図に示すように地中連続壁などの掘削溝l向上コン
クリート、泥水固化物、低強度コンクリートなどの硬化
充填材2を充填して安定液と置替え、地中連続壁などの
、地中構造物を構築する工程において、硬化前の硬化充
填材2中に第2図に示すように挿入・引抜きa3により
管4を挿入する。
"Embodiments" Below, embodiments of the present invention shown in the drawings will be described.
As shown in Figure 1, a hardened filler 2 such as concrete, solidified mud, or low-strength concrete is filled to improve excavated trenches such as underground continuous walls, and is replaced with a stabilizing liquid. In the process of constructing the medium structure, the tube 4 is inserted into the hardened filler 2 before hardening by inserting and pulling out a3 as shown in FIG.

管4は予め周囲に減摩剤を塗布した先端が先鋭状をなす
鋼管等を用い、掘削溝1の深度に応じて順次所要長さの
単位管を継ぎ足しながら鉛直に挿入する。
The pipe 4 is made of a steel pipe with a sharp tip, the circumference of which has been coated with an anti-friction agent in advance, and is inserted vertically into the excavation groove 1 while sequentially adding unit pipes of required length according to the depth of the excavation groove 1.

その後第3図に示すように硬化充填材2を硬化させて所
要日数養生した後、第4図に示すように挿入・引抜き機
3により管4を引抜き、第5図に示すように鉛直孔5を
a・Aする。
After that, as shown in FIG. 3, the hardened filler 2 is cured and cured for a required number of days, and then the tube 4 is pulled out by the insertion/pulling machine 3 as shown in FIG. Do a・A.

この場合、管4の引抜きに伴なって鉛直孔5内に負圧を
生ずるため、第6図に示すように管4の先端に開口6を
設け、管4の挿入時にこの開口6を閉鎖した栓体7をロ
ット、ワイヤー等の連結材8により上方に引抜くことに
より、この開口6及び管4内を通して鉛直孔5と大気を
連通させ、負圧を防止する。
In this case, since negative pressure is generated in the vertical hole 5 as the tube 4 is pulled out, an opening 6 is provided at the tip of the tube 4 as shown in FIG. 6, and this opening 6 is closed when the tube 4 is inserted. By pulling the stopper 7 upward using a connecting member 8 such as a rod or wire, the vertical hole 5 is communicated with the atmosphere through the opening 6 and the inside of the pipe 4, thereby preventing negative pressure.

なお、挿入・引抜き!a3としては、管4の挿入及び引
抜きに充分な作動力を持ち、挿入時に鉛直調整機能を有
するものを用い、挿入・引抜きを共用できるものか望ま
しいか、挿入は圧入振動、衝撃等、いずれによっても可
能であって、必ずしも挿入と引抜きの機械が共通するも
のである必要はない。
In addition, insertion/extraction! For a3, use one that has sufficient operating force for inserting and withdrawing the tube 4, has a vertical adjustment function during insertion, and is it desirable to be able to share insertion and withdrawal. It is also possible to use a common insertion and extraction machine.

また、この発明に用いる硬化充填材2としては、−船釣
には低強度のものが好ましいが、低強度或いは強度が高
いものであっても管4の挿入を円滑化するために凝結開
始が遅いことか必要である。
Furthermore, as the hardened filler 2 used in this invention, it is preferable to use one with low strength for boat fishing, but even if it is low strength or high strength, it is necessary to start setting in order to facilitate insertion of the tube 4. Late or necessary.

「発明の効果」 以上の通りこの発明によれば、予め周囲に減摩剤を塗布
した管を、掘削溝内に充填した硬化前の硬化充填材中に
挿入し、この硬化充填材の硬化養生後管を引抜くので、
従来のようにポーリングエや管の支持フレームの設置工
を行うことなく硬化充填材の養生とほぼ同時に低コスト
で鉛直孔の築造が可能で、築造期間を短縮することかで
きると共に、管を埋め残さずに引抜いて再使用が可能で
経済的であり、しかも低強度コンクリートを用いた場合
においても孔壁の損傷等、地下構造物の品質劣化を招来
することなく確実に鉛直孔を築造することかできる。
"Effects of the Invention" As described above, according to the present invention, a pipe whose periphery is coated with an antifriction agent in advance is inserted into a hardened filler filled in an excavated groove, and the hardened filler is cured. Since the rear tube is pulled out,
Vertical holes can be constructed at low cost almost simultaneously with curing of the hardened filler without having to install polling holes or support frames for pipes as in the past, shortening the construction period and making it possible to bury the pipes. To be economical in that it can be pulled out and reused without leaving any residue, and to reliably construct a vertical hole without causing quality deterioration of underground structures such as damage to the hole wall even when using low-strength concrete. I can do it.

また、管の周囲に予め減摩剤を塗布しであるので、挿入
及び引抜き時の抵抗を小さくして容易に挿入及び引抜く
ことか可能となる。
Furthermore, since an anti-friction agent is applied to the circumference of the tube in advance, the resistance during insertion and withdrawal is reduced, making it possible to easily insert and withdraw the tube.

更に、管径の変更により目的に応じて鉛直孔の径を任意
に変更することができ、管の継ぎ足しにより鉛直孔の深
度を自由に調整することかできる。
Furthermore, the diameter of the vertical hole can be arbitrarily changed depending on the purpose by changing the pipe diameter, and the depth of the vertical hole can be freely adjusted by adding pipes.

【図面の簡単な説明】[Brief explanation of the drawing]

第1〜5図はこの発明の施工工程を示す縦断正面図、第
6図はこの発明に用いる管の先端構造を示す部分縦断正
面図である。 l・・掘削溝、2・・硬化充填材、 3・・挿入・引抜き機、4・・管、 鉛直孔。 第6図
1 to 5 are vertical sectional front views showing the construction process of the present invention, and FIG. 6 is a partial vertical sectional front view showing the tip structure of the pipe used in the present invention. 1. Excavation groove, 2. Hardened filler, 3. Insertion/extraction machine, 4. Pipe, vertical hole. Figure 6

Claims (1)

【特許請求の範囲】[Claims] 1)地中連続壁などの掘削溝内にコンクリート、泥水固
化物、低強度コンクリートなどの硬化充填材を充填して
安定液と置替える地中構造物構築工法において、予め周
囲に減摩剤を塗布した管を、掘削溝内に充填した硬化前
の硬化充填材中に挿入し、前記硬化充填材の硬化養生後
、前記管を引抜くことを特徴とする地中構造物における
鉛直孔の築造工法。
1) In an underground structure construction method in which a hardened filler such as concrete, solidified mud, or low-strength concrete is filled into an excavated trench such as an underground continuous wall and replaced with a stabilizing liquid, an anti-friction agent is applied to the surrounding area in advance. Construction of a vertical hole in an underground structure characterized by inserting the coated pipe into a hardened filler before hardening filled in an excavation trench, and pulling out the pipe after the hardened filler hardens and cures. Construction method.
JP19487788A 1988-08-04 1988-08-04 Construction method of vertical hole in underground structure Expired - Fee Related JPH0611995B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19487788A JPH0611995B2 (en) 1988-08-04 1988-08-04 Construction method of vertical hole in underground structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19487788A JPH0611995B2 (en) 1988-08-04 1988-08-04 Construction method of vertical hole in underground structure

Publications (2)

Publication Number Publication Date
JPH0243410A true JPH0243410A (en) 1990-02-14
JPH0611995B2 JPH0611995B2 (en) 1994-02-16

Family

ID=16331800

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19487788A Expired - Fee Related JPH0611995B2 (en) 1988-08-04 1988-08-04 Construction method of vertical hole in underground structure

Country Status (1)

Country Link
JP (1) JPH0611995B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5462400A (en) * 1991-11-21 1995-10-31 United Parcel Service Of America, Inc. Method and apparatus for mechanical loading and unloading
US5538391A (en) * 1991-11-21 1996-07-23 United Parcel Service Of America, Inc. Method and apparatus for mechanized loading and unloading
JP2014015716A (en) * 2012-07-05 2014-01-30 Taisei Corp Construction method for earth retaining wall

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5462400A (en) * 1991-11-21 1995-10-31 United Parcel Service Of America, Inc. Method and apparatus for mechanical loading and unloading
US5538391A (en) * 1991-11-21 1996-07-23 United Parcel Service Of America, Inc. Method and apparatus for mechanized loading and unloading
JP2014015716A (en) * 2012-07-05 2014-01-30 Taisei Corp Construction method for earth retaining wall

Also Published As

Publication number Publication date
JPH0611995B2 (en) 1994-02-16

Similar Documents

Publication Publication Date Title
US3815368A (en) Method for installing concrete anchor piles in situ
JP2000160980A (en) Sardine bone construction method for large cross section tunnel
JPH0243410A (en) Method for building vertical hole on underground structure
JP2008031772A (en) Construction method of precast pile, and cover for use in the construction method
JP4916758B2 (en) Ground improvement method by high-pressure jet agitation
JP2005120622A (en) Construction method of underground structure
JPS622120B2 (en)
KR100523116B1 (en) The steel pipe inserting method making use of the rod for injecting super pressure grout in Jet Grouting Pile
JPH0630898Y2 (en) Vertical hole building pipe for underground structures
JP2005036454A (en) Timbering structure and timbering method for underground cavity
KR100710443B1 (en) Pipe and Compaction Grouting : PCG
JP2006348564A (en) Construction method of foundation pile and foundation consolidation structure of foundation pile
JPS61134425A (en) Method of forming foundation pile
JPS61254716A (en) Setting of in-place concrete pile
JPS6128770B2 (en)
KR200374104Y1 (en) Pipe and Compaction Grouting : PCG
JP2881501B2 (en) Construction method for high strength cast-in-place concrete piles
JPS601451B2 (en) Water stop mountain stop wall construction method using Benoto pile excavator
CN2057457U (en) Improved rotary driller
JPH05287726A (en) Installation method for line for drainage
JPH0416695A (en) Structure of starting and arrival shaft in shield construction method
JP2001132078A (en) Connection method between manhole and pipe body
JPH06240669A (en) Fixing method for steel pipe pile to bedrock
JPS5820823A (en) Pollution-free pile laying work
JPS621048B2 (en)

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees